HomeMy WebLinkAbout1819 ASTON AVE; 104; CB140069; Permit02-21-2014 City of Carlsbad 1635 Faraday Av Carlsbad.CA 92008 Commercial/Industrial Permit Permit No: Building Inspection Request Line (760) 602-2725 CB140069 Job Address: Permit Type: Parcel No: Valuation: Occupancy Group; Project Title: 1819 ASTON AV CBADSt: 104 Tl 2121201100 $181,071.00 Sub Type: INDUST Lot #: 0 Construction Type: 5B Reference # Status: ISSUED Applied: 01/14/2014 Entered By: SKS Plan Approved: 02/21/2014 Issued: 02/21/2014 Inspect Area Plan Check #: NEW DIMENSIONS ONE SPAS Tl - 128 SF OFF TO OFF // ADD 200 SF RESTROOM-SHOWER-JANITOR TO WHSE SPACE //1,550 SF WHSE TO MFG //ADD HVAC & LIGHTING TO EXISTING WHSE SPACE TOTAL Tl OF 4,878 SF Applicant: CHAMPION ANDREW STE 125 13280 EVENING CREEK DR 8 SAN DIEGO CA 92128-4696 858-793-4777 Owner: JETT&JONES LLC T LAWRENCE JETT P 0 BOX 455 SANTA YNEZ CA 93460 Building Permit $1,017.06 Meter Size Add'l Building Permit Fee $0.00 Add'l Reel. Water Con. Fee $0.00 Plan Check $711.94 Meter Fee $0.00 Add'l Building Permit Fee $0.00 SDCWA Fee $0.00 Plan Check Discount $0.00 CFD Payoff Fee $0.00 Strong Motion Fee $38.02 PFF (3105540) $0.00 Park Fee $0.00 PFF (4305540) $0.00 LFM Fee $0.00 License Tax (3104193) $0.00 Bridge Fee $0.00 License Tax (4304193) $0.00 BTD #2 Fee $0.00 Traffic Impact Fee (3105541) $0.00 BTD #3 Fee $0.00 Traffic Impact Fee (4305541) $0.00 Renewal Fee $0.00 PLUMBING TOTAL $89.00 Add'l Renewal Fee $0.00 ELECTRICAL TOTAL $139.00 Other Building Fee $0.00 MECHANICAL TOTAL $79.74 Pot. Water Con. Fee $0.00 Master Drainage Fee $0.00 Meter Size Sewer Fee $0.00 Add'l Pot. Water Con. Fee $0.00 Redev Parking Fee $0.00 Red. Water Con. Fee $0.00 Additional Fees $0.00 Green Bldg Stands (SB1473) Fee $4.00 HMP Fee ?? Fire Expedidted Plan Review $362.50 Green Bldg Standards Plan Chk ?? TOTAL PERMIT FEES $2,441.26 Total Fees: $2,441.26 Total Payments To Date: $2,441.26 Balance Due: $0.00 Inspector: FINAL Al Date: APPROVAL Clearance: NOTICE: Please take NOTICE thaf approval of your project includes the "Imposition" of fees, dedications, reservations, or other exactions hereafter collectively refenred to as "fees/exadions." You have 90 days from the date this pemiit was issued to protest imposition of these fees/exacfions. If you protest them, you must follow the protest procedures set forth in Govemment Code Section 66020(a), and file the protest and any other required information with the City Manager for processing in accordance with Carlsbad Municipal Code Section 3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack, review, set aside, void, or annul their imposition. You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capacity changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this project. NOR DOES IT APPLY to any fees/exactions of which vou have previousiv been oiven a NOTICE similar to this, or as to which the statute of limitations has previously othenwise expired. TFiEl-0LL0>flNG APPROVALS REQUIRED PRIOR TO PERMIT ISSUANCE: ^^jw^NNING ^Ej^lNEERING ^^UILDING ^N^H^E DHEALTH IZlHAZMAT/APCD >^ DiiSi#fSn#i DAvmS* AMMis«.#.»s#kM Plan Check No.(Z/Ct> ( ^ ^^(jp'^S CITY OF CARLSBAD Building Permit Application 1635 Faraday Ave., Carlsbad, CA 92008 Ph: 760-602-2719 Fax: 760-602-8558 email: building@carlsbadca.gov www.carlsbadca.gov Est. Value Plan Ck.^eposK'^U/3g ( \\nJ^. f^y Date SWPPP JOB ADDRESS 1819 Aston Avenue SUITE#/SPACE#/UNiT# 104 212 120 11 00 CT/PROJECT# UOT# 65 # OF UNITS # BEDROOMS # BATHROOIl/IS TENANT BUSINESS NAME New Dimension One Spas CONSTR. TYPE V-B occ. GROUP B, F-1 DESCRIPTION OF WORK: /nc/utfe Square Feet of Affected Area(s) INTERIOR TENANT IMPROVEMENT FOR A JACUZZI SPA MANUFACTURER. INCLUDES DEMOLITION OF OFFICE SPACE, AND NEW CONSTRUCTION CONSISTING OF PARTITION WALLS, NEW HVAC, NEW LIGHTING, NEW PLUMBING FIXTURES, NEW SINGLE OCCUPANT TOILET ROOM, NEW SINGLE OCCUPANT SHOWER, AND NEW FINISHES. 200 S.F. NEW CONSTRUCTION (RESTROOM/ SHOWER), 128 S.F. REMODEL EXISTING OFFICE, 1,550 S.F. EXISTING WAREHOUSE TO MFG., 3,000 S.F. EXISTING WAREHOUSE (ADD HVAC AND LIGHTING). TOTAL OF 4,878 S.F. AFFECTED BY IMPROVEMENT. EXISTING USE B, F-1, S-1 PROPOSED USE B,F-1 GARAGE (SF) 0 PATIOS (SF) 0 DECKS (SF) 0 FIREPLACE YES|~1# NOTTI AIR CONDITIONING YESrTlNOI I FIRE SPRINKLERS YESFTlNOn APPLICANTNAME (Primary Contact) Andrew Champion APPLICANTNAME (Secondary Contact) Peter Bussett ADDRESS 13280 Evening Creek Dr. South, Ste. 125 ADDRESS Same as primary CITY San Dieao STATE ZIP CA 92128 CITY STATE ZIP PHONE 858-793-4777 FAX PHONE 858-793-4787 FAX EMAIL andyc@sca-sd.com EMAIL peterb@sca-sd.com PROPERTY OWNER NAME Lanikai Management Co CONTRACTOR BUS. NAME Good and Roberts LLC ADDRESS 2382 Faraday, Suite 31 OP ADDRESS 1330 Park Center Drive CITY Carisbad STATE ZIP CA 92008 CITY Vista STATE CA ZIP 92081 PHONE 858-945-8969 FAX PHONE 760-598-7614 FAX EMAIL gjs@lanikaimanagement.com EMAIL rhill@gnrgc.com ARCH/DESIGNER NAME & ADDRESS Smith Consulting Architects STATE LIC. # CII701 CLASS. CITY BUS. LIC.# ,B I 111555 3 (Sec. 7031.5 Business and Professions Code: Any City or County wliich requires a permit to construct, alter, improve, demolish or repair any structure, prior to its issuance, aiso requires the applicant for such permit to fiie a signed statement that he is licensed pursuant to the provisions of the Contractor's License Law [Chapter 9, commending with Section idOOoi Division 3 ofthe Business and Professions Code) or that he is exempt therefrom, and the basis for the alleged exemption. Any violation of Section 7031.5 by any applicant for a permit subjects the appiicant to a civii penalty of not more than five hundred dollars ($500)). WORKERS' COIVIPENSATION Workers' Compensation Declaration: / hersby affm under penalty of perjury one ofthe following declarations: 01 have and will maintain a certificate of consent to self-insure for workers' compensation as provided by Section 3700 of the Labor Code, for the performance of the worl< for which this permit is issued. I have and will maintain workers' compensation, as required by Section 3700 of the Labor Code, for the performance of the work for which this pemiit is issued. My workers' compensation insurance carrier and policy number are: Insurance Co. O/-^ e£PU£LIC ^&je^L tNS • i^Ct^f- Policv Ho.AlCuJ 9 0^ 3 / 3 03 Expiration Date lCi-2>)'SOj^ This section need not be completed if the pennit is for one hundred dollars ($100) or less. I I Certificate of Exemption: I certify that in the perfomian^ of the wori^for which this permit is issued, I shall not employ any person in any manner so as to become subject to the Workers' Compensation Laws of California. WARNING: Failure to secure workersV^iutensation oiverage Is unlawful, and shall subject an employer to criminal penalties and civil fines up to one hundred thousand dollars (&100,000), in addition to the cost of compensation, damages a^gii^ded for iR^Ktlon 3706 of the Labor code, interest and attorney's fees. JS^ CONTRACTOR SIGNATURE Jf^^^ffy DAGENT DATE ;i ' / & - R d) / ^ OWNER-BUILDER DECLARATION / fiereby affirm that I am exempt from Contractor's Ucense Law for (te folbwing reason: I I I, as owner of the property or my employees with wages as their sole compensation, will do the work and the stmcture is not intended or offered for sale (Sec. 7044, Business and Professions Code: The Contractor's License Law does not apply to an owner of property who builds or improves thereon, and who does such work himself or through his own employees, provided that such improvements are not intended or offered for sale. If, however, the building or improvement is sold within one year of completion, the owner-builder will have the burden of proving that he did not build or improve for the purpose of sale). I I I, as owner of the property, am exclusively contracting with licensed contractors to constmct the project (Sec. 7044, Business and Professions Code: The Contractor's License Law does not apply to an owner of property who builds or improves thereon, and contracts for such projects with contractor(s) licensed pursuant to the Contractor's License Law). I I I am exempf under Section Business and Professions Code for this reason: 1.1 personally plan to provide the major labor and materials for construction of the proposed property improvemenl I lYes I iNo 2.1 (have / have not) signed an appiication for a building permit for the proposed work. 3,1 have contracted with the following person (firni) to provide the proposed constniction (include name address / phone / contractors' license number): 4.1 plan to provide portions of the work, but I have hired the following person to coordinate, supervise and provide the major wori< (include name / address / phone / contractors' license number): 5.1 will provide some of the work, but I have contracted (hired) the following persons to provide the wori( indicated (include name / address / phone / type of work): ^PROPERTY OWNER SIGNATURE •AGENT DATE COMPLETE THIS SECTION FOR N O N - R E S I D E N T I A L BUILDING PERMITS ONLY Is the applicant or future building occupant required to submit a business plan, acutely hazardous materials registration form or risk management and prevention program under Sections 25505,25533 or 25534 of the Presley-Tanner Hazardous Substance Account Act? Yes No Is the applicant or future building occupant required to obtain a permit from the air pollution control district or air quality management district? Yes No Is the facility to be constructed within 1,000 feet of the outer boundary of a school site? Yes No IF ANY OF THE ANSWERS ARE YES, A FINAL CERTIFICATE OF OCCUPANCY MAY NOT BE ISSUED UNLESS THE APPLICANT HAS MET OR IS MEETING THE REQUIREMENTS OF THE OFFICE OF EMERGENCY SERVICES AND THE AIR POLLUTION CONTROL DISTRICT. CONSTRUCTION LENDING AGENCY I hereby affirm that there is a construction lending agency for the performance of the work this permit is issued (Sec. 3097 (i) Civil Code). Lender's Name Lender's Address APPLICANT CERTIFICATION I ceitify that I have read the application and state thatthe above Infbmiation Is conect and that the Infbmiation on the plans Is accurate. I agree to comply with all CHy ordinances and State laws relating to building constmctkin. I heneby authorize nepresenlatlve of the City of Carlsbad to enter upon the above mentioned property for inspecfion puiposes. I ALSO AGREE TO SAVE, INDEMNIFY AND KEEP HARMLESS THE CITY OF CARLSBAD AGAINST ALL LIABILmES, JUDGMENTS, COSTS AND EXPENSES WHICH MAY IN ANY WAY ACCRUE AGAINST SAID CfTY IN CONSEQUENCE OF THE GRANTING OF THIS PERMIT. OSHA: An (DSHA pennit is required for excavations over 5'0' deep and demolitbn or constmction of stmctures over 3 stories in height EXPIRATION: Eveiy pennit issued by the Building Oflicial under the provisions of this Code shall expire by limilation and become null and void if the building or work authorized by such pemiit is not commenced within 180 days from lhe date of such permit or if the building or work authorized by such permit is suspended or abandoned at any time after the wori< is commenced fbr a period of 180 days (Section 106.4.4 Uniform Buikiing Code). I APPLICANT'S SIGNATURE DATE /Z/^o//2> STOP: THIS SECTION NOT REQUIRED FOR BUILDING PERMIT ISSUANCE. Complete the following ONLY if a Certificate of Occupancy will be requested at final inspection. Fax (760) 602-8560, Email bulldlnaiScarlsbadca.QOV or Mail the completed form to City of Carisbad, Building Division 1635 Faraday Avenue, Carlsbad, California 92008. C0#: (Office Use Only) CONTACT NAME OCCUPANT NAME ADDRESS BUILDING ADDRESS CITY STATE ZIP CITY STATE ZIP Carlsbad CA PHONE FAX EMAIL OCCUPANT'S BUS. LIC. No. DEUVERY OPTIONS PICK UP: CONTACT (Listed above) OCCUPANT (Listed above) CONTRACTOR (On Pg. 1) MAILTO: CONTACT (Listed above) OCCUPANT (Listed above) CONTRACTOR (On Pg. 1) MAIL / FAX TO OTHER: ASSOCIATED CB#- NO CHANGE IN USE / NO CONSTRUCTION CHANGE OF USE / NO CONSTRUCTiON >ef APPLICANT'S SIGNATURE DATE Inspection List Permit*: CB140069 Type: Tl INDUST Date Inspection Item 03/12/2014 89 Final Combo 03/12/2014 89 03/11/2014 85 03/11/2014 85 02/25/2014 17 02/24/2014 84 Inspector Final Combo T-Bar T-Bar Interior Lath/Drywall Rough Combo PY PY PY PY Act Rl AP Rl AP AP AP NEW DIMENSIONS ONE SPAS Tl - 128 SF OFF TO OFF // ADD 200 SF RESTR Comments COF Friday, March 14, 2014 Page 1 of 1 „^$LSBAD INSPECTION RECORD Building Division 0 INSPECTION RECORD CARD WITH APPROVED PLANS MUST BE KEPT ON THE JOB m CALL BEFORE 3:30 pm FOR NEXT WORK DAY INSPECTION EI FOR BUILDING INSPECTION CALL: 760-602-2725 OR GO TO: www.CarHbadca.aov/BuiMlnff ANO CLICK ON "Request Inspection" DATE: rOj^h^ IP YES" IS CHECKED BELOW THAT DIVISIONS API'ROVAL IS REOUIRErj PRIOR IO HEqUESflNG A FlNAL BUILUING IT-JSPECTION. IF YOU HAVE ANY QUESTIONS PLEASE CALL THE APPLICABLE DIVISIOIMS AT THE PHONE NUMBERS PROVIDED BELOW. AFTER ALL REQUIRED APPROVALS .ARE SIGNED OFF- FAX PO /60 - 602 - 8 S60. EMAIL TO HLDGIN S PE C Tl ON Slfl^C A R L SB A DC A GO V OR BRING IN A COPY OF IHIS CARD fO: 1635 r/.RAOAY A V E , CAriL:;BAD. CA 02OO8, OUUOIMG INSPECTORS CAN BE REACHED AT 760-602-2700 BETWEEN 7;30 AM - 8:00 AM THE DAY OF YOUR INSPECTION CB140069 1819 ASTON Ay 104 NEW DIMENSIONS ONE SPAS Tl - 128 SF OFF TO OFF // ADD 200 SF RESTROOM-SHOWER-JANITOR TO WHSE SPACE // 1,550 SF WHSE TO MFG // ADD HVAC & LIGHTING TO EXISTING WHSE SPACE TOTAL Tl OF 4,878 SF Tl INDUST Lot#|^ n XHAMPIGN; ANDREW. OPY NO .res' Required Prior to Requesting Building Final If Checlced YES Date Inspector Notes \/ Pianning/Landscape 760-944-8463 Allow 48 hours J CM&I (Engineering Inspections) 760-438-3891 Call before 2 pm /-I i/ Fire PreverTtion 760-602-4660 Allow 48 hours fl ' f Type of Inspection CODE tf BUILDING #11 FOUNDATION Date inspector Type of Inspection CODE tf ELECTRICAL #31 •ELECTRICUNDERGROUND DUFER Date Inspector #12 REINFORCED STEEL #34 ROUGH ELECTRIC #66 MASONRV PRE GROUT #33 • ELECTRIC SERVICE •TEMPORARY • GROUT • WALL DRAINS #35 PHOTOVOLTAIC #10 TILTPANELS #11 POUR STRIPS #11 COLUMN FOOTINGS #39 FINAL CODE # MECHANICAL #41 UNDERGROUND DUCTS & PIPING #14 SUBFRAME •FLOOR •CEILING #44 • DUCT & PLENUM • REF. PIPING #15 ROOFSHEATHING #43 HEAT-AIR COND. SYSTEMS #13 EXT. SHEAR PANELS #16 INSUUTION #18 EXTERIOR UTH 2^ #49 FINAL CODE # COMBO INSPECTION #81 UNDERGROUND (11,12,21,31) #17 INTERIOR UTH & DRYWALL #82 DRYWALL,EXTUTH, GASTES (17,18,23) #51 POOLEXCA/STEEL/BOND/FENCE #83 ROOFSHEATING, EXT SHEAR (13,15) #55 PREPLASTER/FINAL #84 FRAME ROUGH COMBO (14,24,34,44) #19 FINAL CODE # PLUMBING #22 • SEWER a BL/CO • PL/CO #85 T-Bar (14,24,34,44) Date #21 UNDERGROUND DWASTE D WTR inspector #89 FINAL OCCUPANCY (19,29,39,49) FIRE Date inspector #24 TOPOUT DWASTE DWTR A/S UNDERGROUND VISUAL #27 TUB & SHOWER PAN A/S UNDERGROUND HYDRO I #23 DGASTEST D GAS PIPING A/S UNDERGROUND FLUSH #25 WATER HEATER A/S OVERHEAD VISUAL #28 SOUR WATER A/S OVERHEAD HYDROSTATIC #29 FINAL CODE # STORM WATER #600 PRE-CONSTRUCTION MEETING A/S RNAL F/A ROUGH-IN F/A RNAL #603 FOLLOW UP INSPECTION HXED EXTINGUISHING SYSTEM ROUGH-IN #605 NOTICETO CLEAN FIXED EXTING SYSTEM HYDROSTATIC TEST #607 WRITTEN WARNING HXED EXTINGUISHING SYSTEM HNAL #609 NOTICE OF VIOUTION MEDICAL GAS PRESSURETEST #610 VERBALWARNING MEDICAL GAS HNAL SEE BACK FOR SPECIAL NOTES EsGil Corporation In PartnersHip witH government for BuiCcCing Safety DATE: 02/07/2014 • APPLICANT • JURIS. JURISDICTION: Carlsbad • PLAN REVIEWER • FILE PLANCHECKNO.: 14-0069 SET: II PROJECTADDRESS: 1819 Aston Ave. Suite 104 PROJECT NAME: New Dimensions One Spas TI I I The plans transmitted herewith have been corrected where necessary and substantially comply with the jurisdiction's codes. ^ The plans transmitted herewith will substantially comply with the jurisdiction's building codes when minor deficiencies identified below are resolved and checked by building department staff. I I The plans transmitted herewith have significant deficiencies identified on the enclosed check list and should be corrected and resubmitted for a complete recheck. I I The check list transmitted herewith is for your information. The plans are being held at Esgil Corporation until corrected plans are submitted for recheck. I I The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant contact person. I I The applicant's copy of the check list has been sent to: IXI EsGil Corporation staff did not advise the applicant that the plan check has been completed. I I EsGil Corporation staff did advise the applicant that the plan check has been completed. Person contacted: Telephone #: Date contacted: (by: ) Email: Fax #: 858-793-4787 Mall Telephone Fax In Person El REMARKS: Applicant to slip sheet TS1,AX1,A3,E0.1,E1.l/E2yim^rPl4.1 to ail city held sets prior to issuing the permit. Applicant to hand carry the pilTis directly to the City of Carlsbad this does not assure a permit will be issued the city may have other corrections. By: John Le Vey Enclosures: EsGil Corporation • GA • EJ • MB • PC 02/07/2014 9320 Chesapeake Drive, Suite 208 • San Diego, Califomia 92123 • (858)560-1468 • Fax (858) 560-1576 EsGil Corporation In PartnersHip witH government for (BuiCding Safety DATE: 01/27/2014 OXPPLICANT >a JURIS. JURISDICTION: Carlsbad PLANREVIEWER • FILE PLANCHECKNO.: 14-0069 SET: I PROJECTADDRESS: 1819 Aston Ave. Suite 104 PROJECT NAME: New Dimensions One Spas TI I I The plans transmitted herewith have been corrected where necessary and substantially comply with the jurisdiction's codes. I I The plans transmitted herewith will substantially comply with the jurisdiction's codes when minor deficiencies identified below are resolved and checked by building department staff. I I The plans transmitted herewith have significant deficiencies identified on the enclosed check list and should be corrected and resubmitted for a complete recheck. E The check list transmitted herewith is for your information. The plans are being held at Esgil Corporation until corrected plans are submitted for recheck. I I The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant contact person. XI The applicant's copy of the check list has been sent to: Andrew Champion 13280 Evening Creek Dr. South, Suite 125 San Diego CA, 91218 I I EsGil Corporation staff did not advise the applicant that the plan check has been completed. XI EsGil Corporation staff did advise the applicant that the plan check has been completed. Person contacted: Andrew Charnpion Telephone #: 858-793-4777 Date contacted: (^^^ ) Email: andyc(gsca-sd.com Fax #: 858-793-4787 ([jVlailv/ Telephone Fax In Person • REMARKS: By: John Le Vey Enclosures: EsGil Corporation • GA • EJ • MB • PC 01/16/2014 9320 Chesapeake Drive, Suite 208 • San Diego, Califomia 92123 • (858) 560-1468 • Fax (858) 560-1576 Carlsbad 14-0069 01/27/2014 PLAN REVIEW CORRECTION LIST TENANT IMPROVEMENTS PLANCHECKNO.: 14-0069 JURISDICTION: Carlsbad OCCUPANCY: FI USE: Spa manufacturing TYPE OF CONSTRUCTION: VB ACTUAL AREA: 4,878 ALLOWABLE FLOOR AREA: STORIES: 1 HEIGHT: unknown SPRINKLERS?: Yes OCCUPANT LOAD: 59 REMARKS: DATE PLANS RECEIVED BY JURISDICTION: 01/04/2014 DATE PLANS RECEIVED BY ESGIL CORPORATION: 01/16/2014 DATE INITIAL PLAN REVIEW COMPLETED; 01/27/2014 PLAN REVIEWER: John Le Vey FOREWORD (PLEASE READ): This plan review is limited to the technical requirements contained in the California version of the International Building Code, Uniform Plumbing Code, Uniform Mechanical Code, National Electrical Code and state laws regulating energy conservation, noise attenuation and access for the disabled. This plan review is based on regulations enforced by the Building Department. You may have other corrections based on laws and ordinances enforced by the Planning Department, Engineering Department, Fire Department or other departments. Clearance from those departments may be required prior to the issuance of a building permit. Code sections cited are based on the 2013 CBC, which adopts the 2012 IBC. The following items listed need clarification, modification or change. All items must be satisfied before the plans will be in conformance with the cited codes and regulations. Per Sec. 105.4 of the 2012 International Building Code, the approval of the plans does not permit the violation of any state, county or city law. To speed up the recheck process, please note on this list (or a copy) where each correction item has been addressed, i.e.. plan sheet number, specification section, etc. Be sure to enclose the marked up list when vou submit the revised plans. Carlsbad 14-0069 01/27/2014 Please make all corrections, as requested in the correction list. Submit FOUR new complete sets of plans for commercial/industrial projects (THREE sets of plans for residential projects). For expeditious processing, corrected sets can be submitted in one of two ways: 1. Deliver all corrected sets of plans and calculations/reports directly to the City of Carlsbad Building Department, 1635 Faraday Ave., Carlsbad, CA 92008, (760) 602- 2700. The City will route the plans to EsGil Corporation and the Carlsbad Planning, Engineering and Fire Departments. 2. Bring one corrected set of plans and calculations/reports to EsGil Corporation, 9320 Chesapeake Drive, Suite 208, San Diego, CA 92123, (858) 560-1468. Deliver all remaining sets of plans and calculations/reports directly to the City of Carlsbad Building Department for routing to their Planning, Engineering and Fire Departments. NOTE: Plans that are submitted directly to EsGil Corporation only will not be reviewed by the City Planning, Engineering and Fire Departments until review by EsGil Corporation is complete. 1. Please clarify if there will be manufacturing or not, the occupancy does not appear to be an F-1, it appears to be an M for the display area and a /S-1 for the engineering area. Please change the occupancy to correspond with the use. 2. On the cover sheet of the plans, specify any items requiring special inspection, in a format similar to that shown below. Section 106.3.2. • REQUIRED SPECIAL INSPECTIONS In addition to the regular inspections, the following checked items will also require Special Inspection in accordance with Sec. 1701 ofthe Uniform Building Code. ITEM REQUIRED? REMARKS FIELD WELDING 3. Egress from a room through an adjoining room (Section 1014.2): a) Shall not be permitted, unless: i) Such adjoining rooms are accessory to the area served, and ii) Such adjoining rooms are not a Group H occupancy, and iii) Such adjoining rooms provide a discernible path of egress travel to an exit. b) Egress shall not pass through kitchens, store rooms, closets or spaces used for similar purposes. c) An exit access shall not pass through a room than can be locked to prevent egress. Carlsbad 14-0069 01/27/2014 4. Show on the plans the new or existing insulation in the display area for the roof, this area has changed from unconditioned to conditioned space. 5. Please provide the required 90 minute backup for the exit signs CBC 1011.6.3 6. Please have the principal designer sign the MECH form's. Advisory Note : When alterations, structural repairs or modifications or additions are made to an existing building, that building, or portion ofthe building affected, is required to comply with all of the requirements for new buildings, per Section 1134B.2. These requirements apply as follows: a) The area of specific alteration, repair or addition must comply as "new" construction. b) Existing sanitary facilities that serve the remodeled area must be shown to comply with all accessibility features. 7. Per the 2013 CPC Table 422 the proposed project will be required to provide restrooms, for each sex. Please show on the plans the locations of the men's and women's accessible restrooms, dimensioned to scale. To speed up the review process, note on this list (or a copy) where each correction item has been addressed, i.e., plan sheet, note or detail number, calculation page, etc.Please indicate here if any changes have been made to the plans that are not a result of corrections from this list. If there are other changes, please brieflv describe them and where they are located in the plans. Have changes been made to the plans not resulting from this correction list? Please indicate: • Yes • No The jurisdiction has contracted with Esgil Corporation located at 9320 Chesapeake Drive, Suite 208, San Diego, California 92123; telephone number of 858/560-1468, to perform the plan review for your project. If you have any questions regarding these plan review items, please contact John Le Vey at Esgil Corporation. Thank you. Carlsbad 14-0069 01/27/2014 [DO NOT PAY- THIS IS NOT AN INVOICE] VALUATION AND PLAN CHECK FEE JURISDICTION: Carlsbad PLANCHECKNO.: 14-0069 PREPARED BY: John Le Vey DATE: 01/27/2014 BUILDING ADDRESS: 1819 Aston Ave. Suite 104 BUILDING OCCUPANCY: FI TYPE OF CONSTRUCTION: VB BUILDING PORTION AREA (Sq. Ft.) Valuation Multiplier Reg. Mod. VALUE ($) Tl 4878 37.12 181,071 Air Conditioning Fire Sprinklers TOTAL VALUE 181,071 Jurisdiction Code cb By Ordinance Bldg. Permit Fee by Ordinance Plan Check Fee by Ordinance ^•J Type of Review: B Complete Review $1,017.06 $661.09 • Structurai Oniy j~l Repetitive Fee Repeats • Other |—J Hourly EsGff Fee Mr. @ $569.55 Comments: Sheet 1 of 1 macvalue.doc + PLAN CHECK PLAN CHECK Community & Economic ^ CiTY OF REVIEW Development Department 1635 Faraday Avenue CARLSBAD TRANSMITTAL Carlsbad CA 92008 www.carlsbadca.gov DATE: 1/24/14 PROJECT NAME:Carlsbad Bus park_ tenant imp PROJECT ID: CT 85-24 #4 PLAN CHECK NO: CB1469 SET#:I ADDRESS: 1819 Aston Av Ste #104 APN: 212-120-11 VALUATION: $69,711 APPLICANT CONTACT: andyc@sca-sd.eom X Ths plan check review transmittal is to notify you of clearance by: LAND DEVELOPMENT ENGINEERING DIVISION Final Inspection by the Construction & Inspection Division is required: Yes No X For status from a division not marked below, please call 760-602-2719 This plan check review is NOTCOMPLETE Items missing or incorrect are listed on the attache d checklist. Please resubmit ame nded plans as required. LAND DEVELOPMENT ENG. 760-602-2750 \/ linda Ontiveros X\ 760-602-2773 Lmda.Qitiveros@carlsbadca.gov Remarks: C i T y OF CARLSBAD PLANNING DIVISION BUILDING PLAN CHECK APPROVAL P-28 Development Services Planning Division 1635 Faraday Avenue (760) 602-4610 www.carlsbadca.gov DATE: 2/1V14 PROJECTNAME: T.I. PROJECTID: PLAN CHECK NO: CB140069 SET#: ADDRESS: 1819 ASTON AV APN: ^ This plan check review is complete and has been APPROVED by the PLANNING Division. By: GINA RUIZ A Final Inspection by the PLANNING Division is required • Yes ^ No You may also have corrections from one or more of the divisions listed below. Approval from these divisions may be required prior to the issuance of a building permit. Resubmitted plans should include corrections from all divisions. • This plan check review Is NOT COIVIPLETE. Items missing or incorrect are listed on the attached checklist. Please resubmit amended plans as required. Plan Check Comments have been sent to: ANDYC@SCA-SD.COIVI For questions or clarifications on tlie attached chiecklist please contact the following reviewer as marked: PLANNING 760-602-4610 ENGINEERING 760-602-2750 FIRE PREVENTION 760-602-4665 I 1 Chris Sexton 760-602-4624 Chris.Sexton@carlsbadca.fiov 1 1 Kathleen Lawrence 760-602-2741 Kathleen.Lawrence@carlsbadca.fiov 1 Greg Ryan 760-602-4663 Gre^orv.Rvan@carlsbadca.fiov X Gina Ruiz 760-602-4675 Gina.Ruiz@carlsbadca.gov 1 1 Linda Ontiveros 760-602-2773 Linda.Ontiveros@carlsbadca.fiov I Cindy Wong 760-602-4662 Cvnthla.Wonfi@carlsbadca.fiov • 1 1 Dominic Fieri 760-602-4664 Dominic.Flerl@carlsbadca.fiov Remarks: Plan Checl< No. CB140069 Address 1819 ASTON AV Date 2/11/14 Review #2 Planner GINA RUIZ Phone (760) 602- 4675 Type of Project & Use: