Loading...
HomeMy WebLinkAboutCT 03-01-01; LA COSTA RESORT & SPA MSTR PLAN; DRAINAGE REPORT; 2005-06-23Drainage Report KSL LA COSTA RESORT & SPA COSTA DEL MAR ENTRY CITY OF CARLSBAD SAN DIEGO COUNTY, CALIFORNIA June 23, 2005 Revised March 30, 2006 Revised September 26, 2006 Prepared for: KSL LA COSTA 2100 COSTA DEL MAR ROAD CARLSBAD, CA 92009 JIM WAPLES Prepared by: RBF CONSULTING 5050 Avenida Encinas, suite 260 Carlsbad, CA 92008 • • • 760.476.9193 CONSULTING Contact Person: Timothy M. Thiele, R.C.E. 60283 RBF JN 55-100221.008 HYDROLOGY STUDY TABLE OF CONTENTS SECTION 1 - INTRODUCTION 1.1 General Introduction 1 SECTION 2 - PROJECT INFORMATION 2.1 Existing Conditions 1 2.2 Interim Conditions 1 SECTION 3 - ANALYSIS/CONCLUSION 2 3.1 Flows 2 3.2 Pipe Analysis 2 3.3 Diversion Structure 2 3.4 CDS Unit 3 3.5 SD L-IA 3 APPENDIX- CALCULATIONS 4 COSTA DEL MAR ENTRY HYDROLOGY STUDY HYDROLOGY STUDY 1 INTRODUCTION The La Costa Resort & Spa has prepared a Master Plan for the resort. The plan includes construction of new resort villas, commercial buildings, parking structures and parking areas, and various interior and exterior surface improvements around the resort. As part of the approval of the Master Plan, an overall drainage study was prepared to address the impacts of the new construction, and recommendations to remediate downstream impacts. This report is titled "Drainage Study for La Costa Resort and Spa-Master Plan", (Rick Engineering, Nov. 2003). A new drainage report associated with the Villas Phase 2, "Drainage Study for La Costa Resort and Spa Phase 2, (Hunsaker, 2005), showed that flows had increased by approximately 15 cfs due to changes in the development plan. This promoted a reevaluation of the 2003 Master Drainage Study. Himsaker recently completed a new overall drainage study. Drainage Study for La Costa Resort and Spa (Hunsaker 2006). As part of the Master Plan improvements the main entrance to the resort at the intersection of El Camino Real /Costa Del Mar (ECR/CDM) will receive a new gatehouse and new entry monuments. Portions of the existing storm drain system will be removed and replaced with new storm drains as recommended by the new overall drainage study (Hunsaker 2006). This new system would tie into the storm drain improvements associated with Villas Phase 2 ofthe Master Plan. This report will address the impacts due to the increased flow for pipe segments as shown on DWG's 422-6D and 422-6F, the design for the diversion structure as part of the ultimate storm drain system, the sizing ofthe CDS unit, and ponding depth at SD L-l A. 2 PROJECT INFORMATION 2.1 Existing Conditions Existing runoff from La Costa Resort & Spa site are conveyed to two different locations. Most of the Resort runoff is conveyed to the intersection of El Camino Real and Costa Del Mar Road via sfreets and pipes. The Costa Del Mar runoff is collected and discharged through an existing, highly corroded, 30" CMP directly into San Marcos Creek. The runoff from the developed portion of the resort to the