Loading...
HomeMy WebLinkAboutEIR 91-01; Rancho Santa Fe Rd Realignment and Mass Grading; Environmental Assesment;RANCHO SANTA FE ROAD ASSESSMENT DISTRICT PROGRAM ENVIRONMENTAL IMPACT REPORT (EIR) INTRODUCTION This document has been prepared by the City of Carlsbad as a Program Environmental Impact Report (EIR). The City of Carlsbad and Fieldstone/La Costa Associates are joint applicants for the proposed actions. This EIR addresses broad environmental impacts of the following at the Program level of analysis: A. The City-proposed 2,210-acre Rancho Santa Fe Road' Assessment District; and B. A General Plan Amendment (GPA) to address the relocation of Rancho Santa Fe Road proposed by the City plus a redistribution of allowed land uses proposed by Fieldstone/La Costa Associates within the General Plan Amendment area to accommodate the roadway relocation. This Program EIR has been prepared in conformance with Section 15168 of the California Environmental Quality Act (CEQA) Guidelines. As such, it is designed to accomplish the following [Section 15168 (b) and (c)]: 1. Provide a more exhaustive consideration of effects and alternatives than would be practical in a project-level EIR; 2. Ensure full consideration of the cumulative impacts associated with the proposed Program-level actions: 3. Avoid duplicative reconsideration of basic policy considerations;. 4. Provide for early consideration of broad policy alternatives and program-wide mitigation measures; 5. Reduce unnecessary paperwork; Sections 15168 (c), (d) and (e) of the State CEQA Guidelines describe the process that should be followed when considering subsequent activities in light of a previously prepared Program EIR. After due consideration of the subsequent activity and potential impacts, these provisions of CEQA would allow the City as Lead Agency to do the following with regard to subsequent activities: 1. Determine that the subsequent activity falls within the scope of the previously prepared Program EIR, and thus requires no new environmental documentation; 2. Require the preparation of a new Initial Study; 3. Issue a Negative Declaration; 4. Require the preparation of a new, subsequent or supplemental EIR (full or focused). Examples of the types of subsequent activities that could arise within the context of this Program EIR could include the following: 1. Master Plan Amendment for the La Costa Southeast Planning Area; 2. Zone 11 Local Facility Management Plan (LFMP) Amendment; 3. Individual Projects. As stated earlier, broad-level impacts of the City-proposed Assessment District and the jointly proposed General Plan Amendment have been addressed at the Program level in this document. However, because the City is desirous of initiating construction of Rancho Santa Fe Road at the completion of this environmental process, site-specific impacts for the following have been addressed at the more detailed project level within this document: 1. Relocation and expansion of Rancho Santa Fe Road to a six-lane prime arterial between La Costa Avenue and Melrose Avenue as proposed by the City. This would be completed by the City using an Assessment District financing program. 