HomeMy WebLinkAbout1715 Yada Pl; ; CBRA2018-0050; PermitPermit
Print Date: 11/04/2019
Job Address:
Ccityof
Carlsbad
Permit No: CBRA2018-0050
Permit Type:
Parcel No:
1715 Vada Pl
BLDG-Associated Permit Resi
1562205400
Work Class:
Lot#:
Single Family Detached
1
Status:
Applied:
Closed -Finaled
03/13/2018
04/17/2019 Valuation:
Occupancy Group:
# Dwelling Units:
Bedrooms:
Project Title:
$466,394.41
1
3.00
VADA FARM
Reference#: DEV02058
Construction Type: VB
Bathrooms: 3.50
Orig. Plan Check#: PC2017-0048
Plan Check#:
Issued:
Permit
Fina led:
Inspector: MColl
Final
Inspection: 11/4/2019 4:20:lOPM
Description: VADA FARM: PHASE 1 //LOT 1 // PLAN lBR // 2,867 SF// 205 SF PATIO// 479 SF GARAGE// 124 SF PORCH
Applicant:
MARY NETTLES
5927 Priestly Dr, 110
Carlsbad, CA 92008-8800
760-918-2829
BUILDING PERMIT FEE ($2000+)
BUILDING PLAN CHECK FEE (BLDG)
Owner:
TRUST VADA FAMILY TRUST 03-12-90
1835 Buena Vista Way
CARLSBAD, CA 92008
ELECTRICAL BLDG RESIDENTIAL NEW/ADDITION/REMODEL
GREEN BUILDING STANDARDS PLAN CHECK & INSPECTION
MECHANICAL BLDG RESIDENTIAL NEW/ADDITION/REMODEL
PARK IN-LIEU FEES SF DETACHED & DUPLEX: NW
PLUMBING BLDG RESIDENTIAL NEW/ADDITION/REMODEL
PUBLIC FACILITIES FEES -outside CFD
SB1473 GREEN BUILDING STATE STANDARDS FEE
SEWER CONNECTION FEE (General Capacity all areas)
STRONG MOTION-RESIDENTIAL
SWPPP INSPECTION FEE TIER 1-Medium BLDG
SWPPP PLAN REVIEW FEE TIER 1-MEDIUM
TRAFFIC IMPACT Residential Single Fam. Outside CFD
Total Fees: $31,885.46 Total Payments To Date: $31,885.46
Contractor:
CALIFORNIA WEST CONSTRUCTION INC
5927 Priestly Dr, 110
Carlsbad, CA 92008-8800
760-918-6768
Balance Due: $0.00
$1,928.85
$742.18
$66.00
$170.00
$92.00
$7,649.00
$182.00
$16,323.80
$19.00
$960.00
$60.63
$246.00
$56.00
$3,390.00
1635 Faraday Avenue, Carlsbad, CA 92008-7314 I 760-602-2700 I 760-602-8560 f I www.carlsbadca.gov
PERMIT INSPECTION HISTORY REPORT (CBRA2018-0050)
Permit Type: BLDG-Associated Permit Residential Application Date: 03/1312018 Owner: TRUSTYADA FAMILY TRUST
03-12-90
Work Class: Single Family Detached Issue Date: 04/17/2019 Subdivision:
Status: Closed -Finaled Expiration Date: 04/07/2020 Address: 1715 Vada Pl
Carlsbad, CA 92008
IVR Number: 10086
Scheduled Actual Inspection Type Inspection No. Inspection Status Primary Inspector Reinspection Complete
Date Start Date
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
08/19/2019 08/1912019 BLDG-82 Drywall, 101276-2019 Passed Michael Collins Complete
Exterior Lath, Gas
Test, Hot Mop
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
BLDG-17 Interior Lath-Drywall Yes
BLDG-18 Exterior Lath and Yes
Drywall
BLDG-23 Gas-Test-Repairs Yes
0812212019 08/2212019 BLDG-14 101643-2019 Cancelled Michael Collins Reinspectlon Complete
Frame/Steel/Baiting/
Welding (Decks)
Checklist Item COMMENTS Passed
BLOG-Building Deficiency Wrong code No
1011012019 1011012019 BLDG-Electric Meter 107212-2019 Passed Michael Collins Complete
Release
Checklist Item COMMENTS Passed
BLDG-Building Deficiency EMR emailed to SDGE Yes
BLDG-Gas Meter 107213-2019 Passed Mlchael Colllns Complete
Release
Checklist Item COMMENTS Passed
BLDG-Building Deficiency GMR emailed to SDGE Yes
11104/2019 11104/2019 BLDG-Final 109696-2019 Passed Luke Storno Complete
Inspection
Checklist Item COMMENTS Passed
BLDG-Building Deficiency No
BLDG-Plumbing Final No
BLDG-Mechanical Final No
BLDG-Structural Final No
BLDG-Electrical Final No
