Loading...
HomeMy WebLinkAbout1751 BRUCE RD; ; 85-176; PermitDECLARATIONS WORKER'S COMPENSATION OWNERlBUlLDER CONTRACTOR r II 1- LENDER 71 ++; 1.i i I ul 4 b z Q b 3 0 r D z 4 m @k&xAppiicant Go&- Temporary File .? Lr c 0 rn m I- 2 $ c z 0 rn a GI n z 0 7 n n n k? - c a - . -.. - 1 T r- I- I L- -7- 1 1 i 1 I I I j'n I 1. COMPk#k COR PLAN CHECK ONLY dl LEGAL bE@XIPTlON MISCELLANEOUS FEE RECEIPT PLAN CHECK FEE 0 HOUSE MOVING 0 PUBLIC FACILITIES FEE 0 SCHOOL FEE - DISTRICT 0 CERTIFICATE OF OCCUPAWY n! t K)SIFEI?ED TO THE CITY. White - Applicant Yellow - File Pink - ( Y DEVELOPMENTAL SERVICES BUlL DIN G DE PAR TME N T 1200 ELM AVENUE CARLSBAD, CALIFORNIA 92008-1989 (619) 438-5525 10-4- 85 N. 0. M. P. 0. Box 1041 Carlsbad, CA. 92008 Dear Sir: Re: PC# 85-176 1751 Bruce Road In answer to your request of 9-5-85 9 an extension of 180 days has been granted to -- Section 304(c) of the 1979 Uniform Building Code prohibits any further extension of time. Building and Planning MO : ky -~E$ELOPMENTAL 1200 ELM AVENUE SERVICES CARLSBAD, CALIFORNIA 92008-1g9g (619) 438-5525 - . .. BUILDING D €PA R TM EN T J 85-176 Dated 4-1-85 To: . N. 0. M. P. 0. Box 1041 1751 Bruce Rd. SFD Carlsbad, CA. 92008 EXPIrnS: 10-1-85 Subject: Plan Check Expiration Gur records indicace that you have nor obtained your building permit for which you filed an application on the date shown above. The provisions of Section 304(c) of the Uniform Building Code state: See. 304(c) Expiration of Plan Check. Applications for which no permit is issued within 180 days following the date of application shall expire by limitation and plans submitted for checking may thereafter be returned to the applicant or destroyed by the Building Official. extend the time for action by the applicant for a period not exceeding 180 days upon written request by the applicant showing that circumstances beyond the control. of the applicant have prevented action from being taken. order to renew action on an application after expiration, the applicant shall resubmit plans and pay a new plan check fee. The Building Official may In For your convenience, please check the appropriate box below indicating your intentions and return this letter to the address above. Project abandoned. I will pick up plans in 10 days. Signature Date Project abandoned, plans ~ay be destroyed. Signature Date w- If you have any questions, please contact the Carlsbad Building Department at 43 8-552 5 #? E E WED ;lly CARLSBI C'17 .. C1985 €UMI~ Depeen I r ." FINAL BUILDING INSPECTION PLAN CHECK NUMBER: 85-176 DATE: 7-25-86 PROJECT NAME: ADDRESS: 1751 Bruce PROJECT NO.: UNIT NUMBER: PHASE NO.: TYPE OF UNIT: 1 NUMBER OF UNITS: SFD CONTACT PERSON: Henry Tubbs CONTACT TELEPHONE: 434-7173 INSPECTED: ?/k/d APPROVED #? DISAPPROVED ~ INSPECTED " DATE BY: INSPECTED: APPROVED ~ DISAPPROVED ___ INSPECTED DATE BY: INSPECTED APPROVED - DISAPPROVED ~ ; ALL DEPARTMENTS COMMENTS: . , .. I ALL DEPARTMENTS . c i Rev. 1/86 WHITE Suspense GREEN: Engineering CANARY Utilities PINK: Planning GOLD: Fire f FINAL BUILDING INSPECTION PLAN CHECK NUMBER: 85-176 DATE: 7- 2 5- 86 PROJECT NAME ADDRESS: 1751 Bruce PROJECT NO.: UNIT NUMBER: t PHASE NO.: 1 NUMBER OF UNIT,S: SFD TYPE OF UNIT: CONTACT PERSON: Henry Tubbrs CONTACT TELEPHONE: 434-7173 INSPECTED DATE ./ By: INSPECTED: APPROVED ~ DISAPP INSPECTED DATE BY: INSPECTED: APPROVED DISAPPROVED - ALL DEPARTWITS _. COMMENTS: Rev. im6 WHITE Suspense GREEN: Engineering CANARY: Utilities PINK: Pkrinlng GOLD Fire /' -_ CORRECTION NOTICE APPROVED PLANS SHALL BE ON JOB SITE BUILDING FOUNDATION 0 REINFORCING STEEL 0 MASONRY 0 GROUT-GUNITE 0 FLOOR AND CEILING FRAME ?) &%A B7 7 fiCc 7 0 SHEATHING a, 0 FRAME 0 EXTERIOR LATH 0 INSULATION 0 INTERIOR LATH OR DRYWALL .I) No7-c4 D& FLL JST &m-w-z PLUMBING *f,, em 0 UNDERGROUND PLUMBING 0 ROUGH PLUMBING 0 TOP OUT PLUMBING 0 SEWER AND PUCO. 0 TUB OR SHOWER PAN 0 UNDERGROUND WATER ./) MaK ~o~sf&%dG- .wddd4/;plt 0 GASTEST 0 WATER HEATER ELECTRICAL d TEMPORARY SERVICE 0 ELECTRIC UNDERGROUND 0 ROUGH ELECTRIC 0 POOL BONDING 0 ELECTRIC SERVICE 0 UPPER GROUND 3 MISCELLANEOUS 0 PLENUM AND DUCTS 0 COMBUSTION AIR CONDITIONED AIR SYSTEMS 0 SOLAR 0 GRADING 0 POOL 0 PATIO 0 SIGN 0 OTHER d- / 4.3 -& TIME: d- 1 DATE: INSPECTOR 4 B U I LDI NG INSPECTION D EPARTM ENT Nofe: fi!al Inspection Required . PHONE - 438-5525 ----________________------------ __-_________________----------- - _-__ CORRECTION NOTICE - APPROVED PLANS SHALL BE ON JOB SITE BUILDING 0 FOUNDATION 0 REINFORCING STEEL 0 MASONRY 0 FLOOR AND CEILING FRAME GROUT-GUNITE 0 SHEATHING 0 FRAME 0 EXTERIOR LATH 0 INSULATION 0 INTERIOR LATH OR DRYWALL u PLUMBING 0 UNDERGROUND PLUMBING UNDERGROUND WATER 0 ROUGH PLUMBING 0 TOP OUT PLUMBING 0 SEWER AND PUCO. 0 TUB OR SHOWER PAN 0 GASTEST 0 WATER HEATER 0 TEMPORARY SERVICE ELECTRIC UNDERGROUND 0 ROUGH ELECTRIC 0 POOL BONDING 0 ELECTRIC SERVICE 0 UPPER GROUND 0 G.F.I. 0 SMOKE DETECTOR MISCELLANEOUS 0 PLENUM AND DUCTS COMBUSTION AIR 0 CONDITIONED AIR SYSTEMS 0 SOLAR 0 GRADING 0 POOL 0 PATIO 0 SIGN 0 OTHER TIME: DATE: INSPECTOR CITY OF CARLSBAD BUI LDlNG INSPECTION DEPARTMENT . PHONE - 438-5525 Note: Final Inspection Required ~~~ . --- ~ ______-_-___--------~ DATE : d/z5/25-- n JURISDICTION fi PLAN CHECKER JURISDICTION: FILE COPY U PLAN CHECK NO: c95-/7/s - z;35 0 UPS PROJECT ADDRESS: /75/ BQULG a, *d a% 0 DESIGNER / PROJECT NAME: The plans transmitted herewith have been corrected where necessary and substantially con?ply with the jurisdiction's building codes. The with cies chec The iden plans the j ident ked by plans tif ied ping departanent staff. A !!!?-list and shou lly compl nor defic re resolv t def icie Id be cor Y 'inen- ,ed and ncies rected and resubmitted for a ccmplete recheck. The check list transmitted herewith is the jurisdiction's copy for your information. The plans are being held at Esgil Corp. until corrected plaris are submitted for recheck. The applicant's copy of the check list is enclosed for the jurisdiction to return to the applicant contact person. The applicant's copy of the check list has been sent to: 0 Esgil staff did not advise the applicant contact person that plan check has been completed. Esgil staff - did advise applicant that the plan check has been completed. Person contacted: Date contacted: Telephone 3 REMARKS : ENCL : c -. 1. the building pai vas prepared in accor- 2. the utility trenches have been oraocrlv dance wieh the soils report: c - -r --- backfilled and compacted, and: and reznforcemcnc comply vith tne soils report and approved plan.' 3. the foundation excavations. Cormrnq f t I I 0 I 0 ESGIL CORPORATION 9320 CHESAPEAKE DR.. SUlTE 208 SAN DIEGO. CA 92 123 (619) 5601468 DATE: d/z/.35- J uR 1 sD 1 c TI 0;: c-Ls Be- rn FILE COPY DESIGNER PLAN CHECK NO: 85-/7& -z- 0 UPS PROJECT ADDRESS: /75/ fi/2ffiE The plans transmitted herewith have been corrected where necessary and substantially comply with the jurisdiction's building codes. The plans transmitted herewith will substantially comply with the jurisdiction's building codes, when minor deficien- cies identified on the enclosed check list are resolved and checked by building department staff. The plans transmitted herewith have major deficiencies identified on the enclosed check.list and should be corrected and resubmitted for a complete recheck. 0 0 0 The check list transmitted herewith is the jurisdiction's copy for your information. The plans are being held at Esgil Corp.'until corrected plans are submitted for recheck. The applicants copy of the check list is enclosed for the jurisdiction to return to the applicant contact person. -. The applicant's copy of the check list has been sent to: Esgil staff did not advise the applicant contact person that plan check has been completed. Esgil staff - did advise applicant that the plan check has been completed. Person contacted: Date contacted: Telephone X BY: ESC L CORPORATION \ _. . Form 31584 ... ~l'APPLIcANT COPY Citp of Cartsba'b - ~- Plan check is limitod to technical'&qufrannta contained in the Uniform Building Code, Oniform Plumbing Code, Uniform #~ch.nical Code, National Ilrctrical Code and state lawa regulating u10rg.r conremation, noise attonution and amsa for tho hndiupped. The plan check is basod on rogulations enforcod by the Building Ifupoction Department. You MY hve other COrr.CriOM based on law .ad ordinance. enforcd by thr Planning Department, tnginaering Dop.M.lrt or other dep~rtaonts. The item circled bela need clarification, modification or change. te be satisfied before the plans will br in conforman- with the cited codes and rogulations. Per See. 301 (e), 1979 Uniform Building Code. tho approval of the plans does not pomft the vtolation ol any stater munty or city lau. All circlod items hvm *. . Please nake alX corrections on the original tracinga and subait tu0 nmu #eta of printar and any original plan sets that MY have hen r urned to u the jurisdiction. tea Buo &$!c ne%: to 8ach circled iter, the sheet of the plana upon which each correction on XndIcate on plana the nsr ol the 1.0.1 owner and (uw of paraon responsible lor the preparation &f the plans. Soc. lO2fb) 0 CITY COPY 0 PLAN CHECKER COPY Submit fully dimn8ioned plot plan dram of all existing and propoaed structures on the lot. Identify property lines and show lot dimnsions .nd all eas~nta. Show location ol all cut or LLII slopos and approximate finiah floor elovationr lor a11 stNCtUIe0 and ahow elWationS at to rCA10 shainq loution SASO, and J .t( J / a11 tornor*- I=. 