Loading...
HomeMy WebLinkAbout1315 PINE AVE; ; CB911322; PermitBUILDING PERMIT 08/01/95 16:23 Page 1 of I Job Address: 1315 PINE AV Suite: Permit Type: RESIDENTAL ADD/ALT (OVER $IOK) Parcel No: 205-052-30-00 Lot#: Valuation: 33,800 Construction Type: VN Occupancy Group: R3/M1 Ref erence#: Description: 400 SF GAR/CONV 660 SF GARAGE RE-NEW PERMIT Permit No: CB911322 Project No: A9101680 Development No: Status: ISSUED Applied: 09/19/91 Apr/Issue: 08/01/95 Entered By: DC Appl/Ownr : PATERSON, NED 619 433-723:2 1918 S. HILL STREET OCEANSIDE, CA 9204 *** Fees Required *** ,' Fees Cdllected & Credits Z ---\i U) Fees: 859.00 Adjustments: / 00— Total"Cre .dits\ .00 Total Fees: / 859.00 Total P,ayments:\ 809.00 Rala'nc'e'-Du'e: 50.00 Fee description U nits,,\ ne/Unit Ext fee Data ------------------- 7--------------31100 Building Permi Plan Check ) / 202.00 Strong Motion Fee 44 3.00 Enter "Y" for Renewal >\ / /'// 156.00 Y Other 12800/ 128.00 RE-NEW * BUILDING TOTAL V / 800.00 Enter "Y" for Plumbing IssueFeé > / 7.50 Y Each Plumbing Fixture or,Trap.. '4 fl---.., 2.50 10.00 Each Water Heater andXoiVent > _-. r' 2.50 2.50 * PLUMBING TOTAL ) . V 20.00 Enter "Y" for Electric Issu i'~l 4 Fee/ >' ' 5.00 Y Enter 'Y" for Remodel 10.00 Y * ELECTRICAL TOTAL ($10 Minimum) V -. 15.00 Enter '1' for Mechanical Issue Fee> 15.00 Y Install Furn/Ducts > 1 9.00 9.00 * MECHANICAL TOTAL 24.00 2972 08/01/95 0001 81 02 C-F'RMT APPROVAL DATE CLEARANCE CITY OF CARLSBAD 2075 Las Palmas Dr., Carlsbad, CA 92009 (619) 438-1161 06/22/94 08:52 Page 1 of 1 Job Address: 1315 PINE AV Permit Type: RESIDENTAL ADD/ALT Parcel No: 205-052-30-00 Valuation: 33,800 Construction Type: VN Occupancy Group: R3/M1 Description: 400 SF GAR/CONV 660 Appl/Ownr : PATERSON, NED 619 1918 S. HILL STREET OCEANSIDE, CA 92054 Suite: (OVER $10K) Lot#: Reference#: SF GARAGE Permit No: CB911322 Project No: A9101680 Development No: Status: ISSUED Applied: 09/19/91 Apr/Issue: 06/03/92 Entered By: DC 4334232 BUILDING PERMIT *** Fees Required ***/ ** ( ;eespl1cted & Credits Fees: 8 09. 0 0 ) \\ Adjustments: / .00 Total Credits: .00 / -. - I Total Fees: 809:00 -' //, Tota1Pyrnents \ 731.00 / ) -Balance Due: 78.00 Fee description / !..r " Units Fe/Unit\ Ext fee Data .. Building Permit I 311.00 Plan Check ,)\ /' /} 202.00 Strong Motion Fee 3.00 Enter 'Y" for Renewal Fee / (i/J i 156.00 Y Other /78.00 78.00 * BUILDING TOTAL \ N 1ç- s2 / 750.00 Enter "'I" for Plumbing Issue Fees > / 7.50 Y INCORPORATED Each Plumbing Fixture r Tr 'N. 4/ 2.50 10.00 Each Water Heater and/or Vent(. > '2 .,5'0 2.50 * PLUMBING TOTAL I/ - / 20.00 Enter Y" for Electric Issue Fee > 5.00 1 Enter 1' for Remodel -'>!f '- 10.00 1 * ELECTRICAL TOTAL ($10 Minimum) 15.00 Enter '1' for Mechanical Issue Fee> 15.00 Y Install Furn/Ducts > 1 9.00 9.00 * MECHANICAL TOTAL 24.00 CITY OF CARLSBAD 2075 Las Palmas Dr., Carlsbad, CA 92009 (619) 438-1161 S t r: Fl: Ste: Status: ISSUED 4990 oi 09/_;9/91 Va1idatediT DC 2.:100 619 433-7232 BUILDING PERMIT 10/5/91 14:37 Page 1 of 1 Job Address: 1315 PINE AV Permit Type: RESIDENTAL ADD/ALT (OVER S10K) Parcel No: 205-052-30-00 Valuation: 33,800 Construction Type: VN Occupancy Group: R3/MI Class Code: Description: 400 SF GAR/CONV 660 SF GARAGE Appl/Ownr : PATERSON, NED 1918 S. HILL STREET Permit No: C3911322 Project No: A9101680 Development No: OCEANSIDE, CA 92054 *** Fees Required *** - **,. ..'ees Co ilected & Credits Fees: 56/00 , N Adjustments: .' otaL Cedi: .00 Total Fees: ,b8 UO'—>-_ Tol-Payrne:s:\ 236.00 / 7 \ 32.00 __!!_!!L/_ c T1./ rBuilding Permit . . 311.00 Plan Check / \ ./ I ç 202.00 Strong Motion Fee F Y / 3.00 * BUILDING TOTAL ' " f 516.00 Enter 4 Y' for PlumLing Issue'Fe'dj/ > \ H/ /'J 7.50 Y Each Plumbing Fixture or / 2.0 2.50 Each Water Heater and/or Vent , / 2.0 2.50 * PLUMBING TOTAL (7 1 13.00 Enter 'Y 11 for Electric Issue Fee > . / 5.00 Y Enter "Y" for Remodel ". 10.00 Y * ELECTRICAL TOTAL ($10 Mirilmurn) 15.00 Enter '1' for Mechanical Issue Fee>- 15.00 Y Install Furn/Ducts ..' 1 9.00 9.00 * MECHANICAL TOTAL 24.00 E or" 4 1 RED PERMIT PUT iAS EXPIRED IN ACCORD E7 SLON 303 (d) DATE* SIGNATU FINAL APPROVAL INSP.,,,,,.- DATE______ CLEARANCE______________ CITY OF CARLSBAD 2075 Las Palmas Dr., Carlsbad, CA 92009 (619) 438-1161 PLAN CHECK NO. q/ EST. VAL / Of PLAN CK DEPOSIT VALID. BY DATh - C-PRt1T 236.00 PERMiT APPLICATION City of Carlsbad Building Department 2075 Las Palmas Dr., Carlsbad, CA 92009 (619) 438-1161 1. PERMiT IYPE A - U Commercial U New Building U Tenant Improvement B - 0 Industrial 0 New Building 0 Tenant Improvement C -Residential 0 Apartment 0 Condo Xsingle Family Dwelling ddition/A1teration Duplex 0 Demolition 0 Relocation 0 Mobile Home 0 Electrical 0 Plumbing Mechanical 0 Pool 0 Spa 0 Retaining Wall 0 Solar 0 Other__________ 2. PROJECT INFORMATION FOR OFFICE USE ONLY Address PE Building or Suite No. Nearest Cross Street b4 c_4Li LEGAL DESCRIPTION Lot No. Subdivision Name/Number Unit No. Phase No. 02 Energy Calcs 02 Structural Calcs 02 Soils Report 0 1 Addressed DESCRIPTION OF WORK OJ/t SQ. FT. # OF STORIES ((pD NAME ADDRESS CITY STATE ZIP CODE DAY TELEPHONE 4. APPLICANT U CONTRACTOR U AGENT FOR CONIHACTOR MUWAER U AGENT FOR OWNER NAME 4> ADDRESS 141 D. CITY L$4A,l4 \W STATE (A ZIP CODE DAY TELEPHONE k'1tUl'.IiI I I.JVVNtI( NAME 4> P1oi4 ADDRESS Ill e? )0. W 4s Sr CITY ) % . STATE (_AfJ ZIP CODE DAY TELEPHONE 433- NAME LI A. ADDRESS CITY STATE ZIP CODE DAY TELEPHONE STATE UC. # LICENSE CLASS CITY BUSINESS UC. # DESIGNER NAME ADDRESS CITY STATE ZIP CODE DAY TELEPHONE STATE UC. # WORKERS' (DMPENSAI1ON Workers' Compensation Declaration: I hereby affirm that TT a certificate of consent to self-insure issued by the Director of Industrial Relations, or a certificate of Workers' Compensation Insurance by an admitted insurer, or an exact copy 3r duplicate thereof certified by the Director of the insurer thereof filed with the Building Inspection Department (Section 3800, Lab. C). INSURANCE COMPANY POLICY NO. EXPIRATION DATE Certificate of Exemption: I certify that in the performance of the work for which this permit is issued, I shall nct employ any person in any manner so as to become subject to the Workers' Compensation Laws of California. SIGNATURE DATE OWNER-BUILDER DECLARATION Owner-Builder Declaration: I hereby affirm that I am exempt from the Contractor's License Law for the Icilowing reason: I, as owner of the property or my employees with wages as their sole compensation, will do the work and the structure is not intended or offered for sale (Sec. 7044, Business and Professions Code: The Contractor's License Law does not apply to an owner of property who builds or improves thereon, and who does such work himself or through his own employees, provided that such improvements are not intended or offered for sale. If, however, the building or improvement is sold within one year of completion, the owner-builder will have the burden of proving that he did not build or improve for the purpose of sale.). 0 I, as owner of the property, am exclusively contracting with licensed contractors to construct the project (Sec. 7044, Business and Professions Code: The Contractor's License Law does not apply to an owner of property who builds or improves thereon, and contracts for such projects with contractor(s) licensed pursuant to the Contractor's License Law). 