BLOG-Fire Final 107955-2019 Scheduled Felix Salcedo Incomplete
Checklist Item COMMENTS Passed
FIRE-Building Final No
November 04, 2019 Page 2 of 2
PERMIT INSPECTION HISTORY REPORT (CBRA2018-0050)
Permit Type: BLDG-Associated Permit Residential Application Date: 03/13/2018 Owner: TRUST VADA FAMILY TRUST
03-12-90
Work Class: Single Family Detached Issue Date: 04/17/2019 Subdivision:
Status: Closed -Finaled Expiration Date: 04/07/2020 Address: 1715 Vada Pl
Carlsbad, CA 92008
IVR Number: 10086
Scheduled Actual Inspection Type Inspection No. Inspection Status Primary Inspector Reinspection Complete
Date Start Date
05/03/2019 0510312019 BLDG-21 090798-2019 Passed Tim Frazee Complete
Underground/Underf
loor Plumblng
Checklist Item COMMENTS Passed
BLDG-Buildlng Deficiency Yes
0511312019 05/1312019 BLDG-11 091636-2019 Passed Michael Collins Complete
Foundatlon/Ftg/Pler
s (Rebar)
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Ufer in place Yes
0612512019 0612512019 BLDG-15 095619-2019 Passed Paul Burnette Complete
Roof/ReRoof (Patio)
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
0711512019 07/1512019 BLDG-13 Shear 097454-2019 Passed Michael Collins Complete
Panels/HD (ok to
wrap)
Checklist Item COMMENTS Passed
BLOG-Building Deficiency Yes
08/05/2019 08105/2019 BLDG-14 099701-2019 Passed Michael Colllns Complete
Frame/Steel/Bolting/
Welding (Decks)
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
BLDG-24 099840-2019 Passed Michael Collins Complete
Rough/Topout
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
BLDG-34 Rough 099841-2019 Passed Mlchael Collins Complete
Electrical
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
BLDG-44 099842-2019 Passed Michael Collins Complete
Rough/Ducts/Dampe
rs
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
08/08/2019 08/08/2019 BLDG-16 lnsulatlon 100212-2019 Passed Michael Collins Complete
November 04, 2019 Page 1 of 2
b~A,lnc.
land planning, civil engineering, surveying
March 10, 2019
w.o. 944-1289-600
Mr. Tim Frazee
CITY OF CARLSBAD,
Building Inspection Division
1635 Faraday Avenue
Carlsbad, CA 92008
ROD BRADLEY, Urban Planner
RONALD L. HOLLOWAY, Civil Engineer
RE: BUILDING FORM VERIFICATION FOR LOTS 1, 2, 7 AND 8 OF
THE YADA FAMILY FARM SUBDMSION, CT 15-11
Dear Mr. Frazee:
This letter is to attest that BHA, Inc. has staked the locations for the house construction on the
above-mentioned lots. We have checked the locations of the building forms of the proposed
houses and found the horizontal and vertical locations to conform to the grading plans
prepared by our office.
If you have any questions regarding this matter, please contact our office.
Sincerely,
bl-tA, Inc.
·'fl--~
Ronald L. Holloway
Senior Vice President
RCE29271
.---r •--~ ,-,.~ovessrci'· .. ,
_,· ~ <? -----·--.. '1¼, ·. i~"/ ··',t>_\
/ I!} / RONALD L:-\~ \
/ f1.1 / HOLLOWAY , ~ \ . /i;l I NO. 29271 \ ~ ; "" I .,, ' '-*\ !*~i ' • • I <P,,:, .. C[VI\. /~"'-1
. 4]',, "·----✓ <>O~ / · . " OF Ct.\.\' ..-'. ...--·
cc: Jim Hall-California West Communities
K:\Civil 3D\1289\PROD\Survey\Pad-Form Ccris\forms\CT 15-1 I_Lots 1-2-7-8 bldg-form-verifieation.wpd
5115 Avenida Encinas, Suite L o Carlsbad, California 92008-4387 o (760) 931-8700 o FAX (760) 931-7780
PROJECT NAME Y~.rlr r:
ADDRESS I f'
/I " ARCHITECT
ENGINEER
CONTRACTOR {' c. I i. ,, ~
OTHER . I\ ,r
INSPECTION DATE .::-/,"Ilic.
PLAN FILE/OTHER
Construction Testing & Engineering, Inc.