1021bl7. tdicate distance r- onter-liru of str& or alley to proporty line and distance lra curh to proporty Uno. Soc. IOZ(b)7 ?lans. rp.cifications and calculations ahall anpinoor or architect. (California ~us.i?rss Md Profesaions Code) b. 1ign.d by 4 CalifOMia Stat. 1i-d 0. CtRY PROTfZTIOl ItaXls closrr thn I foot to pmporty litus ahall bo one-hour fire-rated conatruetion, Iuvr no openinga, and shall h.vo 30 inch 1,000 quare feet on my floor. Ihble I-A Projoctions. including eavei, ky not utend more thu 12 inchma into the 3 foot secb.dc from tho property line. See. 1710 and Soc. SOl(b) , Projoctfons. including eavos.rh.11 bo oao- hour fir-reairtiva construction, huvy timbor or of non-combustible material if they project into the 1' setback area fm the property line. Soc. 1710 Show location of pxmanently vired &oh )r. detector. See. 1210 c. RO(YI SIZES, LIGKT. mxuz~oris AND wrHo parJp0tS when th0 building floor aru UC..d. .J S.C. 1709(.1 .. 9- Ono room aut contain a minimum of 1SO square leot of superliefa1 floor area. kc. 1207(bI Aabitable rOo(11, other than kitchens, sh.11 contain at least 70 square feet of floor area. See. 1207tb) window area aust k at least 1/10 of the floor area and a minimum of 10 square feet per See. 12071 1. Appears to be defleiont in sPna43. 6R*2. f u( d/ 0 nablo windw.area rust.be 1/20 of the fEor area and a minimum of s square feet. In bathroou. laundry rooms and similar rooms. Minimum is 1.) sq.ft. ISec.12OSla) One-half of all roquired window area wit be opmnrble in U-L -7 , , BE ?rovide mchanlcal ventilation capable ol providinq five air changes pw hour In hthroora, water closet cmpart~nts, laundry rooms and similar r- 11 requlred windas are not providrd. See. 110S1a) No habitable I-. other than # kitchen, aha11 bo leaa than 7'0' In any dlmnsion. Ire. 1207IcJ Shoo that Ceiling heiqht for habitable rooma la a minirur of 7.6.. / see. lq7(a) f ! 'b .. ... : ,; '; . .I .. . Show ceiling height for laundry rooms, hallvays. corridors, and bathrooms is a minimum of 7'0". Sec. 1207(a) compartments and 24' clearance in front of vater cloaet. Sac. 1711tb) 5. No cooking room shall be used for sleeping purpose., unlesa complying as an efficiency living unit. Sec. 1208 locations such as glass doors, glazing adjacent to such doors and glazing adjacent :o walking surfaces. Sec. 5406 (including window.) shall be tempered, laminated or approved plastic. Sec. 1711 (f)(g) Sleeping roona ShAfl have a window or exterior door for emergency exit. height shall not exceed 44 The window must have an openable area Of at least 5.7 square feet with the minimum openable vidth 20' and the minimum openable height 24'. Sec. 1204 a required yard more than 2 inches for each foot of yard width if required windows open into the yard. Soc. 1206(d) 0. A mezzanine is an intermediate floor and may not have a floor area exceeding 33 1/3 percent of the total floor area in the room below, and the mezzanine floor must have a clear height of 7 feet, above and belov,and must have 65.B of the long side open to the room below. mezzanine floor and is, by Building Code 4. Provide 30" clear width for vater closet / 1 t6 / A* 1 1 . Specify safety 'glazing for glazing in hazardous 7. Glazing in shower and tub enclosures Sill above the froor. 9. Eaves &nd cornices may not project into 1. The loft you show does not comply as a / definition, a story D., EXITS, STAIRWAYS, AND RAILINGS 1 . Floors above the second story shall have not less than 2 exits. Sec. 3302(a) Required exit doorways shall be not less than 36' in vidth and not less than 6'4' in height, and shall be capable of opening at least 90 degree?. Provide 36' high protective railing for porches, balconies, and open sides of landing.. Maximum opening beeveen railings shall be lea. than 9'. Sec. 1716 Show how guardrail connection details are adequate to support 20 pounds per lineal foot at a right angle to the top rail. Table 234 Sac. 3303(e) Provide stairway and landing details. Sec. 3305(b) C (c) a. Maximum rise 8" and minimum run is 9'. b. Minimum head room ir 6'-6'. E. Minimum width ia 30'. 5f Handrails shall ratisfy the following: a. Provide handrail for stairways over 30" high when serving a single dwelling. Tftle 24. Sec. T25-22lb) nosing of tread.. Sec. 3305(j) have a space not less than 1 1/2' betweon the vall and the hSndrai1. The hand grip portLon of handrail shall be not less than 1 1/4' nor more than 2' in cross-sectional .dimension. Sec. 3305(j) (see attached) b. Handrail shall be 30' to 34' above the c. Handrail projecting from a wall shll . Every stairway landing shall have a dimension, measured in the direction of travel, at least equal to the stairnay vidth. Sec. 3305(g) A door may open over a stairway landing provided the door, in any position, does not reduce the clear area of the landing, in the direction of stairway travel, eo less than one-half the required vidth of the stairway. Sec. 3305fg) 3. A door may open inward at the top step of a stairway provided the top step is not more than 7 1/2" lover than the floor level. Sac. 3303(i)2 x d d / 4. Provide details of vinding stairway. a. Uinimum tread is 6 inches at any point and minimum 9 inches at a point 12 inches from the side of the stairway. b. Maximum rise is 9 inches. c. Minimum vidth is 30 inches. Sac. 3305(d) Provide spiral stairnay details: a. Minimum run is 7 1/2 inches at a point from vhere the tread is the narrovest. b. Maximum rise is 9 1/2 inches. (see attached) c. Minimum headroom is 6 feet 6 inches. Sac. 3305(f) (see attached) Sprial stairways may not be used for required 400 sq. ft. Sec. 3305(f) space of 26 inches beeveen the column and handrail. Sac. 3305(f) Provide I. C.B. 0. Reasearch Report and Number for metal stairway, or submit plans and calculations and approved fabricator registered vith the Building Department or note that the stairway fabrication shall be done under special inspection per the approved fabrication plans. Sec. 306(a)4B and Sec. 306(f) In buildings over 2 stories in height, provide 3/4 hour fire-rated assemblies for all openings in the exterior vall below or within 10 feet horizontally of an exterior stair- way. An exit balcony vith 2 separated stairways is exempt. Sec. 3305 the 3 foot setback from the property lines. Sac. 3305ln) sb- exits when the area served is greater than Spiral stairways must have a clear walking +- P Exterior stairways shall not project into The walls and soffits of the enclosed useable space under interior stairs shall be protected on the enclosed side AS required for one-hour fire-resistive construction. Sec. 3305(m) Xinimum construction specifications shall be made a part of the approved plans. (See attached) d J C. ROOFING Specify roof pitch. Roof pitch is not adequate for roof type specified. Specify minimum pitch of Specify roof material and application. Specify I.C.B.O. approval number for roof materials not covered in UBC. Specify roof slope for drainage or design to support accumulated water. Sec. 3207(a) Show roof drains and overflow.. See. 3207(a) Provide skylight details to show compliance with Sections 3401 and 5207 or provide ICE0 approval number. Provide plastic roof panel details to show compliance with Section 5206 or provide IC80 number. Show attic ventilation. Uinisum vent area is 1/150 of attic area or 1/300 of attice area if at least 5Ot of the required vent is at least 3 feet above ceiling joists. Sec. 3205(c) 8. WONRY #- Provide- fireplace construction details or note construction to be per attached fireplace standard drawing. Sac. 3707 Show 1 3/8* solid core relf-closing door for openinga between garage and dwelling. Sec. 503(d) . Garages are not permitted to open into '+ a room used for sleeping purposes. Sec. 1104 Openings between carport and residence require self-closing doors And stationary 9- window.. Sec. 1214 . Show garage framing section, size of header over garage opening, lateral cross bracing at place line and method of bracing garage front. Chapter 23 NOTE: Minimum plywood diaphragm ratio is 3 1/2 to 1 or 2'8'. Table 24-1 6. Doors between dwellings and attached garages may swing in either direction provided the difference in floor elevation between the dwelling and garage does not exceed 7 1/2 inches And provided the door is not used as the primary means of egress from the. building. . If the difference in floor elevation exceeds 7 1/2 inches, or if the door is used as the primary means of egress from the building, additional steps or landing must be provided in accordance with stairway requirements, and the door must not swing over the depressed level. (see 3303(i)2 and 3305 (9). Provide 18' raised platforms for any FAU, water heater. or any other device which may generate a flame or spark. shall be installed behind raised platform(s) prior to framing platform. 19f J J 104. Note that Continuous fire wall protection 1. WONOATION REOUIRenENTS 119. Show veneer support and connections comply with Sec. 3002. 