UL Net Project Density: DU/AC Zoning: C-M General Plan: P\ Facilities Management Zone: 5 CFD (in/out) # 1 Date of participation:05/07/1991 Remaining net dev acres: (For non-residential development: Type of land use created by this permit: ) REVIEW #: 12 3 Legend: IEI Item Complete • Item Incomplete - Needs your action K • • Environmental Review Required: YES • NO ^ TYPE DATE OF COMPLETION: Compliance with conditions of approval? If not, state conditions which require action. Conditions of Approval: 13 • • Discretionary Action Required: YES • NO ^ TYPE APPROVAL/RESO. NO. DATE PROJECT NO. OTHER RELATED CASES: Compliance with conditions or approval? If not, state conditions which require action. Conditions of Approval: • • Coastal Zone Assessment/Compliance Project site located in Coastal Zone? YES O NO El CA Coastal Commission Authority? YES O NO El If California Coastal Commission Authority: Contact them at - 7575 Metropolitan Drive, Suite 103, San Diego, CA 92108-4402; (619) 767-2370 Determine status (Coastal Permit Required or Exempt): • • Habitat Management Plan Data Entry Completed? YES • NO El If property has Habitat Type identified in Table 11 of HMP, complete HMP Permit application and assess fees in Permits Plus (A/P/Ds, Activity Maintenance, enter CB#, toolbar. Screens, HMP Fees, Enter Acres of Habitat Type impacted/taken, UPDATE!) D D Inclusionary Housing Fee required: YES Q NO El (Effective date of Inclusionary Housing Ordinance - May 21, 1993.) Data Entry Completed? YES • NO • (A/P/Ds, Activity Maintenance, enter CB#, toolbar. Screens, Housing Fees, Construct Housing Y/N, Enter Fee, UPDATE!) • • Housing Tracking Form (form P-20) completed: YES • NO • N/AE p-28 Page 2 of 3 07/11 Site Plan: EDD City Council Policy 44 - Neighborhood Architectural Design Guidelines EDD 1. Applicability: YES • NO E EDD 2. Project complies: YES • NOQ • • Zoning: 1. Setbacks: Front: Interior Side: Street Side: Rear: Top of slope: Required. Required. Required Required. Required. Shown Shown Shown Shown. Shown • • 2. Accessory structure setbacks: Front: Required. Interior Side: Required. Street Side: Required. Rear: Required. Structure separation: Required. Shown Shown Shown Shown. Shown • • 3. Lot Coverage: Required Shown • ED 4. Screening of Equipment: ADDED TO TSI Required YES Shown SECTIONS NOT SHOWN SECTION • • • ED Spaces Required, Shown 5. Parking: (breakdown by uses for commercial and industrial projects required) Residential Guest Spaces Required Shown Additional Commonts #1. PLEASE ADD SECTIONS/ELEVATIONS TO THE PLANS SHOWING HOW THE NEW ROOF MOUNTED EQUIPMENT WILL BE SCREENED FRQM COLLEGE BL & ASTON AV AS ONLY THE POLICY REGARDING ROOF MOUNTED EQUIPMENT HAS BEEN INCLUDED IN THE PLANST OK TO ISSUE AND ENTERED APPROVAL INTO COMPUTER GINA RUIZ DATE 2/11/14 P-28 Page 3 of 3 07/11 PC Comments '''"'^^DG. DEPT COPY Daryl K. James & Associates, Inc. 205 Colina Terrace Vista, CA 92084 T. (760) 724-7001 Email: kitfire@sbcglobal.net Checlced by: Matthew Ernau Date: 2/1/2014 APPLICANT: Andrew Champion JURISDICTION: Carlsbad Fire Department PROJECT NAME: New Dimension One Spa PROJECT ADDRESS: 1819 Aston Ave Suite 104 PROJECT DESCRIPTION: CB140069 INSTRUCTIONS • This plan review has been conducted in order to verify conformance to minimum requirements of codes adopted by the Carlsbad Fire Department • The items below require correction, clarification or additional information before this plan check can be approved for permit issuance. • To expedite the recheck process, please note on this list (or copy) how and where each correction item has been addressed, i.e. sheet number, note number, detail number, legend number, etc Corrections or modifications to the plans must be clouded and provided with numbered deltas and revision dates.. • Please direct any questions regarding this review to: Matthew Ernau 760-738-8279 or eniauS7@cox.net • CORRECTED PLANS, DESCRIPTIVE NARRATIVE OF REVISIONS FOLLOWING EACH COMMENT ON THIS FORM, AND A COPY OF BUILDING DEPARTMENT (EsGil) COMMENTS MUST BE SUBMITTED DIRECTLY TO: " Matthew Ernau 1382 Hale Ave Escondido, CA 92029 IF PLANS ARE NOT SENT OR DELIVERED DIRECTLY TO THE ADDRESS ABOVE RECOMMENDATION FOR APPROVAL COULD BE DELAYED YOUR PHOTOMETRIC PLAN OF ALL OCCUPIED AREAS IS REQUIRED TO DEMONSTRATE COMPLIANCE WITH CBC 1006, AND WILL BE REVIEWED BY THE CARLSBAD FIRE DEPARTMENT, DEPUTY FIRE MARSHAL GREG RYAN (760 602-4665) TS.1 In existing project data section under construction type is VA or VB make correction on plans. 2of 2 Al AFI ADI M-1 E0.1 E1.0 Provide a note that explains how you may exit through another room to get to the second exit in this occupancy use include 2013 CBC section that supports this. Provide a note fire extinguisher location and size to be in accordance with CFC 906. Add one additional fire extinguisher in engineering room. On sheet TS1 under scope of work you describe use as manufacturer, provide detailed description of this use. Provide detailed description of what Product Display room and Engineering room are being used for. In finish notes section change note #3 to 2013 CBC In door schedule provide detailed description of door locking hardware being used for existing doorslOOA and 108B Add this note stating air-moving systems supplying air in excess of 2000cfm equipped with Smoke detectors approved and listed by the State Fire Marshal and design using 2013 CFC and 2013 NFPA 72 In Fixture List include a description and a symbol for exit sign including directional type being used include in description must provide 90 minutes battery back-power In Fixture List include a description and a symbol for all emergency lighting being used include in description must provide 90 minutes battery back-power. In notes section add a note that states: existing exit signs and emergency lighting has been tested and provides 90 minutes of battery backup RECEfVED JAN 1 4 2014 CITY OF CARLSBAD BUILDING DIVISION PROJECT: STRUCTURAL CALCULATIONS H<»QWITZ TAKIOR KUSHKAKI ST«UCTU«Al ENGlNCeHS^ Ui-P DESIGN ASSUMPTIONS: CONCRETE STRENGTH AT TVf^NTY EIGHT DAYS: MASONRY: GRADE "N" CONCRETE BLOCK F' M = MORTAR: TYPES 1,800 PSI GROUT: 2000 PSI REINFORCING STEEL: A-615 GRADE 40: GRADE 60: #4AND LESS (U.O.N.) #5 ANO LARGER .PSI PSI STRUCTURAL STEEL A-36 LUMBER: DOUGLAS FIR-LARCH JOISTS BEAMS AND POSTS STUDS SEISMIC FORCE: WINDFORCE: " DESIGN LOADS: ROOF DEAD LOAD SLOPING ROOFING PLYWOOD JOISTS INSUL & CLG. MISC. TOTAL = ROOF LIVE LOAD SLOPING FLAT 1t2 STUD OR BETTER REPORT BY: REPORT NO.: ELM FLOOR DEAD LOAD ML FLOORING PLYWOOD JOISTS INSUL & CLG. MISC. SOIL PRESSURE: WALL DEAD LOAD EXT. INTERIOR EXTERIOR 10 PSF 16 PSF TOTAL = FLOOR LIVE LOAD INTERIOR BALCONY EXrr WALKWAY 40 PSF 60 PSF (U.O.N.) 100 PSF These calculatjons are limited only to the Hems included herein, selected by the dient and do not imply approval of any other portion of the structure by this office. These cateulations are not valid if aitersd in any way, or rvA accompanied by a wet stamp and signature ofthe Engineer of Record. Job No. Designed By Date 1 i/io//4-| San Oiego - 14288 Oinielson Street, Suite * 200, Powey, CA 92064, 858-879.8989, Fax 8S8-S79-89S9 Las Vegas - 23S0 So. Jones *101. Las Vegas, NV 89146. 7 0 2-505-8225, fax 702-215-5801 -- I.O T^rri wi-j. 4- f f^^. A6r, ^ . ^ ^ 5-^ ' /^opeo U/A(?-. £££-4- 2^ / • BUILDING ENERGY ANALYSIS REPORT PROJECT: Dimension One Spas 1819 Aston Ave., Suite 104 Carlsbad, CA 92008 Project Designer: Smith Consulting Architects Report Prepared by: Michael Dell DELL CO. 1629 York Drive Vista, Ca 92084 760-940-0064 RECEIVED JAN 1 4 2014 CiTY OF CARLSBAD BUILDING .DIVISION Job Number: NR1-213 Date: 1/7/2014 The EnergyPro computer program has been used to perform the calculations summarized in this compliance report. This program has approval and is authorized by the California Energy Commission for use with both the Residential and Nonresidential 2008 Building Energy Efficiency Standards. This program developed by EnergySoft, LLC - www/.energysoft.com. EnergyPro 5.1 by EnergySoft User Number: 1712 RunCode: 2014-01-07710:20:30 ID: NR1-213 TABLE OF CONTENTS Cover Page 1 Table of Contents 2 Nonresidential Performance Title 24 Forms 3 Form ENV-MM Envelope Mandatory Measures 16 Form MECH-MM Mechanical Mandatory Measures 17 HVAC System Heating and Cooling Loads Summary 18 EnergyPro 5.1 by EnergySoft Job Number: ID: NR1-213 User Number: 1712 PERFORMANCE CERTIFICATE OF COMPLIANCE (Part 1 of 3) PERF-1 C Project Name Dimension One Spas Date 1/7/2014 Project Address 1819 Aston Ave., Suite 104 Carlsbad Climate Zone CA Climate Zone 07 Total Cond. Floor Area 2,950 Addition Floor Area 2,950 GENERAL INFORMATION Building Type: • Nonresidential • • Relocatable - indicate • High-Rise Residential • specific climate zone • Hotel/Motel Guest Room all climates Phase of Construction: • New Construction • Addition • Alteration STATEMENT OF COMPLIANCE This certificate of compliance lists the building features and specifications needed to comply with Title 24, Parts 1 and 6 of the California Code of Regulations. This certificate applies only to a Building using the performance compliance approach. |c*llfomla Association of Building Enttrgy Consultants aaoMaii^mmm— Ras-if>-3iT «. Nftos-io-are The documentation author hereby certifies that the documentation is accurate and complete. Documentation Author Name f^ichael Dell Signature Company DELL CO. CEPE NR08-90-3530 Date 1/7/2014 Address 1629 York Drive Phone 760-940-0064 City/State/Zip y^^f^ 92084 The Principal Designer hereby certifies that the proposed building design represented in this set of construction documents Is consistent with the other compliance forms and worksheets, with the specifications, and with any other calculations submitted with this permit application. The proposed building has been designed to meet the energy efficiency requirements contained in sections 110,116 through 118, and 140 through 149 of Title 24, Part 6. Please check one: ENV. LTG. MECH. • • I hereby affirm that I am eligible under the provisions of Division 3 of the Business and Professions Code to sign this document as the person responsible for its preparation; and that I am licensed in the State of California as a civil engineer, mechanical engineer, electrical engineer, or I am a licensed architect. I affirm that I am eligible under the provisions of Division 3 of the Business and Professions Code by section 5537.2 or 6737.3 to sign this document as the person responsible for its preparation; and that I am a licensed contractor performing this work. I affirm that I am eligible under Division 3 of the Business and Professions Code to sign this document because it pertains to a structure or type of work described as exempt pursuant to Business and Professions Code Sections 5537, 5538 and 6737.1. Principal Envelope Designer Name Signature Dat.dl/7d///^ Company g^,-,^ (insulting Architects Address License" # f^ n Q \ City/State/Zip Phone Principal Mechanical Designer Name Seaside Heating & Air Conditioning Signature Company Seaside Heating & Air Conditioning Date 1-7-2014 Address License # 790514 City/State/Zip Phone Principal Lighting Designer Name Signature Company Lighting Compliance Not In The Scope Of This Submittal Date Address License # City/State/Zip Phone INSTRUCTIONS TO APPLICANT COMPLIANCE & WORKSHEETS (check box if worksheets are included) El ENV-1 C Certificate of Compliance. Required on plans. El MECH-1 C Certificate of Compliance. Required on plans. • LTG-1 C Certificate of Compliance. Required on plans. El MECI-I-2C Air/Water Side/Service Hot Water & Pool Requirements. • LTG-2C Lighting Controls Credit Worl<sheet. El MECH-3C Mechanical Ventilation and Reheat. • LTG-3C Indoor Lighting Power Allowance. El MECH-5C Mechanical Equipment Details. EnergyPro 5.1 by EnergySoft User Number: 1712 RunCode: 2014-01-07T10:20:30 ID: NR1-213 Page 3 of 18 PERFORMANCE CERTIFICATE OF COMPLIANCE (Part 2 of 3) PERF-1 C Project Name Date Dimension One Spas 1/7/2014 ANNUAL TDV ENERGY USE SUMMARY (kBtu/sqft-yr) Energy Component Standard Design Proposed Design Compliance Margin Heating Space Heating 1.21 0.60 0.6? Heating Space Cooling 178.64 15766 20.98 Cooling Indoor Fans 47.39 47.39 0.00 Fans Heat Rejection 0.00 0.00 0.00 Heat Rej Pumps & Misc. 0.00 0.00 0.00 Pumps Domestic Hot Water 0.00 0.00 OOO DHW Lighting 142.15 142.15 000 Ligiiting Receptacle 70.60 70.60 OOO Receptacle Process 0.00 0.00 OOO Process Process Lighting 0.00 0.00 OOO Process Ltg TOTALS 440.00 418.40 21.60 Percent better than Standard 4.9% ( 4.9 % excluding process) BUILDING COMPLIES GENERAL INFORMATION Building Orientation (S) 180 deg Conditioned Floor Area 2,950 sqft. Number of Stories 1 Unconditioned Floor Area 1,550 sqft. Number of Systems 2 Conditioned Footprint Area 2,950 sqft. Number of Zones 2 Natural Gas Available On Site yes Orientation Gross Area Glazing Area Glazing Ratio Front Elevation 0 sqft. 0 sqft. 0.0% Left Elevation (W) 0 sqft. 0 sqft. 00% Rear Elevation (N) 0 sqft. 0 sqft. 00% Right Elevation (E) 0 sqft. 0 sqft. 00% Total 0 sqft. 0 sqft. 00% Roof 2,950 sqft. 64 sqft. 2.2% Standard Prescriptive Lighting Power Density Prescriptive Envelope TDV Energy 1600 45,398 W/sqft. Proposed f.600 51,250 Prescriptive Values for W/sqft. Comparison only. See LTG-1 C for allowed LPD. Remarks: EnergyPro 5.1 bv EnergySoft User Number: 1712 RunCode: 2014-01-07710:20:30 ID: NR1-213 Paae4 of 18 PERFORMANCE CERTIFICATE OF COMPLIANCE (Part 3 of 3) PERF-1 C Project Name Dimension One Spas Date 1/7/2014 ZONE INFORMATION System Name Zone Name Occupancy Type Floor Area (sqft.) Inst. LPD (W/sf)^ Ctrl. Credits (W/sf)^ Allowed LPD Proc. Loads (W/sf) System Name Zone Name Occupancy Type Floor Area (sqft.) Inst. LPD (W/sf)^ Ctrl. Credits (W/sf)^ Area (W/sf)^ Tailored (W/sf)" Proc. Loads (W/sf) Camer 50TCQA06 Production/Product Display Retail Sales, Wholesale 