HomeMy WebLinkAbout2180 RUTHERFORD RD; ; CB020858; PermitV I :m ~ . · City of Carlsbad
1635 'Faraday Av Carlsbad, CA 92008
04-19-2002 Commercial/Industrial Permit Permit No: CB020858
Building Inspection Request Line (760) 602-2725
Job Address:
Permit Type:
Parcel No:
Valuation:
Occupancy Group:
Project Title:
· Applicant:
2180 RUTHERFORD RD CBAD
Tl Sub Type:
2120702500 Lot#:
$30,000.00 Construction Type:
Reference #:
CALLAWAY GOLF .
HVAC, COMPRESSOR W/STRUCTURAL
INDUST
0
NEW
Owner:
Status:
Applied:
Entered By:
Plan Approved:
Issued:
Inspect Area:
ISSUED
03/22/2002
MOP
04/17/2002
04/19/2002
SMITH CONSULTING ARCHITECTS
STE 200
l2220 EL CAMINO REAL
SAN DIEGO CA 92121
(858) 793-4777
CALLAWAY GOLF CO
22$5 RUTHERFORD RD
CARLSBAD CA 92008
5360 04/19/02 0002 01
CGP
1.
Total Fees: $541.23
Building Permit
Add'I Building Permit Fee
Plan Check
Add'I Plan Check Fee
Plan Check Discount
Strong Motion Fee
Park Fee
LFM Fee
Bridge Fee
BTD #2 Fee
BTD#3 Fee
Total Payments To Date: $.157.94 Balance Due:
$242.99
$0.00
$157.94
$0.00
$0.00
Meter Size
Add'I Reel. Water Con. Fee
Meter.Fee
SDCWAFee
CFO Payoff Fee
PFF
PFF (CFO Fund)
License Tax
License Tax (CFO, Fund)
Traffic Impact Fee
$383.29
, Renewal Fee
-$6.30
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
Traffic Impact (CFO Fund)
PLUMBING TOTAL
ELECTRICAL TOTAL
MECHANICAL TOTAL
Master Drainage Fee
Sewer Fee
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
i: Add'I Renewal Fee $110.00
·t Other Building Fee r Pot. Water Con. Fee
Meter Size ,: ,,.:
$24.00
$0.00
$0.00
$0.00
$0.00
('· Add'I Pot. Water Con. Fee
Reel. Water Con. Fee
$0.bo
$0.00
Redev Parking Fee
Additional Fees
TOTAL PERMIT FEES $541.23
FINAL APPROVAL
Date: 6. ~ '/J 'L---Clearance: ------
NOTICE: Please take NOTICE that approval of your project includes the "Imposition" of fees, dedications, reservations, or other exactions hereafter collectively
referred to as "fees/exactions." You have 90 days from the date this permit was issued to protest imposition of these fees/exactions. If you protest them, you must
follow the protest procedures set forth in Government Code Section 66020(a), and file the protest and any other required information with the City Manager for
processing in accordance with Carlsbad Municipal Code Section 3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack,
review, set aside, ·void, or annul their imposition.
You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capacity
changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this project. NOR DOES IT APPLY to any
f f hi ' T h' f I' i i h
02
383-29
0 u ·
PERMIT ~~LICATION
CITY OF CARLSBAD BUILDING DEPARTMENT
1635 Faraday Ave., Carlsbad, CA 92008
,,....,,.H,,,, o/"Afo' ,,,,... ,J ,)"",, ',,, ~-"."'"""-~~7-,.,,---,"""'
, " ' ,, ,, ,,. "'' ' ,' ~ --~,. , '
Lot No. Subdivision Name/Number
FOR OFFICE USE ONLY
PLAN CHECK N0,O"2..,. e;s-s
EST. VAL. 5c:)f O(!) {) r-1-
Plan Ck. Deposit / 5 /. &l-'f
Validated By f {)'D
Date }/'2./l,,~6/
Unit No. Phase No. Total # of units
WV.t. VJ..
C Gi=" 1 ~7 = 9Lt
# of Bathrooms --
Name "J??a~ /;,). /r'°"" -+A---<. Address // {? ) J:_'-· slkCt., U_::>~ _ Cit~, {//' ,s,'tq _<;_ t?I, State/Zip '7:l,J}rTele~ne ~~ax # -5~5':JS-
~,illlC;t\:. 'ES[ll~qqn.(@it¢r. ~ O~E!ntt9r:.G_o,nti:,a_q1;or,_,,,:'IlQwfl!!fa~,n fqr:,<;.}ytne,t-;:,~~,,;0,;i~~~~;::~i:,;;,c:,f '//,;, ¼-.'{ '.~>:::{ ;i;~3:z;
Name y
lf.:' )~ROP,i:iRD[OWNER:,·:_-,' -_·:-, "."
