Loading...
HomeMy WebLinkAbout1019 Daisy Ave; ; CBR2019-2971; Recycle,• C Cicyof Carlsbad PURPOSE CLIMATE ACTION PLAN CONSISTENCY CHECKLIST 8-50 Development Services Building Division 1635 Faraday Avenue (760) 602-2719 www.carlsbadca.gov This checklist is intended to · assist building permit applicants identify which Climate Action Plan (CAP) ordinance requirements apply to their projects. The completed checklist must be included in the building permit application. It may be necessary to supplement the completed checklist with supporting materials, calculations or certifications, to demonstrate full compliance with CAP ordinance requirements. For example, projects that propose or require a performance approach to comply with energy-related measures will need to attach to this checklist separate calculations and documentation as specified by the ordinances. NOTE: The following type of permits are not required to fill out this form ❖ Patio I ❖ Decks I ❖ PME (w/o panel upgrade) I ❖ Pool A If an item in the checklist is deemed to be not applicable to a project, or is less than the minimum required by ordinance, an explanation must be provided to the satisfaction of the Building Official. A Details on CAP ordinance requirements are available on the city's website. A A CAP Building Plan template (form B-55) shall be added to the title page all building plans. This template shall be completed to demonstrate project compliance with the CAP ordinances. Refer to the building application webpage and download the latest form. · Project Name/Building Permit No.: ____________ BP No.: CJB:>Qa-o I q . dQ ?J f Property Address/APN: 2.14:-~-z..-1~ Applicant Name/Co.: Applicant Address: Contact Phone: Contact information of person completing this checklit (if different than above): Name: "7kvY\.,e, J Contact Phone: Company name/address: Applicant Signature~~ Contact Email: Date: _lo_/-i,_"Z/_/l_tl_ B-50 Page 1 of6 Revised 08/19 City of Carlsbad Climate Action Plan Consistency Checklist isa--Residential · □ New construction )I' Additions and alterations: 1( BPV < $60,000 r-- □ BPV ~ $60,000 □ Electrical service panel upgrade only □ BPV ~ $200,000 D Nonresidential □ New construction □ Alterations: □ BPV ~ $200,000 or additions ~ 1,000 square feet □ BPV ~ $1,000,000 □ ~ 2,000 sq. ft. new roof addition 1. Energy Efficiency A high-rise residential building is 4 or more stories, including a Low-rise High-rise mixed-use building in which at least 20% of its conditioned floor area is residential use 2A, 3A, 18, 2B, 4A 3B,4A N/A N/A --l)A11 residential additions and alterations 1A,"4A 4A 1-2 family dwellings and townhouses with attached garages only *Multi-family dwellings only where interior finishes are removed 1A, 4A* 1B, 4A* and significant site work and upgrades to structural and mechanical, electrical, and/or plumbing systems are proposed 18, 28, 38, 48 and 5 I 18, 5 18,28,5 Building alterations of~ 75% existing gross floor area 28,5 18 also applies if BPV ~ $200,000 Please refer to carlsbad Municipal Code (CMC) sections 18.21.155 and 18.30.190, and the califomia Green Building Standards Code (CALGreen) for more infonnalion when completing this section. A D Residential addition or alteration ~ $60,000 building pennit valuation. See CMC section 18.30.190. Year Built Single-family. Requirements D Before 1978 Select one: D Duct sealinq D Attic insulation D Cool roof D 1978 and later Select one: D Lighting package D Water heating Package D Between 1978 and 1991 D 1992 and later D N/A _________ _ □ Exception: Home energy score<! 7 (attach certification) Multi-family Requirements D Attic insulation Select one: D Duct sealing D Attic insulation D Cool roof Select one: D Lighting package D Water heating package 8. D Nonresidential* new construction or alterations i!: $200,000 building permit valuation, or additions i!: 1,000 square feet D N/A Updated 8/15/2019 2 City of Carlsbad Climate Action Plan Consistency Checklist ,,...