4.5.6. and Sac. 2516(a) regarding ties and #9 wire in horizontal joints or note construction to be perattached sheets 30-1 or 30-2. Show height and construction details of a11 masonry walls. Chapter 24 Note that cleanout openings shall bc'provided at the bottom of all cells to be grout filled over 4' in a single pour. Cleanout shall be sealed before grouting, after inspection. Sac. 2415 Show floor and roof connections to masonry walls. Connection shall resist 200 pounds per lineal foot or the actual design load, \ whichever is greater. Sac. 2310 t- 0 123. Provide material specif ications for mortar, grout, masonry and reinforcing steel. Sec. 2403 \ 3 124. Show how masonry house walls retaining earth are to be waterproofed. Provide detail. Note that special inspection of the msonry will be required for G. GAUGE AND CARPORTS .Garage requires one-hour fire protection . on the garage side of walls and ceilings common to the dwelling. Table 5-8 Sec.S03(b) .All elements supporting floor Above garage to have one-hour fire-resistive protection on the garage side. Sec. 503. Beams and posts, not within tho wall or ceiling con- struction, must comply with UBC, Table 43-A. be minimum 6' dimension beem and minimuu 2 Note on plans that"& soils engineer shall eva4uate any unanticipated uncompacted fill or expansive soil or other soi: problems disclosed during construction". Sec.306(a)12. Submit soils classification determination by a licensed engineer or architect .based on observation, tests, borinqs, or excavations, and containing comments on the degree of expansiveness, compressibility and bearing value. Sac. 2905 Note on the plan the soils classification, whether or not the soil is expansive, and note the allowable bearing value. Sec. 2905 The foundation plan does not comply with the soil report recommendation for this project Provide notes on the foundation plan listing the soils report recommendations for foundations. slab And building pad preparation. Note on the foundation plan that "Prior to the Contractor requesting a Building Department foundation inspection, the soils engineer shall advise the Building Official in writing that: 1. the building pad was prepared in accor- dance with the soils report: 2. the utility trenches have been properly backfilled and compacted, And: 3. the foundation excavations, forming and reinforcement comply with the soils report and approved plan.' Provide spread footings for concentrated lOAdS designed for 1,000 PSF soil bearing or per bearing value as determined by an engineer or architect. Chapter 29 Show height of a11 foundation walls. Chaptor 23 Shov height of retained earth on a11 foundation walls. Chapter 23 Show distance of foundation to edge of cut or fill slopea and shov steepnass and heights of cuts and fills. Chapter 29 Note on plans that vood shall be 6' above finish grade. Soc. 2417(c) 7. Note on plans that surface water vi11 drain away from building and shov drainage pattorn and key elevations. Sec. 2905(f) Dimension foundation per Table 29A. TABLE NO. 29-A-FOUNOATIONS FOR STUO BEARING WAUS-MINIMUM REQUIREMENTS TNIMNLSS OF FOUWOATION WALL WUYIER OF STOlltS WIOTN OF foonm (Iachosl TnlCXNEn Of fOOTlNc (IDCIeIJ om OF IOUNDATIOW IELOW WANIM SURIACL Of CIOUNO 12 IS 18 6 7 a 12 18 24 1 I I I I I 1 SOTES: foenrhclons shnll be u required in Sect1011 2907(a). top of the fODliIIR . Whe? uusd mmditionq.or fmrt c+itiau arc found. footings and The mound under the door may be excavated 10 ;he elevation of the Shov foundation sills to be pressure treated. or equal. Sec. 2517(c) 3. Shov foundation bolt size and spacing. Sec. 2907ce) Specify size, ICBO number and manufacturer of pove: driven pins. Show edge and end distance and spacing. Sec, 306(f) Shov size, imbedinant and location of hold dovn anchors on foundation plan. Sac. 2312tf) Note on plan that hold dovn anchors must be tied in place prior to foundation inspection. Sac. 2312(f) Show adequate footings under all shear Malls. Sec. 231l(e) Show stepped footings for slopes steeper than 1:lO. Soc. 2907(c) Show minimum 18' clearance from grade to bottom of floor joists and minimum 12' clearance to bottom of girders. Sec. 2517 Show pier size, spacing and depth into undisturbed soil. Table 29-A Shov minimum under floor access of L8"x 24'. Sac. 2517 Shov minimum under floor ventilation equal to 1 1/2 sq. ft. for each 25 lineal feet of exterior foundation vith openings as cloae to corners aa practicable to provide cross ventilation on at least tvo approximate- Ly opposite sides. Sec. 2517 Show a11 joiats, rafters, beams, and poats Fir-Larch or better. All poats and beams 5' and thicker shall be No. 1 Grade Douglas Fir-Larch or better. (Table 25-A-1) Shov wall bracing. Every exterior wood stud wall and main croas partition shall be braced at each end and at least every 25 feat of length vith 1x4 diagonal let-in brace or equivalent. Sec. 2518(gl5 r 2" to 4. thick to be No. 2 Grade Douglas Not. C:OSS bridging or blocking. ?loor joists and rafters more than 12' in depth and spanning more than 8 feet shall be supported laterally by bridging at intervals not exceeding 8 feet. Sec. 2506(g) Show blocking at ends and at supports of floor joists. and for rafters at exterior walls. Sec. 2506(q) Show solid blocking at ridge line and at exterior walls on trussed roofs. Soc. 2506lg) Show double joists. Floor joists shall be doubled under baariaq partitions running parallal with the joists. Sec. 25181d) 5 Show rafter ties. Rafter ties shall bo spaced not more than 4 feet on centor where raftorr and ceiling joists are not parallel. Sec. 251E(h) Show rafter purlin braces to be not less than 45 de rear to the horizontal. Sac. ~518(9) Show 1/2" minimum clearance betveen top plate of interior partitions and bottom chord of trusses. (To ensure loading will be as designed.) Show double top plate with minimum 48' lap splice. Sac. 2518tq14 ' Show nailing will be in compliance vith Table 25-P. Provide fire stops between stories, botmoon top story and roof space, at ceilings and floor levels in interior and exterior valls, in mansard roof or eyebrow so no concealed or furred space is greater than IO' horizontally or vertically, between stair stringers at top and bottom and betveen studs along and in line vith stair run adjoining stud valls and partitions, at perimeter ol sliding door pockets, betveen chimney and wood frame using metal or incombustibles for the fire stop and at other places that could afford passage of flame. Sec. 2517(f) Shov stud size and spacing. .\taximum allow- able stud heights: 2"x4"9 16" is 14': 3'x4'&tnx6'@ 16"o.c. is 20'. Sec. 2518Ig)2 Note an A.I.T.C. Certificate of Compliance for glued laminated vood members shall be given to the Building Inspeczor prior to ereczion. Sec. 306(f) Detail a11 post to beam and post to footing connections. Sec. 2517(c) 4 Specify nail size and spacing for all shear valls, floor and roof diaphragms. Indicate required blocking. Maintain maximum diaphragm dimension ratios. (Tables I,J,FI. Show 3.~4' or 2"x6' studs in first story of three story building. Sec. 2518(f) Provide trusa details and truss calculation8. Provide roof framing plan. Sac. 302(a17 Provide framing sections through Section 302fa) 7 Specify all header sizes for opening over 4' wide. Sec. 2518(g) 7 Provide calculationa for Section 302la) 7 In area. subject to water splash and in exterior locations, wood columns and poata shall be supported by piers projecting at leaat 2' above the finished gr8de and shall bear on a metal base plate or treated vood unleas tho columns or posts are foun- dation grade redwood or cedar. Sec. 2517(Cl4 -.-. . 'e. . .. I. .C .' Shw location of attic access with minimun size 22' x 30'. Sec. 320s . Shw draft separation for attic areas in excess of 3,000 sq.ft. See. 3205 Shw draft separation.for space between dropped ceilings and floor above in excess of 1,000 sq.ft. See. 2517 ficarion index. Table 25-5 ridge as a beam. Sac. 2518 (h) I, . Specify plyvood grade and panel indenti- . when roof pitch is less than 3:12, design . Wood shear walls shall not b. used to resist horizontal forces contributed by masonry in buildings over one story in height. Sec. 2S16tb) board and gypsum wallboard shall not be used in vertical diaphragms to resist forces imposed by masonry or concrete construction. Table 47-1 . If cripple wall studs are less than 14". framing shall be solid blocking. S.e.2518(g16 Cripple vall studs exceeding 4 €eet in height shall be 3 inch by 4 inch or 2 inches by 6 inches when supporting 2 stories. Sac. 2518(q)6 or other weather exposed areas, is exterior grade. Sac. 2517(g) 3 line on all exterior stud valls to be stuccoed. Sec. 4706(e) Provide an approved waterproof building paper under wood siding. Sac. 1701(a) Specify an approved flashing for exterior openings and parapet walls. Sec. 3208 Y Gypsum lath and plaster, gypsum sheathing access. least one size larger than supported rafters. Sac. 2518(h) 3 and rafters. . Ridges, hips, and valleys shall be at 9. Provide weal straps across ridge beam J. MECHANICAL All heating, ventilating, and cooling systems and appliances shall comply with the Uniform Me anical Code. Show the size, location and type of a11 heating and cooling appliances or systems. . Show source of combustion air for furnace will comply vith Chaper 6. U.H.C. . Every dwellinq unit shall be provided with heating facilities capable of maintain- ing a room temperature of 70. F. at 3 feet above the floor in all habitable rooms. Shov basis for compliance. UBC Sec. 1211 3. Show minimum 30' deep unobstructed working space in front of furnace. 2d Note on olans.clearances to be F # 3 wr manufac- Show access to the attic or under floor furnace to ba minimum 30 inchea by 30 inches. Sec. 708 5 709 UUC Note that passagevay to :he attic furnace shall be unobstructed and have continuous solid floorinq not Less than 24 inches wide. Sec 708 UUC . Show permanent electrical outlet and lighting fixture controlled by a witch for the attic furnace. Sec. 708 UHC . Shov details to comply with Sec:ion '109 for furnace under the floor, Section 708 for attic furnace. or Section 710 for roof or outside furnace. Note on plan, gas vents and non-combustible piping passing through three floors or less shall be effectively draft stopped at each floor or ceiling. UBC Sac. 1706(aJ6 K. ELECFRICAL (National EIectrical Code) All wiring shall comply vith the National Electrical Code. . Note on the plan the amperage of electrical 9 service. . If the electrical installation is more 9 can 200 amperes. show panel location and Provide a single line diagram and load calculations including: a. Wiring method employed. b. Sizes of all conductors, switcher, circuit breakers. fuses, and conduits. E. Approximate length of service feeders. d. Provide plot plan showing services, all panel locations, circuit arrangement and load distribution on panel busses. e. Provide typical panel schedule(s1. Dwellings require minimum 100 amp service. Show location of all alectricaL receptacle$. spacing is not adequate in #. Electrical receptacle locations and/or . At least one receptacle shall be installed outdoors, in basements and attached garaqes, other than laundry OuthtS. Art. 210-25(b) Show minimum dwelling~lighting (NEC 7 Art. 210-26(aJ and GFI'S in garage, baths and outdoors. NEC Art. 2LO-B(aI. fl Art. 250-81 . Note 'UFER' ground to be provided (NEC). 