(Sec. 7031.5 Business and Professions Code: Any City or County which requires a permit to construct, alter, improve, demolish or repair any structure, prior to its
issuance, also requires the applicant for such permit to file a signed statement that he is licensed pursuant to the provisions of the Contractor's License Law
[Chapter 9, commending with Section 7000 of Division 3 of the Business a,nd Professions Code) or that he is exempt therefrom, and the basis for the alleged
exemption. Any violation of Section 7031.5 by any applicant for a permit subjects the applicant t.e a civil penalty of not more than five hundred dollars [$5001).
,T4s /It~ J?;c,J'c.-,fs. vo/ ttqfµ, <'PE 'i~cisg-?t:.o-svz--0 s""r:;'>&
Name Address City State/Zip "rel , ho e'"1I)
State Lice~se # -~__.,-'-'"'-~'-----License Class /3 City Business Lice,nse # U!,p!'/)!!.'.!.!!~U--4
Design~r Name , Addrf~JO f;I, r/rM fNO #-ia, City Q Sq~30 TeliiPJL7qJ-f7TJ ~~~:~~;:;:&:QJJJl4~f Qt{. -,~::,: ,:,7, -.~:. : ~ :~~:~-,-:~·:-:----, ,-.., ~~ ~735-,, -: :,, ,:, ; \',/ ~,',,\' ';i:)n-~,~~-:_:f ::::r--~-',;;i:·~;2:.;~~--"'J'.m
..,..W?r)-Jrs' Compensation Declaration: I hereby affirm under penalty of perjury one of'the following declarations:
· i 'WI have and will maintain a certificate of consent to self-insure for workers' compensatiqn as provided by Section 3700 of the Labor Code, for the performance
of the work for which this permit is issued.
~I have and will maintain workers' compensation, as required by Section 3700 of the Labor Code, for the performance of the work for which this permit is
issued. My worker's compensation insurance carrier and policy number are:
Insurance Company (7,7/,s: A):.,7(,' f~A<:c:~~ .,_,/~-=-Policy No. 0?9~0/-Cl;JJ I /6 Expiration Date 7-/ -o 2-.
, {THIS SECTION NEED NOT BE COMPLETED IF THE PERMIT IS FOR ONE HUNDRED DOLLARS ($100)-0R LESS)
0 CERTIFICATE OF EXEMPTION: I certify that in the performance of the work for which this permit is issued, I shall not employ any person in any manner so as
to-become subject to the Workers' Compensation Laws of California.
WARNING: Failure to secl!re workers' compensation covarage is unlawful, and shall subject an employer to-criminal pen11!ties and civil fines up to one hundred
thousand dollars ($100 000), in addition t the cost of compensation, damages as provided for in-Section 3706 of the Labor code, interest and attorney's fees.
SIGNATURE --~ f-DATE t:.-/-/9-C<., ,
0 I, as owner of the property or my employees with wages as their sole compensation, will do the work and the structure is not intended or offered for sale
(Sec. 7044, Business and Professions Code: The Contractor's License Law does -not apply to an owner of property who builds or improves thereon, and who does
such work himself or through his own employees, provided that such improvements are not intended or offered for sale. If, however, the building or improvement is
sold within one year of completion, the owner-builder will have the burden of proving that he did not build or improve for. the purpose of sale).
' D I, as owner of the property, am exclusively contracting with licensed contractors to construct the project (Sec. 7044, Business and Professions Code: The
Contractor's License Law does not apply to an owner of property who builds or improves thereon, and ·contracts for such projects with contractor(s) licensed
pursuant to the Contractor's License Law). ·o I am exempt under Section ______ Business and Professions Code for this reason:
1. I personally plan to provide the major labor and materials for construction of the proposed property improvement. D YES ONO
