HomeMy WebLinkAboutCT 02-18; THE BLUFFS; WATER SYSTEM ANALYSIS; 2003-10-15WATER SYSTEM ANALYSIS FOR THE BLUFFS PROJECT IN THE CITY OF CARLSBAD Revised October 15, 2003 Prepared by: Dexter Wilson Engineering, Inc 703 Palomar Airport Road Suite 300 Carlsbad, CA 92009 Job No. 782-001 EXTER WILSON ENGINEERING, INC. DEXTER S. WILSON, P.E. ANDREW M. OVEN, P.E. STEPHEN M. NIELSEN, P.E. MICHAEL J. FILECCIA, P.E. October 15, 2003 782-001 Anastasi Development Company, LLC 4743 Bryce Circle Carlsbad, CA 92008 Attention: Darryl Nyznyk, President Subject: Water System Analysis for The Bluffs Project in the City of Carlsbad Introduction This report provides a water system analysis for The Bluffs project in the City of Carlsbad. This report was originally prepared on March 28, 2003 and submitted for City of Carlsbad review. Comments were received in a memorandum from the City dated September 18, 2003. The comment referring to the water study requested that the water demand design criteria be changed to reflect the currently adopted design standards for the City of Carlsbad. This requires a change from a water demand of 250 gpd/unit to 550 gpd/unit. This change is reflected in this revised report. The Bluffs project is located east of the 1-5 between Chinquapin Avenue and Agua Hedionda Lagoon. The Bluffs project proposes a total of 78 multi-family residential units. Finish grade for building pads within the project range in elevation from a low of 61 feet to the highest building pad which is 85 feet in elevation. 703 PALOMAR AIRPORT ROAD, SUITE 300 • CARLSBAD, CA 920C9 • (760)438-4422 • FAX (760) 438-0173 Darryl Nyznyk October 15, 2003 Purpose of Studv The purpose of this study is to provide a water system analysis based upon the lot layout and street layout ofthe proposed project. This report provides a recommended water distribution system to serve the proposed residential development. Water Svstem Design Criteria The design criteria used in sizing the water distribution system piping for The Bluffs are consistent with the latest adopted design standards of the City of Carlsbad. These criteria include a minimum desirable static pressure of 60 psi and a maximum desirable static pressure of 120 psi. Under Peak Hour Demand conditions, minimum residual pressure at any location must not be less than 40 psi. Under a Maximum Day Demand with Fire Flow, a minimum residual pressure of 20 psi must be maintained at the location of the fire demand. Peaking factors used in analyzing various demand scenarios were 1.65 for average day to maximum day demands, and 2.9 for average day to peak hour demands. Proiected Water Demand The expected water demand for The Bluffs was estimated using water demand criteria from the latest adopted design standards of the City of Carlsbad. These criteria specify an average demand of 550 gallons per day per dwelling unit. Table 1 below presents the projected onsite water demand for the project. DEXTER WILSON ENGINEERING, INC. PAGE 2 Darryl Nyznyk October 15, 2003 TABLE 1 THE BLUFFS PROJECTED WATER DEMAND MLj:^o^miM WmMmMifMr:: •.>, . i >i _v 4., t y,. ,i'4r.