0 1 am exempt under Section Business and Professions Code for this reason: (Sec. 7031.5 Business and Professions Code: Any City or County which requires a permit to construct, alte:, improve, demolish, or repair any structure, prior to its issuance, also requires the applicant for such permit to file a signed statement that he is licensed pursuant to the provisions of the Contractor's License Law (Chapter 9, commencing with Section 7000 of Division 3 of the Business and Professions Code) or that he is exempt therefrom, and the basis for the alleged exemption. Any violation of Section 7031.5 by any applicant for a permit subjects the a licant o a civil penalty of not more than five hundred dollars [$5001). SIGNATURE I\ U — DATE 7 f Is the applicant or future building occupant required to submit a business plan, acutely hazardous materials registration form or risk management and prevention program under Sections 25505, 25533 or 25534 of the Presley-Tanner Hazardous Substance Account Act? DYES [3 NO Is the applicant or future building occupant required to obtain a permit from the air pollution control district or air quality management district? DYES 0 N Is the facility to be constructed within 1,000 feet of the outer boundary of a school site? DYES [3 NO IF ANY OF THE ANSWERS ARE YES, A FINAL CERTIFICATE OF OCCUPANCY MAY NOT BE ISSUED AFTER JULY 1, 1989 UNLESS THE APPLICANT HAS MET OR IS MEETING THE REQUIREMENTS OF 11W OFFICE OF EMERGENCY SERVICES AND THE AIR IOLLU11ON (X)N1IIOL DISTRICT. WNSThUCI1ON LENDING AGENCY I hereby affirm that there is a construction lending agency for the performance of the work for which this permi: is issued (Sec 3097(1) Civil Code). LENDER'S NAME LENDER'S ADDRESS IT APPLICANT CERTIFICATION I certify that I have read the application and state that the above information is correct. I agree to comply with all City ordinances and State laws relating to building construction. I hereby authorize representatives of the City of Carlsbad to enter upon the above mentioned property for inspection purposes. I ALSO AGREE TO SAVE INDEMNIFY AND KEEP HARMLESS THE CITY OF CARLSBAI) AGAINST All UAI3IIJ11ES JUDGMENTS COSTS AND EXPENSES WHICH MAY IN ANY WAY ACCRUE AGAINST SAID CITY IN CONSEQUENCE OF 11W GRANTING OF THIS PERMIT. OSHA: An OSHA permit is required for excavations over 5'0' deep and demolition or construction of structures over 3 stories in height. Expiration. Every permit issued by the Building Official under the provisions of this Code shall expire by limitatbn and become null and void if the building or work authorized by such permit is not commenced within 365 days from the date of such permit or if the building or work authorized by such permit is suspended or abandoned at any time after the work is commenced for a period of 180 days (Section 303(d) Uniform Building Code). APPLICANVSSIATURE DATE: t' ? I ~~A CITY OF CARLSBAD INSPECTION REQUEST PERMIT# CB911322 FOR 08/03/95 DESCRIPTION: 400 SF GAR/CONV 660 SF GARAGE RE-NEW PERMIT TYPE: RADMAJ JOB ADDRESS: 1315 PINE AV APPLICANT: PATERSON, NED PHONE: CONTRACTOR: PHONE: OWNER: PHONE: REMARKS: MW/NED/729-7071/999-2424 INS PECTO SPECIAL INSTRUCT: INSPECTOR AREA PD PLANCK# CB911322 0CC GRP R3/M1 CONSTR. TYPE VN STE: LOT: 619 433-7232 TOTAL TIME: CD LVL DESCRIPTION ACT COMMENTS 19 ST Final Structural 29 PL Final Plumbing 39 EL Final Electrical 49 ME Final Mechanical ***** INSPECTION HISTORY ***** DATE DESCRIPTION ACT INSP COMMENTS 071195 Final Combo CO PD EXPIRED/INFORMED 070595 Final Combo CA TP RE-SCHEDULE 033193 Rough Electric AP PD 033193 Underground/Conduit-Wiring AP PD 033193 Final Combo CO PD 032293 Final Combo CO PD 031093 Final Combo CO PD NO ONE THERE 110992 Frame/Steel/Bolting/Welding CO PD 100192 Ftg/Foundation/Piers AP PD 110491 Interior Lath/Drywall AP PD 110191 Insulation AP PD 103191 Insulation CA PD 103091 Frame/Steel/Bolting/Welding PA PD GARAGE CONVERSION ESGIL CORPORATION 9320 CHESAPEAKE DR., SUITE 208 SAN DIEGO, CA 92123 (619) 560-1468 DATE: JURISDICTION: C_Afl_LS_eAc PLAN CHECK NO: / f-• SET: PROJECT ADDRESS: /'>IS P ,' ,1JE. URISDICTION flPLAN. CH flFILE COPY DUPS DEESIGNER PROJECT NAME: p --s / - 6Ae AO,-n ov The plans transmitted herewith have been corrected where necessary and substantially comply with the jurisdiction's building codes. The plans transmitted herewith will substantially ccmply with the jurisdiction's building codes when minor deficien- cies identified are resolved and checked by building department staff. D The plans transmitted herewith have significant deficiencies identified on the enclosed check list and should be corrected and resubmitted for a complete recheck. U The check list transmitted herewith is for your information. The plans are being held at Esgil Corp. until corrected plans are submitted for recheck. The applicant's copy of the check list is enclosed for the jurisdiction to return to the applicant contact person. U The applicant's copy of the check list has been sent to: Esgil staff didnot advise the applicant contact person that plan check has been completed. U Esgil staff did advise applicant that the plan check has been completed. Person contacted: Date contacted: Telephone # El REMARKS: OF) CITY _i ,Lj iUO Ju's FALl -c,€.. '- ~ 10 (px Altf3 By: PETE _ Enclosuf ESGIL CORPORATION L6(,-- 0 GA 7CM ESGIL CORPORATION 9320 CHESAPEAKE DR., SUITE 208 SAN DIEGO, CA 92123 (619) 560-1468 DATE: A (1~JR I S DI JURISDICTION: CARLSBAD flL PAN CHECKER UFILE COPY PLAN CHECK NO: SET: 1T oups fl DESIGNER PROJECT ADDRESS: /3,iç pi, PROJECT NAME: /_//ZADD?TIc)AJ U The plans transmitted herewith have been corrected where necessary and substantially comply with the jurisdiction's building codes. The plans traimitted herewith will substantially comply U with the jurisdiction's-building codes when minor deficien- cies identified I are resolved and checked by building department staff. [I)The plans transmitted herewith have significant deficiencies identified on the enclosed check list and should be corrected and resubmitted for a complete recheck. The check list transmitted herewith is for your information. " The plans are being held at Esgil Corp. until corrected Plans are submitted for recheck. U The applicant's copy of the check list is enclosed for the jurisdiction to return to the applicant contact person. The applicant's copy of the checklist has been sent to: NE2 P/'tTEjSo,v /lb S'oiTH WLL ..cr OCFA,vS, •9lOS/ Esgil staff didnot advise the applicant contact person that plan check has been completed. Esgil staff did advise applicant that the plan check has been completed. Person contacted:________________________ Date contacted: Telephone #________________ REMARKS: By: PETh _F1CI1- Enclosures:____________________ ESGIL CORPORATION 0 GA 0 RN C) DM PLAN NO: ________________ -z- JURISDICTION: CITY OF CARlSBAD TO: pT)eso ENCLOSURES: Piur ADDRESS: I . / S P(AJe AV <~M- j (S(QJ Tt) Ve3 L(0Q FLOOR AREA: pJ E 1.) 