Loading...
HomeMy WebLinkAboutCT 02-22; VILLAGES OF LA COSTA GREEN NBHD 1.09; SEWER STUDY; 2003-09-22I 1 HUNSAKER ^ASSOCIATES SAN DIECO, INC. BEcEr PLANNING ENCINEERING SURVEYING IRVINE LOS ANGELES RIVERSIDE SAN DIECO SEWER STUDY for LA COSTA GREENS VILLAGE 1.9 City of Carlsbad Prepared for Morrow Development 1903 Wright Place Suite 180 Carlsbad, CA 92008 w.o. 2352-68 September 22, 2003 DAVE HAMMAR LEX WILLIMAN ALISA VIALPANDO 10179 Huennekens St. San Diego, CA 92121 (858) 558-4500 PH (858)558-1414 FX www.HunsakerSD.com lnfo®HunsakerSD.com Hunsaker & Associates San Diego, Inc. R^yrriond L. Martin, R.C.E. Project Manager o 11 SJ:kc mswordMi:\reports\2362\068\sewer snj(iy\a01 .doc wo 2352-68 12/24/2003 7:53 AM 12/24/03 CL La Costa Greens Village 1.9 Sewer Study TABLE OF CONTENTS SECTION Design Criteria I Sewer Study Sunnmary II Sewer Study Map III SJ:kc msword\h:\reports\2352\068\sewer study\a01 .doc wo 2352-68 12/24/2003 7:37 AM 12/24/03 La Costa Greens Village 1.9 Sewer Study Design Criteria Dwelling Units 71 Demand 220 gal/cap/day Peak Factor 2.5 Maximum Depth 0.50 diameter Roughness, n 0.011 for PVC Sample Calculation Peak Flow = Dwelling Units x Demand x Peak Factor Peal Flow = 71 units x 220 gal/unit day x 2.5 Peak Flow = 39050 gal/day Peak Flow = 0.0602 cfs SJ:l<c msword\h:\repocts\2352\068\sevrer study\a01 .doc wo 2352-68 12/24C003 7:37 AM 12/24/03 La Costa Greens Village 1.9 Sewer Study Results FOR: La Costa Greens. Villaae 1.9 W.O. 2352-0068 BY: Steve Jerrick SEWER STUDY SUMIVIARY DATE 9/20/2003 REFER TO PLAN SHEET: LINE FRO M TO POPULATIO N PER D.U. IN- LINE D.U.' s POPULATION SERVED PEAK /AVC. RATI 0 PEAK DESIGN FLOW LINE SIZE (INCHE S) DESIG N SLOPE (%) dn (FEET ) dn/D VELOCI TY (F.p.s.) COMMENTS LINE FRO M TO POPULATIO N PER D.U. IN- LINE D.U.' s IN-LINE TOTAL PEAK /AVC. RATI 0 M.G.D. C.F.S. LINE SIZE (INCHE S) DESIG N SLOPE (%) dn (FEET ) dn/D VELOCI TY (F.p.s.) COMMENTS 1 3 2 2.75 4 11 11 2.5 0.002 0.003 8 3.11 0.02 0.03 1.11 ** 2 2 1 2.75 6 16.5 27.5 2.5 0.006 0.009 8 8.7 0.03 0.04 1.82 ** • 3 1 ex 2.75 4 11 66 2.5 0.013 0.020 8 6.72 0.04 0.06 2.39 ** 4 5 4 2.75 5 13.75 13.75 2.5 0.003 0.004 8 2 0.03 0.04 0.91 ** 5 4 1 2.75 5 13.75 27.5 2.5 0.006 0.009 8 2 0.03 0.05 1.30 ** 6 5 6 2.75 5 13.75 13.75 2.5 0.003 0.004 8 2 0.03 0.04 0.91 ** 7 6 7 2.75 5 13.75 27.5 2.5 0.006 0.009 8 2 0.03 0.05 1.30 ** 8 7 8 2.75 5 13.75 71.5 2.5 0.014 0.022 8 5.63 0.04 0.06 2.59 ** 9 8 9 2.75 9 24.75 96.25 2.5 0.019 0.030 8 1.95 0.06 0.09 1.91 * 10 9 10 2.75 9 24.75 121 2.5 0.024 0.037 8 5.72 0.05 0.08 2.87 ** 11 10 ex 2.75 3 8.25 129.25 2.5 0.026 0.040 8 2 0.07 0.10 2.20 ** 12 11 7 2.75 11 30.25 30.25 2.5 0.006 0.009 8 2.57 0.03 0.05 1.43 ** Velocities are slightly less than 2 FPS where slopes are less than 2% due to the following conditions: 1. Existing access hole elevation; and, 2. Maintain current street slope and minimum depth of sewer main on adjacent proposed streets in order to keep proper vertical clearances. Velocities are slightly less than 2 FPS, however, minimum slope of 2% maintained. SJ:fcc mswaid\h:\repoits\2352\06S\sewer studyVad .doc wo 2352-88 12/24/2003 7:37 AM 12124/03