^.;i , _ Multi-Family Residential 78 550 gpd/unit 42,900 gpd Fire Flow Requirements The fire flow requirements for The Bluffs are based upon planned use within the project. For multi-family residential units, the fire flow requirement is 3,000 gpm, per the January 2003 draft ofthe Water Master Plan Update for the City of Carlsbad. Water Svstem Computer Model The University of Kentucky KYPIPE program was used to create a computer model of the proposed water system for The Bluffs. This computer program utiUzes the Hazen- WiUiams equation for determining head-loss in pipes; the Hazen-Wilhams "C" value used for all pipes is 120. The hydraulic model for this report includes significant tributary piping and all onsite piping. Because ofthe large size ofthe 255 Zone service system, only a portion ofthis system was included in the modeling effort. The 255 Zone system is fed by two reservoirs, the 1.5 MG Skyline Reservoir and the 1.5 MG Elm Reservoir. The 255 Zone demands were assumed to be split evenly between these reservoirs; external demands were modeled in the system based upon this assumption. The Bluffs is the only project included in the computer model since it is served primarily by the Skyline Reservoir. The Skyhne Reservoir was modeled as a fixed grade node with a hydrauhc grade Hne of 255 feet. DEXTER WILSON ENGINEERING, INC. PAGE 3 Darryl Nyznyk October 15, 2003 Existing Water Svstem The Bluffs project will connect to the 255 Zone water system. This pressure zone is served by two reservoirs, the 1.5 MG Skyline Reservoir and the 1.5 MG Elm Reservoir. Under normal conditions, however, the contribution of the Elm Reservoir to onsite flows will be insignificant. The 16-inch transmission main in Hillside Drive and Chinquapin Avenue accommodates the bulk ofthe project demand. Additional capacity is provided by the loop consisting of a 10-inch line in Adams Street and a 12-inch line in Park Drive. The Bluffs project is surrounded by an existing water system loop. This loop consists ofa 10-inch main in Adams Street, a 12-inch main in Chinquapin Avenue, and a 6-inch and 8-inch main in Harrison Street. Because ofthe fire flow requirement for multi- family residential development of3,000 gpm, is it prudent to upsize the existing 6-inch main in Harrison to 8-inch diameter. Appendix A presents a fire flow analysis at the existing fire hydrant on Harrison Street at the northwest corner of The Bluffs project. Residual pressure at this location under fire flow conditions is 55 psi with the replacement 8-inch water line. There is also an existing 6-inch water line in Locust Street which will be removed as part of The Bluffs project. This existing water main will be replaced with the recommended water system configuration internal to The Bluffs project. The Bluffs project will connect to the existing water system at three points. A new connection will be made to the 12-inch water main in Chinquapin Avenue. The other project connection points are the intersections of Locust Avenue and Harrison Street and the intersection of Locust Avenue and Adams Street. The 6-inch pipe in Harrison Street must be upgraded to 8-inch pipe to provide required fire flow at the proposed fire hydrant between Chinquapin Avenue and Locust Street. All onsite piping is recommended to be 8-inch. DEXTER WILSON ENGINEERING, INC. PAGE 4 Darryl Nyznyk October 15, 2003 Exhibit A presents a map of the water system in the vicinity of The Bluffs project and shows which facilities are existing and which facilities will be constructed by the proposed development. Water Svstem Analvsis and Results The computer analyses performed are presented in Appendix A of this report. The results show that minimum residual pressures throughout the project are satisfied