6-Aj STORIES: 0 ,k.. PLAN CORRECTIONIKKr CITYOFCARLSBAD SI*LE FAMILY AND DUPLEX LMRLLI FOREWORD: PLEASE READ Plan check is limited to technical requirements contained in the Uniform Building Code, Uniform Plumbing Code, Uniform Mechanical Code, National Electrical Code and state laws regulating energy conservation, noise attenuation and access for the handicapped. The plan check is based on regulations enforced by the Building Inspection Department. You may have other corrections based on laws and ordinances by the Planning Department, Engineering Department or other departments. Present California law mandates that residential construction comply with Title 24 and the following model codes: 1988 UBC (eff. 1/1/90) 1988 UPC (eff. 1/1/90) 1990 NEC (eff. 7/1/91) 1988 UMC (eff. 1/1/90) The above regulations apply to residential construction, regardless of the code editions adopted by ordinance. The circled items listed need clarification, modification or change. All items have to be satisfied before the plans will be in conformance with the cited codes and regulations. Per Sec. 303(c), 1988 Uniform Building Code, the approval of the plans does not permit the violation of any state, county or city law. To speed un the recheck process, note on this list (or a copy) where each correction item has been addressed i.e., plan sheet, specification. etc. Be sure to enclose the marked up list when you submit the revised plans. Date plans received by jurisdiction: Date plans received by Esgil Corporation: Date initial plan check completed: By: PETFLccHEX Applicant contact person: Telephone: List No. 12, Carlsbad Single Family Dwelling and Duplex With All Supplements. (1988 UBC) PLANS ) Please make all Corrections on the original tracings and submit two new sets of prints, and any original plan Sets that may have been returned to you by the jurisdiction, to: Esgil Corporation, 9320 Chesapeake Drive, Suite #208, Sari Diegoi California 92123, (619) 560-1468. ) Please make all corrections on the original tracings and submit two new sets of prints, and any original plan sets that may have been returned to you by the jurisdiction, to: The jurisdiction's building department. Indicate on the Title Sheet of the'plans, the name of the legal owner and name of person responsible for the preparation of the plans. Section 302(a)7. All sheets of plans must be signed by the -' person responsible for their preparation. (California Business and Professions Code). Plans, specifications and alculations shall be signed by the California state licensed engineer or architect responsible for their preparation, for plans deviating from conventional wood frame construction. Specify expiration date of license. (California Business and Professions Code). Specify on the Title Sheet of the plans the gross floor area of each element of this project including dwelling, garage, carport, patio, deck and balcony. Section 302(d). Provide a statement on the Title Sheet of the plans that this project shall comply with Title 24 and 1988 USC, UHC and UPC and 1990 NEC. Submit fully dimensioned plot plan drawn to scale showing location, size, and use of all existing and proposed structures on the lot. Identify property lines and show lot dimensions and jill easements. Show location of all cut or fill slopes. Show, finish floor elevations and show elevations of 'adjacent 'finish grade. Show drainage' patterns with-.*, minimum slopes. Section 302(d). Indicate distance from property lines to ( proposed building. Section 302(d). Show on the title sheet all structures, pools, walls, etc. included under this application. Any portion of the project shown on the site plan that is not included with the building permit application filed should be clearly identified as "not included." Clearly show if the lower level is a basement ( or a story, based on the definitions in Sections 403 and 420. Plot the finish grade (as defined) on the elevations and dimension the distance to the floor above, for story determination. On the cover sheet of the plans, specify any f items requiring special inspection, in a format similar to that shown below or sticky back. REQUIRED SPECIAL INSPECTIONS In addition to the regular inspections, the following checked items will also require Special Inspection in accordance with Sec. 306 of the Uniform Building Code. ITEM REQ. IF REMARKS CHECKED SOILS COMPLIANCE PRIOR TO FOUNDATION INS?. STRUCTURAL CONCRETE OVER 2500 PSI PRESTRESSED STEEL FIELD WELDING HIGH STRENGTH BOLTS DPANSION ANCHORS SPECIAL MASONRY SPRAYED ON FIRE PROOFING PILES/CAISSONS DESIGNER-SPECIFIED Exterior walls closer than 3 feet to property ( lines shall be one-hour rated construction and have no openings. Table 5-A. 7/9/91 2 Exterior walls closer than 3 feet to a property / line shall have 30 inch parapets when the floor area per floor exceeds 1,000 square feet. Section 1709. Projections, including eaves, may not extend more than 12 inches into the 3 foot setback from the property line. Section 1710. Eaves over required windows shall be not less I than 30 inches from the side and rear property lines. Section 504. 0'. Plastic skylights shall not be installed within / that portion of a roof located within a distance to property line where openings in exterior walls are prohibited or required to be protected. Section 5207 (a) 7. lØ. Projections, including eaves, shall be one- hour fire-resistive construction, heavy timber or of noncombustible material if they project into the 3' setback area from the property line. Section 1710. Show location of permanently wired smoke detector: Centrally located--tin corridor or area giving access to sleeping rooms. On each story. C. In the basement. When sleeping rooms are upstairs, at the upper level in close proximity to the stair. In rooms adjacent to hallways serving bedrooms, when such rooms have a ceiling height 24 inches or more above the ceiling height in the hallway. NOTE: Detectors shall sound an alarm audible in all sleeping areas of the unit. Section 1210 When the valuation of a room addition or repair exceeds $1,000, or when sleeping rooms are created, smoke detectors shall be provided at existing bedrooms per item 19 above. Section 1210. Habitable rooms, other than kitchens, shall contain at least 70 square feet.. .of floor area. At least one room shall have not less than 120 square feet of floor area. Section 1207 (b). Window area must be at least 1/10 of the floor I area and a minimum of 10 square feet per Section 1205 (a). Appears to be deficient in Openable window area in habitable rooms must be 1/20 of the floor area and a minimum of 5 square feet. In bathrooms, laundry rooms and similar rooms 1/20 of area is required and minimum is 1.5 sq. ft. Section 1205 (a). At least 1/2 of the common wall must be open and have an opening not less than 25 sq. ft. nor one tenth of the floor area of the interior room if light and ventilation is being supplied from an adjacent room. Section 1205 (a). z.s< Required windows shall not open into a roofed ( porch unless the ceiling height is at least 7 feet, the longer side is at least 65% open, and the porch abuts a street, yard or court. Section 1205 (a). 7'. Provide mechanical ventilation capable of providing five air changes per hour in bathrooms, water closet compartments, laundry rooms and similar rooms if required openable windows are not provided. Section 1205 (c). 