Loading...
HomeMy WebLinkAbout1744 BLACKBIRD CIR; ; CB960818; PermitBUILDING PERMIT Permit No : CB96013 1.8 Project No: R9601130 Deuel opmcnt No: DEU8Y02I3 SlJitP: b.P-/06 02 05/24/96 15~46 Paqe 1 of 1 Job AddreSs: 1744 ELflCKBIRD CH Permit' Type: SINGLE FQMILY DWLNG - DETQCHED Parcel No: 215-601-07-00 Lot#: 134 Occupancy Group: Reference#: CT85-35 Status: ISSUE5 Description: 2210 SF+407 GAR,PLRN 1,PHQSE 5 Rpplied: 05/05/96 : RUOCET,REPUBLIC DEU,CT85-35,Pf44,PC960694 CI p r / I 5s iJe : 0 5 / 24/9 6 I Ua 1 uat i on 8 181,334 Construction Type: UN Entered By: RMQ nppl/Ownr : REPUBLIC DEU CO 714-998-2550 180 N RIUERUIEW DR FINRHEIM CFI 92808 7704 or9/24/% Q#l 01 02 C-PRMT I2404 *I4 Plan Check Nunrber > CB960694 *** Fees Required *** **+ Fees Collected & Credits x. * * Fees : 1 "F'ota 1 Fees: 1 CI rJ j u s t rlie rr t s : Fee desc r i p t i on ---....---------------- Number of Bedrooms Number of Bathrooms Ku i 1 id i ng Perm i t Plan Check Strong Motion Fee Enter Number of EDU Enter IlY" to Autoca or rnanua 1 1 y enter Payoff Fee for CFD Enter t'Y1l for F'li-lmtc Each P 1 unrh i ng F i xtu Each Su i 1 ding Sewer Each Instal l/Repaiv Each blater Heater a Gas Piping System Each Uacuunr Breaker * PLUM5ING TOTQL I Enter ''Yl' for Electric Issue Fee 3 * ELECTRICRL TOTRL Enter 'Y' for Mechanical Issue Fee> * EUILDING 'TOTAL Single Phase Per QHP > 11-istal 1 Furn/Ducts/Heat Purrips 2 Each Install Fireplace > Each Exhal.Jst Far) 3 Each Instal I/Reloc Uent 2 * MECHQNICQL TOTRL PLDR D > PO0 350, 00 12,404.1.4 Ext fee 3.00 3.00 Y27.00 603.00 18.00 2400,OO 3300 I 00 540.00 4666, 3.4 12454.14 20 t 00 112.00 '15 8 00 7.00 7.00 7,OO 14.00 I- D -- Y Y -I- ata --- 182.00 10.00 Y 100 ,25 25.00 35 IO0 15.00 Y 1 9.00 9.00 2 6.50 13.00 3 6.50 19.50 4 4.50 18.00 75 IO0 * 24 8.00 L 9 FINAL BUILDING INSPECTION DEPT: BUILDING ENGINEERING @Eā€™?f=ā€™ PLANNING U/M WATER PLAN CHECK#: CB960818 PERMIT#: CB960818 PROJECT NAME: 2210 SF+407 GAR,PLAN 1,PHASE 5 DATE: 11/19/96 PERMIT TYPE: SFD AVOCET,REPUBLIC DEV,CT85-35,PA4,PC960694 ADDRESS: 1744 BLACKBIRD ClQ$#E# .23>& ~ CONTACT PERSON/PHONE#: MW/HARLEY/431-4783 SEWER DIST: CA WATER DIST: CA NOV 1 9 INSPECTED DATE BY: INSPECTED: APPROVED - DISAPPROVED - I FINAL BUILDING INSPECTION DEFT: BUILDING ENGINEERING FIRE PZANNING U/M WATER PERMIT#: CB960818 PERMIT TYPE: SFD PROJECT NAME: 2210 SF+407 GAR,PLAN 1,PHASE 5 ADDRESS: 1744 BLACKBIRD CR WT# 134 f"%AN CHECK#: CB960818 DATE: 11/19/96 AVOCET,REWBLIC DEV,CT85-35,PA4,PC960694 CONTACT PERSON/PHONE#: MW/HARLEY/431-4783 SEWER DIST: CA WATER DIST: CA INSPECTED DATE BY: INSPECTED: APPROVED - DISAPPROVED 12131?6 APPROVED DISAPPROVED - a0 INSPECTED: DATE INSPECTED BY : INSPECTED DATE BY: INSPECTED : APPROVED - DISAPPROVED - ā€™ t FINAL BUILDING INSPECTION DEPT: BUILDING ENGINEERING FIRE PLANNING Urn WATER PLAN CHECK#: CB960818 DATE: 11/19/96 PERMIT#: CB960818 PERMIT TYPE: SFD PROJECT NAME: 2210 SF+407 GAR,PLAN 1,PHASE 5 AVOCET, REPUBLIC DEV, CT85-35, PA4, PC960694 ADDRESS: 1744 BLACKBIRD CR LOT# 134 CONTACT PERSON/PHONE# : MW/HARLEY/431-4783 SEWER DIST: CA WATER DIST: CA INSPECTED DATE BY: INSPECTED: APPROVED - DISAPPROVED - INSPECTED DATE BY: INSPECTED: APPROVED - DISAPPROVED - COMMENTS : . i FINAL BUILDING INSPECTION DEPT: BUILDING ENGINEERING FIRE PLANNING U/M PL?W CHECK#: CB960818 DATE: 11/19/96 PERMIT#: CB960818 PERMIT TYPE: SFD PROJECT NAME: 2210 SF+407 GAR,PLAN 1,PHASE 5 AVOCET,REPUBLIC DEV,CT85-35,PA4,PC960694 MJv I g k Ti -< ADDRESS: 1744 BLACKBIRD CR 134 CONTACT PER!SON/PHONE#: MW/HARLEY/431-4783 SEWER DIST: CA WATER DIST: CA INSPECTED DATE BY: INSPECTED: APPROVED - DISAPPROVED - INSPECTED DATE BY: INSPECTED: APPROVED - DISAPPROVED - .* CITY OF CARLSBAD INSPECTION REQUEST PERMIT# CB960818 FOR 12/03/96 INSPECTOR AREA PY DESCRIPTION: 2210 SF+407 GAR,PLAN 1,PHASE 5 PLANCK# CB960694 TYPE: SFD CONSTR. TYPE VN APPLICANT: REPUBLIC DEV CO PHONE: 714-998-2550 AVOCET,REPUBLIC DEV,CT85-35,PA4,PC960694 OCC GRP JOB ADDRESS: 1744 BLACKBIRD CR STE : LOT: 134 CONTRACTOR: PHONE: OWNER: PHONE : REMARKS: MW/HARLEY/431-4783 SPECIAL INSTRUCT: INSPECTOR 4 TOTAL TIME: CD LVL DESCRIPTION ACT COMMENTS 19 29 39 49 ST Final Structural PL Final Plumbing EL Final Electrical ME Final Mechanical fi ***** INSPECTION HISTORY ***** DATE 111996 091696 091696 091696 091196 090696 081296 081296 061396 060696 060696 DESCRIPTION Final Combo Interior Lath/Drywall Exterior Lath/Drywall Gas/Test/Repairs Insulation Rough Combo Shear Panels/HD's Roof/Reroof Ftg/Foundat ion/Piers Underground/Under Floor Sewer/Water Service ACT INSP COMMENTS NS PY METER RELEASE AP PY AP PY AP PY AP PY AP PY AP PD AP PD AP PY AP PY AP PY