Loading...
HomeMy WebLinkAbout1731 CALAVO CT; ; CB022897; PermitCity of Carlsbad 1635 Faraday Av Carlsbad, CA 92008 Building Inspection Request Line (760) 602-2725 10-1 1-2005 Resident ia I Perm it Permit No: CB022897 Job Address: Permit Type: Parcel No: Valuation: Occupancy Group: # Dwelling Units: Bedrooms: Project Title: Applicant: STEVEN DWEBER P 0 BOX 230078 ENClNlTAS CA 92023 753-8486 1731 CALAVO CT CBAD RESDNTL SubType: RAD 2073600700 Lot#: 0 $1 2,566.00 Construction Type: NEW Reference #: 0 Structure Type: 0 Bathrooms: 0 LHEUREUX RES/ 122 SF ADDITION LIVING SPACE(DINING RM), 112 SF GARAGE ADD Status: WITHDRAW Applied: 09/25/2002 Entered By: CB Plan Approved: Issued: Inspect Area: Orig PC#: Plan Check#: Owner: LHEUREUX STEPHEN M&ANN D 2002 FAMILY TRUST 01-08 1731 CALAVO CT CARLSBAD CA 92008 Building Permit Add'l Building Permit Fee Plan Check Add'l Plan Check Fee Plan Check Discount Strong Motion Fee Park in Lieu Fee Park Fee LFM Fee Bridge Fee Other Bridge Fee BTD #2 Fee BTD #3 Fee Renewal Fee Add'l Renewal Fee Other Building Fee Pot. Water Con. Fee Meter Size Add'l Pot. Water Con. Fee Recl. Water Con. Fee $122.79 $0.00 $79.81 $0.00 $0.00 $1.26 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Meter Size Add'l Recl. Water Con. Fee Meter Fee SDCWA Fee CFD Payoff Fee PFF (31 05540) PFF (4305540) License Tax (31 041 93) License Tax (43041 93) Traffic Impact Fee (3105541) Traffic Impact Fee (4305541) Sidewalk Fee PLUMBING TOTAL ELECTRICAL TOTAL MECHANICAL TOTAL Housing Impact Fee Housing InLieu Fee Housing Credit Fee Master Drainage Fee Sewer Fee Additional Fees TOTAL PERMIT FEES $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $55.00 $20.00 $24.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $302.86 Total Fees: $302.86 Total Payments To Date: $79.81 Balance Due: $223.05 FINAL APPROVAL InsDector: Date: Clearance: NOTICE: Please take NOTICE that approval of your project includes the 'Impositionn of fees, dedications, reservations, or other exactions hereafter collectively referred to as "fees/exactions." You have 90 days from the date this permit was issued to protest imposition of these feeslexactions. If you protest them, you must follow the protest procedures set forth in Government Code Section 66020(a), and file the protest and any other required information with the City Manager for processing in accordance with Carlsbad Municipal Code Section 3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack, review, set aside, void, or annul their imposition. You are hereby FURTHER NOTIFIED that your right to protest the specified feeslexactions DOES NOT APPLY to water and sewer connection fees and capacity changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this project. NOR DOES IT APPLY to any feeslexactions of which YOU have Dreviouslv been aiven a NOTICE similar to this. or as to which the statute o f limitations has Dreviouslv otherw ise exDired. PERMIT APPLICATION CITY OF CARLSBAD BUILDING DEPARTMENT 1635 Faraday Ave., Carlsbad, CA 92008 n FOR OFFICE USE ONLY 'PLAN CHECK NO(& -zz$3 9 7 Date - Total # of units Lot No. Subdivision NamelNumber Unit No. Phase No. - L.- '02 0002 01 79 = 31 # of Bedrooms EGPcgf Bathrooms I-AW. {lrB4- Description of Work (Sec. 7031.5 Business and Professions Code: Any City or County which requires a permit to construct, alter, improve, demolish or repair any structure, prior to its issuance, also requires the applicant for such permit to file a signed statement that he is licensed pursuant to the provisions of the Contractor's License Law [Chapter 9, commending with Section 7000 of Division 3 of the Business and Professions Code1 or that he is exempt therefrom, and the basis for the alleged exemption. Any violation of Section 7031.5 by any applicant for a permit subjects the applicant to a civil penalty of not more than five hundred dollars [$5001). Name Address city Statelzip Telephone # State License # License Class City Business License # Designer Name Address City Statelzip Telephone State License I Workers' Compensation Declaration: I hereby affirm under penalty of perjury one of the following declarations: 0 of the work for which this permit is issued. 0 issued. My worker's compensation insurance carrier and policy number are: Insurance Company Policy No. Expiration Date (THIS SECTION NEED NOT BE COMPLETED IF THE PERMIT IS FOR ONE HUNDRED DOLLARS [$1001 OR LESS) 0 CERTIFICATE OF EXEMPTION: I certify that in the performance of the work for which this permit is issued, I shall not employ any person in any manner so as to become subject to the Workers' Compensation Laws of California. WARNINQ: Failure to secure workers' compensation coverage is unlawful, and shall subject an employer to criminal penalties and civil fines up to one hundred thousand dollars ($100,00OL in addition to the cost of compensation, damages as provided for in Section 3706 of the Labor code, interest and attorney's fees. SIGNATURE DATE I have and will maintain a certificate of consent to self-insure for workers' compensation as provided by Section 3700 of the Labor Code, for the performance I have and will maintain workers' compensation, as required by Section 3700 of the Labor Code, for the performance of the work for which this permit is 0 I, as owner of the property or my employees with wages as their sole compensation, will do the work and the structure is not