north is collected into an earthen swale that flows southerly, parallel to El Camino Real. These flows are collected by an existing headwall structure, which discharges through an existing pubhc 36" CMP storm drain pipe, crossing under El Camino Real and discharging into Batiquitos Lagoon. Costa Del Mar Entry Hydrology Study HYDROLOGY STUDY 2.2 Proposed Conditions With the increase in runoff due to the proposed development listed in the Master Plan, the intersection of ECR/CDM will continue to receive a majority of the runoff from the Resort. Flow will be split by a diversion structure and conveyed through the new storm drain pipes in Costa Del Mar and rehabilitated pipes in El Camino Real to evenly distribute the flows between the pipe systems for better efficiency. 3 ANALYSIS/CONCLUSION 3.1 Flov/s Flows from the site to San Marcos Creek are increasing slightly from the Qs shown on the approved plans. The total increase is 3.43 cfs. San Marcos Creek and its North Tributary have been modeled using the U.S Army Corps of Engineers HEC-2 Water Surface Profiles program (May 1991). This study was completed by the Rick Engineering Company in 2002 and defines a flood profile for the project area. 3.2 Pipe Analysis The increase in flows outlined in the new overall drainage report (Hunsaker 2006) made it necessary to upsize certain pipe segments to insure that the HGL would be contained within the system. Pipe segments 34-38 were upsized in order to carry the increased flows associated with the new overall drainage study (Hunsaker 2006). 3.3 Diversion Structure The basis of design for the storm drain diversion just north of the El Camino Real/Costa del Mar intersection is to maximize the flows that can be carried by the existing pipes crossing ECR. The flow to be directed west across ECR will be 39 cfs, with the remaining 43.20 cfs directed to the storm drain under CDM during the 1 OO-year design event. Design flow rates are taken from the new overall drainage study (Hunsaker 2006). Summary of Results The results from the analysis shows that by lowering the invert elevation of the storm drain pipe outletting towards El Camino Real by a 0.10 feet, decreasing the orifice diameter to 30" while keeping the invert of the 30" orifice equal to the invert ofthe 36" RCP, and lowering the invert elevation of the storm drain pipe outletting towards Costa Del Mar by 0.60 feet, it would provide the needed diversion distribution of flows during the 1 OO-year design event and would have maximum headwater elevation in the clean-out structure of approximately 14.98 ft, which is 1.82 ft below the rim elevation. Costa Del Mar Entry Hydrology Study HYDROLOGY STUDY 3.4 CDS Unit The basis for design will be based upon the Rational Method for sizing calculations: Q = C*I*A where: Q = design treatment flow rate in cubic feet per second (cfs) C = runoff coefficient (no units) I = rainfall intensity in inches per hour A = tributary area in acres Summary of Results The results from the analysis showed that 4.81 cfs will need to be freated by the CDS unit. Based upon the design requirements from CDS Technologies, the system would require a Model No. PSWC 40-40. 