\NESTERN
SOIL AND FOUNDATION
ENGINEERING INC.
--r::::·
ti ~ {!_ •-4
J 423 HALE ·AVENUE, ESCONDIDO, CA. 92025 [619] 746-3553
/ \
WESTERN
• SOIL AND FOUNDATION ENGINEERING, INC .
PMONE 746-3553
... AREA CODE 619
423 HALE AVENUE
ESCONDIDO, CALIFORNIA 92025
•
•
•
October 27, 1988
Costa Real Municipal Water District
5950 El Camino Real
Carlsbad, Ca. 92008
Project:
Subject:
Gentlemen:
Job No. 86-93
Headquarters Expansion Project
C.R.M.W.D. Project No. 86-107
Carlsbad, California
Soil Report
At the request of Mr. David Williams of Krommenhoek & McKeown, Inc. Architects,
we are submitting this report on the existing soil conditions for the above re-
perenced site.
We prepared the initial soil report titled "Preliminary Soil Investigation,
Headquarters Expansion Project, C.R.M.W.D. Project No. 86-107, 5950 El Camino Real,
Carlsbad, California 92008" and "Addendum No. 1 to our Report of Preliminary Soil
Investigation", dated March 30, 1987.
On October 27, 1988, a representative from our firm inspected the site.
It was found to be generally in the same condition as at the time of the Preliminary
Soil Investigation with the following exceptions: (1) The open spaces have been
brushed, and (2) additional loose fill soils have been placed and stockpiled
over the loose fill soils in the easterly portion of the site along the swale.
This area is currently being used for a pipe and materials storage area .
OCT
•
•
October 27, 1988
Job No. 86-93
Headquarters Expansion Project
Page 2
It is our assumption that the proposed construction will be ·silililiar ·.to
that which was originally described in the Preliminary Soil Investigation
Report .• In our opinion, structures may be constructed on the site provided
the recommendations contained in the "Preliminary" and "Addendum No. l" are
followed.
If you have any questions after reviewing these findings and recommendations,
please do not hesitate to contact this office.
professional service is sincerely appreciated.
Respectfully submitted,
RCE 26676 RGE 928
DEZ:svh
Distribution: (1) Addressee
(3) David Williams
INC •
WESTERN
This opportunity to be of
SOIL AND FOUNDATION ENGINEERING, INC.
•
•
WESTERN
SOIL AND FOUNDATION ENGINEERING, INC.
PHONE 746-3553
AREA CODE 619
423 HALE AVENUE
ESCONDIDO. CALIFORNIA 92025
November 14, 1988
KROMMENHOEK/MC KEOWN & ASSOCIATES
P. 0. Box 82208
San Diego, CA 92138-2208
Attention: David Williams
Project: Our Job No. 86-107
Headquarters Expansion
Costa Real Municipal Water District
5950 El Camino Real
Carlsbad, California 92008
Subject: Soil Report Update
Mr. Williams:
. ---..,
! :-::.,-.:Ji_ .•
This letter has been prepared to address those items found in your letter of
October 31, 1988. This letter will also address the structural pavement section
per our discussion of November 10, 1988.
We have reviewed the following plans showing the new location of the proposed
building:
a) Site Plan, Demolition Plan, Sheet A-1, undated,
b) Grading Plan, Sheet C-1, undated; and
c) a contour map, undated.
Our Preliminary Soil Investigation report dated January 30, 1987 and Addendum No. 1,
dated March 30, 1987 still apply to the new plans. The recommendations found therein
should be followed during construction.
•
•
November 14, 1988
Job. No. 86-107
-
Headquarters Expansion Project
Page 2
The Preliminary Soil Investigation report is a "Preliminary" report since it was
performed prior to the earthwork (grading) operations. A "Final" report will be
issued on completion of all earthwork, including paved areas and trench backfill.
It is our understanding that the proposed construction will consist of one building,
as shown on Sheet No. A-1. This will consist of a one-story masonry structure.
Depths of soil removal will be as shown in Table I and IA, as shown in the
"Preliminary" and Addendum No. 1, respectively. The depths of removal apply
to pavements, walks and other improvements as stated on page 3 of the "Preliminary" .
This removal is necessary due to low density fill, colluvium and stockpiled s.oil
material.
All on-site soil material should be suitable for fill with the exception of
deleterious materials, trash and oversized debris as noted in the "Preliminary",
page 3.
Imported material should be approved by our firm prior to importing these materials.
Import should be granular and have an expansion index of 50 or less.
We recommend the following minimum structural pavement sections:
WESTERN
SOIL AND FOUNDATION ENGINEERING, INC.
November 14, 1988
Job No. 86-107
Headquarters Expansion Project
Page 3
a) Passenger car parking areas -3 inches of asphaltic concrete
over 4 inches of aggregate base,
b) Truck parking areas and car and truck driveways -3 inches of
asphaltic concrete over 6 inches of aggregate base,
c) Twenty feet in front of trash dumpsters -6 inches of concrete
reinforced with number 4 bar at 18 inches on center at mid-height
of slab.
Asphaltic concrete shall conform with Section 201 of the standard specifications
for Public Works Construction. Aggregate base shall conform to Class 2 requirements
of Cal Trans. The upper 12 inches of the subgrade shall be scarified, brought to
near optimum moisture content and compacted with suitable equipment to at least 95
percent relative compaction.
After rough subgrade is achieved, a resistance "R" value test should be performed
on the near surface soils. Then, the pavement section shall be designed using the
R-value test results.
Respectfully submitted,
WESTERN SOIL AND FOUNDATION ENGINEERING, INC.
DEZ:pl
Distribution: (4)
(2)
RCE 26676 RGE 928
Addressee
Costa Real Municipal Water District -WESTERN
SOIL AND FOUNDATION ENGINEERING, INC.
•
,-
WESTERN
SOIL AND FOUNDA T/ON ENGINEERING, INC.
PHONE 746-35!:?~-
AREA CODE 61 9
March 30, 1987
COSTA REAL MUNICIPAL WATER DISTRICT
5950 EL Camino Real
Carlsbad, CA 92008
Attention: WILLIAM E. BLAKESLEY
Re: OUR PROJECT NO. 86-93
Headquarters Expansion Project
C.R.M.W.D, Project No. 86-107
5950 El Camino Real
Carlsbad, California
423 HAt..E AVENUE
ESCONDIOO. CALIFORNIA 9202S
Subject: ADDENDUM NO. l TO OUR REPORT OF PRELIMINARY SOIL INVESTIGATION
Mr. Blakesley:
This report presents the results of our Addendum No. l to our Report of
Preliminary Soil Investigation, dated January 30, 1987. Addendum No. l
consisted of three additional test pits in the vicinity of the rectangular
shaped proposed and future buildings situated parallel and near the western
property line, The test pit locations are shown on Plate Number lA
The new test pit numbers are T-9, T-10, and T-11. (Plate numbers 11, 12,
and 13, respectively.) ,,
The soil in the vicinity of the three new test pits consisted of loose to
medium dense, very moist to wet, brown clayey sand and sandy clay to depths
ranging from l to 3\ feet below existing ground surface.
Underlying the sandy clay and clayey sand was medium hard to very hard, moist,
light brown to orange siltstone to at least the depths investigated (7 to 9~ feet).
The siltstone became difficult to excavate with a 580 C backhoe at depths ranging
from 7 to 9~ feet below existing ground surface.
A six inch thick layer of very dense quartzite was encountered in test pit
number T-10 at a depth of 5 feet.