Inspection I Testing I Geotechnical I Environmental & Construction Engineering I Civil Engineering I Surveying
INSPECTION REPORT
I ,. u l INSPECTION
~ c. I~ )c.c. □ CONCRETE
□ REINF. STEEL
□ MASONRY
□ P.T. CONCRETE
□ FIELD WELDING
□ SHOP WELDING
□ BATCH PLANT
□ EXP. ANCHOR
PAGE
GTE JOB NO.
OF
REPORT NO.
MA TE RIAL IDENTIFICATION
CONG. MIX NO. & lb/in2
GROUT MIX NO. & lb/in2
MORT AR TYPE & lb/in2
REINF. STEEL GR./SIZE / J \ -~ fr-f
STRUCTURAL STEEL '-'"~r ,r
HIGH-STRENGTH BOLT
MASONRY BLOCK
OTHER
BLDG. PERMIT/OTHER c. ~ 12.~~e-e>o s.a □ OTHER ,-I I C er
MATERIAL SAMPLING
0 CONCRETE O MORTAR O GROUT
0 REINFORCING STEEL O STRUCTURAL STEEL
0 FIREPROOFING O MASONRY BLOCK
0 SOL TS O OTHER
INSPECTIONS PERFORMED, MATERIAL IDENTIFICATION, PROGRESS, WORK REJECTED, REMARKS
PLEASE NOTE ANY RE-INSPECTION, TESTING, OR OTHER PROJECT ISSUES.
, , ,., j ,..c(
j, I ,,{ r ,,J f"I ~ ,I .. r, t:. ,.. -I '/,-I Ji..L ';-r
"'41:-l,A 71.,,,l,P. -
Certification of Compliance: All work, unless otherwise noted, complies with applicable codes and the approved plans and specifications.
PRINTED NAME
CERTIFICATION NO.
1 r IC VI 11 , I ,: .r C,. v\ -4 I ,1 I '
,.,.,...J,Jp,-..,, 1}1
SIGNATURE ~ " c___ -;:-------======---=::::-
1441 Montiel Road, Suite 115 I Escondido, CA 92026 Ph (760) 746-4955 I Fax (760) 746-9806 I www.cte-inc.net
b~A,lnc.
land planning, civil engineering, surveying
ROD BRADLEY, Urban Planner
RONALD L. HOLLOWAY, Civil Engineer
March 10, 2019
w.o. 944-1289-600
Mr. Tim Frazee
CITY OF CARLSBAD,
Building Inspection Division
1635 Faraday Avenue
Carlsbad, CA 92008
RE: BUILDING FORM VERIFICATION FOR LOTS 1, 2, 7 AND 8 OF
THE YADA FAMILY FARM SUBDMSION, CT 15-11
Dear Mr. Frazee:
This letter is to attest that BHA, Inc. has staked the locations for the house construction on the
above-mentioned lots. We have checked the locations of the building forms of the proposed
houses and found the horizontal and vertical locations to conform to the grading plans
prepared by our office.
If you have any questions regarding this matter, please contact our office.
Sincerely,
bl-IA, Inc.
-~~
Ronald L. Holloway
Senior Vice President
RCE29271
;orESS/ 0,11 ~ </ • . '1.( . ~-. ~ · l!J · RONALD L.. ~.
. ~ · HOLLOWAY '. ,;._ ·. j : NO. 29271 : &; : '* ;.· '%7' . c!~\\. o#'"' . e OF c~\.\'< ·
cc: Jim Hall-California West Communities
K:\Civil 30\1289\PROO\Survey\Pad-Form Ccrls\forms\CT 15-11 _Lots l •2· 7-8 bldg-form-verification.wpd
5115 Avenida Encinas, Suite L Carlsbad, California 92008-4387 (760) 931-8700 FAX (760) 931-7780
GEOSOILS, INC. W.O.: _____ 7_:3_7_7•...cC_-s:.c:....._ ___ _
Geotechnical• Coastal -Geologic -Environmental DATE: 04/22/19 ____ ___; __ c._ ___ _
NAME: TODD ------------HOURS: 2.5 ------------
FOOTING TRENCH OBSERVATION SUMMARY
CLIENT NAME: CAL-WEST PROJECT NAME: _____ Y:..:A_::D::.A:._ ___ _
LOCATION/TRACT: _______________ Y::.A_::D_A_P_L::::·•c.:C::.A:cRc:LccS-'-B_A:.D:.., C:..:Ac:L:.IF ______________ _
UNIT/PHASE/LOTS: LOTS 1,2,7,8,AND 12 -------------------'-'--'-'------------------
REFERENCED GEOTECHNICAL REPORT: 6927-A-SC DATED AUGUST 3, 2015
OBSERVATION SUMMARY
TG INITIALS -------04/22/19 DATE -------
TG INITIALS -------04/22/19 DATE -------
TG INITIALS -------04/22/19 DATE -------
TG INITIALS -------
04/22/19 DATE -------
A representative of GeoSoils, Inc. observed on site soil and footing conditions. Soil conditions in the trench
are generally free of loose soil and debris, non-yielding and uniform, and plumb: and are in general
conformance with those indicated in the geotechnical report.