2. Associated grading that will be necessary for the roadway relocation as well as the redistribution of land uses needed to accommodate the new roadway location. Grading is to be funded by the private land owners when not required for construction of the road. Because of the interrelationship of the grading necessary for the roadway and the redistribution of land uses, this portion of the project is being jointly proposed by both the City and Fieldstone/La Costa Associates. II. PROJECT DESCRIPTION A. Project Location and Setting 1. Location The proposed Rancho Santa Fe Road Assessment District encompasses approximately 2,210 gross acres of land in the southeast quadrant part of the City of Carlsbad (see Figures 1 and 2). Its boundaries encompass all of LFMP Zones 11 and 12. The Assessment District is generally located on both sides of the current alignment of Rancho Santa Fe Road, south of Melrose Avenue and north of the City of Encinitas. The existing limits of the City of Carlsbad form the Assessment District's northeastern, eastern and southern boundaries. Details regarding the proposed Assessment District are addressed below in Section II.C.l. Within the proposed Assessment District lies a smaller area which will be the subject of a General Plan Amendment (GPA) . This GPA area consists of 736 acres and is shown in Figure 3. The purpose and details of the City-initiated GPA are discussed in Section II.e.2. Figure 4 shows the area of disturbance that will be involved in the relocation and expansion of Rancho Santa Fe Road and the associated grading program. This area includes the right-of-way for the new roadway, rights-of-way for the extension of existing roadways to connect with Rancho Santa Fe Road in its new location, and grading that will be required not only to accommodate the roadway rights-of-way, but the areas that will be disturbed to accommodate the land use redistribution addressed in the GPA analysis. Section II.C.3 provides additional detail regarding these elements of the project. WARNER SPRINGS POINT LOMA IMPERIAL^ BEACH Rancho Santa Fe Road Assessment District Regional Map Figure 1 Prxyect Design CcnTsulUmts J.N. 738.00 RANCHO SANTA FE ROAD A5SESS^^ENT DISTRICT BOUNDARY (PROPOSED) LECHNO T77i PRCOEEB 01STa:CT I—1 NOT » P»BT<0«. OK BUtT WIUIWMW PARCEI ====3='.'CE NC Rancho Santa Fe Road Assessment District Boundary 9 Project Design QynsuUants Figure 2 J.N.73«.00 TABLE 1 PARCELS AND OWNERS IN RANCHO SANTA FE ROAD ASSESSMENT DISTRICT* Reference Assessor No. Parcel No. 1 255-022-01 2 255-041-14 3 255-010-09 4 255-010-18 5 255-010-19 7 255-030-10 8 255-030-11 9 255-030-09 10 255-031-24 11 255-031-25 12 264-220-47 13 223-060-15 14 223-060-49 14A 223-060-49 — 15 223-050-64 - 15B 223-050-64 - 16 223-050-63 - 17 223-050-65 18 223-071-07 18A 223-071-07 '18B 223-071-07 18C 223-071-07 -19 223-071-05 19A 223-071-05 - 20 223-071-09 2 OA 223-071-09 21 223-032-01 22 223-032-02 23 223-011-02 24 223-021-11 24 223-021-08 26 223-021-06 27 223-011-03 28 223-011-04 29 223-050-54 30 233-050-59 31 223-050-52 32 222-470-23 33 222-156-13 34 223-010-35 35 223-021-12 Owner Fieldstone/La Costa Associates Fieldstone/La Costa Associates Fieldstone/La Costa Associates Fieldstone/La Costa Associates Fieldstone/La Costa Associates Fieldstone/La Costa Associates Fieldstone/La Costa Associates Fieldstone/La Costa Associates Fieldstone/La Costa Associates Fieldstone/La Costa Associates Fieldstone/La Costa Associates Fieldstone/La Costa Associates FLCA (Part) FLCA (Part) FLCA (Part) FLCA (Part) Fieldstone/La Costa Associates Fieldstone/La Costa Associates FLCA (Part) FLCA (Included in Ref. No. 18) FLCA (Part) FLCA (Included in Ref. No. 18) FLCA (Part) FLCA (Part) FLCA (Part) FLCA (Part) Fieldstone/La Costa Associates Fieldstone/La Costa Associates Fieldstone/La Costa Associates Fieldstone/La Costa Associates Fieldstone/La Costa Associates Fieldstone/La Costa Associates Fieldstone/La Costa Associates Fieldstone/La Costa Associates Fieldstone/La Costa Associates Fieldstone/La Costa Associates Fieldstone/La Costa Associates Fieldstone/La Costa Associates Fieldstone/La Costa Associates Fieldstone/La Costa Associates Fieldstone/La Costa Associates Gross Area 5.80 132.80 84.90 27.70 2.30 74.60 10.80 37.80 56.50 33.80 0.60 78.60- 39.10 2.80 70.20 0. 