2/. Show discharge point for exhaust air to be at least 5 feet from any mechanical ventilating intake. Section 1205(c). 2%. Ductless fans cannot be used in bathrooms if a I tub or shower is present. Section 1205(c). 2/. No habitable room, other than a kitchen, shall be less than 7'0" in any dimension. Section 1207 (c). Show that ceiling height for habitable rooms is a minimum of 716". Section 12,07 (a). Show ceiling height for laundry rooms, / hallways, corridors, and bathrooms is a minimum of 710". Section 1207 (a). Dimension on the plans the 30" clear width for water closet compartments and 24" clearance in front of water closet. Section 511 (a). 31. Specify safety glazing for glazing in ( 'hâzar!ous locations such as glass doors, glazing adjacent to doors and glazing adjacent to walking surfaces. Section 5406. 31. Glazing, in the same wall plane as a door, f must be safety glazing if within 12" of the door and less than 60" above the walking surface, unless the glazing is leaded or faceted glass. Section 5406 (d) 6. 3j1 Glazing in shower and tub enclosures shall be ( tempered, laminated or approved plastic (including windows within 5 feet of tub or shower floor). Section 5406 (d) 5. 2/12/90 3 5 '. Provide spiral stairway details, per Section 3306 (f): 621 ( Provide skylight details to show compliance with Sections 3401 and 5207 or provide I.C.B.0. approval number. a. Minimum run is 7 1/2 inches measured at a / point 12 inches from where the treads are 6'. Plastic skylights must be separated from each the narrowest. other by at least 4 feet. Section 5207 (a) 6. b. Maximum rise is 9 1/2 inches. Maximum 64 Show attic ventilation. Minimum vent area is clear opening between. risers is 6 inches. 1/150 of attic area or 1/300 of attic area if at least 50% of the required vent is at least C. Minimum headroom is 6 feet 8 inches 3 feet above cave vents or cornice vents. Show required area and area provided. d. The tread must provide a clear walking Section 3205 (c). area measuring at least 26 inches from the AT L/ 00)4 /1vu.L C GAl VLLS / ON outer edge of the supporting column to the MASONRY inner edge of the handrail. / 5,. Spiral stairways may not be used for required 67. Provide fireplace construction details or note construction to be fireplace per attached exits when the area served is greater than 400 ( standard drawing. Chapter 37. sq. ft. Section 3306 (f). Show anchored veneer support and connections 5'. Provide I.C.B.0. Research Report and number for attached to wood in Seismic Zones 3 and 4, metal stairway, or submit plans and comply with Section 3006 (d)l and Section 2515 calculations and approved fabricator registered (a). Show ties and #9 wire in horizontal with the building department or note that the joints. stairway fabrication plans shall be submitted / to and approved by the building official prior f7. Show height and construction details of all to installation. -..-.. masonry walls. Chapter 24. .5/- Exterior stairways shall not project into the 3 /8. Show floor and roof connections to masonry foot setback from the property lines. Section walls. Connection shall resist 200 pounds per 3306 (n). lineal foot or the actual design load, / whichever is greater. Cross grain tension or 5J(. The walls and soffits of the enclosed usable bending in wood ledgers is not permitted. ( space under interior stairs shall be protected Section 2310. on the enclosed side as required for one-hour / fire-resistive construction. Section 3306 (m). . Show a minimum 2" air space and flashing j between planter and building walls. Within units, show that corridors have a Section 2516 (c) 7. minimum width of 36 inches. Section 3305 (b). GARAGE AND CARPORTS ROOFING / 7'. Garage requires one-hour fire protection on Specify roof slope, the garage side of walls and ceiling common to Roof slope is not adequate for roof type / ( the dwelling. Table 5-B, Section 503 (d). specified. Table 32-B,C,D and E. 71. All elements supporting floor above garage, including walls supporting floor joists, must .- Specify-roof material and-application. Chapter have one-hour fire-resistive protection on the 32. . garage side. Section 503 (b) 5fl' Specify I.C.B.O. or U.L. approval number for 74. Show 1 318" solid core self-closing door for roof materials not covered in U.B.C., e.g., openings between garage and dwelling. Section tile, etc. Section 107. 503 (d). 61. Specify minimum 1/4 inch per foot roof slope 13. Garages are not permitted to open into a room ' for drainage or design to support accumulated used for sleeping purposes. Section 1104. water. Section 3207 (a) and Section 2305 (f). 6 • Show roof drains and overflows. Section 3207. 12/18/90 5 An occupancy separation is not required between ( carport and residence, provided the carport is open on two or more sides and has no enclosed uses above. Section 503 (a) Exception 3. ill Show garage framing sections, size of header I over garage opening, lateral cross bracing at plate line, method bracing garage front and holddowns if required. Chapter 23. NOTE: Maximum shear panel height-to-width ratio is 3 1/2 to 1 for plywood. Table 25-I. 7/ Doors may open into the garage only if the f floor or landing in the garage is not more than one inch lower than the door threshold. Section 3304 (i). Provide an 18" raised platform for any FAU, water heater, or other device in the garage which may generate a flame or spark. UMC Section 508, UPC Section 1310 (a). FOUNDATION RUIRTS 1. Per soils report, note on the plan the soils classification, whethët or not the soil is expansive and note the allowable bearing value. Section 2905 (c). The foundation plan does not comply with the soils report recommendations for this project. Please review the report and modify design, notes and details as required to show compliance:_________________________________ 8 Provide notes on the foundation plan listing ( the soils report recommendation for foundations, slab and building pad preparation. Provide a letter from the soils engineer confirming that the foundation plan, grading plan and specifications have been reviewed and that it has been determined that the recommendations in the soils report are properly incorporated into the construction documents (when required by the soil report). The soils engineer recommended that he/she review the foundation excavations. Note on the foundation plan that "Prior to the contractor requesting a Building Department foundation inspection, the soils engineer shall advise the building official in writing that: The building pad was prepared in accordance with the soils report, The utility trenches have been properly backfilled and compacted, and The foundation excavations comply with the intent of the soils report". Show height of all foundation walls. Chapter 23. Show height of retained earth on all foundation walls. chapter 23. If cut or fill slopes exist, show distance of foundation to edge of cut or fill slopes and show steepness and heights of cuts and fills. Chapter 29. Note on plans that wood shall be 6" minimum above finish grade. Section 2907 (a). 