under all flow scenarios based upon the recommended layout ofthe water system as shown in Exhibit A. System Pressures. Static water service pressures for project finished floors will range between 74 psi and 84 psi when the reservoir level is 255 feet. When the reservoir is filled to its high water line of 263 feet, however, project pressures will range from 77 psi to 88 psi. Building service pressure regulators are recommended for all buildings in the project with service connections below 70.5 feet elevation. These pressure regulators serve to maintain building service pressures below 80 psi in accordance with the Uniform Plumbing Code. Maintaining residual system pressure under the high system demand posed by fire flow conditions is not a concern. The computer analyses show that residual pressures remain above 53 psi in all modeled fire flow conditions. Recommendations The following recommendations and conclusions are made based on the water system analyses performed for The Bluffs project. 1. The project will be served by the 255 Zone system, with flow primarily coming from the transmission main extending from the Skyhne Reservoir through DEXTER WILSON ENGINEERING. INC. ' p^Q^ 5 Darryl Nyznyk October 15, 2003 Hillside Drive and Chinquapin Avenue. Exhibit A presents the recommended water system layout. All onsite piping is recommended to be 8-inch. 2. Maximum static pressures within The Bluffs project will range between 77 psi and 88 psi based on the Skyline Reservoir high water line of 263 feet. 3. The existing section of 6-inch pipe in Harrison Street from Chinquapin Avenue to Locust Street is to be replaced with an 8-inch pipe. 4. The existing 6-inch water main in Locust Street will be removed and replaced with the water lines recommended within The Bluffs project. The replacement of this existing 6-inch line with an 8-inch line will extend beyond the project boundaries to Harrison Street on the west and Adams Street on the east. 5. All new water lines recommended for The Bluffs project must be designed to meet AWWA C900 Class 150 for PVC pipe. 6. Building service pressure regulators are recommended for all buildings in the project with service connections below 70.5 feet elevation. This will maintain building service pressures below 80 psi in accordance with the Uniform Plumbing Code. Thank you for the opportunity to prepare this report. Ifyou have any questions on the enclosed information, please do not hesitate to call. Dexter Wilson Engineering, Inc. Andrew Oven AO:ndg cc: George O'Day, O'Day Consultants, Inc. DEXTER WILSON ENGINEERING, INC. PAGE 6 APPENDIXA COMPUTER RUNS 255 Zone System Analysis NODE AND PIPE DIAGRAM REFERENCE: Exhibit A at the back of the report. CONDITIONS MODELED: 1. Average Day demands. 2. Peak Hour Demands. 3. Maximum Day Demands plus 3,000 gpm Fire Flow evenly split between Nodes 104 and 106. 4. Maximum Day Demands plus 8,000 gpm Fire Flow evenly split between Nodes 108 and 110. 5. Maximum Day Demands plus 3,000 gpm Fire Flow evenly split between Nodes 35 and 110. A-l Water System Analysis for The Bluffs Project in the City of Carlsbad Appendix A Job No. 782-001 October 14, 2003 FLOWRATE IS EXPRESSED IN GPM AND PRESSURE IN PSIG A SUMMARY OF THE ORIGINAL DATA FOLLOWS PIPE NO. NODE NOS. LENGTH DIAMETER ROUGHNESS MINOR LOS (FEET) (INCHES) 1 0 2 750.0 16.0 120.0 .00 3 2 4 960.0 16.0 120.0 .00 5 4 6 560.0 16.0 120.0 .00 7 6 8 550.0 12.0 120.0 .00 9 8 10 180.0 12.0 120.0 .00 11 10 12 390.0 12.0 120.0 .00 13 12 14 860.0 10.0 120.0 .00 15 14 16 970.0 10.0 120.0 .00 17 16 18 1370.0 10.0 120.0 .00 19 18 20 650.0 10.0 120.0 .00 21 20 22 70.0 10.0 120.0 .00 23 22 24 180.0 10.0 120.0 .00 25 24 26 130.0 10.0 120.0 .00 27 26 28 400.0 10.0 120.0 .00 29 28 30 420.0 10.0 120.0 .00 31 30 32 590.0 8.0 120.0 .00 33 32 34 430.0 6.0 120.0 .00 35 34 35 250.0 8.0 120.0 .00 36 35 36 260.0 8.0 120.0 . 