2. I (have / have not) signed an application for a building permit for the proposed work.
3. I have contracted _with the following person (firm) t_o provide the proposed construction (include name / address / phone number / contractors license number):
4. I plan to provide portions of the work, but I have hired the -following person to coordinate, supervise and-provide the major work (include name / address / phone number/ contractors license number): _____________________________________________ _
5. I will provide some of the work, but I have i;:ontracted (hired) the following persons to provide the work indicated (include name/ address / phone number/ type
of work): ,
PROPERTY OWNER SIGNATURE _________________ ~----DATE ________ _
t?:i~i!t~TJL:tJit$;§1;9ti§k1:i?s;t[qN£.f~@E~mi~-;~1,11~1?itf~!flri~Jf$.:Qtlfit .--~~·.-::_:-r:.:, ,:;_~~~z:2'.2:::;:\::i:· ;1::.1~1-:::;.l:.::i?~;_,';;'.~~si:1'.':t:::f;,:,~:t:r:si
Is the applicant or future building occupant required to submit a business plan, acutely hazardous materials registration form or risk management and prevention
,program under Sections 25505, 25533 or 25534 of the Presley-Tanner Hazardqus Substance Account Act? 0 YES D NO
Is the applicant or future building occupant required to obtain a permit from the air pollution control district or air quality management district? 0 YES O NO
Is the facility to be constructed within 1,000 feet of the outer boundary of a school site? tJ YEi;, D NO
IF ANY OF THE ANSWERS ARE YES, A FINAL CERTIFICATE OF OCCUPANCY MAY ·NOT BE ISSUED UNLESS THE APPLICANT HAS MET OR IS MEETING THE
REQUIREMENTS OF THE OFFICE OF EMERGENCY SERVICES AND THE AIR POLLUTION CONTROL DISTRICT.
~~TRU:QTION':,1:.ENDING AGENCY·,;:-:-'' ', :. : ,: ': -:,::":: ~
I here~y affirm that there is a construction lending agency for the performance of the work for·which this permit is issued (Sec. 3097(il Civil Code).
I certify that I have read the application and state that the above information is correct and that the information on the plans is accurate. I agree to comply with all
City ordinances and State laws relating to building construction. I hereby authorize representatives of the Cit\' of Carlsbad to enter upon the above mentioned
property for inspection purposes. I ALSO AGREE TO SAVE, INDEMNIFY AND KEEP ,HARMLESS THE CITY OF CARLSBAD AGAINST ALL LIABILITIES,
JUDGMENTS, COSTS AND EXPENSES WHICH MAY IN ANY WAY ACCRUE AGAINST SAID CITY IN CONSEQUENCE OF THE GRANTING OF THIS PERMIT.
OSHA: An OSHA permit is e ired for excavations over 5'.0" deep and demolition or construction of structures over 3 stories in height.
EXPIRATION: Every per it iss ed by the building Offi al under the provisions bf this Code shall expire by limitation and' become nail and void if the building or work
authorized by such permit s no ced withi 8 ys from the date of s ch permit or if the building or work authorized by such permit is suspended or abandoned
at any time after the work is i:: Section 1. .4.4 Uniform Building Code). "'2~ I
APPLICANT'SSIGNATU . , DATE ?i '1,/ 6J,.. -~------~---------
PINK: Finance
J
City of Carlsbad Bldg Inspection Request
For: ~f3M002
Permit# CB020858
'B/1
Title: CALLAWAY GOLF
Description: HVAC, COMPRESSOR W/STRUCTURAL
Type:TI Sub Type: IN DUST
Job Address: 2180 RUTHERFORD RD
Suite: Lot 0
Location:
APPLICANT SMITH CONSUL TING ARCHITECTS
Owner: CALLAWAY GOLF CO
Remarks:
Total Time:
CD Description Act Comments
Inspector Assignment: TP ---
Phone: 6195202143
Inspector£
Requested By: TROY
Entered By: CHRISTINE
19 Final Structural Altve; ------'--------
29 Final Plumbing
39 Final Electrical
49 Final Mechanical
! t--,fr;?C ----a.---
Associated PCRs/CVs
PCR00003 ISSUED
PCR01025 ISSUED
Inspection History
Date Description
06/25/2002 15 Roof/Reroof
05/01/2002 11 Ftg/Foundation/Piers
05/0112002 12 Steel/Bond Beam
Act ' lnsp Comments
AP TP WELD BRACKET TO STRUCT@ ROOF FOR HUMID/AC UNIT
WC TP
AP TP HOUSE KEEP PAD FOR COMP & DRYER
/• /°"_· ------------------------------------
.... ~ KLEINFELDER
FINAL REPORT FOR
SPECIAL INSPECTION AND MATERIALS TESTING
DATE: August 1, 2002
To: Building Department
City of Carlsbad
1635 Faraday Avenue
Carlsbad, California 92008
SUBJECT: SATISFACTORY COMPLETION OF WORK REQUIRING SPECIAL
INSPECTION AND MATERIAL TESTING
PERMIT NO. CB020858
17348
PROJECT ADDRESS: __ -C=al=lo=--w-a,.._y...;:G-::o=lf ... @_.__2 __ 18 __ 0 __ R __ u __ th __ e __ rfi=o--rd=R=d, ... C __ ar _____ ls .... ba __ d __ C __ A _____________ _
We declare under penalty of perjury that, to the best of our knowledge, all the work listed below requiring special
inspection, material sampling and testing, including the off-site fabrication of building components for the structure/s
constructed under the subject permits is in conformance with the approved plans, the inspection and observation
program and other construction documents, and the applicable workmanship provisions of the Uniform Building
Code.