3.5 SD L-l A Analysis The basis for design is to determine the ponding depth above the proposed grate inlet, so as to determine if water will pond above the adjacent bench area. Summary of Results The results from the analysis shows that the ponding depth will 0.61 feet above the grate inlet, which is approximately 0.39 feet lower then the adjacent bench area. Costa Del Mar Entry Hydrology Study HYDROLOGY STUDY References Hunsaker and Associates. September 15, 2006. Drainage Study for La Costa Resort and Spa. W.O. 2503-1 Hunsaker and Associates. July 14, 2005. Grading Plans for La Costa Resort and Spa Phase 2. Dwg. No. 422-6C Rick Engineering. November 3, 2003. Drainage Study for La Costa Resort and Spa - Master Plan (REC Job No. 14107-L) Costa Del Mar Entry Hydrology Study HYDROLOGY STUDY APPENDIX Costa Del Mar Entry Hydrology Study SCALE HORIZ. T- 20' VERT, r- 4' HYDROLOGY STUDY RIP-RAP SIZING CALCULATIONS Costa Del Mar Entry Hydrology Study 7U ot I'y/Q^ //// I .• // 30 or 3'.V I E' min I fiaupj f n-_'wjH (ly(, ) T/?-? 1 - l/i Ch Sill Ty;..? ? - Witl.ojt sill 1 *• li.icliii".> o:' Ri;»r,i;» , U • Tij".- D-.ir.ctLT V * Eutto::! WivJc't of Concrete Cm.-.; Riprap li^r ihall te se;:<riet; on ?lcn? s-'.ECTic-i 0.=' siPJi? A':o riLir' \>loci;y ft/S;c. Rid Clii^ificJtio.T ' P.ipra-T ThicertlS {T) K. f i ltT«- Clo-^r; • \>loci;y ft/S;c. Rid Clii^ificJtio.T ' P.ipra-T ThicertlS {T) K. Sec. 2C3~ iec, " 12-; r-:-ic IS-IC lC-20 1:3. 3 liciinj So^ 2 Zj<;iin; FfcinT 1/iTTc.T - r/2 Icn 1 To" 2 Ten .n 1.0 1. < -2.0 2'iJ 2. < ^.3 S.4 3/16" c: _ - 1/4- 81 3/3- -.1/2- r/4- - S.ird i" - Sjr.d 11/2- - Sini 2- - -Sari filler Elan!-eC T^.ic••^.^es^ » 1 foa~ or T, w.hic.'icv^r is leii Sill <2O-C-2C0O CliSS concrete, if iko-.in cn Plar.s. ^zc-z/or, A-A Concrete Channs'! 3C.-i./'J ELEVATION - 2. p- KDT£5: t. Type of riprap a. F.e;-jlar Quarry Stone. • b. E.'oien Concrete if S.'-.own cn ."'icns. c. CsSbles not acceptable. 2. Cradilicn and Placer.enC as specified.in P.cgicnil Standards Corr:. Std. Spe:. Prcv. Sec. 203-1.6 znd Sec. 30G-S, V 3. Riprap is to ba placed over a filter blanket vi-hich nay be granular catcrial cr plastic filter cloth. a. Granular naterial specs, in Table above- b. Plastic filter cloth specs.-In Ee^. Stds. €3.-=:. Std. Spec. Prov. Sec. 20^-1.7- • A. If desired riprap and filter blanket class is not available', use larger class. *• S:jndird Specifications for PobTic Vorfcs ^ Construction by So. CA Chap.