00 37 20 36 930.0 8.0 120.0 .00 39 34 100 320.0 12.0 120.0 .00 41 28 100 270.0 12.0 120.0 .00 43 6 28 2750.0 16.0 120.0 .00 101 100 102 240.0 8.0 120.0 .00 103 102 104 20.0 8.0 120.0 .00 105 102 106 130.0 8.0 120.0 . 00 107 104 108 90.0 8.0 120.0 .00 109 108 110 110.0 8.0 120.0 .00 111 110 112 80.0 8.0 120.0 .00 113 112 114 110.0 8.0 120.0 .00 115 36 112 50.0 8.0 120.0 .00 117 24 104 90.0 8.0 120.0 .00 119 108 110 100.0 8.0 120.0 .00 255.00 A-2 Water System Analysis for The Bluffs Project in the City of Carlsbad Appendix A Job No. 782-001 October 14, 2003 ON NUMBER DEMAND ELEVATION CONNECTING PIPES 2 160.00 .00 1 3 4 8.02 .00 3 5 6 .00 .00 5 7 43 8 2.29 .00 7 9 10 3.82 .00 9 11 12 9.55 .00 11 13 14 1. 91 .00 13 15 16 1.53 .00 15 17 18 4. 97 .00 17 19 20 1.15 68.00 19 21 37 22 5.35 70.00 21 23 24 .00 78.00 23 25 117 26 4.20 81.00 25 27 28 8.13 85.00 27 29 41 30 63.50 88.00 29 31 32 14 . 60 72.00 31 33 34 668.00 72.00 33 35 39 35 .00 68.00 35 36 36 4.76 64.00 36 37 115 100 3.00 77.00 39 41 101 102 2.60 74.00 101 103 105 104 3.80 75.00 103 107 117 106 3.40 72.00 105 108 4.20 72.00 107 109 119 110 4.90 70.00 109 111 119 112 1.10 71.00 111 113 115 114 6.80 73.00 113 SELECTION: ALL RESULTS ARE OUTPUT EACH PERIOD 43 3 VALUES ARE OUTPUT FOR MAXIMUM AND MINIMUM PRESSURES THIS SYSTEM HAS 33 PIPES WITH 27 JUNCTIONS , 6 LOOPS AND 1 FGNS THE RESULTS ARE OBTAINED AFTER 7 TRIALS WITH AN ACCURACY = .00010 A-3 Water System Analysis for The Bluffs Project in the City of Carlsbad Appendix A Job No. 782-001 October 14, 2003 The Bluffs Project Water System Analysis Average Day Demands, All Pipes Open PIPE NO. NODE NOS. FLOWRATE HEAD LOSS PUMP HEAD MINOR LOSS VELOCITY HL/100 1 0 2 991.58 .53 .00 . 00 1.58 .71 3 2 4 831.58 .49 .00 .00 1.33 .51 5 4 6 823.56 .28 .00 .00 1.31 .51 7 6 8 169.00 .06 .00 .00 .48 .11 9 8 10 166.71 .02 .00 .00 .47 .11 11 10 12 162.89 .04 .00 .00 .46 . 10 13 12 14 153.34 .19 .00 .00 . 63 .22 15 14 16 151.43 .21 .00 .00 . 62 .22 17 16 18 149.90 .29 .00 .00 . 61 .21 19 18 20 144.93 .13 .00 .00 .59 .20 21 20 22 78.33 .00 .00 .00 .32 .06 23 22 24 72.98 .01 .00 .00 .30 .06 25 24 26 -90.23 -.01 .00 .00 -.37 -.08 27 26 28 -94.43 -.04 .00 .00 -.39 -.09 29 28 30 139.57 . 08 . 00 .00 .57 .19 31 30 32 76.07 .11 .00 .00 .49 . 18 33 32 34 61.47 .21 .00 .00 .70 .49 35 34 35 -127.00 -.12 .00 .00 -.81 -.46 36 35 36 -127.00 -.12 .00 .00 -.81 -.46 37 20 36 65.45 .13 .00 .00 .42 . 14 39 34 100 -479.54 -.24 .00 .00 -1.36 -.75 41 28 100 412.43 . 15 .00 .00 1.17 .57 43 6 28 654.56 . 91 .00 .00 1.04 .33 101 100 102 -70.10 -.04 . 00 .00 -.45 -.15 103 102 104 -76.10 .00 .00 .00 -.49 -.18 105 102 106 3.40 .00 .00 .00 .02 .00 107 104 108 83.30 .02 .00 . 00 .53 .21 109 108 110 38.53 .01 .00 .00 .25 .05 111 110 112 74.20 .01 .00 .00 .47 . 17 113 112 114 6.80 .00 .00 .00 .04 .00 115 36 112 -66.30 -.01 .00 .00 -.42 -.14 117 24 104 163.21 .07 .00 .00 1.04 .74 119 108 110 40.57 .01 .00 .00 .26 .06 A-4 Water System Analysis for The Bluffs Project in the City of Carlsbad Appendix A Job No. 782-001 October 14, 2003 JUNCTION NUMBER DEMAND GRADE LINE ELEVATION PRESSURE 2 160.00 254.47 4 8.02 253.97 6 .00 253.69 8 2.29 253.63 10 3.82 253.61 12 9.55 253.57 14 1. 