intended or offered for sale (Sec. 7044, Business and Professions Code: The Contractor's License Law does not apply to an owner of property who builds or improves thereon, and who does such work himself or through his own employees, provided that such improvements are not intended or offered'for sale. If, however, the building or improvement is sold within one year of completion, the owner-builder will have the burden of proving that he did not build or improve for the purpose of sale). as owner of the property, am exclusively contracting with licensed contractors to construct the project (Sec. 7044, Business and Professions Code: The ctor's License Law does not apply to an owner of property who builds or improves thereon, and contracts for such prolects with contractorls) licensed pursuant to the Contractor's License Law). 0 1. 2. 3. 4. am exempt under Section personally plan to provide the major labor and materials for construction of the proposed property improvement. 0 YES ON0 (have I have not) signed an application for a building permit for the proposed work. have contracted with the following person (firm) to provide the proposed construction (include name I address I phone number I contractors license number): Business and Professions Code for this reason: plan to provide portions of the work, but I have hired the following person to coordinate, supervise and provide the major work (include name I address I phone number I contractors license number): 5. of work): I will provide some of the work, but I have contracted (hired) the following persons to provide the work indicated (include name I address I phone number I type PROPERTY OWNER SIGNATURE DATE Is the applicant or future building occupant required to submit a business plan, acutely hazardous materials registration form or risk management and prevention program under Sections 25505, 25533 or 25534 of the Presley-Tanner Hazardous Substance Account Act? 0 YES 0 NO Is the applicant or future building occupant required to obtain a permit from the air pollution control district or air quality management district? 0 YES 0 NO Is the facility to be constructed within 1,000 feet of the outer boundary of a school site? 0 YES NO IF ANY OF THE ANSWERS ARE YES, A FINAL CERTIFICATE OF OCCUPANCY MAY NOT BE ISSUED UNLESS THE APPLICANT HAS MET OR IS MEETING THE REQUIREMENTS OF THE OFFICE OF EMERGENCY SERVICES AND THE AIR POLLUTION CONTROL DISTRICT. 8 I hereby affirm that there is a construction lending agency for the performance of the work for which this permit is issued (Sec. 3097(i) Civil Code). LENDER'S NAME LENDER'S ADDRESS CANT CERTI I certify that I have read the application and state that the above information is correct and that the information on the plans is accurate. I agree to comply with all City ordinances and State laws relating to building construction. I hereby authorize representatives of the Cit) of Carlsbad to enter upon the above mentioned property for inspection purposes. I ALSO AGREE TO SAVE, INDEMNIFY AND KEEP HARMLESS THE CITY OF CARLSBAD AGAINST ALL LIABILITIES, JUDGMENTS, COSTS AND EXPENSES WHICH MAY IN ANY WAY ACCRUE AGAINST SAID CITY IN CONSEQUENCE OF THE GRANTING OF THIS PERMIT. WHITE: File YELLOW: Applicant PINK: Finance - City of Carlsbad 07/0 1 / STEVEN DWEBER P 0 BOX 230078 ENClNlTAS CA 92023 Re: Application Date: 09/25/2002 0:OO:OO Plan Check #: CB022897 Address: 1731 CALAVO CT Expiration Date: 09/25/2003 0:OO:OO Permit Type: RESDNTL Description: LHEUREUX RES/ 122 SF ADDITION LIVING SPACE(DINING RM), 112 SF GARAGE ADD You applied to have your plans checked on the date noted above. To date, the related building permit has not been obtained. The original plan review application will expire as no building permit has been issued. Plans submitted and not retrieved from the building department prior to the plan check expiration date noted above will be destroyed. The provisions of sections 304 (d) of the Uniform Building Code state: “Section 304 9d) Expiration of Plan Review Applications for which no permit is issued within one year following the date of application shall expire by limitation, and plans and other data submitted for review may thereafter be returned to the applicant or destroyed by the Building Official. In order to renew action on an application after expiration, the applicant shall resubmit plans and pay a new plan review fee.” In order to provide better service, please indicate your handling choice for the plans originally and return this letter to the Building Department. Project Abandoned - I will pick up plans within 10 days Project Abandoned - Plans may be destroyed. If you have any questions, please contact the Building Department at (760) 602-271 8, Raenette Abbey Building Department 1635 Faraday Avenue Carlsbad, CA 92008-7314 (760) 602-2700 FAX (760) 602-8560 @ EsGil Corporation DATE: 02/05/03 JURISDICTION: Carlsbad PLAN CHECK NO.: 02-2897 0 PLAN REVIEWER 0 FILE SET: I11 PROJECT ADDRESS: 1731 Calavo Court PROJECT NAME: Room Addition for LHeureux Residence -_ The plans transmitted herewith have been corrected where necessary and substantially comply with the jurisdiction’s building codes. 0 The plans transmitted herewith will substantially comply with the jurisdiction’s building codes when minor deficiencies identified below are resolved and checked by building department staff. 