Loading...
HomeMy WebLinkAbout1319 LAUREL TREE LN; ; CB983813; PermitCity of Carlsbad 04/13/1999 Building Permit Permit No:CB983813 Job Address: Permit Type: Parcel No: Valuation: Occupancy Group: Project Title: Building Inspection Request Line (760) 438-3101 1319 LAUREL TREE LN CBAD APT Sub Type: 2120405900 Lot#: $471,661.00 Construction Type: VN Reference#: SDP95-01 BLDG 15,UNITS 146-148,246-248 6278 SF+1372 SF PORC,BALC+PATIO-LAUREL T Owner: Status: Applied: Entered By: Appr/lssued: Inspect Area: ISSUED 05/20/1998 RMA 04/13/1999 Applicant: CUATROCORP LAUREL TREE INVESTMEN85&o04/13/99 0001 01 1770 4TH AV 92101 619 687-7380 Total Fees: Description $45,227.38 • 'C C-PRHT C C "•~"'-;:~· '4~ """•1\.J',, ', g ~-" ,, s ,~ ', " ,:otal !'BYments To Oate: $0.00 *, llJll~ce Due: $45,227.38 Fee --------------------~-,, -, ____________________________ ,.. ___ , __ ,.._ * ELECTRICAL TOTAL * MECHANICAL TOTAL * PLUMBING TOTAL Building Permit 1 '1' t ¢ 1 + d ; , 0 '0 j ; 110.00 134.00 364.00 1,923.00 5,400.00 02 Enter #Units & Code-Pot~ Enter Y to Autocalc P. \a, sa4. oo (MlffxJL,I.._ 9,360.00 1,944.00 or manually enter Bridg or manually enter T.I.F Payoff Fee for CFD Plan Check Strong Motion Fee 11-7c~ Inspector: -L~~~~~-.~ FINAL APPROVAL Clearance: 16,111.38 1,250.00 47.00 NOTICE: Please take NOTICE that approval of your project includes the "Imposition· of fees, dedications, reservations, or other exactions hereafter collectively referred to as "fees/exactions." You have 90 days from the date this permit was issued to protest imposition of these fees/exactions. If you protest them, you must follow the protest procedures set forth in Government Code Section 66020(a), and file the protest and any other required information with the City Manager for processing in accordance with Ca~sbad Municipal Code Section 3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack, review, set aside, void, or annul their imposition. You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capactiy changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this project NOR DOES IT APPLY to any fees/exactions of which ou have reviousl been iven a NOTICE similar to this a as to which the statute of limitations has reviousl otherwise ex ired. CITY OF CARLSBAD 2075 Las Palmas Dr., Carlsbad, CA 92009 (760) 438-1161 Inspection List Permit#: CB983813 Type: APT BLDG 15,UNITS 146-148,246-248 6278 SF+1372 SF PORC,BALC+PATIO-LA Date Inspection Item Inspector Act Comments 06/06/2000 89 Final Combo RB AP 06/05/2000 89 Final Combo RB NR ONC.O. S 06/02/2000 89 Final Combo RB NR 0610112000 89 Final Combo RI 05/31/2000 39 Final Electrical RI 05/31/2000 39 Final Electrical RB we 05/3112000 89 Final Combo RB NS 05/30/2000 89 Final Combo RI 05/30/2000 89 Final Combo RB co &NR 05/26/2000 89 Final Combo RB PA 05/26/2000 89 Final Combo RI 05/25/2000 89 Final Combo RB NS 05/2512000 89 Final Combo RI 05/24/2000 89 Final Combo RI 05/24/2000 89 Final Combo RB NS 05/22/2000 89 Final Combo DA NS 05/18/2000 89 Final Combo RB NR 05/17/2000 89 Final Combo RB CA ROUTE FINAL 05/11/2000 39 Final Electrical RB CA DONE 0511012000 39 Final Electrical RB AP EMR 05/09/2000 39 Final Electrical RB NS 05/08/2000 39 Final