Loading...
HomeMy WebLinkAbout1631 Corte Orchidia; ; CBR2016-0386; PermitCity of Carlsbad 1635 Faraday Av Carlsbad, CA 92008 Print Date: 02/02/2017 Residential Permit Permit No: CBR2016-0386 www.carlsbadca.gov Job Address:1631 Corte Orchidia Permit Type:BLDG-Residential Work Class:Cogen Status:Closed -Finaled Parcel No:2159503000 Lot #:Applied:12/16/2016 Valuation:$8,400.00 Reference #:Issued:12/16/2016 Occupancy Group:Construction Type:Finaled: # Dwelling Units:Bathrooms:Inspector:MColl Bedrooms:Orig. Plan Check #: Plan Check #: Project Title: Description:MOSSA: ROOF MOUNT SOLAR, 21 MODULES, 5.46KW Owner: COOWNER MOSSA LOUIS&DEBORAH 1631 Corte Orchidia CARLSBAD, CA 92011 BUILDING PERMIT FEE $2000+$106.09 BUILDING PLAN CHECK FEE (BLDG)$74.26 SB1473 BUILDING STANDARDS FEE $1.00 STRONG MOTION-RESIDENTIAL $1.09 Total Fees:$182.44 Total Payments To Date:$182.44 Balance Due:$0.00 Please take NOTICE that approval of your project includes the "Imposition" of fees, dedications, reservations, or other exactions hereafter collectively referred to as "fees/exaction." You have 90 days from the date this permit was issued to protest imposition of these fees/exactions. If you protest them, you must follow the protest procedures set forth in Government Code Section 66020(a), and file the protest and any other required information with the City Manager for processing in accordance with Carlsbad Municipal Code Section 3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack, review, set aside, void, or annul their imposition. You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLYto water and sewer connection fees and capacity changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this project.NOR DOES IT APPLYto any fees/exactions of which you have previously been given a NOTICE similar to this, or as to which the statute of limitation has previously otherwise expired. —.um monsomi THE FOLLOWING APPROVALS REQUIRED PRIOR TO PERMIT ISSUANCE:0 PLANNING 0 ENGINEERING 0 BUILDING 0 FIRE 0 HEALTH 0 HAZMATIAPCD Building Permit Application Plan Check(No. Cf.Z(2-2(D(0 -C..)"%'(f) City of 1635 Faraday Ave., Carlsbad, CA 92008 Est. Value &C-{00 Ph: 760-602-2719 Fax: 760-602-8558Carlsbad Plan Ck. Depositemail: building@carlsbadca.gov www.carlsbadca.gov Date (1,- 1 ( Co ((.0 ISWPPP JOB ADDRESS I u 8 1 SUITEO/SPACEO/UNITO APN CO il Oral 1 1 Gt CT/PROJECT #LOT #PHASE ##OF UNITS #BEDROOMS # BATHROOMS TENANT BUSINESS NAME CONSTR. TYPE OCC. GROUP DESCRIPTION OF WORK:Include Square Feet of Affected Area(s) K.W 5:q1p PV Array Roof Mount ;Modules 71 ;Inverter(s)I ;String(s)3 •, Main Panel upgrade?ND ;Flush Mounted?yiS ;RMA?NO EXISTING USE PROPOSED USE ' GARAGE (SF)PATIOS (SF)DECKS (SF)FIREPLACE AIR CONDITIONING FIRE SPRINKLERS YESO#NCO YES ONO 0 YESEl NO0 APPLICANT NAME PROPERTY OWNER NAMEAmaya Salce LOU M 05501Pravda Contact ADDRESS ADDRESS • 2370 Oak Ridge Way 1431 e 0144-C.Ora/014 CITY STATE ZIP CITY STATE alVistaCA92081OAGfVI*4d 6 ft ZIP qa.6/1 PHONE FAX PHONE 'FAX 760-877-4038 EMAIL EMAIL asalceasolarcity.com DESIGN PROFESSIONAL CONTRACTOR BUS. NAMESame as Contractor Solar City Corp. ADDRESS ADDRESS 3055 Clearview Way CITY STATE ZIP CITY STATE ZIP San Mateo CA 94402 PHONE 'FAX PHONE FAX (650) 638-1028 EMAIL EMAIL asalceasolarcity.com STATE LIC.it STATE LIC.#CLASS CITY BUS. LIC.# 888104 C46.Cia 1227803 (Sec.7031.5 Business and Professions Code: Any City or County which requires a permit to construct, alter, improve, demolish or repair any structure, prior to its issuance, also requires theapplicant for such permit to filea signed statement that he is licensed pursuant to the provisions of the Contractor's License Law [Chapter 9, commending with Section 7000 of Division3 of theBusiness and Professions Code) or that he is exempt therefrom, and the basis for the alleged exemption. Any violation of Section 7031.5 by any applicant for a permit subjects the applicant toa civil penalty of not more than five hundred dollars ($500)). WORKERS'COMPENSATION Workers' Compensation Declaration:I hereby affirm under penaltyof perjury one ofthe following declarations: EiI have and will maintain a certificate of consent to self-insure for workers' compensation as provided by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued. I have and will maintain workers' compensation, as required by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued. My workers' compensation insurance carrier and policy number are: Insurance Co.Zurich American Insurance Company Policy No.WC0182014-00 (AOS)Expiration Date 911116 Tlig.section need not be completed if the permit is for one hundred dollars ($100) or less.' 11 Certificate of Exemption:I certify that in the performance of the work for which this permit is issued,I shall not employ any person in any manner so as to become subject to the Workers' Compensation Laws of California.WARNING: Failure to secure workers' compensation coverage is unlawful, and shall subject an employer to criminal penalties and civil fines up to one hundred thousand