--.. , ( / l .. · 2. D Transportation Demand Management (TOM) A List each proposed nonresidential use and gross floor area (GFA) allocated to each use. B. Employee ADT/1,000 square feet is selected from the table below. Use GFA Employee ADT for first Employee ADT for each 1,000S.F. subsequent 1,000 S.F. Total If total employee ADT is greater than or equal to 11 0 employee ADT, a TOM plan is required. TOM plan required: Yes D No D Employee ADT Estimation for Various Commercial Uses Office (all)2 Restaurant Retaib Industrial Manufacturing Warehousin ADT for first 1,000 s.f. 20 11 8 4 4 4 EmpADT/ 1000 s.f.1 20 11 4.5 3.5 3 1 1 Unless otherwise noted, rates estimated from /TE Trip Generation Manual, 1C1hEdition 2 For all office uses, use SANDAG rate of 20 ADT/1,000 sf to calculate employee ADT 3 Retail uses include shopping center, variety store, supermarket, gyms, pharmacy, etc. Other commercial uses may be subject to special consideration Sample calculations: Office: 20,450 sf 1. 20,450 sf/ 1000 x 20 = 409 Employee ADT Retail: 9,334 sf 1. First 1,000 sf= 8 ADT 2. 9,334 sf -1,000 sf= 8,334 sf 3. 8,334 sf/ 1,000 x 4.5 + 8 = 46 Em lo ee ADT Updated 4/12/2019 Total Employee ADT 3 City of Carlsbad Climate Action Plan Consistency Checklist See CMC 18.21.155 and CALGreen Appendix A5, Division A5.2 -Energy Efficiency. A5203.1.1 Choose one: o .1 Outdoor lighting D .2 Warehouse dock seal doors D .3 Restaurant service water heating (comply with California Energy Code section 140.5, as amended) o N/A, _________ _ D .4 Daylight design PAFs D .5 Exhaust air heat recovery A5203.1.2.1 Choose one as applicable: D .95 Energy budget D .90 Energy budget D NIA A5.211.1* D On-stte renewable energy D NIA A5.211.3* D Green power (rf offered by local utirtty provider, 50% minimum renewable sources) D NIA A5212.1 D Elevators and escalators D NIA A5213.1 D Steel framing D NIA ' lndudes hotels/motels and high-rise residential buildings * For alterations 2: $1,000,000 8PV and affecting > 75% existing gross floor area, or alterations that add 2,000 square feet of new roof addition: comply with CMC 18.30.130 instead. 2. Photovoltaic Systems A. D Residential new construction (for low-rise residential building pennlt applications submitted after 1/1120). Refer to 2019 California Energy Code section 150.1(c)14 for requirements. Notes: 1) High-rise residential buildings are subject to nonresidential photovoltaic requirement (28 below) instead. 2) If project includes installation of an electric heat pump water heater pursuant to CMC 18.30.150(8) (high-rise residential) or 18.30.170(8) (low-rise residential), increase system size by .3kWdc if PV offset option is selected. Floor Plan ID (use additional CFA #d.u. Calculated kWdc' sheets ff necessary) Total System Size: kWdc = (CFAx.572) I 1,000 + (1.15 x#d.u.) 'Formula calculation where CFA = conditional floor area, #du = number of dweltings per plan type If proposed system size is less than calculated size, please explain. Exception D D D D kWdc 8. D Nonresidential new construction or alterations :t$1,000,000 8PVand affecting ~75% existing floor area, or addition that increases roof area by ~,000 square feet Please refer to CMC section 18.30.130 when completing this section. Note: This section also applies to high-rise residential and hotel/motel buildings. Choose one of the following methods: D Gross Floor Area (GFA) Method GFA: Min. System Size: __ kWdc D If < 1 O,OOOs.f. Enter. 5 kWdc D 112: 10,000s.f. calculate: 15 kWdcx(GFN10,000)" "Round building size factor to nearest tenth, and round system size to nearest whole number. □ Time-Dependent Valuation Method Updated 8/15/2019 3 City of Carlsbad Climate Action Plan Consistency Checklist Annual TDV Energy use:*** ______ x .80= Min. system size: _____ kWdc ***Attach calculation documentation using modeling software approved by the California Energy Commission. 