Loading...
HomeMy WebLinkAbout1715 Yada Pl; ; CBRA2018-0050; PermitPermit Print Date: 11/04/2019 Job Address: Ccityof Carlsbad Permit No: CBRA2018-0050 Permit Type: Parcel No: 1715 Vada Pl BLDG-Associated Permit Resi 1562205400 Work Class: Lot#: Single Family Detached 1 Status: Applied: Closed -Finaled 03/13/2018 04/17/2019 Valuation: Occupancy Group: # Dwelling Units: Bedrooms: Project Title: $466,394.41 1 3.00 VADA FARM Reference#: DEV02058 Construction Type: VB Bathrooms: 3.50 Orig. Plan Check#: PC2017-0048 Plan Check#: Issued: Permit Fina led: Inspector: MColl Final Inspection: 11/4/2019 4:20:lOPM Description: VADA FARM: PHASE 1 //LOT 1 // PLAN lBR // 2,867 SF// 205 SF PATIO// 479 SF GARAGE// 124 SF PORCH Applicant: MARY NETTLES 5927 Priestly Dr, 110 Carlsbad, CA 92008-8800 760-918-2829 BUILDING PERMIT FEE ($2000+) BUILDING PLAN CHECK FEE (BLDG) Owner: TRUST VADA FAMILY TRUST 03-12-90 1835 Buena Vista Way CARLSBAD, CA 92008 ELECTRICAL BLDG RESIDENTIAL NEW/ADDITION/REMODEL GREEN BUILDING STANDARDS PLAN CHECK & INSPECTION MECHANICAL BLDG RESIDENTIAL NEW/ADDITION/REMODEL PARK IN-LIEU FEES SF DETACHED & DUPLEX: NW PLUMBING BLDG RESIDENTIAL NEW/ADDITION/REMODEL PUBLIC FACILITIES FEES -outside CFD SB1473 GREEN BUILDING STATE STANDARDS FEE SEWER CONNECTION FEE (General Capacity all areas) STRONG MOTION-RESIDENTIAL SWPPP INSPECTION FEE TIER 1-Medium BLDG SWPPP PLAN REVIEW FEE TIER 1-MEDIUM TRAFFIC IMPACT Residential Single Fam. Outside CFD Total Fees: $31,885.46 Total Payments To Date: $31,885.46 Contractor: CALIFORNIA WEST CONSTRUCTION INC 5927 Priestly Dr, 110 Carlsbad, CA 92008-8800 760-918-6768 Balance Due: $0.00 $1,928.85 $742.18 $66.00 $170.00 $92.00 $7,649.00 $182.00 $16,323.80 $19.00 $960.00 $60.63 $246.00 $56.00 $3,390.00 1635 Faraday Avenue, Carlsbad, CA 92008-7314 I 760-602-2700 I 760-602-8560 f I www.carlsbadca.gov PERMIT INSPECTION HISTORY REPORT (CBRA2018-0050) Permit Type: BLDG-Associated Permit Residential Application Date: 03/1312018 Owner: TRUSTYADA FAMILY TRUST 03-12-90 Work Class: Single Family Detached Issue Date: 04/17/2019 Subdivision: Status: Closed -Finaled Expiration Date: 04/07/2020 Address: 1715 Vada Pl Carlsbad, CA 92008 IVR Number: 10086 Scheduled Actual Inspection Type Inspection No. Inspection Status Primary Inspector Reinspection Complete Date Start Date Checklist Item COMMENTS Passed BLDG-Building Deficiency Yes 08/19/2019 08/1912019 BLDG-82 Drywall, 101276-2019 Passed Michael Collins Complete Exterior Lath, Gas Test, Hot Mop Checklist Item COMMENTS Passed BLDG-Building Deficiency Yes BLDG-17 Interior Lath-Drywall Yes BLDG-18 Exterior Lath and Yes Drywall BLDG-23 Gas-Test-Repairs Yes 0812212019 08/2212019 BLDG-14 101643-2019 Cancelled Michael Collins Reinspectlon Complete Frame/Steel/Baiting/ Welding (Decks) Checklist Item COMMENTS Passed BLOG-Building Deficiency Wrong code No 1011012019 1011012019 BLDG-Electric Meter 107212-2019 Passed Michael Collins Complete Release Checklist Item COMMENTS Passed BLDG-Building Deficiency EMR emailed to SDGE Yes BLDG-Gas Meter 107213-2019 Passed Mlchael Colllns Complete Release Checklist Item COMMENTS Passed BLDG-Building Deficiency GMR emailed to SDGE Yes 11104/2019 11104/2019 BLDG-Final 109696-2019 Passed Luke Storno Complete Inspection Checklist Item COMMENTS Passed BLDG-Building Deficiency No BLDG-Plumbing Final No BLDG-Mechanical Final No BLDG-Structural Final No BLDG-Electrical Final No BLOG-Fire Final 107955-2019 Scheduled Felix Salcedo Incomplete Checklist Item COMMENTS Passed FIRE-Building Final No November 04, 2019 Page 2 of 2 PERMIT INSPECTION HISTORY REPORT (CBRA2018-0050) Permit Type: BLDG-Associated Permit Residential