Executed on this -1§.t_day of ___ A __ u_.g.__us __ t ____ 2 __ 00 .......... 2
MONTH YEAR
Special Inspection and Materials Testing covered by this final report include the specific inspection and testing services
for the specific dates listed on page 2 of this report. The type of special inspection and testing services described in our
Daily Field Reports is summarized as: Observation of field and shop structural welding.
A. H the inspection services were provided by an approved materials testing laboratory or special inspection agency:
TESTING LABORATORY OR SPECIAL INSPECTION AGENCY: ______ KL=E=IN=FE=L=D=E=R,_._IN=-:...;C ..... ____ _
ADDRESS: 5015 SHOREHAM PLACE, SAN DIEGO, CA 92122
RESPONSIBLE PROJECT MANAGER OF THE TESTING LABORATORY OR SPECIAL INSPECTION AGENCY:
NAME (Print or Type) _____ R __ O __ N __ AL=D ____ .C __ • ,...TH .......... O __ M __ S ___ O __ N ______________________ _
City of San Diego Special Inspector Registration Number: #380 Expiration Date: ______ 12aa../;...;3 __ 1;..:./...;;0 __ 4 ______ _
SIGNATURE: -~ ( ____ -. ~
RESPONSIBLE MANAGING ENGINEER OF THE TESTING LABORATORY OR SPECIAL INSPECTION AGENCY:
NAME (Print or Type) ___ -=RI=C=K __ E=·-=L_ARS=-=O=N ________________________ _
cc: Calloway Golf
Industrial Commerical Systems
17348 Pa2e 1 of2 08/01/02
lt..,j KLEINFELDER
CB020858
6/13/02:
6/18/02
6/21/02
6/24/02
6/27/02
7/2/02
7/3/02
7/8/02
7/17/02
7/18/02
17348 Pal!e2 of2 08/01/02
Ill KLEINFELDER
Construction Observation Report
Date 7 /Jg/ 0 2-.
Client ---------,-....----r-+-"<--------,1----..,,--DFR No, _______ _
Project Location _,::Z._/g'i.c....__0_-'------'--__,__"'--1---=::__--=----=----+-------'-,c=-
Contractor~/ C----=.S~----------
Time Arrived I l OU
Time D1parted f 'l C,--O
Reviewed bY------------Date Reviewed----~---~.~~fime ~ l a le
lype of Observations ~ -1,,,.. e Masonry
1, C:-,:..A ~ Welding
0 Bolting
. D Batch plant
D Reinforcement Steel
D Pre-Post Tensioned Tendoh
D Foundations
0 Fireproofing
0 Metal Decking
D Concrete
D Soil
D Other
Documents Referenced -~"-IA.J-~~o~/~"~/~:-~o~o~-/4#-'A ...... ffff--"-r_Vu_e"----'-'J.------+p~/4-ec.~A./~~-~~S~f-c-~c..._,'J~---
A + ' l/U ')( ~ If
Jl'"Ct_ /"l I ~ I / <, ...,.(
?
f Report items comply D Report items incomplete
Acknowledged by c...fia,/ /(~
Representing __ (_:$ ____________ _
Pagel-otL Kleinfelder Representative Print Name
F-1 (9/93) ;:rc..]5p~ 50717, ls'-8S-
Ill KLEINFELDER ,,
Construction Observation Report
Project Name-G~ec-C..L/~/a~""'-=-=---q -y~0?~o~{_f' ___ _,_/_,_1....._l/~A.,_(_=---"-~-<.C-="-=l-=u ...... t......,la"'""'l...__.l...._auc=.__ Date 7/17 /o--z._
Client~-----~-___ Pro~ct ~o /7 3 \.{ g_
Project Location '). / (O R.., 1 i e, [~rcl t-<cL . Cc.., r~ 6 a. cA
DFR No. _______ _
Time Arrived D 6 00
Contractor _LC. 5, . Bldg. Permit No. L.. Bo?. 08.S.i< Time Departed / 6C){) w~, Time 5, 0 J..r Reviewed bY-~----------Date Reviewed--------
"fype of Observations . ,_I D Masonry
1,c-/vj ~Welding
D Bolting
0 Batch plant
D Reinforcement Steel
D Pre-Post Tensioned Tendon
D Foundations
D Fireproofing
D Metal Decking
D Concrete
D Soil
D Other
Documents Referenced _.;.....:Ac.._'1-->_t---=b"---'l'--ts...._l_· _o_o_+j;--"-'11,p,.,,"'::,='-=o..-=c...u t""_J_;___::P~/4'--'-a..::_#--"'~"-l~i-Jf'-'--..::_C"'\=.cC j=------
f/vlfl .
