Loading...
HomeMy WebLinkAbout1742 CEREUS CT; ; CB152498; PermitCity of Carlsbad 1635 Faraday Av Carlsbad, CA 92008 08-12-2015 Pool Permit Permit No: CB152498 Job Address: Permit Type: Parcel No: Valuation: Reference #: PC#: Project Title: Applicant: Building Inspection Request Line (760) 602-2725 17 42 CEREUS CT CBAD POOL 2155170500 Lot#: 0 $24,400.00 Construction Type: NEW RIKER RES-500 SF POOL/SPA Owner: Status: Applied: Entered By: Plan Approved: Issued: Inspect Area: ISSUED 08/05/2015 SLE 08/12/2015 08/12/2015 PRP AQUATICS INC RIKER CRAIG H&JULIA J FAMILY TRUST 03-02-12 5748 AVENIDA ROBLES GRANITE BAY CA 95746 916 743-2290 Building Permit Add'l Building Permit Fee Plan Check Add'l Plan Check Fee Electrical Fee Plumbing Fee Strong Motion Fee Green Bldg Standards (SB1473) Fee Renewal Fee Add'l Renewal Fee Other Building Fee Additional Fees TOTAL PERMIT FEES 17 42 CEREUS CT CARLSBAD CA 92011 $246.49 $0.00 $172.54 $0.00 $33.00 $33.00 $3.17 $1.00 $0.00 $0.00 $0.00 $0.00 $489.20 Total Fees: $489.20 Total Payments To Date: $489.20 Balance Due: Inspector: Clearance: $0.00 NOTICE: Please take NOTICE that approval of your project includes the "Imposition" of fees, dedications, reservations, or other exactions hereafter collectively referred to as "fees/exactions." You have 90 days from the date this permit was issued to protest imposition of these fees/exactions. If you protest them, you must follow the protest procedures set forth in Government Code Section 66020(a), and file the protest and any other required information with the City Manager for processing in accordance with Carlsbad Municipal Code Section 3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack, review, set aside, void, or annul their imposition. You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capacity changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this project. NOR DOES IT APPLY to any fees/exactions of which ou have reviousl been iven a NOTICE similar to this or as to which the statute of limitations has reviousl otherwise ex ired. City of Carlsbad 1635 Faraday Av Carlsbad, CA 92008 08-12-2015 Storm Water Pollution Prevention Plan (SWPPP} Permit Permit No:SW150299 Job Address: Permit Type: Parcel No: Reference #: CB#: Project Title: Applicant: 17 42 CEREUS CT CBAD SWPPP 2155170500 Lot#: 0 RIKER RES-SWPPP FOR POOL/SPA Owner: Status: Applied: Entered By: Issued: Inspect Area: Tier: Priority: ISSUED 08/05/2015 SLE 08/12/2015 1 L PRP AQUATICS INC RIKER CRAIG H&JULIA J FAMILY TRUST 03-02-12 5748 AVENIDA ROBLES GRANITE BAY CA 95746 916 743-2290 Emergency Contact: ERIC 760-476-0008 SWPPP Plan Check SWPPP Inspections Additional Fees TOTAL PERMIT FEES Total Fees: $106.00 1742 CEREUS CT CARLSBAD CA 92011 $48.00 $58.00 $0.00 $106.00 Total Payments To Date: $106.00 Balance Due: -<·rz:~"-·---~-- - -" -~-'--'-'~·---~·· ~ -.-.~. "·-~'"' '-'•~'--"• -"~=''"'"'"""-"-~=~~..,=-·"· $0.00 THE FOLLOWING APPROVALS REQUIRED PRIOR TO PERMIT ISSUANCE: 0PLANNING D ENGINEERING 0BUILDING DFIRE 0HEALTH [] HAZMATIAPCD Cicyof Building Permit Applicatio11 Plan Check No. Q,t) 15 ~\'C1~' 1635 Faraday Ave., Carlsbad, CA 92008 Est. Value Ph: 760-602-2719 Fax: 760-602-8558 Plan Ck. Deposit Carlsbad email: building@carlsbadca.gov ~--'""""2?t'o www.carlsbadca.gov Date C3 ~· 5-15 j&)C) ,-, JOB ADDRESS L~\1t"l\.$ U:; __ SUITE#/SPACE#/UNI1'# IAPN (;6" ( 14'2.. '215 -5i7 - -{;(j CT/PROJECT # I LOT# J ~~ ;;_? I PHASE# I# OF UNITS I# BEDROOMS #BATHROOMS I TENANT BUSINESS NAME I CONSTR. TYPE I occ. GROUP DESCRIPTION OF WORK: Include Square Feet of Affected Area(s) rrc;,puse4 fool/ 5,1(4 EXISTING USE I PROPOSED USE I GARAGE (SF) PATIOS (SF) lDEC:KS (SF) FIREPLACE rR CONDITIONING 1 FIRE SPRINKLERS YESO NoD YES0No0 YEsONoO APPLICANT NAME ba.\ij cl ~·To~~5 PROPERTY OWNER NAME JQ"I/( ; (r .. ~\1 ~ lft(eV Prinarv Contact . <.e ·~ ADDRESS 6 q L . A i bi1c.,·~4S ADDRESS / (L '•.,} ~'I t V f'VI ~ C~lj !(t:ll {;::lf"(' '-L:'::> CITY ( l . ( STA~ ZIP CITY c~v'l '>PtlcA STA}f ZIP u_w· ,,bon (:i C('Z.6'(lTf ('' &I lei\ -·I PHONE.7lt , . '0 -l{7 (o ·...COG_$· I FAX PHONE I FAX EMAIL EMAIL DESIGN PROFESSIONAL CONTRACTOR BUS;. NAME fu~-11~-fV f_c:;.oiS ADDRESS ADDRESS b , . 7 , .4v-eV\\ ~t\ f VI Ll, "14 S L.f ) I ..__, ~" ~ CITY STATE ZIP CITY (qvls bc1J STATE ZIP (;{-C('""~ '''OQ LU • ., PHONE I FAX PHONE -e;,C:.;(.f~ I FAX '](~·0-47lo EMAIL EMAIL j.c.v~eZ_Q i-?.::;m-j]vv"od . (. ul"-1 ( L-\V"fl e I STATE LIC. # STATE LIC.# lcr;,5 I CITY BUS. LIC.# l c:\q·? {/1-f r<Vt.Lu-->e£ (Sec. 7031.5 Busmess and Profess1ons Code: Any C1ty or County wh1ch requ1res a perm1t to construct, alter, 1m prove, demolish or repa1r any structure, pnor to its 1ssuance, also requ1res the applicant for such permit to file a signed statement that he is licensed pursuant to the provisions of the Contractor's License Law (Chapter 9, commending with Section 7000 of Division 3 of the Business and Professions Code) or that he is exempt therefrom, and the basis for the alleged exemption. Any violation of Section 7031.5 by any applicant for a permit subjects the applicant to a civil penalty of not more than five hundred dollars {$500)). Workers' Compensation Declaration: I hereby affirm under penalty of perjury one of the following declarations: D I have and will maintain a certificate of consent to self·insure for workers' compensation as provided by Section 3700 of the Labor Code, for the pertormance of the work for which this permit is issued. 