A representative of GeoSoils, Inc. observed and reviewed footing excavation depth/width. Footing
excavations generally extend to proper depth and bearing strata, and are in general conformance with
recommendations of the geotechnical report.
A representative of GeoSoils, Inc. reviewed footing setbacks from slope face (if applicable). The setback was
in general accordance with the recommendations of the geotechnical report.
CONSULT THE PROJECT STRUCTURAL ENGINEER ABOUT GRAVEL FROM UTILITY LINE
ADJACENT NE CORNER OF LOT 12.
NOTES TO SUPERINTENDENT/FOREMAN
1. Footing excavations should be cleaned of loose debris and thoroughly moistened just prior to placing concrete.
2. Based on expansion potential of underlying soils, presoaking of soil below slabs may be recommended. Consult the
geotechnical report for presoaking recommendations. We note that clayey soils may take an extended period time for
such, and the contractor should schedule accordingly.
3. In the event of a site change subsequent to our footing observation and prior to concrete placement (i.e. heavy rain, etc.),
we should be contacted to perform additional site observations and/or testing.
4. This memo does not confinn the minimum footing dimension as required by the project structural engineer's design, if
different from the geotechnical report.
NOTES TO BUILDING INSPECTOR
Soil compaction test results, as well as depth of fill, relative compaction, bearing values, corrosivity, and soil expansion index test results are
contained in the As-Graded Geotechnical or Final Compaction Report provided at the completion of grading.
DIGITAL DELIVERY: JIM HALL
Representative of GeoSoils, Inc.
GEOSOILS, INC. W.O.: 7377-C-SC
Geotachnieal-Coastal-Geologic -Environmental --------'-'-----DATE: 04/22/19 ---......::...:.::.:..:..:.. ___ _
NAME: TODD ------------HOURS: 2.5 ------=:.::.. ____ _
FOOTING TRENCH OBSERVATION SUMMARY
CLIENT NAME: CAL-WEST PROJECT NAME: VADA ------------
LOCATION/TRACT: VADA PL., CARLSBAD, CALIF
UNIT/PHASE/LOTS: LOTS 1,2,7,8,AND 12 ------------:...:.::.:..:..::..:.:.::c:.:c:::.=:...:.::. ___________ _
REFERENCED GEOTECHNICAL REPORT: 6927-A-SC DATED AUGUST 3, 2015
OBSERVATION SUMMARY
___ T_G ___ INITIALS
__ 0::.c4;.:/2c:.2/_19.:....._DATE
___ T_G ___ INITIALS
__ 0::.c4;.:/2_2i_19 __ DATE
TG INITIALS -------
__ 04=/2=2/--'-19.:....._DATE
TG INITIALS -------
__ .c.0_4/--'-2_21_19 __ DATE
A representative of GeoSoils, Inc. observed on site soil and footing conditions. Soil conditions in the trench
are generally free of loose soil and debris, non•yielding and uniform, and plumb; and are in general
conformance with those indicated in the geotechnical report.
A representative of GeoSoils, Inc. observed and reviewed footing excavation depth/width. Footing
excavations generally extend to proper depth and bearing strata, and are in general conformance with
recommendations of the geotechnical report.
A representative of GeoSoils, Inc. reviewed footing setbacks from slope face (if applicable). The setback was
in general accordance with the recommendations of the geotechnical report.
CONSULT THE PROJECT STRUCTURAL ENGINEER ABOUT GRAVEL FROM UTILITY LINE
ADJACENT NE CORNER OF LOT 12.
NOTES TO SUPERINTENDENT/FOREMAN
1. Footing excavations should be cleaned of loose debris and thoroughly moistened just prior to placing concrete.
2. Based on expansion potential of underlying soils, presoaking of soil below slabs may be recommended. Consult the
geotechnlcal report for presoaking recommendations. We note that clayey soils may take an extended period time for
such, and the contractor should schedule accordingly.
3. In the event of a site change subsequent to our footing observation and prior to concrete placement (i.e. heavy rain, etc.),
we should be contacted to perform addttional site observations and/or testing'.