Free groundwater was not encountered in any of the test pits and no seeps
were observed.
For recommendations and conclusions, refer to the Report of Preliminary Soil
Investigation, pages 3 through 6, inclusive.
Test pits T-9 through T-11 were made on February 19, 1987.
The depths of removal at each test pit location are shown on Table lA, attached.
In our Preliminary Soil Investigation report, foundation and slab-on-grade
reconnnendations were made. Considering the very high expansive soils, two
alternatives to these reconnnendations are given as follows:
• First, selective grading may be used in order
to keep the expansive soils from being placed in
the upper four feet of the building pads.~·Then
the near surface soils may be tested to determine
their potential expansion. Foundation and slab
recommendations may be made based on test results
obtained. Footing and slab requirements may be
reduced accordingly.
A second alternative would be to import non-
expansive soil (expansion potential of 4 percent
or less) and place into the upper 4 feet of
WESTERN
SOIL AND FOUNDATION ENGINEER/NG, INC.
' ' 1 ..
u
'I I,
,.J
✓
--)
building pads within the perimeter of 5 feet
beyond the building perimeters. The building
perimeter would include all concrete slabs
and walks.
_Th~~t~~: two feet of parking areas may be treated similarly in order to increase 0,/
the Resistance "R" Value of the near surface soils and thusly decrease the structural
pavement section.
If you have any questions after reviewing the findings and recol!lllendations contained
in the attached report, please do not hesitate to contact this office. This opportunity
to be of professional service is sincerely appreciated.
Very truly yours,
WESTERN SOIL AND FOUNDATION ENGINEERING, INC.
DENNISE. ZIMMERMAN RCE 26676
DEZ:ch
Attachments: Table 1, Test Pit Logs
Distribution: (8) Addressee
WESTERN
SOIL AND FOUNDATION ENGINEERING, INC.
r .. 7 -• T-9 .. • • .. -• 0 TllNCH II\. '){]ll.l. ,,.v .. 0 • ~ .. -e .. • -: .. -.. • .... -u --• • • -... • • .. • • • • -= .. .. [levatfon 298 • ill -·· .. C ~ • ill .. ,.. 0
• • ., u ·=· ---.. --• .. • .. -• -.. • .. .. .. .. 0. C • c-■ .. • -• • • • C u .. • •• .. -.. . . • -.. & -.. .. .. • .. 0 .. . • • • .. -0
C • • • -.. • C • co• • • • • 0 • • • C c,O .. IS i • .. DESCRIPTIOfl • u 0
0 -u
Brown Clayey Wet Loose --Sand/ sandy clay
l ----
2 ---
Light Brown Moist Med. -Siltstone Hard -
3
0rangish Brown Moist Hard tc --Sil ts tone 'ery Har,
4
Brown Ironstained Moist Very --Silts tone Hard .
5 ---.
6 -·--·---...... --------· ~------· -. ....... ----" '
7 Duartzite Drv g~~ie --..
Brown Ironstained Moist Very --Siltstone Dense -8----9-
~-. Difficult Digging with
10-580 C Backhoe at 9 1 -011 -
Bottom of Test Pit at --9 1-611 ----------------
SUISUlFACI IXlltLOllATION LOG
Headquarters Expansion
Project C,R,M,W,D LOOQU IT: DZ DATI LOOQID: ?/tn'o,
I Project No. 86-107 -JOI NUMIIII: 86-93 Plate No, 11
I""'
•
,,-~ -.. tlU:NCll IIUM!!I T-10 .. • • .. --.. 0 .. 'U .. 0 • • .. -!! --.; .. ... .. • . . .. -C,I --• • • • -.. C • • .. • • • • --E1evatfon ··• ,. 0
• • ~u 301 • =i . .. . C C ~ • =i .. --
E • .. • .. • -• .. --c~• --.. .. ..
. .. o• C • .. • -• • • • C u
• • • ii .. -.... • -... .. -.. ...
C • L 0 ... • • • .. -0 C
• • CO a • • -..
• C C • -• • 0 • •
~
uO L • .! • -0 DESCRIPTION • u 0 -0
-311 over 4" Base Wet Loose
Brown Clayey Sand/ -
l Sandv Clav -·-· ··-----·· ---·-·--------· •-C
Light Brown and Very Med, -Orange Layered and Moist Hard -
2 -Desicated Siltstone .
. -
3 --
-.
4 -· Orangish brown Moist !lard c, -Siltstone Very .
5 Hard
Quartz ice NiKie
--~---.. . •-··-Dry --...
6 -
Orangish Brown Hoist Hard t,
Siltstone Very -
Hard . ---7 ------------··--
8 • Bottom of Test . Pit at
7' -611 . --9 -. . -10. --. ------. --------
.
SUISUllfACI IXPLOll.ATION LOG
~OOQR IT: DZ DATI l,DQQID:2/19/87
. JOI NU II I Ill: 86-93 Plate No. 12
C ... .,,
• -• 0 ntllCB NUMJl!l T-11 • • • • -.. ► V,. • • -!! --0 -.. -.. ... .. • . . .. -u --• • -.. C • • .. • • • • -• • -Elevatfon • -·· -> 0
• • ~u 300 • C C • :I ..
E • .. . .. . • ---
. .. --c!■ • .. • -.. • .. ..
o• C • -.. .. • -• • • • C g
• • • ii .. -.. . . • -.... ~ -.. 0 ... .. ~ C
• C • • • • .. 0 • C • co• • • • ..
• C • • • 0 • • . ~
uO .. • .! •
0 DESCR IPTIOII • 0 0 -u
-2¼"AC over 4" Base Very Soft to
Brown Sandy Clay/ · Moist Hard/
.
1 -Clayey Sand Loose •
to Med. --Dense .
2 -. --3 --
4-Orangish Brown Moist Medium
Desicated Siltstone Hard ---
s-Orangish Brown Moist Hard t,
Siltstone Very -
Hard ---6-. -
7 ---I---•--·---
-Bottom Of Test Pit At -
a-7'-0" .
. -• 9-. -. --• -----. -----• -----
SUISUIFACI IXftLOIATION LOG
LOOOR IT: DZ DATI LOOOID:z11q/sP
I
I
-.IOI IIUIIIIII: 86-93 Plate No. 13
TEST PIT
NUMBER
T-9
T-10
T-11
TABLE lA
REQUIRED DEPTH OF REMOVAL
WESTERN
DEPTH OF REMOVAL
AT TH!S LOCATION
(FEET)
3
5
5
SOIL AND FOUNDATION ENGINEERING, INC.
WESTERN
SOIL AND FOUNDATION ENGINEERING, INC.
P1-<0NE 746-35S3
AREA CODE 619
January 30, 1987
COSTA REAL MUNICIPAL WATER DISTRICT
5950 El Camino Real
Carlsbad, CA 92008
Attention: WILLIAM E. BLAKESLEY
RE: Job No. 86-93
Headquarters Expansion Project
C.R.M.W.D. Project No. 86-107
5950 El Camino Real
Carlsbad, California 92008
SUBJECT: Report Of Preliminary Soil Investigation
Mr. Blakesley:
423 HALE AVENUE
ESCONDIDO. CAL..IFORNIA 92025
In accordance with your request, we have completed a preliminary soils investigation
for the proposed project. We are presenting, herewith, our findings and recommend-
ations.
The findings of this study indicate that the site is suitable for the proposed
development provided the special site pre.paration and foundation recommendations
presented in the attached report are complied with.