-of AP/--^ ' SAN DIEGO REGIONAL STArJOAHD DRA\7},VG RiP RAP Ef'iERGY DISSlPA iCR Cy Aer.fov.'J^ — . HYDROLOGY STUDY DIVERSION STRUCTURE ANALYSIS Costa Del Mar Entry Hydrology Study La Costa Resort and Spa Costa Del Mar Flow Distribution through Diversion Structure Assuming Inlet Control RBF JN 55-100221 10/2/2006 Watersurface Elevation 12.50 12.60 12.70 12.80 12.90 13.00 13.10 13.20 13.30 13.40 13.50 13.60 13.70 13.80 13.90 14.00 14.10 14.20 14.30 14.40 14.50 14.60 14.70 14.80 14.90 14.98 15.00 15.10 15.20 15.30 15.40 15.50 Flow through 30" Diameter Orifice into 36" RCP El. 11.00 Q=0.6*A'(2GH)'K).5 11.82 13.98 15.86 17.53 19.06 20.47 21.79 23.04 24.22 25.35 26.43 27.46 28.46 29.43 30.36 31.27 32.15 33.01 33.84 34.66 35.45 36.23 37.00 37.74 38.48 39.05 39.19 39.90 40.60 41.28 41.95 42.61 Flow through 30" Diameter Orifice El. 10.40 Q=0.6*A*(2GH)'K).5 21.79 23.04 24.22 25.35 26.43 27.46 28.46 29.43 30.36 31.27 32.15 33.01 33.84 34.66 35.45 36.23 37.00 37.74 38.48 39.19 39.90 40.60 41.28 41.95 42.61 43.13 43.26 43.90 44.53 45.16 45.77 46.38 Total Outflow (cfs) 11.82 13.98 15.86 17.53 45.48 47.93 50.25 52.46 54.58 56.61 58.57 60.47 62.30 64.08 65.81 67.50 69.14 70.75 72.32 73.85 75.35 76.83 78.27 79.69 81.09 82.18 82.45 83.80 85.13 86.43 87.72 88.99 Comment Matches Assumed Inflow HYDROLOGY STUDY CDS UNIT Costa Del Mor Entry Hydrology Study CONS U LTI NG PLANNINQ M DESIBN • CONSTRUCTmN Baa.Ay^.SBOB • WWW.RBF.COM ,JOR 5S '100Z2.\. oo^ SHEETNO. \ I CALCULATED BY DATE l°ll<&l0T CHECKED BY DATE SCAl F S^TOEATF^tfii,,. OTP, Page 1 of 1 l^foclel* Designation Treatment Capaciiy Ranip Screen DiameteiWeight Siflnp Capacity Depth Below Pipe Irvert Foot Pri rt Diameter l^foclel* Designation cfs MGD m (yd') m (ft) PMIU20_15 (Drophin fiUet) 0.7 0.5 2.0\1.5 0.5 4.2 4,8 PMSU20 15 4 0.7 D.5 2.0 M.S 0.5 3.5-4 4.8 PMSU20 15 0.7 0.5 20\1.5 1.1 5.1 60 i 2 PMSU20 20 1,1 OJ 2.0 \2.0 1.1 5.7 6.0 i 2 PMSU20 25 16 1 2.0\2,5 11 6.0 6.0 PMSU30 20 2 1.3 3.0 \2.0 2.1 6.2 7,2 PMSU30 30 3 19 3.0\3.0 2.1 7.2 7,2 Pfti5SU40_30 4,5 3 4.0\3.0 5.6 S.6 9.5 PIVISU40 40 0 3.9 4.0 \4.0 5.0 9.6 9,5 pswcao^ 20 2 13 3.0 \ 2.0 19 6.0 7,2 h PSW30_30 3 19 3.0 \ 3.0 IS 7.0 6.0 PSVVC30 30 3 19 3.0 \3.0 2.1 7.0 7.2 £ QL PSVVC40 30 i 4.5 3 4.0 \3.0 19 g.5 8.3 —>>• PSWC40 40 • n 6 3.9 4.0\4.0 19 9.6 8.3 PSW60_42 9 SJ ao\4,2 19 9.6 9,5 PSVVC56 40 9 5.8 5.6\4.0 19 9.6 9.5 s PSW50_50 11 7.1 5.0\5.0 19 10.3 9.5 PSW356_53 14 9 5.6\5.3 1.9 10.9 9.5 PSWC56_6S 19 12 5.6\6.S 19 12.6 9.5 pswcse 78 25 16 5.6\7.8 19 13.6 9^.6 PSW70 70 25 17 7.0\7.0 3,9 14 12.5 pmmo m m 19 10.0\6.0 6.9.0f14,1 12 PSW1O0L8O 50 32 10.0\8.0 6.9or14.1 14 18 PSW100 100 64 41 10.0 \ 10.0 6.9 or 14.1 16 = s CSW150 134 148 95.5 15.0 \ 13.4 14.1*** 19.6*** 25.5 to g CSVV20CL164 270 174 20.0 \ 16.4 14.1*** 22.6*** 34.5 Q a. CSW240 160 300 194 24.0 \ iao 14.1*** 212*** 41 *CDS Piecast Marihole Irsert Unit (PMRJ). Pfscast Mantote Stonmwater Unit (PMSy), PrecastStorimvaterConcer«c Precast (P). and Gast In Pfece (C), Stormv^^tser (SW) (PSWC). XDS Technologies can cigtomize ui^ts to meetspecfflc design ftows and sump capacif es *Sump Capacifies arKl Deptfi Below Pipe ln*«rtcan vary dte to specific ate design http://www.cdstech.com/dnlds/docs/CDS%20Unit%20Capacities.jpg 10/18/2005 HYDROLOGY STUDY SD L-IA Costa Del Mar Entry Hydrology Study • • • CONSULTING PLANNING • DESIGN • CDNSTRUCTIQN SaO.479.380B • WWW.RBr.COM .inR SHEETNO. OF ' CALCULATED BY DATE *°U€.\0S CHECKED BY DATE SCAl F ^3^100 ' 12.42 (L^ 9^') 2^' 31: Vi s. 'eiJeo Tfcr D