0 The plans transmitted herewith have significant deficiencies identified on the enclosed check list and should be corrected and resubmitted for a complete recheck. The check list transmitted herewith is for your information. The plans are being held at Esgil 0 The applicant’s copy of the check list is enclosed for the jurisdiction to forward to the applicant Corporation until corrected plans are submitted for recheck. contact person. 0 The applicant‘s copy of the check list has been sent to: Esgil Corporation staff did not advise the applicant that the plan check has been completed. 0 Esgil Corporation staff did advise the applicant that the plan check has been completed. Person contacted: Telephone #: REMARKS: Place soils stamp on plans. Mail Telephone Fax In Person Appointment Applicant Hand Carried Plans to City By: Ray Fuller Enclosures: LOG Esgil Corporation 0 GA MB 0 EJ 0 PC (P) 02/05/03 trnsrntl.dot 9320 Chesapeake Drive, Suite 208 + San Diego, California 92123 + (858) 560-1468 + Fax (858) 560-1576 - EsGil Corporation Zn !Purtncrsfiip dtfi ~ovcrnmcnt for BuiHiry Safety DATE: 11/20/02 JURIS D I CTI 0 N : Carlsbad PLAN CHECK NO.: 02-2897 0 PLAN REVIEWER 0 FILE SET: I1 PROJECT ADDRESS: 1731 Calavo Court PROJECT NAME: Room Addition for L'Heureux Residence 0 The plans transmitted herewith have been corrected where necessary and substantially comply 0 The plans transmitted herewith will substantially comply with the jurisdiction's building codes when minor deficiencies identified below are resolved and checked by building department staff. The plans transmitted herewith have significant deficiencies identified on the enclosed check list with the jurisdiction's building codes. and should be corrected and resubmitted for a complete recheck. The check list transmitted herewith is for your information. The plans are being held at Esgil 0 The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant The applicant's copy of the check list has been sent to: Corporation until corrected plans are submitted for recheck. contact person. Steven Weber Post Office Box 230078 Encinitas, Ca. 92023 Esgil Corporation staff did not advise the applicant that the plan check has been completed. IX1 Esgil Corporation staff did advise the applicant that the plan check has been completed. Person contacted: Steven Weber Date contacted: I I 120 /oL (by: (L- ) Telephone #: (760) 753--8486 Fax #: (760) 436-0260 MaiW Telephone Fax In Person REMARKS: By: Ray Fuller Enclosures: Esgil Corporation GA 0 MB EJ 0 PC 1 1 /I 3/02 tmsrntl.dot 9320 Chesapeake Drive, Suite 208 + San Diego, California 92123 + (858) 560-1468 + Fax (858) 560-1576 Carlsbad 02-2897 11/20/02 RECHECK PLAN CORRECTION LIST QPROJECT ADDRESS: 1731 Calavo Court SET: I1 DATE PLAN RECEIVED BY ESGIL CORPORATION: 11/13/02 DATE RECHECK COMPLETED: 11/20/02 [IREVIEWED BY: Ray Fuller FOREWORD (PLEASE READ): This plan review is limited to the technical requirements contained in the Uniform Building Code, Uniform Plumbing Code, Uniform Mechanical Code, National Electrical Code and state laws regulating energy conservation, noise attenuation and disabled access. This plan review is based on regulations enforced by the Building Department. You may have other corrections based on laws and ordinances enforced by the Planning Department, Engineering Department or other departments. The following items listed need clarification, modification or change. All items must be satisfied before the plans will be in conformance with the cited codes and regulations. Per Sec. 106.4.3, 1997 Uniform Building Code, the approval of the plans does not permit the violation of any state, county or city law. A. Please make all corrections on the original tracings and submit two new sets of prints to: ESGIL CORPORATION. B. To facilitate rechecking, please identify, next to each item, the sheet of the plans upon which each correction on this sheet has been made and return this sheet with the revised plans. C. The following items have not been resolved from the previous plan reviews. The original correction number has been given for your reference. In case you did not keep a copy of the prior correction list, we have enclosed those pages containing the outstanding corrections. Please contact me if you have any questions regarding these items. D. Please indicate here if any changes have been made to the plans that are not a result of corrections from this list. If there are other changes, please briefly describe them and where they are located on the plans. Have changes been made not resulting from this list? OYes ONo Carlsbad 02-2897 11/20/02 The items listed below are from the previous list. These remaining items have not been adequately addressed. The remarks in bold are to emphasize the remaining problem. 1. Please make all corrections on the original tracings, as requested in the correction list. Submit three sets of plans for commerciaVindustria1 projects (two sets of plans for residential projects). For expeditious processing, corrected sets can be submitted in one of two ways: I. Deliver all corrected sets of plans and calculations/reports directly to the City of Carlsbad Building Department, 1635 Faraday Ave., Carlsbad, CA 92009, (760) 602-2700. The City will route the plans to EsGil Corporation and the Carlsbad Planning, Engineering and Fire Departments. 