HomeMy WebLinkAboutCT 03-01-02; LA COSTA RESORT & SPA PHASE 2; SEWER FACILITY STUDY; 2004-11-01Wafer Resources Engineering Consuttants llll West Town and Country Road, Suite 42 Orange, Califomia 92868 Phone: (714) 571-5500 Fax: (714) 571-5599 E-mail: email@sandrewsengineering.com MEMORANDUM To: Chris Bergh MDS Consulting From: Nancy E. Baker Date: November 1, 2004 Subject: La Costa Resort and Spa (LCR&S) Master Plan Sewer Facility Study Job No. 164-04 TNTRODUCTION The ouroose ofthis study is to analyze the on-site existing and proposed sewer facilities for the devebpment ofthe LCR&S Master Plan (Master Plan). The Master Plan '^7-ts of remod^^^^^^ several of the existing LCR&S facilities and the construction of 165 villas. .The foll^;."^ analysis ofthe LCR&S sewer facilities is based on discussions with and data received firom Mike CuJcV KSL Resorts Steve Deering, Dudek and Associates and Frank Reynaga, Leucadia Wa'^^a^e" and the LWD Sewer Master Plan (LWD MP), dated July 1999. ANALYSIS The LCR&S is located within the LWD service area. The LCR&S sewer facilities consist of both private and public sewers. The flows generated by the LCR&S gravity feed into the La Costa Lift Station located in LWD Drainage Basin #11. The lift station is owned and operated bv the LWD The La Costa Lift Station existing / ultimate capacity and existmg / ultimate average day and peak flows tributary to the station shown m Table 1 were obtained from the LWD MP. Table 1 T a rosta T ift Station Capacity and Flows Station Capacity (gpm) Average Day Flow (gpm) Peak Flow (gpm) Existing 3,000 700 1,400 Ultimate 3,000 920 1,800 Per LWD it has been determined that the existing public sewer facilities (including the La Costa Lift Station are sufficient to convey the additional sewer flows generated by the Master Planned facihties However, LWD has requested that an on-site sub-area sewer master plan be developed traccLt r all ixistmg and proposed EDU's and develop existing and proposed/ultimate flows generated by the LCR&S facilities along with a map showing all existmg and future sewer facilities. The attached Exhibit A, LCR&S Sewer Facility Map shows the existmg and proposed sewer facilities for the LCR&S. SAE \ Page 1 CTo3 ^01-oz La Costa Resort and Spa November 1, 2004 Sewer Facility Study allotments. The current EDU count mcludes altotmenK ,f ^,„iQyy These EDU's added 12/18/02) and <^'^fZ^,^^^ZS^\i^^^iii,ion.Aeounc^iEDV improvements are •-'f-^f;t^^^^XT:^^^^^^ ' -"^std'^rr^ rtiSrrmfSCndrr^^^^ Plan. Xhe ulttmate EDU's for the Master ^^^;^^^f2::^^^^"^^^^^ November 1,2004 Table 3 LCR&S Sewer EDU Breakdown Facility Description Existing Unit Existing EDU per Unit Existing EDU's Ultimate Unit Revised EDU per Unit Ultimate EDU's Net EDU Gain /(Loss) Gas Pumps 3 Pumps 2.0 for 4 or less pumps 2.00 3 Pumps 2.0 for 4 or less pumps 2.0 2.00 4.00 0 0 Floor drains Ballroom Homes 2 Drains 962 seats 6 2.0 1 per 40 seats 1 4.00 24.05 6.00 L urams 2162 seats 0 1 per 40 seats 54.05 0 30.00 (6.00) TOTAL EDU'S 452.79 550.32 97.53 Table 4 shows the estimated existing and ultimate average sewage flows Pe'" l^^^a^^^ °" the EDU's shown in Table 3 and an average flow factor of 215 gpd/EDU per the LWD Standard Spec Book, dated October 13, 1999. SAE Page 3 \ La Costa Resort and Spa Sewer Facility Study November 1, 2004 ,.„e 5 shows the estimated exrstms and ultimate pea. no.s perVaclllt, hased on the EDU's Shown in Table 3 and a peak flow factor of 2. Page 4 SAE \ La Costa Resort and Spa g^w^r Facility Study November_L2004 A .r.A neak sewage flows generated by \ La Costa Resort and Spa Q.wf^r Facility Study Novemberl^2004 NEB\LCR&S_Sewer_Study.doc Page 6 SAE \ f