87. Note on plans that surface water will drain away from building and show drainage pattern Section 2905 (f). Dimension foundation per U.B.C. Table 29A: Floors Footing Supported* Stenwall Width Depth Thickness 1 6" 12" 12" 6" 2 8" 15" 18" 7" 3 10" 18" 24" 8" Foundations may support a roof in addition to the floors. Where only a roof is supported, use foundation for one floor. -. Show foundation sills to be pressure treated, 1 or equal. Section 2516 (c) 3. 6. Show foundation bolt size and spacing. Section 2907 (f). 91. Specify size, I.C.B.O. number and manufacturer of power driven pins. Show edge and end distances and spacing. Section 302 (d). (/,J 5-t1--L 2/13/90 6 - A-L- E&U*Q ,T J>t- £'VD-S oF Tlt ( 6 Aj2 & - FoAtT /4 ,PA,v E (S :2)If required, show size, embedment and location Show rafter ties. Rafter ties shall be spaced of hold down anchors on foundation plan. S not more than 4 feet on center and be just Section 302 (d). above the ceiling joists, where rafters and If hold downs are required, note on plan that hold down anchors must be tied in place prior to foundation inspection. Section 305 (e) 1. Show adequate footings under all bearing walls and shear walls. Section 2907 (b). . Show on the plans stepped footings for slopes steeper than 1:10. Section 2907 (c). Show minimum 18" clearance from grade to bottom of floor joists and minimum 12" clearance to bottom of girders. Section 2516 (c)2. Show pier size, spacing and depth into undisturbed soil. Table 29-A. Show minimum underfloor access of 18" x 24". ' Section 2516 (c). Show minimum underfloor ventilation equal to 1 ( sq. ft. for each 150 sq. ft. of underfloor area. Openings shall be as close to corners as practicable and shall provide-cross ventilation on at least two approximately opposite sides. Section 2516 (c) 6. FRG Show wall bracing. Every exterior wood stud wall and main cross-stud partition shall be braced at each end at least every 25 feet of length with 1 x 4 diagonal let-in braces or equivalent. Section 2517 (g) 3, Table 25-V. 4 In 2-story buildings, shear panels at the first story (at least 4.8 inches in width) shall be located at each end or as near thereto as possible and comprise at least 25 percent of the linear length of the wall, or provide design. Section 2517(g)3, Table 25-V. 1/27. Note cross bridging or blocking. Floor joists and rafters 12" or more in depth shalLbe supported 1atéza11y by bridging at intervals not exceeding 8 feet, unless- both edges are held inline. Sec. 2506 (h), 2517 (d) 6. 1ø '. Show blocking at ends and at supports of floor 7 joists, rafters and trusses at exterior walls. Section 2517 (d) 3, 2517 (h) 6. 1. Bearing partitions, perpendicular to joists, :1 shall not be offset from supporting girders, beams, walls or partitions, more than the depth of the joist. Section 2517 (d) 5. ceiling joists are not parallel. Section 2517 (h) 4. S1tt M4X 1' vC 77 FS 711fA.' 1313706' OF ,ArTEJS ,,-' -s o E-14' Di1iC770,v. Show rafter purlin braces to be not less than / 45 degrees to the horizontal. Section 2517 (h) 5. 1l. Show double top plate with minimum 48" lap ( splice. Section 2517 (g) 2. Show nailing will be in compliance with Table 25-Q. Show or note fire stops at the following locations per Section 2516 (f): In concealed spaces of stud walls and partitions, including furred spaces, at the ceiling and floor levels and at 10 foot intervals along the length of the wall; At all interconnections between concealed vertical and horizontal spaces such as occur at soffits, drop ceilings and cove ceilings; C. In concealed spaces between stair stringers at the top and bottom of the run and between studs along and inline with the run of stairs if the walls under the stairs are unfinished; and d. In openings around vents, pipes, ducts, chimneys, fireplaces and similar openings which afford a passage for fire at ceiling and floor levels, with noncombustible materials. l. In duplexes, draft stops shall be provided in ( floor-ceiling assemblies and attics in line with walls separating units and separating units from common areas. . Show stud size azi&spacing. Maximum allowable / stud heights: Bearing wall: 2 x4 and 2 x 6 max. 101 ; Non-bearing: 2 x 4 max. 141 , 2 x 6 max. 201. Table 25-R-3. Studs supporting two floors, a roof and I ceiling must be 3 x 4 or 2 x 6 at 16" o.c. Table 25-R-3. l)tI. Note on A.I.T.C. Certificate of Compliance for glued laminated wood members shall be given to the building inspector prior to installation. Section 2505. 17/6/91 7 i4. Show I.C.B.0. approval number for prefab fireplace. Show height of chimney above roof per I.C.B.0. approval or Table 37-B. 154. Note on plan: Gas vents and non-combustible piping, in walls, passing through three floors or less shall be effectively draft stopped at each floor or ceiling. UBC, Section 1706 (a) 6. l. Provide dryer vent to outside. UMC, Section / 1903. ELECTRICAL (MArIoIAL ELECTRICAL (XOE) All wiring shall comply with the National Electrical Code. iyL ( Show on the plan the amperage of the electrical service, the location of the service panel and the location of any sub- panels. If service is over 200 amps, submit single line diagram, panel schedule and load calculations. 9be Note on the plans: "Electrical outlets shall installed in accordance with NEC Article 210-52". Note on the plans: "Lighting outlets / controlled by a wall switch shall be provided in accordance with NEC Article 210-70". Note on the plans: "Light fixtures installed in clothes closets ill comply with NEC Article 410-811. Note convenience outlets in s.ii'&., outdoors, and in garages andr-nis (other than for laundry and similar equipment) shall be GFI protected. NEC, Art. 210-8. Note electrical system ground to be provided ( per NEC, Art. 250-80(a), 81(c). PLZJMBIM (uNIFo14 PLUMBING (X)DE) 158. Show water heater size, tpe- and ---1ait on plans. UPC, Section 1301. Show source for providing combustion air to fuel burning water heater. If wall openings in an enclosure are used, at least one-half of the required opening area shall extend into the upper twelve inches of the enclosure and one-half within the lower twelve inches. UPC, Section 1307. '98 Note on the plans that "all weather-exposed surfaces shall have a weather-resistive barrier to protect the interior wall covering and that exterior openings shall be flashed in such a manner as to make them weatherproof". Section 1707. ANICAL (uNuoI4 M&Jjr&L cx)DE) All heating, ventilating, and cooling systems and appliances shall comply with the Uniform Mechanical Code. Show the size, location and type of all heating and cooling appliances or systems. I Fo API)*-O 7'DO ,, Ituu £)(IXirJG VS 140/ Every dwelling unit shall be provided with / heating facilities capable of maintaining a room temperature of 70 degrees F. at 3 feet above the floor in all habitable. rooms. Show basis for compliance. UBC, Sec. 1212. i4. Note on the plans that the FAU closet or alcove / must be 12 inches wider than the furnace or furnaces being installed. UMC Section 704. Show minimum 30" deep unobstructed working space in front of furnace. Section 505, UNC. 1/3. Furnace shall not be installed in any bedroom, bathroom or in a closet or confined space with access only through such room unless specified as direct vent appliance, enclosed furnace or electric heating appliance. Section 704 UMC. 141. Show source of combustion air to furnace, per Chapter 6, UMC. 1L)4. Show access to the attic containing equipment ( to be minimum 30 inches by 30 inches. The opening may be 22 inches by 30 inches if the equipment can be removed through such opening. Section 708 UMC. iz.i. Note that passageway to the attic furnace shall ( be unobstructed and have continuous solid flooring not less than 24 inches wide, not more than 20 feet in length through the attic. Section 708 U11C - 11i. Show permanent electrical outlet and lighting fixture controlled by a switch for furnace located in attic or underfloor space. Section 708 & 709 UMC. 4. Show details to comply with Section 709 for furnace under the floor, or Section 710 for roof or outside furnace. 