2. Bring one corrected set of plans and calculations/reports to EsGil Corporation, 9320 Chesapeake Drive, Suite 208, San Diego, CA 92123, (858) 560-1468. Deliver all remaining sets of plans and calculations/reports directly to the City of Carlsbad Building Department for routing to their Planning, Engineering and Fire Departments. reviewed by the City Planning, Engineering and Fire Departments until review by EsGil Corporation is complete. NOTE: Plans that are submitted directly to EsGil Corporation only will not be 9. Need to specify which windows are existing and which are proposed. Response was see sheet 10 but no sheet 10 was provided? IO. Could not locate where new footing for Strong wall was shown with deepen footings. Show required width of stem wall and depth to insure minimum 3” clearances below SSTB 28’s (25” embedment). 0 To speed up the review process, note on this list (or a copy) where each correction item has been addressed, i.e., plan sheet, note or detail number, calculation page, etc. 0 Please indicate here if any changes have been made to the plans that are not a result of corrections from this list. If there are other changes, please briefly describe them and where they are located in the plans. 0 Have changes been made to the plans not resulting from this correction list? Please indicate: Yes 0 No 0 0 The jurisdiction has contracted with Esgil Corporation located at 9320 Chesapeake Drive, Suite 208, San Diego, California 92123; telephone number of 858/560-1468, to perform the plan review for your project. If you have any questions regarding these plan review items, please contact Ray Fuller at Esgil Corporation. Thank you. EsGil Corporation In !Partnership witfi Government for %~il;iin..Safety DATE: 10/02/02 J U Rl SDl CTI ON : Carlsbad PLAN CHECK NO.: 02-2897 mT 0 PLAN REVIEWER 0 FILE SET: I PROJECT ADDRESS: 1731 Calavo Court PROJECT NAME: Room Addition for L’Heureux Residence 0 0 0 w 0 w 0 w The plans transmitted herewith have been corrected where necessary and substantially comply with the jurisdiction’s building codes. The plans transmitted herewith will substantially comply with the jurisdiction’s building codes when minor deficiencies identified below are resolved and checked by building department staff. The plans transmitted herewith have significant deficiencies identified on the enclosed check list and should be corrected and resubmitted for a complete recheck. The check list transmitted herewith is for your information. The plans are being held at Esgil Corporation until corrected plans are submitted for recheck. The applicant’s copy of the check list is enclosed for the jurisdiction to forward to the applicant contact person. The applicant’s copy of the check list has been sent to: Steven Weber Post Office Box 230078 Encinitas, Ca. 92023 - -78 Esgil Corporation staff did not advise the applicant that the plan check has been completed. Esgil Corporation staff did advise the applicant that the plan check has been completed. Person contacted: Steven Weber Date contacted: lo- 3-0~ (by:bb) Fax #: (760) 436-0260 REMARKS: Telephone #: (760) 753--8486 Mail w Telephone Fax In Person By: Ray Fuller Enclosures: Esgil Corporation 0 GA 0 MB EJ 0 PC 09/26/02 tmsmtl.dot 9320 Chesapeake Drive, Suite 208 San Diego, California 92123 + (858) 560-1468 + Fax (858) 560-1576 Carlsbad 02-2897 10/02/02 PLAN REVIEW CORRECTION LIST SINGLE FAMILY DWELLINGS AND DUPLEXES PLAN CHECK NO.: 02-2897 J U RI SDI CTION: Carlsbad PROJECT ADDRESS: 1731 Calavo Court FLOOR AREA: STORIES: 1 Room Addition/Garage Conversion 122 Garage Extension 112 HEIGHT: REMARKS: DATE PLANS RECEIVED BY JURIS D I CTI 0 N : 09/25/02 DATE PLANS RECEIVED BY ESGIL CORPORATION: 09/26/02 DATE INITIAL PLAN REVIEW PLAN REVIEWER: Ray Fuller I COMPLETED: 10/02/02 FOREWORD (PLEASE READ): This plan review is limited to the technical requirements contained in the Uniform Building Code, Uniform Plumbing Code, Uniform Mechanical Code, National Electrical Code and state laws regulating energy conservation, noise attenuation and access for the disabled. This plan review is based on regulations enforced by the Building Department. You may have other corrections based on laws and ordinance by the Planning Department, Engineering Department, Fire Department or other departments. Clearance from those departments may be required prior to the issuance of a building permit. Present California law mandates that residential construction comply with the 1998 edition of the California Building Code (Title 24), which adopts the following model codes: 1997 UBC, 1997 UPC, 1997 UMC and 1996 NEC (all effective 7/1/99). The above regulations apply to residential construction, regardless of the code editions adopted by ordinance. The following items listed need clarification, modification or change. All items must be satisfied before the plans will be in conformance with the cited codes and regulations. Per Sec. 106.4.3, 1997 Uniform Building Code, the approval of the plans does not permit the violation of any state, county or city law. To speed UD the recheck process, please note on this list (or a COPY) where each correction item has been addressed, Le., plan sheet number, specification section, etc. Be sure to enclose the marked up list when you submit the revised Dlans. 1 -* , Carlsbad 02-2897 10/02/02 PLANS 1. 2. qq 3. 4. 5. I \ 6- I 7. 4, 10 8. 