2,950 •1.600 Warehouse Commercial, Industrial Store 1,550 •O600 Notes: 1. See LTG-1 C 2. See LTG-2C 3. See LTG-3C 4. See LTG-4C (items marked with asterisk, see LTG-1 -C by ottiers) (by ottiers) Items above require special documentation EXCEPTIONAL CONDITIONS COMPLIANCE CHECKLIST The local enforcement agency should pay special attention to the items specified in this checklist. These Items require special written justification and documentation, and special verification to be used with the performance approach. The local enforcement agency determines the adequacy of the justifications, and may reject a building or design that otherwise complies based on the adequacy of the special justification and documentation submitted. The exceptional features listed in this performance approach application have specifically been reviewed. Adequate written justification and documentation for their use have been provided by the applicant. Authorized Signature or Stamp EnergyPro 51 by EnergySoft User Number: 1712 RunCode: 2014-01-07710:20:30 ID:NR1-213 Page 5 of 18 CERTIFICATE OF COMPLIANCE AND FIELD INSPECTION ENERGY CHECKLIST (Part 1 of 3) ENV-1 C Project Name Dimension One Spas Date 1/7/2014 Project Address 1819 Aston Ave., Suite 104 Cartsbad Climate Zone Total Cond. Floor Area 2,950 Addition Floor Area 2,950 GENERAL INFORMATION Building Type: Cl Nonresidential • High-Rise Residential • Hotel/Motel Guest Room • Schools (Public School) • Relocatable Public School Bldg. IZI Conditioned Spaces O Unconditioned Spaces • Skylight Area for Large Enclosed Space s 8000 ft (If checked include the ENV-4C with submittal) Phase of Construction; • New Construction • Addition • Alteration Approach of Compliance: • Component • Overall Envelope • Unconditioned (file affidavit) Front Orientation: N, E, S, W or in Degrees: 180 deg FIELD INSPECTION ENERGY CHECKLIST OPAQUE SURFACE DETAILS INSULATION Tag/ID Assembly Type = 5 0) UJ 6 z o o £ 3 0) O OC OC o oc Is £ — = 5 -J < o tn Roof 2,886 (S) 0.051 R-19 4.2.2-A12 Existing Slab 2,950 (N) 0.730 None 4.4.7-A1 Existing Demising 1,000 (N) 0.183 R-19 4.3.3-A5 New • • • 1. See Instructions in the Nonresidential Compliance Manual, page 3-96. 2. If Fail, then describe on Page 2 of the Inspection Checklist Form and take appropriate action to correct. A fail does not meet compliance. FENESTRATION SURFACE DETAILS Tag/ID Fenestration Type £. ta 0) < Orientation N,E,S,W Max U-Factor U-Factor Source Max (R)SHGC SHGC Source Overhang Conditions Status Pass '5 u. 1 Skylight 64 (S) 1.190 Default 0.680 Default • Existing • • • • • • • • • • • • • • • • • • • • • • • • • • • • • 1. See Instructions in the Nonresidential Compliance Manual, page 3-96. 2. If Fail then describe on Page 2 of the Inspection Checklist Form and take appropriate action to correct. Verify building plans If necessary. EnergyPro 5.1 by EnergySoft User Number: 1712 RunCode: 2014-01-07710:20:30 ID: NR1-213 Page 6 of 18 CERTIFICATE OF COMPLIANCE AND FIELD INSPECTION ENERGY CHECKLIST (Part 2 of 3) ENV-1 C Project Name Dimension One Spas Date 1/7/2014 ROOFING PRODUCT (COOL ROOFS) (Note if the roofing product is not CRRC certified, this compliance approach cannot be used). Go to Overall Envelope Approach or CHECK APPLICABLE BOX BELOW IF EXEMPT FROM THE ROOFING PRODUCT "COOL ROOF" REQUIREMENTS: Pass Fail' N/A • Roofing compliance not required in Climate Zones 1 andi 6 with a Low-Sloped. 2:12 pitch or less. • • • • Roofing compliance not required in Climate Zone 1 with a Steep-Sloped with less than 5 Ib/ft'. Greater than 2:12 pitch. • • • • Low-sloped Wood framed roofs in Climate Zones 3 and 5 are exempted, solar reflectance and thermal emittance or SRI that have a U-factor of 0.039 or lower. See Opaque Surface Details roof assembly. Column H of ENV-2C. • • • • Low-sloped Metal building roofs in Climate Zone 3 and 5 are exempted, solar relectance and thermal emittance or SRI that have a U-factor of 0.048 or lower. See Opaque Surface Details roof assembly below. Column H of ENV-2C. • • • • The roof area covered by building integrated photovoltaic panels and building integrated solar thermal panels are exempted. Solar reflectance and thermal emittance or SRI, see spreadsheet calculator at www.enerav.ca.aov/title24/ • • • • Roof constructions that have thennal mass over the roof membrane with a weight of at least 25 Ib/ff^are exempt from the Cool Roof criteria below. • • • • High-rise residential buildings and hotels and motels with low-sloped roofs in Climate Zones 1 through 9, 12 and 16 are exempted from the low-sloped roofing criteria. • • • 1. If Fail then describe on this page of the Inspection Checklist Form and take appropriate action to correct. Verify building plans if necessary. CRRC Product ID Number^ Roof Slope < 2:12 >2:12 Product V\/eight < SIb/ft' 2 5lb/ft^ Product Type' Aged Solar Reflectance^ Thermal Emmitance SRI* Pass Fail^ • • • • • • • • • • n' • • • • • • n' • • • • • • n' • • • • • • n' • • • • • • • • 1. The CRRC Product ID Number can be obtained from the Cool Roof Rating Council's Rated Product Directory at www.coolroofs.Qra/products/search.phD 2. Indicate the type of product is being used for the roof top, i.e. single-ply roof, asphalt roof, metal roof, etc. 3. If the Aged Reflectance is nof available in the Cool Roof Rating Council's Rated Product Directory then use the Initial Reflectance value from the same directory and use the equation (0.2+0.7(pirttiai - 0.2) to obtain a calculated aged value. Where p is the Initial Solar Reflectance from the Cool Roof Rating Council's Rated Product Directory. 4. Checl< box if the Aged Reflectance is a calculated value using the equation above. 5. The SRI value needs to be calculated from a spreadsheet calculator at http://www.enerav.ca.aov/title24/ 6. If Fail then describe on this page of the Inspection Checklist Form and take appropriate action to correct. Verify building plans if necessary. To apply Liquid Field Applied Coatings, the coating must be applied across the entire roof surface and meet the dry mil thickness or coverage recommended by the coatings manufacturer and meet minimum performance requirements listed in §118(1)4. Select the applicable coating: • Aluminum-Pigmented Asphalt Roof Coating • Cement-Based Roof Coating • Other Discrepancies: EnergyPro 5.1 bv EnergySoft User Number: 1712 RunCode: 2014-01-07710:20:30 ID: NR1-213 Page 7 of 18 CERTIFICATE OF COMPLIANCE (Part 3 of 3) ENV-1 C AND FIELD INSPECTION ENERGY CHECKLIST (Part 3 of 3) Project Name Date Dimension One Spas 1/7/2014 Required Acceptance Tests Designer: This form Is to be used by the designer and attached to the plans. Listed below Is the acceptance test for Envelope Fenestrations system. The designer is required to check the acceptance tests and list all the fenestration products that require an acceptance test. If all the site-built fenestration of a certain type requires a test, list the different fenestration products and the number of systems. The NA7 Section In the Appendix of the Nonresidential Reference Appendices Manual describes the test. Since this form will be part of the plans, completion of this section will allow the responsible party to budget for the scope of work appropriately. Enforcement Agency: Systems Acceptance. Before Occupancy Permit is granted for a newly constructed building or space or whenever new fenestration is installed in the building or space shall be certified as meeting the Acceptance Requirements. The ENV-2A form Is not considered a complete form and is not to be accepted by the enforcement agency unless the boxes are checked and/or filled and signed. In addition, a Certificate of Acceptance forms shall be submitted to the enforcement agency that certifies plans, specifications, installation certificates, and operating and maintenance information meet the requirements of §10-103(b) of Title 24 Part 6. The field inspector must receive the properly filled out and signed forms before the building can receive final occupancy. A copy of the ENV-2A for each different fenestration product line must be provided to the owner of the building for their records. Test Description ENV-2A Test Performed By: Fenestration Products Name or ID Requiring Testing or Verification Area of like Products Building Envelope Acceptance Test • EnergyPro 5.1 by EnergySoft User Number: 1712 RunCode: 2014-01-07710:20:30 ID: NR1-213 Page 8 of 18 CERTIFICATE OF COMPLIANCE and FIELD INSPECTION ENERGY CHECKLIST (Part 1 of 4) MECH-1 C Project Name Dimension One Spas Date 1/7/2014 Project Address 1819 Aston Ave., Suite 104 Carlsbad Climate Zone Total Cond. Floor Area 2,950 Addition Floor Area 2,950 GENERAL INFORMATION Building Type: IZI Nonresidential • High-Rise Residential • Hotel/Motel Guest Room • Schools (Public School) • Relocatable Public School Bldg. 0 Conditioned Spaces Unconditioned Spaces (affidavit) Phase of Construction: • New Construction • Addition • Alteration Approach of Compliance: • Component Overall Envelope Energy TDV • Unconditioned (file affidavit) Front Orientation: N, E, S, W or in Degrees: 180 deg HVAC SYSTEM DETAILS FIELD INSPECTION ENERGY CHECKLIST Equipment^ Inspection Criteria Meets Criteria or Requirements Equipment^ Inspection Criteria Pass Fail - Describe Reason^ Item or System Tags (i.e. AC-1, RTU-1, HP-1) Carrier 50TCQA06 • • Equipment Type^: Packaged DX • • Number of Systems 2 • • Max Allowed Heating Capacity^ 58,000 Btu/hr • • Minimum Heating Efficiency^ 7.70 HSPF • • Max Allowed Cooling Capacity^ 61,500 Btu/hr • • Cooling Efficiency' 13.2 SEER/11.2 EER • • Duct Location/ R-Value Conditioned / 0.0 • • When duct testing is required, submit MECH-4A & MECH-4-HERS No • • Economizer No Economizer • • Thermostat Setback Required • • Fan Control Constant Volume • • Equipment^ Inspection Criteria FIELD INSPECTION ENERGY CHECKLIST Equipment^ Inspection Criteria Pass Fail - Describe Reason^ Item or System Tags (i.e. AC-1, RTU-1, HP-1) • • Equipment Type^: • • Number of Svstems • • Max Allowed Heating Capacity' • • Minimum Heating Efficiency' • • Max Allowed Cooling Capacity' • • Cooling Efficiency' • • Duct Location/ R-Value • • When duct testing is required, submit MECH-4A & MECH-4-HERS • • Economizer • • Thermostat • • Fan Control • • 1. If the Actual installed equipment performance efficiency and capacity is less lhan the Proposed (from the energy compliance submittal or from the building plans) the responsible party shall resubmit energy compliance to include the new changes. 2. For additional detailed discrepancy use Page 2 of the Inspection Checklist Form. Compliance fails if a Fail box is checked. 3. Indicate Equipment Type: Gas (Pkg or, Split), VAV, HP (Pkg or split), Hydronic, PTAC, or other. EnergyPro 5.1 by EnergySoft User Number: 1712 RunCode: 2014-01-07710:20:30 ID: NR1-213 Page 9 of 18 CERTIFICATE OF COMPLIANCE and FIELD INSPECTION ENERGY CHECKLIST (Part 2 Of 4) MECH-1 C Project Name Dimension One Spas Date 1/7/2014 Discrepancies: EnergyPro 5.1 by EnergySoft User Number: 1712 RunCode: 2014-01-07710:20:30 ID: NR1-213 Page 10 of 18 o UJ M— o CO •c CD I- (0 _l o LU X o >-o oc UJ z UJ z g I-o UJ Q. (fi UJ U. •o c ra UJ O O O u. O UJ o I- QC UJ O if> 0) to ro <^ 0) c O c .o 55 c t3 CD O c re •Q. <D o o < <D i_ '3 cr eo DC .0 •5. a. ns T3 CO ^ c = S£ 0) •D i2 !c c CD 0} Q..= •5 W a> in <D S € o x: </) — to to .D 0) c 1*- o « $ il CD = •i « <n CD •c o g-5 . ta g^o) •5 Q..« S P, o Q. CD 9. = DC 9 = -S O (D CL O O <2 Q. ' CD a o CO Q. (U .c ui S Q) ^ (D CD to o £ CD tD £ o ^ IL ro •- 5 -It tD < ro CD c^ CO £ £ c :e -— to CCC CD O O 5 o to .9. 0) tD DM ffi 10 g T3 CD O S ro ffi !2 £,= = .5>> "O to > •D c tD c ID C C) to tD •D CD 0)E .g> CD O S-.0 CD ™ 3 to ffi = Is £ < ^ to Z ° CO CD = CD .C .0 O CO Q. ra E E iS CD O w M to o c ra (3 JO ^ °- ™ SS CD £ $ ? ° n £ Q. T3 CD CD ta. o CD O ra 13. to o O) c p •5 UJ c CD ra I .1 CD CD CO o g. E ra 0 tD = OC M 9- tD >. C o to o c raO ra .9 CD Q. C -D CD 20" 9 to — CD c 0> ra c to ^ll 3 '5 £ ID ITto C CD 0} 00." ™ S-E CD to _ o< c ra a> Q. .E £•= P ra o- •5 .g .D «o •O CD < CD E > •S to^ 5 ffi "o c ro o 1 « >, CD •- C CD "'^ = £w< •D CD "D CD Q CD ^ g.^ ro to ffi ra >; 13) CD '3 (D cn Q. >. (D >> o .c CJ i2 3 E B ^ CJ tD " C o CD to _ - to E£ 8- A CD > 0 CQ CD m ra «!E « 0 e o n 0) g ^ ^\ *- o c < 2 ET= E m >« o >* (O CCO a 0) u . o CD < ^ tn CT) c ra.c i5 .E o to CD S^to^ ^ §1 1 iE " ffi K 1^ tD D.3 ; n CB " 1^ ra _ ^1 u to 5 CD a> -Q CO CD £ CO "£ $ ffiS .0 CD S £ < E o to "S " .c to tD S tD £ T3 .Q to ffil tD C O 3 tD to T- c CO: E Q. O c CD E t: ro ^ c a E> ffi o o ra c 2^^ E .c UJ CD P ffi oS >, ffi S XI i= t T3 CD ro c CD oO — o o P o i; "5=6 n " ro to c z^ra.EP fTl Iz: E •D E P S2 .E = 7^ C ^ c p E 9. '3 p- CD •P O CD •P = ffi S i5 to ^ w •- Q.-'~ ^. P < P ffi I _I T3 • • _1 <D .£ < P " •P to C P tD ro o c ro tD 5 > ro S E c E s « ra p Q. P o £ •p 0 ra P ,n P = E£. .» 3 to cr P tD to CD CD P eg O E P "D o a> -it S ffi to .» C 3 ~ P P »- .p «r o S. y c p to CD ^ CO T3 p = s --• ra 5 .9 P S» S I— Q. O o 2. 2.S to Q. lllll ra C T3 o p ra 0 •5" ffi g-oS cn> I- DC 0 03 ^ > to 0) > to Q. C= > Q. ra < =J li. > CO •o- § ra i= ra ^ 5 0 e Q 1 P o 80 0-50 O § .