91 253.38 16 1.53 253.17 18 4.97 252.88 20 1.15 252.75 68.00 80.06 22 5.35 252.74 70.00 79.19 24 .00 252.73 78.00 75.72 26 4.20 252.74 81.00 74.42 28 8.13 252.78 85.00 72.70 30 63.50 252.70 88.00 71.37 32 14.60 252.59 72.00 78.26 34 668.00 252.38 72.00 78.17 35 .00 252.50 68.00 79.95 36 4.76 252.62 64.00 81.74 100 3.00 252.62 77.00 76.10 102 2. 60 252.66 74.00 77.42 104 3.80 252.67 75.00 76. 99 106 3.40 252.66 72.00 78.29 108 4.20 252.65 72.00 78.28 110 4.90 252.64 70.00 79.14 112 1.10 252.63 71.00 78.70 114 6.80 252.63 73.00 77.84 MAXIMUM PRESSURES 36 4.76 252.62 64 .00 81.74 20 1.15 252.75 68.00 80. 06 35 .00 252.50 68.00 79. 95 MINIMUM PRESSURES 30 63.50 252.70 88.00 71.37 28 8.13 252.78 85.00 72. 70 26 4.20 252.74 81.00 74.42 THE NET SYSTEM DEMAND = 991.58 SUMMARY OF INFLOWS(+) AND OUTFLOWS(-) FROM FIXED GRADE NODES PIPE NUMBER 1 FLOWRATE 991.58 THE NET FLOW INTO THE SYSTEM FROM FIXED GRADE NODES 991.58 A-5 Water System Analysis for The Bluffs Project in the City of Carlsbad Appendix A Job No. 782-001 October 14, 2003 THE NET FLOW OUT OF THE SYSTEM INTO FIXED GRADE NODES = 00 A SUMMARY OF CONDITIONS SPECIFIED FOR THE NEXT SIMULATION FOLLOWS THE DEMANDS ARE CHANGED FROM ORIGINAL VALUES BY A FACTOR = 2.90 THE RESULTS ARE OBTAINED AFTER 2 TRIALS WITH AN ACCURACY = .00000 Peak Hour Demands PIPE NO. NODE NOS. 10 2 3 2 4 5 4 6 7 6 8 9 8 10 11 10 12 13 12 14 15 14 16 17 16 18 19 18 20 21 20 22 23 22 24 25 24 26 27 26 28 29 28 30 31 30 32 33 32 34 35 34 35 36 35 36 37 20 36 39 34 100 41 28 100 43 6 28 101 100 102 103 102 104 105 102 106 107 104 108 FLOWRATE 2875.58 2411.58 2388.32 490.11 483.47 472.39 444.69 439.15 434.72 420.30 227.15 211.63 -261.67 -273.85 404.74 220.59 178.25 -368.29 -368.29 189.82 -1390.65 1196.05 1898.22 -203.30 -220.70 9.86 241.58 HEAD LOSS 3.84 3.55 2.03 .43 .14 .29 1.37 1.51 2.09 . 93 .03 .07 -.08 -.26 .56 .76 1.52 -.83 -.87 .91 •1.73 1.11 6.53 -.27 -.03 .00 .14 PUMP HEAD .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 . 00 .00 MINOR LOSS .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 VELOCITY 4.59 85 81 39 37 34 82 79 78 72 93 86 07 12 65 41 02 35 35 21 94 39 03 30 41 06 54 HL/1000 5.12 3.70 3. 63 .79 .77 .73 59 ,56 ,53 44 46 ,40 ,60 , 65 ,34 ,29 53 33 1 1 3 -3 -3.33 .98 -5 4 , 2, -1. 42 10 37 11 -1.29 .00 1.53 A-6 Water System Analysis for The Bluffs Project in the City of Carlsbad Appendix A Job No. 782-001 October 14, 2003 109 108 110 111.75 .04 .00 .00 .71 .37 111 110 112 215.19 .10 .00 .00 1.37 1.23 113 112 114 19.72 .00 .00 .00 .13 .01 115 36 112 -192.28 -.05 .00 .00 -1.23 -1.00 117 24 104 473.30 .48 .00 .00 3.02 5.30 119 108 110 117.65 .04 .00 .00 .75 .40 JUNCTION NUMBER DEMAND GRADE LINE ELEVATION PRESSURE 2 464.00 251.16 4 23.26 247.61 6 .00 245.57 8 6.64 245.14 10 11.08 245.00 12 27.69 244.72 14 5.54 243.35 16 4.44 241.84 18 14.41 239.74 20 3.33 238.81 68.00 74.02 22 15.52 238.78 70.00 73.14 24 .00 238.70 78.00 69. 64 26 12.18 238.78 81.00 68.37 28 23.58 239.04 85.00 66.75 30 184.15 238.48 88.00 65.21 32 42.34 237.72 72.00 71.81 34 1937.20 236.20 72.00 71.15 35 .00 237.04 68.00 73.25 36 13.80 237.90 64.00 75.36 100 8.70 237.94 77.00 69.74 102 7.54 238.20 74.00 71.15 104 11.02 238 .23 75.00 70.73 106 9.86 238.20 72.00 72.02 108 12.18 238.09 72.00 71.97 110 14.21 238.05 70.00 72.82 112 3.19 237.95 71.00 72.35 114 19.72 237.95 73.00 71.48 MAXIMUM PRESSURES 36 13.80 237.90 64.00 75.36 20 3.33 238.81 68.00 74 . 