50 48.50 18.90 33.40 0.00 12.70^ 0.00 1.90 70.90 42.70 90.80 32.60 0.80 40.80 5.50 2.60 18.50 1.60 31.90 38.80 0.50 1.50 5.10 1.60 35.10 24.40 TABLE 1 (CONT'D) PARCELS AND OWNERS IN RANCHO SANTA FE ROAD ASSESSMENT DISTRICT* Reference Assessor Gross No. Parcel No. Owner Area 36 223-021-16 FLCA (Part) 10.20 37 223-021-09 Fieldstone/La Costa Associates 39.40 38 223-010-37 Fieldstone/La Costa Associates 38.10 39 223-010-12 Fieldstone/La Costa Associates 9.30 40 223-010-18 Fieldstone/La Costa Associates 0.00 41 233-010-19 Fieldstone/La Costa Associates 5.80 42 223-010-27 Fieldstone/La Costa Associates 62.00 43 223-010-29 Fieldstone/La Costa Associates 105.30 45 264-220-71 Brighton Homes 65.60 46 255-031-17 Brighton Homes 2.90 47 255-023-01 Northwest Pacific R.R. Company 3 .90 48 255-023-02 Northwest Pacific R.R. Company 0.90 49 255-040-17 Wiegand Properties Part. 41.90 50 255-040-19 Shelley, Daniel T. 47.20 51 264-010-11 Shelley, Daniel T. 67.40 52 264-010-07 Rice Enterprises 89.70 53 264-010-09 Rice Enterprises 1.40 54 264-010-25 Brighton Homes 102.60 55 264-010-22 Brighton Homes 15.20 56 264-010-23 Brighton Homes 13.30 57 264-010-21 Brighton Homes 16.80 58 255-031-18 Homes by Polygon 30.60 59 255-031-22 Homes by Polygon 20.30 60 255-031-23 Homes by Polygon 15.40 61 255-031-20 Meadowcenter II Partnership 7.60 62 223-060-40 Christopher Homes 26.70 63 233-060-29 Commonwealth Company 4.50 64 223-060-28 Union Oil Company 0.70 65 223-060-50 Mission Estancia Partnership 6.80 223-060-32 M.A.G. Properties 42.90 -^67 223-060-31 M.A.G. Properties 8.70 r68 223-061-02 Shelley, Daniel T. 40.00 |j9 223-061-01 Shelley, Daniel T. 40.00 81 223-020-16 CAL 4189 Joint Venture 6.40 Subtotal 2,209.40 * Excerpt from "Facilities Financing Plan for Local Facilities Management Zones 11 and 12, City of Carlsbad", Table 6-1 (P&D Technologies, September 29, 1989). RANCHO SANTA FE ROAD ASSESSMENT DISTRICT BOUNDARY (PROPOSED) LEGEND fTPi PROPOSt; DlSTSiCT • NOT A PAST lO.S. OR EXI*T. DCVELOPMCNI '^_** ts*. CPA AREA Rancho Santa Fe Road Assessment District Proposed General Plan Amendment Boundary and GPA Properties Figure 3 Prvject Design Consultants J.N. 738.00 TABLE 2 VKRCEL8 AND OWNERS WITHIN THE RANCHO SANTA FE ROAD ASSESSMENT DISTRICT GENERAL PLAN AMENDMENT AREA* I • I I 1 I \ I I J I i Reference Assessor Gross No. Parcel No. Owner Area 13 223-060-15 Fieldstone/La Costa Associates 78.60 14 223-060-49 FLCA (Part) 39.10 14A 223-060-49 FLCA (Part) 2.80 15 223-050-64 FLCA (Part) 70.20 15B 223-050-64 FLCA (Part) 0.50 16 223-050-63 Fieldstone/La Costa Associates 48.50 17 223-050-65 Fieldstone/La Costa Associates 18.90 18 223-071-07 FLCA (Part) 33 .40 18A 223-071-07 FLCA (Included in Ref. No. 18) 0.00 18B 223-071-07 FLCA (Part) 12.70 18C 223-017-07 FLCA (Included in Ref. No. 18B) 0.00 19 223-071-05 FLCA (Part) 1.90 19A 223-071-05 FLCA (Part) 70.90 20 223-071-09 FLCA (Part) 42.70 2 OA 223-071-09 FLCA (Part) 90.80 21 223-032-01 Fieldstone/La Costa Associates 32.60 22 223-032-02 Fieldstone/La Costa Associates 0.80 23 223-011-02 Fieldstone/La Costa Associates 40.80 24 223-021-11 Fieldstone/La Costa Associates 5.50 24 223-021-08 Fieldstone/La Costa Associates 2.60 26 223-021-06 Fieldstone/La Costa Associates 18.50 27 223-011-03 Fieldstone/La Costa Associates 1.60 28 223-011-04 Fieldstone/La Costa Associates 31.90 29 223-050-54 Fieldstone/La Costa Associates 38.80 30 233-050-59 Fieldstone/La Costa Associates 0.50 66 223-060-32 M.A.G. Properties 42.90 67 223-060-31 M.A.G. Properties 8.70 TOTAL 736.20 Excerpt from "Facilities Financing Plan for Local Facilities Management Zones 11 