9. /- turers listing. Sac. 704 UUC - - L. PLUUBING (Uniform Plumbinq Code) All plumbing shall comply with the Unifrom ing Code. Shov water heater size, type and location on plans. #. Show method of providing combustion air to fuel burning water heater. Sec. 1307 Fuel combustion water heater shall not be installed in bath or bedroom or in a closet opening into bath or bedroom. Sac. 1309 4. Provide adequate barrier to protect water heater from vehicle damage. Sec. 1310 - 2/5. Furnace shall not be installed under any fl rtairuay. Sec. 704 Urn: #. Furnace shall not be inStAl1ed in any bedroom. bathroom, closet, or in confined space with access only through such room, unless specified as direct vent appliance, enclosed furnace or electric heating appliance. Sac. 704 UUC 244. Shw ICBO approval for prefab fireplace and provide approved installation instructions at job site. 9. ldr. Show T and P valve on water heater and show route of discharge line co exterior Sec. 1007(e) Provide dryer vent to outside. UUC Sac. 1903 Note on che plan that hose bibbs and lawn sprinkler systems shall have approved backflow prevention devices. See. 1003 Shower stall shall accomodate a 30'circle and have a minimum floor area of 900 sq.in. UPC 9091d) .. 281. p uc- .w [st :NsUZAtTON I DUPtUtfll 3ha JetarlS Of duplex COmon iPartY1 and !:oor;:eilrno JSsumOkiaB EO ACniaV. 3 sound :ranamission <:ass (STC] racin9 in ...lis of 50 rl.eiblds ~n8 Jn CmWet tnnulacron class I I~CI racing on tlmr. csrLrng of $0 lircables. shav nor pnmuaeron of A~~~~ILss Cor prpinq. 0Lmrtol dovtas. roc*ss.d eLn*Cs* ~.~~cuEs. soffits. or heacinp v~t~Lac~m(* oc insular& co aULntau r.qurr.d sound eran~rasron rarinq. TtCl* 25 Prardo tnsularron in walls md cerl~~ ~rvinq. ~r.4 it qaraqo us. IS nor eontrnl1.d by rmordenc t1Cl.e 2s. TiC1* 25 ..IUUSL duerr sna~~ br sma1.d. L~n.d* to Ami- of 50 br- qu.9. and PRRCI CWSERVATXONK ?!U- Red NOW Stat. J4andAt.d R.gUlAtiM0 (Calif. -in. Code) kcam affectiva June 16, 1983 and require Uuc tho design satisfy one of the alternatfvr A. 8. C. 1. 2. 3. 4 and AB 163). Tho law A~SO requires that many M~.~OY consdvacion items be ratistid. enerqy p.ckag~S (See JCtaChed p.Cl.9- la in 20- . Copies of tlte Resfdonti81 horgy Conservation Ranucrl suy bo obuinod from: Publications Unit. California tnerqy Coamission. 1111 How Ave. ICI-50, Sacramento. California 9582s. (Tal. (9161 920-621611. California Buildlaq Officials also maintain A telephone 'hoeline' ktuomn 10100 I.& and moon and 1zOO P.H. to 4100 P.H. at 0161 456-3823. the alternativm ensrpy padugm that 4, or A. 163 to shou corplianee. and provide ealculationo urd other dau, appropriate to that sel.c+ed p.c'u90. the responsible designer should 'The design submitted sUb828ntially eonforms to the Energy Requlatione for Aesidmntial Buildings'. Show the *R* value for the wlls and wt8 that the insulation used shall comply with California QUAlity Standarda. Note the insulation installer shall post a signed certificate, in a canspiciau place in the building, s.tating the insulation coaplios with Title 24, Chapter 2-53 and title 20, Chapter 2, Subchapter 4. Article 3. Note doors And windows. including skyligM8. ktwoan conditionod and non-conditioned sp~ee shall be fully weatharstrippd. Note on the framing plan that wather- stripping. crulkinq or sealants must be usod to limit filtration in the burldinp onvolope at the following loeationor htrrior joints around window8 and door frames: betweon wall sola platas and floors. and ~~.fwaon exc~cloc wall pAneIs; pen.rrarions in walls. coiling., and AS lines: openings in attie f1ooc.r and ~ll ocher opening. in the buildiq enve 1 ow. Note chat doors and windows to be corrifiod and l~oalrd A. complying with the Ulrrpl Regulations. Mote fans oxhaustinp air to have back draft dupers. ShW On the title Sh-t Of the plM01 US S.1OCt.d i.S. AI Be Ce 1, 2. 3, A SCACOMOnC, On the Plan title sh-tr Ceiling and ra1Jt.d AI.... floors for plwbrng, electricity. and 4 +a- +. Note a~ tho oxterior wall Ciroplaa 'tir-plaee tT~ve minim- SIX spuaro inches of Outside air: to have qlass or wtsl door eoverrng the ontire oponiw of the Cfroboxr to have tight-fitting daaper with readily accessible control and should not have a continuous burainq piloc light.. Note ducts shall comply with Chapter 10, 1976 Urn: and Shall b. tightly Se8l.d with UStiC or taw. Note at the water heater loeatian Ontor heatar to have wrap of R-12 external insulation'. Note. whore water heator is in uncwrditioad apace. the first fiw feet of oucl~t pip. to have 1-3 wrap. Note ill olrculatinq hot water piwe in unconditioned sp8C.8 shall k insulaub. Note thst all qas fir& haating and cooling appliances. showrs and taunts shall caply with the tnergy Cffichny Standard.. Sha. at bath and kitchen, that the general liqhtinq shall have an efficiuy of not less than 25 lwns per watt i.0. florescent. Note that lexcopc heat pumps) shall have an aut-* themostat with uchaniu which un b. manually program4 eo automatically set back the thermostat set points for at least two poriods within 14 hours. Shw tho size. typa and location of the space heating lor cooling) rystr and provide enerqy ulculations it a oufput OTU/Hr. axcoeds 4S.000 Unrflrr. output. ~OU ulu .d l0d.i for MU .al UC.~ beor arm on Stat0 J- lis& Ourdoor pools YLU~ Losarl Cue1 hwtors rsqurro pool awrs AS ull A0 oaer onerpy ravraq dovtcms sue AS CL.. cL#&s. ~LC. ft0-L 406 wxsamms Show A minimum 7' air space and flashing between planter md buildinp walls. See. tSl7(eJ Specify material to be used under ehe shower tile. See. 1707(a) Specify lath and plrrtar to comply with Chapter 47, uac. Tvo 3/4' copper pipea must be installed from water heater location to convaniant location of futura solar' panels (City Ord.) Provide sleeves (:oaf jacks) in roof for two future 3/4* copper piper ta cunvsnient Location of future solar panels (City Ord.1 Note :hat solar water pipinq is to be inrulated in aroas that ace aot hoaeed or coolad. (City Ord.) haatinq or cooling systao . 0 Building plans aro rubstantrally correct and coaplate. BY: 0 Buildinq plans require major correetions and cocnplete plan rachack. by plan chock onpineor, is required. . BY1 0.t. I you have any quostions regarding this plan cheek, please call at you. at no ch?rqe. ii additional aesistance Ws wuld AI80 be pleasod to mot rith neoded. .. BUILDING PORTION Date : Jurisdiction dm uo32Q BUILDING AREA VALUATION VALUE Prepa ed by: -la Commercial Residential - Res. or Corn. Fire Sprinklers VALUATION AND PLAN CHECK FEE @ @ @ ’. 0 Bldg. Dept. 0 Esgil PLAN CHEW NO. B5776 -r BUILDING ADDRESS 175) BgOC4Fe* APPLICANT/CONTAC T 3#15 PHONE NO. 7.9 3965- BUILDING OCCUPANCY /2-3, DESIGNER PHONE TYPE OF CONSTRUCTION UAf CONTRACTOR PHONE Air Conditioning 1 I I I I Total Value I r/6/ / 8/8 Fee Adjusted To Reflect OEnergy Regulations (Fee x 1.1) OHandicapped Regulations (Fee x 1.065) Building Permit Fee $ 5-s&3. O0 s Plan Check Fee $ 38z’Zo $ COMMENTS; 8/4/02 - PLAN CHECK NUMBER /75/ &$&(e/ Ed OATE - TYPE OF STRUCTURE .s'Fd - ZONE: w3 1 P LA" I NG : 5: 8% 2 CCFWENTS: 3 --- ' !$ 0 a REDEVELOPMNT ATFZOVAL REQUIRE --a A w 0 Id- i a= gz up: 63 LANDSCAPE PLAN COMMENTS: I ADDITlOPlRL COlYMENTS: .. I /KD/ - E.D.U: .- -- EASEMENTS: ADD IT I ONAL COMMENTS : YII - ua O"' ua OK TO ISSUE: DATE : /d/di. &- - * ENGINEERING INSPE _I-- PUBLIC FORKS INSPECTOR: -- - FINAL OK: DATE: * IF THIS ITEM IS NOT CHECKED, BUILDING DEPARVIENT MILL MAKE ALL INSPECTiONS (DRIVEWAYS, CURB CUT, DRAINAGE, ETC.) . bRIAN ShITh ENGINEERS, INC. Client: B.A. WORTHING, XNC. SHEET Carlsbad, CA 92008 Carlsbad, CA 92008 OF 2656 State Street I?. 0. Box 1041 1 24 gA- / &f w’ Job No. 5889 March 12, 1385 E. Brian Smith RCE 13817 EhS:rai Structural calculations for a proposed residence - Bruce Road #3 5- (3.14 r-= 4244 v =/ y= 34 27.3 = s/p / 0 \= 6 24- c I I I I I ll I 30' l3 SHEET OF I4 24 TYPES OF SHEATHING A --- 1 x DIAG SHEAThING @ (4) (8)d @ BOUNDARIES UBC SEC. 2514 b 1/2" DRYWALL WITH 5d COOLER NAILS @ 7" O.C. EDGES AND 45' w/ (3) 8d NAILS ALONG STUDS 100. #/l. A --- FIELD (TABLE 47-1 UBC) A --- 5/8" DRYWALL WITH 6d COOLER NAILS @ 7" O.C. EDGES AND FIELD (TABLE 47-1 UBC) 100. #/l. A --- 1/2" DRYWALL WITH 5d COOLER NAILS @ 4'' O.C. EDGES AND FIELD (TABLE 47-1 UBC) 125. #/l. 5/8" DRYWALL WITH 6d COOLER NAILS @ 4" O.C. EDGES AND FIELD (TABLE 47-1 UBC) 125. #/l. A --- 1/2" BLOCKED DRYWALL WITH 5d COOLER NAILS @ 4'' 0.C. EDGES C FIELD (TABLE 47-1 UBC) 150. #/1. A --- 5/8" BLOCKED DRYWALL WITH 6d COOLER NAILS @ 4" O.C. EDGES & FIELD (TABLE 47-1 UBC) 175. #/1. A --- 7/8" STUCCO OVER PAPER BACKED LATH w/16 GAUGE STAPLES AT 6" O.C. AT TOP 6 BOTTOM PLATES, EDGE OF SHEAR WALL AND ON FIELD (ICBO REPORT NO. 1823, MAY 1972) OR (ICBO REPORT NO. 1318, FEBRUARY 1973) - 180. #/l. A --- 7/8" STUCCO OVER PAPER BACKED LATH w/16 GAUGE STAPLES AT 3" O.C. AT TOP & BOTTOM PLATES, EDGE OF SHEAR WALL AND 6" O.C,. ON FIELD (ICBO REPORT NO. 1823, MAY 1972) OR (ICE0 REPORT NO. 1318, FEBR. 1973)180.#/1. Q __- 3/8" STRUCTURAL I PLYWOOD WITH 8d NAILS AT 6" 0.C. AT EDGES & 12" O.C. FIELD (TABLE 25K UBC) 276. #/1. Q __- 3/8" STRUCTURAL I PLYWOOD WITH 8d NAILS AT 4" O.C. AT EDGES & 12" O.C. FIELD (TABLE 25K UBC) 432.#/1. Q _-- 3/8" STRUCTURAL I PLYWOOD WITH 8d NAILS AT 3" O.C. AT EDGES & 12" O.C. FIELD (TABLE 25K UBC) 552. #/l. A --- 3/8" STRUCTURAL I PLYWOOD WITH 8d NAILS AT 2" 0.C. AT EDGES & 12" O.C. FIELD (TABLE 25K UBC) 732. #/l. Q -__ STRUCTURAL PLYWOOD WITH d NAILS AT O.C. AT EDGES & 12" O.C. FIELD REQUIRES MIN. 3" NOMINAL FRAMING MEMBERS (TABLE 25K UBC) ci .--- 1: - I- @!