7/9/91 9 Fuel combustion water heater shall not be ( installed in bath or bedroom or in a closet opening into bath or bedroom. UPC, Section 1309. iØ. Provide adequate barrier to protect water I heater from vehicle damage. An 18" platform for the water heater does not satisfy this requirement. UPC, Section 1310. 162 Show T and P valve on water heater and show route of discharge line to exterior. UPC, Section 1007 (e). 163. Show that water heater is adequately braced to resist seismic forces, when not connected by rigid pipe. UMC Section 504(d). 16t Show shower stall can accommodate a 30" circle / and has a minimum floor area of 1,024 sq. in. UPC 909 (d). 1p. Provide clothes washer hook-up for each unit. Title 24, Part 3. NOISE INSLILAlION £PUPLXFs) IØ'. Show details of duplex common (party) walls and floor/ceiling assemblies to achieve a Sound Transmission Class (STC) rating in walls of 50 decibels and an Impact Insulation Class (IIC) rating on floor/ceiling of 50 decibels. Title 24. 1p4. Show how penetrations of assemblies for piping, electrical devices, recessed cabinets, bathtubs, soffits, or heating ventilating, or exhaust ducts shall be sealed, lined, or insulated to maintain required sound transmission rating. Title 24. 1. Provide insulation in walls and ceiling to / achieve STC of 50 between garage and living area if garage use is not controlled by resident. Title 24. ENERGY NSVATION 1,4. Provide plans, calculations and worksheets to show compliance with current energy standards. 0170. The regulations require a properly completed and properly signed Form CF-1R to be either imprinted on the plans, taped to the plans or "sticky backed" on the plans, to allow the building inspector to readily compare the actual construction with the requirements of the approved energy design. 17/ All energy items shown on the plans must be in agreement with the information shown on the properly completed Form CF-1R. 172. Specify on the building plans all of the mandatory energy conservation requirements as listed on the enclosure titled, "Mandatory Energy Conservation Requirements". Show the make, model and efficiency of the ( space heating (or cooling) system and provide heat loss calculations if the output exceeds 45,000 BTU/Hr. 171. For room additions, show that the glazing area ( of the addition does not exceed 16% of the newly-conditioned floor area, plus glazing removed or relocated due to the addition. 3/5. Provide fluorescent general lighting in kitchen(s) per CAC, Title 24, 2-5352(J). CARLSBAD S .F.D. & IXJPWC SUPPLEMENT 171 . Energy conservation design should be for Zone 7. 131 Floor drains must have auto-prime (city policy). For gas piping under slabs that serve kitchen island cooktops, see the attached Policy 91-46 for special sleeve and clean-out requirements. 1,74'. Note exhaust fans cannot be ductless type (city policy). New residential units must be pre-plumbed for I future solar water heating. Note "two roof jacks must be installed" where the water heater is in the one story garage and directly below the most south facing roof (City Ordinance No. 8093). 1 Note "two 3/4" copper pipes must be installed ( to the most convenient future solar panel location when the water heater is not in a one story garage and is not directly below the most south facing roof. (City Ordinance No. 8093). 1. All piping for present or future solar water (. heating must be insulated when in areas that are not heated or cooled by mechanical means (city policy). lS. Incorporate the waterproofing details, on the ( attached Policy 80-8, where interior living space occurs below grade at the masonry wall(s). 14. Show on the Title Sheet on the plans, the / information required by the attached Developmental Services Sheet 112383. 7 /10/91 10 - - ------ - not requ.LLed. Esgil Corporation will advise the City to place their soils notice stamp on the plans. Heavy timber framing, minimum 6" x lot, beams ~6. and minimum 8" x 8" post, for the structural beam and column supporting the fire separation between the garage and living area above, is acceptable if shown on the plans. (city policy). All structures require a Class -B roof covering, f except room additions. If a room addition covers all of the existing building (2nd story addition), then the above exception doesn't apply. City Ordinance 9792 requires two parking spaces/unit with clear area of 20'x20' i.e. no washing machines, etc. Show compliance. 10. All chimneys attached €6 any appliance or fireplace that burns solid fuel shall be equipped with an approved spark arrester. The net free area of the spark arrester shall be not less than four times the net free ara of the outlet of the chimney. The spark arrester screen shall have heat and corrosion resistance equivalent to 12 gauge wire, 19 gauge galvanized wire or 24 gauge stainless steel. Openings shall not permit the passage of spheres having a diameter larger than 1/2-inch and shall not block the passage of spheres having a diameter of less than 3/8-inch. The City of Carlsbad has contracted with Esgil Corporation located at 9320 Chesapeake Drive, Suite 208, San Diego, California 92123; telephone number 619/560-1468, to perform the plan check for your project. If you have any questions regarding these plan check items, please contact__________________ PETE at Esgil Corporation. If you have any questions regarding City Building permit procedures, please contact Carter Darnell at the City of Carlsbad, 2075 Las Palmas Dr., telephone 619/438-1161. Thank you. Enclosures: MISCELLANEOUS 10. Please see additional corrections, or remarks, ( on the following page. To speed up the recheck process, note on this list (or a copy) where each correction item has been addressed, i.e., plan sheet, note or detail number, calculation page, etc. Please indicate here if any changes have been made to the plans that are not a result of corrections from this list. If there are other changes, please briefly describe them and where they are located in the plans. Have changes been made to the plans not resulting from this correction list? Please check. ____Yes No 7/10/91 11 Ce,rtiflcate of Compliance: Residential (Page 1 of 2) CF-1R ProjectTlLle Date - Project Address Bu Ming Permit N Documentation Author Telephone Ockcd By/Date Cornpll&nce Method (Package. Point System or Computer) Climate Zone Enlorccmeni Agency the Only GENERAL INFORMATION