SEWER STUDY
for
LA COSTA GREENS
VILLAGE 1.9
City of Carlsbad
Prepared for
Morrow Development
1903 Wright Place
Suite 180
Carlsbad, CA 92008
w.o. 2352-68
September 22, 2003
DAVE HAMMAR
LEX WILLIMAN
ALISA VIALPANDO
10179 Huennekens St.
San Diego, CA 92121
(858) 558-4500 PH
(858)558-1414 FX
www.HunsakerSD.com
lnfo®HunsakerSD.com
Hunsaker & Associates
San Diego, Inc.
R^yrriond L. Martin, R.C.E.
Project Manager
o
11
SJ:kc mswordMi:\reports\2362\068\sewer snj(iy\a01 .doc
wo 2352-68 12/24/2003 7:53 AM 12/24/03 CL
La Costa Greens Village 1.9
Sewer Study
TABLE OF CONTENTS
SECTION
Design Criteria I
Sewer Study Sunnmary II
Sewer Study Map III
SJ:kc msword\h:\reports\2352\068\sewer study\a01 .doc
wo 2352-68 12/24/2003 7:37 AM 12/24/03
La Costa Greens Village 1.9
Sewer Study
Design Criteria
Dwelling Units 71
Demand 220 gal/cap/day
Peak Factor 2.5
Maximum Depth 0.50 diameter
Roughness, n 0.011 for PVC
Sample Calculation
Peak Flow = Dwelling Units x Demand x Peak Factor
Peal Flow = 71 units x 220 gal/unit day x 2.5
Peak Flow = 39050 gal/day
Peak Flow = 0.0602 cfs
SJ:l<c msword\h:\repocts\2352\068\sevrer study\a01 .doc
wo 2352-68 12/24C003 7:37 AM 12/24/03
La Costa Greens Village 1.9
Sewer Study
Results
FOR: La Costa Greens. Villaae 1.9
W.O. 2352-0068
BY: Steve Jerrick
SEWER STUDY SUMIVIARY
DATE 9/20/2003
REFER TO PLAN
SHEET:
LINE FRO
M TO POPULATIO
N PER D.U.
IN-
LINE
D.U.'
s
POPULATION
SERVED
PEAK
/AVC.
RATI
0
PEAK DESIGN
FLOW
LINE
SIZE
(INCHE
S)
DESIG
N
SLOPE (%)
dn
(FEET
)
dn/D
VELOCI
TY
(F.p.s.)
COMMENTS LINE FRO
M TO POPULATIO
N PER D.U.
IN-
LINE
D.U.'
s IN-LINE TOTAL
PEAK
/AVC.
RATI
0 M.G.D. C.F.S.
LINE
SIZE
(INCHE
S)
DESIG
N
SLOPE (%)
dn
(FEET
)
dn/D
VELOCI
TY
(F.p.s.)
COMMENTS
1 3 2 2.75 4 11 11 2.5 0.002 0.003 8 3.11 0.02 0.03 1.11 **
2 2 1 2.75 6 16.5 27.5 2.5 0.006 0.009 8 8.7 0.03 0.04 1.82 **
•
3 1 ex 2.75 4 11 66 2.5 0.013 0.020 8 6.72 0.04 0.06 2.39 **
4 5 4 2.75 5 13.75 13.75 2.5 0.003 0.004 8 2 0.03 0.04 0.91 **
5 4 1 2.75 5 13.75 27.5 2.5 0.006 0.009 8 2 0.03 0.05 1.30 **
6 5 6 2.75 5 13.75 13.75 2.5 0.003 0.004 8 2 0.03 0.04 0.91 **
7 6 7 2.75 5 13.75 27.5 2.5 0.006 0.009 8 2 0.03 0.05 1.30 **
8 7 8 2.75 5 13.75 71.5 2.5 0.014 0.022 8 5.63 0.04 0.06 2.59 **
9 8 9 2.75 9 24.75 96.25 2.5 0.019 0.030 8 1.95 0.06 0.09 1.91 *
10 9 10 2.75 9 24.75 121 2.5 0.024 0.037 8 5.72 0.05 0.08 2.87 **
11 10 ex 2.75 3 8.25 129.25 2.5 0.026 0.040 8 2 0.07 0.10 2.20 **
12 11 7 2.75 11 30.25 30.25 2.5 0.006 0.009 8 2.57 0.03 0.05 1.43 **
Velocities are slightly less than 2 FPS where slopes are less than 2% due to the following conditions:
1. Existing access hole elevation; and,
2. Maintain current street slope and minimum depth of sewer main on adjacent proposed streets in order to keep proper vertical
clearances.
Velocities are slightly less than 2 FPS, however, minimum slope of 2% maintained.
SJ:fcc mswaid\h:\repoits\2352\06S\sewer studyVad .doc
wo 2352-88 12/24/2003 7:37 AM 12124/03