Loading...
HomeMy WebLinkAboutCT 02-22; VILLAGES OF LA COSTA GREENS NBHD 1.09; STORM WATER MGMT PLAN; 2004-06-17STORM WATER MANAGEMENT PLAN for LA COSTA GREENS NEIGHBORHOOD 1.09 City of Carlsbad, California Prepared for: Western Pacific Housing 5790 Fleet Street Carlsbad, CA 92008 w.o. 1751-123 r June 17, 2004 Eric Mosolgo, R.C.E Water Resources Department Manager Hunsaker & Associates San Diego, Inc. pile JP9 KT:do H:WEPORTSM751\123\SWMP01.doc w.o. 1751-123 5/17/2004 4:26 PM La Costa Greens Neighborhood 1.09 Storm Water Management Plan TABLE OF CONTENTS CHAPTER 1 - Executive Summary 1.1 Introduction 1.2 Summary of Pre-Developed Conditions 1.3 Summary of Proposed Development 1.4 Results and Recommendations 1.5 Conclusion CHAPTER 2 - Storm Water Criteria 2.1 Regional Water Quality Control Board Criteria 2.2 City of Carlsbad SUSMP Criteria CHAPTER 3 - Identification of Typical Pollutants 3.1 Anticipated Pollutants from Project Site 3.2 Sediment 3.3 Nutrients 3.4 Trash & Debris 3.5 Oxygen-Demanding Substances 3.6 Oil & Grease 3.7 Bacteria & Viruses 3.8 Pesticides CHAPTER 4 - Conditions of Concern 4.1 Receiving Watershed Descriptions 4.2 Pollutants of Concern in Receiving Watersheds CHAPTER 5 - Flow-Based BMPs 5.1 Design Criteria 5.2 Vortechs Treatment Units 5.3 Pollutant Removal Efficiency Table 5.4 Maintenance Requirements 5.5 Scheduie of Maintenance Activities 5.6 Annual Operations & Maintenance Costs KT: H:«EPORTSM751\123\SWMP01.doc w.o. 1751-123 6/17/2004 4:26 PM La Costa Greens Neighborhood 1.09 Storm Water Management Plan CHAPTER 6 - Source Control BMPs 6.1 Landscaping 6.2 Urban Housekeeping 6.3 Automobile Use 6.4 Site Design BMPs CHAPTER 7 - Site BMP Design (Vortechs Treatment Units) 7.1 BMP Locations 7.2 Determination of Treatment Flows 7.3 Vortechs Treatment Unit Selections CHAPTER 8 - References List of Tables and Figures Chapter 1 - Watershed Map Chapter 3 - Pollutant Category Table Chapter 4 - San Diego Region Hydrologic Divisions Chapter 4 - Combined 1998 and Draft 2002 Section 303(d) Update Chapter 4 - Beneficial Uses of Inland Surface Waters Chapter 4 - Water Quality Objectives Chapter 6 - Pollutant Removal Efficiency Table (Flow-Based BMPs) Chapter 7 - 85'^^ Percentile Rainfall Isopluvial Map Chapter 7 - Neighborhood 1.09 BMP Location Map Chapter 7 - Design Runoff Determination Summary Table Chapter 7 - Vortechs Unit Treatment Capacity Table Chapter 7 - Vortechs System Data Attachments BMP Location Map KT:de H:\REPOFiTS\175ni23\SWMP01.doo w.o. 1751-123 6/17/2004 4:26 PM La Costa Greens Neighborhood 1.09 Storm Water Management Plan CHAPTER 1 - EXECUTIVE SUMMARY 1.1 - Introduction Phase 1 ofthe La Costa Greens project site is located north of Alga Road, south of the proposed extension of Poinsettia Lane, and east ofthe La Costa Golf Course. Neighborhood 1.09 is located roughly in the center of the development, east of Alicante Road, north of Neighborhood 1.12 and south of Neighborhood 1.08. Neighborhood 1.09 is one of seven subdivisions within the La Costa Greens Phase development. An exhibit showing the location of each treatment unit and the breakdown ofthe areas tributary to each treatment unit is included on the following page. All runoff from Neighborhood 1.09 will eventually drain to a proposed storm drain outlet located at the southwest corner of Neighborhood 1.10 (at the Street KK cul- de-sac). In addition to the flow contributed by Neighborhood 1.09, Neighborhood 1.10, the northern portion of Neighborhood 1.12, and offsite area from adjacent residential developed areas east of La Costa Greens Phase 1 (totaling 98 acres) will also drain to this storm drain outlet location. Runoff ultimately drains to an unnamed tributary of San Marcos Creek. Flow from this tributary eventually discharges into San Marcos Creek towards the Batiquitos Lagoon. Per the City of Carlsbad SUSMP, the La Costa Greens Neighborhoods 1.09 project is classified as a Priority Project and subject to the City's Permanent Storm Water BMP Requirements. CITY OF SAN MARCOS THE GREENS 1.9 \ \^ VICINITY MAP NTS KT:da H:lREPORTSM751M23VSWMP01.doc w.o. 1751-123 6/17/2004 4:26 PM LEGEND WATERSHED TRIBUTARY TO TREATMENT UNIT TREATMENT UNIT 0 OFFSITE RUN-ON LOCATION H LA COSTA GREENS POST-CONSTRUCTION BMP LOCATION EXHIBIT FLOW-BASED BMP FOR NEIGHBORHOOD 1.08, OFFSITE DEVELOPMEl AND AUCANTE ROAD FLOW-BASED BMP FOR NEIGHBORHOOD 1.09, 1.10, A PORTION OF 1.12, AND OFFSITE DEVELOPMENT FLOW-BASED BMP FOR NElGHBORHOOD1.il FLOW-BASED BMP FOR NEIGHBORHOOD 1.13,1.14, PORTION OF 1.12, ALICANTE ROAD, AND OFFSrrE DEVELOPMENT Ri\0327\!.Hyd\Slte Location Mop 8.5xU.dw9C 1275]Jun-12-2003>l4i39 La Costa Greens Neighborhood 1.09 Storm Water Management Plan This Storm Water Management Plan (SWMP) has been prepared pursuant to requirements set forth in the City of Carlsbad's "Standard Urban Storm Water Mitigation Plan (SUSMP)." All calculations are consistent with criteria setforth by the Regional Water Quality Control Board's Order No. 2001-01, and the City of Carlsbad SUSMP. This SWMP recommends the location and sizing of site Best Management Practices (BMPs) which include a single Vortechs treatment unit (see BMP Location Map in this chapter). Furthermore, this report determines anticipated project pollutants, pollutants of concern in the receiving watershed, peak flow mitigation, recommended source control BMPs, and methodology used forthe design of flow-based and volume- based BMPs. 1.2 - Summarv of Pre-Developed Conditions Phase 1 ofthe La Costa Greens project site is located north of Alga Road, south of the proposed extension of Poinsettia Lane, and east of the La Costa Golf Course. Neighborhood 1.09 is located roughly in the center of the development, east of Alicante Road, north of Neighborhood 1.12 and south of Neighborhood 1.08. Runoff from the site in natural conditions drains to the San Marcos Creek. The Regional Water Quality Control Board has identified San Marcos Creek as part of the Carlsbad Hydrologic Unit, San Marcos Hydrologic Area, and the Batiquitos Hydrologic Subarea (basin number 4.51). 