3. Water Heating A D Residential and hotel/motel new construction Please refer to CMC sections 18.30.150 and 18.30.170 when completing this section. □ For systems serving individual dwelling units choose one: □ Heat pump water heater AND Compact hot water distribution AND Drain water heat recovery (low-rise residential only) D Heat pump water heater AND PV system .3 kWdc larger than required in CMC section 18.30.130 (high rise residential hotel/motel) or CA Energy Code section 150.1 (c) 14 (low-rise residential) o Heat pump water heater meeting NEEA Advanced Water Heating Specification Tier 3 or higher D Solar water heating system that is either .60 solar savings fraction or 40 s.f. solar collectors D Exception: □ For systems serving multiple dwelling units, install a central water-heating system with all of the following: D Gas or propane water heating system □ Recirculation system per CMC 18.30.150(8) (high-rise residential, hotel/motel) or CMC 18.30.170(8) (low- rise residential) D Solar water heating system that is either: D .20 solar savings fraction □ .15 solar savings fraction, plus drain water heat recovery D Exception: B. D Nonresidential new construction Please refer to Carlsbad Ordinance CMC section 18.30.150 when completing this section. □ Water heating system derives at least 40% of its energy from one of the following (attach documentation): □ Solar-thermal □ Photovoltaics □ Recovered energy D Water heating system is (choose one): D Heat pump water heater D Electric resistance water heater( s) □Solar water heating system with .40 solar savings fraction □ Exception: Updated 8/15/2019 4 City of Carlsbad Climate Action Plan Consistency Checklist 4. Electric Vehicle Charging A D Residential New construction and major alterations• Please refer to Carlsbad Ordinance CMC section 18.21.140 when completing this section. D One and two-family residential dwelling or townhouse with attached garage: □ One EVSE Ready parking space required □ Exception : □ Multi-family residential· □ Exception · Total Parking Spaces EVSESoaces Proposed Caoable Readv Installed Calculations: Total EVSE spaces = .10 x Total parking (rounded up to nearest whole number) EVSE lnstaHed = Total EVSE Spaces x .50 (rounded up to nearest whole number) EVSE other= Total EVSE spaces -EVSE Installed (EVSE other may be 'Capable," "Ready" or "Installed.") Total 'Major alterations are: (1) for one and two-family dwellings and townhouses wilh attached garages, alterations have a building pennK valuation~ $60,000 or include an electrical service panel upgrade; (2) for multifamily dwellings (lhree un~ or more without attached garages), alterations have a building pennn valuation ~ $200,000, interior finishes are removed and significant sKe work and upgrades to structural and mechanical, electrical, and/or plumbing systems are proposed. B D Nonresidential new construction (includes hotels/motels) D Exception · Total Parking Spaces EVSE Soaces Proposed Caoable I Readv Installed Total I Calculation· Refer to the table below· Total Number of Parkina Soaces provided Number of reauired EV Soaces Number of renuired EVSE Installed Spaces □ 0-9 1 1 □ 10-25 2 1 □ 26-50 4 2 □ 51-75 6 3 □ 76-100 9 5 □ 101-150 12 6 □ 151-200 17 9 □ 201 and over 10 oercent of total 50 nercent of Reouired EV Soaces Updated 8/15/2019 5 City of Carlsbad Climate Action Plan Consistency Checklist 5. D Transportation Demand Management (TOM): Nonresidential ONLY An approved Transportation Demand Management (TOM) Plan is required for all nonresidential projects that meet a threshold of employee-generated ADT. City staff will use the table below based on your submitted plans to detennine whether or nor your penntt requires a TOM plan. If TOM is applicable to your penntt, staff will contact the applicant to develop a stte-specific TOM plan based on the penntt details. Acknowledgment: Employee ADT Estimation for Various Commercial Uses Office ( all)2 Restaurant Retai'3 Industrial Manufacturing Warehousin EmpADTfor first 1,000 s.f. 20 11 8 4 4 4 EmpADTI 1000 s.f.1 13 11 4.5 3.5 3 1 , Unless otherwise noted, rates estimated from /TE Trip Generation Manual, 1 ()th Edition 2 For all office uses, use SAN DAG rate of 20 ADTl1,000 sf to calculate employee ADT 3 Reti;iil uses include shopping center, variety store, supermarket, gyms, pharmacy, etc. Other commercial uses may be subject to special consideration Sample calculations: Office: 20,450 sf 1. 20,450 sf/ 1000 x 20 = 409 Employee ADT Retail: 9,334 sf 1. First 1,000 sf= 8 ADT 2. 9,334 sf -1,000 sf= 8,334 sf 3. 