12SJ1 have and will maintain workers' compensation, as required by Section 3700 of the Labor Code, for the pertormance of the work for which this permit is issued. My workers' compensation insurance carrier and policy numberare lnsuranceCo. S~t:ltt" (oJid~1t'~i't::i·i·!'cvi PolicyNo. qf0$41'7 Expiration Date fii,/t /!(};:; r - This section need not be completed if the permit is for one hundred dollars ($100) or less. 0 Certificate of Exemption: I certify that in the performance of the work for which this permit is issued, I shall not employ any person in any manner so as to become subject to the Workers' Compensation Laws of California. WARNING: Failure to secure workers' compensation coverage is unlawful, and shall subject an employer to criminal penalties and civil fines up to one hundred thousand dollars (&100,000), in addition to the cost of compensation, 3706 of the Labor code, interest and attorney's fees. _N5 CONTRACTOR SIGNATURE I hereby affirm that I am exempt from Contractor's License Law for the following reason: D D D I, as owner of the property or my employees with wages as their sole compensation, will do the work and the structure is not intended or offered for sale (Sec. 7044, Business and Professions Code: The Contractor's License Law does not apply to an owner of property who builds or improves thereon, and who does such work himself or through his own employees, provided that such improvements are not intended or offered for sale. If, however, the building or improvement is sold within one year of completion, the owner-builder will have the burden of proving that he did not build or improve for the purpose of sale). I, as owner of the property, am exclusively contracting with licensed contractors to construct the project (Sec. 7044, Business and Professions Code: The Contractor's License Law does not apply to an owner of property who builds or improves thereon, and contracts for such projects with contractor(s) licensed pursuant to the Contractor's License Law). I am exempt under Section Business and Professions Code for this reason: 1. I personally plan to provide the major labor and materials for construction of the proposed property improvement DYes 0No 2. I (have I have not) signed an application for a building permit for the proposed work. 3. I have contracted with the following person (firm) to provide the proposed construction (include name address I phone I contractors' license number): 4. I plan to provide portions of the work, but I have hired the following person to coordinate, supervise and provide the major work (include name I address I phone I contractors' license number): 5. I will provide some of the work, but I have contracted (hired) the following persons to provide the work indicated (include name I address I phone I type of work): _N5 PROPERTY OWNER SIGNATURE 0AGENT DATE I certify that I have read the application and state that the above information is correct and that the information on the plans is accurate. I agree to comply with all City ordinances and State laws relating to building construction. I hereby authorize representative of the City of Cansbad to enter upon the above mentioned property for inspection purposes. I ALSO AGREE TO SAVE, INDEMNIFY AND KEEP HARMLESS THE CITY OF CARLSBAD AGAINST ALL LIABILITIES, JUDGMENTS, COSTS AND EXPENSES WHICH MAY IN ANY WAY ACCRUE AGAINST SAID CITY IN CONSEQUENCE OF THE GRANTING OF THIS PERMIT. OSHA: An OSHA permit is required for excavations over 5'0' deep and demolition or construction of structures over 3 stories in height. EXPIRATION: Every permit issued by the Building Official under the provisions of this Code shall expire by limitation and become null and void if the building or IMlrk authorized by such permitis not commenced within 180 days from the date of such permit or if the building orm~ authorized by such permit is suspended or abandoned at any time after the IMlrk is commenced for a period of 180 days (Section 106.4.4 Uniform Building Code). ~/ ,2$ APPLICANT'S SIGNATURE DATE I on Permit#: CB152498 Type: POOL RIKER RES -500 SF POOL/SPA Date __ Inspection ~m Inspector Act ------Comments 02/12/2016 59 Final Pool Rl 02/12/2016 59 Final Pool PO AP 12/02/2015 55 Fence/Pre-Plaster PO AP 12/02/2015 55 Fence/Pre-Plaster PO AP 11/03/2015 51 Excav/Steei!Bonding/Fence PO AP 10/30/2015 51 Excav/Steei/Bonding/Fence AEK AP no card onsite 09/03/2015 23 Gas/Test/Repairs PO AP 09/03/2015 31 Underground/Conduit-Wirin PO AP 09/03/2015 51 Excav/Steei/Bonding/Fence PO AP 09/01/2015 51 Excav /Steei/Bondi ng/F ence PO co Friday, February 12, 2016 Page 1 of 1 DATE: PROJECT NAME: PLAN CHECK REVIEW TRANSMITTAL Community & Economic Development