Loading...
HomeMy WebLinkAboutCT 73-49; Arco AM-PM Mini Market; Drainage Study; 1992-05-12HYDROLOGY AND DRAINAGE STUDY FOR ARC0 AM-PM MINI-MARKET C.U.P. 91-3 TABLE OF CONTENTS SHEET 2 ...................... SITE CONDITIONS & DRAINAGE CHARACTERISTICS SHEET 3 ...................... DESIGN DATA & METHODS SHEET 465 ................... DRAINAGE CALCULATIONS APPENDIX I ................... CHARTS & GRAPHS APPENDIX II .................. HYDROLOGY PLANS SHEET 1 SITE CONDITIONS: EXISTING CONDITIONS CONSIST OF AN IMPROVED LOT FORMERLY OCCUPIED BY THE BANK OF SAN DIEGO WITH PAVED AND LANDSCAPED AREAS. SEE CITY DRAWING 228-5 FOR REFERENCE GRADING AND IMPROVEMENT PLANS. NO OFF-SITE AREAS DRAIN ONTO OR ACROSS THE EXISTING'AREAS TO BE REGRADED AND IMPROVED. DRAINAGE CHARACTERISTICS: RUNOFF WILL BE LIMITED TO SHEET FLOW FROM LANDSCAPED SLOPES AND PAVED AREAS WITH BUILDING ROOF AREAS DISCHARGING ONTO PAVED AREAS THROUGH CURB OUTLETS OR ONTO SPLASH BLOCKS IN LANDSCAPED AREAS AND COLLECTED BY SURFACE DRAINAGE SWALES, EXCEPT FOR PUMP ISLAND CANOPY, WHICH WILL BE DRAINED THROUGH UNDERGROUND PIPES. RUNOFF WILL BE CONTROLLED BY SURFACE IMPROVEMENTS CONSISTING OF CONCRETE CURBS AN0 GUTTERS, AND CONCRETE SWALES DIRECTING FLOW TO POINTS OF DISCHARGE AT EXISTING DRAINAGE FACILITIES OR TO NEW SUB-SURFACE SYSTEMS. SHEET 2 DESIGN DATA & METHODS DESIGN BASE0 UPON THE SAN Dl EGO COUNTY FLOOD CONTROL DESIGN 8 PROCEDURE MANUAL DATA USED: 1. 2. 3. 4. 5. SOIL TYPE FOR NON PAVED AREAS - GROUP C RUNOFF COEFFICIENTS FROM APPENDIX I-X LANDSCAPED AREA 0.40 ROOF & PAVE0 AREA 0.90 - CONSERVATIVE SINCE TOTAL IMPERVIOUS AREA 90% USE 0.90 TIME OF CONCENTRATION.TI FROM URBAN AREA FLOW CURVES APPENDIX X-C FOR SHEET FLOW; VELOCITY FOR GUTTER FLOW FROM APPENDIX X-D; VELOCITY FOR CONCRETE SWALES FROM MANNING'S EQUATION FOR OPEN CHANNELS; VELOCITY FOR PIPE FLOW FROM MANNING'S EQUATION. Tc = Ti + Tf TI (OVERLAND FLOW TIME OR INLET TIME) Tf (TRAVEL TIME IN GUTTER, SWALE OR PIPE) EXAMPLE OF CALCULATION PROCEDURE FOR Tc DETERMINATION INITIAL SOAKING TIME - 5 MlN. (CITY OF CARLSBAD) USE 5 MIN. "C" FACTOR OF DRAINAGE AREA A-I - 0,40 DISTANCE FROM MOST REMOTE POINT OF DRAINAGE AREA TO POINT OF DISCHARGE @ A-2 = 65 FEET AVERAGE SLOPE - .049 FROM OVERLAND FLOW CHART (APPENDIX X-C) T1 - 6 MlN. "C" FACTOR OF DRAINAGE AREA A-2 0.90 DISTANCE = 35' SLOPE = .02 10 MlN. (COUNTY DRAINAGE MANUAL) FROM CHART T~ 1.5 USE 1 MIN. Tc = 5 + 6 + 1 = 12 MIN. STORM INTENSITY FACTOR I FROM INTENSITY DURATION CHART APPENDIX XI-A Q50 Ql 00 - RUNOFF IN CFS FOR 50 YR. STORM FROM RATIONAL FORMULA Q - CI'A - RUNOFF IN CFS FOR 100 YR. STORM FROM RATIONAL FORMULA Q CIA SHEET 3 APPENDIX I CHARTS E GRAPHS SHEET 4 SHEET 5 .. c 0 c. m u P c " c 4 e L U c 0 c. 0 tu c I - FA c nc N m - n A n d ln 6-Hour Precipitation (inches) g 0uIoY)oIn 0 om? 0 In .. 0 .. w3 * w 4. 6-Hour Precipitation (inches) 5 olnoyou! ... . 9 8, &o .. 