If you have any questions after reviewing the findings and recommendations
contained in the attached report, please do not hesitate to contact this office.
This opportunity to be of professional service is sincerely appreciated.
Very truly yours,
WESTERN SOIL AND FOUNDATION ENGINEERING, INC.
DENNISE. ZIMMERMAN
DEZ:ji
Attachments
RCE 266 76
Distribution: Addressees (8)
TABLE OF CONTENTS
PAGE
Introduction and Project Description 1
Project Scope 1
Findings 2
Site Description 2
Groundwater 3
Reconmendations and Conclusions 3
Site Preparation 3
Existing Fill 3
Imported Fill 3
Surface Drainage 4
Earthwork 4
Cut and Fill Slopes 4
Rippability 4
Foundations 4
Field Explorations
Laboratory Testing
Limitations
Table I
Plate Number 1
Plate Number 2
Plate Nw:iber 3-10
Plate Number 11
APPENDIX
ATTACHMENTS
General 4
Transition Areas 5
Lateral Resistance 5
Retaining Walls 6
Footing Observations 6
Asphaltic Concrete
Pavement 6
7
7
8
Removal Depths
Plot Plan
Unified Soil Classification Chart
Trench Logs
Laboratory Test Results
Grading Specifications and Reconmendations
WESTERN
SOIL AND FOUNDA T/ON ENGINEERING, INC
PRELIMINARY SOIL INVESTIGATION
HEADQUARTERS EXPANSION PROJECT
C.R.M.W.D. PROJECT NO. 86-107
5950 EL CAMINO REAL
CARLSBAD, CALIFORNIA 92008
Prepared For:
COSTA REAL MUNICIPAL WATER DISTRICT
5950 EL CAMINO REAL
CARLSBAD,CA 92008
JOB NO. 86-93
JANUARY 30, 1987
WESTERN
SOIL AND FOUNDATION ENGINEERING, INC.
•
PRELIMINARY SOIL I:IVESTIGATION
HEADQUARTERS EXPANSION PROJECT
C.R.M.W.D. PROJECT NO. 86-107
5950 EL CAMINO REAL
CARLSBAD, CALIFORNIA, 92008
INTRODUCTION AND PROJECT DESCRIPTION
This report presents the results of our preliminary soils investigation for
the proposed Headquarters Expansion Project.
It is our understanding that the proposed construction will consist of three
new structures. All are proposed to be of masonry construction. Building A
is to be a lOO'xl50' warehouse located in the southeast quadrant of the site.
It is suspected that this site may be in the uncontrolled fill area. Building B
is a 40'xlOO' shop building located in the northeast quadrant; and Building C
is a 7,500 sq. ft. addition extending easterly from the existing administration
building. Other site improvements yet unplanned may include a vehicle fueling
facility, paved parking and work areas, storm drains and street improvements
on the service road along the easterly boundary.
The site configuration and test pit locations are shown on Plate Number 1.
PROJECT SCOPE
This investigation consisted of a surface reconnaissance, subsurface explorations,
obtaining representative samples, laboratory testing, analysis of the field and
laboratory data, and preparation of this report. Specifically, the intent of
this analysis was to:
a) Explore the subsurface conditions to the depths
influenced by the proposed construction,
WESTERN
SOIL AND FOijNDA TION ENGINEERING, INC.
-1-
b) Evaluate, by laboratory tests, the pertinent
engineering properties of the various strata
which will influence the development, in-
cluding their bearing capacities, expansive
characteristics, and settlement potential,
c) Develop soil engineering criteria for site
grading,
d) Determine potential construction difficulties
and provide reco111111endations concerning these
problems, and
e) Recommend an appropriate foundation system
for the type of structures anticipated and
develop soil engineering design criteria
for the recommended foundation design.
FINDINGS
The property 1s irregular in shape. The site is a 6.5 acre parcel lying along
the east side of El Camino Real approximately one quarter mile north of Palomar
Airport Road. The westerly portion of the property is currently occupied by the
District's administrative office, a metal maintenance and operations building,
a temporary trailer housing the engineering department and a paved parking lot.
The easterly portion is undeveloped and is used as a pipe and materials storage
area. The site slopes generally easterly at a grade of about five percent.
The site varies in elevation from about 311 feet above M.S.L. in the northwest
corner to about 270 feet above M.S.L. in the southeast corner.
The site 1s covered with loose fill soils with trash, that range 1n depth from
l to 12 feet below existing grade at the locations investigated. These soils
are composed of fine to coarse sands and silty clays. The fill soil is under-
lain by colluvial soils to depths below existing grade of 1 to 14 feet. These
WESTERN
SOIL AND FOUNDA T/ON ENGINEER/NG, INC.
-2-
•
'
soils consist of silty clays and clayey silts. These colluvial soils are soft
to stiff and very moist to wet. The colluvial soils are underlain by formational
soils consisting of very moist, hard to very hard siltstone,
The silty clays and clayey silts of the fills and colluvial soils are in the
very high expansive range. These soils require special consideration as dis-
cussed later in this report.
GROUNDWATER: Free groundwater was not encountered in any of the exploratory
trenches and no surface seeps were observed. It must be noted, however, that
fluctuations in the level of groundwater may occur which may not have been
evident at the time of our field investigation. One exception is perched water at
a depth of three feet in test pit Number T-5.
RECOMMENDATIONS A.iD CONCLUSIONS
SITE PREPARATION
EXISTING FILL: We recommend that any existing fill, topsoil, alluvium, colluvium,
and low density soil be removed to firm natural ground from beneath proposed
fill pad areas, parking and driveway areas, slabs or sidewalks so that struct-
ures will be supported on firm material. This soil may be replaced, if desired,
as a properly controlled fill densified to at least 90% relative compaction.
All deleterious materials, trash and oversized debris encountered in this fill
should be removed and legally disposed of off-site,
Based on the findings of this study, it appears that the maximum depth of removal
and recompaction of the native soils will be on the order of 15 feet. The actual
depths of removal will vary from 3 to 15 feet. The actual depth of removal
The horizontal limits! at each test pit location is shown on Table I, attached,
of these reconunendations should include the area within the perimeter of 15" -t
l
'
", :: :., 'r.
,,, ,·' feet beyond the exterior of any buildings, pavements, walks or other improve-
ments. All areas to receive asphaltic or Portland cement concrete pavements,
slabs or sidewalks should be treated similarly.
p:;:.,,2--
IMPORTED FILL: Imported fill, if required at this site1 should be examined by
WESTERN
SOIL AND FOUNDATION ENGINEERING, INC.
-3-
-1·· . ,,, I f l 1_ r
'
•
•
our office to determine their suitability prLor to importing these materials.
SURFACE DRAINAGE: Surface drainage should be directed away from the structures
and ponding of water should not be allowed adjacent to their foundations.
EARTHWORK: All earthwork and grading contemplated for site preparation should
be accomplished in accordance with the attached Reconnnended Grading Specifi-· u
··--·-·------------cations and Special Provisions. All special site preparation recommendations
presented in the sections above will supersede those in the standard Reconnnended
Grading Specifications. All embankments, structural fill, and fill should be
compacted to a minimum of 90%. Utility trench backfill should be compacted
to a minimum of 90% of its maximum dry density. The maximum dry density of
each soil type should be determined in accordance with A.S.T.M. Test Method 1557-78,
Method A or C.