Department 1635 Faraday Avenue Carlsbad CA 92008 www .carlsbadca.gov PROJECT ID: PLAN CHECK NO: SET#: ADDRESS: APN: VALUATION/SCOPE OF WORK: This plan check review is complete and has been APPROVED by the Division. By: A Final Inspection by the Division is required Yes No This plan check review is NOT COMPLETE. Items missing or incorrect are listed on the attached checklist. Please resubmit amended plans as required. Plan Check Comments have been sent to: You may also have corrections fmm one or more of tl1e cllvfslons listed below. Approval from these divisions may be required pl'ior to the issuance of a building permit Resubrnltted plans sJ1ould include corrections from all divisions. For questions or clarifications on the attached checklist please contact the following reviewer as marked: Remarks: VaiRay Marshall 760-602-2741 Val Ray. Marshall@carlsbadca.gov E-37 1. SITE PLAN Provide a fully dimensioned site plan drawn to scale. Show: North arrow Existing & proposed structures Property line dimensions Easements Show on site plan: Drainage patterns Existing & proposed slopes Existing topography Retaining Walls (location and height) Indicate what will happen with soil excavated from pool area. Include on title sheet: Site address Assessor's parcel number Legal description/lot number Grading: Quantities of Cut Fill Import Export Project does not comply with the following engineering conditions of approval for project no: Conditions were complies with by: LOT NO. 186 MAP NO. 8352 REF. NO. Page 2 of 4 Date: REV 6/2012 E-37 2. GRADING PERMIT REQUIREMENTS The conditions that require a grading permit are found in Section 11.06.030 of the Municipal Code. Inadequate information available on site plan to make a determination on grading requirements. Include accurate grading quantities in cubic yards (cut, fill, import, export and remedial). This information must be included on the plans. If no grading is proposed write: "NO GRADING" , Grading Permit required. NOTE: The grading permit must be issued and rough grading approval obtained prior to issuance of a building permit. A separate grading plan prepared a registered civil engineer must be submitted together with the completed application form attached. No grading permit required. 3. MISCELLANEOUS PERMITS RIGHT -OF-WAY PERMIT is required to do work in city right-of-way and/or private work adjacent to the public right-of-way. A separate right-of-way issued by the engineering division is required for the following: Please complete attached right-of-way application form and return to the engineering department together with the requirements on the attached right-of-way checklist, at the time of resubmittal. Right-of-way permit and pool permit will be issued simultaneously. Page 3 of 4 REV 6/2012 E-37 4. STORM WATER Construction Compliance Project Threat Assessment Form complete incomplete Requires Tier 1 Storm Water Pollution Prevention Plan. Please complete attached form and return (SW ) Requires Tier 2 Storm Water Pollution Prevention Plan. Requires submittal of Tier 2 SWPPP, payment of processing fee and review by city. Post-Development (SUSMP) Compliance Storm Water Standards Questionnaire complete incomplete Project is subject to Standard Storm Water Requirements. See city Standard Urban Storm Water Management Plan (SUSMP) for reference. Project needs to incorporate low impact development strategies throughout in one or more of the following ways: Rainwater harvesting (rain barrels or cistern) Vegetated Roof Bio-retentions cell/rain garden Pervious pavement/pavers Flow-through planter/vegetated or rock drip line Vegetated swales or rock infiltration swales Downspouts disconnect and discharge over landscape Otb.er: 5. ADDITIONAL COMMENTS Page 4 of 4 REV 6/2012 CITY OF CARLSBAD STORM WATER COMPLIANCE ASSESSMENT B-24 Develo12,ment Services Building Division 1635 Faraday Avenue 760-602-2719 www .carlsbadca .gov I am applying to the City of Carlsbad for the following type(s) of construction permit: 1;81 Building Permit D Right-of-Way Permit 0 My project is categorically EXEMPT from the requirement to prepare a storm water pollution prevention plan (SWPPP) because it only requires issuance of one or more of the following permit types: Patio/Deck Photo Voltaic Re-Roofing Sign Spa-Factory Sprinkler Electrical Fire Additional Fire Alarm Fixed Systems Mechanical Mobile Home Plumbing Water Discharge Project Storm Water Threat Assessment Criteria* No Threat Assessment Criteria D My project qualifies as NO THREAT and is exempt from the requirement to prepare a storm water pollution prevention plan (SWPPP) because it meets the "no threat" assessment criteria on the City's Project Threat Assessment Worksheet for Determination of Construction SWPPP Tier Level. My project does not meet any of the High, Moderate or Low Threat criteria described below. Tier 1 -Low Threat Assessment Criteria JXl My project does not meet any of the Significant or Moderate Threat criteria, is not an exempt permit type (See list above) and the project meets one or more