4. This memo does not confirm the minimum footing dimension as required by the project structural engineer's design, if
different from the geotechnical report.
NOTES TO BUILDING INSPECTOR
Soil compaction test results, as well as depth of fill, relative compaction, bearing values, corrosivity, and soil expansion index test results are
contained in the As-Graded Geotechnical or Final Compaction Report provided at the completion of grading.
DIGITAL DELIVERY: JIM HALL
Representative of GeoSoils, Inc.
{ Cicyof
Carlsbad
a •
CERTIFICATION OF
SCHOOL FEES PAID
B-34
Development Services
Building Department
1635 Faraday Avenue
760-602-2719
www.carlsbadca.gov
This form must be completed by the City, the applicant, and the appropriate school districts and returned to the City
prior to issuing a building permit. The City will not issue any building permit without a completed school fee form.
Project Name _.!Y.,_A.,_,D~A:,_:_F.:::AS!CR,.,,M"----------------------
Building Permit
Plan Check Number PC2017-0048 // CBRA2018-0050-LOT 1
Project Address: _.J.,_7..._l s"--'Y-"AlJD,,,.AcuP..iL .. A;i;Cs.E,._ ______________________ _
A.P.N _1_.,5.,,6□-2,..2 .. P□-5<=4c:c•P,..,O,__ ___________________ _
Project Applicant CARLSBAD BUENA VISTA 12, LP
(Owner Name)
Project Description: _,_1 _,,S"-F-"D'---------------------------
Building Type
Residential: 1 NEW DWELLING UNIT(S)
2,867 Square Feet of Living Area in New Dwelling/s
Second Dwelling Unit: 0 Square Feet of Living Area in SDU ------'------~---------------
Reside n ti a I Additions: Net Square Feet New Area
Commercial/Industrial: Net Square Feet New Area
City Certification of
Applicant Information, S~ Evett1 Date November 30, 2018
SCHOOL DISTRICTS WITHIN THE CITY OF CARLSBAD
[81 Carlsbad Unified School District
6225 El Camino Real
Carlsbad CA 92009 (760-331-5000)
LJ Encinitas Union School District-
By appointment only
101 South Rancho Santa Fe Rd
Encinitas, CA 92024
(760-944-4300 x1166\
D Vista Unified School District
1234 Arcadia Drive
Vista CA 92083 (760-726-2170) xt
2222
D San Marcos Unified School District
255 Pico Ave Ste. 100
San Marcos, CA 92069 (760-290-2649)
Contact: Katherine Marcelja (By Appl. Only)
LJ San Dieguito Union High School District-By Appointment Only
684 Requeza Dr.
Encinitas, CA 92024
(760-753-6491 X 5514)
Certification of ApplicanUOwners. The person executing this declaration ("Owner') certifies under penalty of perjury
that (1) the information provided above is correct and true to the best of the Owners knowledge, and that the Owner
will file an amended certification of payment and pay the additional fee if Owner requests an increase in the number
of dwelling units or square footage after the building permit is issued or if the initial determination of units or square
footage is found to be incorrect, and that (2) the Owner is the owner/developer of the above described project(s), or
that the person executing this declaration is authorized to sign on behalf of the Owner.
Signature: ----1--;(/-+-,.-"---/,~'---""~:.µLJ""-1/~;.=......&""--"?&"--?,: ___ Date:
B-34 Page 1 of2 Rev. 03/09
SCHOOL DISTRICT SCHOOL FEE CERTIFICATION
(To be completed by the school district(s))
***************************************************************************************************
THIS FORM INDICATES THAT THE SCHOOL DISTRICT REQUIREMENTS FOR THE
PROJECT HAVE BEEN OR WILL BE SATISFIED.
SCHOOL DISTRICT:
The undersigned, being duly authorized by the applicable School District, certifies that
the developer, builder, or owner has satisfied the obligation for school facilities. This is
to certify that the applicant listed on page 1 has paid all amounts or completed other
applicable school mitigation determined by the School District. The City may issue
building permits for this project.
SIGNATURE OF AUTHORIZED SCHOOL
DISTRICT OFFICIAL
TITLE
NAME OF SCHOOL DISTRICT
DATE
PHONE NUMBER
-¼ ~ I ~ICY\ 1 ;,'.', (• "'-,..; • ,,\.j J_
(S-----G:,'--'--v' '-""'"" ~' °J
S, , (>-£ v: \ Y\\,p::rd ,-e <1" A
CARLSBAD UNIFIED SCHOOL DISTRICT
6'25 El CA,Ml~G ReAL
CARLSBAD, CA 92GJ9
l1-,s-,<c
B-34 Page 2 of 2 Rev. 03/09