Vista -Carlsbad -Buena Joint Sewerage System
AUDIT REPORT
June 30• 1967
CA ltltOLL & BIi.A nTLE~, ASSOCIATES
CERTI P-1 ED PUBLIC ACCOUNTANTS
..
• ..
• ..
• .. --• --.. ---.. .. .. -----------.. -------
Cflll.ll.OLL & Bll.flnTLfY, fl550Clf1Tf5
CERTIF"IEO PUBLIC ACCOUNTANTS
W. T, CAR ROLL, C, P.A •
H, W. BRANTLEY, C. F>. A,
Joint Advisory Committee
City of Carlsbad
Carlsbad, California
Gentlemen:
901 DOVER DRIVE, SUITE 220
nEWPOll:T BEflCH, CflllfOQnlfl 92660
AREA CODE 714
646-442B · 545-7792
MEMBERS AMERICAN
INSTITUTE OF CERTIFIED
PUBLIC ACCOUNTANTS
MEMBERS CALIFORNIA
SOCIETY OF CERTIFIED
PUBLIC ACCOUNTANTS
October 5, 1967
We have audited the books and records of the Administrator (the City of
Carlsbad) and made random tests of the Operator's (San Diego County) records
and verified flow readings at the Encina Water Pollution Control Facility
for the fiscal year ended June 30, 1967,
Our report includes billings by the Operator for expenses incurred during
the fiscal year under review, even tho funds were not expended until a sub-
sequent date, In addition, a payment made by Vista for the June 1966 billing
by the Administrator which was received in the current fiscal year was applied
to the 1965-66 year in our previous report and therefore is not taken into
account again in this current period under review,
The underpayment by Vista resulted primarily from Operator's billings for
the last month (plus late charges) considerably in excess of the estimate,
The amount received by the City of Carlsbad is offset by charges in a like
amount since all of the costs are borne by the City's Sanitation Fund and
receipts are credited to this fund,
The underpayment of $8,398 should be billed separately to Vista so that it
can be readily identified and Buena's overpayment of $1,471 should either be
paid to them, preferably, or deducted by Buena from its next payment or
payments,
Actual sewage flow obtained by us at the Encina plant was substantially the
same as that recorded by the Operator's Engineers and we therefore accepted
the County's flow records,
We mention again the possibility of insurance being allocated in some other
manner than sewage flow and, in addition, would appreciate a more detailed
estimate of infiltration, if feasible, to protect Carlsbad's interest, The
reading at the Encina plant, less Buena and Vista's flow readings, are assumed
to be Carlsbad's flow and charged accordingly, Any errors appear to be
absorbed by Carlsbad,
• .. ..
• ..
• --.. -.. -.. .. .. -.. -.. ----• .. .. .. ----..
------
Joint Advisory Committee
City of Carlsbad
-2-Octobers, 1967
Costs incurred by the County and T V line inspection referred to as "special
investigation" on the Operator's records should be charged to the _May Co.,
whose contractors were responsible for certain line damage. The expenses
were allocated on the basis of sewage flow and any recovery should be credited
to the participants on that basis, The amount to be recovered is $1,785,64,
Minutes of proceedings should, in our opinion, be formalized to a greater
degree than at present and be signed by the Secretary, We were hard pressed
to determine who was authorized to act as Chairman, as we read the minutes,
In our opinion, the statement presented is substantially correct and reflects
the position of the participants at June 30 1 1967 and the results of the
operations for the fiscal year then ended applied on a basis consistent with
that of the preceding year,
Very truly yours,
CARROLL & BRANTLEY
By __ w ___ '7'1...,.~;--a-r-tn_e_r_~---~----
WC:hw
-• Vista -Carlsbad-Buena Joint Sewerage System .. ALLOCATION OF OPERATING COSTS AND REVENUES -SUMMARY
• For the Year Ended June 30, 1967 .. City Sanitation Districts Total of ---Costs Carlsbad Vista Buena --.. -OPERATOR'S BILLINGS:
Encina plant -Unit I 46,839 17,892 28,188 759
Buena Vista pump statjon -Unit C 12,133 12,133
Vista metering station -Unit A 2,737 2,737 -Agua Hedionda pump station• -Unit G e,000 3,420 5,388
Ocean outfall -Unit ,J 1,895 724 1,1',0 3} .. Trunk line repair, etc. 1,1120 542 855 23 -Supervision and consulting
service, etc. 3,722 1,422 _2,2110 60 . --77,554 211,000 52,681 873
• Damage investigation to be
recovered from May Co, 1L78!_ 682 11075 29 .. 791340 24z682 531756 902
• ADMINISTRATOR'S COSTS: .. Directors' meetings 950
Engineering consulting • and auditing 803
Insurance 2,087 -Office expense and equipment 952
• *Repair Encina plant storm damage _!L8E • -0 15011 2,301 5 1110 139
TOTAL COSTS 87,944 27,969 58,934 1,0111
• Billings to participants 81,017 27,969 50,536 2,512 ----UNDER (OVERPAYMENT) 61927 0 1390 ..il.i..';?1) • = -----SEWAGE FLOW ALLOCATED FOR 1966-67 --Percent to Total
Millions Vista -of Vista Carlsbad -Gallons Carlsbad Buena ---.. City of Carlsbad 324,34 38,83 38,20
Vista Sanitation District 510. 99 61,17 60, 18 .. 835,33 100.00 ---Buena Sanitation District 13,73 l. 62 ---849,06 100.00
-Allocations of Cost:
• Units A, Band C -Vista only
Units E thru H -Carlsbad and Vista .. Units I and J -Vista, Carlsbad and Buena ..
-*Insurance proceeds were received in 1965-66,