of the following criteria: • Results in some soil disturbance; and/or • Includes outdoor construction activities (such as saw cutting, equipment washing, material stockpiling, vehicle fueling, waste stockpiling). Tier 2 · Moderate Threat Assessment Criteria D My project does not meet any of the Significant Threat assessment Criteria described below and meets one or more of the following criteria: • Project requires a grading plan pursuant to the Carlsbad Grading Ordinance (Chapter 15.16 of the Carlsbad Municipal Code); or, • Project will result in 2,500 square feet or more of soils disturbance including any associated construction staging, stockpiling, pavement removal, equipment storage, refueling and maintenance areas and project meets one or more of the additional following criteria: • Located within 200 feet of an environmentally sensitive area or the Pacific Ocean, and/or • Disturbed area is located on a slope with a grade at or exceeding 5 horizontal to 1 vertical, and/or • Disturbed area is located along or within 30 feet of a storm drain inlet, an open drainage channel or watercourse, and/or • Construction will be initiated during the rainy season or will extend into the rainy season (Oct. 1 through April 30). Tier 3 -Significant Threat Assessment Criteria Cl My project includes clearing, grading or other disturbances to the ground resulting in soil disturbance totaling one or more acres including any associated construction staging, equipment storage, stockpiling, pavement removal, refueling and maintenance areas: and/or D My project is part of a phased development plan that will cumulatively result in soil disturbance totaling one or more acres including any associated construction staging, equipment storage, refueling and maintenance areas: or, D My project is located inside or within 200 feet of an environmentally sensitive area (see City ESA Proximity map) and has a significant potential for contributing pollutants to nearby receiving waters by way of storm water runoff or non-storm water discharge(s). I certify to the best of my knowledge that the above checked statements are true and correct. I understand and acknowledge that even though this project does not require preparation of a construction SWPP, I must still adhere to, and at all times during construction activities for the permit type(s) check above comply with the storm water best management practices pursuant to Title 15 of the Carlsbad Municipal Code and to City Standards. Project Address: Assessor Parcel No. 'The City Engineer may authorize minor variances from the Storm Water Threat Assessment Criteria in special circumstances where it can be shown that a lesser or higher Construction SWPPP Tier Level is warranted. B-24 f7l(z (~r-euJ (J_ Owner/Owner's Authorized Agent Name: q v1 v{ .J o~t-7 City Concurrence: By: Date: Tjii..YES Cl NO \lN ~·l· \5 Page 1 of 1 Title: Date: Project 10: C5 15~'-t9~ Rev.03/09 Construction SWPPPTier Level Tier3 Tier2 Tier 1 Exempt CONSTRUCTION THREAT ASSESSMENT WORKSHEET FOR DETERMINATION OF PROJECT'S PERCEIVED THREAT TO STORM WATER QUALITY E-33 Development Services Land Development Engineering 1635 Faraday Avenue 760-602-2750 www.carlsbadca.gov Perceived Construction Threat Assessment Criteria* Threat to Storm Water Quality Tier 3 -High Construction Threat Assessment Criteria 0 Project site is 50 acres or more and grading will occur during the rainy season 0 Project site is 1 acre or more in size and is located within the Buena Vista or Agua Hedionda Lagoon watershed, inside or within 200 feet of an environmentally sensitive area (ESA) or discharges directly to an ESA High 0 Soil at site is moderately to highly erosive (defined as having a predominance of soils with 0 USDA-NRCS Erosion factors kt greater than or equal to 0.4) Site slope is 5 to 1 or steeper 0 Construction is initiated during the rainy season or will extend into the rainy season (Oct. 1 0 through April 30). Owner/contractor received a Storm Water Notice of Violation within past two years Tier 3 -Medium Construction Threat Assessment Criteria Medium 0 All projects not meeting Tier 3 High Construction Threat Assessment Criteria Tier 2 High Construction Threat Assessment Criteria 0 Project is located within the Buena Vista or Agua Hedionda Lagoon watershed, inside or within 200 feet of an environmentally sensitive area (ESA) or discharges directly to an ESA D Soil at site is moderately to highly erosive (defined as having a predominance of soils with USDA-NRCS Erosion factors kt greater than or equal to 0.4) High 0 Site slope is 5 to 1 or steeper 0 Construction is initiated during the rainy season or will extend into the rainy season (Oct. 1 through April 30). D Owner/contractor received a Storm Water Notice of Violation within past two years 0 Site results in one half acre or more of soil disturbance Tier 2 -Medium Construction Threat Assessment Criteria Medium D All projects not meeting Tier 2 High Construction Threat Assessment Criteria Tier 1 -Medium lnsQection Threat Assessment Criteria 0 Project is located within the Buena Vista or Agua Hedionda Lagoon watershed, within or directly adjacent to an environmentally sensitive area (ESA) or discharges directly to an ESA 0 Soil at site is moderately to highly erosive (defined as having a predominance of soils with USDA-NRCS Erosion factors k1 greater than or equal to 0.4) Medium D Site slope is 5 to 1 or steeper 0 Construction is initiated during the rainy season or will extend into the rainy season (Oct. 1 through April 30). 