Application Date: 03/13/2018 Owner: TRUST VADA FAMILY TRUST 03-12-90 Work Class: Single Family Detached Issue Date: 04/17/2019 Subdivision: Status: Closed -Finaled Expiration Date: 04/07/2020 Address: 1715 Vada Pl Carlsbad, CA 92008 IVR Number: 10086 Scheduled Actual Inspection Type Inspection No. Inspection Status Primary Inspector Reinspection Complete Date Start Date 05/03/2019 0510312019 BLDG-21 090798-2019 Passed Tim Frazee Complete Underground/Underf loor Plumblng Checklist Item COMMENTS Passed BLDG-Buildlng Deficiency Yes 0511312019 05/1312019 BLDG-11 091636-2019 Passed Michael Collins Complete Foundatlon/Ftg/Pler s (Rebar) Checklist Item COMMENTS Passed BLDG-Building Deficiency Ufer in place Yes 0612512019 0612512019 BLDG-15 095619-2019 Passed Paul Burnette Complete Roof/ReRoof (Patio) Checklist Item COMMENTS Passed BLDG-Building Deficiency Yes 0711512019 07/1512019 BLDG-13 Shear 097454-2019 Passed Michael Collins Complete Panels/HD (ok to wrap) Checklist Item COMMENTS Passed BLOG-Building Deficiency Yes 08/05/2019 08105/2019 BLDG-14 099701-2019 Passed Michael Colllns Complete Frame/Steel/Bolting/ Welding (Decks) Checklist Item COMMENTS Passed BLDG-Building Deficiency Yes BLDG-24 099840-2019 Passed Michael Collins Complete Rough/Topout Checklist Item COMMENTS Passed BLDG-Building Deficiency Yes BLDG-34 Rough 099841-2019 Passed Mlchael Collins Complete Electrical Checklist Item COMMENTS Passed BLDG-Building Deficiency Yes BLDG-44 099842-2019 Passed Michael Collins Complete Rough/Ducts/Dampe rs Checklist Item COMMENTS Passed BLDG-Building Deficiency Yes 08/08/2019 08/08/2019 BLDG-16 lnsulatlon 100212-2019 Passed Michael Collins Complete November 04, 2019 Page 1 of 2 b~A,lnc. land planning, civil engineering, surveying March 10, 2019 w.o. 944-1289-600 Mr. Tim Frazee CITY OF CARLSBAD, Building Inspection Division 1635 Faraday Avenue Carlsbad, CA 92008 ROD BRADLEY, Urban Planner RONALD L. HOLLOWAY, Civil Engineer RE: BUILDING FORM VERIFICATION FOR LOTS 1, 2, 7 AND 8 OF THE YADA FAMILY FARM SUBDMSION, CT 15-11 Dear Mr. Frazee: This letter is to attest that BHA, Inc. has staked the locations for the house construction on the above-mentioned lots. We have checked the locations of the building forms of the proposed houses and found the horizontal and vertical locations to conform to the grading plans prepared by our office. If you have any questions regarding this matter, please contact our office. Sincerely, bl-tA, Inc. ·'fl--~ Ronald L. Holloway Senior Vice President RCE29271 .---r •--~ ,-,.~ovessrci'· .. , _,· ~ <? -----·--.. '1¼, ·. i~"/ ··',t>_\ / I!} / RONALD L:-\~ \ / f1.1 / HOLLOWAY , ~ \ . /i;l I NO. 29271 \ ~ ; "" I .,, ' '-*\ !*~i ' • • I <P,,:, .. C[VI\. /~"'-1 . 4]',, "·----✓ <>O~ / · . " OF Ct.\.\' ..-'. ...--· cc: Jim Hall-California West Communities K:\Civil 3D\1289\PROD\Survey\Pad-Form Ccris\forms\CT 15-1 I_Lots 1-2-7-8 bldg-form-verifieation.wpd 5115 Avenida Encinas, Suite L o Carlsbad, California 92008-4387 o (760) 931-8700 o FAX (760) 931-7780 PROJECT NAME Y~.rlr r: ADDRESS I f' /I " ARCHITECT ENGINEER CONTRACTOR {' c. I i. ,, ~ OTHER . I\ ,r INSPECTION DATE .::-/,"Ilic. PLAN FILE/OTHER Construction Testing & Engineering, Inc. Inspection I Testing I Geotechnical I Environmental & Construction Engineering I Civil Engineering I Surveying INSPECTION REPORT I ,. u l INSPECTION ~ c. I~ )c.c. □ CONCRETE □ REINF. STEEL □ MASONRY □ P.T. CONCRETE □ FIELD WELDING □ SHOP WELDING □ BATCH PLANT □ EXP. ANCHOR PAGE GTE JOB NO. OF REPORT NO. MA TE RIAL IDENTIFICATION CONG. MIX NO. & lb/in2 GROUT MIX NO. & lb/in2 MORT AR TYPE & lb/in2 REINF. STEEL GR./SIZE / J \ -~ fr-f STRUCTURAL STEEL '-'"~r ,r HIGH-STRENGTH BOLT MASONRY BLOCK OTHER BLDG. PERMIT/OTHER c. ~ 12.