02 35 .00 237.04 68.00 73.25 MINIMUM PRESSURES 30 184.15 238.48 88.00 65.21 28 23.58 239.04 85.00 66.75 26 12.18 238.78 81.00 68.37 A-7 Water System Analysis for The Bluffs Project in the City of Carlsbad Appendix A Job No. 782-001 October 14, 2003 THE NET SYSTEM DEMAND = 2875.58 SUMMARY OF INFLOWS(+) AND OUTFLOWS(-) FROM FIXED GRADE NODES PIPE NUMBER FLOWRATE 1 2875.58 THE NET FLOW INTO THE SYSTEM FROM FIXED GRADE NODES = 2875.58 THE NET FLOW OUT OF THE SYSTEM INTO FIXED GRADE NODES = .00 A SUMMARY OF CONDITIONS SPECIFIED FOR THE NEXT SIMULATION FOLLOWS THE DEMANDS ARE CHANGED FROM ORIGINAL VALUES BY A FACTOR = 1.65 THE FOLLOWING SPECIFIC DEMAND CHANGES ARE MADE : JUNCTION NUMBER DEMAND 106 1505.60 104 1505.30 THE RESULTS ARE OBTAINED AFTER 4 TRIALS WITH AN ACCURACY = .00216 Maximum Day Demands IS 3,000 GPM Fire Flow split evenly between Nodes 104 and 106 PE NO. NODE NOS. FLOWRATE HEAD LOSS PUMP HEAD MINOR LOSS VELOCITY HL/1000 1 0 2 4635.13 9.30 .00 .00 7.40 12.41 3 2 4 4371.13 10.68 .00 .00 6. 97 11.13 5 4 6 4357.89 6.20 .00 . 00 6. 95 11.07 7 6 8 884.20 1.29 .00 .00 2.51 2.34 9 8 10 880.42 .42 .00 . 00 2.50 2.32 11 10 12 874.12 .89 .00 .00 2.48 2.29 13 12 14 858.36 4 . 63 .00 .00 3.51 5.39 15 14 16 855.21 5.19 .00 .00 3.49 5.35 17 16 18 852.69 7.29 .00 .00 3.48 5.32 19 18 20 844.48 3.40 .00 .00 3.45 5.23 21 20 22 519.38 . 15 .00 .00 2.12 2.12 23 22 24 510.55 .37 .00 .00 2. 09 2.06 A-i Water System Analysis for The Bluffs Project in the City of Carlsbad Appendix A Job No. 782-001 October 14, 2003 25 24 26 -972.13 -.88 .00 .00 -3. 97 -6 78 27 26 28 -979.06 -2.75 .00 .00 -4. 00 -6 .87 29 28 30 375.94 .49 .00 .00 1. 54 1 .17 31 30 32 271.17 1.11 .00 .00 1. 73 1 .89 33 32 34 247.08 2.78 .00 .00 2. 80 6 .46 35 34 35 300.13 .57 .00 .00 1. 92 2 .28 36 35 36 300.13 .59 .00 .00 1. 92 2 .28 37 20 36 323.21 2.43 .00 .00 2. 06 2 . 62 39 34 100 -1155.26 -1.23 .00 .00 -3. 28 -3 .84 41 28 100 2105.28 3.15 .00 .00 5. 97 11 . 68 43 6 28 3473.69 20.00 .00 .00 5. 54 7 .27 101 100 102 945.08 4.58 .00 .00 6. 03 19 .08 103 102 104 -564.81 -.15 .00 .00 -3. 60 -7 .36 105 102 106 1505.60 5.88 .00 .00 9. 61 45 .21 107 104 108 -587.44 -.71 .00 .00 -3. 75 -7 .91 109 108 110 -289.54 -.23 .00 .00 -1. 85 -2 . 13 111 110 112 -602.45 -.66 .00 .00 -3. 85 -8 .29 113 112 114 11.22 .00 .00 .00 . 07 .01 115 36 112 615.49 .43 .00 .00 3. 93 8 .62 117 24 104 1482.68 3.95 .00 .00 9. 46 43 .94 119 108 110 -304.83 -.23 .00 .00 -1. 95 -2 .35 JUNCTION NUMBER DEMAND GRADE LINE ELEVATION PRESSURE 2 264.00 245.70 4 13.23 235.01 6 .00 228.82 8 3.78 227.53 10 6.30 227.11 12 15.76 226.22 14 3.15 221.58 16 2.52 216.39 18 8.20 209.11 20 1.90 205.71 68.00 59. 67 22 8.83 205.56 70.00 58. 74 24 .00 205.19 78.00 55. 12 26 6. 93 206.07 81.00 54. 20 28 13.41 208.82 85.00 53. 66 30 104.78 208.33 88.00 52. 14 32 24.09 207.21 72.00 58. 59 34 1102.20 204.44 72.00 57. 39 35 .00 203.87 68.00 58. 88 36 7.85 203.28 64.00 60. 35 100 4. 95 205.67 77. 00 55. 76 102 4.29 201.09 74.00 55. 07 104 1505.30 201.24 75. 00 54. 70 106 1505.60 195.21 72.00 53. 39 A-9 Water System Analysis for The Bluffs Project in the City of Carlsbad Appendix A Job No. 782-001 October 14, 2003 108 110 112 114 6. 