1.3 - Summarv of Proposed Development The La Costa Greens Neighborhood 1.09 project will include construction of two (2) proposed roads, grading of the proposed site to make it suitable for construction of single-family residential dwellings, construction of underground utilities typically associated with residential developments, and the construction of 64 residences. The proposed project site consists of 75 residential lots and 2 open space lots, for a total area of 21.04 acres (14.83 acres and 6.21 acres respectively). Approximately 30% will remain undeveloped. The offsite developed areas, which will drain to the storm drain outlet located in Neighborhood 1.10 have been quantified in two hydrology studies; "Hydrology & Hydraulic Study - La Costa Greens Phase 1", prepared by O'Day Consultants May 25, 2002, and "Tentative Map Drainage Study for La Costa Greens - Phasel Neighborhoods 1.08 through 1.14," prepared by Hunsaker & Associates San Diego, Inc. April 17, 2003. The O'Day report identified a total of 98 acres of offsite developed area that contribute flow to the La Costa development in the vicinity of the 1.09 and 1.12 Neighborhood. The Hunsaker & Associates report identified two run on locations: one at the southeast corner of Neighborhood 1.09 consisting of 19 KT:de H:W6PORTS\1751\123\SWMP01.doc w.o. 1751-123 6/17/2004 4:26 PM La Costa Greens Neighborhood 1.09 Storm Water Management Plan acres of area; and one at the northeast corner of Neighborhood 1.12 consisting of 79 acres of area. The offsite run on at the southeast corner of Neighborhood 1.09 will be collected and piped through Neighborhood 1.09 and 1.10 to the outlet. The Quadrangle Map Watershed Exhibit for La Costa Greens illustrates the extent of offsite areas draining to the La Costa Greens Phase I proposed development and has been included in the Attachment section of this report. Development of the site will not cause any diversion to or from the existing watershed to the storm drain system. . The proposed treatment unit will located offline from the main storm drain system and proposed to be located in the vicinity of the Street KK cul-de-sac (see Ultimate Condition Site Map included in the pocket of the this report). 85* percentile runoff will be treated in a storm water BMP prior to discharge to the existing storm drain and detention basin. Flows in excess ofthe treatment flow will bypass the treatment unit. A runoff coefficient of 0.63 was assumed for the proposed single-family residential development, based on City of Carlsbad criteria. 1.4 - Results and Recommendations Using the 85"^ percentile rainfall of 0.67 inches (see Isopluvial Map in chapter 7) and assuming approximately 50 percent imperviousness in the contributing watershed Table 1 below summarizes rational method 85*'' percentile calculations for the proposed water quality treatment unit for the La Costa Greens Neighborhoods 1.09, 1.10 & 1.12 developments. Table 1 - Developed Conditions BS*"^ Percentile Calculations Area Drainage Area (acres) 85*^ Percentile Rainfall (inches) Rainfall Intensity (inches/hour) Runoff Coefficient Percent impervious (%) BMP Treatment Area 291.5 0.67 0.2 0.53* 50 Rational Method calculations predicted an 85"^ percentile runoff flow of roughly 30.9cfs for the area discharging to the storm drain. 85"^ percentile flows will be treated in the proposed Vortechs unit priorto discharging to the Alicante Road storm drain. The proposed Vortechs unit is an offline precast treatment unit. The SS''^ percentile design flow rate is forced into the treatment area by a diversion weir built in the KT:de H:\REPORTS\1751\123\SWMP01 .doo w.o. 1751.123 6/17/2004 4:26 PM La Costa Greens Neighborhood 1.09 Storm Water Management Plan upstream junction. Flows in excess of the design flow rate pass over the weir and proceed downstream. A single Vortechs Model PCI6x24 will be required to meet the water quality treatment requirements for Neighborhood 1.09. The proposed Vortechs Model PCI6x24 will be located offline from the main storm drain system and is to be located in the vicinity of the Street KK cul-de-sac. 1.5 - Conclusion The combination of proposed construction and permanent BMP's will reduce, to the maximum extent practicable, the expected project pollutants and will not adversely impact the beneficial uses of the receiving waters. KT:de H:lREPORTS\175nl23\SWMP01.doo w.o. 1751-123 6/17/2004 4:26 PM CARLSBAD WATERSHED MAP FOR LA COSTA GREENS NEIGHBORHOOD 1.09 crrv OF CARLSBAD. CALIFORNIA La Costa Greens Neighborhood 1.09 Storm Water Management Plan CHAPTER 2 - STORM WATER CRITERIA 2.1 - Regional Water Qualitv Control Board Criteria All runoff conveyed in the proposed storm drain systems will be treated in compliance with Regional Water Quality Control Board regulations and NPDES criteria prior to discharging to natural watercourses. California Regional Water Quality Control Board Order No. 2001-01, dated February 21, 2001, sets waste discharge requirements for discharges of urban runoff from municipal storm separate drainage systems draining the watersheds of San Diego County. Per the RWQCB Order, post-development runoff from a site shall not contain pollutant loads which cause or contribute to an exceedance of receiving water quality objectives or which have not been reduced to the maximum extent practicable. Post-construction Best Management Practices (BMPs), which refer to specific storm water management techniques that are applied to manage construction and post-construction site runoff and minimize erosion, include source control - aimed at reducing the amount of sediment and other pollutants - and treatment controls that keep soil and other pollutants onsite once they have been loosened by storm water erosion. Post construction pollutants are a result ofthe urban development ofthe property and the effects of automobile use. Runoff from paved surfaces can contain both sediment (in the form of silt and sand) as well as a variety of pollutants transported by the sediment. Landscape activities by homeowners are an additional source of sediment. All structural BMPs shall be located to infiltrate, filter, or treat the required runoff volume or flow (based on the 85"^ percentile rainfall) prior to its discharge to any receiving watercourse supporting beneficial uses. 2.2 - Citv of Carlsbad SUSMP Criteria Per the City of Carlsbad SUSMP, the La Costa Greens Neighborhood 1.09 project is classified as a Priority Project and subject to the City's Permanent Storm Water BMP Requirements. These requirements required the preparation of this Storm Water Management Plan. The Storm Water Applicability Checklist, which must be included along with Grading Plan applications, is included on the following page. KT.de H:\REP0RTS\1751M 23\SWMP01 .doc w.o. 1751-123 8/17/2004 4:26 PM 1?