Electrical RB co 05105/2000 39 Final Electrical RB NS 05/03/2000 39 Final Electrical RB NS 03/24/2000 23 Gas/TesURepairs RB AP 03/0912000 16 Insulation RB NS 02/29/2000 17 Interior Lath/Drywall RB AP 02/29/2000 84 Rough Combo RB AP COMPLETED 02/28/2000 17 Interior Lath/Drywall RB co 0212512000 17 Interior Lath/Drywall RB NS 02/24/2000 17 Interior Lath/Drywall RB PA 1ST LAYER OK 02/23/2000 17 Interior Lath/Drywall RB NS 02/22/2000 17 Interior Lath/Drywall RB CA BY TOM 02/18/2000 16 Insulation RB NS 02117/2000 16 Insulation RB AP 02/17/2000 18 Exterior Lath/Drywall RB CA DONE 02116/2000 16 Insulation RB NR 02116/2000 18 Exterior Lath/Drywall RB AP 02/15/2000 16 Insulation RB NS 02/15/2000 18 Exterior Lath/Drywall RB NS 02/15/2000 84 Rough Combo RB NS 0211012000 84 Rough Combo RB co 02/09/2000 16 Insulation RB NR 02/09/2000 84 Rough Combo RB NR Wednesday, June 07, 2000 Page 1 of 2 02/08/2000 18 Exterior Lath/Drywall RB WC 02/08/2000 84 Rough Combo RB NS 02/04/2000 84 Rough Combo RB NR 02/02/2000 14 Frame/Steel/Bolting/Weldin RB PA PRELIM FOR TUB AREAS 02/02/2000 14 Frame/Steel/Bolting/Weldin RB CA 01/27/2000 34 Rough Electric RB NS 01/26/2000 34 Rough Electric RB CA 01/26/2000 44 Rough/Ducts/Dampers RB CA 01/25/2000 34 Rough Electric RB NS 01/25/2000 44 Rough/Ducts/Dampers RB NS 01/18/2000 34 Rough Electric RB NS 01/18/2000 44 Rough/Ducts/Dampers RB CA BY TOM 01/13/2000 24 Rough/Topout RB PA ND 18 IN TO TOILET -RETEST 1ST FLR 01/12/2000 14 Frame/Steel/Bolting/Weldin RB co PRE LIM 01/12/2000 14 Frame/Steel/Bolting/Weldin RB co 01/11/2000 18 Exterior Lath/Drywall PD NR 01/11/2000 24 Rough/Topout RB NS 01/11/2000 84 Rough Combo PD AP 01/06/2000 34 Rough Electric PD CA 01/05/2000 34 Rough Electric PD NR 12/08/1999 13 Shear Panels/HD's RB AP 12/07/1999 13 Shear Panels/HD's RB NR 12/06/1999 13 Shear Panels/HD's RB co LOTS OF CORRECTIONS 12/03/1999 13 Shear Panels/H D's RB NS 11/23/1999 15 Roof/Reroof RB AP 11/22/1999 15 Roof/Reroof RB NR REMOVE DEBRIS 08/05/1999 11 Fig/Foundation/Piers DH AP 07/26/1999 21 Underground/Under Floor DH AP 07/23/1999 21 Underground/Under Floor DH NR Wednesday, June 07, 2000 Page 2 of 2 UNSCHEDULED BUILDING INSPECTION DATE INSPECTOR _l_'Z£5 __ _ PERMIT# fcf-3 tf1-/-5 . PLAN CHECK# ___ _ JOB ADDRESS 13 r L ~ct '<rd z;:lj2_ L.4 DESCRIPTION .Ml(! r >,,,- CODE DESCRIPTION ACT COMMENTS &l :.~~~~~ld1111 IDSP8ctl01 Dopt, BoHdl•g E•gl••"'"' Pl•••l"9Q Llto Plan Check#: Fire Date: 5/17/2000 Permit#: Project Name: Address: Contact Person: Sewer Dist: CB983813 BLDG 15,UNITS 146-148,246-248 6278 SF+1372 SF PORC,BALC+PATIO-LAUREL T 1319 LAUREL TREE LN Phone: CA Water Dist: CA Lot: Permit Type: APT Sub Type: ·························································································································································· Inspected ~--Date \5\?,IJ \tit By: wr, 'W Inspected: Approved:)( Disapproved: __ Inspected Date By: Inspected: Approved: Disapproved: __ Inspected Date By: Inspected: Approved: Disapproved: __ ··························································································································································· Comments: _____________________________ _