- G D 1 p1W M -. - r .. Isp.7' v- - G;Z~ U 24 c I RICHARD J. TOAL. RCE 14505 RAYMOND R. TOAL. RCE 16880 OLAV 9. MEUM L.S. 4384 TOAL ENGINEERING CIVIL ENOINEERS, LAND PLANNERS AND LAND SURVEYORS 130 AVENIDA NAVARRO SAN CLEMENTE. CALIFORNIA 92672 PHONE (714) 492-8586 P.O. BOX 3878 MAILING ADDRESS P.O. BOX 3878 SAN CLEMENTE, CALIFORNIA 92672 December 3, 1985 City of Carlsbad 1200 Elm Avenue Carlsbad, CA 92008 Attention: City Engineer Subject: Rough Grade Certification Project 2.8531 Drawing No. 258-4 JN 4938 Gentlemen: Please be advised that. Lots 3, 7 & 8 being graded as part of the subject project have been graded in substantial compliance with the approved grading plan. Veg truly yours, uR&ymond R. Toal RRT:bb REPORT OF GEOTECHNICAL INVESTIGATION . LOTS 3 AND 6-8, MAP 10870 BRUCE ROAD AND PARK DRIVE CARLSBAD, CALIFORNIA PREPARED FOR : B. A. Worthing Port Office Box 1041 Carl sbad, Cal i fornia I PREPARED BY: Southern California Soil & Testing, Inc. Post Office Box 20627 6280 Riverdal e Street San Diego, Cal i fornia 92120 r '. "- , SOUTHERN CALIFORNIA SOIL AND TESTING. INC . 6290 RIVERDALE ST. SAN DIEQO. CALIF. 92120 TELE 290-4321 P.0. BOX 20627 SAN DIEGO. CALIF. 37.120 74-831 VELlE WAY PALM OEBERT. CALIF. 92260 TELE 346-1079 678 ENTERPRISE ST. EBCONDIDO, CALIF. 92025 TELE 746-4544 June 6, 1985 €3. A. Northing Post Office Box 1041 Carl sbad, California 92008 SCS&T a521118 Report No. 1 SUBJECT: Report of Gebtechnical Investigation, Lots 3 and 6-8, Map 10870, Bruce Road and Park Drive, Carlsbad, California. Gent1 emen : In accordance with your request we have completed a geotechnical investigation for the proposed project. We are presenting herewith our findings and recommendations. The findings of this study indicate that the site is suitable for the proposed development provided the recommendations presented in the attached report are complied with. If you have any questions after reviewing the findings and recommendations contained in the attached report, please do not hesitate to contact this office. This opportunity to be of professional service is sincerely appreciated. Respectfully submitted, . SOUTHERN CALIFORNIA SOIL & TESTING, INC. RRR:JRH:nr cc: (5) Submitted ( 1 ) SCS&T , Escondi do SOUTHERN CALIFORNIA SOIL AND TESTING. INC. TABLE OF CONTENTS PAGE Introduction and Project Description ...................................... 1 Project Scope ............................................................. 1 Findings .................................................................. 2 Site Description ...................................................... 2 General Geology and Subsurface Conditions ............................. 3 Geologic Setting and Soil Description ............................ 3 Tectonic Setting ................................................. 3 Geologic Hazards ................................................. 4 Groundwater ...................................................... 5 Recommendations and Conclusions. .......................................... 5 Site Preparation ...................................................... 5 General .......................................................... 5 Surface Drainage .................................................. Earthwork ........................................................ 6 Foundations ............................................................... 6 General .......................................................... 6 Settlement Characteristics ....................................... 6 Expansive Characteristics ........................................ 6 General .......................................................... 7 Backfill ......................................................... 7 Bearing Pressure ................................................. 7 Passive Pressure ................................................. 7 Active Pressure .................................................. 7 Limitations ............................................................... 8 Review, Observation and Testing ....................................... 8 Time Limitations ...................................................... 9 Professional Standard ................................................. 9 Retaining Walls ........................................................... 7 Factor of Safety ................................................. 8 Uniformity of Conditions .............................................. 8 Change in Scope ....................................................... 9 Client's Responsibility .............................................. 10 Field Explorations ....................................................... .O Laboratory Testing ....................................................... 10 ATTACHMENTS PLATES Plate 1 Plot Plan Plate 2 Subsurface Exploration Legend Plate 3-7 Trench Logs Plate 8 Direct Shear Test Results Maximum Density and Optimum Moisture Content APPEND I X Recommended Grading Specirication and Special Provisions SOUTHERN CALIFORNIA SOIL AND TESTING. INC. 6280 RIVERDALE ST. SAN DIEGO, CALIF. 92120 TELE 280-4321 P.O. BOX 20627 SAN DIEGO. CALIF. 91110 74-831 VELIE WAY PALM OEBERT. CALIF. 9~260 TELE 346-1076 678 ENTERPRISE ST. ESCONDIDO, CALIF. 92025 TBLE 746-4544 GEOTECHNICAL INVESTIGATION LOTS 3 AND 6-8, MAP 10870 BRUCE RAOD AND PARK DRIVE CARLSBAD, CALIFORNIA INTRODUCTION AND PROJECT DESCRIPTION This report presents the results of our geotechnical investigation for four proposed residences which are to be located near the intersection of Bruce Road Park Drive in the City of Carlsbad. It is our understanding that some additional grading is proposed to develop these sites but the maximum cuts and fills planned are generally in the order of 10 feet or less in height. The site configuration and exploration locations are shown on Plate No. 1. PROJECT SCOPE This investigation consisted of: surface reconnaissance; subsurface explorations; obtaining representative disturbed and undisturbed samples; laboratory testing; analysis of the field and laboratory data; research of available geological literature pertaining to the site; and preparation of this report. Spec,ifically, the intent of this analysis was to: a) Explore the subsurface conditions to the depths influenced by the proposed constructidn. SOUTHERN CALIFORNIA SOIL AND TESTING, INC. . SCS&T 5521118 June 6, 1985 Page 2 Evaluate, by laboratory tests, the pertinent engineering properties of the various strata which will influence the development, including their bearing capacities, expansive characteristics and settlement potential. Define the general geology of the site including possible geologic hazards which could have an effect on the site development. Develop s'oi 1 engineering criteria for site grading. Determine potential construction difficulties and provide recommendations concerning these problems. Recommend an appropriate foundation system for the type of structures anticipated and develop soil engineering design criteria for the recommended foundation design. FINDINGS SITE DESCRIPTION The project site consists of four lots within an existing subdivision east of the intersection of Bruce Road and Park Drive in Carlsbad, California. Lot 3 is located on a west to east trending ridge with a level pad on the upper eastern portion of the lot which has been cut into the ridge. This site slopes steeply to the northwest, west and southwest with elevations ranging from approximately 50 feet to 90 feet (MSL). These slopes are in a natural condition and vegetation consists of heavy growth of native brush, plants and grasses. Lots 6, 7, and 8 consist of relatively level cut and fill pads bounded.by approximately 4 feet to 30 feet high moderately Steep, cut and fill slopes. Fill on these slopes ranges up to 7 feet high with a slope ratio on the order of approximately 2:l (horizontal to vertical). Elevations on these lots rang6 from 30 feet to 100 feet (MSL). , SCS&T 8521118 June 6, 1985 Page 3 GENERAL GEOLOGY AND SUBSURFACE CONDITIONS GEOLOGIC SETTING AND SOIL DESCRIPTION: The subject site is located in the Coastal Plains Physiographic Province of San Diego County and is underlain by materials of sedimentary origin and some artifical fill. Lot 3 has been cut into the Eocene Santiago Formation and associated topsoil which consists of tan, humid, dense, silty sandstone and up to 1 foot of brown, dry, loose silty sand respectively. Soil conditions as encountered in our explorations on Lots '6, 7 and 8 were approximately 3 to 7 feet of artificial fill consisting of brown to dark gray brown, humid to moist, loose to medium dense silty sand. The fill was generally underlain by a minimum of 4 feet of alluvium which consist of gray brown to dark gray brown, moist, medium dense silty sand. On Lot 8 this alluvium was underlain by a minimum of 2 feet of light tan, moist, medium dense very friable sand. On the lower northwest pad area of Lot 7, three feet of artifical fill was underlain by in excess of 7 feet of dark brown to gray brown alluvium which was moist, medium dense, clayey sand. TECTONIC SETTING: No evidence of faulting was noted during our surface reconnaissance or in our exploratory trenches. A review of available geologic literature reveals the presence of numerous minor northeast trending faults in the Carlsbad vicinity of the site that are presently classified as inactiye. The project site is located approximately 6 miles east of the Rose Canyon Fault Zone. The Rose Canyon Fault Zone is a series of northwest trending faults of Quaternary as potentially active, rather than active according to the criteria of the California Division of Mines and Geology. This classification is based on the lack of the conclusive evidence to verify Holocene movement along this fault zone. age that is currently classified It should be recognized that by major, active fault zones The nearest of these are the miles to the northeast. much of Southern Cal ifornia is characterized that could possibly affect the subject site. Elsinore Fault Zone, located approximately 24 SCS&T 8521118 June 6, 1985 Page 4 GEOLOGIC HAZARDS The subject site can be ,considered to be relatively free of geologic hazards. Potential