and 12, City of Carlsbad", Table 6-1 (P&D Technologies, September 29, 1989). <s> ^ Rancho Santa I'l Fe Road Approximate Carlsbad/San Marcos City Boundary Proposed Melrose Drive/ Rancho Santa Fe Road intersection Reconfiguration La Costa Meadows D rive >>////////////; •vl CO CO b o PROPOSED ROAD FUTURE ROAD DISTURBED AREA Proposed Bridge Across SM Creel-; Questhaven Road Realignment > ^ 0) -I zL <D ^ 0) (0 SiB c o fij) i-*< 3 -1 O o' <D i-f 3D 0) 3 O 0) 03 •n (D 3D O S3 a o 03 O EL CD 2. Setting As noted earlier, the proposed Assessment District encompasses all of LFMP Zones 11 and 12. Zone 11 extends from roughly Encinitas Creek on the south to San Marcos Creek and Questhaven Road on the north. The southernmost portion is drained by Encinitas Creek. The central portion is drained by an unnamed tributary to Encinitas Creek which joins Encinitas Creek. The northern portion drains into San Marcos Creek. The area is fairly hilly, being marked by a series of drainages and ridges. The ridgeline in the northernmost aspect of the zone reaches over 990 feet in elevation, then quickly drops to the south down a 24% slope to the head of the central intermittent drainage. The slopes elsewhere in the study area are not as severe, but are still fairly steep. An east-west tending ridge in the southernmost portion of the zone rises over 100 feet above Encinitas Creek with north-facing slopes of 24%. Vegetative cover types include coastal sage scrub, chaparral, grassland, oak woodland, riparian woodland, elderberry woodland, and eucalyptus. The environmental setting of Zone 12 has been addressed in previous environmental documents, most notably the draft "Arroyo La Costa Master Plan EIR", which is incorporated by reference into this EIR. B. Construction Phasing Phasing of the Road and Grading Construction program is anticipated to be as follows: Phase I Phase I construction consists of mass grading the area shown on Figure 5. In order to have existing Rancho Santa Fe Road remain open through the Road and Grading Construction program, it may be necessary to stage the grading operation and stockpile material in the area between the proposed Rancho Santa Fe Road alignment and the existing road and also in the area west of the existing road north of the existing La Costa Vale Subdivison. This stockpiled material will then be used to complete the mass grading during the Phase III operation. Material will only be stockpiled in areas proposed for grading. 11 Rancho Santa Fi ^.^ Industrial Park MASS GRADING N o CO Figure 5 Rancho Santa Fe Road i Assessment District Construction PHASE I Stanley Mahr Rasarvoir - MASS GRADING Legend ii CONSTRUCTION AREA-PHASE Project Design CorisuJuif us J.N. 738.00 Grading will also need to be staged to preserve existing utilities in their existing positions until they can be relocated during the Phase II construction. Once the Phase I construction has commenced, it will be necessary to close the Truck Bypass for the existing Rancho Santa Fe Road. Therefore, the existing roadway will be open to traffic without the Truck Bypass from the commencement of the Phase I construction until the southerly portion of the new alignment is completed during the Phase II construction. Phase II Once the grading operation for Phase I establishes the new alignment and subgrade for Rancho Santa Fe Road, existing utilities impacted by the grading and realignment of the road can be relocated into the new alignment and abandoned from their existing positions. This phase also consists of construction of improvements for Rancho Santa Fe Road in its new alignment, between La Costa Avenue and the temporary detour, along with extension of Calle