dollars (&100,000), in addition to the cost of compensation, damages as provided for in Section 3706 of the Labor code, Interest and attorney's fees. ,e5 CONTRACTOR SIGNATURE 0 AGENT DATE OWNER -BUILDER DECLARATION I hereby affirm that I am exempt from Contractor's License Law for the following reason: [1:1 I,as owner of the property or my employees with wages as their sole compensation, will do the work and the structure is not intended or offered for sale (Sec. 7044, Business and Professions Code: The Contractor's License Law does not apply to an owner of property who builds or improves thereon, and who does such work himself or through his own employees, provided that such improvements are not intended or offered for sale.If,however, the building or improvement is sold within one year of completion, the owner-builder will have the burden of proving that he did not build or improve for the purpose of sale).ElI,as owner of the property, am exclusively contracting with licensed contractors to construct the project (Sec. 7044, Business and Professions Code: The Contractor's License Law does not apply to an owner of property who builds or improves thereon, and contracts for such projects with contractor(s) licensed pursuant to the Contractor's License Law). ElI am exempt under Section Business and Professions Code for this reason: 1.I personally plan to provide the major labor and materials for construction of the proposed property improvement.OYes ON° 2.I (have / have not) signed an application fora building permit for the proposed work. 3.I have contracted with the following person (firm) to provide the proposed construction (include name address / phone / contractors' license number):, 4.I plan to provide portions of the work, but I have hired the following person to coordinate, supervise and provide the major work (include name / address / phone / contractors' license number): 5.I will provide some of the work, butI have contracted (hired) the following persons to provide the work indicated (include name / address / phone / type of work): R5PROPERTY OWNER SIGNATURE EIAGENT DATE COMPLETE THIS SECTION FOR NON -RESIDENTIAL BUILDING PERMITS ONLY Is the applicant or future building occupant required to submit a business plan. acutely hazardous materials registration form or risk management and prevention program under Sections 25505, 25533 or 25534 of the Presley-Tanner Hazardous Substance Account Act?D Yes O No Is the applicant or future building occupant required to obtain a permit from the air pollution control district or air quality management district?0 Yes 0 No Is the facility to be constructed within 1,000 feet of the outer boundary of a school site?0 Yes 0 No IF ANY OF THE ANSWERS ARE YES, A FINAL CERTIFICATE OF OCCUPANCY MAY NOT BE ISSUED UNLESS THE APPLICANT HAS MET OR IS MEETING THE REQUIREMENTS OF THE OFFICE OF EMERGENCY SERVICES AND THE AIR POLLUTION CONTROL DISTRICT. CONSTRUCTION LENDING AGENCY I hereby affirm that there is a construction lending agency for the performance of the work this permit is issued (Sec. 3097 (i) Civil Code). Lender's Name Lender's Address APPLICANT CERTIFICATION Icertify thatIhave read the application and state that the above information Is conect and that the irdonnation on the plans is accuraW.Iagreeto comply with all Cily ordinancesawl State laws relating to building construction. Ihereby authorize representativeofthe CityofCarlsbad to enter upon the above mentioned Property brinspection purposes.I ALSO AGREE TO SAVE, INDEMNIFY AND KEEP HARMLESS THE CITY OF CARLSBAD AGAINST ALL LIABILITIES, JUDGMENTS, COSTS AND EXPENSES WHICH MAY IN ANY WAY ACCRUE AGAINST SAID CITYIN CONSEQUENCE OF THE GRANTING OF THIS PERMIT. OSHA An OSHA permit is required for excavations overar deep and demolition or construction of structures over 3 stories in height EXPIRATION: Every permit issued by the Building Oficial under the provisionsofthis Code shall expire by limitation and become null and void if the building or work authorized by such permit is not commenced within 180 days from the date ofsuch permit orifthe building or walk authoredAarc • permit is suspended or abandoned at any time after the work is commencedfora period of180 d.(Section 1064.4 Uniform Building Code). ../ECAPPLICANT'S SIGNATURE UMW DATE /2.I ca • PERMIT INSPECTION HISTORY REPORT (CBR2016-0386) Permit Type:BLDG-Residential Application Date:12/16/2016 Owner:COOWNER MOSSA LOUIS&DEBORAH Work Class:Cogen Issue Date:12/16/2016 Subdivision: Status:Closed -Fineled Expiration Date:08/01/2017 Address:1631 Corte Orchidia Carlsbad, CA 92011 -4064 IVR Number:863 Scheduled Actual Date Start Date Inspection Type Inspection No.Inspection Status Primary Inspector Reinspection Complete 02/02/2017 02102/2017 BLDG-35 Solar 012309-2017 Passed Michael Collins Complete Panel BLDG-Final 012310-2017 Passed Michael Collins Complete Inspection Checklist Item COMMENTS Passed BLDG-Building Deficiency Release emailed to SDGE.Yes BLDG-Electrical Final Yes February 02, 2017 Page 1 of 1