^ -'^PENDKA storm Watar standards Does the project nrap«A; -__i_£H2ems^ Yea No k www.avn;h io^3to,iMiMnri,riwjZr'^™ teourcea Control Boart web site Sectton 2. Constmction Storm Water BMP Requirements- a Storm Water PoS pr?v™n&^bn^ll^^^ "^"^ P^P^^^ a Water Pollution Sl SrWP^^^^ Standards,' and must prepare prioritization in PaTo below. construction site PglCLjDgtermlne Construction Phase Storm W^t^r p.^-..».,Tn-nt- Would the project meet any of these criteria during construction? Yes No praject subject to California's statewlda General NPOF'S Parr,,.» .., , Dj§charges Assodated Wrth Cs..^.^L^^^j}^^^^ P^""'* Storm Water Does the project propose grading or soil disturfaanca? cnn^';;ZT' H'^f ^aye the potential to contact any portion of the constnjction arga. including washing and staoing ama^9 ' ^ ;— ' —..r^ •.>.>.. M BUM amviint^ areas c .•- project usa any constraction materials that could neaativeiv affpH- ./.«+or 31 ^n'^^'' i'^"""^ Construction Sits Priori*, !yi?°=?S1??i* *e Munidpal Pem* each ecn.,tn,Hi.„ Th?e r>Xl 'l V'fMuirements must be desianatpH «/Hh V"^'"-' 7'"' -^••"SuuCucn otorm bai^'^' ^" """Aucfion BMP requiremeS M^^T'"™'* fat apply J*? <»nstnictian pnority does aSrf thn TS, on a case-by-case requirements.] ' ^re details on construction BMP- A) High Priority Ka^n" ^ ™- S-^dlng « occur during the . within an environmenteiy sS arts wate'r P-^lects. active or inactive, acgacentcrtribttery to sensilive water bodies • B) Medium Priority " PoI"fon7Sc^'p«w^'p1=TrnS"^ "^^^ ' storni Water Constnjction PeS 0 e s Jfr JTr*^ ^"^^ '^^"^^l -<^*ee.re-alignmiS;«r„^,„tclSSSritc^ ' ''^m^T.lZ^l'^^^^r'^. 9-^''na such as ent.e.*.t,?o?S^r^%^errsTpS ^ «sreo?,SNgrsr^,s^ • • C; Low Priority ' ic«rsri;^it^jr^^^^^ ruc'!I"i''l3!*,""""S ['9f'*-<=fl«ay where minimal to no grading occurs such as pedestnan ramps. driveway^addiCons. small retaining Ls, etc ^ sue? af'"™,,?" ^I"?? ^"'^^^ grading pemiits are not required' • m n^v^enrJ o ™' ^'"^'^'^"^ ^"'^^ ^nan 32 La Costa Greens Neighborhood 1.09 Storm Water Management Plan CHAPTER 3 - IDENTIFICATION OF TYPICAL POLLUTANTS 3.1 - Anticipated Pollutants from Proiect Site The following table details typical anticipated and potential pollutants generated by various land use types. The La Costa Greens Neighborhoods 1.09 development will consist of detached single-family residence. Thus, the Detached Residential Development categories have been highlighted to clearly illustrate which general pollutant categories are anticipated from the project area. General Pollutant Categories Priority Project Categories Sediments Nutrients Heavy IVIetals Organic Compounds Trash & Debris Oxygen Demanding Substances Oil & Grease Bacteria & Viruses Pesticides E^mmmm - \.« . ISi'lSiffil wm IP i^J&rmi 1^ ..•(••*S5«.,sr m Attached Residentiai Development X X X p(i) p(2) p X Commercial Development >100,000 ft^ pd) pd) p(2) X p{5) X p(3) p(5) Automotive Repair Shops x X(4){5) X X Restaurants X X X X Hillside Development >5,000 ft^ X X X X X X Parking Lots pd) pd) X X pd) X p(1) streets, Highways & Freeways X pd) x X(4) X p(5) X Retail Gas Outlets x X(4) X X X = anticipated P = potential (1) A potential pollutant if landscaping exists on-site. (2) A potential pollutant if the project includes uncovered parking areas. (3) A potential pollutant if land use involves food or animal waste products. (4) Including petroleum hydrocarbons. (5) Including solvents. KT:de H:\REPORTSM75H123\SWMP01.doc w.o. 1751-123 8/17/2004 4:26 PM La Costa Greens Neighborhood 1.09 Storm Water Management Plan 3.2-Sediment Soils or other surface materials eroded and then transported or deposited by the action of wind, water, ice, or gravity. Sediments can increase turbidity, clog fish gills, reduce spawning habitat, smother bottom dwelling organisms, and suppress aquatic vegetative growth. 3.3 - Nutrients Inorganic substances, such as nitrogen and phosphorous, that commonly exist in the form of mineral salts that are either dissolved or suspended in water. Primary sources of nutrients in urban runoff are fertilizers and eroded soils. Excessive discharge of nutrients to water bodies and streams can cause excessive aquatic algae and plant growth. Such excessive production, referred to as cultural eutrophication, may lead to excessive decay of organic matter in the water body, loss of oxygen in the water, release of toxins in sediment, and the eventual death of aquatic organisms. 3.4 - Trash & Debris Examples include paper, plastic, leaves, grass cuttings, and food waste, which may have a significant impact on the recreational value of a water body and aquatic habitat. Excess organic matter can create a high biochemical oxygen demand in a stream and thereby lower its water quality. In areas where stagnant water is present, the presence of excess organic matter can promote septic conditions resulting in the growth of undesirable organisms and the release of odorous and hazardous compounds such as hydrogen sulfide. 3.5 - Oxygen-Demanding Substances Biodegradable organic material as well as chemicals that react with dissolved oxygen in water to form other compounds. Compounds such as ammonia and hydrogen sulfide are examples of oxygen-demanding compounds. The oxygen demand of a substance can lead to depletion of dissolved oxygen in a water body and possibly the development of septic conditions. 