£ O a; 5 • 00 o • • CO C\i Q: 2 • • • • • o O c 3 BC • • • • • 1 2 o ,0 o UJ M— o tf CD (0 -I o UJ X o >-o DC UJ z UJ z g I-o UJ Q. CO Q _l UJ •o c n UJ O z < o o U. o UJ o I-oc UJ o to ro 03 C O c .o 55 c Cb Q eto » UJ 0) •= <i> " ra o) <n i 2^ ^ CO < 0) b <1> e I •g Q .2 < < Q o8 « a o tfl 3 ra o c X u_ ti> u>o tD 55 w 5 o t\i CO CM I • • • o O c 3 • • • • • • • • • tD 1 2 i I AIR SYSTEM REQUIREMENTS (Part 1 of 2) MECH-2C Project Name Date Dimension One Spas 1/7/2014 Item or System Tags (i.e. AC-1, RTU-1, HP-1) Indicate Air Systems Type (Central, Single Zone, Packag e, VAV, or etc..) Item or System Tags (i.e. AC-1, RTU-1, HP-1) Carrier 50TCQA06 Number of Systems 2 lUIANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value Indicate Page Reference on Plans or Schedule and indicate the applicable exception(s) lUIANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value T-24 Sections lUIANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 112(a) 7.70 HSPF lUIANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 112(a) 13.2 SEER/11.2 EER lUIANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 112(b), 112(c) Yes lUIANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 112(c), 115(a) n/a lUIANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 121(b) No lUIANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 121(b) 1,526 cfm 763 cfm each unit lUIANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 121(c) No lUIANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 121(c) No lUIANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 122(e) Programmable Switch lUIANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 122(e) Setback Required lUIANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 122(f) Auto lUIANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 122(g) n/a lUIANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 123 lUIANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 124 Conditioned / 0.0 PRESCRIPTIVE IVIEASURES Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Lealcage Sealing. If Yes, a MECH-4-A must be submitted 144(a&b) n/a Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Lealcage Sealing. If Yes, a MECH-4-A must be submitted 144(a&b) 88,739 Btu/hr Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Lealcage Sealing. If Yes, a MECH-4-A must be submitted 144(a&b) n/a Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Lealcage Sealing. If Yes, a MECH-4-A must be submitted 144(a&b) 90,426 Btu/hr Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Lealcage Sealing. If Yes, a MECH-4-A must be submitted 144(c) Constant Volume Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Lealcage Sealing. If Yes, a MECH-4-A must be submitted 144(c) Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Lealcage Sealing. If Yes, a MECH-4-A must be submitted 144(c) Yes Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Lealcage Sealing. If Yes, a MECH-4-A must be submitted 144(d) No Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Lealcage Sealing. If Yes, a MECH-4-A must be submitted 144(e) No Economizer Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Lealcage Sealing. If Yes, a MECH-4-A must be submitted 144(f) Constant Temp Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Lealcage Sealing. If Yes, a MECH-4-A must be submitted 144(f) Constant Temp Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Lealcage Sealing. If Yes, a MECH-4-A must be submitted 144(g) Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Lealcage Sealing. If Yes, a MECH-4-A must be submitted 144(1) Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Lealcage Sealing. If Yes, a MECH-4-A must be submitted 144(k) No 1. Total installed capacity (MBtu/hr) of all electric heat on this project exclusive of electric auxiliary heat for heat pumps. If electric heat is used explain which exception(s) to §144(g) apply. EnergyPro 5.1 by EnergySoft User Number: 1712 RunCode: 2014-01-07710:20:30 ID: NR1-213 Page 13 of 18 o CO X u UJ .g" g t o a •- < s "5 to !i UJ X UJ QC o Ul > -I < 5 > < UJ X UJ cc tn ffl. >-u z < Q. 3 o o o O- 5 UJ > < u z < X u UJ s CO • ffl < UJ < O UJ to ro tb c O c .0 55 c - tb Q- Q OJ •= I ^S^'i d 5? C 13.U. S m CO "-^ .ff to ^ . Q tD > P .oCS LU > ra C3 DC 2Q O UJ Li. CD 2 O 0.0, o ffi J3 »- Q O EO ^ U- ffi O o<x Li. ffi'i- o ffi > o CO o o CO CO < CQ > o z < n. :D o CJ o to CO < CQ < LU CC < E a ffi < > Q _ O 01^ LU CC > T3 O o a ffi C31 5 ^ •5 % E S .11 - _2 ; o : o LJC3 E E 4 5 .91S ^ to ra ffi ffi Q Oi tD m £ C5 ' < O 1^ • .2 1= c.9 ffi £ c ffi •> — oc i S i "o _ "sl o . Q. ffi ffi ffi to ffi ^ !t E =5 ffi I?-! ffi o ,2 01 ' ffi I ffi CO CO 10 p a. ffi fi o in X o UJ -5 cv O Vi -I ? UJ Q UJ S Q. 5 o Ul -J < o z < X o UJ (0 Q. s 3 D. 0. X ffl E Q. c i2 0) o 5 >-oc < to ro Q) C O ffi c E .O S to 5 c o CD 3 V) OC u o < oc UJ z o ffi E a 21 ^5 •D 1. c o iS CO o ts cs IN c UJ _: m OS > 5 • T3 LU 0. X ffl E 3 UJ 9 . ffl a il " o o z IJ O o u a X m Q. 0. a. (O ffi C3 < UJ X § ffi a > E o c o fi o •<»• o o c 3 OC a tn < H UJ Q O Z !5 UJ z oc UJ !5 -I < QC UJ O >• u. > I-c •D ?i o o V) o < oc s UJ tn > tn _i < oc UJ o § (D E o >-oc < (/) z < u. E UJ I-(/> >- (A _l < OC (-z UJ o J E ffi (0 I ID I ffi fi ENVELOPE MANDATORY MEASURES: NONRESIDENTIAL ENV-MM Project Name Dimension One Spas Date 1/7/2014 DESCRIPTION Building Envelope Measures: §118(a): Installed insulating material shall have been certified by the manufacturer to comply with the California Quality Standards for insulating material. Title 20 Chapter 4, Article 3. §118(c): All Insulating IVIaterials shall be installed in compliance with the flame spread rating and smoke density requirements of Sections 2602 and 707 of Title 24, Part 2. §118(f): The opaque portions of framed demising walls in nonresidential buildings shall have insulation with an installed R-value of no less than R-13 between framing members. §117(a): All Exterior Joints and openings in the building that are obsen/able sources of air leakage shall be caulked, gasketed, weatherstripped or otherwise sealed. IVIanufactured fenestration products and exterior doors shall have air infiltration rates not exceeding 0.3 cfm/ft.^ of §116(a) 1: window area, 0.3 cfm/ft.^ of door area for residential doors, 0.3 cfm/ft.^ of door area for nonresidential single doors (swinging and sliding), and 1.0 cfm/ft.^ for nonresidential double doors (swinging). §116(a) 2: Fenestration U-factor shall be rated in accordance with NFRC 100, or the applicable default U-factor. §116(a) 3: Fenestration SHGC shall be rated in accordance with NFRC 200, or NFRC 100 for site-built fenestration, or the applicable default SHGC. §116(b): Site Constructed Doors, Windows and Skylights shall be caulked between the unit and the building, and shall be weatherstripped (except for unframed glass doors and fire doors). EnergyPro 5.1 bv EnergySoft User Number: 1712 RunCode: 2014-01-07710:20:30 ID: NR1-213 Page 16 of 18 MECHANICAL MANDATORY MEASURES: NONRESIDENTIAL MECH-MM Project Name Dimension One Spas Date 1/7/2014 Equipment and System Efficiencies §111: Any appliance for which there is a California standard established in the Appliance Efficiency Regulations will comply with the applicable standard. §115(a): Fan type central furnaces shall not have a pilot light. §123: Piping, except that conveying fluids at temperatures between 60 and 105 degrees Fahrenheit, or within HVAC equipment, shall be insulated in accordance with Standards Section 123. §124: Air handling duct systems shall be installed and insulated in compliance with Sections 601, 602, 603, 604, and 605 of the CMC Standards. Controls §122(e): Each space conditioning system shall be installed with one of the following: 1A. Each space conditioning system serving building types such as offices and manufacturing facilities (and all others not explicitly exempt from the requirements of Section 112 (d)) shall be installed with an automatic time switch with an accessible manual override that allows operation of the system during off-hours for up to 4 hours. The time switch shall be capable of programming different schedules for weekdays and weekends and have program backup capabilities that prevent the loss of the device's program and time setting for at least 10 hours if power is interrupted; or IB. An occupancy sensor to control the operating period of the system; or 1C. A 4-hour timer that can be manually operated to control the operating period of the system. 2. Each space conditioning system shall be installed with controls that temporarily restart and temporarily operate the system as required to maintain a setback heating and/or a setup cooling thermostat setpoint. §122(g): Each space conditioning system serving multiple zones with a combined conditioned floor area more than 25,000 square feet shall be provided with isolation zones. Each zone: shall not exceed 25,000 square feet; shall be provided with isolation devices, such as valves or dampers that allow the supply of heating or cooling to be setback or shut off independently of other isolation areas; and shall be controlled by a time control device as described above. §122(c): Thermostats shall have numeric setpoints in degrees Fahrenheit (F) and adjustable setpoint stops accessible only to authorized personnel. §122(b): Heat pumps shall be installed with controls to prevent electric resistance supplementary heater operation when the heating load can be met by the heat pump alone §122(a&b): Each space conditioning system shall be controlled by an individual thermostat that responds to temperature within the zone. Where used to control heating, the control shall be adjustable down to 55 degrees F or lower. For cooling, the control shall be adjustable up to 85 degrees F or higher. Where used for both heating and cooling, the control shall be capable of providing a deadband of at least 5 degrees F within which the supply of heating and cooling is shut off or reduced to a minimum. Ventilation §121(e): Controls shall be provided to allow outside air dampers or devices to be operated at the ventilation rates as specified on these plans. §122(f): All gravity ventilating systems shall be provided with automatic or readily accessible manually operated dampers in all openings to the outside, except for combustion air openings. §121 (f): Ventilation System Acceptance. Before an occupancy permit is granted for a newly constructed building or space, or a new ventilating system serving a building or space is operated for normal use, all ventilation systems serving the building or space shall be certified as meeting the Acceptance Requirements for Code Compliance Service Water Heating Systems §113(c) Installation 3. Temperature controls for public lavatories. The controls shall limit the outlet Temperature to 110° F. 2. Circulating service water-heating systems shall have a conlrol capable of automatically turning off the circulating pump when hot water is not required. EnergyPro 5.1 by EnergySoft User Number: 1712 RunCode: 2014-01-07710:20:30 ID: NR1-213 Page 17 of 18 HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY Project Name Dimension One Spas Date 1/7/2014 System Name Carrier 50TCQA06 Floor Area 2,950 ENGINEERING CHECKS SYSTEM LOAD Number of Systems 2 COIL COOLING PEAK COIL HTG. PEAK Heating System CFM Sensible Latent CFM Sensible Output per System 58,000 Total Room Loads 3,918 71,738 20,345 354 8,040 Total Output (Btuh) 116,000 Return Vented Lighting 0 Output (Btuh/sqft) 39.3 Return Air Ducts 3,587 402 Cooling System Return Fan 0 0 Output per System 61,500 Ventilation 1,526 12,946 11,522 1,526 59,076 Total Output (Btuh) 123,000 Supply Fan 5,113 -5,113 Total Output (Tons) 10.3 Supply Air Ducts 3,587 402 Total Output (Btuh/sqft) 41.7 Total Output (sqft/Ton) 287.8 TOTAL SYSTEM LOAD 96,971 31,867 62,807 Air System CFM per System 2,000 HVAC EQUIPMENT SELECTION Airflow (cfm) 4,000 Carrier 50TCQA06 90,426 35,186 88,739 Airflow (cfm/sqft) 1.36 Airflow (cfm/Ton) 390.2 Outside Air (%) 38.1 % Total Adjusted System Output 90,426 35,186 88,739 Outside Air (cfm/sqft) 0.52 (Adjusted for Peak Design conditions) Note: values above given at ARI conditions TIME OF SYSTEM PEAK Jul 2 PM Jan 1 AM HEATING SYSTEM PSYCHROMETRICS Airstream Temperatures at Time of Heating Peak) 34 °F Outside Air 1,526 cfm 70 °F M 91 °F —• Heating Coil Supply Fan 4,000 cfm 91 "F ROOM 70 "F COOLING SYSTEM PSYCHROMETICS (Airstream Temperatures at Time of Cooling Peak) 83 / 68 °F Outside Air 1,526 cfm 75 / 63 °F =• 78 / 64 °F 55 / 54 "F • 56 / 54 "F • Cooling Coil Supply Fan 4,000 cfm 53.1 % 57 / 55 "F ROOM 74 / 63 "F EnergyPro 5.1 by EnergySoft User Number: 1712 RunCode: 2014-01-07710:20:30 ID: NR1-213 Page 18 of 18 BUILDING ENERGY ANALYSIS REPORT PROJECT: Dimension One Spas 1819 Aston Ave., Suite 104 Carlsbad, CA 92008 Project Designer: Smith Consulting Architects Report Prepared by: Michael Dell DELL CO. 1629 York Drive Vista, Ca 92084 760-940-0064 Job Number: NR1-213 Date: 1/7/2014 The EnergyPro computer program has been used to perform the calculations summarized in this compliance report. This program has approval and is authorized by the California Energy Commission for use with both the Residential and Nonresidential 2008 Building Energy Efficiency Standards. This program developed by EnergySoft, LLC - www.energysoft.com. EnergyPro 5.1 by EnergySoft User Number: 1712 RunCode: 2014-01-07710:20:30 ID: NR1-213 TABLE OF CONTENTS Cover Page 1 Table of Contents 2 Nonresidential Performance Title 24 Forms 3 Form ENV-MM Envelope Mandatory Measures 16 Form MECH-MM Mechanical Mandatory Measures 17 HVAC System Heating and Cooling Loads Summary 18 EnergyPro 5.1 by EnergySoft Job Number: ID:NR1-213 User Number: 1712 PERFORMANCE CERTIFICATE OF COMPLIANCE (Parti of3) PERF-1 C Project Name Dimension One Spas Date 1/7/2014 Project Address 1819 Aston Ave., Suite 104 Carlsbaci Climate Zone CA Climate Zone 07 Total Cond. Floor Area 2,950 Addition Floor Area 2,950 GENERAL INFORMATION Building Type: • Nonresidential • • Relocatable - indicate • High-Rise Residential • specific climate zone • Hotel/Motel Guest Room all climates Phase of Construction: • New Construction • Addition • Alteration STATEMENT OF COMPLIANCE This certificate of compliance lists the building features and specifications needed to comply with Title 24, Parts 1 and 6 of the California Code of Regulations. This certificate applies only to a Building using the performance compliance approach. [OillTornMi A»»oclatk>n of Bmidlnp Bn»i Iding Bnmrgy BBB Consultant* The documentation