CUT AND FILL SLOPES: We recommend that cut and fill slopes be constructed with
a slope ratio of 2.0:l.O (horizontal:vertical) or flatter, to a maximum height
of 20 feet.
Slopes should be planted as soon as feasible after grading. Slope erosion
including sloughing, rilling, and slumping of surficial soils may be anticipated
if the slopes are left unplanted for a long period of time, especially during
rainy seasons. Erosion control and drainage devices should be installed in
compliance with the requirements of the controlling agencies.
RIPPABILITY: All soil material exposed rn the test pits (trenches) can be
excavated by conventional means.
FOUNDATIONS: Considering the expansive soils in the very high range, the
structures should be supported on continuous footings bearing in compacted
on-site soil material at a minimum depth of 24 inches. Footings may be designed
for an allowable dead plus live load bearing value of 1500 pounds per square
foot. These values may be increased by one-third for short-term loads, including
wind or seismic. Footings should have a minimum width of 12 inches. Due to
WESTERN
SOIL AND FOUNDATION ENGINEERING, INC.
-4-
-
the very highly expansive soils, all continuous footings should contain at least
four #5 reinforcing bars, two top and two bottom.
Settlements under building loads are expected to be within tolerable limits
for the proposed structures.
/ f1>"~ f0''-?Cl',,c.0
I
Concrete slabs-on-grade may be supported on compacted soil material. Due to
the highly expansive soils,~ inches of clean washed concrete sand should
-~./
be placed beneath the slab. Slab reinforcing should be provided in accordance
with the anticipated use of and loadings on the slabs. As a minimum, due to
the highly expansive soils, the slabs should be reinforced with #4 bars at 15
inches on center both ways located at mid-height of concrete slab. The slab
should be a minimum of five inches thick. In areas where moisture-sensitive
floor coverings are to be utilized and in other areas where floor dampness would
be undesirable, we recommend consideration be given to providing an impermeable
membrane beneath the slabs. The membrane should be covered with 2 inches of sand
to protect it during construction and to allow the concrete to cure properly.
The sand should be lightly moistened just prior to placing the concrete. Care
should be taken not to puncture the visqueen. All joints (laps) in the visqueen
should be a minimum of 6 inches in width and sealed with an approved sealer.
TRANSITION AREAS: Foundations supported partially on cut and partially on fill
are not recommended. The tendency of cut and fill soils to compress differ-
ently can frequently result in unequal structural support and subsequent crack-
ing to portions of the structure. Therefore, in transition areas, we recommend
that the entire cut area be overexcavated and replaced with soils compacted to
a minimum of 90%. This overexcavation or undercutting should be carried to a
depth of 3 feet below finish subgrade.
LATERAL RESISTANCE: Resistance to lateral loads may be provided by friction
at the base of the footing and by passive pressure against the adjacent soil.
For concrete footings on compacted soil a coefficient of friction of 0.30 may
be used. An allowable passive uniform pressure of 250 pounds per square foot
WESTERN
SOIL AND FOUNDATION ENGINEERING, INC
-5-
per foot of depth acting against the foundations may be used 1n design.
If footings are proposed adjacent to slope areas, we recommend that the footings
be deepened to provide a minimum horizontal distance from the outer edge
of footings to the adjacent slope face of one-half the height of the slope.
The minimum and maximum distances should be 8 and 12 feet, respectively.
RETAINING WALLS: Retaining walls must be designed to resist lateral earth
pressures and any additional lateral loads caused by surcharge loads. We
reco!llll>end unrestrained walls be designed for an equivalent fluid pressure of
35 pounds per cubic foot (pcf) where backfill is level. We recommend restrained
walls be designed for an equivalent fluid pressure of 35 pcf plus an additional
uniform lateral pressure of 6H pounds per square foot where H=the height of
backfill above the top of the wall footing in feet. Wherever wall will be
subjected to surcharge loads, they should also be designed for an additional
uniform lateral pressure equal to one-third the anticipated surcharge pressure
in case of unrestrained walls, and one-half the anticipated surcharge in the
case of restraining walls.
The preceding design pressures assume there is sufficient drainage behind the
walls to prevent the build-up of hydrostatic pressures from surface water in-
filtration. Adequate drainage may be provided by means of weep holes with per-
meable material installed behind the walls or by means of a system of subdrains.
Backfill placed behind the walls should be compacted to a minimum degree· of
compaction of 90% using light compaction equipment. If heavy equipment is
used, the walls should be appropriately temporarily braced.
FOOTING OBSERVATIONS: All footing excavations should be reviewed by the Soils
Engineer prior to placing reinforcing steel and concrete.
ASPHALTIC CONCRETE PAVEMENT. The asphaltic concrete pavement section should
be designed by our office. During the earthwork operations, we should sample
the subgrade soil material, perform R-Value tests, and design the pavement section
accordingly.
WESTERN
SOIL AND FOUNDATION ENGINEERING, INC.
-6-
..-•·-,
FIELD EXPLORATIONS
Eight subsurface explorations were made at the locations indicated on the
attached Plate Number l on January 6, 1987. These explorations consisted of
trenches dug by means of a blackhoe. The field work was·conducted under the
observation of our geology and soil engineering personnel.
The explorations were carefully logged when made. These logs are presented on
the following Plate Numbers 3 through 10. The soils are described in accord-
ance with the Unified Soils Classification System as illustrated on the attached
simplified chart on Plate Number 2. In addition, a verbal textural description,
the wet color, the apparent moisture and the density or consistency are presented.
The density of granular material is given as either very loose, loose, medium
dense, dense or very dense. The consistency of silts or clays is given as either
very soft, soft, medium stiff, stiff, very stiff or hard. Samples of typical
and representative soils were obtained and returned to the laboratory for testing.
LABORATORY TESTING
Laboratory tests were performed in accordance with the generally accepted
American Society for Testing and Materials (A.S.T.M.) test methods or suggested
procedures. Test results are shown on Plate Number 11.
WESTERN
SOIL AND FOUNDATION ENGINEERING, INC.
-7-
✓
LIMITATIO!iS
The recoamiendationa preaented in thia report are contingent upon
our review of final plan• and specification■• The 1oil engineer
1hould review and verify the compliance of the final plans with
tbia report and with Chapter 70 of the Unifonn Building Code.
It is recommended that Western Soil and Foundation Engineering,
Inc., be retained to provide continuous soil engineering service ■
during the earthwork operation■• Thia is to observe compliance with
the design concepts, specifications or recommendations and to allow
design changes in the event that subsurface conditions differ from
those anticipated prior to start of construction.
The recommendations and opinions expressed in this report reflect
our best estimate of the project re~uirements based on an evaluation
of the subsurface soil conditions encountered at the subsurface ex-
ploration locations and the assumption that the soil condition• do
not deviate appreciably fr0111 those encountered. It should be recog-
nized that the performance of the foundations and/or cut and fill
slopes may be influenced by undisclosed or unforeseen variations in
the soil conditions that may occu~ in the intermediate and unexplored
areas. Any unusual conditions not covered in this_ report that may
be encountered ~uring site development should be brought to the
attention of the soila engineer ao that be may make modification•
if necessary.
This office should be advised of any changes in the project scope 10
that it may be determined if the recommendations contained herein
are appropriate. This should be verified in writing or modified by
a written addendum.
The findings of thia report are valid as of this date. Change ■ in
the condition of a property can, however, occur with the paa1age of
time, whether they be due to natural processea or the work of man
WESTERN
SOIL AND FOUNDATION ENGINEERING, INC.