~~e-e>o s.a □ OTHER ,-I I C er MATERIAL SAMPLING 0 CONCRETE O MORTAR O GROUT 0 REINFORCING STEEL O STRUCTURAL STEEL 0 FIREPROOFING O MASONRY BLOCK 0 SOL TS O OTHER INSPECTIONS PERFORMED, MATERIAL IDENTIFICATION, PROGRESS, WORK REJECTED, REMARKS PLEASE NOTE ANY RE-INSPECTION, TESTING, OR OTHER PROJECT ISSUES. , , ,., j ,..c( j, I ,,{ r ,,J f"I ~ ,I .. r, t:. ,.. -I '/,-I Ji..L ';-r "'41:-l,A 71.,,,l,P. - Certification of Compliance: All work, unless otherwise noted, complies with applicable codes and the approved plans and specifications. PRINTED NAME CERTIFICATION NO. 1 r IC VI 11 , I ,: .r C,. v\ -4 I ,1 I ' ,.,.,...J,Jp,-..,, 1}1 SIGNATURE ~ " c___ -;:-------======---=::::- 1441 Montiel Road, Suite 115 I Escondido, CA 92026 Ph (760) 746-4955 I Fax (760) 746-9806 I www.cte-inc.net b~A,lnc. land planning, civil engineering, surveying ROD BRADLEY, Urban Planner RONALD L. HOLLOWAY, Civil Engineer March 10, 2019 w.o. 944-1289-600 Mr. Tim Frazee CITY OF CARLSBAD, Building Inspection Division 1635 Faraday Avenue Carlsbad, CA 92008 RE: BUILDING FORM VERIFICATION FOR LOTS 1, 2, 7 AND 8 OF THE YADA FAMILY FARM SUBDMSION, CT 15-11 Dear Mr. Frazee: This letter is to attest that BHA, Inc. has staked the locations for the house construction on the above-mentioned lots. We have checked the locations of the building forms of the proposed houses and found the horizontal and vertical locations to conform to the grading plans prepared by our office. If you have any questions regarding this matter, please contact our office. Sincerely, bl-IA, Inc. -~~ Ronald L. Holloway Senior Vice President RCE29271 ;orESS/ 0,11 ~ </ • . '1.( . ~-. ~ · l!J · RONALD L.. ~. . ~ · HOLLOWAY '. ,;._ ·. j : NO. 29271 : &; : '* ;.· '%7' . c!~\\. o#'"' . e OF c~\.\'< · cc: Jim Hall-California West Communities K:\Civil 30\1289\PROO\Survey\Pad-Form Ccrls\forms\CT 15-11 _Lots l •2· 7-8 bldg-form-verification.wpd 5115 Avenida Encinas, Suite L Carlsbad, California 92008-4387 (760) 931-8700 FAX (760) 931-7780 GEOSOILS, INC. W.O.: _____ 7_:3_7_7•...cC_-s:.c:....._ ___ _ Geotechnical• Coastal -Geologic -Environmental DATE: 04/22/19 ____ ___; __ c._ ___ _ NAME: TODD ------------HOURS: 2.5 ------------ FOOTING TRENCH OBSERVATION SUMMARY CLIENT NAME: CAL-WEST PROJECT NAME: _____ Y:..:A_::D::.A:._ ___ _ LOCATION/TRACT: _______________ Y::.A_::D_A_P_L::::·•c.:C::.A:cRc:LccS-'-B_A:.D:.., C:..:Ac:L:.IF ______________ _ UNIT/PHASE/LOTS: LOTS 1,2,7,8,AND 12 -------------------'-'--'-'------------------ REFERENCED GEOTECHNICAL REPORT: 6927-A-SC DATED AUGUST 3, 2015 OBSERVATION SUMMARY TG INITIALS -------04/22/19 DATE ------- TG INITIALS -------04/22/19 DATE ------- TG INITIALS -------04/22/19 DATE ------- TG INITIALS ------- 04/22/19 DATE ------- A representative of GeoSoils, Inc. observed on site soil and footing conditions. Soil conditions in the trench are generally free of loose soil and debris, non-yielding and uniform, and plumb: and are in general conformance with those indicated in the geotechnical report. A representative of GeoSoils, Inc. observed and reviewed footing excavation depth/width. Footing excavations generally extend to proper depth and bearing strata, and are in general conformance with recommendations of the geotechnical report. A representative of GeoSoils, Inc. reviewed footing setbacks from slope face (if applicable). The setback was in general accordance with the recommendations of the geotechnical report. CONSULT THE PROJECT STRUCTURAL ENGINEER ABOUT GRAVEL FROM UTILITY LINE ADJACENT NE CORNER OF LOT 12. NOTES TO SUPERINTENDENT/FOREMAN 1. Footing excavations should be cleaned of loose debris and thoroughly moistened just prior to placing concrete. 