93 8.09 1.82 11.22 201.95 202.18 202.84 202.84 72.00 70.00 71.00 73.00 56.31 57.28 57.13 56.27 36 20 35 MAXIMUM PRESSURES 7.85 203.28 1.90 205.71 .00 203.87 64.00 68.00 68.00 60.35 59.67 58.88 30 106 28 MINIMUM PRESSURES 104.78 208.33 1505.60 195.21 13.41 208.82 88.00 72.00 85.00 52.14 53.39 53.66 THE NET SYSTEM DEMAND = 4635.13 SUMMARY OF INFLOWS(+) AND OUTFLOWS(-) FROM FIXED GRADE NODES PIPE NUMBER 1 FLOWRATE 4635.13 THE NET FLOW INTO THE SYSTEM FROM FIXED GRADE NODES = THE NET FLOW OUT OF THE SYSTEM INTO FIXED GRADE NODES 4635.13 ,00 A SUMMARY OF CONDITIONS SPECIFIED FOR THE NEXT SIMULATION FOLLOWS THE DEMANDS ARE CHANGED FROM ORIGINAL VALUES BY A FACTOR = 1.65 THE FOLLOWING SPECIFIC DEMAND CHANGES ARE MADE : JUNCTION NUMBER DEMAND 110 1508.10 108 1506.90 THE RESULTS ARE OBTAINED AFTER 2 TRIALS WITH AN ACCURACY = .00451 A-10 Water System Analysis for The Bluffs Project in the City of Carlsbad Appendix A Job No. 782-001 October 14, 2003 Maximum Day Demands Plus 3,000 GPM Fire Flow split evenly between Nodes 108 and 110 PIPE NO. 1 3 5 7 9 11 13 15 17 19 21 23 25 27 29 31 33 35 36 37 39 41 43 101 103 105 107 109 111 113 115 117 119 NODE 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 35 20 34 28 6 100 102 102 104 108 110 112 36 24 108 NOS. 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 35 36 36 100 100 28 102 104 106 108 110 112 114 112 104 110 FLOWRATE 4636.09 4372.09 4358.86 884.15 880.37 874.07 858.31 855.16 852.64 844.44 312.33 303.50 -922.66 -929.59 397.09 292.31 268.22 594.87 594.87 530.21 -1428.85 2134.62 3474.71 700.82 690.92 5. 61 1910.81 196.76 -1104.19 11.22 1117.22 1226.16 207.15 HEAD LOSS 9.31 10. 69 6.20 1.29 .42 .89 ,63 ,19 ,29 ,40 .06 .14 -.80 -2.50 .54 1.28 3.23 4. 5. 7, 3, 2, 2. 6, 02 11 08 -1.82 3.23 20.01 2. 63 .21 .00 6.33 .11 -2.04 .00 30 78 11 PUMP HEAD .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 MINOR LOSS VELOCITY HL/1000 .00 7.40 12.41 .00 6.98 11.13 .00 6. 95 11.07 .00 2.51 2.34 .00 2.50 2.32 .00 2.48 2.29 .00 3.51 5.39 .00 3.49 5.35 .00 3.48 5.32 .00 3.45 5.23 .00 1.28 .83 .00 1.24 .79 .00 -3.77 -6.16 .00 -3.80 -6.24 .00 1. 62 1.29 .00 1.87 2.17 .00 3.04 7.52 .00 3.80 8.10 .00 3.80 8.10 .00 3.38 6.54 .00 -4.05 -5.70 .00 6.06 11.98 .00 5.54 7.28 .00 4.47 10. 97 .00 4.41 10. 68 .00 .04 .00 .00 12.20 70.29 .00 1.26 1.04 .00 -7.05 -25.46 .00 .07 .01 .00 7.13 26.02 .00 7.83 30. 91 .00 1.32 1.15 JUNCTION NUMBER 2 4 6 8 10 DEMAND 264.00 13.23 .00 3.78 6.30 GRADE LINE 245.69 235.00 228.81 227.52 227.10 ELEVATION PRESSURE A-ll Water System Analysis for The Bluffs Project in the City of Carlsbad Appendix A Job No. 782-001 October 14, 2003 12 15.76 226.21 14 3.15 221.57 16 2.52 216.39 18 8.20 209.10 20 1.90 205.70 68.00 59. 67 22 8.83 205.64 70.00 58.78 24 .00 205.50 78.00 55.25 26 6.93 206.30 81.00 54.30 28 13.41 208.80 85.00 53.65 30 104.78 208.26 88.00 52.11 32 24.09 206.97 72.00 58.49 34 1102.20 203.74 72.00 57.09 35 .00 201.72 68.00 57.94 36 7.85 199.61 64.00 58.77 100 4.95 205.56 77.00 55.71 102 4.29 202.93 74.00 55.87 104 6.27 202.72 75.00 55.35 106 5. 61 202.93 72.00 56.74 108 1506.90 196.39 72.00 53. 90 110 1508.10 196.28 70.00 54.72 112 1.82 198.31 71.00 55.17 114 11.22 198.31 73.00 54.30 MAXIMUM PRESSURES 20 1.90 205.70 68.00 59.67 22 8.83 205.64 70.00 58.78 36 7.85 199.61 64.00 58.77 MINIMUM PRESSURES 30 104.78 208.26 88.00 52.11 28 13. 41 208.80 85.00 53.65 108 1506.90 196.39 72.00 53. 