0 Owner/contractor received a Storm Water Notice of Violation within past two years 0 Site results in one half acre or more of soil disturbance Tier 1 -Low lnsQection Threat Assessment Criteria Low 'BI All projects not meeting Tier 1 Medium Construction Threat Assessment Criteria -Not Applicable -Exempt *The c1ty eng1neer may authonze mmor vanances from the construction threat assessment cntena m spec1al Circumstances where it can be shown that a lesser or higher amount of storm water compliance inspection is warranted in the opinion of the city engineer E-33 Page 1 of 1 REV 4/30/10 -~f ., '··'¥ C! TY 0 F RLSB STORM WATER STANDARDS QUESTIONNAIRE E-34 Development Services Land Development Engineering 1635 Faraday Avenue 760-602-2750 www.carlsbadca.gov To address post-development pollutants that may be generated from development projects, the City requires that new development and significant redevelopment priority projects incorporate Permanent Storm Water Best Management Practices (BMP's) into the project design per the City's Standard Urban Stormwater Management Plan (SUSMIP). To view the SUSMP, refer to the Engineering Standards (Volume 4, Chapter 2) at www.carlsbadca.gov/standards. Initially this questionnaire must be completed by the applicant in advance of submitting for a development application (subdivision, discretionary permits and/or construction permits). The results of the questionnaire determine the level of storm water standards that must be applied to a proposed development or redevelopment project. Depending on the outcome, your project will either be subject to 'Standard Stormwater Requirements' or be subject to additional criteria called 'Priority Development Project Requirements'. Many aspects of project site design are dependent upon the storm water standards applied to a project. Your responses to the questionnaire represent an initial assessment of the proposed project conditions and impacts. City staff has responsibility for making the final assessment after submission of the development application. If staff determines that the questionnaire was incorrectly filled out and is subject to more stringent storm water standards than initially assessed by you, this will result in the return of the development application as incomplete. In this case, please make the changes to the questionnaire and resubmit to the City. If you are unsure about the meaning of a question or need help in determining how to respond to one or more of the questions, please seek assistance from Land Development Engineering staff. A separate completed and signed questionnaire must be submitted for each new development application submission. Only one completed and signed questionnaire is required when multiple development applications for the same project are submitted concurrently. In addition to this questionnaire, you must also complete, sign and submit a Project Threat Assessment Form with construction permits for the project. Please start by completing Step 1 and follow the instructions. When completed, sign the form at the end and submit this with your application to the city. To determine if your project is a priority development project, please answer the following questions: 1. Is your project LIMITED TO constructing new or retrofitting paved sidewalks, bicycle lanes or trails that meet the following criteria: (1) Designed and constructed to direct storm water runoff to adjacent vegetated areas, or other non-erodible permeable areas; OR (2) designed and constructed to be hydraulically disconnected from paved streets or roads; OR (3) designed and constructed with permeable pavements or surfaces in accordance with USEPA Green Streets uidance? 2. Is your project LIMITED TO retrofitting or redeveloping existing paved alleys, streets, or roads that are designed and constructed in accordance with the USEPA Green Streets guidance? YES NO If you answered "yes" to one or more of the above questions, then your project is NOT a priority development project and therefore is NOT subject to the storm water criteria required for priority development projects. Go to step 4, mark the last box stating "my project does not meet PDP requirements" and complete applicant information. E-34 Page 1 of 3 Effective 6/27113 STORM WATER STANDARDS QUESTIONNAIRE E-34 Development Services land Development Engineering 1635 Faraday Avenue 760-602-2750 www.carlsbadca.gov To determine if your project is a priority development project, please answer the following questions: 1. Is your project a new development that creates 10,000 square feet