9. IO. IV ‘ 11. Please make all corrections on the original tracings, as requested in the correction list. Submit three sets of plans for commerciaVindustriaI projects (two sets of plans for residential projects). For expeditious processing, corrected sets can be submitted in one of two ways: I. Deliver all corrected sets of plans and calculations/reports directly to the City of Carlsbad Building Department, 1635 Faraday Ave., Carlsbad, CA 92009, (760) 602-2700. The City will route the plans to EsGil Corporation and the Carlsbad Planning, Engineering and Fire Departments. 2. Bring one corrected set of plans and calculations/reports to EsGil Corporation, 9320 Chesapeake Drive, Suite 208, San Diego, CA 92123, (858) 560-1 468. Deliver all remaining sets of plans and calculations/reports directly to the City of Carlsbad Building Department for routing to their Planning, Engineering and Fire Departments. NOTE: Plans that are submitted directly to EsGil Corporation only will not be reviewed by the City Planning, Engineering and Fire Departments until review by EsGil Corporation is complete. Generally the Plans are incomplete and a thorough Plan Check can not be done.The following list is a general list only and corrections may follow. Energy calculations required when addition exceeds 100 sg ft. Note closet for FAU to be 12” wider than unit. Missing detail numbers on foundation plan, elevations etc. Note or shown on the plans that the maximum drop is 1 inch for out swinging doors shown Le. at the fire door. Section 1003.3.1.6 Show on plans the required 1 hour protection to roof sheathing and fire door for garage separation. Tempered glass required within 2 ft of door i.e. window Q for example. Need to specify which windows are existing and which are proposed. Appears using butted glass at corner of addition and will need to specify a thickness of glass capable of resisting wind and deflection loads and show that glass is supportted on all four edges i.e. at butted edge’s. Show that existing wall to dining room is at least 50% open (including header ) in order to obtain light and ventilation thru new room area. Carlsbad 02-2897 10/ 02 / 02 12. Specify connection from existing top plates to new Le. some type of strap. +e c~#. i 1 3- '%4mtls 14. Provide vertical calculations for new beams at garage to include new point loads to foundation. Specify all beam to beam connections. Provide lateral calculations for this project Le. at front left corner of garage where beams intersect. 15. The window schedule shall clearly describe the required U-factor and solar heat gain coefficient (SHGC) values and demonstrate compliance with the Title 24 energy calculations. 4; cl 1 -2q I 16. All sheets of the latest CF-1 R form must be imprinted onto the plans (sheets 1 of 3, 2 of 3 and 3 of 3 must be included). 17. A mechanical duct sealing certification test must be performed by a certified HERS inspector shall be shown on the CFI-R form. (This requirement is valid for all new low rise residential construction including room additions greater than 100 square feet that are usinq the Prescriptive energy calculation method.) compliance with the "Alternate to Package D" requirements 0 To speed up the review process, note on this list (or a copy) where each correction item has been addressed, i.e., plan sheet, note or detail number, calculation page, etc. 0 Please indicate here if any changes have been made to the plans that are not a result of corrections from this list. If there are other changes, please briefly describe them and where they are located in the plans. 0 Have changes been made to the plans not resulting from this correction list? Please indicate: Yes 0 No' & 0 The jurisdiction has contracted with Esgil Corporation located at 9320 Chesapeake Drive, Suite 208, San Diego, California 921 23; telephone number of 858/560-1468, to perform the plan review for your project. If you have any questions regarding these plan review items, please contact Ray Fuller at Esgil Corporation. Thank you. Carlsbad 02-2897 l0/02/02 VALUATION AND PLAN CHECK FEE JURISDICTION: Carlsbad PLAN CHECK NO.: 02-2897 PREPARED BY: Ray Fuller DATE: 10/02/02 BUILDING ADDRESS: 1731 Calavo Court BUILDING OCCUPANCY: R3 U1 TYPE OF CONSTRUCTION: VN I Jurisdiction Code CB By Ordinance Bldg. Permit Fee by Ordinance I I $1 22.79 I _.___.______._ _________~ Plan Check Fee by Ordinance - . __ __ - ___ Type of Review: R Complete Review 0 Repetitive Fee r-- q Repeats Structural Only 0 Other Hourly -1 Hour * Esgil Plan Review Fee I $79.81 $68.761 Comments: Sheet 1 of 1 macvalue.doc BUILDING PLANCHECK CHECKLIST DATE: PLANCHECK NO.: CB 022 69 3 BUILDING ESS: 1'3 3 I cr; I a v'c? cJ+ - 3&/" _c (y7 ASSESSORS PARCEL NUMBER: ,& 7 EST. VALUE: LJ,, 566 PROJECT DESCRIPTION: N3-0 ENGINEERING DEPARTMENT APPROVAL DENIAL The item you have submitted for review has been approved. The approval is based on plans, information andlor specifications provided in your submittal; therefore any changes to these items after this date, including field modifications, must be reviewed by this office to insure continued conformance with applicable codes. Please review carefully all comments attached, as failure to comply with instructions in this report can result in suspension of permit to build. I Please see the attached report of deficiencies marked with 0. Make necessary corrections to plans or specifications for compliance with applicable