-b-
•
ou tbi1 or adjacent propertie ■, lu addition, change ■ in the State-
of-tbe-Art and/or Government Code• 111&y occur. Due to ■uch change ■,
the finding ■ of the report 111&y be invalidated wholly or in part by
change ■ beyond our control. Therefore, thi1 report ahould not be
relied upon after a period of one year without a review by u■ veri-
fying the ■uitability of the conclusion■ and recommendation■•
We will be reaponaible for our data, interpretation,, and recom-
mendation■, but shall not be respon1ible for the interpretation• by
other• of the information developed, Our services consist of pro-
fessional consultation and obaervation only, and no warranty of any
kind whatsoever, express or implied, ia made or intended in con-
nection with the work performed or to be performed by ue, or by our
proposal for consulting or other services, or by our furnishing of
oral or written report• or findings,
It i ■ the responsibility of the Client or the Client'• representa-
tive to ensure that the information and reco1111Dendation1 contained
herein are brought to the attention of the engineer and architect
for the project and incorporated into the project's plan• and speci-
fication■, It is further his responsibility to take the necessary
measures to ensure that the contractor and his 1ubcontractors carry
out such rec01111Dendation1 during construction,
WESTERN
SOIL AND FOUNDATION ENGINEERING, INC.
-, I
ATTACHMENTS
WESTERN
SOIL AND FOUNDA T/ON ENGINEERING, INC.
SEE BACK POCKET FOR PLATE I
WESTERN
SOIL AND FOUNDATION ENGINEERING, INC.
Test Pit
No.
T-1
T-2
T-3
T-4
T-5
T-6
T-7
T-8
TABLE I
REQUIRED DEPTH OF REMOVAL
Depth of Removal
at This Location
(Feet)
6
6
6
9
3
15
7
10
WESTERN
-'
SOIL AND FOUNDATION ENGINEERING, INC.
•
•
StraSUUACE UPLOUTIOH LEGEND
UNIFIED SOIL CLASSIFICATION CHilT
son. DESCRIPTION GROUP SYMBOL
I. COARSE GRAINED, More than
half of material i1 larger
than No. 200 1ieve 1ize.
GRAVELS CLEAN GRAVELS
More than half of
coarse fraction ia
larger than No. 4
sieve size but
smaller than 3"
GRAVELS WITH FINES
(Appreciable amount
of fines)
SANDS CLEAN SANDS
More than half of
coarse fraction is
smaller than No. 4
sieve size. SANDS WITH FINES
(Appreciable amount
of fines)
II. FINE GRAINED, More than
half of material is smaller
than No. 200 sieve size.
SILTS AND CLAYS
Li'fuid Limit
leu than 50
SILTY AND CLAYS
Li'fuid Limit
greater than 50
HIGHLY ORGANIC SOILS
GW
GP
GM
GC
SW
SP
SM
SC
ML
GL
OL
MB
CB
OH
PT
WESTERN
TYPICAL NAMES
Well graded gravels, grnel-
■and mixtures, little or no
fine■•
Poorly graded gravels, gravel-
1and mixtures, little or no
fines.
Silty gravels, poorly graded
gravel-sand-silt mixtures.
Clayey gravels, poorly
graded gravel-sand, clay
mixture ■•
Well graded sand, gravelly
sands, little or no fine,.
Poorly graded sands, gravelly
sands, little or no fine,.
Silty sands, poorly graded
•and and silt mixtures.
Clayey sands, poorly graded
sand and clay mixture ■•
Inorganic ailt1 and very
fine' sands, rock flour, sandy
silt or clayey-silt-sand
mixtures with alight plast-
icity.
Inorganic clays of low to
medium plasticity, gravelly
clays, sandy claya, ■ilty
clay,, lean clays.
Organic 1ilty and organic
silty clay• of low plasticity
Inorganic ailtya, micaceoua
or diat0111aceou1 fine sandy
or silty' 1oil1, elastic
silt1.
Inorganic clays of high
plasticity, fat
Organic clay• of mediwa
to high plaaticity.
Peat and other highly
organic 1oill
SOIL AND FOtJNDA TION ENGINEER/NG, INC.
PLATE NUMBER 2
--. -• II: TRENCli NUMJIER T-1 .. II: • .. -.. 0 ►'°'--0 • ~ .. -~ -.. ll .,; .. ... • z•t -u --• • II: -.. II: .. .. z • • .. --C Elevation -=i -·· C -• =i .. > 0
z • ~u 301.0 .... a: C • --t --.. .. IS ► .; • -.. • .. .. • .. 0 .. C • -~-.. • -0 • • • C u .. • •• .. -.. • 0 • -... a -.. ~ • .. 0 .. a: • • 0 C
0 C • z .. z • ..
• C C • CO IS • • • IS • 0 IS • uO .. s: • 0 -~ DESCRIPTION :ii Cl 0
0 -u
SP Light Brown Fine to Coarse Very Loose -Moist . -Sand (fill)
1 -CL -
2-CK Brown Silty Clay Very Soft
Moist to -
BAG -Medium -
Stiff 95.8 25.0 84.3
3--
--
4
-CL/Ml Gray-Orange Silty Clay to Very Stiff
Clayey Silt Moist -
5
-BAG ML Gray Siltstone With Iron Very Hard 100.3 25.7 91.6
Staining Moist But -
5-Fr act--
ured --.
' -
--
-a-
Becomin: --Very
9-Hard -
--
10----
11-CK 104 .8 -22.0
12· Bottom of Trench -Excavated With Case 580 --Backhoe ----
-CK=Chunk Samples -BAG=Loose Bulk Sample --
SUBSURFACE EXPLORATION LOG
HEADQUARTERS EXPANSION PROJECT
C.R,M.W.D. PROJ. No. 86-107 LOQQl'O aT: V .G' DATI LOOOID: 1-6-8 7
: JOI NUMIIII: 86 ·9] Plate No. 3
-
,
• T-2 -., 0 TRENCH NUMBER
.. • • .. --.. -.. 'U ,. ~ ., ~ .. -..
.;. .. ... .. • a•,. u --.. .. -.. C • C .. a .. • C -.. • -Elevation 300,5 .. . ; -.. 0
s • .J u • ~ C C a ~ .. . C a: ... a • ---.. E --.. C .. • .. a ..
0 .. C c!w --.. .. • .. • -• • • • C u
• • •• .. -.. . . .. -.. ~ -.. .J
• C • .. 0 .. . • • • .. 0 C
• C C ll co• .. • C ll • .. .. .. 0 .. • -.J
uO .. a: • Cl
0 DESCRIPTION :i u 0 -u
CL Gray Silty Clay With Roots Wet Soft . . . to
1· Medium -
Stiff . .
2· BAG -10 7. 5 23,4 92.3 --(Fill)
3 CL Black to Dark Gray Silty Wet Medium
Organic Clay Stiff
4-CL Brownish-Gray Silty Clay Medium
. -Wet 106.7 21.2
. Stiff .
5 ML Brown Silty Clay Very Medium . Moist Stiff -
( Co lluvium)
6 . . Gray Siltstone With Iron Very Hard
Stain Moist
.
-r (Formation)
.
Bottom of Trench . a· -. -9-Excavated With Case 580 -. Backhoe -10--. -11--. BAG=Loose Bulk Samples -12--. -. -. -. --
HEADQUARTERS EXPANSION PROJECT SUBSURFACE EXPLORATION LOG
. C.R.M.W.D. PROJ. No. 86-107
LOGGlrO ■T: V.G. DATI U)QQfD: , -~·"'
-JOI NU II I I~: 86-93 Plate No. 4
,.... -·-,,. -ll .. 0 TRENCH NUMllER T-3 ► ll • ► -.. .. 'TJ ► .. ~ -!!