or more of impervious surfaces collectively over the entire project site? This includes commercial, industrial, residential, mixed-use, and public develo ment ro ·ects on ublic or private land. 2. Is your project creating or replacing 5,000 square feet or more of impervious surface collectively over the entire project site on an existing site of 10,000 square feet or more of impervious surface? This includes commercial, industrial, residential, mixed-use, and ublic develo ment ro·ects on ub/ic or rivate land. 3. Is your project a new or redevelopment project that creates 5,000 square feet or more of impervious surface collectively over the entire project site and supports a restaurant? A restaurant is a facility that sells prepared foods and drinks for consumption, including stationary lunch counters and refreshment stands selling prepared foods and drinks for immediate consum tion. 4. Is your project a new or redevelopment project that creates 5,000 square feet or more of impervious surface collectively over the entire project site and supports a hillside development project? A hillside development project includes development on any natural slope that is twenty-five percent or greater. 5. Is your project a new or redevelopment project that creates 5,000 square feet or more of impervious surface collectively over the entire project site and supports a parking lot. A parking lot is a land area or facility for the temporary parking or storage of motor vehicles used personally for business or for commerce. 6. Is your project a new or redevelopment project that creates 5,000 square feet or more of impervious surface collectively over the entire project site and supports a street, road, highway freeway or driveway? A street, road, highway, freeway or driveway is any paved impervious surface used for the transportation of automobiles, trucks, motorcycles, and other vehicles. 7. Is your project a new or redevelopment project that creates or replaces 2,500 square feet or more of impervious surface collectively over the entire site, and discharges directly to an Environmentally Sensitive Area (ESA)? "Discharging Directly to" includes flow that is conveyed overland a distance of 200 feet or less from the project to the ESA, or conveyed in a pipe or open channel any distance as an isolated flow from the project to the ESA (i.e. not commin les with flows from adjacent lands).* 8. Is your project a new development that supports an automotive repair shop? An automotive repair shop is a facility that is categorized in any one of the following Standard Industrial Classification (SIC) codes: 5013, 5014, 5541, 7532-7534, or 7536-7539. 9. Is your project a new development that supports a retail gasoline outlet (RGO)? This category includes RGO's that meet the following criteria: (a) 5,000 square feet or more or (b) a project Average Daily Traffic (ADT) of 100 or more vehicles erda . 1 O.ls your project a new or redevelopment project that results in the disturbance of one or more acres of land and are expected to generate pollutants post construction? 11.1s your project located within 200 feet of the Pacific Ocean and (1) creates 2,500 square feet or more of impervious surface or (2) increases impervious surface on the property by more than 10%? YES NO I If you answered "yes" to one or more of the above questions, you ARE a priority development project and are therefore subject to implementing structural Best Management Practices (BMP's) in addition to implementing Standard Storm Water Requirements such as source control and low impact development BMP's. A Storm Water Management Plan (SWMP) must be submitted with your application(s) for development. Go to step 3 for redevelopment projects. For new projects, go to step 4 at the end of this questionnaire, check the "my project meets PDP requirements" box and complete applicant information. If you answered "no" to all of the above questions, you ARE NOT a priority development project and are therefore subject to implementing only Standard Storm Water Requirements such as source control and low impact development BMP's required for all development projects. A Storm Water Management Plan (SWMP) is not required with your application(s) for development. Go to step 4 at the end of this questionnaire, check the "my project does not meet PDP requirements" box and complete applicant information. E-34 Page 2 of 3 Effective 6/27113 STORM WATER STANDARDS QUESTIONNAIRE E-34 Development Services land Development Engineering 1635 Faraday Avenue 760-602-2750 www.carlsbadca.gov you answered the structural BMP's required for Priority Development Projects apply only to the creation or replacement of impervious surface and not the entire development. Go to step 4, check the "my project meets PDP requirements" box and complete applicant information. If you answered "no," the structural BMP's required for Priority Development Projects apply to the entire development. Go to step 4, check the meets PDP uirements" box and information. My project meets PRIORITY DEVELOPMENT PROJECT (PDP) requirements and must comply with additional stormwater criteria per the SUSMP and I understand I must prepare a Storm Water Management Plan for submittal at time of application. I understand flow control (hydromodification) requirements may apply to my project. Refer to SUSMP for details. D My project does not meet PDP requirements and must only comply with STANDARD STORMWATER REQUIREMENTS per the SUSMP. As part of these requirements, I will incorporate low impact development strategies throughout my project. Applicant Information and Signature Box Address: (.7 u. ·z (-"' I L 7 ev(kS l:v. Applicant Name: i\ . . ./ _,..., U ''t vlt' J 0 vc) Applicant Signature: ~~-}v-z/ ,/1__,.7 L I "2""" .