codes and standards. Submit corrected plans and/or specifications to this office for review. ~ 1 By: Date: A Right-of-way permit is required prior to construction of the following improvements: By: Date: By: Date: Dedication Application Dedication Checklist Improvement Application Improvement Checklist ENGINEERING DEPT. CONTACT PERSON Name: JOANNE JUCHNIEWICZ City of Carlsbad Address: 1635 Faraday Avenue, Carlsbad, CA 92008 Phone: 1760) 602-2775 Future Improvement Agreement Grading Permit Application Grading Submittal Checklist CFD INFORMATION Parcel Map No: Lots: Right-of-way Permit Application Right-of-way Permit Submittal Checklist and Information Sheet Sewer Fee Information Sheet Carlsbad Tract: A4 1 Rev. 7/1m BUILDING PLANCHECK CHECKLIST SITE PLAN I. Provide a fully dimensioned site plan drawn to scale. Show: A. North Arrow F. Right-of-way Width & Adjacent Streets B. Existing & Proposed Structures G. Driveway widths C. Existing Street Improvements H. Existing or proposed sewer lateral D. Property Lines I. Existing or proposed water service E. Easements J. Existing or proposed irrigation service / 0 0 2. Show on site plan: B / A. Drainage Patterns 1. Building pad surface drainage must maintain a minimum slope of one percent towards an adjoining street or an approved drainage course. 2. ADD THE FOLLOWING NOTE: “Finish grade will provide a minimum positive drainage of 2% to swale 5’ away from building.” B. Existing & Proposed Slopes and Topography C. Size, type, location, alignment of existing or proposed sewer and water service (s) that serves the project. Each unit requires a separate service, however, second dwelling units and apartment complexes are an exception. D. Sewer and water laterals should not be located within proposed driveways, per standards. 0 3. Include on title sheet: A. Site address B. Assessor‘s Parcel Number C. Legal Description For commercial/industriaI buildings and tenant improvement projects, include: total building square footage with the square footage for each different use, existing sewer permits showing square footage of different uses (manufacturing, warehouse, office, etc.) previously approved. EXISTING PERMIT NUMBER DESCRIPTION 2 RW. 7l1I1uoo BUILDING PLANCHECK CHECKLIST 2ND 0 El 0 0 DISCRETIONARY APPROVAL COMPLIANCE 4a. Project does not comply with the following Engineering Conditions of approval for Project No. 4b. All conditions are in compliance. Date: DEDICATION REQUIREMENTS 5. Dedication for all street Rights-of-way adjacent to the building site and any storm drain or utility easements on the building site is required for all new buildings and for remodels with a value at or exceeding $15,000, pursuant to Carlsbad Municipal Code Section 18.40.030. Dedication required as follows: Dedication required. Please have a registered Civil Engineer or Land Surveyor prepare the appropriate legal description together with an 8 w" x 11" plat map and submit with a title report. All easement documents must be approved and signed by owner@) prior to issuance of Building Permit. Attached please find an application form and submittal checklist for the dedication process. Submit the completed application form with the required checklist items and fees to the Engineering Department in person. Applications will not be accept by mail or fax. Dedication completed by: Date: IMPROVEMENT REQUIREMENTS 6a. All needed public improvements upon and adjacent to the building site must be constructed at time of building construction whenever the value of the construction exceeds $75.000, pursuant to Carlsbad Municipal Code Section 18.40.040. Public improvements required as follows: Attached please find an application form and submittal checklist for the public improvement requirements. A registered Civil Engineer must prepare the appropriate improvement plans and submit them together with the requirements on the attached checklist to the Engineering Department through a separate plan check process. The completed application form and the requirements on the 3 H\WmcmOCSCHQSnBu!Jdirq Phwheck CLlSt Form (RIDDLE ~ HARVEY 7-12-W)doc RW. 1uzMI) BUILDING PLANCHECK CHECKLIST 1 ST 0 8. 0 2ND 0 0 0 0 0 0 0 0 3RD 0 0 0 0 0 0 checklist must be submitted in person. Applications by mail or fax are not accepted. Improvement plans must be approved, appropriate securities posted and fees paid prior to issuance of building permit. Improvement Plans signed by: Date: 6b. Construction of the public improvements may be deferred pursuant to Carlsbad Municipal Code Section 18.40. Please submit a recent property title report or current grant deed on the property and processing fee of $310 so we may prepare the necessary Future Improvement Agreement. This agreement must be signed, notarized and approved by the City prior to issuance of a Building permit. Future public improvements required as follows: 6c. Enclosed please find your Future Improvement Agreement. Please return agreement signed and notarized to the Engineering Department. Future Improvement Agreement completed by: Date: 6d. No Public Improvements required. SPECIAL NOTE: Damaaed or defective improvements found adiacent to buildina site must be repaired to the satisfaction of the Citv Inspector prior to occwancv. GRADING PERMIT REQUIREMENTS The conditions that invoke the need for a grading permit are found in Section 11.06.030 of the Municipal Code. 7a. Inadequate information available on Site Plan to make a determination on grading requirements. Include accurate grading quantities (cut, fill import, export). 