90 THE NET SYSTEM DEMAND = 4 636.09 SUMMARY OF INFLOWS(+) AND OUTFLOWS(-) FROM FIXED GRADE NODES PIPE NUMBER 1 FLOWRATE 4636.09 THE NET FLOW INTO THE SYSTEM FROM FIXED GRADE NODES = 4 636.09 THE NET FLOW OUT OF THE SYSTEM INTO FIXED GRADE NODES = .00 A SUMMARY OF CONDITIONS SPECIFIED FOR THE NEXT SIMULATION FOLLOWS A-12 Water System Analysis for The Bluffs Project in the City of Carlsbad Appendix A Job No. 782-001 October 14, 2003 THE DEMANDS ARE CHANGED FROM ORIGINAL VALUES BY A FACTOR = 1. 65 THE FOLLOWING SPECIFIC DEMAND CHANGES ARE MADE JUNCTION NUMBER DEMAND 110 1508.10 35 1500.00 THE RESULTS ARE OBTAINED AFTER 3 TRIALS WITH AN ACCURACY = .00064 Maximum Day Demands Plus 3,000 GPM Fire Flow split evenly between Nodes 35 and 110 PIPE NO NODE NOS. FLOWRATE HEAD LOSS PUMP HEAD MINOR LOSS VELOCITY HL/1000 1 0 2 4636.12 9.31 .00 .00 7.40 12.41 3 2 4 4372.12 10.69 .00 .00 6. 98 11.13 5 4 6 4358.89 6.20 .00 .00 6. 96 11.07 7 6 8 873.64 1.26 .00 .00 2.48 2.29 9 8 10 869.86 .41 .00 .00 2.47 2.27 11 10 12 863.56 .87 .00 .00 2.45 2.24 13 12 14 847.80 4.53 .00 .00 3.46 5.26 15 14 16 844.65 5.07 .00 .00 3.45 5.23 17 16 18 842.12 7.12 .00 .00 3.44 5.20 19 18 20 833.92 3.32 .00 .00 3.41 5.11 21 20 22 246.79 .04 .00 .00 1.01 .54 23 22 24 237.96 .09 .00 .00 .97 .50 25 24 26 -809.28 -.63 .00 .00 -3.31 -4.83 27 26 28 -816.21 -1.96 . 00 .00 -3.33 -4 . 91 29 28 30 431.23 . 63 .00 .00 1.76 1.51 31 30 32 326.46 1.57 .00 .00 2. 08 2.66 33 32 34 302.37 4.04 .00 .00 3.43 9.39 35 34 35 984.30 5.14 .00 .00 6.28 20.58 36 35 36 -515.70 -1.62 .00 .00 -3.29 -6.21 37 20 36 585.24 7.31 .00 .00 3.74 7.86 39 34 100 -1784.13 -2.75 .00 .00 -5.06 -8.59 41 28 100 2224.40 3.49 .00 .00 6.31 12.93 43 6 28 3485.25 20.12 .00 .00 5.56 7.32 101 100 102 435.31 1.09 .00 .00 2. 78 4.54 103 102 104 425.41 .09 . 00 .00 2.72 4.35 105 102 106 5. 61 .00 .00 .00 .04 .00 A-13 Water System Analysis for The Bluffs Project in the City of Carlsbad Appendix A Job No. 782-001 October 14, 2003 107 104 108 1466.38 3.87 .00 .00 9.36 43.05 109 108 110 710.95 1.24 .00 .00 4.54 11.26 111 110 112 -48.65 -.01 .00 .00 -.31 -.08 113 112 114 11.22 .00 .00 .00 .07 .01 115 36 112 61.69 .01 .00 .00 .39 .12 117 24 104 1047.23 2.08 .00 .00 6. 68 23.08 119 108 110 748.50 1.24 .00 .00 4.78 12.39 JUNCTION NUMBER DEMAND GRADE LINE ELEVATION PRESSURE 2 264.00 245.69 4 13.23 235.00 6 .00 228.80 8 3.78 227.55 10 6.30 227.14 12 15.76 226.26 14 3.15 221.74 16 2.52 216.66 18 8.20 209.54 20 1. 90 206.22 68.00 59.90 22 8.83 206.19 70.00 59.01 24 .00 206.10 78.00 55.51 26 6.93 206.72 81.00 54.48 28 13.41 208.69 85.00 53.60 30 104.78 208.05 88.00 52.02 32 24.09 206.48 72.00 58.28 34 1102.20 202.45 72.00 56.53 35 1500.00 197.30 68.00 56.03 36 7.85 198.92 64.00 58.46 100 4. 95 205.20 77.00 55.55 102 4.29 204.11 74.00 56.38 104 6.27 204.02 75.00 55. 91 106 5.61 204.11 72.00 57.25 108 6.93 200.14 72.00 55.53 110 1508.10 198.91 70.00 55.86 112 1.82 198.91 71.00 55.43 114 11.22 198.91 73.00 54.56 MAXIMUM PRESSURES 20 1.90 206.22 68.00 59.90 22 8.83 206.19 70.00 59.01 36 7.85 198.92 64.00 58.46 MINIMUM PRESSURES 30 104.78 208.05 88.00 52.02 28 13.41 208.69 85.00 53. 60 26 6. 93 206.72 81.00 54.48 A-14 Water System Analysis for The Bluffs Project in the City of Carlsbad Appendix A Job No. 782-001 October 14, 2003 THE NET SYSTEM DEMAND = 4636.12 SUMMARY OF INFLOWS(+) AND OUTFLOWS(-) FROM FIXED GRADE NODES PIPE NUMBER FLOWRATE 1 4636.12 THE NET FLOW INTO THE SYSTEM FROM FIXED GRADE NODES = 4636.12 THE NET FLOW OUT OF THE SYSTEM INTO FIXED GRADE NODES = .00 A-15 EXHIBIT A THE BLUFFS NODE AND PIPE DIAGRAM CS1\\FS\DWG\782001\EXHIBIT A.dwg 03-27-03 10:2