-:_...., Accessor's Parcel Number(s): z I~ -5 i'1 -o<§,--ti(;> Applicant Title: Date: This Box for City Use Only City Concurrence: By:\) Date: Project ID: NO *Environmentally Sensitive Areas include but are not limited to all Clean Water Act Section 303(d) impaired water bodies; areas designated as Areas of Special Biological Significance by the State Water Resources Control Board (Water Quality Control Plan for the San Diego Basin (1994) and amendments); water bodies designated with the RARE beneficial use by the State Water Resources Control Board (Water Quality Control Plan for the San Diego Basin (1994) and amendments); areas designated as preserves or their quivalent under the Multi Species Conservation Program within the Cities and County of San Diego; and any other equivalent environmentally sensitive areas which have been identified by the Copermittees. Page 3 of 3 Effective 6/27113 STORM WATER COMPLIANCE FORM TIER 1 CONSTRUCTION SWPPP E-29 STORM WATER COMPLIANCE CERTIFICATE ~ My project is not in a category of permit types exempt from the Construction SWPPP requirements ~ My project is not located inside or within 200 feet of an environmentally sensitive area with a significant potential for contributing pollutants to nearby receiving waters by way of storm water runoff or non-storm water discharge(s). ~ My project does not require a grading plan pursuant to the Carlsbad Grading Ordinance (Chapter 15.16 of the Carlsbad Municipal Code) ~ My project will not result in 2,500 square feet or more of soils disturbance including any associated construction staging, stockpiling, pavement removal, equipment storage, refueling and maintenance areas that meets one or more of the additional following criteria: • located within 200 feet of an environmentally sensitive area or the Pacific Ocean; and/or, • disturbed area is located on a slope with a grade at or exceeding 5 horizontal to 1 vertical; and/or • disturbed area is located along or within 30 feet of a storm drain inlet, an open drainage channel or watercourse; and/or • construction will be initiated during the rainy season or will extend into the rainy season (Oct. 1 through April 30). I CERTIFY TO THE BEST OF MY KNOWLEDGE THAT ALL OF THE ABOVE CHECKED STATEMENTS ARE TRUE AND CORRECT. I AM SUBMITTING FOR CITY APPROVAL A TIER 1 CONSTRUCTION SWPPP PREPARED IN ACCORDANCE WITH THE REQUIREMENTS OF CITY STANDARDS. I UNDERSTAND AND ACKNOWLEDGE THAT I MUST: (1) IMPLEMENT BEST MANAGEMENT PRACTICES (BMPS) DURING CONSTRUCTION ACTIVITIES TO THE MAXIMUM EXTENT PRACTICABLE TO MINIMIZE THE MOBILIZATION OF POLLUTANTS SUCH AS SEDIMENT AND TO MINIMIZE THE EXPOSURE OF STORM WATER TO CONSTRUCTION RELATED POLLUTANTS; AND, (2) ADHERE TO, AND AT ALL TIMES, COMPLY WITH THIS CITY APPROVED TIER 1 CONSTRUCTION SWPPP THROUGHOUT THE DURATION OF THE CONSTRUCTION ACTIVITIES UNTIL THE CONSTRUCTION WORK IS COMPLETE AND APPROVED BY THE CITY OF CARLSBAD. E-29 v/:.:_· 1 · "' JJ( J/15 DATE I STORM WATER POLLUTION PREVENTION NOTES 1. ALL NECESSARY EQUIPMENT AND MATERIALS SHALL BE AVAILABLE ON SITE TO FACILITATE RAPID INSTALLATION OF EROSION AND SEDIMENT CONTROL BMPS WHEN RAIN IS EMINENT. 2. THE OWNER/CONTRACTOR SHALL RESTORE ALL EROSION CONTROL DEVICES TO WORKING ORDER TO THE SATISFACTION OF THE CITY ENGINEER AFTER EACH RUN-OFF PRODUCING RAINFALL. 3. THE OWNER/CONTRACTOR SHALL INSTALL ADDITIONAL EROSION CONTROL MEASURES AS MAY BE REQUIRED BY THE CITY ENGINEERING OR BUILDING INSPECTOR DUE TO UNCOMPLETED GRADING OPERATIONS OR UNFORESEEN CIRCUMSTANCES WHICH MAY ARISE. 4. ALL REMOVABLE PROTECTIVE DEVICES SHALL BE IN PLACE AT THE END OF EACH WORKING DAY WHEN THE FIVE (5) DAY RAIN PROBABILITY FORECAST EXCEEDS FORTY PERCENT (40%). SILT AND OTHER DEBRIS SHALL BE REMOVED AFTER EACH RAINFALL. 5. ALL GRAVEL BAGS SHALL BE BURLAP TYPE WITH 3/4 INCH MINIMUM AGGREGATE. 