0AJ1+-
-3 116 ,, D I le 1 ~
report items comply D Repo~ items incomplete
Acknowledged by ~ t</--e--
Representing __,_/...c::6=-,,:$:;__ ___________ _
Page J_ di_}__
D Report items comply with exceptions
emfelder Representative Signature s'o~ 1-1. w~r, c~
Kleinfelder Representative Print Name
F-1 (9/93) ~t1d, '1io717 c..f?~ Rr
Ill KLEINFELDER
Construction Observati,on Report
Project Name C.o.\lo.c,-Jo.y G-ol £
Client---------------Project No. 17 3 lf 8
Project Location o// 80 Ru+her £c>rd Rd Co..rlSbo.dJ C.B
Date 07-Ool-<2,il
DFR No _________ _
Time Arrived ______ _
Contractor .:r C. 5 Bldg. Permit No. C bDiil0858 Time Departed-------
Reviewed by Date Reviewed---------10-fal LI ~Time -'~H~t:.~':J'.~----
lype of Observations D Masonry
0"welding
D Bolting
D Batch plant
D Reinforcement Steel
D Pre-Post Tensioned Tendon
D Foundations
D Fireproofing
D Metal Decking
D Concrete
D Soil
D Other
Documents Referenced ----------------------------------
N. ' . 'd. "J. • . Q .. HVliC t. Cam Pres soc .8cl. 1'r1on
I •
· (oPe.n,'n~s) ·
Summary ,ii roo£ f>e.11 ~+,.o..+,·cnS Pe.r: re,v,'.seol Plo.n de..+o..;I s1/<oo.nd 7 r -
(D C.Dn£,~r-me.c/ u.Je..lde.r Ce..r+ ..
ci Report items co~ply D Report items incomplete · D Report items comply with exceptions
Acknowledged by &.--~
~r Representative Signature
Representing _ __,~~--------~----
Page _L of __L_
F-1 (9/93)
Kleinfelder Representative Print Nak
Ill KLEINFELDER
Construction Observation Report
Project Name C.a..JIQ..Wo.v GoJf Date 07-03-0~ r
Client-----~---------Project No. I 7 34 8 DFR No. ________ _
Project Location ,;v 80 RiA+be_cf:ord Rd Co..rJSbo.d ~,, .) Time Arrived _______ _
Contractor IC. .5 Bldg. Permit No. C b()olQ8 SB Time Departed-------
Reviewed by Date Reviewed---------71;1;;':).Time ~J~11~t~.J~----
lype of Observations D Masonry
0'welding
D Bolting
0 Batch plant
0 Reinforcement Steel
0 Pre-Post Tensioned Tendon
0 Foundations
D Fireproofing
D Metal Decking
0 Concrete
0 Soil
D Other
Documents Referenced ~---------------------------------
I
H ~ H ' p .. . uc. -VIIC , C,om ,-e.ssar 8dc:l,f10n
Summary Pl roa£ oPe.nin~S 0,.S Pe.r re.'v,'sed Plo.n sl,de.±o.il.5 (oo.nd1 ~ I c.on+{nCAed-fo · , , · Ill ol:ase.rv.ecl the; £,'f-lt4P o-.ncl '-IJ«.ldu,!} a-£ new coo:£ 5uPPar+ s+eel.
r/ Report items comply D Report items incomplete D Report items comply with exceptions
Acknowledged by_t/4~.::.=-~~1---__________ _
Representing---------------~--
Page _L of _I -
F-1 (9/93)
'taeinteicier Representative Signature
.ToAn T: /17,Jler IC.BO
Kleinfelder Representative Print Name
Ill KLEINFELDER
Construction Observation Report
Project Name Co..l lotltJo/ G:oJ£
Client----~----------Project No. I ]3 '-/ 8
Date 07•08. Oci}
DFR No, ________ _
Project Location _....,,p/""--'-l_,,8..__0,-,e__,Rci.,,,u"-'-+'--'1,~e.o.Lr__.f_,,o...,r-.__,d _ _._g........,c:1,____.c...,o.._,_r...,1$,J..bw:0,..,......d....,)_,,c."""fl'-'---___ _ Time Arrived--------
Contractor_=I.-C.~S __________ Bldg. Permit No. C.. bo«oB5& Time Departed ______ _
To+o..l Reviewed by Date Reviewed ________ _ ~ Time _t>f-~,H~t",-;S~----
lype of Observations D Masonry
!!?'welding
[j Bolting
0 Batch plant D Foundations
0 Reinforcement Steel D Fireproofing
ti Pre-Post Tensioned Tendon-----D Metal Decking
Documents Referenced BPProve,d Plo.nS ond sPe.c.