Esfera to connect to the new alignment, as shown on Figure 6. The existing Rancho Santa Fe Road will remain open to traffic until Phase II is complete. Upon the completion of this portion of roadway, traffic will be routed onto the new alignment between La Costa Avenue and the temporary detour to allow the Phase III construction to proceed. Phase III A and B This phase consists of two components, and will allow for completion of the Rancho Santa Fe Road and Grading Construction program. Phase IIIA: Since traffic can be moved onto the new alignment of Rancho Santa Fe Road constructed in Phase II, the existing Rancho Santa Fe Road between La Costa Avenue and the Temporary Detour can be closed to allow for completion of the mass grading in the area west of the new alignment, as shown on Figure 7. Construction of Rancho Santa Fe Road between the Temporary Detour and the San Marcos Creek bridge, along with the realignment of Questhaven Road to connect with the new alignment of Rancho Santa Fe Road will also be completed as part of Phase IIIA. 13 Rancho Santa Fa Industrial Park N CO o cn Stanley Mahr Rasarvoir DETOUR Legend Si CONSTRUCTION AREA-PHASE I Figure 6 Rancho Santa Fe Road Assessment District Construction PHASE II ^ PrqjeaDesign ConsidtcGTXs J.N. 738.00 Rancho Santa Fa Industrial Park N OJ CO o CO o Z /"PHASE ROAD AND BRIDGE PHASE III A: MASS GRADING AND ROAD SOUTH OF BRIDGE Stanley Mahr Raaarvoir CONSTRUCTION AREA-PHASE ll! Figure 7 Rancho Santa Fe Road Assessment District Construction PHASE III A AND III B PrqjeaDesign ConsuUctnts J.N. 738.00 I I I Phase IIIB: The bridge at San Marcos Creek and Rancho Santa Fe Road north of the bridge is to be constructed in Phase IIIB. Traffic at this intersection of Rancho Santa Fe Road and Melrose Drive will likely need to be locally detoured while connection to the existing road alignments is completed. Although this phasing description provides a specific outline of work for each phase, it should be noted that elements described in each phase will probably overlap to accommodate a single, continuous construction program for the entire project. It should also be noted that the mass grading associated with the M.A.G. Property, located at the southern end of the road project, could be completed as a seperate phase. Discretionary Actions The City of Carlsbad is an applicant for the proposed Rancho Santa Fe Road Assessment District and will also serve as Lead Agency per the requirements of the CEQA. Discretionary actions include the following: 1. Certification of the final Rancho Santa Fe Road Assessment District Program EIR; 2. General Plan Amendment; 3. Approval of the proposed Rancho Santa Fe Road Assessment District; 4. Approval of a grading plan for the roadway and redistribution of the associated land uses. 5. Issuance of engineering and grading permits for the construction of Rancho Santa Fe Road and grading for the associated land uses. Based on our current understanding, responsible Agencies of the project, as defined in the CEQA Guidelines, are as follows: 1. U.S. Army Corps of Engineers (ACOE) for the issuance of a Section 404 Permit related to the crossing of San Marcos Creek; 2. California Department of Fish and Game (CDFG) for a Section 1601 Streambed Alteration Permit; 16 Project Characteristics Each of the major elements of the proposed activities addressed within this EIR are described below. 