2. Based on expansion potential of underlying soils, presoaking of soil below slabs may be recommended. Consult the geotechnical report for presoaking recommendations. We note that clayey soils may take an extended period time for such, and the contractor should schedule accordingly. 3. In the event of a site change subsequent to our footing observation and prior to concrete placement (i.e. heavy rain, etc.), we should be contacted to perform additional site observations and/or testing. 4. This memo does not confinn the minimum footing dimension as required by the project structural engineer's design, if different from the geotechnical report. NOTES TO BUILDING INSPECTOR Soil compaction test results, as well as depth of fill, relative compaction, bearing values, corrosivity, and soil expansion index test results are contained in the As-Graded Geotechnical or Final Compaction Report provided at the completion of grading. DIGITAL DELIVERY: JIM HALL Representative of GeoSoils, Inc. GEOSOILS, INC. W.O.: 7377-C-SC Geotachnieal-Coastal-Geologic -Environmental --------'-'-----DATE: 04/22/19 ---......::...:.::.:..:..:.. ___ _ NAME: TODD ------------HOURS: 2.5 ------=:.::.. ____ _ FOOTING TRENCH OBSERVATION SUMMARY CLIENT NAME: CAL-WEST PROJECT NAME: VADA ------------ LOCATION/TRACT: VADA PL., CARLSBAD, CALIF UNIT/PHASE/LOTS: LOTS 1,2,7,8,AND 12 ------------:...:.::.:..:..::..:.:.::c:.:c:::.=:...:.::. ___________ _ REFERENCED GEOTECHNICAL REPORT: 6927-A-SC DATED AUGUST 3, 2015 OBSERVATION SUMMARY ___ T_G ___ INITIALS __ 0::.c4;.:/2c:.2/_19.:....._DATE ___ T_G ___ INITIALS __ 0::.c4;.:/2_2i_19 __ DATE TG INITIALS ------- __ 04=/2=2/--'-19.:....._DATE TG INITIALS ------- __ .c.0_4/--'-2_21_19 __ DATE A representative of GeoSoils, Inc. observed on site soil and footing conditions. Soil conditions in the trench are generally free of loose soil and debris, non•yielding and uniform, and plumb; and are in general conformance with those indicated in the geotechnical report. A representative of GeoSoils, Inc. observed and reviewed footing excavation depth/width. Footing excavations generally extend to proper depth and bearing strata, and are in general conformance with recommendations of the geotechnical report. A representative of GeoSoils, Inc. reviewed footing setbacks from slope face (if applicable). The setback was in general accordance with the recommendations of the geotechnical report. CONSULT THE PROJECT STRUCTURAL ENGINEER ABOUT GRAVEL FROM UTILITY LINE ADJACENT NE CORNER OF LOT 12. NOTES TO SUPERINTENDENT/FOREMAN 1. Footing excavations should be cleaned of loose debris and thoroughly moistened just prior to placing concrete. 2. Based on expansion potential of underlying soils, presoaking of soil below slabs may be recommended. Consult the geotechnlcal report for presoaking recommendations. We note that clayey soils may take an extended period time for such, and the contractor should schedule accordingly. 3. In the event of a site change subsequent to our footing observation and prior to concrete placement (i.e. heavy rain, etc.), we should be contacted to perform addttional site observations and/or testing'. 