•
cil" Report items comply D Report items incomplete D Report items comply with e?(ceptions
Acknowledged bY-----~------~---
R~presenting -~----------------
Page _J_ of _L
F-1 (9/93)
~r Representative Signature
Kleinfelder Representc1tive Print Name
D Concrete
D Soil
l]-Other
Ill KLEINFElDER
Construction Observation Report
ProjectName LC<lk{,J~y Golf' /HvA:-t AdJ,f!'o~)
Client -----------..ac-----c--Project No. 1j $ ~R
Project Lffffiiti'a~;_=z,~,!~?;y-::.g;t1;;;~mi~,A Cvr &ba {
Contractor / 6,$ Bldg. Permit No. 02. ~ ~ £ ~
Date t:,/;~/02_ ·
DFR No. I_>,
Time Arrived _0-'--~_0_0 ___ _
Reviewed bY------------Date Reviewed ______ _
I!_me Drparted 0~
/4~~Time A,~
Type of Observations D Masonry
£/..f ~ Welding
D Bolting
D Batch plant
D Reinforcement Steel
D Pre-Post Tensioned Tendon
• ~ ':I,
D Foundations
D Fireproofing
D Metal Decking
Documents Referenced AtJS Df. / -9.R /f' /4.,,,. <t -,¥ec .S. /,11 .S. C
b
Report items comply D Report items incomplete
Acknowledged by ~ tzC~ Q ="
Representing __ ;r=-_C--=$:._.__ ________ _
Page+ot-J--
F-1·(9/93) ,
Kleinfelder Representative Print Name
JC~O #-~07 [7CK-gs-\;_,
D Concrete
0 Soil
D Other
Ill KLEINFELDER
Construction Observation Report
Project Name (u./1"-Wo/ 0a/f /Hv&c Date 6/f<,z/02.,
DFR No. 2 5,.
Time Arrived ~O~?~o~o ___ _
_,_....__.-=;;;... __________ Bldg. Permit No. _0=-2_ .. -==g::~~=--=-----Time Departed f~/~O~O ___ _
~ime 4,0fv-Reviewed by ____________ Date Reviewed--------
Type of Observations SAop
D Masonry
l)("welding
0 Bolting
D Batch plant
D Reinforcement Steel
D Pre-Post Tensioned fendo·n
D Foundations
D Fireproofing
D Metaf Decking
D Concrete
D Soil
0-0ther
Documents Referenced --#--A-'--o~~"-"i)~/--=o_._/-_Q__.c.__~""--lr--'/A'--L-C/WJ'-=-. --=..$~4--=~'-l-f.?--=-r;cc...,,.c-....c~-1-'.A--'--l_r_c.. ____ _
D Report items comply D Report items incomplete
~~--· a/l .. ~-;; ~"" {.._..;
Acknowleaged by 3' ~ ~ ~-~ , -r-c..5 f
Representing_· ---'4--'-"--_,,,,::;.__ _________ _
einfelder Representative Signature . . !
Page+of~ Kleinfelder Representative Print Name
F-1 (9/93) XCI10 /:I ~o ?f?G ts-8.5
,. . :
Ill KLEINFELDER
DFR No. _______ _
Time Arrived _,_/~f~C}~a ___ _
Reviewed by~-------------Date Reviewed--------
Time r,"parted~..s.'00
~I Time <i_i{J f,
Type of Observation~•'r / ' D Masonry
fl l'f ,. Welding
D Bolting
D Batch plant
D Reinforcement Steel
D Pre-Post Tensioned Tendon
D Foundations
D Fireproofing
D Metal Decking
D Concrete
0 Soil
D Other
Documents Referenced __.A'----'--"-~-=--~----D...c_._l--=..0 --1-l_-_cr---'---""'g_--l1/'--+-1-;:),..,,,.e........il~&2=----\.,,6~-(_s. _____ _
?'ore
D Report items comply D Report items incomplete
Acknowledged by ~ h --
RepresentinQ----~-----------
Page-{-ot+
F-1 (9/93)
f?FJ 0~~ ,',u
-
Ill KLEINFELDER
Type of Observations , 1 } D Masonry
. Firt7J ~ Welding
D Bolting
D Batch plant
D Reinforcement Steel
D Pre-Post Tensioned Tendon
D Foundations
D Fireproofing
D Metal Decking
D Concrete
D Soil
D Other
Documents Referenced _._A_.___u-=-=s..=-b=-,t_c__" .s--l-_9-+--=-%----1/~D____:.:_.::..._k)~b~~=---,_-------
~ Report items comply . D Report ftems ;,complete
Acknowledged by ~ "2."..i.~ ..... --
Representing ~~--------------
Page--l-of+ Kleinfelder Representative Print Name
F-1 (9/93)
Ill KLEIN FE L o·E R
Construction Observation Report
Project Name _6_4_{~/C(~f,\J~C\.~y~l-=---~l_f~A_I Vi'-'-'A_q c_-==6C4-xt~'~-=>L=-pS--=---1'_0.<J--=---Dateb/~7/0~
DFR No,_1,=--c$ _____ _ Client Project No. !'