0 ! . SAN DlEGO COUNTY DEPARTMENT OF SPECIAL DISTRICT SERVICES DES GN MANUAL URBAN AREAS OVERLAND TIME OF FLOW CURVES APPROVED /F*kL4L f /? (*'e' IV44 2 . .. - 1.5' 4 2 a, n: .Gin 2% . Deplh RESIDENTIAL STREET ONE SIDE ONLY ! EXAMPLE: Given: a = IO s = 2.5 */. Chart giver1 Deplh = 0.4, Velocity = 4.4 tpr. SAN DlEGO COUNTY DEPARTMENT OF SPECIAL DISTRICT SERVICES APPROVE0 fid DATE ~-!&& I APPENDIX X-0 GUTTER AND ROADWAY DISCHARGE-VELOCITY CHART DESIGN MANUAL IV-A- I3 TABLE 2 RUNOFF COEFFICIENTS (RATIONAL METHOD) DEVELOPED AREAS (URBAN) Land Use Residential: Single Family Hulti-Units Mobile homes Rural (lots greater than 1/2 acre) Comnercial(2) 80% Impervious Industrial(2) 90% Impervious NOTES : - A .40 a45 .45 .30 -70 .80 "2- Coefficient C Soi I F~up (1) - B C - .45 .so .50 .60 .50 .55 .75 . .80 .85 @ - 0 .55 . 70 .65 * 45 .85 .95 (l)s0il Group m&s are available at the 'dffices.'of the Department of Public Works. (*)Where actual conditions deviate significantly from the tabulated impervious- by multiplying 80% or 90% by the ratio of actual imperviousness to the ness values of 80% or 90%. the values given for coefficient C. may be revised be less than 0.50. For example: Consider comrcial property on 0 soil.-group. tabulated imperviousness. However, In no case shall the final coefficient Actual imperviousness - 50% Tabulated imperviousness - 80% - Revised C - 0 x 0.85 = 0.53 80 IV-A-9 APPENDIX IX-B Rev. 5/01 Group B Soils having moderate infiltration rates when thoroughly wetted, consisting chiefly of mod- drained soils with moderately fine to mod- erately deep to deep, moderately well to well moderate rate of water transmission. erately coarse texturqs. These soils have a Group C Soils having slow infiltration rates when thoroughly wetted, consisting chiefly of (1) soils with a layer that impedes the downward movement of water, of (2) soils with moderately fine to fine texture and a slow rate of water transmission. slow infiltration rate. These soils have a Group D Soils having very slow infiltration rates when thoroughly wetted, consisting ~iefly of (1) clay soils with a high swelling potential; ' (2) soils with a high permanent water table; (3) soils with clay pan or clay layer at nearly impervious materials. These soils have or near the surface; and (4) shallow soils over a very slow rate of water transmission. Soil group and soil cover maps have been prepared by the Soil Con- servation Service, and include most oi: the County. The maps are available at the offices of the Department of Sanitation and flood Control. I The Department of Sanitation and Flood Control has developed a computer prop- for calculating CN numbers after soils groups and covers have been tabulated for given basin and sub-basins. Tabulation is usually - accomplished by using a one-half or one inch square grid and listing _' . . the group and cover at each intersection. The hydrologic condition of soil cover must be determined for each basin or sub-basin. Photos and slides showing typical hydrologic conditions of soil cover for many areas of San Diego County can be examined at the office of the Department of Sanitation and Flood Control 4 I-A-4 REV. 11/75 - I.. . d I XI-A-7 .. 1 -i 1 1 APPENDIX II HYDROLOGY PLANS