1. Rancho Santa Fe Road Assessment District Land within the City-proposed 2,210 acre District is currently vacant and, as regards CEQA, falls into one of two categories. One category consists of land which has been subject to previous analysis under CEQA at the project level and for which either: (a) a draft EIR has been prepared and is being processed through the City (Arroyo La Costa/Calle Barcelona); (b) a certified EIR already exists; or (c) a Negative Declaration has been issued. These properties are shown in Figure 8 and are listed in Table 3. Because they have already been evaluated with regard to CEQA and are merely awaiting Final Maps or building permits, no further analysis of potential impacts related to these properties is included in this Program EIR. Their inclusion in the Rancho Santa Fe Assessment District is for financial and funding purposes only. The other category is comprised of land which carries General Plan land use designations, but which must still be subjected to more detailed analysis and further consideration under CEQA. These properties comprise the GPA area and were previously shown in Figure 3. They are also listed in Table 2. Section II.C.2 below describes the proposed GPA. 17 RANCHO SANTA FE ROAD I I LEGEND g2 PBOOOSE; D1STP:C7 I—I NOT * SiST fO.S. OR EXTT 0«vf 03 4»5E5»MtMT OWTKICT P«0««T« NOT WrrXIN 6PA ARfA Rancho Santa Fe Road Assessment District Properties Not In GPA Area Figure 8 Prq^ Design ConsuJkmts JLN. 73«.OC TABLE 3 PARCELS AND OWNERS WITHIN THE RANCHO SANTA FE ROAD ASSESSMENT DISTRICT BUT NOT THE GENERAL PLAN AMENDMENT AREA* No. 'erence Assessor Parcel No. Owner Gross Area 1 255 -022-01 Fieldstone/La Costa Associates 5. 80 2 255 -041-14 Fieldstone/La Costa Associates 132. 80 3 255 -010-09 Fieldstone/La Costa Associates 84. 90 4 255 -010-18 Fieldstone/La Costa Associates 27. 70 5 255 -010-19 Fieldstone/La Costa Associates 2. 30 7 255 -030-10 Fieldstone/La Costa Associates 74. 60 8 255 -030-11 Fieldstone/La Costa Associates 10. 80 9 255 -030-09 Fieldstone/La Costa Associates 37. 80 10 255 -031-24 Fieldstone/La Costa Associates 56. 50 11 255 -031-25 Fieldstone/La Costa Associates 33. 80 12 264 -220-47 Fieldstone/La Costa Associates 0. 60 32 222 -470-23 Fieldstone/La Costa Associates 5. 10 33 222 -156-13 Fieldstone/La Costa Associates 1. 60 34 223 -010-35 Fieldstone/La Costa Associates 35. 10 35 223 -021-12 Fieldstone/La Costa Associates 24. 40 36 223 -021-16 FLCA (Part) 10. 20 37 223 -021-09 Fieldstone/La Costa Associates 39. 40 38 223 -010-37 Fieldstone/La Costa Associates 38. 10 39 223 -010-12 Fieldstone/La Costa Associates 9. 30 40 223 -010-18 Fieldstone/La Costa Associates 0. 00 41 233 -010-19 Fieldstone/La Costa Associates 5. 80 42 223 -010-27 Fieldstone/La Costa Associates 62. 00 43 223 -010-29 Fieldstone/La Costa Associates 105. 30 45 264 -220-71 Brighton Homes 65. 60 46 255 -031-17 Brighton Homes 2. 90 47 255 -023-01 Northwest Pacific R ,R. Company 3. 90 48 255 -023-02 Northwest Pacific R.R. Company 0. 90 49 255 -040-17 Wiegand Properties Part. 41. 90 50 255 -040-19 Shelley, Daniel T. 47. 20 51 264 -010-11 Shelley, Daniel T. 67. 40 52 264 -010-07 Rice Enterprises 89. 70 53 264 -010-09 Rice Enterprises 1. 40 54 264 -010-25 Brighton Homes 102. 60 55 264 -010-22 Brighton Homes 15. 20 56 264 -010-23 Brighton Homes 13. 30 57 264 -010-21 Brighton Homes 16. 80 58 255 -031-18 Homes by Polygon 30. 60 59 225 -031-22 Homes by Polygon 20. 30 19 TABLE 3 (CONT'D) PARCELS AND OWNERS WITHIN THE RANCHO SANTA FE ROAD ASSESSMENT DISTRICT BUT NOT THE GENERAL PLAN AMENDMENT AREA* Reference No. 60 61 62 63 64 65 68 69 81 TOTAL Assessor Parcel No. 255- 255- 223- 233- 223- 223- 226- 223- 223- 031-23 •031-20 •060-40 060-29 060-28 060- 50 061- 02 061-01 020-16 Owner Homes by Polygon Meadowcenter II Partnership Christopher Homes Commonwealth Company Union Oil Company Mission Estancia Partnership Shelley, Daniel T. Shelley, Daniel T. CAL 4189 Joint Venture Gross Area 15.40 7.60 26.70 4.50 0.70 6.80 40.00 40.00 6.40 1,471.70 Excerpt from "Facilities Financing Plan for Local Facilities Management Zones 11 and 12, City of Carlsbad", Table 6-1 (P&D Technologies, September 29, 1989). 