Project Location A (l{O Rv4-he,r,,J Rel Co,&~ cA
Contractor---1-/_,._L;...$ ____________ Bldg. Permit No. C,.2-fl~f?
Time Arrived OY O 0
Time peparted _/_'-1_0_0 ___ _
Reviewed by ____________ Date Reviewed--------~~el-Time 4. {kA/'
lype of Observations D Masonry
----.5hop .O(welding
D Bolting
D Batch plant
D Reinforcement Steel
D Pre-Post Tensioned Tendon
D Foundations
D Fireproofing
D Metal Decking
D Concrete
D Soil
D Other
Documents Referenced ~fi_i.J_S._b~/._J,._~-'--"'"~"'--I-/_A----=ia'-"'-'.c>.t.c=...L.../. _~_,f>:='.==-.;_c_.S.~/_A ....... ,-='SC=-.:.._/_D_F_R__i__:i:l-=-A....._,,,,,,~'---
I
f Report ;terns comply /J ~D Re~';;(//omplere .
Acknowledged by fvfJ1i.... U ~..(b
Representing I.l )> -
Page-f-of+ Kleinfelder Representative Print Name
a F-1 (9/93)
-~·j ttW
NUCCIR Mill Test Report
BAR MILL-PLYMOIITU
!IUCOR -PLYMOUTH IS Rll 1.s.o. 9002 AND RN R,B.S. CERTIFIED MILL
SHJ
Ite111 Description BeatU Yield Tensile Elng C Mn p s Si cu Iii Cr V Mo Nb
Grade p .s. I. P.S,I. ~ 8' Wt/ft
l l! 6 FLAT BAR 220991 42, H8 66,052 30.0 00 ,15 .74 ,014 .041 .23 .42 .10 ,18 .005 • 020 .005
; ASTM A36-01 ASMESR36 42,320 66,398 29.020.400
3/8 K 5 FLAT BRR 121124 49,585 68,693 32.0 00 .13 .72 .OD6 . 031 . 25 .29 ,09 .10 . 005 .018 .005
. RSTM R36-0l RSMESR36 49,159 69,IH n.o 6,38D
3/8 K 5 FLAT BRR 221123 48,618 70,963 32,0 DO .u .64 .005 .029 .22 .35 .12 . 12 .005 . 031 ,005
RSIM R36-0l ASMESR36 49,285 70,771 32.0 6.380
1/~ K .!I -n·nr ·snR· -,220344 -58,087 78,896 28.0 DO .18 . 79 .011 . 028 ,-26 -,:32 . 08 • 10 • 008 , 011 • 001
" RSTM R36-01, ASMESR3 6 57,644 1·1 ,T31' 28. o t. 2so
-,\.
M~4)v~
WE CERTIFY IBRT ALL MRIIUFRGIURillG PROCESSES, llilCLUDililG MELIIIIG OCCURRED Ill TBt UIIIIED
STATES. ALL OF THE MATERIAL PRODUCED IS MADE FROM SCRAP SHEL AlilD !ROIi, MERCURY IS
NOT USED Ill TBE PRODUCTION OF STEEL. ALL PRODUCTS PRODUCED ARE WELD FREE,
PLANT METALLURGIST QUALITY ASSURANCE MANAGER
.... (5)
0.
.,.
City ot Catlahad 02-858
4/3/02
City of Carlsbad
•:fii•Gii,141•14·ii1Ui!Yiii
BtrlLDING DEPARTMENT
NOTICE OF REQUIREMENT FOR SPECIAL INSPECTION
D~ Not Remove F~ni Plans
Plan Check No. Da-858
Job Address or Legal De$cription itSO Rutherford Rd.