3.6 - Oil & Grease Characterized as high high-molecular weight organic compounds. Primary sources of oil and grease are petroleum hydrocarbon products, motor products from leaking vehicles, oils, waxes, and high-molecular weight fatty acids. Elevated oil and grease content can decrease the aesthetic value of the water body, as well as the water quality. KT:de H:\REPORTS\1751\123\SWMP01.doc w.o. 1751-123 6/17/2004 4.26 PM La Costa Greens Neighborhood 1.09 Storm Water Management Plan 3.7 - Bacteria & Viruses Bacteria and viruses are ubiquitous microorganisms that thrive under certain environmental conditions. Their proliferation is typically caused by the transport of animal or human fecal wastes from the watershed. Water, containing excessive bacteria and viruses can alter the aquatic habitat and create a harmful environment for humans and aquatic life. Also, the decomposition of excess organic waste causes increased growth of undesirable organisms in the water. 3.8 - Pesticides Pesticides (including herbicides) are chemical compounds commonly used to control nuisance growth or prevalence of organisms. Excessive application of a pesticide may result in runoff containing toxic levels of its active component. KT:dB H:WEPORTS\1751M23\SWMP01.doc w.o. 1751-123 8/17/2004 4:26 PM La Costa Greens Neighborhood 1.09 Storm Water Management Plan CHAPTER 4 - CONDITIONS OF CONCERN 4.1 - Receiving Watershed Descriptions As shown in the watershed map on the following page, the pre-developed La Costa Greens Neighborhoods 1.09 site drains to an unnamed tributary of San Marcos Creek which eventually discharges to the Batiquitos Lagoon within the San Marcos Creek watershed. Development ofthe site will not cause any diversion to or from the existing watershed to the storm drain system. The Regional Water Quality Control Board has identified San Marcos Creek as part ofthe Carlsbad Hydrologic Unit, San Marcos Creek Watershed, and the Batiquitos Hydrologic Subarea (basin number 4.51). 4.2 - Pollutants of Concern in Receiving Watersheds San Marcos Creek is not listed on the EPA's 303(d) List of endangered waterways (included in this Chapter). Per the "Water Quality Plan for the San Diego Basin", the beneficial uses forthe Batiquitos Lagoon and San Marcos Creek includes agricultural supply, contact water recreation, non-contact recreation, warm freshwater habitat, and wildlife habitat. Table 3-2 from the "Water Quality Plan for the San Diego Basin" (included at the end of this Chapter) lists water quality objectives for a variety of potential pollutants required to sustain the beneficial uses ofthe San Marcos hydrologic area. KT:de H:\REPORTS\1751\123\SWMP01.doc w.o. 1751-123 6/17/2004 4:26 PM WATEHSHED MAP FOR LA COSTA GREENS NEIGHBORHOOD 1.09 cmr OF CARLSBAD, CALIFORNIA 26 Los Monos HSA (904.31) Agua Hedionda Lagoon Bacterial Indicators^ 6.8 acres 1998 Sedimentation / Siltation 27 Los Monos HSA (904.31) Agua Hedionda Creek lower portion Total Dissolved Solids lower 7 miles 2002 28 San Marcos HA (904.50) Pacific Ocean Shoreline at Moonlight State Beach Bacterial Indicators^ 0.4 miles 1998 29 Escondido Creek HA (904.60) Pacific Ocean Shoreline at San Elijo Lagoon Bacterial Indicators^ 0.44 miles 1998 30 San Elijo HSA (904.61) San Elijo Lagoon Bacterial Indicators^ 150 acres 1998 Eutrophic 330 acres Sedimentation / Siltation 150 acres 31 San Dieguito HU (905.00) Pacific Ocean Shoreline at San Dieguito Lagoon Mouth Bacterial Indicators^ 0.86 miles 1998 32 Del Dios HSA (905.21 and 905.22) Green Valley Creek Sulfate 1 mile 2002 33 Del Dios HSA Hodges Entire Reservoir Color Entire 2002 (905.21) Reservoir Entire Reservoir Nitrogen Phosphorus Total Dissolved Solids Reservoir (1104 acres) 34 Felicita HSA (905.23) Felicita Creek Total Dissolved Solids lower 0.92 miles 2002 35 Felicita HSA (905.23) Kit Carson Creek should in 905.21 HSA Total Dissolved Solids 1 mile 2002 36 Highland HSA (905.32) Cloverdale Creek Phosphoms Total Dissolved Solids 1.2 miles 2002 37 Sutherland HSA (905.53) Sutherland Reservoir Entire Reservoir Color Entire Reservoir 2002 38 Miramar Reservoir HA (906.10) Los Penasquitos Lagoon Entire Lagoon Sedimentation / Siltation 469 acres 1998 39 Miramar Reservoir HA (906.10) Pacific Ocean Shoreline Torrey Pines State Beach at Del Mar (Anderson Canyon) Bacterial Indicators^ 0.4 miles 2002 40 Scripps HA (906.30) Pacific Ocean La Jolla Shores Beach at El Paseo Grande Bacterial 3.9 miles 1998 40 Scripps HA (906.30) Shoreline La Jolla Shores Beach at Caminito Del Oro • Indicators^ La Jolla Shores Beach at Vallecitos La Jolla Shores Beach at Ave de la Playa last updated 9/23/2003 S:\WQS\303dllst\SD Staff Report-2002\FINAL VERSIONS\Listed Waterbodies-2002j{ls\Table 4 (Sep03 page 3 of 6 Table 2-2. BENEFICIAL USES OF INLAND SURFACE WATERS 1,2 Inland Surface Waters . Hydrologic Unit Basin Number BENEFICIAL USE 1,2 Inland Surface Waters . Hydrologic Unit Basin Number M U N A G R 1 N D P R 0 C G W R F R S H P 0 W R E C 1 R E C 2 B 1 0 L W A R M 0 0 L D W 1 L D R A R E S P W N San Diego County Coastal Streams - continued Buena Visla Lagoon 4.21 See Coastal Waters- Table 2-3 Buena Vlsta Creek 4.22 + • • • • • i • Buena Vista Creek • 4.21 + • • • • • • • Agua Hedionda 4.31 See Coastal Waters- Table 2-3 Agua Hedionda Greek 4.32 • • • • • • • Buena Creek 4.32 • • • • • • • Agua Hedionda Creek 4.31 • • • • • • • Letterbox canyon 4.31 • • • • • • • Canyon de las Encinas 4.40 + o • • • San IViarcos Creel? Watershed Batiquitos Lagoon 4.51 See Coastal Waters- Table 2-3 San Marcos Creek 4.52 + • • • • • unnamed Intermittent streams 4.53 + • • • • • San IViarcos Creek Watershed San IViarcos Creek 4.51 + • • • • • Encinitas Creek 4.51 + • • • • • • Existing Beneficial Use 0 Potential Beneficial Use + Excepted From MUN (See Text) 1 Waterbodies are listed multiple times if they cross hydrologic area or sub area boundaries. Benefidal use designations apply to all tributaries to the indicated waterbody, if not listed separately. Tablo 2-2 BENEFICIAL USES 2-27 March 12, 1997 Table 2-3. BENEFICIAL USES OF COASTAL WATERS BENEFICIAL USE Coastal Waters Hydrologic Unit Basin 1 N N A R E R E C .0 B 1 E S W I R A M A A Q M 1 S P W A S H Number D V C C M 0 T L R R U G W R E Number 1 2 M L D E A R N M L L Pacific Ocean • • • • • • • • • • • • • Dana Point Harbor • • • • • • • • • Del Mar Boat Basin • • • • • • • • • • Mission Bay • • • • • • • • • • • Oceanside Harbor • • • • • • • • • • • San Diego Bay ' • • • • • • • • • • • • Coastal Lagoons Tijuana River Estuary ii.ii • • • • • • • • • • • Mouth of San Diego River 7.11 • • • • • • • • • • Los Penasquitos Lagoon ^ 6.10 • • • • • • • • • • San Dieguito Lagoon 5.11 • • • • • • • • • Batiquitos. Lagoon 4,51 • • • • • • • • • San Elijo Lagoon . 