hazards such as tusnamis, seiches, liquefaction, or 1 andsl i di ng shoul d be consi dered to be negl i gi bl e or nonexis tent. The most likely major geologic hazard to affect the site is groundshaking as a result of movement'along one of .the major active fault zones mentioned previously. The maximum bedrock accelerations that would be attributed to portion of zed in the a maximum probable earthquake selected fault zones that cou fol 1 owing tab1 e. occurring along the nearest d affect the site are summar TABLE 1 Maximum Probable Maximum Bedrock Fault Zone Classification Distance Earthquake Accel era t i on Rose Canyon Potentially 6 miles 6.0 magnitude 0.359 El si nore Active 24 miles 7.3 magnitude 0.239 Active Based on the current fault zane classification, and the maximum bedrock accelerations capable of developing, it is recommended that the Coronado Banks, Elsinore or San Clemente Fault Zones be considered the design earthquake source for the subject development. Although a maximum probable earthquake along the La Nacion and/or Rose Canyon Fault Zones could conceivably produce ground motions considerably stronger than those that would be attributed to the major, active fault zones, it is our opinion that, due to the current classification of these local fault zones as potentially active rather than active, they should not be used as the design earthquake source for this project. SCS&T 8521118 June 6, 1985 Page 5 Construction in accordance with the minimum standards of the Uniform Building Code and the governing agencies should minimize potential damage due to groundsha ki ng. GROUNDWATER: No groundwater was encountered during our subsurface exploration and we do not anticipate any major groundwater related problems, either during or after construction. However, it should be recognized that minor groundwater seepage problems may occur after devel opement of a site- even where none were present before development. These are usually minor phenomena and are often the result of an alteration of the permeability charcteristics of the soil , an alteration in drainage patterns and an increase in irrigation water. Based on the permeability characteristics of the soil and anticipated usage of the development, it is our opinion that any seepage problems which may occur will be minor in extent. It is further our opinion that these problems can be most effectively corrected on an individual basis if and when they develop. RECOMMENDATIONS AND CONCLUSIONS SITE PREPARATION GENERAL: We recommend that the existing fill and loose native soils be removed to firm natpral ground and be stockpiled for future use. Firm natural gournd is defined as native soil which possesses an in-situ density equal to or greater 85% of its maximum dry density. The soils exposed at the base of these excavations should then be scarified 12 inches, be moisture treated to at least 2% over optimum and densified to a minimum of 90% relative compaction. The stockpiled soils may then be replaced in eight inch lifts, moisture conditioned and compacted as indicated above. The horizontal limits of these recommendations should include the area within a perimeter of 10 feet outside of each proposed structure and all areas to receive additional fill and all slopes. Based on the findings of this study, it is anticipated that the maximum depth of removal and recompaction will be on the order of seven feet. , SCS&T 8521118 June 6, 1985 Page 6 SURFACE DRAINAGE: We recommend that a1 1 surface drainage be directed away from the proposed structures and that ponding of water not be allowed adjacent to the building foundations. It is further recommended that drainage not be allowed to flow over the top of slopes. EARTHWORK: A1 1 earthwork and grading contemplated for site preparation should be accomplished in accordance with the attached Recommended Grading Specifications and Special Provisions. All special site preparation recommendations presented in the sections above will supersede those in the standard Recommended Grading Specifications. All embankments, structural fill and fill should be compacted to at least 90% relative compaction at or slightly over optimum moisture content. Utility trench backfill within five feet of the proposed structures and beneath asphalt pavements should be compacted to a minimum of 90% of its maximum dry density. The maximum dry density of each soil type should be determined in accordance with A.S.T.M. Test Method D-1557-78, Method A or C. FOUNDATIONS GENERAL: It is our opinion that the proposed building may be supported by shallow spread footings. All footings should be founded at least 12 or 18 inches below lowest adjacent finished grade for one or two story structures, respectively. All footings should possess a minimum width of 12 inches. An allowable soil bearing pressure of 2000 psf may be used for foundation design. We further recommend that all continuous footings :be reinforced with at least one No. 4 bar top and bottom. SETTLEMENT CHARACTERISTICS: The anticipated total and/or differential settlements for the proposed structure may be considered to be within tolerable limits provided the recommendations presented in this report are fol 1 owed. EXPANSIVE CHARACTERISTICS: The prevailing foundation soils were found to be nondertimentally expansive and will not require special consideration and/or design. SCS&T 8521118 June 6, 1985 Page 7 RETAINING WALLS GENERAL: It is our understanding that the retaining walls planned for the site will be of masonry construction and that they will have a maximum height on the order of 6 feet. All walls should have adequate weep holes or a subdrain system to prevent a building of hydrostatic pressure behind the wall. BACKFILL: All backfill soils should be compacted to at least 90% relative compaction. Expansive or clayey soils should not be used for backfill material. The wall should not be backfilled until the masonry has reached an adequate' strength. BEARING PRESSURE: The foundation for the proposed walls may consist of spread footings founded in the native soils or compacted fill. Footings should extend through any loose topsoils and fill or the topsoils and fill should be removed and be replaced as a compacted fill. Footings may be designed for an allowable bearing pressure as previously recommended. PASSIVE PRESSURE: The passive pressure for the prevailing soil conditions may be considered to be 350 pounds per square foot per foot of depth. This pressure may be increased one-third for seismic loading. The coefficient of friction for concrete to soil may be assumed to be 0.55 for the resistance to lateral movement. When combining frictional and passive resistance, the latter should be reduced by one-third. ACTIVE PRESSURE: The active soil pressure for the design of earth retaining structures with level backfills may be assumed to be equivalent to the pressure of a fluid weighing 35 pounds per cubic foot for walls free to move at the top (unrestrained walls). For a 2:l backfill condition, this design pressure should be increased to 55 pcf. These pressures do not consider any surcharge other than the sloping backfill. If any are anticipated this office should be contacted for the necessary increase in soil pressure. SCS&T 8521118 June 6, 1985 Page 8 FACTOR OF SAFETY: The above values, with the exception of the allowable soil bearing pressure, do not include a factor of safety. Appropriate factors of safety should be incorporated into the design to prevent the walls from overturning and sliding. LIMITATIONS REVIEW, OBSERVATION AND TESTING The recommendations presented in this report are contingent upon our review of final plans and specifications. The 'soil engineer and engineering geolgist should review and verify the compliance of the final grading plan with this report and with Chapter 70 of the Uniform Building Code. It is recommended that Southern California Soil & Testing, Inc. be retained to provide continuous soil engineering services during the earthwork operations. This is to observe compliance with the design concepts, specifications or recommendations and to allow design changes in the event that subsurface conditions differ from those anticipated prior to start of construction. UNIFORMITY OF CONDITIONS I The recommendations and opinions expressed in this report reflect our best estimate of the project requirements based on an evaluation of the subsurface soil conditions encountered at the subsurface exploration locations and the assumption that the soil conditions do not deviate apprecjably from those encountered. It should be recognized that the performance of the foundations and/or cut and fill slopes may be influenced by undisclosed or unforseen variations in the soil conditions that may occur in the intermediate and unexplored areas. Any unusual conditions not covered in this report that may be encountered during site development should be brought to the atte-ntion of the soils engineer so that he may make modifications if necessary. c SCS&T 8521118 June 6, 1985 Page 9 CHANGE IN SCOPE This office should be advised of any changes in the project scope or proposed site grading so that it may be determined if the recommendations contained herein are appropriate. This should be verified in writing or modified by a written addendum. TIME LIMITATIONS The findings of this report are valid as of this date. Changes in the condition of a property can, however, occur with the passage of time, whether they be due to natural processes or the work of man on this or adjacent properties. In addition, changes in the State-of-the-Art and/or Government Codes may occur. Due to such changes, the findings of this report may be invalidated wholly or in part by changes beyond our control. Therefore, this report should not be relied upon after a period of two years without a review by us verifying the suitability of the conclusions