7b. Grading Permit required. A separate grading plan prepared by a registered Civil Engineer must be submitted together with the completed application form attached. The Gradina Permit must be issued and rouah aradinq approval obtained prior to issuance of a Building Permit. NOTE: Grading Inspector sign off by: Date: 7c. Graded Pad Certification required. (Note: Pad certification may be required even if a grading permit is not required.) 4 on 00 BUILDING PLANCHECK CHECKLIST 7d .No Grading Permit required. 7e. If grading is not required, write "No Grading" on plot plan. MISCELLANEOUS PERMITS 8. A RIGHT-OF-WAY PERMIT is required to do work in City Right-of-way and/or private work adjacent to the public Right-of-way. Types of work include, but are not limited to: street improvements, tree trimming, driveway construction, tying into public storm drain, sewer and water utilities. Right-of-way permit required for: 9. INDUSTRIAL WASTE PERMIT If your facility is located in the City of Carlsbad sewer service area, you need to contact the Carlsbad Municipal Water District, located at 5950 El Camino Real, Carlsbad, CA 92008. District personnel can provide forms and assistance, and will check to see if your business enterprise is on the EWA Exempt List. You may telephone (760) 438-2722, extension 7153, for assistance. Industrial Waste permit accepted by: Date: IO. NPDES PERMIT Complies with the City's requirements of the National Pollutant Discharge Elimination System (NPDES) permit. The applicant shall provide best management practices to reduce surface pollutants to an acceptable level prior to discharge to sensitive areas. Plans for such improvements shall be approved by the City Engineer prior to issuance of grading or building permit, whichever occurs first. fees are attached WATER METER REVIEW 12a. Domestic (potable) Use Ensure that the meter proposed by the owner/developer is not oversized. Oversized meters are inaccurate during low-flow conditions. If it is oversized, for the life of the meter, the City will not accurately bill the owner for the water used. All single family dwelling units received "standard" 1" service with 5/8" service. 5 Rev. 7/1W BUILDING PLANCHECK CHECKLIST 1ST 2ND 3RD 0 If owner/developer proposes a size other than the “standard”, then ownerldeveloper must provide potable water demand calculations, which include total fixture counts and maximum water demand in gallons per minute (gpm). A typical fixture count and water demand worksheet is attached. Once the gpm is provided, check against the “meter sizing schedule” to verify the anticipated meter size for the unit. 0 Maximum service and meter size is a 2” service with a 2 meter. 0 If a developer is proposing a meter greater than 2”, suggest the installation of multiple 2 services as needed to provide the anticipated demand. (manifolds are considered on case by case basis to limit multiple trenching into the street). 0 0 12b. Irrigation Use (where recycled water is not available) All irrigation meters must be sized via irrigation calculations (in gpm) prior to approval. The developer must provide these calculations. Please follow these guidelines: 1. If the project is a newer development (newer than 1998), check the recent improvement plans and observe if the new irrigation service is reflected on the improvement sheets. If so, at the water meter station, the demand in gpm may be listed there. Irrigation services are listed with a circled “I”, and potable water is typically a circled “W”. The irrigation service should look like: STA 1+00 Install 2” service and 1.5: meter (estimated 100 gpm) 2. If the improvement plans do not list the irrigation meter and the service/meter will be installed via another instrument such as the building plans or grading plans (w/ a right of way permit of course), then the applicant must provide irrigation calculations for estimated worst-case irrigation demand (largest zone with the farthest reach). Typically, Larry Black has already reviewed this if landscape plans have been prepared, but the applicant must provide the calculations to you for your use. Once you have received a good example of irrigation calculations, keep a set for your reference. In general the calculations will include: 0 Hydraulic grade line 0 Elevation at point of connection (POC) 0 Pressure at POC in pounds per square inch (PSI) 0 Worse case zone (largest, farthest away from valve 0 Total Sprinkler heads listed (with gpm use per head) 0 Include a 10% residual pressure at point of connection 3. In general, all major sloped areas of a subdivision/project are to be irrigated via separate irrigation meters (unless the project is only SFD with no HOA). As long as the project is located within the City recycled water . * BUILDING PLANCHECK CHECKLIST 1ST 2ND 3RD service boundary, the City intends on switching these irrigation services/meters to a new recycled water line in the future. 0 0 12c. Irrigation Use (where recycled water is available) \& I 1. Recycled water meters are sized the same as the irrigation meter above. 