5.61 • • • • • • • • • Aqua Hedionda Lagoon 4.31 • • • • • • • • • • • ^ Includes the tidal prisms of the Otay and Sweetwater Rivers. 2 Fishing from shore or boat permitted, but other water contact recreational (REC-1) uses are prohibited. 9 Existing Beneficial Use Tabla 2-3 ' BENEFICIAL USES ' 2-47 March 12, 1997 Table 3-3. WATER QUALITY OBJECTIVES Concentrations not to be exceeded more than 10% of the time during any one year period. Ground Water Hydrologic Basin Unit Number Constituent (mg/L or as noted) TDS CI SO4 %Na NO3 Fe Mn MBAS ODOR Turb NTU Color Units Buena Vista Creek HA 4.20 El Salto HSA a 4.21 3500 800 500 60 45 0.3 0.05 0.5 2.0 none 15 1.0 Vlsta HSA a 4.22 1000 b 400 b 500 b 60 10 b 0.3 b 0.05 b 0.5 0.75 b 15 1.0 Agua Hedionda HA 4.30 1200 500 500 60 10 0.3 0.05 0.5 0.75 Los Monos HSA aj 4.31 3500 800 500 60 45 0.3 0.05 0.5 2.a none 15 15 1.0 1.0 Encinas HA 4.40 3500 b 800 b 500 b 60 45 b 0.3 b 0.05 b 0.5 2.0 b none 15 San Marcos HA 4.50 1000 400 500 60 10 0.3 0.05 0.5 0.75 none 15 1.0 1.0 Batiquitos HSA aek 4.51 3500 800 500 60 45 0.3 0.05 0.5 2.0 none 15 Escondido Creek HA a 4.60 750 300 300 60 10 0.3 0.05 0.5 0.75 none 15 1.0 1.0 San Elijo HSA a 4.61 2800 700 600 60 45 0.3 0.05 0.5 1.0 15 1.0 Escondido HSA 4.62 1000 300 400 60 10 0.3 0.05. 0.5 0.75 15 1.0 SAN DIEGUITO HYDROLOGIC UNIT 905.00 Solana Beach HA a Hodges HA 5,10 5.20 1500 b 1000 b 500 b 400 b 500 b 500 b 60 60 46 b 10 b 0.85 b 0.3 b 0.15 b 0.05 b 0.5 0.5 0.75 b 0.75 b 15 15 1.0 1.0 San Pasqual HA 5.30 1000 b 400 b 500 b 60 10 b 0.3 b 0.05 b 0.5 0.75 b none 15 Santa Maria Valley HA 5.40 1000 400 500 60 10 0.3 0.05 0.5 0.75 none 15 1.0 1.0 Santa Ysabel HA 5.50 500 250 250 60 0.3 0.05 0.5 0.75 none 15 1.0 PENASQUITOS HYDROLOGIC UNIT 906.00 Miramar Reservoir HA af 6.10 1200 500 500 60 10 0.3 0.05 0.5 0.75 none 15 1.0 Poway HA 6.20 750 q 300 300 60 10 0.3 0.05 0.5 0.75 none 15 1.0 Scripps HA 6.30 Miramar HA g 6.40 750 300 300 60 10 0,3 0.05 0.5 0.75 none 15 Tecolote HA 6.50 1.0 HA - Hydrologic Area HSA - Hydrologic Sub Area (Lower casa letters Indicate endnotes following the table,) Table 3-3 WATER QUALITY OBJECTIVES Paga 3-29 October 13, 1994 La Costa Greens Neighborhood 1.09 Storm Water Management Plan Chapter 5 - FLOW-BASED BMPs 5.1 - Design Criteria Flow-based BMPs shall be designed to mitigate the maximum flowrate of runoff produced from a rainfall intensity of 0.2 inch per hour. Such basins utilize either mechanical devices (such as vaults that produce vortex effects) or non-mechanical devices (based on weir hydraulics and specially designed filters) to promote settling and removal of pollutants from the runoff. Per the request of the City of Carlsbad, 85'*^ percentile flow calculations were performed using the Rational Method. The basic Rational Method runoff procedure is as follows: Design flow (Q) = C * I * A Runoff Coefficient (C) - In accordance with the City of Carlsbad standards, the weighted runoff coefficient for all the areas draining to the treatment unit was determined using the areas analyzed in the final engineering hydrology report. The runoff coefficient is based on the following characteristics ofthe watershed: - Land Use - Single Family Residential in Developed Areas - Soil Type - Hydrologic soil group D was assumed for all areas. Group D soils have very slow infiltration rates when thoroughly wetted. Consisting chiefly of clay soils with a high swelling potential, soils with a high permanent water table, soils with clay pan or clay layer at or near the surface, and shallow soils over nearly impervious materials, Group D soils have a very slow rate of water transmission. Rainfall Intensity (I) - Regional Water Quality Control Board regulations and NPDES criteria have established that flow-based BMPs shall be designed to mitigate a rainfall intensity of 0.2 inch per hour. Watershed Area (A) - Corresponds to total area draining to treatment unit. 5.2 - Vortechs Treatment Units The Vortechs Storm Water Treatment System is designed to efficiently remove grit, contaminated sediments, metals, hydrocarbons and floating contaminants from surface runoff. Combining swirl-concentrator and flow-control technologies to eliminate turbulence within the system, the Vortechs System ensures the effective capture of sediment and oils and prevents resuspension of trapped pollutants for flows up to 25 cfs. KT:dE H:\REPORTSM751\123\SWMP01.doc w.o. 1751-123 8/17/2004 4:26 PM La Costa Greens Neighborhood 1.09 Storm Water Management Plan Other features ofthe Vortechs Systems include the following: Large capacity system provides an 80 percent net annual Total Suspended Solids (TSS) removal rate Unit is installed below grade Low pump-out volume and one-point access reduce maintenance costs Design prevents oils and other floatables from escaping the system during cleanout Enhanced removal efficiencies of nutrients and heavy metals with offline configuration The tangential inlet to the system creates a swirling motion that directs settleable solids into a pile towards the center ofthe grit chamber. Sediment is caught in the swirling flow path and settles back onto the pile after the storm event is over. Floatable entrapment is achieved by sizing the low flow control to create a rise in the water level of the vault that is sufficient to just submerge the inlet pipe with the 85**^ percentile flow. 5.3 - Pollutant Removal Efficiencv Table Pollutant of Concern BMP Categories Hydrodynamic Separation Devices'^^ Vortechs Stormwater- , Treatment System . Sediment M-H • --.-"^ H. .r;f • Nutrients L-M L-M Heavy Metals L-M -•-/^.-CL-M*c-.. - . Organic Compounds L-M -.-^.BL-M- - - --f- Trash & Debris M-H . ••.:1-:H--V.