Total Conditioned Floor Area: 1 BuildingType: SingleFamily - Hotel/Motel (check one or more) - Multi-Family (less than 4 stories) Addition - Multi-Family (4 or more stories) Existing-Plus-Addition Front Entry Orientation: North / East / South / West / All Orientations (circle one or more) Number of Dwelling Units: Floor Construction Type: Slab! Raised Floor (circle one or both) Infiltration Control: Standard/Tight (circle one) BUILDING SHELL INSULATION Component Insulation Location/Comments Type R-Value (atdc, to garage, typical. etc.) Wall .............. wall .............. Roof ............. Roof ............. Floor ............. Floor ........... .. Slab Edge GLAZING Shading Devices Glazing Area Glass Type Interior Exterior Overhang FrarningType Orientation (sf) (single, double) (roller blind, etc.) (shadescrecn. etc.) (yes/no) (metal/wood) Front.... Front.... Left...... Left...... Rear..... Rear..... Right.... Right.... Skylight ....... Skylight ....... THERMAL MASS Type/Covering Area Thickness (slab/exposed, tile. etc.) (s (inches) Location/Description (kitchen, bath. etc.) Certificate of Compliance: Residential (Pag2of2) CF-1R Project Title Date HYAC SYSTEMS Minimum Duct Type (furnace, air Efficiency Location Duct Output Manufacture:-/ Model # condition. heat pump) (SE. SEER.HSPF) (attic. etc.) R-Value (Btuh) (or approved equal) Maximum Furnace Heating Output: Btuh HOT WATER SYSTEMS Tank ManufacturerjModel # System Type (storage gas, etc.) Capacity (or approved equal) Special Feature(s) SPECIAL FEATURES/REMARKS (Add extra sheets if necessary) COMPLIANCE STATEMENT This certificate of compliance lists the building features and performance specifications needed to comply with Title 24, Chapter 2-53 and Title 20, Chapter 2, Subchapter 4, Article I of the California Administrative code. This certificate has been signed by the individual with overall design responsibility and the building owner, who shall retain a copy of it and transmit the certificate to any subsequent purchaser of the building. When this certificate of compliance is submitted for a single building plan to be built in multiple orientations, all building conservation - features which vary are indicated in the Special Features/Rem arks section.— Designer Name: Tide/Firm: Address: Telephone: Building Owner Name: Title/Firm: Address: Telephone: (signature) (date) (date) Documentation Author Name: Tide/Firm: Address: Telephone: Enforcement Agency Name: Agcy: Telephone: (signature) (date) (signature or stamp) (date) Form Revised Marci 1998 To FOLUAMG N= aECIFYDrG KANDATORY REqJIRD02M SBOM BE INCORPORATE) OH PLAN SEE=, OR JOB SPECIFICATION ,:._.s,.i,..w_ All heating, ventilating, air conditioning, and water heating equipment shall meet all of the requirements of the Appliance Efficiency Standards and shall be certified by the California Energy Commission. A two stage thermostat, which controls the supplementary heat on its second stage, shall be provided for heat pumps. Thermostats shall be equipped with an automatic setback, which the building occupant can program to automatically set back the thermostat twice in 24 hours. Equipment which requires preventive maintenance to maintain efficient operation shall be furnished with complete necessary maintenance information. All gas-fired fan type central furnaces, gas-fired fan type wall furnaces, and cooking appliances shall be equipped with an intermittent ignition device. All fan systems exhausting air to the outside shall be provided with backdraft dampers. All transverse duct, plenum, and fitting joints shall be sealed with pressure sensitive tape or mastic to prevent air loss and shall-be insulated to conform to the provisions of Section 1005 of the UMC, 1982 Edition. A vapor barrier is required in climate zone 1, 14, and 16. All manufactured windows and sliding glass doors shall meet the 1972 ANSI air infiltration standards and shall be certified and labeled. All swinging doors and windows leading to unconditioned areas shall be fully weather-stripped. (U) Storage type water heaters and storage and backup tanks for solar systems shall be externally wrapped with R-12 insulation or greater. The five feet of pipe closest to the water heater, if outside conditioned space, shall be insulated with a minimum of R-3. Steam and steam condensation return piping and recirculating hot water piping outside the building envelope shall be insulated in accordance with T0-1406(d). Lamps used in luminaries for general lighting in kitchens and bathrooms shall have an efficiency of not less than 25 lumens per watt. Showerheads and faucets shall be equipped with flow restrictors as outlined in the appliance efficiencitanda.rds and shall be certified to the Energy Commission. Masonry and factory-built fireplaces on exterior walls, shall be equipped with tight-fitting closeable metal or glass doors covering the entire opening of the firebox; a combustion air intake equioped with a readily accessible, operable, and tight fitting damper to draw air from the outside of the building; and a tight fitting flue damper with a readily accessible ccntrol. Insulation used shall comply with California Quality Standards. The insulation installer shall post. a signed certificate. .. Section. 276. Insulation Certificate (All Occupancies). After installing insulation, the installer shall post in a conspicuous location in the building a certificate signed by the installer and the builder stating that the installation conforms the requirements of Title 24, Part 2, Chapter 2-53, and that the materials installed conform with the requirements of Title 20, Chapter 2, Subchapter 4, Article 2. The certificate Shall state the manufacturer's name and material identification, the installed "W' value, and (in applications of loose fill insulation) the minimum installed weight per square foot consistent with the manufacturer's labeled density for the desired "R" value. For infiltration control all openings and penetrations must be caulked and sealed, such as around windows, at sole plates, and openings for utility pipes and wires. Form EOI 3/5/86 Date Jurisdiction CARLSBAD Prepared by o Bld g. Dept. VALUATION AND PLAN CHECK FEE o Esgil PLAN CHECK NO. cjj _/3?_7- BUILDING ADDRESS /3_I_P1'.JF_,4vE APPLICANT/CONTACT PHONE NO._________________ BUILDING OCCUPANCY - 1Z3 , DESIGNER PHONE______________ TYPE OF CONSTRUCTION CONTRACTOR PHONE: BUILDING PORTION BUILDING AREA VALUATION MULTIPLIER VALUE 3 (73—i8 _____ _________ Air _Conditioning Commercial Residential @ Res. or Comm. - Fire Sprinklers Total Value 3.3boo• Bui1di6 Permit FeeS Plan Check Fee S Z 01 COMMENTS: SHEET (cF ( 12/87 BUILDING PLANCHECK ENGINEERING CHECKLIST DATE: 7fl ITEM COMPLETE PLANCHECK NO. R cflZ2 ITEM INCOMPLETE NEEDS YOUR ACTION \S PrAv e-no ITEM SELECTED (-106 T. VL, PROJECT ID: AV-IN 205-3S7—O LEGALREQUIREMENTS SitePlan jN I tQ I t1 123 S R T D D ccc H H H E E E K, K K Provide a fully dimensioned site plan drawn to scale. Show: north arrow, property lines, easements, existing and proposed structures, streets, existing street improvements, right-of-way width and dimension setbacks. Show on site plan: Finish floor elevations, pad elevations, elevations of finish grade adjacent to building, existing topographical lines, existing and proposed slopes, driveway with percent (%) grade and drainage patterns. E E 3. Provide legal description and Assessors Parcel Number. Discretionary _Approval Compliance LY] 4. No Discretionary approvals were required. Project complies with all Engineering Conditions of Approval for Project No.