► -.. .. 0 ► .. -... ell ► u --.. ll -.. C ll • .. ll .. • • -•
z • .. u Elevation 297.5 .. ::i Ill .. ; C C -• :t .. > 0
-... a: t! ---.. E --• ► c!• • .. • -.. a: .. ..
0 .. C • -0 .. .. • -• • • C u
• • •• .. -.. • 0 .. -... .. -.. .. .. 0 .. a: • • C • C • lll cos a: • ► 0 a: -.. • C C .. .. s lll 0 • lll -.. uO .. • • D
DESCRIPTIOH :ii u 0
0 -u
SP Light Brown F-C Sand ilery Loose
(Fill lois t SP 1-Brown Very Silty Fine San< Moist Loose -
CL Orange-Brown Silty Clay Very Soft 91.3 24,2
2-BAG Moist to -Medium -Stiff -
3--
--(Colluvium)
4
-BAG ML Pale Yellow Clayey Silt Very So.ft to 90.4 28.2
Moist Medium -
5 Stiff
-ML Brown-Gray Siltstone With Very Hard
Inter bedded Lenses of Gray Moist (Fract--
&-Fine Sands tone With Iron ured) -
--· Staining -
r -
--
a--
--
9--
--
10--Very Very --Moist Hard
11--
-(Formation) -
1-Bottom of Trench --
--
-BAG-Loose Bulk Samples -
--
--
HEADQUARTERS EXPANSION PROJECT SUBSURFACE EXPLORATION LOG
C.R.M.W.D. PROJ. No, 86-10 7
LOQGID 81': V .G. D.&TI L,OQGID:, -~-QC
-JOI NUlllfll:86-93 Plate No. 5
--• -., 0 TRENCH NUMBER T-4 .. • • .. -.. .. 'U .. 0 • ~ .. -~ -.. ► .. • z • .. -u --• .. z
= ► C • .. .. z .. • .. -•
Elevation 294.0 .... ; -> 0
z • ... u .. :I ..... C C t! • :I .. --
E --.. .. .. .. • -► z .. .. .. c!• --
a. oa. C • .. • -0 • • • C u
• • • iii .. -.. • 0 • -.... a -.. ... C .. 0 ~•c • • 0 • C • z .. z • a
• C C • Oo • • • .. • 0 .. :II .. .! . ... DESCRIPTION u .. 0 a 0
0 • -u
CL Olive Brown Silty Clay Very Soft . --With Fragments of SiJt-Moist
1-stone and Chunks of Asph-to -
alt Wet --
2-BAG (Fill) 87 .o 25 .o ----3---
4 -GL/OI )ark Gray Clay With Decom-lwet ,oft to 104 .o 25 .o
JOS ing Organics Medium -
5-(Colluvium) Stiff -
6" GL
Brown-Gray Silty Clay With Wet Medium -
. -Minor Organic Material to Stiff -
Very -r Moist -. -
(Colluvium)
8
-ML Gray Siltstone With Iron Very Hard
Staining.Bi-Valve Impress-Moist -
-9· ion ---10----11-Very -Hard --12-
-(Formation)
-Bottom of Trench -
Very Slow Digging With --Case 580 Backhoe --
-BAG=Loose Bulk Samples -
SUBSURFACE EXPLORATION LOG
HEADQUARTERS EXPANSION PROJECT
C.R.M.W.D, PROJ. No. 86-10 7 LOOOlrO 8T! V.G. DATI LDGGl!D:l-6-87
-JOI NUMII~: 86-93 Plate No. 6
-.. a: T-5 ► a: • -.. 0 TRENCH NUMBER .. ~ ► -!!
► -► • ... V ► 0 u -► Ill -.... zZ ► --.. a: -► C • C ► • .. • C -.. -Elevation 303.S • ~ .. . ; C C -a: ► > 0
s • .. u C .. II: • ~ --
t --C ► C ... • = ... a: ► ►
► 0 .. C • C ~ Ill • -0 .. ► -• • • C u
. • •ii .. -... " .. -... ~ -► ,J -.. 0 ~•c • • C
• C • ll a: • ► 0 a: .. ..
. • C C Oo • -C • 0 C ll C • D .. DESCRIPTION
u .. :i u 0
0 -u
SP Dark Brown Silty Fine ro Very Loose . -. Coarse Sand Moist (Fill)
1 ML Gray Siltstone Very Hard . (Fragmented) Moist --2---
3-Perched Water at 3' .
. .
-4-Less Fragmented at .4' -Very -
Hard . s· . .
6" (Formation) .
.
Bot tom of Trench -r Very Slow Digging With -. Case 580 Backhoe -3· -. -9· . --10----11--. -12· -. -. ---. --.
SUBSURFACE EXPLORATION LOG
. HEADQUARTERS EXPANSION PROJECT
C.R.M.W.D. PROJ. No. 86-107 LOOO!D IY: V.G. DAT! LOOGfD: 1-6-8 7
-JOI NU MI fll: 86-93 Plate No. 7
.
.
.
'
.
.. • • 0
.; .. -= ... ....
C z • .., Q ... t --• 0 ... • •ii • • C • • C
,J
0
SM -
1-
-
2-
-
3-
-
4-
-
s-
-
6·
-.,..
-
3-
-
9-
-
10-
-
11--
1~ ML -BAG
LJ""' &
-CK
14 -ML
,.. .•
I
'
TRENCH NUMBER
Elevation
T-6
293.O
DESCRIPTION
Brown very Silty Fine to
Medium Sand With Many
Chunks of Asphalt up to
18" and Concrete up to
4-5 feet.
Minor Amounts of Wood
( Sides Caving)
(Fi 11)
-------------
Brown Silty Fine to Medium
land
Fragments of Clay Pipe,
Large Blocks of Concrete,
Some Asphaltic Concrete
And Wood
(Fill)
Dark Brown Clayey Silt
(Colluvium)
Brownish Gray Fragmented
Silts tone
HEADQUARTERS EXPANSION PROJECT
C.R.M.W.D. PROJ. No. 86-10 7
-
J . -.. • • .. -
.. 'T.I .. 0 • : .. --.. • .... C,I --• Ill • • .. • • • -• •
::I a, Ill • -• > 0 .. C C • ::I .. • ... . .. . • ---
C • c!• • .. .; • -.. • ... ... .. • -• • • • C u • -••• .. -.. • -• 0 ~--• • -0 .. ,J C
C • • • .. • -•
80 .. -C • • • • i • 0 • • u 0 u
-
-
Moist Loose ---
-
-
--
----. ---
Moist Loose -
-
-
-
-
-
-
-
----
-
Very Medium
Moist Stiff -
-
-
Very -
Moist Hard
SUBSURFACE EXPLORATION LOG
LOQ0t0 ST: V.G. DATI LDOGro: 1-"-Q'
JOI NUIIIII!: 86-93 Plate No. 8
---z • 0 TRENCH NUMl!Ei T-6 .. z • .. -.. -.. -u .. 0 • ~ .. -IC
..: .. ,. (Continued) .. • z z .. -u --II IC -,. ◄ z .. .. z .. • .. -II z
-Elevation Ill IU • -,.. 0
: • u 293.0 II :::i ◄ ◄ z :::i .. . ... .. .. .. z • ---.. ... --.. <C ~ Ill .. .. ..: • -.. z .. .. .. .. 0 .. C • .. • -0 u • • C
-:I • • .. -.. • Q ---u
• .. ~ -.. ...