- - " Oxygen Demanding Substances L Bacteria L ' L - -> Oil & Grease L-H H Pesticides L L (1) The County will periodically assess the performance characteristics ofthese BMPs to update this table. (2) Proprietary Structural BMPs. Not ali serve the same function. L (Low): Low removal efficiency (roughly 0-25%) M (Medium): Medium removal efficiency (roughly 25-75%) H (High): High removal efficiency (roughly 75-100%) U: Unknown removal efficiency, applicant must provide evidence supporting use Sources: Guidance Specifying Management Measures for Sources of Nonpoint Pollution in Coastai Waters (1993), National Stormwater Best Management Practices Database (2001), and Guide for BMP Selection in Urban Developed Areas (2001). KT:de H:\REPORTSM751\123\SWMP01.doo w.o. 1751-123 S/17/2004 4:26 PM La Costa Greens Neighborhood 1.09 Storm Water Management Plan 5.4 - Maintenance Reguirements Flow-based storm water treatment devices should be inspected periodically to assure their condition to treat anticipated runoff. Maintenance ofthe proposed Vortechnics units includes inspection and maintenance 1 to 4 times per year. Maintenance of the Vortechs units involves the use of a "vactor truck", which clears the grit chamber ofthe treatment unit by vacuuming all the grit, oil and grease, and water from the sump. Typically a 3-man crew is required to perform the maintenance ofthe treatment unit. Properly maintained Vortechs Systems will only require evacuation of the grit chamber portion of the system. In some cases, it may be necessary to pump out all chambers. In the event of cleaning other chambers, it is imperative that the grit chamber be drained first. Proper inspection includes a visual observation to ascertain whether the unit is functioning properly and measuring the amount of deposition in the unit Floatables should be removed and sumps cleaned when the sump storage exceeds 85 percent of capacity specifically, or when the sediment depth has accumulated within 6 inches of the dry-weather water level. The rate at which the system collects pollutants will depend more heavily on site activities than the size ofthe unit. 5.5 - Schedule of Maintenance Activities Target Maintenance Date - March 15'*^ Maintenance Activity - Annual inspection and cleanout. Clear grit chamber of each unit with vactor truck. Perform visual inspection. Remove floatables. 5.6 - Annual Operations & Maintenance Costs The following costs are intended only to provide a magnitude ofthe costs involved in maintaining BMPs. Funding shall be provided by the Master Home Owners Association for La Costa Greens, of which neighborhood 1.09 is a member of. Approximate annual maintenance costs for each ofthe proposed Vortechs units are outlined below. Costs assume a 3 man crew: Maintenance for Model PCI 6x24: Periodic Inspection, Maintenance and Monitoring = $800 Annual Cleanout Cost = $3,000 Subtotal = $3,800 Contingency = $380 Total = $4,180 KT:de H:\REPORTS\1751\123\SWMP01.doc w.o. 1751-123 6/17/2004 4:26 PM La Costa Greens Neighborhood 1.09 .storm Water Management Pian CHAPTER 6 - SOURCE CONTROL BMPS 6.1 - Landscaping Manufactured slopes shall be landscaped with suitable ground cover or installed with an erosion control system. Homeowners should be educated as to the proper routine maintenance to landscaped areas including trimming, pruning, weeding, mowing, replacement or substitution of vegetation in ornamental and required landscapes. Per the RWQCB Order, the following landscaping activities are deemed unlawful and are thus prohibited: - Discharges of sediment Discharges of pet waste - Discharges of vegetative clippings Discharges of other landscaping or construction-related wastes. 6.2 - Urban Housekeeping Fertilizer applied by homeowners, in addition to organic matter such as leaves and lawn clippings, all result in nutrients in storm water runoff. Consumer use of excessive herbicide or pesticide contributes toxic chemicals to runoff. Homeowners should be educated as to the proper application of fertilizers and herbicides to lawns and gardens. The average household contains a wide variety of toxins such as oil/grease, antifreeze, paint, household cleaners and solvents. Homeowners should be educated as to the proper use, storage, and disposal ofthese potential storm water runoff contaminants. Per the RWQCB Order, the following housekeeping activities are deemed unlawful and are thus prohibited: Discharges of wash water from the cleaning or hosing of impervious surfaces including parking lots, streets, sidewalks, driveways, patios, plazas, and outdoor eating and drinking areas (landscape irrigation and lawn watering, as well as non-commercial washing of vehicles in residential zones, is exempt from this restriction) Discharges of pool or fountain water containing chloride, biocides, or other chemicals Discharges or runoff from material storage areas containing chemicals, fuels, grease, oil, or other hazardous materials Discharges of food-related wastes (grease, food processing, trash bin wash water, etc.). KT:de H:\REPORTS\1751M23\SWMP01.doc w.o. 1751-123 6/17/2004 4:26 PM La Costa Greens Neighborhood 1.09 Storm Water Management Plan 6.3 - Automobile Use Urban pollutants resulting from automobile use include oil, grease, antifreeze, hydraulic fluids, copper from brakes, and various fuels. Homeowners should be educated as to the proper use, storage, and disposal ofthese potential storm water contaminants. Per the RWQCB Order, the following automobile use activities are deemed unlawful and are thus prohibited: - Discharges of wash water from the hosing or cleaning of gas stations, auto repair garages, or other types of automotive service facilities. - Discharges resulting from the cleaning, repair, or maintenance of any type of equipment, machinery, or facility including motor vehicles, cement- related equipment, port-a-potty servicing, etc. - Discharges of wash water from mobile operations such as mobile automobile washing, steam cleaning, power washing, and carpet cleaning. The Homeowners Association should make all homeowners aware of the aforementioned RWQCB regulations through a homeowners' education program. A monitoring program should also be implemented to insure compliance. 