author hereby certifies that the documentation is accurate and complete. Documentation Author Name Michael Dell Signature Company DELL CO. CEPE NR08-90-3530 Date 1/7/2014 Address 1629 York Drive Phone 760-940-0064 City/State/Zip yist^, Ca 92084 The Principal Designer hereby certifies that the proposed building design represented in this set of construction documents is consistent with the other compliance forms and worksheets, with the specifications, and with any other calculations submitted with this permit application. The proposed building has been designed to meet the energy efficiency requirements contained in sections 110, 116 through 118, and 140 through 149 of Title 24, Part 6. Please check one: ENV. LTG. MECH. I hereby affirm that I am eligible under the provisions of Division 3 of the Business and Professions Code to sign this document as the person responsible for its preparation; and that I am licensed in the State of California as a civil engineer, mechanical engineer, electrical engineer, or I am a licensed architect. I affirm that I am eligible under the provisions of Division 3 of the Business and Professions Code by section 5537.2 or 6737.3 to sign this document as the person responsible for its preparation; and that I am a licensed contractor performing this worl<. I affirm that I am eligible under Division 3 of the Business and Professions Code to sign this document because it pertains to a structure or type of worl< described as exempt pursuant to Business and Professions Code Sections 5537, 5538 and 6737.1. Principal Envelope Designer Name SCA Signature I Date/ V/^/^ Company Smith Consulting Architects Address License # City/State/Zip Phone Principal Mechanical Designer Name Seaside Heating & Air Conditioning Signature Company Seaside Heating & Air Conditioning Date 1-7-2014 Address License # 790514 City/State/Zip Phone Principal Lighting Designer Name Signature Company Lighting Compliance Not In The Scope Of This Submittal Date Address License # City/State/Zip Phone INSTRUCTIONS TO APPLICANT COMPLIANCE & WORKSHEETS {check box if worksheets are included) Ei ENV-1 C Certificate of Compliance. Required on plans. El MECH-1 C Certificate of Compliance. Required on plans. • LTG-1 C Certificate of Compliance. Required on plans. Ei MECH-2C AirA/Vater Side/Sen/ice Hot Water & Pool Requirements. • LTG-2C Lighting Controls Credit Worksheet. El MECH-3C Mechanical Ventilation and Reheat. • LTG-3C Indoor Lighting Power Allowance. 13 MECH-5C Mechanical Equipment Details. EnergyPro 5.1 by EnergySoft User Number: 1712 RunCode: 2014-01-07710:20:30 ID: NR1-213 Page 3 of 18 PERFORMANCE CERTIFICATE OF COMPLIANCE (Part 2 of 3) PERF-1 C Project Name Date Dimension One Spas 1/7/2014 ANNUAL TDV ENERGY USE SUMMARY (kBtu/sqft-yr) standard Proposed Compliance Space Heating 1.21 0.60 0.61 Heating Space Cooling 178.64 157.66 20.98 Cooling Indoor Fans 47.39 47.39 0.00 Fans Heat Rejection 0.00 0.00 0.00 Heat Rej Pumps & Misc. 0.00 0.00 0.00 Pumps Domestic Hot Water 0.00 0.00 0.00 DHW Ughting 142.15 142.15 0.00 Lighting Receptacle 70.60 70.60 0.00 Receptacle Process 0.00 0.00 0.00 Process Process Lighting 0.00 0.00 0.00 Process Ltg TOTALS 440.00 418.40 21.60 Percent better than Standard 4.9% ( 4.9 % excluding process) BUILDING COMPLIES GENERAL INFORMATION Building Orientation ^S; 180 deg Conditioned Floor Area 2,950 sqft. Number of Stories 1 Unconditioned Floor Area 1,550 sqft. Number of Systems 2 Conditioned Footprint Area 2,950 sqft. Number of Zones 2 Natural Gas Available On Site Yes Orientation Gross Area Glazing Area Glazing Ratio Front Elevation 0 sqft. 0 sqft. 0.0% Left Elevation (W) 0 sqft. 0 sqft. 0.0% Rear Elevation (N) 0 sqft. 0 sqft. 0.0% Right Elevation (E) 0 sqft. 0 sqft. 0.0% Total 0 sqft. 0 sqft. 0.0% Roof 2,950 sqft. 64 sqft. 2.2% standard Prescriptive Lighting Power Density Prescriptive Envelope TDV Energy 1.600 45,398 w/sqft. Proposed 1.600 51,250 Prescriptive Values for W/sqft. Comparison only. See LTG-1 C for allowed LPD. Remarks: EnergyPro 5.1 bv EnergySoft User Number: 1712 RunCode: 2014-01-07710:20:30 ID: NR1-213 Paae 4 of 18 PERFORMANCE CERTIFICATE OF COMPLIANCE (Part 3 of 3) PERF-1 C Project Name Dimension One Spas Date 1/7/2014 ZONE INFORMATION System Name Zone Name Occupancy Type Floor Area (sqft.) Inst. LPD (W/sf)' Ctrl. Credits (W/sf)^ Allowed LPD Proc. Loads (W/sf) System Name Zone Name Occupancy Type Floor Area (sqft.) Inst. LPD (W/sf)' Ctrl. Credits (W/sf)^ Area {\N/sif Tailored (W/sf)" Proc. Loads (W/sf) Carrier 50TCQA06 Production/Product Display Retail Sales, Wholesale 2,950 •1.600 Warehouse Commercial, Industrial Stora 1,550 *0.600 Notes: 1. See LTG-1 C 2. See LTG-2C 3. See LTG-3C 4. See LTG.4C (items marked with asterisk, see LTG-1 -C by others) (by others) Items above require special documentation EXCEPTIONAL CONDITIONS COMPLIANCE CHECKLIST The local enforcement agency should pay special attention to the items specified in this checldist. These Items require speciai written justification and documentation, and special verification to be used with the performance approach. The local enforcement agency determines the adequacy of the justifications, and may reject a building or design that otherwise complies based on the adequacy of the special justification and documentation submitted. The exceptional features listed in this performance approach application have specifically been reviewed. Adequate written justification and documentation for their use have been provided by the applicant. Authorized Sionature or Stamp EnergyPro 5.1 by EnergySoft User Number: 1712 RunCode: 2014-01-07710:20:30 ID:NR1-213 Page 5 of 18 CERTIFICATE OF COMPLIANCE AND FIELD INSPECTION ENERGY CHECKLIST (Part 1 of 3) ENV-1 C Project Name Dimension One Spas Date 1/7/2014 Project Address 1819 Aston Ave., Suite 104 Carlsbad Climate Zone Total Cond. Floor Area 2,950 Addition Floor Area 2,950 GENERAL INFORMATION Building Type: El Nonresidential • High-Rise Residential • Hotel/I^otel Guest Room • Schools (Public School) • Relocatable Public School Bldg. 121 Conditioned Spaces • Unconditioned Spaces • Sl<ylight Area for Large Enclosed Space s 8000 ft (If checked include the ENV-4C with submittal) Phase of Construction: • New Construction • Addition • Alteration Approach of Compliance: • Component • Overall Envelope • Unconditioned (file affidavit) Front Orientation: N, E, S, W or in Degrees: 180 deg FIELD INSPECTION ENERGY CHECKLIST OPAQUE SURFACE DETAILS INSULATION Tag/ID Assembly Type c 0) (0 "V U DC DC o 'C 0) 0) 3 1<-!i UJ > X 3 Ul u. DC Is 1^ .2 C St £ u. _)< T3 C -) < c .2 •O 3 o iS U 0} (0 (0 IS o. Roof 2,886 (S) 0.051 R-19 4.2.2-A12 Existing Slab 2,950 (N) 0.730 None 4.4.7-A1 Existing Demising 1,000 (N) 0.183 R-19 4.3.3-A5 New • • 1. See Instructions in the Nonresidential Compliance Manual, page 3-96. 2. If Fail, then describe on Page 2 of the Inspection Checklist Form and take appropriate action to correct. A fail does not meet compliance. FENESTRATION SURFACE DETAILS Tag/ID Fenestration Type £. (0 <•> Orientation N,E,S,W IMax U-Factor U-Factor Source Max (R)SHGC SHGC Source Overhang Conditions Status Pass u. 1 Skylight 64 (s; 1.190 Default 0.680 Default • Existing • • • • • • • • • • • • • • • • • • • • • • • • • • • • • 1. See Instructions in the Nonresidential Compliance Manual, page 3-96. 2. If Fail then describe on Page 2 of the Inspection Checklist Form and take appropriate action to correct. Verify building plans if necessary. EnergyPro 5.1 by EnergySoft User Number: 1712 RunCode: 2014-01-07X10:20:30 ID: NR1-213 Page 6 of 18 CERTIFICATE OF COMPLIANCE AND FIELD INSPECTION ENERGY CHECKLIST (Part 2 of 3) ENV-1 C Project Name Dimension One Spas Date 1/7/2014 ROOFING PRODUCT (COOL ROOFS) (Note if the roofing product is not CRRC certified, this compliance approach cannot be used). Go to Overall Envelope Approach or Performance Approach. CHECK APPLICABLE BOX BELOW IF EXEMPT FROM THE ROOFING PRODUCT "COOL ROOF" REOUIREMENTS: Pass Fail^ N/A • Roofing compliance Dfil required in Climate Zones 1 andi6 with a Low-Sloped. 2:12 pitch or less. • • • • Roofing compliance net required in Climate Zone 1 with a Steep-Sloped with less than 5 Ib/ft'. Greater than 2:12 pitch. • • • |-| Low-sloped Wood framed roofs in Climate Zones 3 and 5 are exempted, solar reflectance and thermal emittance or SRI that have a U-factor of 0.039 or lower. See Opaque Surface Details roof assembly. Column H of ENV-2C. • • • |-| Low-sloped Metal building roofs in Climate Zone 3 and 5 are exempted, solar relectance and thermal emittance or SRI that have a U-factor of 0.048 or lower. See Opaque Surface Details roof assembly below, Column H of ENV-2C. • • • |-i The roof area covered by building integrated photovoltaic panels and building integrated solar thermal panels are exempted. Solar reflectance and thermal emittance or SRI, see spreadsheet calculator at www.enerav.ca.aov/title24/ • • • r-l Roof constructions that have thermal mass over the roof membrane with a weight of at least 25 Ib/ff^ are exempt from the Cool Roof criteria below. • • • |-i High-rise residential buildings and hotels and motels with low-sloped roofs in Climate Zones 1 through 9,12 and 16 are exempted from the low-sloped roofing criteria. • • • 1. If Fail then describe on this page of the Inspection Checklist Form and take appropriate action to correct. Verify building plans if necessary. CRRC Product ID Number' Roof Slope < 2:12 >2:12 Product Weight < 5lb/ft^ £ 5lb/ft^ Product Type' Aged Solar Reflectance' Thermal Emmitance SRI* Pass Fail^ • • • • n' • • • • • • • • • • • • • • • • • • n' • • • • • • • • • • • • • • 1. The CRRC Product ID Number can be obtained from the Cool Roof Rating Council's Rated Product Directory at www.coolroofs.ora/products/search.DhD 2. Indicate the type of product is being used for the roof top, i.e. single-ply roof, asphalt roof, metal roof, etc. 3. If the Aged Reflectance is not available in the Cool Roof Rating Council's Rated Product Directory then use the Initial Reflectance value from the same directory and use the equation (0.2+0.7(pi„iiiai - 0.2) to obtain a calculated aged value. Where p is the Initial Solar Reflectance from the Cool Roof Rating Council's Rated Product Directory. 4. Check box if the Aged Reflectance is a calculated value using the equation above. 5. The SRI value needs lo be calculated from a spreadsheet calculator at http://www.enerav.ca.aov/title24/ 6. If Fail then describe on this page of the Inspection Checklist Form and take appropriate action to correct. Verify building plans if necessary. To apply Liquid Field Applied Coatings, the coating must be applied across the entire roof surface and meet the dry mil thickness or coverage recommended by the coatings manufacturer and meet minimum performance requirements listed in §118(1)4. Select the applicable coating: • Aluminum-Pigmented Asphalt Roof Coating • Cement-Based Roof Coating • Other. Discrepancies: EnergyPro 5.1 by EnergySoft User Number: 1712 RunCode: 2014-01-07710:20:30 ID: NR1-213 Paae 7 of 18 CERTIFICATE OF COMPLIANCE (Part 3 of 3) ENV-1 C AND FIELD INSPECTION ENERGY CHECKLIST (Part 3 of 3) Project Name Date Dimension One Spas 1/7/2014 Required Acceptance Tests Designer: This form is to be used by the designer and attached to the plans. Listed below is the acceptance test for Envelope Fenestrations system. The designer is required to check the acceptance tests and list all the fenestration products that require an acceptance test. If all the site-built fenestration of a certain type requires a test, list the different fenestration products and the number of systems. The NA7 Section in the Appendix of the Nonresidential Reference Appendices Manual describes the test. Since this form will be part of the plans, completion of this section will allow the responsible party to budget for the scope of work appropriately. Enforcement Agency: Systems Acceptance. Before Occupancy Permit is granted for a newly constructed building or space or whenever new fenestration is installed in the building or space shall be certified as meeting the Acceptance Requirements. The ENV-2A form is not considered a complete form and is not to be accepted by the enforcement agency unless the boxes are checked and/or filled and signed. In addition, a Certificate of Acceptance forms shall be submitted to the enforcement agency that certifies plans, specifications, installation certificates, and operating and maintenance information meet the requirements of §10-103(b) of Title 24 Part 6. The field inspector must receive the properly filled out and signed forms before the building can receive final occupancy. A copy of the ENV-2A for each different fenestration product line must be provided to the owner of the building for their records. Test Description ENV-2A Test Performed By: Fenestration Products Name or ID Requiring Testing or Verification Area of like Products Building Envelope Acceptance Test • • • • • • • • • • • • • • • • • • • • • • • • • • EnergyPro 5.1 by EnergySoft User Number: 1712 RunCode: 2014-01-07710:20:30 ID: NR1-213 Page 8 of 18 CERTIFICATE OF COMPLIANCE and FIELD INSPECTION ENERGY CHECKLIST (Part 1 of 4) MECH-1 C Project Name Dimension One Spas Date 1/7/2014 Project Address 1819 Aston Ave., Suite 104 Carlsbad Climate Zone Total Cond. Floor Area 2,950 Addition Floor Area 2,950 GENERAL INFORMATION Building Type: • Nonresidential • High-Rise Residential • Hotel/I^otel Guest Room • Schools (Public School) • Relocatable Public School Bldg. • Conditioned Spaces Unconditioned Spaces (affidavit) Phase of Construction: • New Construction • Addition • Alteration Approach of Compliance: • Component Overall Envelope Energy TDV • Unconditioned (file affidavit) Front Orientation: N, E, S, W or in Degrees: 180 deg HVAC SYSTEM DETAILS FIELD INSPECTION ENERGY CHECKLIST Equipment^ Inspection Criteria Meets Criteria or Requirements Equipment^ Inspection Criteria Pass Fail - Describe Reason^ Item or System Tags (i.e. AC-1, RTU-1, HP-1) Camer 50TCQA06 • • Equipment Type^: Packaged DX • • Number of Systems 2 • • IVlax Allowed Heating Capacity^ 58,000 Btu/hr • • l^/linimum Heating Efficiency^ 7.70 HSPF • • IVlax Allowed Cooling Capacity^ 61,500 Btu/hr • • Cooling Efficiency^ 13.2 SEER/11.2 EER • • Duct Location/ R-Value Conditioned / 0.0 • • When duct testing is required, submit MECH-4A & MECH-4-HERS No • • Economizer No Economizer • • Thermostat Setback Required • • Fan Control Constant Volume • • Equipment^ Inspection Criteria FIELD INSPECTION ENERGY CHECKLIST Equipment^ Inspection Criteria Pass Fail - Describe Reason^ Item or System Tags (i.e. AC-1, RTU-1, HP-1) • • Equipment Type^: • • Number of Systems • • IVlax Allowed Heating Capacity^ • • IVIinimum Heating Efficiency^ • • IVlax Allowed Cooling Capacity^ • • Cooling Efficiency^ • • Duct Location/ R-Value • • When duct testing is required, submit MECH-4A & MECH-4-HERS • • Economizer • • Thermostat • • Fan Control • • 1. If the Actual installed equipment performance efficiency and capacity is less than the Proposed (from the energy compliance submittal or from the building plans) the responsible party shall resubmit energy compliance to include the new changes. 