20 The purpose of the AssessnfininDistxl^ funding for the coristruction of two arterial rdad^, Rancho Santa Fe Road land Callu Duiceluna, accordance with the JJunicipal Improvement Act 1913 and assessment di^€rttrb--feonds to bo isstied-ln accordance with the Improvement Bond Act of 1915. Section 6.0 of the draft "Facilities Financing Plan for Local Facilities Management Zones 11 and 12, City of Carlsbad" (P&D Technologies, September 29, 1989) which is currently being processed by the City provides additional details regarding the proposed Assessment District, and in accordance with Section 15150 of the State CEQA Guidelines, is incorporated by reference to this EIR. 2. General Plan Amendment Relocation of Rancho Santa Fe Road, as proposed, will require that the City's General Plan be updated to show the new roadway location. However, by relocating the road, it will also be necessary to revise the adjacent land uses to better accommodate its new location. For this reason, the City and Fieldstone/La Costa Associates are initiating a General Plan Amendment which will provide for a redistribution of land uses within the GPA area. This redistribution will merely redefine the limits of the current land use designations, with no net loss or gain in the number of residential units currently allowed. However the General Plan Amendment will result in an increae of open space designated area from the current 41.7 acres to approximately 266 acres, office designated area (0) from 11.5 acres to 20.1 acres, and commercial designated area (C) from 36.7 acres to 53.9 acres. Figure 9 shows the existing land use designations within the GPA area with Rancho Santa Fe Road in its current location. Figure 10 shows the proposed land uses with Rancho Santa Fe Road moved easterly to its new location. Tables 4 and 5 provides a before-and- a fter sramary pt the X^M .MsgjgjaJ^ii^L^^ • Conformance to these proposed land uses with the existing General Plan, the La Costa Master Plan and the LFMP Zone 11 is discussed in the Land Use section of this EIR. 21 COiWIT or SAM OICGO CitT Of fNCINIlA NOTE: The new conceptual alignment ol Rancho Santa FeJRd. *°~" was approved by the City Council on October 20. 1987. GROWTH FiQure 9 MANAGEMENT • General Plan Designations PROGRAM Zone 11 Rancho Santa Fe Road Assessment District Existing Land Use Designation In GPA Area Project Design Consultants J.N. 738.00 AREA PROPOSED TO BE AMENDED citv Of S.H I ciiy Of ;Ncirii(#s OS open Space NOTE- ^''^ conceptual allgnniGnl ol Rancho Santa Fe was approved by the City Council on October 20, 1987. Proposed Land-Use Designations in GPA Area Figure 10 Project Desi^ Consultants J.N. 738.00 I • I I I 3. Relocation of Rancho Santa Fe Road and Associated Grading A "Route Adoption Report" has been prepared for the relocation of Rancho Santa Fe Road (Project Design Consultants, September 15, 1989) which is incorporated by reference into this EIR. It provides a detailed description of the roadway relocation and expansion project being proposed jointly by the City and Fieldstone/La Costa Associates and forms the basis for the summary description provided below. Rancho Santa Fe Road is generally a north-south road which links the circulation systems of the Cities of Carlsbad, San Marcos and Encinitas. The road is presently designated as a six-lane prime arterial in the City of Carlsbad's General Plan. The referenced Route Adaption Report proposes to relocate the road from its present alignment to the "Canyon Alignment", which moves the portion of the road between Melrose Avenue and La Costa Avenue approximately 1/4 mile east of its present location.