Q C • .. 0 .. z z • • .. 0 C .. • z .. .. . • C C :I Co .. • .. :I 0 .. :I .. u 0 .. .. .!! 0
u DESCRIPTION ... u 0 -u
1~ ill, Brownish Gray Fragmented Very Hard -Siltstone Moist -
16--
1;.. Bottom of Trench
Backhoe .Fully Extended -
-15° Excavated With Case 580 --Backhoe -------------. --. -------------------------CK=Chunk Samples -
BAG=Loose Bulk Sample --
' --
I --
.
-
I -HEADQUARTERS EXPANSION PROJECT SUBSURFACE EXPLORATION LOG
C.R.~1.W .D. PROJ. No. 86-107
LOGGED IY: V.G. l)ATI LOOG!D: 1-6-87
I -JOI HUMl!R: 86-93 Plate No. 8 (Cont.)
-
• -• TRENCH NUMBER T-7 ► • • ► --... 2 .. 'U ► 0 .. :!: ► -..
-► ... ► • .... -u --• .. • = ► • • .. • .. • -•
C [levatfan .. . . -• > 0 . z • ... u • :II •=z C C • a :II ► --
► t --• .. • .. -• -► • .. ► ... o• C • c-11 .. • -• • • • C Cl
-• • ii ... -a.• a -... .! • • -► ... ... 0 .... • • 0 C
D C • a cos • • ► • .. ...
• • C C II .. • • 0 C a ... u 0 ... • • 0
DESCRIPTION • Cl 0
0 -u
SM Brown Si ltv Sand (Fill) Moist Loose
MJ.. Yellow Brown Sandy CJayey Very Medium
1-Silt Moist Dense -
(Fill)
2-CK Dark Brown Clayey Silt Very Stiff -Moist --. 3----4-(Colluvium)
ML Pale Yellow Clayey Silt Very Soft
5-aoist ---
6
" ML Gray Siltstone With Lense Very Hard -of Fine Sandstone and Moist But -, Iron Staining Fragme--. nted ---a-Hard --to
9"" Very -
-(Formation) Hard .
lv Bottom of Tr.ench . -Excavated With Case 580
11-Backhoe ---.
12" . -----CK~Chunk Samples ----
SUBSURFACE EXPLORATION LOG
HEADQUARTERS EXPANSION PROJECT
C.R.M.W.D. PROJ. No. 86-107 LOQClrD ■T: V.G. DATI U,QClt:D: 1-6-87
-JOI NUMII~: 86 -93 Plate No. 9
•
-, ~----..-------. .....,r----,----i----
---z .. • • D
.. • .. .. • _, • • C •
z 0 -...
C
.J u
0 .: ••
TRENCH NUMBER T-8
Elevation
• C t-------------J.
.J
0 DESCRIPTION
.. . • • .. :i . ..
C e . -• 0
C :II
z •
C • ~ -u -.. . .
C Ci . .. -... -.. -.... z • •
., • I • • • i -
► ► -• • .. = a • .. .. -• a
.... . -:i .. ► a • • -► 0 z • 0 u
..
.. z
~ ! .. .. C U _, C ....
C :II
0 c.,
. ML. Pale Yellow Clayey Silt
(Fi 11)
Very
Moist
Medium
Dense . -
SM -
-
.
-
s-
CL
-
r
-
Dark Brown Silty Fine Sand Moist
With Large Chunks of
Asphalt up to 2 feet
(Fill)
Brown Silty Clay Very
Moist
Loose
to
Hedium
Dense
Stiff
-
--
-
-
-
-
-
-
-
-
-
s1,--7-:;--t;-::-;--::--~:-:-::---;;:-;--;----;:-;--+--+---+---+---l---l--_J ML IP ale Orange-Yellow Clayey Very
( Co lluvium)
Soft to
Medium --Silt Moist
9-1--t"'i:n-:--ff.ef[;;-;:;=<~;-;;--;,:;T.::-;:;::;:----~;:---t.S~'.t •i,".f f'L F-1-----t----l-----i---_.J ML Yellow-Gray Siltstone Very
-Weathered and Fragmented Moist Hard
10-
-
11-
-
---
--
HEADQUARTERS EXPANSION PROJECT
C.R.M.W.D.PROJ, No, 86-107
SUBSURFACE EXPLORATION LOG
LOQG~O IY: V .G. 0AT! LOQG(0: 1-6-87
JOI NUMI(~: 86-93 Plate No. 10
-----
-
---
'
•
•
•
Sample
A
B
C
Sample
Number
A
No,
-
LABORATORY TEST RESULTS
Maximum Density/Optimum Moisture
Location
T-1 @ 2.0'
Location
T-1 @
T-1 @
T-2 @
2.0'
5.5'
2,0'
Direct Shear*
Cohesion
(pcf)
740
Maximum Optimum
Density Moisture
(pcf) (Percent)
113. 7 16.0
109.5 16.3
116.5 14.8
Angle of Internal Friction
(Degrees)
11
*Sample remolded to 90% of maximum dry density at optimum
moisture content, Samples saturated prior to testing,
Sample No.
C
Location
T-2@ 2.0'
Expansion Test
Percent
Expansion
14 .4
WESTERN
Expansion
Index
144
SOIL AND FOUNDATION ENGINEERING, INC.
PLA';'C: ~CXBER 11
Potential
Expansion
Per UBC
Very High
•
'
•
PMONE 7•~3!5!53
.. ,.EA COO£ e,a
-•,,
WESTERN
SOIL AND FO!JNDA TION ENGINEERING, INC .
,23 MAL£ AVll!:NUE
ESCONOIOO. CA.Llfl'"OANIA Sia202:S
SPECIFICATIONS FOR CONSTRUCTION OF CONTROLLl!D FILLS
GENERAL DESCRIPTIOK: The c0U1truction of CO!ltrolled fill1 1ball con1i1t of
ade,uate prelim~iary 1oil inve1ti1atiou1, and cleariq, removal of exi1tiug
1tructure1 and foundation,, preparation of land to be filled, excavation of
earth and rock from cut area, c0111p1ction and control of tbe fill, and all
other work nece111ry to complete the 1rading of the filled area to conform
with the line,, gradea, and elopes a1 1howu on the accepted plan,.
CLEARING AND PREPARATION OF A.REAS TO BE FILUD:
(a) All fill control project, 1hall have a preliminary ,oil inveatigation or a
vi1u1l examin1tion, depending upon the nature of the job, by a ,ualified 1oil
engineer prior to grading,
(b) All timber, trees, bruah, vegetation, and other rubbish 1hall be removed,
piled and burned, or othervi1e dispoaed of to leave the prepared area with a
finiahed appearance free from unsightly debria,
(c) Any 10ft, 1wampy or othervi1e uneuitable area,, ■hall be corrected by drainage
pr removal of compres1ible material, or both, to the depth• indicated on the plan•
or a, directed by the 1oil ~ngineer.
(d) The natural ground which i• determined to be 1ati1factory for the 1upport
of the filled ground 1hall then be plowed or ecarified to a depth of at leaat
1ix inche1 (6") or deeper aa 1pecified by the 1oil engineer, and until the 1ur-
face ia free from rut•, hummock,, or other uneven feature• which would tend to
prevent uniform compactiO!l by the e,uipment to be u1ed.