6.4 - Site Design BMPs Prionty projects, such as the La Costa Greens Neighborhood 1.09 development, shall be designed to minimize, to the maximum extent practicable the introduction of pollutants and conditions of concern that may result in significant impact, generated from site runoff to the storm water conveyance system. Site design components can significantly reduce the impact of a project on the environment. The following design techniques have been proposed to accomplish this goal. - Implementing on-lot hydrologically functional landscape design and management practices; Additional detail regarding landscaping design is discussed in section 6.1. - Minimizing project's impervious footprint. Methods of accomplishing this goal include constructing streets, sidewalks, and parking lots to the minimum widths necessary without compromising public safety. Another method for minimizing impervious area includes incorporating landscaped areas in the drainage system to encourage infiltration and reduce the amount of directly connected impervious areas. - Minimizing directly connected Impervious Areas. Where landscaping is proposed, drain rooftops into adjacent landscaping prior to discharging to the storm water conveyance system. Approximately 30% ofthe Neighborhood 1.09 proposed project site will remain undeveloped. KT:de H;\REPORTSi1751M23\SWMP01.doo w.o. 1751-123 6/17/2004 4:26 PM La Costa Greens Neighborhood 1.09 Storm Water Management Plan CHAPTER 7 - SITE BMP DESIGN VORTECHS TREATMENT UNITS 7.1 - BMP Locations The site design includes a single Vortechs treatment unit (shown on BMP Location Map located on the following page). The proposed Vortechs Model PCI6x24 will be located offline from the main storm drain system and is to be located in the vicinity of the Street KK cul-de-sac. 7.2 - Determination of Design Treatment Flows The 85"^ percentile design flow rate has been calculated using the Rational Method. Required data forthe Rational Method treatment flow determination include the following: - Runoff Coefficient (C) = 0.53 - Rainfall Intensity (I) = 0.20 inches per hour - Drainage area to treatment unit (A) = 291.5 Ac. Runoff coefficients were derived based upon a weighted average of each area tributary to the treatment unit and the associated runoff coefficient. The following table summarizes the parameters used for determination of design flows to each ofthe Vortechs treatment units. DESIGN RUNOFF DETERMINATION SUMMARY TABLE Treatment Unit Runoff Coefficient (C) 85^" Percentile Rainfall (inches/hour) Drainage Area (acres) 85'^ Pet. Design Flow (cfs) PC 16x24 0.53 0.2 291.5 30.9 KT.de H:\REPORTSM 751M23\SWMP01 .doc w.o. 1751-123 6/17/2004 4:26 PM La Costa Greens Neighborhood 1.09 Storm Water Management Plan 7.3 - Vortechs Treatment Unit Selection Per the special design prepared by Scott Gorneau of Vortechnics, (excerpts attached dated August 15, 2003) the Vortechs Model PCI6x24 has been designed to treat a flow rate of 52.82 cfs. This unit (details attached), as proposed on the improvement plans, is an offline precast treatment unit, meaning that the design flow rate is forced into the treatment area through a diversion structure, while flows in excess ofthe design flow rate pass over an inline weir and proceed downstream. The weir in the diversion structure will create a restriction, which will raise the HGL upstream of the weir. These losses will be analyzed in the Hydrology study to ensure that the potential for flooding occurrences during high return rainfall events is minimized to an acceptable level. KT:de H:\REP0RTS\1751\123\SWMP01 .doo w.o. 1751-123 6/17/2004 4:26 PM VILLAGES OF LA COSTA NEIGHBORHODD 1.09, 1.10 AND PORTION OF 1.12 (NORTH) TDCAT^/I^MT Cl n\A; r^CTCOR/lIM A-TI^M. Q=C*I*A TREATMENT AREA 291.50 ACRES RAINFALL INTENSITY 0.20 IN/HR WEIGHTED CURVE NUMBER 0.53 Q = 30.90 CFS 4:16 PM6/9/2003 Sheetl RM-TREATMENT FLOW.xIs Plan View GritChamber Oil Chamber/. FlowCantrol Baffle Wall: . • Chamber • ••••:• Elevation View: Dry-Weather Grit Chamber The swirling motion created by the tangential inlet directs settleable solids toward the center of this chamber. Sediment is caught in the swirling flow path arid settles •' back onto the pile after the storm •event: is oven - • .. Oil Chamber & Baffle Wall • The center baffle traps floatables in •the oil chamber, even during clean^ .out. Highly resistaritto flpw.surges. Flow Control Chamber ^ .•The weir and orifica flow control'sf^'•"• " -1] Raise level and volume in the.'r-'' ^sterh as flow rate increases;' arici*: SJ gradually drain the.'system as'^ flow rate subsides.' .' , '• 1) Initial Wet Weather Phase During a two-month storm event tha water level begins to • rise above the top of the inlet pipe. This influent control feature reduces turbulence and avoids resuspension of pollutants. 3) Full Capacity Phase When the high-flow outlet approaches fuil discharge, stonn drains are flawing st peak capacitj/t The Vorta±is Systsm is designed to match your design storm flow and provide treat- 2) Transition Phase As the inflow rate increases above tha controlled outflow rate, the tank fills and the floating contaminant layer accu- mulated from past storms rises. Swirling action increases at this stage, while sediment pile remains stable. —I—'•^— 4) Storm Subsidence Phase/Cleaning Treated runoff is decanted at a contralled rate, restoring the water level to a low dryweatiier vdume and revealing a cnnicai pile of sediment The low water levei iaciiitates inspection and ^ ~r the WortecM' Stormwater Treatment System Perfcrated Covers iiw.i J L =1 / 8' ta 9' ^ -/ Typ'cal ffta 4' . Plan View To begin the design of your Vortechs System, refer to. the sizing chart below and com- plete a Specifier's Worksheet to provide details about your site and design flows. Then simply fax or man the worksheet to Vortechnics with your site plan, and we'll produce detailed Vortechs System scale draw- ings free of charge. Bevation View Engineering NdCES ' . S^h^^S^,™» S^'"K * ^ "^^^ °" prmiiding one square foot of grie-' chancer surferaaraafDP each TOO gpm of peal, design storm flow rate (e.g.. lO-yeap storm). For more ••• • . .dataHs aboue Vbrtediraca ^•ngcritsria refer .to Vbrtailinica Tachnical Bulleth 3;. • • • • • •: ' • • ,B) Sadiment storagayoluiiys assiTOBs.a.3 fboesump.. . " ' . , I " ' y2,S^!