2. If a project fronts a street with recycled water, then they should be connecting to this line to irrigate slopes within the development. For subdivisions, this should have been identified, and implemented on the improvement plans. Installing recycled water meters is a benefit for the applicant since they are exempt from paying the San Diego County Water Capacity fees. However, if they front a street which the recycled water is there, but is not live (sometimes they are charged with potable water until recycled water is available), then the applicant must pay the San Diego Water Capacity Charge. If within three years, the recycled water line is charged with recycled water by CMWD, then the applicant can apply for a refund to the San Diego County Water Authority (SDCWA) for a refund. However, let the applicant know that we cannot guarantee the refund, and they must deal with the SDCWA for this. 0 13. Additional Comments: 7 Rev. 711uOO PLANNING DEPARTMENT BUILDING PLAN CHECK REVIEW CHECKLIST e s AJ VI N 9 6 0 8 APN: ,337 -340-07 yJ i Compliance with conditions of approval? If not, state conditions which require action. Conditions of Approval: Discretionary Action Required: YES - NO X TYPE APPROVAURESO. NO. DATE PROJECT NO. OTHER RELATED CASES: Compliance with conditions or approval? If not, state conditions which require action. Conditions of Approval: c- CFD (i@ #-Date of participation: - Remaining net dev acres: Coastal Zone AssessmentKompIiance Project site located in Coastal Zone? YES& NO- CA Coastal Commission Authority? YESK NO- If California Coastal Commission Authority: Contact them at - 7575 Metropolitan Drive, Suite 103, San Diego CA 92108-4402; (61 9) 767-2370 Determine status (Coastal Permit Required or Exempt): If NO, complete Coastal Permit Determination Form now. Coastal Permit Determination Log #: Coastal Permit Determination Form already completed? YES- NO___ Follow-Up Actions: 1) Stamp Building Plans as "Exempt" or "Coastal Permit Required (at minimum Floor Plans). 2) Complete Coastal Permit Determination Log as needed. lnclusionary Housing Fee required: (Effective date of lnclusionary Housing Ordinance - May 28k93.) YES - NO Data Entry Completed? YES - NO - (A/P/Ds, Activity Maintenance, enter CB#, toolbar, Screens, Housing Fees, Construct Housing Y/N, Enter Fee, UPDATE!) Site Plan: H:\ADMIN\COUNTER\BldgPlnchkRevChklst Rev 9/01 N.0 1. Provide a fully dimensional site plan drawn to scale. Show: North arrow, property lines, easements, existing and proposed structures, streets, existing street improvements, right-of-way width, dimensional setbacks and existing topographical lines (including all side and rear yard slopes). 2. Provide legal description of property and assessor's parcel number. Policy 44 - Neighborhood Architectural Design Guidelines 1. Applicability: YES NOL 2. Project complies YES NO Zoning: 1. 2. 3. 4. 5. Setbacks: Front: Required 20' Shown 20' Street Side: Required - Shown - Top of slope: Required 0% Shown - Interior Side: Required 113 ' Shown /7') " Rear: Required W" Shown 13 '7" fM )7lUWWE Accessory structure setbacks: Front: Required Shown Interior Side: Required hxi ;;ltm; '- Street Side: Required Shown Rear: Required Structure separation: Required Shown Lot Coverage: Required s, Shown /YO% f Height: Required t3o ' Shown 2-Y Parking: Spaces Required 2- Shown 2- (breakdown by uses for commercial and industrial projects required) Residential Guest Spaces Required Shown OK TO ISSUE AND ENTERED APPROVAL INTO COMPUTER DATEd'~oo~ H:\ADMIN\COUNTER\BldgPlnchkRevChklst Rev 9/01 STATE OF CALIFORNIA -_ THE RESOURCES AGENCY GRAY DAVIS. Governor CALIFORNIA COASTAL COMMISSION SAN DIEGO AREA 7575 METROPOLITAN DRIVE, SUITE 103 SAN DIEGO, CA 92108402 (619) 767-2370 EXEMPTION LETTER DATE: November 6,2002 NAME: Steven Weber P.O. Box 230078 Encinitas, Ca 92023 LOCATION: 173 1 Calavo Court. Carlsbad PROJECT: Additions to living area (122 sq.R.1 and garage (1 12 sq.ft.1. This is to certify that this location andor proposed project has been reviewed by the staff of the Coastal Commission. A coastal development permit is not necessary for the reasons checked below. 0 The site is not located within the coastal zone as established by the California Coastal Act of 1976, as amended. @ The proposed development is included in Categorical Exclusion No. adopted by the California Coastal Commission. IXI 0 The proposed development is judged to be repair or maintenance activity not resulting in an addition to or enlargement or expansion of the object of such activities (Section 30610(d) of the Coastal Act). The proposed development is an improvement to an existing single-family residence (Section _?M!O(a) of thr Coastal Act) and not located in the area between the sea and the first public road or within 300 feet of the inland extent of any beach (whichever is greater) (Section 13250(b)(4) of the 14 Cal. Admin. Code. The proposed development is an improvement to an existing single-family residence and is located in the area between the sea and the first public road or within 300 feet of the inland extent of any beach (whichever is greater) but is not a) an increase of 10% or more of internal floor area, b) an increase in height over lo%, or c) a significant non-attached structure (Sections 30610(a) of the Coastal Act and Section 1 3 2 5 O(b)(4) of Administrative Regulations). The proposed development is an interior modification to an existing use with no change in the density or intensity of use (Section 30106 of the Coastal Act). (over) ~