2. For additional detailed discrepancy use Page 2 of the Inspection Checklist Form. Compliance fails if a Fail box is checked. 3. Indicate Equipment Type: Gas (Pkg or. Split), VAV, HP (Pkg or split), Hydronic, PTAC, or other. EnergyPro 5.1 by EnergySoft User Number: 1712 RunCode: 2014-01-07710:20:30 ID: NR1-213 Page 9 of 18 CERTIFICATE OF COMPLIANCE and FIELD INSPECTION ENERGY CHECKLIST (Part 2 of 4) MECH-1 C Project Name Dimension One Spas Date 1/7/2014 Discrepancies: EnergyPro 5.1 by EnergySoft User Number: 1712 RunCode: 2014-01-07710:20:30 ID: NR1-213 Page 10 of 18 o I z o LU O CO (0 CL I- "3 O UJ X o >• <D QC LU Z LU O LU Q. V) LU lE •o c (0 LU O Q. o o LJ. o LU !; O LI H DC LU O I CO cc CD c O c .o tH c CD Q w w 0) I-(D O c « Q. CD O O < CD ^ CT 0) OC fl) "D ffl CO •5..° ^% o o .C tf) -0 S c x: 0) Q..E •5 CO <1> (0 ID (0 C (D UJ ffl CD U) X3 fl) .2 >- « ffl .y o ffl CO o| <o 5 CD ffi ffi ffl o »_ c — ffl ffiS ffl y c <D ffl £ Q. = ffi ffl O ffi ffl ffl c g ffl ffi t J3 3 re 3 c ffl If) ffi o o ffl ^ Q. ffi O ^ 9- 0 D. ffi ^ ? i •So 1 S- P o OT O <D CO C ffi tn .t ffi ffi .n „ (D O D) .>< 3 s- >- < re Q. 5 ^ re (D Q-E (D Q. O (U :5 C ffi .Q la O OT CO •- ffi^ re ffi ro QJ _p _ _ re "re iS m c _ = .TO- OT > x> c ffl ffi 9' •« ffi T3 ffi T3 C -ffl T3 — VLI w ffl OT • UJ ffi >% .Q T3 ffi OT ffi C .52 0)E •«£ fl) !2 O " ffi • . O OT Q. ffl E E iS ffi o 8 " ^ re *Q _ffl ^ >- °-« ffi <D X fli ^ <-» w m ffl a. T3 ffi ffi Q. O ffi O ffl Q. OT i_ O D) C i3 C I (D (D Ui o E S ffi = L OT y- o >. t o OT O C D)0 iS 0) 2" ™ 5 OT £J c o ffi f 3 CT ffi .E <i> O O a ffi ffl c &ffi C o ffi o — ^ 9 OT *-ffi c pi OT 3 5 3 ffi ffi CTOT C ffi OJ o o OT O C ffi §. O) c 3 .£ - 3 — ST •= c ffi •D ffi< ffi p > ^ -I-" OT^ S re T3 ffi " 15 = g .ffi ffl o 1 ^ >, ffi .- S ffi g c 0 «ffl£ 73 ffi -ci ffi y ffi •ti re 2 OT ffl o ,— := k_ ffi 3 ffi Q..O Q. >% ffi >. 0^0 C *- C ffl D) S Q. C Q. 3 3 O £ O O Q) O o m O ffi OT ffi ° 80 .52 E •£ s o ffi •> ffi CO ffi CQ .. -D .. ^ O P o (0 o — fl) S c § 0) _ » 0)8 CO 8 C < ffi'< :SS tn ^ tn 0) ffl 0) UJ (/) c 0) OT ffi II. OT ffi c .> ffl (U ^8 OT (1) - OT 3 E C OT ffi E E CT ffi '5 x> I- ffi |H E -D Q. ffi •3 ts ffi § ffi ^ to " ? ffis'-s^ ffl <D ffi ffl OT Q- «~ O s O o C £< E u t ^ T3 R (° ^ m O ^ OT CO ® 5 os- S ^ 55- !g fflffl <=> ffi .—-.^ V •E t3 " o 3 OJ OT 1- OJ Q. o o E o ffi e " S c ffl ffi c ffi CL P ffl E ffi « ^ g'^8^ =6 - < = UJ — 3 £ O ffi ^ -to-B .2 S g ffi i= O ffi E ffi C ^ ^OT " 8 2.5 ffi 8-5 E& ° 8 c o J3 <-> ffl 0) ffl - •" " .E §i o i: ffi OT C C C O ^ 8.l| 2 rem g-1 § g< ffiP " o L.- - ffi — ..^ ffi iS OT ^ OT C1..E _ o „ ffl CT) ffi o).E — c 2 re '5 .= fe-o e - 5" ffi Eo o < ™ I _ -I 2 ffi< ffi 3-"2 E !2 5ST3 1 ill fll ^ ffl s ffi ^ ffl o .0 OT £ .D c ^ ^ ^ om 2 ffi-o O -^-^ O OJ O « CT c - ffi P O D) OT c ffi .52 ffi 2 ffl -JJ' P T;"*^ ffl CT OT tij E .E 2 .P c O E £ M- ^ ffi ffi 9 «= ffi c ffi S o ^. il' ffi ffi ffi Q. COOT ffi to £ -Q P C TO 0) ^ =111 CO > I- DC > <5 U) Q. ro < = u. > CO c ; .9 ro .ti (0 > S o c Q 0} N <f> 1 e g ^ UJ ^^1 o £ 1 i r o "o O)-O > .E - CO c 3 c O o; > < o C3 oS < > o • • • • 00 o i • • • • • • • • • • • • • • • • CN I • • • • • • • • • a • • • • • o I • c a Q: • • • • • • • £ 2 CO o § 5 fi .Q I fi o o LU ro o CD Q. H CO o LU z o >-o oc LU z LU o LU Q. (fi LU LJ. T3 C (0 LU O o O LL O LU !^ o LL QC LU O CO CD % CD C O c .o CO c CD .£ Q > m T3 CD E o t E'co O LU .9.1- to O) CO £co 0) ro .Q CO < 0) 5 >-X !2 m 3 , O ro ''o **- CD c S S §S «< < b 08 CO J2 3 0 0^, ro o c X u. OJ Old CD .i5 1- QQO c CD E 9 •3, o UJ o eg 2 T3 C < _C ro ffi X ffi •D 'm re ffi CO OJ .— • • • • • • lv o • • • • • • • • • • • • • • • • • • CN rv (D E it: o 1 CD fi I fi AIR SYSTEM REQUIREMENTS (Part 1 of 2) MECH-2C Project Name Date Dimension One Spas 1/7/2014 item or System Tags (i.e. AC-1, RTU-1, HP-1) Indicate Air Systems Type (Central, Single Zone, Paclcag e, VAV, or etc..) item or System Tags (i.e. AC-1, RTU-1, HP-1) Carrier 50TCQA06 Number of Systems 2 •MANDATORY IVIEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV IVIinimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value Indicate Raj je Reference on Plans or Schedule and indicate the applicable exception(s) •MANDATORY IVIEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV IVIinimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value T-24 Sections •MANDATORY IVIEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV IVIinimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 112(a) 7.70 HSPF •MANDATORY IVIEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV IVIinimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 112(a) 13.2 SEER/11.2 EER •MANDATORY IVIEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV IVIinimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 112(b), 112(c) Yes •MANDATORY IVIEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV IVIinimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 112(c), 115(a) n/a •MANDATORY IVIEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV IVIinimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 121(b) No •MANDATORY IVIEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV IVIinimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 121(b) 1,526 cfm 763 cfm each unit •MANDATORY IVIEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV IVIinimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 121(c) No •MANDATORY IVIEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV IVIinimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 121(c) No •MANDATORY IVIEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV IVIinimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 122(e) Programmable Switch •MANDATORY IVIEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV IVIinimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 122(e) Setback Required •MANDATORY IVIEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV IVIinimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 122(f) Auto •MANDATORY IVIEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV IVIinimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 122(g) n/a •MANDATORY IVIEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV IVIinimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 123 •MANDATORY IVIEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV IVIinimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 124 Conditioned / 0.0 PRESCRIPTIVE MEASURES Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(a&b) n/a Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(a&b) 88,739 Btu/hr Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(a&b) n/a Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(a&b) 90,426 Btu/hr Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(c) Constant Volume Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(c) Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(c) Yes Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(d) No Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(e) No Economizer Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(f) Constant Temp Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(f) Constant Temp Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(g) Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(1) Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(k) No 1. Total installed capacity (MBtu/hr) of all electric heat on this project exclusive of electric auxiliary heat for heat pumps. If electric heat is used explain which exception(s) to §144(g) apply. EnergyPro 5.1 by EnergySoft User Number: 1712 RunCode: 2014-01-07710:20:30 ID:NR1-213 Page13of18 o CO • Z o LU ro .o> g >- o ^ 2 CO LU Z LU QC O Z < z g z LU > -J < 3 > < UJ X UJ oc c .g>ts - 2 u) = U-ffl e*^o LJ CD > Q b < X ^>ro Si Z O. UJ > _i < O u UJ (0 m > o z < 0. 3 u o o u. ro I "^3X ;i 8UJ CO • m < UJ DC ' < m o LU CO CD <^ CU c O CD C E .O " CO 5 c CD ^ o" .5 0= Q cn .5 o c ^ if C3 CD C .4— O V. S2 C Q.LL O .O) 3 O in cn CO CD D oC5 o D c if CD cn O cxo. CD CD .O H- Q §og :7 Q- .2 CO U. CD O o<x .E >.CQ CO CD > CD Q ro •5 o O -To CM 10 ro o 51. CO o o 10 I c 3 .C o ro ffi CO CD Q. o CD O CO a cn o c ro a 3 E 3 o o CO CO < m > o z < o o o o CO CO < m < m cc < a CD n E 3 c T3 O a X CD CD ro m < > o b LU CC ,0 c CD > T3 O T3 < ffi tn c ro CD cn 3 b X o CO a CD « o •t ro O CD Q O ci X % ro 0) ro O CJ o o cn o 5«f o O 0 E 3 <D CJl CO O _3 O O < E: I E _3 O : O cn rf a I c E o O O I • CD O CD tn £ . c ro ••5 < ro CD £ > C3! "O o O o ro . a ' CD CC Q. < CD .Q J 3 cn in CD I CD : -D : CD (D fi I (D fi o z o LU c\j o cd Q_ (fi LU O I-Z LU o LU _l < o z < z o LU CO CO CD C O c .o 55 c CD .S Q oc < 3 (0 oc UJ o H Q OC UJ X i = ^5 5 21 CO (0 o „ -1 o T3 1. C O s CO u 1? UJ S>o Q> C UJ _: (0 On •D < • • • (0 C3 O O O UJ CVJ CO CN C3 C3 Q. z CO o to (D Ol UJ oc E a c aj Q. U. Q. Q. 3 (0 o o o CN 00 CN CC >< o c 0) o E UJ z UJ o «3 O O 00 E o c o o UJ 3 o I o o c 3 (0 UJ a cs Q. E 3 Q. 0) (B o < UJ X QC UJ < oc UJ o > _l i < 3 CD 5 c 5 c o o (0 o < oc s m > CO < oc H Z UJ o E n Z E d> t tn CO C3 § C3 (D E CB O OC < 3 CO z < u. s UJ H CO > CO _l < oc I-z UJ o 4) E (0 z E tn CO P CD O CD I <b o I fi I (D fi ENVELOPE MANDATORY MEASURES: NONRESIDENTIAL ENV-MM Project Name Dimension One Spas Date 1/7/2014 DESCRIPTION Building Envelope Measures: 6118(aV Installed insulating material shall have been certified by the manufacturer to comply with the California Quality 5 ^ '• Standards for insulating material. Title 20 Chapter 4, Article 3. 811R/ ^ ^" Insulating Materials shall be installed in compliance with the flame spread rating and smoke density requirements of 911 »(C}. Sections 2602 and 707 of Title 24, Part 2. 6118(fV opaque portions of framed demising w/alls in nonresidential buildings shall have insulation with an installed R-value ^ ^ of no less than R-13 between framing members. 6117(a)- ^" Joints and openings in the building that are observable sources of air leakage shall be caulked, gasketed, ^ ^ weatherstripped or othenwise sealed. Manufactured fenestration products and exterior doors shall have air infiltration rates not exceeding 0.3 cfm/ft.^ of §116(a) 1: window area, 0.3 cfm/ft.^ of door area for residential doors, 0.3 cfm/ft.^ of door area for nonresidential single doors (swinging and sliding), and 1.0 cfm/ft.^ for nonresidential double doors (swinging). §116(a) 2: Fenestration U-factor shall be rated in accordance with NFRC 100, or the applicable default U-factor. si 1\r> Fenestration SHGC shall be rated in accordance with NFRC 200, or NFRC 100 for site-built fenestration, or the §110(3) J. applicable default SHGC. 6116(bV Constructed Doors, Windows and Skylights shall be caulked between the unit and the building, and shall be 5 ^ weatherstripped (except for unframed glass doors and fire doors). EnergyPro 5.1 by EnergySoft User Number: 1712 RunCode: 2014-01-07710:20:30 ID: NR1-213 Paqe 16 of 18 MECHANICAL MANDATORY MEASURES: NONRESIDENTIAL MECH-MM Project Name Dimension One Spas Date 1/7/2014 Equipment and System Efficiencies §111: Any appliance for which there is a California standard established in the Appliance Efficiency Regulations will comply with the applicable standard. §115(a): Fan type central furnaces shall not have a pilot light. §123: Piping, except that conveying fluids at temperatures between 60 and 105 degrees Fahrenheit, or within HVAC equipment, shall be insulated in accordance with Standards Section 123. §124: Air handling duct systems shall be installed and insulated in compliance with Sections 601, 602, 603, 604, and 605 of the CMC Standards. Controls §122(e): Each space conditioning system shall be installed with one of the following: IA. Each space conditioning system serving building types such as offices and manufacturing facilities (and all others not explicitly exempt from the requirements of Section 112 (d)) shall be installed with an automatic time switch with an accessible manual override that allows operation of the system during off-hours for up to 4 hours. The time switch shall be capable of programming different schedules for weekdays and weekends and have program backup capabilities that prevent the loss of the device's program and time setting for at least 10 hours if power is interrupted; or IB. An occupancy sensor to control the operating period of the system; or IC. A 4-hour timer that can be manually operated to control the operating period of the system. 