and recommendations. PROFESSIONAL STANDARD In the performance of our professional services, we comply with that level of care and skill ordinarily exercised by members of our profession currently practicing, under similar conditions and in the same locality. The client recognizes that subsurface conditions may vary from those encountered at the locations where our borings, surveys, and explorations are made, and that our data, interpretations, and recommendations are based solely on the information obtained by us. We will be responsible for those data, interpretations, and recommendations, but shall not be responsible for the interpretations by others of the information developed. Our services consist of professional consul tation and observation only, and no warranty of any kind whatsoever, express or implied, is made or intended in connection with the work performed or to be performed by us, or by our proposal for consulting or other services, or by our furnishing of oral or written reports or findings. SCS&T 8521118 CLIENT'S RESPONSIBILITY June 6, 1985 Page 10 It is the responsibility of B. A. Worthing, or his representatives to ensure that the information and recommendatipns contained herein are brought to the attention of the engineer and architect for the project and incorporated into the project's plans and specifications. It is further his responsibility to take the necessary measures to insure that the contractor and his subcontractors carry out such recommendations during construction. FIELD EXPLORATIONS Five subsurface explorations were made at the locations indicated on the attached Plate Number 1 on May 24, 1985. These explorations consisted of trenches dug by means of a backhoe. The field work was conducted under the observation of our geology personnel. The explorations were carefully logged when made. These logs are presented on the following Plate Numbers 3 through 7. The soils are described in accordance with the Unified Soils Classification System as illustrated on the attached simplified chart on Plate 2. In addition, a verbal textural description, the wet color, the apparent moisture and the density or consistency are presented. The density of granular materials is given as either very loose, loose, medium dense, dense or very dense. The consistency of silts or clays are given as either very soft, soft, medium stiff, stiff, very stiff, or hard. Disturbed and "undisturbed" samples of typical and representative soils were obtained and returned to the laboratory for testing. LABORATORY TESTING Laboratory tests were performed in accordance with the generally accepted American Society for Testing and Materials (A.S.T.M.) test methods or suggested procedures. A brjef description of the .tests performed is presented bel ow: SCS&T 8521118 June 6, 1985 Page 11 a) MOISTURE-DENSITY: Field moisture content and dry density were determined for representative undisturbed samples obtained. This information was an aid to classification and permitted recognition of variations in material consistency with depth. The dry unit weight is determined in pounds per cubic foot, and the field moisture content is determined as a percentage of the soil's dry weight. The results are summarized in the trench 1 ogs. b) CLASSIFICATION: Field classifications were verified in the laboratory by visual examina.tion. The final soil classifications are in accordance with the Unified Soil C1 ass i f i ca ti on Sys tern . DIRECT SHEAR TESTS: Direct shear tests were performed to determine the failure envelope based on yield shear strength. The shear box was designed to accomodate a sample having diameters of 2.375 inches or 2.50 inches and a height of 1.0 inch. Samples were tested at different vertical loads and a saturated moisture content. The shear stress was applied at a constant rate of strain of approximately 0.05 inches per minute. The results of these tests are presented on attached Plate Number 8.' d) COMPACTION TEST: The maximum dry density and optimum moisture content of typical soils were determined in the laboratory in accordance with A.S.T.M. Standard Test D-1557-78, Method A. The results of these tests are presented on the attached Plate No. 8. LEGEND: ' TRENCH LOCATION I . .-. .. . . __ . .. 0 80 SCALE SOUTHERN CALlFORNlA 0 +>L> SOIL & TESTING, INC. 7- DATE 6-7-85 RRR DY lJoB No. 8 5 2 1 1 1 8 1 PLATE NO.l r E X P L. 0 RAT I 0 N By RRR JOB NO. 8521118 LEGEND 6-7-85 DATE Plate No. 2 UNIFIED SOIL CLASSIFICATION CHART SOIL DESCRIPTION GROUP SWOL nprcx :IA.WS 1. COhRSE GRAINED, More than half of materiAl is larqer than No. 200 sieve si:e. GX\VCLS CLEAN GRAVELS More than half of coarse fraction is larger than No. 4 sieve size but smaller than 3". GRAVELS WITII FINES (Appreciable amount of fines) s;Luos CLEAN -SANDS More than half of coarse fraction is smaller than No. 4 sieve size. SANDS WITH FINES (Appreciable amount of fines) 11. FINE GRAINED, More than half of material is smaller than No. 200 sieve size. SILTS AND CLAYS Liquid Limit less than 50 SILTS WD CLAYS Liquid Limit greater than 50 HIGHLY 0RGX:IIC SOILS I cw CP .CM CC sw SP SM sc NL CL OL MH CH OH PT Well graded sravels, gravel- sand mixtures, little or no fines. Poorly graded gravels, gravel sand mixtures, little OK no fines. Silty gravels, poorly graded gravel-sand-silt mixtures. Clayey gravels, poorly graded gravel-sand, clay mixturqs. Well graded sand,gtavelly sands, little or no fines. Poorly graded sands, gravelly sands. little or no fines. Silty sands, poorly graded sand and silt mixtures. Clayey sands, poorly graded sand and clay mixtures. , Inorganic silts and very fine sands, rock flour, sanCy silt or clayey-silt-sand mixtures with sliqht plast- icity Inorgnnic clays of 104 to medium plasticity,gravelly clays, sandy clays,silty clays, lean clays. Organic silts and organic silty clays of lw plasticity Inorganic silts, micaceous or diatomaceous fine sandy or silty soils, elastic silts. Inorganic clays of high plasticity, fat clays. Organic clays oE medium to high plasticity. Peat and other highly organic soils. ... * - Idater level at time of excavation or as indicated US - Undisturbed, driven ring sample or tGbe sarnple CK - Undisturbed chunk sarnple BG - Bulk sample SOUTHERN CALIFORNIA SOIL & TESTING, INC. l¶PFJO RIVERDALE BTAEET BAN DIEOO. CALIFORNIA DPlPO TRENCH NUMBER 1 ELEVATION - u 0 DESCR lPTlO N Brown, SILTY SAND (fill) Dry to Humid Loose 92.6 6.5 72 - Light Brown, SILTY SAND (Native-Topsoil/Alluvium Humid Loose - 76 - - 98.7 7.5 Dark Gray Brown, SILTY SAND (AI luvium) Moist Med i urn Dense Light Tan, POORLY GRADED SLIGHTLY SILTY SAND Moist Medium Dense (Sandstone) SUBSURFACE EXPLORATION LOG JOB NUMBER: SOUTHERN CALIFORNIA SOIL & TESTIMG,INC. - W P 2. W J a. 4 v) I - CK CK BG CK BG SM TRENCH NUMBER 2 ELEVATION DESCR I PT IO N Dark Gray Brown, SILTY SAND (fill) Dark Brag Brown, SILTY SAND (Native - Alluvium) Humid Moist Loose Medi um Dense to Dense 95.8 116.7 - 6.2 9.1 74 90 SOUTH ERN CALIFOR MIA SOIL Q TESTING,IRIC. SUBSURFACE EXPLORATION LOG (DATE LOGGED: 5-24-85 LOGGED BY: G, s. , TRENCH NUMBER 3 ELEVATION W a > t- W -I P I 4 v) - CK CK ain a0 ux a- DESCR lPTlO N a 0 SM Dark Bray Brown, SILTY SANt (fill) Humid to Moist Medi urn Dense 112.4 115.8 8.3 7.3 87 - Gray Brown, SILTY SAND (Native A1 1 uvi an) Moist Med i urn Dense Humid Yedium lense Light Brown, SILTY SAND 8 Plate No. 5 SOUTHERN CALIFORNIA SOIL & TESTING,INC. 1 SOUTHERN CALIFORNIA SOIL 6; TESTING,JNC. 3 SUBSURFACE EXPLORATION LOG - LOGGEDBY: G. s. DATE LOGGED: 5-24-85 JOB NUMBER: 8523118 Plate No. 6 I. J 7 .o W > c W -I a a I U ln CK - CK . .. CK CK CK .II SM - sc TRENCH NUMBER 4 ELEVATION DESCRIPTION Brown, SILTY SAND (fill) Sray Brown, CLAYEY SAND (Native-Alluvium) I Dry to Humid Moist Loose to Med i urn Dense Med i urn Dense 2 wo >- -b cu 4: WI =o u s M TRENCH NUMBER 5 ELEVATION DESCRIPTION Brown, SILTY SAND (Topsoi 1 ) Tan, SILTY SAND ( San t i ago Format i on) I, Humid Loose Dense SOUTHERN CALIFORNIA A SOlL 4% TESTIP(G,IPCIC. w SUBSURFACE EXPLORATION LOG I LOGGEDBY: G s .. 5-24-85 I (DATE LOGGED: 8521118 I Plate No. 7 JOB NUMBER: I DIRECT SHEAR TEST RESULTS DESCRIPTION ~ SAMPLE angle of cohesion Internal intercept friction (0) (4 T-1 @ - 2-4 -~ T-4 @ 3.5 BemoJ&&Lo 90% Undisturbed - 30 175 300 31 - SAMPLE MAXIMUM DENSITY and OPTIMUM MOISTURE CONTENT maximum optimum DESCRIPTION density moisture (4 content (%) A METHOD ASTM 1557-78 Brown Silty Sand 129.1 9.5 T-1 8 2-4 I ley RRR IDATE 6-6-85 IJOB NO. 8521118 I Plate No. 8 , LOTS 3 AND 6-8,MAP 10870 RECOMMENDED GRADING SPECIFICATIONS - GENERAL PROVISIONS GENERAL INTENT The intent of these specifications is to establish procedures for clearing, compacting natural ground, preparing areas to be filled, and placing and compacting fill soils to the lines and grades shown on the accepted plans. The recommendations contained in the preliminary soil investigation report and/or the attached Special Provisions are a part of the Recommended Grading Specifications and shall supersede the provisions contained hereinafter in the case of conflict. These specifications shall only be used in conjunction with the soil report for which they are a part. No deviation from these specifications will be allowed, except where specified in the soil report or in other written communication signed by the Soil Engineer . OBSERVATION AND TESTING Southern California Soil and Testing, Inc., shall be retained as the Soil Engineer to observe and test the earthwork in accordance with these specifications. It will be necessary that the Soil Engineer or his representative provide adequate observation so that he may provide an opinion that the work was or was not accomplished as specified. It shall be the responsibility of the contractor to assist the soil engineer and to keep him apprised of work schedules, changes and new information and data so that he may provide these opinions, In the event that any