4. This memo does not confirm the minimum footing dimension as required by the project structural engineer's design, if different from the geotechnical report. NOTES TO BUILDING INSPECTOR Soil compaction test results, as well as depth of fill, relative compaction, bearing values, corrosivity, and soil expansion index test results are contained in the As-Graded Geotechnical or Final Compaction Report provided at the completion of grading. DIGITAL DELIVERY: JIM HALL Representative of GeoSoils, Inc. { Cicyof Carlsbad a • CERTIFICATION OF SCHOOL FEES PAID B-34 Development Services Building Department 1635 Faraday Avenue 760-602-2719 www.carlsbadca.gov This form must be completed by the City, the applicant, and the appropriate school districts and returned to the City prior to issuing a building permit. The City will not issue any building permit without a completed school fee form. Project Name _.!Y.,_A.,_,D~A:,_:_F.:::AS!CR,.,,M"---------------------- Building Permit Plan Check Number PC2017-0048 // CBRA2018-0050-LOT 1 Project Address: _.J.,_7..._l s"--'Y-"AlJD,,,.AcuP..iL .. A;i;Cs.E,._ ______________________ _ A.P.N _1_.,5.,,6□-2,..2 .. P□-5<=4c:c•P,..,O,__ ___________________ _ Project Applicant CARLSBAD BUENA VISTA 12, LP (Owner Name) Project Description: _,_1 _,,S"-F-"D'--------------------------- Building Type Residential: 1 NEW DWELLING UNIT(S) 2,867 Square Feet of Living Area in New Dwelling/s Second Dwelling Unit: 0 Square Feet of Living Area in SDU ------'------~--------------- Reside n ti a I Additions: Net Square Feet New Area Commercial/Industrial: Net Square Feet New Area City Certification of Applicant Information, S~ Evett1 Date November 30, 2018 SCHOOL DISTRICTS WITHIN THE CITY OF CARLSBAD [81 Carlsbad Unified School District 6225 El Camino Real Carlsbad CA 92009 (760-331-5000) LJ Encinitas Union School District- By appointment only 101 South Rancho Santa Fe Rd Encinitas, CA 92024 (760-944-4300 x1166\ D Vista Unified School District 1234 Arcadia Drive Vista CA 92083 (760-726-2170) xt 2222 D San Marcos Unified School District 255 Pico Ave Ste. 100 San Marcos, CA 92069 (760-290-2649) Contact: Katherine Marcelja (By Appl. Only) LJ San Dieguito Union High School District-By Appointment Only 684 Requeza Dr. Encinitas, CA 92024 (760-753-6491 X 5514) Certification of ApplicanUOwners. The person executing this declaration ("Owner') certifies under penalty of perjury that (1) the information provided above is correct and true to the best of the Owners knowledge, and that the Owner will file an amended certification of payment and pay the additional fee if Owner requests an increase in the number of dwelling units or square footage after the building permit is issued or if the initial determination of units or square footage is found to be incorrect, and that (2) the Owner is the owner/developer of the above described project(s), or that the person executing this declaration is authorized to sign on behalf of the Owner. Signature: ----1--;(/-+-,.-"---/,~'---""~:.µLJ""-1/~;.=......&""--"?&"--?,: ___ Date: B-34 Page 1 of2 Rev. 03/09 SCHOOL DISTRICT SCHOOL FEE CERTIFICATION (To be completed by the school district(s)) *************************************************************************************************** THIS FORM INDICATES THAT THE SCHOOL DISTRICT REQUIREMENTS FOR THE PROJECT HAVE BEEN OR WILL BE SATISFIED. SCHOOL DISTRICT: The undersigned, being duly authorized by the applicable School District, certifies that the developer, builder, or owner has satisfied the obligation for school facilities. This is to certify that the applicant listed on page 1 has paid all amounts or completed other applicable school mitigation determined by the School District. The City may issue building permits for this project. SIGNATURE OF AUTHORIZED SCHOOL DISTRICT OFFICIAL TITLE NAME OF SCHOOL DISTRICT DATE PHONE NUMBER -¼ ~ I ~ICY\ 1 ;,'.', (• "'-,..; • ,,\.j J_ (S-----G:,'--'--v' '-""'"" ~' °J S, , (>-£ v: \ Y\\,p::rd ,-e <1" A CARLSBAD UNIFIED SCHOOL DISTRICT 6'25 El CA,Ml~G ReAL CARLSBAD, CA 92GJ9 l1-,s-,<c B-34 Page 2 of 2 Rev. 03/09