8,334 sf 11,000 x 4.5 + 8 = 46 Em lo ee ADT I acknowledge that the plans submitted may be subject to the City of Carlsbad's Transportation Demand Management Ordinance. I agree to be contacted should my penntt require a TDM P. and understand that approved TOM plan is a condttion of pennft issuance. Person other than Applicant to be contacted for TD Name(Printed): _________ _....,~..-«------- EmailAddress: __________________ _ Updated 8/15/2019 Date: (o/ul1~ 1 Phone Number. ____ _ 6 City of Carlsbad cbR2017-1434 July 10, 2017 (City of Carlsbad Owner: WASTE MANAGEMENT PLAN B-59 Controctor: Development Services Bulldfng Division 1635 Farad.av A11enue 760-602-271!1' www.carlsbadca.gDI/ Job A<Jd, .. ,,;_· _,l_;:_o_,1-'4'---'D-'4--1=f>"-'~--'/W-'-'-'t.-:.._ __ Phooo N,mberc.· _7.,__.(,'-'o'-· _.7c._Z-...,_"1.._~5"--C,:Lb=S-c..... __ _ Permit#: l-fL '2.ol'I -z.qt, EstimalE!dCostofProJact: .$, ____________ _ Type of Project: O New Construction O Romodol or T.I. Jirosldontiol □ Commercial O DomoUtion (check all that apply) □Other----------------------------­ Non-hamrcious consttuctlon waste goncratcd during tho course of this project sMll be rocyclod and/or :sa1vagod for ro-use at a minimum of 50% pcrCALGrccn Soc. 5.408.1. Failure to comply moy result Ill a ponolty fee up to $1,000. For ptojrn:ts whlCh consist of malnly equipment and/or racking. thDt have a combined weight of now construction disposal that docs not exceed 2 lbs per square foot of building orco affected by this permit, may bo docmcd to meet tho 50% minimum ,oqulrcment uwn approvol of 0ullding Department. ALTERNATIVE FORMS OF COMPLIANCE: llf selected. do not complete Tables 1 & 2 bolowJ D Construction waste shall not exceed 2 lbs. per sf. of area. All receipts shall be provided to tho Building Official prior to ftnal. llhls option not oppllca.blc for most construction projccts.J Square foct of construction aroa. _______ X 2 lbs. -________ lbs.or oUowoblc wasto. ;pi: plan on using a WASTE MANAGEMENT ml I-off bin. Ali receipts shalt bo provided to the Bulldlflg Official prior to fmol. Table 1-Estimated waste (To be filled out prior to permit issui:mcc--refer to example on Page 2.) MATERIALS lbs. of waste to be tuki!n to lbs. of waste to bo Waste Hauling Company or Re-Use Mothod LANDFILL RE-USED or RECYCLED Asphalt/ Conc:rate Brick / Mason,y Cardboard Drywall Landscape Dabris Lumbur / \'lood Meta!s Mbit.--dWosto Trash 'Gurba••o Other: TOTAL lbs:: Estimated Percentage to be Re-Used or Recycled, ______ % Uon provided herein, to the best of my know lodge. Is true and correct. ot- 11t-to/, "I Official Use Only OPlonApprovc-d □Plan Denied 0Pra 1uatlon Approved Rovlcwcd/ Approved by:. _______________ _ l'lil',I!' 1012 City of Carlsbad cbR2017-1434 July 10~ 2017 Table 2 -Actual Waste (To be completed aftN construction.) MATERIALS lbs. of waste ui~en to tbs. of waste LANDFILL RE-USED or RECYCLED Asphalt/ Concrete Brick/ Masonry Cardboard Ol)Wall LandS"..ilpc Debris lumber/ Wood MotiJIS /,li>.edWaste Trash / Gu rbal!i> Other: TOTAL lbs,: Actual Percentage Re-Used or Recycled. ______ % Official Use Only Waste Hauling Company or Re-Use Method (comple:e only If dlffcrnnt than Tublu 1) 0 5()')(, Goal Achieved D 50% Goal Not AchlO\'Cd D Allcrnati\'O Compllanco AchlO\'Od Penalty Paid s _______ _ Reviewed/ Approved Dy_· _________________ _ EXAMPLE: Uso the following example as a guide to completing this form. MAIERIALS lbs. ot wo.ste-10 be tajcen lo lbt.. of wc:sre 10 be lANDF!ll RE,USEO or kECYCLEO Asp!ialt I Coacret• 0 :~ooo :Irick I Muonry 1.DO 45 C• C':u.iboffll 0 ~-"j!) Dryw.U 0 50 Ladscope D•bri, 0 .120 Lu:uber lWoo.i 500 D Metals 3.00 :-oo MixtdWut< 1500 {) Trash/ C"'1?b•:~ 3.00 0 Otbar: Poot <::;:w,~t! 0 900 TOTAl. lbs.: -;J_JOC· 3':{J-0 Percentage to be Re-Used or Recycled 59 0/o Fom1uIa: Toto! Ro-used or Recycled (TOlill Combined Waste) X 100 ~ o/o Re-Used or Recycled Waste Houlir.9 Company or Re--Ut4t Method A'F.,C. H!>.u.fo,.o, Co. WM / Rl-1,{:stci. 't•YLCR, Ov..-,-~~t At C. H9.uLi,w . C.,. i\t e t-trml~1•1..:1 Co. Mulc.-ied. e Re-used. o,~--:slt~ wast~ Mav.(l~e,..,_e,,:~ w ,vt. 1 A't,C. Hau(i111.0 WM WM !A-~~d n;; c:.rus.hed. ~.a,;.e ov,-;;~te 3870 X 100 ~ 59% Ro-Used or Rcx:yclca (2700 + 3870) Since 59% exceeds the minimum requirement of 50%, this plan compllos.