unusual conditions not covered by the special provisions or preliminary soil report are encountered during the grading operations, the Soil Engineer shall be contacted for further recommendations. SCS&T 8521118 June 6, 1985 Appendix, Page 2 If, in the opinion of the Soil Engineer, substandard conditions are encountered, such as; questionable or unsuitable soil, unacceptable moisture content, inadequate compaction, adverse weather, etc., he will be empowered to either to either stop construction until the conditions are remedied or corrected or recommend rejection of this work. Test methods used to determine the degree of compaction should be performed in accordance with the following American Society for Testing and Materials test methods: Maximum Density & Optimum Moisture Content - A.S.T.M. D-1557-78. Density of Soil In-Place - A.S.T.M. D-1556-64 or A.S.T.M. D-2922. All densities shall be expressed in terms of Relative Compaction as determined by the foregoing A.S.T.M. testing procedures. PREPARATION OF AREAS TO RECEIVE FILL All vegetation, brush and debris derived from clearing operations shall be removed, and legally disposed of. all areas disturbed by site grading should be left in a neat and finished appearance, free from unsightly debris. Any abandoned buried structures encountered during grading operations must be totally removed. All underground utilities to be abandoned beneath any proposed structure should be.removed from within 10 feet of the structure and properly capped off. The resulting depressions from the above described procedures should be backfilled with acceptable soil that is compacted to the requirements of the Soil Engineer. This includes, but is not limited to, septic tanks, fuel tanks, sewer lines or leach lines, storm SCS&T 8521118 June 6, 1985 Appendix, Page 3 drains and water lines. Any buried structures or utilities not to be abandoned should be investigation by the Soil Engineer to determine if any special recommendation will be necessary. All water wells which will be abandoned should be backfilled and capped in accordance to the requirements set forth in the Geotechnical Report. The top of the cap should be at least 4 feet below finish grade or 3 feet below the bottom of footing whichever is greater. The type of cap will depend on the diameter of the well and should be determined by the Soil Engineer and/or a qualified Structural Engineer. When the slope of the natural ground receiving fill exceeds 20% (5 horizontal units to 1 vertical unit), the original ground shall be stepped or benched. Benches shall be cut to a firm competent soil condition. The lower bench shall be at least 10 feet wide or 1 1/2 times the the equipment width which ever is greater and shall be sloped back into the hillside at a gradient of not less than two (2) percent. All other benches should be at least 6 feet wide. The horizontal portion of each bench shall be compacted prior to receiving fill as specified hereinbefore for compacted natural ground. Ground slopes flatter than 20% shall be benched when considered necessary by the Soil Engineer. I After clearing or benching, the natural ground in areas to be filled shall be scarified to a depth of 6 inches, brought to the proper moisture content, compacted and tested for the minimum degree of compaction in the Special Provisions or the recommendation contained in the preliminary soil investigation report. All loose soils in excess of 6 inches thick should be removed to firm natural ground which is defined as natural soils which possesses an in-situ density of at least 85% of its maximum dry density. c SCS&T 8521118 June 6, 1985 Appendix, Page 4 FILL MATERIAL Materials placed in the fill shall be approved by the soil engineer and shall be free of vegetable matter and other deleterious substances. Granular soil shall contain sufficient fine material to fill the voids. The definition and disposition of oversized rocks, expansive and/or detrimental soils are covered in the soils report or Special Provisions. Expansive soils, soil’s of poor gradation, or soils with low strength characteristics may be thoroughly mixed with other soils to provide satisfactory fill material, but only with the explicit consent of the soil engineer. Any import material shall be approved by the Soil Engineer before being brought to the site. PLACING AND COMPACTION OF FILL Approved fill material shall be placed in areas prepared to receive fill in layers not to exceed 6 inches in compacted thickness. Each layer shall have a uniform moisture content in the range that will allow the compaction effort to be efficiently applied to achieve the specified degree of compaction. Each layer shall be uniformly compacted to a minimum specified degree of compaction with equipment of adequate size to economically compact the layer. Compaction equipment should either be specifically designed for soil compaction or of proven reliability. The minimum degree of compaction to be achieved is specified in either the Special Provisions or the recommendations cantained in the preliminary soil investigation report. When the structural fill~material includes rocks, no rocks will be allowed to nest and all voids must be carefully filled with soil such that the minimum degree of compaction recommended in .the Special Provisions is SCS&T 8521118 June 6, 1985 Appendix, Page 5 achieved. The maximum size and spacing of rock permitted in structural fills and in non-structural fills is discussed in the soil report, when applicable. Field observation and compaction tests to estimate the degree of compaction of the fill will be taken by the Soil Engineer or his representative. The location and frequency of the tests shall be at the Soil Engineer's discretion. When the compaction test indicates that a particular layer is less than the required degree of compaction, the layer shall be reworked to the satisfaction of the Soil Engineer and until the desired relative compaction has been obtained. Fill slopes shall be compacted by means of sheepsfoot rollers or other sui tab1 e equi pment. compaction by sheepsfoot roll ers shall be at vertical intervals of not greater than four feet. In addition, fill slopes at ratios of two horizontal to one vertical or flatter, should be trackrolled. Steeper fill slopes shall be over-built and cut-back to finish contours. Slope compaction operations shall result in all fill material six or more inches inward from the finished face of the slope having a relative compaction of at least 90% of maximum dry density or that specified in the Special Provisions section of this specification. The compaction operation on the slopes shall be continued until the Soil Engineer is satisfied that the slopes will be sftable in regards to surficial stability. Slope tests will be made by the Soils Engineer during construction of the slopes to determine if the required compaction is being achieved. Where failing tests occur or other field problems arise, the Contractor will be notified that day of such conditions by written communication from the Soil Engineer in the form of a daily field report. c SCS8T 8521118 June 6, 1985 Appendix, Page 6 If the method of achieving the required slope compaction selected by the Contractor fails to produce the necessary results, the Contractor shall rework or rebuild such slopes until the required degree of compaction is obtained, at no additional cost to the Owner or Soils Engineer. CUT SLOPES The Engineering Geologist shall inspect all cut slopes excavated in rock or lithified formational material during the grading operations at intervals determined at his discretion. If any conditions not anticipated in the preliminary report such as perched water, seepage, lenticular or confined strata of a potentially adverse nature, unfavorably inclined bedding, joints or fault planes are encountered during grading, these conditions shall be analyzed by the Engineering Geologist and Soil Engineer to determine if mi tigating measures and necessary. Unless otherwise specified in the soil and geological report, no cut slopes shall be excavated higher or steeper than that allowed by the ordinances of the controlling governmental agency. 1 ENGINEERING OBSERVATION Field observation by the soil Engineer or his representative shall be made during the filling and compacting operations so that he can express his opinion regarding the conformance of the grading with acceptable standards of practice. The presence of the Soil Engineer or his representative or the observation and testing shall not release the Grading Contractor from his duty to compact all fill material to the specified degree of compaction. , . SCS&T 8521118 June 6, 1985 Appendix, Page 7 SEASON LIMITS Fill shall not be placed during unfavorable weather conditions. When work is interrupted by heavy rain, filling operations shall not be resumed until the proper moisture content and density of the fill materials can be achieved. Damage site conditions resulting from weather or acts of God shall b repaired before acceptance of work. RECOMMENDED GRADING SPECIFICATIONS - SPECIAL PROVISIONS The minimum degree of compaction to be obtained in compacting natural ground, in the compacted fill, and in the compacted backfill shall be at least 90 percent. Detrimentally expansive soil is defined as soil which will swell more than 3 percent against a pressure of 150 pounds per square foot from a condition of 90 percent of maximum dry density and air dried moisture content to saturation. I Oversized fill material is defined as rocks or lumps over 6 inches in diameter. At least 40 percent of the fill soils shall pass through a No. 4 U.S. Standard Sieve. TRANSITION LOTS: Where transitions between cut and fill occur within the proposed building pad, the cut portion should be undercut a minimum of one foot below the base of the proposed footings and recompacted as structural backfill.