(e) Ro fill 1hall be placed until the prepared native ground baa been approved
by the •oil enaineer,
(f) Where fill• are made on the hill1ide1 with 1lope1 1reater than 5 (horizontal)
to 1 (vertical), horizontal benchea ■hall be cut into firm undiaturbed natural
around to provide lateral and vertical ■tability, The initial bench at the toe
of the fill ahall be at lea■t 10 feet in width on firm undi ■turbed iatural &round
at the elevation of the toe ■take. The 1oil ensineer 1hall determine the width
and fre,uency of all Neceedin& benchea vbich will vary with the aoil condition•
aad tile 1teepnu1 of llope.
(a) A.fter the natural ground ha• been prepared, it ■hall be brouaht to the proper
aoi1ture content and compacted to .not leu than 90% of au:i111U111 denaity, A.S.T.M.
Dl.557-64T,
•
1
,
•
'
{b) Expansive •oil• may re.uire •pecial compaction •pecifications a1
directed in the preliminary aoil inve,tigation by the 1oil enginee~.
(i) The cut portions of building pad1 in which rock-like material eziata may
re.uire excavation and recompaction for density compatibility with the fill••
directed by the aoil engineer.
MATERIALS: The fill •oila ahall con1i1t of •elect material• graded •o that at
least 40 percent of the material passes the No. 4 •ieve. The material may be
obtained from the excavation, a borrow pit, or by mixing •oil• from one or more
•ource•. The material u1ed shall be free from vegetable matter, and other del-
eteriou• •ubstancea, and shall not contain rocks or lump• greater than 6 incbe1
in diameter. If excessive vegetation, rock•, or •oils with unacceptable physical
characteristics are encountered, these materials shall be disposed of in waste
areas designated on the plans or as directed by the soil engineer. If soil•
are encountered during the grading operation which were not reported in the
preliminary soil investigation, further testing will be re.uired to ascertain
their engineering properties. Any special treatment recommended in the prelim-
inary or subse.uent soil reports not covered herein ahall become an addendum to
these specifications.
No material of a perishable, apongy, or otherwise unstable nature shall be used
in the fills.
PLACING 1 SPREADING AllD COMPACTING FILL 'MATERIAL:
(a) The selected fill !ll4terial shall be placed in layers which shall not exceed
aix inches (6") when compacted. Each layer shall be spread evenly and ahall be
thoroughly blade1ixed during the spreading to insure,uniformity of m4terialcatid
moisture in each layer.
(b) When the moisture content of the fill material is below that specified by
the soil engineer, water shall be added until the moisture content is near optimum
as determined by the soil engineer to assure thorough bonding during the com-
pacting process.
(c) When the moisture content of the fill material is above that specified by
the soil engineer, the fill material ahall be aerated by blading and scarifying,
or other satisfacfory methods until the moisture content is near optimum aa
determined by the ■oils engineer.
(d) After each layer has been placed, mixed and epread evenly, it 1hall be
thoroughly compacted to not less than the 1pecified maximum density in accord-
ance with A.S.T.M. D1557-64!. Compaction shall be by means of tamping or 1beep1-
foot rollers, multiple-wheel pneumatic-tired rollera, or other types of rollers.
Roller• shall be of such design that they will be able to compact the fill to
the apecified density. Rolling of each layer shall be continuous over its entire
area and the roller shall make 1ufficient passes to obtain the desired density.
The entire area to be filled ahall be compacted to the specified density •
WESTERN
SOIL AND FOIJNDA TION ENGINEERING, INC
-2-
,
f
,
..
,
• . •
'
r -
(e) Fill 1lope1 1hall be compacted by aean1 of 1heep1foot roller, or other
1uitable eiuipment. Compactin& operation• 1hall be continued until the 1lope1
are 1table but not too den1e for planting and until there ia no appreciable 81DOUDt
of loo1e 1oil on the 1lope1. Compacting of the 1lope1 ahall be accomplished by
backrolling the 1lope1 in increment• of 3 to S feet in elevation 1ain or by other
aethod1 producing 1ati1factory re1ult1.
(f) Field denaity te1t1 1ball be •de by the aoil engineer for approximately each
foot in elevation 1•in after compaction, but not to exceed tvo feet in vertical
beicht between te1t1. The location of the te1t1 in plan aball be 1paced to 1ive
the best po11ible coverage and 1hall be taken no farther than 100 feet apart.
Te1t1 1hall be taken on corner and terrace lots for each two feet in elevation
1ain. The soil engineer may take additional te1t1 •• con1idered nece11ary to
check on the uniformity of compaction. Where 1beepsfoot roller, are u1ed, the
te1t1 1hall"be taken in the compacted material below the diaturbed 1urface. _No
additional layer• of fill ,hall be spread until the field density teata indicate
that the specified density baa been obtained.
(g) The fill operation shall be continued in 1ix inch (6"} compacted layers, aa
1pec;ified above, until the fill bas been brought to the finished slopes and crades
•• tbown on the accepted plans.
SUPERVISION: Supervi1ion by the aoil engineer 1ball be made during the filling
and compacting operation• 10 that be can certify that the fill wa1 made in accord-
ance with accepted apecificationa.
The 1pecification1 and 1oil te1ting of 1ubgrade, 1ubbaae, and base material• for
road1, or other public property 1ball be done in accordance with 1pecification1
of the governing agency.
SEASONAL LIMITS: No fill material 1ball be placed, 1pread, or rolled during
unfavorable weather condition.. When the work i• interrupted by heavy rain,
1rading 1ball not be re,umed until field te1t1 by the aoil engineer indicate
that the moi1ture content and density of the fill are aa previously 1pecified.
In the event that, in the opinion of the·engineer, aoila unaatiafactory ••
foundation material are encountered, they ahall not be incorporated in the
1rading and di1po1ition will be made at the engineer'• discretion. ·
WESTERN
SOIL AND FOUNDATION ENGINEERING, INC.
-3-
• r
•
• ~
'
• ,,..
l
\
;,f,,
''
,,
:;, '
f
}'.i~\:'..'.<
',\·
('
--.. ,L
..J
<(
w
0::
0 z
~
<(
u
..J w
2
fl',
,,
E)(JST
f::y
J".:-50'""
,'
<-~· ' . ,,1/rft \,
,1/9,v /
~
\
\ \ ._
\ \
\ \ // i~ v
1
l / < i:~/ <-,, I
<,,ov ~J / \ l
I I I
b r--, ) '
PROP. I l/
/" -'\\ I ;~ \ ,\!
~: \ I
\
\
l
8 L D G, ~
~ l;/o-2 1
, I BLDG. f---~;' ~---I I / r-1 -7,q JV;;
~( /
T-3 ,....
( ~
-'---'----+---'---------"--
(
\
;ii:-. ~ I ;t~ /
=-=-~ o/--/ ~---(_ ____/
\
\
~
_, THI"'? rf,ltJ'f rW? ~~
, )< E:=fa'(E:==O ~r,..t::.~c;,
,App~><· I~ r., -n-t~
~M7---eN1 ~~ t~
./ilf'Pf.QI(• l'1= lco' t
t--< TEST PIT
PLATE IA
DATE: 3/30/81 JOB No.~
TEST PIT LOCATION
FOR
COSTA REAL MUNICIPAL WATER DISTI
\NESTERN
SOIL ANO FOUNOATION ENGINEERING