6. ADEQUATE EROSION AND SEDIMENT CONTROL AND PERIMETER PROTECTION BEST MANAGEMENT PRACTICE MEASURES MUST BE INSTALLED AND MAINTAINED. SPECIAL NOTES Page 1 of 3 Development Services Land Development Engineering 1635 Faraday Avenue 760-602-2750 www.carlsbadca.gov PROJECT INFORMATION Site Address: /?Lf Z (cV"""C'i_j {_{:: .. Assessor's Parcel Number: l/£3 -<7!7-6 $ ..,;;c Project ID: C-t!) I !:Q '2 ..qqcz:, ,.., . c:: ~. cc: Construction Permit No.:':)~'\./ ( ::_) U 2;. ( ·1 Estimated Construction Start Date ____ _ Project Duration Months Emergency Contact: Name: t?nc. 24 hour Phone: 7 {c;() ·-t.f 7 6 -oO(J_tj Perceived Threat to Storm Water Quality D Medium ~Low If medium box is checked, must attach a site plan sheet showing proposed work area and location of proposed structural BMPs For City Use Only CITY OF CARLSBAD ST~R1SWPPP Approved By: da,{)~ Date: ~· 1· lfi': REV 4/30/10 Erosion Control Tracking Non-Storm Water Waste Management and Materials BMPs Sediment Control BMPs Control Management BMPs Pollution Control BMPs BMPs <: <: <: E E 0 "0 0 0 (L) "0 (L) <: t5 n <: Cl ii5 E <: E "0 ~ 0 <: Cl ro <: ro 2 2 '5 a. (L) (L) E iii "E ro "' Cl w (j) u;"' u; <: ·s ~ Cl u; 2 :2 Cl "0<1.) <: 1:: ro <: ;::-a. (L) "E c: <: ~ ·;:: 0' (L) 0 ~1 "' Best Management Practice <: ·a. <: "' <: ~ :c ro~ "' ~ co -0 (L) 0 (L) (9 i LlJ .2! (L) ro :.e ro~ (BMP) Description ~ <: E (L)Cl ro <: 0'-0 "' -g~ "0 Qi "' :2 2 sa "' 0 ~(/) "' Cl ~.5 co -~ c "OCl <: <: (L) g ! .92 '3 -~ ~ E ro ro "0>, 0"' ~ .~ 0 :::> > "' (L) E ~(L) 0 0 co Cl o:l5 (L)!:!:! jj )j (L) ro ~ :2 OCl 0 <: (L) cnE ro IDro OID (L) 'iii ~-1 s -Q 0:: N Cl) ~:;: a;:5 ·a. "E1 ~ c ro (L) E .:.: Qi -::J .0 §2 =en ::c "5i i (L) "0 .S::<: (L) 0 w (L) ::J "0 ·-"0 0 <: .:.: ro ~ o n 0 0 a. u. '5 > :a~ .Oro .!9 ·-ro 0 :g <: c t: ·-(L) ~ (L) 0 <: ~ct .s::(L) ii5 ~-' (L) ~ ro~ 0 -(L) .s:: .0 .!::ro ro 0 0 CllCJ .!9 0 0 0 0 o n -.... (L)_ U5 (9 UJO 1i5 i:i5 (/) 0 u: (9 cn> (/) (/)Q. Ci5E (1)0:: Q. >O :2 (/) :c 0::::2 CASQA Designation ~ ..... 00 q> ,.... ,.... (") "i L() <0 ..... '>? 0 ,.... N ,.... (") ..... 00 ,.... CiJ (") "i L() <9 00 0 0 ,.... uJ uJ uJ uJ uJ ,.... a: a: ch ch ch ch ~ ~ :;i; :;i; 0 0 LlJ LlJ uJ :2 ~ :2 LlJ LlJ LlJ (/) (/) (/) (/) (/) (/) (/) 1-1-z z z z s s s s Construction Activity LlJ (/) I>< Gradina/Soil Disturbance .X:' !>< TrenchinQ/Excavation >< x Stockpiling Drillina/Borina Concrete/Asphalt Saw cuttina rx Concrete flatwork X rx Paviilii' X Conduit/Pipe Installation IX Stucco/Mortar Work )<' "'Y ·x -~ Waste Disposal 'X 'X Staaina/Lay Down Area Equipment Maintenance and Fueling Hazardous Substance Use/Storage Dewatering Site Access Across Dirt Other (list): Instructions: Begin by reviewing the list of construction activities and checking the box to the left of any activity that will occur during the proposed construction. Add any other activity descriptions in the blank activity description boxes provided for that purpose and place a check in the box immediately to the left of the added activity description. For each activity descrribed, pick one or more best management practices (BMPs) from the list located along the top of the form. Then place an X in the box at the place where the activity row intersects with the BMP column. Do this for each activity that was checked off and for each of the selected BMPs selected from the list. For Example -If the project includes site access across dirt, then check the box to the left of "Site Access Across Dirt". Then review the list for something that applies such as "Stabilized Construction Ingress/Egress" under Tracking Control. Follow along the "Site Access Across Dirt" row until you get to the "Stabilized Construction Ingress/Egress" column and place an X in the box where the two meet. As another example say the project included a stockpile that you intend to cover with a plastic sheet. Since plastic sheeting is not on the list of BMPs, then write in "Cover with Plastic" in the blank column under the heading Erosion Control BMPs. Then place an X in the box where the "Stockpiling" row intersects the new "Cover with Plastic" column. To learn more about what each BMP description means, you may wish to review the BMP Reference Handout prepared to assist applicants in the selection of appropriate Best Management Practice measures. The reference also explains the California Stormwater Quality Association (CASQA) designation and how to apply the various selected BMPs to a project. .. E-29 Page 2 of 3 REV 4/30/10 PLANNING DIVISION BUILDING PLAN CHECK APPROVAL P-29 DATE: 8-5-15 PROJECT NAME: PROJECT 10: Planning Division 1635 Faraday Avenue (760) 602-4610 www.carlsbadca.fl.ov PLAN CHECK NO: CB 15-2498 SET#: 1ADDRESS: 1742 Cereus Ct APN: 215-517-05-00 ~ This plan check review is complete and has been APPROVED by the Planning Division. By: Chris Sexton A Final Inspection by the Planning Division is required Yes No You may also have corrections from one or more of divisions listed below. Approval from these divisions may be required the issuance a building permit. Resubmitted plans should include corrections from all D This plan check review is NOT COMPLETE. Items missing or incorrect are listed on the attached checklist. Please resubmit amended plans as required. Plan Check APPROVAL has been sent to: For questions or clarifications on the attached checklist please contact the following reviewer as marked: PLANNING 760-602-4610 I:8J Chris Sexton 760-602-4624 Chris.Sexton@carlsbadca.gov D Gina Ruiz 760-602-4675 Gina.Ruiz@carlsbadca.gov D Remarks: ENGINEERING 760-602-2750 FIRE PREVENTION 760-602-4665