________________ Project does not comply with the following Engineering Conditions of Approval for Project No.__________________ Conditions complied with by: Date:________ FieldReview Field review completed. No issues raised. 12f E:1 0 8. Field review completed. The following issues or discrepancies with the site plan were found: A. Site lacks adequate public improvements E 0 B. Existing drainage improvements not shown or in conflict with site plan. C. Site is served by overhead power lines. P:\D0CS\M1SF0RMS\FRM0010.DH REV. 02/27/91 D. Grading is required to access site, create pad or provide for ultimate street improvement. E E E. Site access visibility problems exist. Provide onsite turnaround or engineered solution to problem. EE F. Other:__________________________________________ Dedication Requirements 9. No dedication required. LII D 0 10. Dedication required. Please have a registered Civil Engineer or Land Surveyor prepare the appropriate legal description together with an 8½" x 11" plat map and submit with a title report and the required processing fee. All easement documents must be approved and signed by owner(s) prior to issuance of Building Permit. The description of the dedication is as follows:___________________________ Dedication completed, Date By:_______ Improvement Recalirements 11. No public improvements required. SPECIAL NOTE: Damaged or defective improvements found adiacent to building site must be repaired to the satisfaction of the City inspector prior to occupancy. E E12. Public improvements required. This project requires construction of public improvements pursuant to Section 18.40 of the City Code. Please have a registered Civil Engineer prepare appropriate improvement plans and submit for separate plancheck process through the Engineering Department. Improvement plans must be approved, appropriate securities posted and fees paid prior to issuance of permit. The required improvements are: Improvement plans signed, Date: by: P:\D0CS\MISF0RMS\FRP40010.DH REV. 02/27/91 10%j 'LON Improvements are required. Construction of the public improvements may be deferred in accordance with Section 18.40 of the City Code. Please submit a letter requesting deferral of the required improvements together with a recent title report on the property and the appropriate processing fee so we may prepare the necessary Future Improvement Agreement. The Future Improvement Agreement must be signed, notarized and approved by the City prior to issuance of a Building Permit. Future Improvement Agreement completed, Date:IOa9I By:_____________________ 13a. Inadequate information available on site plan to make a determination on grading requirements. Please provide more detailed proposed and existing elevations and contours. Include accurate estimates of the grading quantities (cut, fill, import, export). E El No grading required as determined by the information provided on the site plan. El El El 15. Grading Permit required. A separate grading plan prepared by a registered Civil Engineer must be submitted for separate plan check and approval through the Engineering Department. NOTE: The Grading Permit must be issued and ciradinq substantially complete and found acceitable to the City Inspector prior to issuance of Building Permits. Grading Inspector sign off. Date: by: Miscellaneous Permits d E-1 El 16. Right-of-way Permit not required. El El El 17. Right-of-way Permit required. A separate Right-of-way Permit issued by the Engineering Department is required for the following: El El 18. Sewer Permit is not required. El El El 19. Sewer Permit is required. A sewer Permit is required concurrent with Building Permit issuance. The fee required is noted below in the fees section. 144 El El 20. Industrial waste Permit is not required. P:\D0CS\MISF0RMS\FRM0010.DH REV. 02/27/91 'El flE 21. Industrial Waste Permit is required. Applicant must complete Industrial Waste Permit Application Form and submit for City approval prior to issuance of a Building Permits. Permits must be issued prior to occupancy. Industrial Waster Permit accepted - Date: By:____________________________ Fees Required o T 27. Park-in-Lieu Fee Quadrant: Fee per Unit:______________ N/A Total Fees:_____ O Traffic Impact Fee Fee Per Unit: Total Fee:__________ 0 Bridge and Thorough fare Fee Fee Per Unit: Total Fee:__________ El Public Facilities Fee required. El Facilities Management Fee Zone: Fee:________ o Sewer Fees Permit No. EDU's________ Benefit Area: Fee:_______________ O Sewer Lateral Required:__________________________ Fee:_________________ REMARKS: EE ITEM hr ô4 rterrd rr, ENGINEERING AUTHORIZATION TO ISSUE PERMIT P:\D0CS\MISF0RMS\FRM0010.DH REV. 02/27/91 PLANNING CHECKLIST Plan Check No. ?/- /32 Z Address 3iT ///L Avg Planner -0~A %A, £& Y? k Phone 438-1161 ext. (Name) APN: O32 - Type of Project and Use yCes q 41 4.1 Zone - Facilities Management Zone 20 Legend CV . . t) U a w L) U Item ComDlete .c .c C C Item Incomplete - Needs your action 1, 2, 3 Number in circle indicates plancheck number where deficiency was identified LJ-{] 0 Environmental Review Required: YES - NO 1SPE DATE OF COMPLETION: Compliance with conditions of approval? If not, state conditions which require action. Conditions of Approval C MM Discretionary Action Required: YES NO c-' TYPE APPROVAL/RESO. NO. DATE: PROJECT NO. OTHER RELATED CASES: Compliance with conditions of approval? If not, state conditions which require action. Conditions of Approval 0 California Coastal Commission Pt Required: YES NO DATE OF APPROVAL: San Diego Coast District, 3111 Camino Del Rio North, Suite 200, San Diego, CA. 92108-1725 (619) 521-8036 Compliance with conditions of approval? If not, state conditions which require action. Conditions of Approval E Landscape Plan Required: YES ___ NO 7 See attached submittal requirements for landscape plans Site Plan: OZ 00 1. Provide a fully dimensioned site plan drawn to scale. Show: North arrow, property lines, easements, existing and proposed structures, streets, existing street improvements, right-of-way width and dimensioned setbacks. O 0 2. Show on Site Plan: Finish floor elevations, elevations of finish grade / adjacent to building, existing topographical lines, existing and proposed / slopes and driveway. El' D 0 3. Provide legal description of property. 0 0 4. Provide assessor's parcel number. Zoning: 5270 0 Setbacks: Front: Required 2 ' Shown 27 / Int. Side: Required 10' Shown I c' Street Side: Required N4 Shown ,W Rear: Required 2 o' Shown 20'-!- Lot coverage: Required Shown Height: Required 5(' Shown 9' 0 Parking: Spaces Required 2t.( 2d7wn 21 'X'3" 1747 Guest Spaces Required Shown 0 0 0 Additional Comments OK TO ISSUE AND ENTERED APPROVAL INTO COMPUTERc - DATE /ô - PLNCK.FRM .;: ,. 17 kv Ov WI vil if I 45 2. 71 KIM 4a ... PSI Cj L10±J11L.JMINIMAL 5LOt7- ) è 3