^Mf,^J^v^T^''t^^^ ^P*""" aPpScatfon. An^'alterations to iha'sildng chart specifi-' :;^^^^'^^^S^^Tr^':T:^'^ ahop drawinga. Pbaaa-call Vortachnica for tha Vsht of spe.. rapaci6y.>han itknaadid to.;maU-a spedRc'faquirim'ent fc'r spiil containment.'can be': ^^Thn ™1""-«"^"?-™'JTtha selected modeL Vortachnica tachnical staff will optimia System' • ^ gec»Tie07to.ma8t containment raquiramenta withm l.MetnbSpsa'ffcaton'Oiart • . • Vortechs System Inlet/Outlet Configurations Vortechs Systems con be configured to accommo- date various inlet and outlet pipe orientatLons. The inlet pipe can enter the end or side of the tank at right angles - outlet pipes can exit the end or the side of system at most angles. End Inlet \ Side Inlet t Offline I Ta Palish \ Pppfppat:rnpnt: Ta Vortechs ™ Stormwater Treatment Systems Vortechnics FLOW CALCULATIONS La Costa Greens Village Neighborhood Carlsbad, CA PCI6X24 System 1.10 Vortechs Orifice Cd 0.56 9.00 Crest Elevation (ft) = 99.50 A (ft') Vortechs Weir Cd = 0 Weir Crest Length (ft) = 0 Crest Elevation (ft) = 104.00 Bypass Weir Cd = 3.3 Weir Crest Length (ft) = 11 Crest Elevation (ft) = 101 Head Elevation Orifice Flow Weir Flow Bypass Flow Total Flow (ft) (ft) (cfs) (cfs) (cfs) (cfs) 0.00 99.50 0.00 0.00 0.00 0.00 0.25 99.75 1.69 0.00 0.00 1.69 0.50 100.00 4.77 0.00 0.00 4.77 0.75 100.25 8.76 0.00 0.00 8.76 1.00 100.50 13.48 0.00 0.00 13.48 1.25 100.75 18.84 0.00 0.00 18.84 1 50 101 00 24.76 0 00 0 00 24.76 1.75 101.25 31.21 0.00 4.54 35.74 2.00 101.50 38.13 0.00 12.83 50.96 2.25 101.75 45.21 0.00 23.58 68.78 2 50 102.00 49.52 0 00 36 30 85.82 First highlighted row indicates treatment of the 85th percentile flow (first flush) before bypass flow occurs. Second row indicates the elevation at which the 24 inch inlet pipe is submerged and thereby acting as the flow control into the unit, Flows greater than the 24 inch pipe capacity will most likely be bypassed. ICalculated by: WSG 10/10/2003 jjChecked by: 104 5 - 104 0 - 103 5 - 103 0 - 102 5 - 102 0 101 5 - 101 0 - 100 5 100 0 - 99 5 - 99 0 • Vortechs™ System Stage Discharge Curve Pi/m"** r*rr 0.0 10.0 20.0 30.0 40.0 50.0 60.0 70.0 80.0 90.0 Discharge (cfs) f:\data\vortechn\projects\4404ADSPC16X24.xls AP 10/10/2003 Vortechs™ Stormwater Treatment Systems VQRTECHS SYSTEM ESTIMATED NET ANNUAL TSS REMOVAL EFFICIENCY Vortechnics La Costa Greens Village Neighborhood Carlsbad, CA PCI 6X24 System 1.10 Design Ratio^ = (193.5 acres) x (0.53) x (449 qpm/cfs) (201.1 sf) = 228.9 Bypass occurs at an elevation of 101' (at approximately 55 gpm/sf) Rainfall Intensity Ooeratinq Rate^ % Total Rainfall Rmvl. Effcv" Rel. Effcy •7hr gpm/sf Volume^ (%) (%) 0.02 4.6 10.4% 98.0% 10.2% 0.04 9.2 10.1% 98.0% 9.9% 0.06 13.7 9.7% 98.0% 9.6% 0.08 18.3 8.1% 98.0% 8.0% 0.10 22.9 8.2% 98.0% 8.0% 0.12 27.5 8.6% 98.0% 8.4% 0.14 32.0 4.6% 98.0% 4.5% 0.16 36.6 4.9% 97.5% 4.7% 0.18 41.2 5.2% 96.0% 5.0% 0.20 45.8 3.6% 94.0% 3.4% 0.25 56.9 9.0% 89.0% 8.0% 0.30 64.6 5.3% 83.0% 4.4% 0.35 70.3 2.8% 78.5% 2.2% 0.40 76.1 2.7% 73.5% 2.0% 0.45 81.1 2.0% 69.0% 1.4% 0.50 85.5 0.0% 65.0% 0.0% 0.60 97.1 0.4% 52.0% 0.2% 0.70 103.4 1.6% 0.0% 0.0% 89.8% % rain falling at >0.7'7hr or bypassing treatment = Assumed removal efficiency for bypassed flows = Removal Efficiency Adjustment = Net Annual TSS Removal Efficiency = 2.9% 0.0% 7.6% 82% 1 - Design Ratio = (Total Drainage Area) x (Runoff Coefflcient) x (cfs to gpm conversion) / Grit Chamber Area - The Total Drainage Area and Runoff Coefficient is specified by the site engineer. - The conversion factor from cfs to gpm is 449. • Operating Rate (gpm/sf) = intensity (7hr) x Design Ratio. 3 - Based 10 Years of Hourly Precipitation Data From NCDC Station 7740, San Dlego WSO Airport, San Diego County, CA 4 - Based on Vortechnics laboratory verified removal of 250 micron particles (see Technical Bulletin #1). 5- Reduction due to use of 60-minute data for a site that has a time of concentration less than 30-minutes. ICalculated by: WSG 10/10/2003 "llChecked byT f:\data\vortechn\projects\4404ADSPC16X24.xls AP 10/10/2003 La Costa Greens Neighborhood 1.09 Storm Water IVIanagement Plan CHAPTER 8 - REFERENCES "Standard Urban Storm Water Mitigation Plan - Storm Water Standards", City of Carlsbad, April 2003. "Standards for Design and Construction of Public Works Improvements in the City of Carisbad", City of Carlsbad, California; April 1993. "Master Drainage and Storm Water Quality Management Plan", City of Carlsbad, California; March 1994. "Tentative Map Drainage Study for La Costa Greens - Phasel Neighborhoods 1.08 through 1.14," Hunsaker & Associates San Diego, Inc. April 17, 2003. "Hydrology & Hydraulic Study- La Costa Greens Phase 1", O'Day Consultants; May 25, 2002 "Hydrology Manual", County of San Diego Department of Public Works - Flood Control Division; Updated April 1993. "San Diego County Hydrology Manual", County of San Diego Department of Public Works - Flood Control Section; June 2003. "Order No. 2001-01, NPDES No. CAS0108758 - Waste Discharge Requirements for Discharges of Urban Runoff from the Municipal Separate Storm Sewer Systems (MS4s) Draining the Watersheds ofthe County of San Diego, the incorporated Cities of San Diego County, and San Diego Unified Port District", California Regional Water Quality Control Board - San Diego Region; February 21, 2001. 'Wafer Quality Pian for the San Diego Basin", California Regional Water Quality Control Board - San Diego Region, September 8, 1994. "Vortechnics Storm Water Treatment System Manual", Vortechnics; Revised May 2000. KT:de H:\REPORTS\17S1M23\SWMP01.doc w.o. 1751-123 6/17/2004 4:26 PM 0 2000 4000 6000 SCALE l'=2000' HUNSAKER &. ASSOCLVTES SAN DIECa IHC PtWNINC 10179 (tonfan SUM aOtfCUNC Sn DK|O^ Ca 92121 suRVrriNC nKasajsswsoo- FX(a5a)ss-'Hi4 QUADRANGLE MAP WATERSHED EXHIBIT FOR LA COSTA GREENS CARLSBAD. CALIFORNIA R'\0I65\lHycl\0l65*H09-QUAJ)MAPS.clviQC £Oas:AuB-lS-2003UO>58 SHEET 1 OF 1 o o I d 5