• Associated with the roadway relocation project is a grading program, the extent of which was previously shown in Figure 4. In addition to altering the landform as needed to expand Rancho Santa Fe Road to six lanes and move it from its current location to that shown earlier, the proposed grading program is also designed to accommodate the proposed land use redistribution shown in Figure 10. As a result, the area that will be disturbed through cut and fill activity will encompass approximately 475 acres, as shown in Figure 4, and will involve the movement of roughly j&-^million cubic yards of earth. S. In addition, the proposed grading program will also accomplish the following: a. Provide for the extension of Esfera Street from its current terminus to connect with Rancho Santa Fe Road in its new location; b. Ensure the availability of good quality soils for the roadbed and subgrade; c. Ensure that adequate grading is accomplished during the roadway project so that soils will not have to be transferred from one side of the six-land road to the other after the road is open to traffic. 24 d. Minimize local disturbances to the community through grading (dust, noise, traffic, etc.) by completing the grading program in one operation; e. Improve the economic viability and cost effectiveness of the roadway project through economies of scale. D. Project Objectives The objectives of the proposed Rancho Santa Fe Assessment District Project are as follows: 1. To provide for the timely relocation and expansion of Rancho Santa Fe Road to a six-lane prime arterial roadway, as called for in the Circulation Element of Carlsbad's General Plan. 2. Through the expansion of Rancho Santa Fe Road, to eliminate a notoriously unsafe roadway, thereby contributing to the future health, safety and welfare of the residents of Carlsbad and surround areas, as well as commuters who use the road daily. 3. To provide a vital link in the region's roadway network. 4. To establish a means of financing the realignment and expansion of the roadway through the formation of an Assessment District. 5. To establish land use designations within the City's Land Use Element and the Zone 11 Management Plan. 6. To provide a Program EIR which can be used in the future by the City to process individual applications or tentative maps for land within the Assessment District, in conformance with Section 15168 of the CEQA guidelines. 25 LIST OF FIGURES Figure 1 Figure 2 Figure 3 Figure 4 Figure 5 Figure 6 Figure 7 Figure 8 Figure 9 Figure 10 Rancho Santa Fe Road Assessment District Regional Map Rancho Santa Fe Road Assessment District Boundary Rancho Santa Fe Road Assessment District General Plan Amendment Boundaries and GPA Properties Rancho Santa Fe Road Assessment District Area of Distribution Rancho Santa Fe Road Assessment District Construction Phase I Rancho Santa Fe Road Assessment District Construction Phase II Rancho Santa Fe Road Assessment District Construction Phase III Rancho Santa Fe Road Assessment District Properties not in GPA Area Rancho Santa Fe Road Assessment District Existing Land Use Designations in GPA Area Rancho Santa Fe Road Assessment District Proposed Land Use Designations in GPA Area Table 1 Table 2 Table 3 LIST OF TABLES Parcels and Owners in the Rancho Santa Fe Road Assessment District Parcels and Owners within the Rancho Santa Fe Road Assessment District and the General Plan Amendment Area Parcels and Owners within the Rancho Santa Fe Road Assessment District but not the General Plan Amendment Area 26