2. Each space conditioning system shall be installed with controls that temporarily restart and temporarily operate the system as required to maintain a setback heating and/or a setup cooling thermostat setpoint. §122(g): Each space conditioning system serving multiple zones with a combined conditioned floor area more than 25,000 square feet shall be provided with isolation zones. Each zone: shall not exceed 25,000 square feet; shall be provided with isolation devices, such as valves or dampers that allow the supply of heating or cooling to be setback or shut off independently of other isolation areas; and shall be controlled by a time control device as described above. §122(c): Thermostats shall have numeric setpoints in degrees Fahrenheit (F) and adjustable setpoint stops accessible only to authorized personnel. § 122(b): Heat pumps shall be installed with controls to prevent electric resistance supplementary heater operation when the heating load can be met by the heat pump alone §122(a&b): Each space conditioning system shall be controlled by an individual thermostat that responds to temperature within the zone. Where used to control heating, the control shall be adjustable down to 55 degrees F or lower. For cooling, the control shall be adjustable up to 85 degrees F or higher. Where used for both heating and cooling, the control shall be capable of providing a deadband of at least 5 degrees F within which the supply of heating and cooling is shut off or reduced to a minimum. Ventilation §121(e): Controls shall be provided to allow outside air dampers or devices to be operated at the ventilation rates as specified on these plans. §122(f): All gravity ventilating systems shall be provided with automatic or readily accessible manually operated dampers in all openings to the outside, except for combustion air openings. §121 (f): Ventilation System Acceptance. Before an occupancy permit is granted for a newly constructed building or space, or a new ventilating system serving a building or space is operated for normal use, all ventilation systems serving the building or space shall be certified as meeting the Acceptance Requirements for Code Compliance Service Water Heating Systems §113(c) Installation 3. Temperature controls for public lavatories. The controls shall limit the outlet Temperature to 110° F. 2. Circulating service water-heating systems shall have a control capable of automatically turning off the circulating pump when hot water is not required. EnergyPro 5.1 by EnergySoft User Number: 1712 RunCode: 2014-01-07710:20:30 ID:NR1-213 Page 17 of 18 HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY Project Name Dimension One Spas Date 1/7/2014 System Name Carrier 50TCQA06 Floor Area 2,950 ENGINEERING CHECKS SYSTEM LOAD Number of Systems 2 COIL COOLING PEAK COIL HTG. PEAK Heating System CFM Sensible Latent CFM Sensible Output per System 58,000 Total Room Loads 3,918 71,738 20,345 354 8,040 Total Output (Btuh) 116,000 Return Vented Lighting 0 Output (Btuh/sqft) 39.3 Return Air Ducts 3,587 402 Cooling System Return Fan 0 0 Output per Systeni 61,500 Ventilation 1,526 12,946 11,522 1,526 59,076 Total Output (Btuh) 123,000 Supply Fan 5,113 -5,113 Total Output (Tons) 10.3 Supply Air Ducts 3,587 402 Total Output (Btuh/sqft) 41.7 Total Output (sqft/Ton) 287.8 TOTAL SYSTEM LOAD 96,971 31,867 62,807 Air System CFM per System 2,000 HVAC EQUIPMENT SELECTION Airflow (cfm) 4,000 Carrier 50TCQA06 90,426 35,186 88,739 Airflow (cfm/sqft) 1.36 Airflow (cfm/Ton) 390.2 Outside Air (%) 38.1 % Total Adjusted System Output 90,426 35,186 88,739 Outside Air (cfm/sqft) 0,52 (Adjusted for Peak Design conditions) Note: values above given at ARI conditions TIME OF SYSTEM PEAK Jul 2 PM Jan 1 AM HEATING SYSTEM PSYCHROMETRICS Airstream Temperatures at Time of Heating Peak) 34 °F Outside Air 1,526 cfm 70 "F 56 °F • 90 °F 91 °F —• Heating Coil Supply Fan 4,000 cfm 1 91 °F ROOM 70 °F COOLING SYSTEM PSYCHROMETICS (Airstream Temperatures at Time of Cooling Pealc) 83 / 68 °F Outside Air ^ ^ 1,526 cfm 75 / 63 °F < =• Cooling Coil Supply Fan 4,000 cfm 57 / 55"F 53.1 % ROOM 74 / 63 °F EnergyPro 5.1 by EnergySoft User Number: 1712 RunCode: 2014-01-07710:20:30 ID: NR1-213 Page 18 of 18 SAN DIEGO REGIONAL HAZARDOUS MATERIALS QUESTIONNAIRE OFFICE USE ONLY UPFP# HV# BP DATE / / Business Name Business Contact Telephone # ( ) -07 84 Project Address City State Zip Code APN# 'ZlZ-ll.d)'- II Mailing Address JA;9 At^b^•) jk/KMiifT . ^wru- ip^ City State Zip Code Plan File* F'roject Contact Telephone # { loA ) The following questions represent the facility's activities, NOT the specific project description. PART I: FIRE DEPARTMENT - HAZARDOUS MATERIALS DIVISION: OCCUPANCY CLASSIFICATION: Indicate by circling the item, whether your business will use, process, or store any of the following hazardous materials. If any of the items are circled, applicant must contact the Fire Protection Agency with jurisdiction prior to plan submittal. Facility's Square Footage (including proposed project): Occupancy Rating: g ^ F^l 1. Explosive or Blasting Agents 5. Organic Peroxides 9. Water Reactives 13. Corrosives 2. Compressed Gases 6. Oxidizers 10. Cryogenics 14. Other Health Hazards 3. Flammable/Combustible Liquids 7. Pyrophorics 11. Highly Toxic or Toxic Materials None of These. 4. Flammable Solids 8. Unstable Reactives 12. Radioactives PART II: SAN DIEGO COUNTY DEPARTMENT OF ENVIRONMENTAL HEALTH - HAZARDOUS MATERIALS DIVISIONS (HMD): If the answer to any of the questions is yes, applicant must contact the County of San Diego Hazardous Materials Division, 5500 Overland Ave., Suite 110, San Diego, CA 92123. Call (858) 505-6700 prior to the issuance of a building permit. FEES ARE REQUIRED. Project Completion Date: 7- I I 1 Expected Date of Occupancy: 2- / I / f 4 YES HO (for new construction or remodeling projects) HOS your business listed on the reverse side of this form? (check all that apply). • • • • • • • • CalARP Required I Date Initials • CalARP Complete I H^^Will your business dispose of Hazardous Substances or Medical Waste in any amount? ST Will your business store or handle Hazardous Substances in quantities equal to or greater than 55 gallons, 500 pounds, , 200 cubic feet, or carcinogens/reproductive toxins in any quantity? HO/Vill your business use an existing or install an underground storage tank? H^/V9ill your business store or handle Regulated Substances (CalARP)? l3\/^ill your business use or install a Hazardous Waste Tank System (Title 22, Article 10)? M Will your business store petroleum in tanks or containers at your facility with a total storage capacity equal to or greater than 1,320 gallons? (California's Aboveground Petroleum Storage Act). PART III: SAN DIEGO COUNTY AIR POLLUTION CONTROL DISTRICT: If the answer to any of the questions below is yes, applicant must contact the Air Pollution Control District (APCD), 10124 Old Grove Road, San Diego, CA 92131-1649, telephone (858) 586-2600 prior to the issuance of a building or demolition permit. Note: if the answer to questions 4 or 5 is yes, applicant must also submit an asbestos notification form to the APCD at least 10 working days prior to commencing demolition or renovation, except demolition or renovation of residential structures of four units or less. Contact the APCD for more information. YES NO • CalARP Exempt Date Initials Date Initials Will the subject facility or construction activities include operations or equipment that emit or are capable of emitting an air contaminant? (See the APCD factsheet at http://www.sdaDcd.ora/info/facts/Dermits.pdf, and the list of typical equipment requiring an APCD permit on the reverse side of this from. Contact APCD if you have any questions). • (ANSWER ONLY IF QUESTION 1 IS YES) Will the subject facility be located within 1,000 feet of the outer boundary of a school (K through 12)? ^(Search the California School Directory at http://www.cde.ca.Qov/re/sd/ for public and private schools or contact the appropriate school district). 0\/^Has a survey been performed to determine the presence of Asbestos Containing Materials? 0 VVill there be renovation that involves handling of any friable asbestos materials, or disturbing any material that contains non-friable asbestos? Will there be demolition involving the removal of a load supporting structural member? Briefly describe business activities: oFn^ J F%o00OT P>^<^U»Y/ A3JC^t7cv Briefly describe proposed project: I declare under perialty of perjury tliat to the best of my knowledge and belieWfie responses made hereji are tme and correct. I declare under penalty of perjury that to Name of Owner or Authorized Agent Sig(yiture(j»f'Owner or Ai^orized Agent / "s* in Date FIRE DEPARTMENT OCCUPANCY CLASSIFICATION:. BY: FOR OFFICIAL USE ONLY: DATE: EXEMPT OR NO FURTHER INFORMATION REQUIRED RELEASED FOR BUILDING PERMIT BUT NOT FOR OCCUPANCY RELEASED FOR OCCUPANCY COUNTY-HMD* APCD COUNTY-HMD APCD COUNTY-HMD APCD *A stamp in this box onlv exempts businesses from completing or updating a Hazardous Materials Business Plan, Other permitting requirements may still apply. HM-9171 (02/11) County of San Diego - DEH - Hazardous Materials Division ^ PLUMBING, Development Services ELECTRICAL, Building Division ^ CITY OF MECHANICAL leas Faraday Avenue WORKSHEET 760-6022719 B-18 ^^y^^LSB^KD — www.carlsbadca.gov Project Address: Permit No.: Infomiation provided below refen to work being done on the above mentioned permit only. This form must be completed and returned to the Building Dlvitiow befora the pwmlt cqw b< issued. Building Dept. FODC (760) 602-8SS8 Number of new or relocated fixtures, traps, or floor drains. New building sewer line? ....... ..... ............ ..... Ves No f^ Number of new roof dralns?.......................................................................................„..............„...... ^ Install/alter water line? Numlser of new water heaters?... ........... ....... ............... ............. 1 Numiser of new, relocated or replaced gas outlets?......... .............. ............... ^ Numt>er of new hose bibs?.. ..... .... ........ ................ I Residential Permitti New/expanded service: Numlser of new amps: Minor Remodel Ves No Commerdal/lnduslriait Tenant Improvement: Number of OKisting amps involved In Oib project ^ Number of new amps Involved In thh project: C> New Construction: Amps per Panel: Single Phase —........ ............ ....... Numk>er of new amperes Three Phase. ........ ......... .. Number of new amperes "Zod Three Phase 480.............. ............. ........... Number of new amperes Number of new fumaces, A/C, or heat pumps? .................... ................... C2- New or relocated duct worb? ........... ........... ........Ves X-^ No Number of new fireplaces? .......... ................ .............................. ................ O Number of new exhaust fans?.......... ........ ............... ................. . 0- Relocate/install vent? Number of new exhaust hoods? .... o Number of new boilers or compressors? . ..... Number of HP B-18 Page 1 of 1 Rev. 03/09 City of Carlsbad Permit No: Address VALUATION WORKSHEET Building Division Assessor Parcel No. Date By Type of Woric Area of Woric Multiplier VALUE SFD and Duplexes $110.17 $0.00 Residential Additions $131.73 $0.00 Remodels / Lofts $57.48 $0.00 Apartments & Multi-family $98.20 $0.00 Garages/Sunrooms/Solariums $28.74 $0.00 Patio/Porch/Carport $9.58 $0.00 Enclosed Patio $15.51 $0.00 Decks/Balconies/Stairs $15.57 $0.00 Retaining Walls, concrete,masonry $19.16 $0.00 Pools/Spas-Gunite $40.72 $0.00 Tl/Stores, Offices 1,878 $37.12 $69,711.36 Tl/Medical, restaurant, H occupancies $50.30 $0.00 Photovoltaic Systems/ # of panels $400.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fire Sprinkler System $3.11 $0.00 Air Conditioning - commercial $5.03 $0.00 Air Conditioning - residential $4.19 $0.00 Fireplace/ concrete, masonry $3,855.98 $0.00 Fireplace/ prefabricated Metal $2,621.34 $0.00 $0.00 $0.00 TOTAL Valuation: $69,711 Comm/Res (C/R): C Building Fee $548.62 Plan Check Fee $384.03 Strong Motion Fee $15.00 Green Bldg. Stand. Fee $1.00 Green Bldg PC Fee $150.00 License Tax/PFF $2,439.90 License Tax/PFF (in CFD) $1,268.75 CFD tsthourof Plan CheckFire Expedite Plumbing TBD Mechanical TBD Electrical TBD $69,711.36 CFD EI Yes (PFF= 1.82%) 0 No (PFF = 3.5%) Land Use: Density: Improve. Area: Fiscal Year: Annex. Year: Factor: CREDITS PFF and/orCFD Explanation: City of Carlsbad ^.y,^.. VALUATION WORKSHEET Permit No: '-^ * ^ ' Address Assessor Parcel No. Date Building Division By Type of Work Area of Work IVIuitiplier VALUE SFD and Duplexes $110.17 $0.00 Residential Additions $131.73 $0.00 Remodels / Lofts $57.48 $0.00 Apartments & Multi-family $98.20 $0.00 Garages/Sunrooms/Solariums $28.74 $0.00 Patio/Porch/Carport $9.58 $0.00 Enclosed Patio $15.51 $0.00 Decks/Balconies/Stairs $15.57 $0.00 Retaining Walls, concrete,masonry $19.16 $0.00 Pools/Spas-Gunite $40.72 $0.00 Tl/Stores, Offices 328 ', $37.12 $12,175.36 Tl/Medical, restaurant, H occupancies $50.30 $0.00 Photovoltaic Systems/ # of panels $400.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fire Sprinkler System $3.11 $0.00 Air Conditioning - commercial $5.03 $0.00 Air Conditioning - residential $4.19 $0.00 Fireplace/ concrete, masonry $3,855.98 $0.00 Fireplace/ prefabricated Metal $2,621.34 $0.00 $0.00 $0.00 TOTAL $12,175.36 Valuation: $12,175 Comm/Res (C/R): 0 Building Fee $156.27, Plan Check Fee ^^^^109^ Strong Motion Fee ^ f3^ Green Bldg. Stand. Fee $1.00 Green Bldg PC Fee $150.00 License Tax/PFF $426.14 License Tax/PFF (in CFD) $221.59 CFD 1st hour of Plan CheckFire Expedite Plumbing TBD Mechanical TBD Electrical TBD CFD 0 Yes (PFF= 1.82%) 0 No (PFF = 3.5%) Land Use: Density: Improve. Area: Fiscal Year: Annex. Year: Factor: CREDITS PFF and/orCFD Explanation: I r I 5" n D •n o 3 s CL > 3i m Z z z Cl z z z o CD c t— z Cl t2> > •o •o 3 I •I c m o • o • a o 3 ro • O o I o c • 9