Owner~ GOif Address fl 6 6 ,2u1lfedFo,1JJ 11.DNJ
You are hereby notified that in addition to the inspection of construction provided by the
Building Department. an approved Registered Special Inspector is required to provide continuous
h1spection during the perfonnance of the phases of construction indicated on the reverse side of
this sheet. ·
The Registered Special Inspector shall be approved by the City ofCarlsbad Building
Departnient prior to the issuance of the building pennit. Special Inspectors.having a
current certification from the City of San DiegQ. Los Angeles, or ICBO are approved as
Special Inspectors for the type of constructicn for which they ate certified.
The inspections by a Special Inspector do not change the requirements for inspections by
personnel of the City of C~lsbad building department. The inspections by a Special
Inspector are in addition to tg.e inspections nonnally required by the Courity Building
Code. ,
The Special Inspector is not authorized to inspect and approve any work other t~an that for which
he/she is. specifically assigned to inspect. The Special Inspector is not authorized to accept
alternate materials. structural changes~ or any requests for plan ch;mges. The Special Inspector is
required to submit written reports to the City of Carlsbad building department of all work that
he/she inipected and approved.: The final ins})ection approval will not be given until all Special
Inspection reports have been received and approved by the City of Carlsbad building department.
Please submit the names of the inspectors who will perfonn the special inspections on each of the
items indicated on the reverse side of this sheet.
(over)
go·d 9lS109SSS8r.:xe.:i . d'10) 1I9S3
/,
;)
J
City of Carlsbad 02·858
4/3/02
SPECIAL JNSPECTION· PROGRAM
ADDRESS OR LEGAL DESCRIPTION= a,~ r<v1H6'aFott() ~01ro
PLANcHecK NuMaeR: DZ--f>~9'. owNER'$ NAME: ~ ,olR
I, as the owner, or agent of the owner (contractors may not employ the special inspector}1 certify at I, or thQ_architact/enginaer of reco.td, will be responsible for employing the special
inspe o s.) as requir~d Uniform ulldlng Code (USC) Section 1701.1 for the construction
proje. I t t the i isted ab e. USC Section 106.3.5.
I, as the engim::er/architect of record. certify tb(lt I have prepared the f'ollowing ipecial in$pection
program as required by UBC Section 106.3.S for the construction project located at the site listed above.
1. Liat of work requiring spacial inspactf on:
D sous Compliance Prior to Foundation inspection D Structural Concrete Over 2500 PSI D Prestressed Concr,te D Structural Masonry D Oei.f'1ner Specified
t2l Fleld Welding
D J:figh Streng~h Bolting D Expansion/Epoxy Anchors 0 Sprayed"On Fireproofing -D Other ____ _
2. Nama(s) of individual(s) or flrm(s) responsible for tha special inspections listed
above; ·
A. ClitU~t1r1tJ w116~ ENh. 14u M~c"f'i ~ sw a'"'° ~" 'b111 B . .,......_...;.._...,_ ________________________ _
c. -------------------.......-----------,---
3. Duties of the specfal ln,peetors for the work li5ted above:
A. AN'4. AM flu.et W@41~ l-e55 fffM 17/tb"
B.
Special inspectors ehall Check in with the City and preunt tneir etedenttpls for approval.grior to beginning work on the job site.
l.O.d 9LSW9S8S81:Xe.:t '&Im 7I9S3
Apr-24-02 01:lOP
I· P.01
Sm ithConsu lti hgArch ltects
TRANSMITTAL
To: Mike Majors.
Company: CALLAWAY GOLF COMPANY
2180 Rut)'\erford Road
Carlsbad, CA 92008 .
ATTACHED:
No. Copies Date
1 4/24/02
TRANSMITTED VIA:
181 FAX {Sheet 1 of 5)
D Mail -
D Messenger
D Overnight Delivery
D Other
REMARKS:
DISTRIBUTION:
SCA File
Rich Ruzylo Callaway
Bill Boothbl I.C.S.
Description
Field Bulletin No. 001
Fax No. 760-804-7009
760-930-5350
760-599-0535
Date: 4/24/02
Project No: 02120.T -----------
Project Callaway Golf -HQ
HVAC, Comp. w/Structural
I
ACTION
D For your approval
D For your review and comment
D As requested
181 For your use/ files
0 Reviewed as noted
D No exceptions taken
[J Revise/ Resubmit
With Encl. W/0 Encl.
0 D
181 D
12] D
D D
BY: Andrew Tarango
12220 El Camino Real
Suite200
San Diego, CA 92130
a53,793,4n7
353,793,4787 fax
APR-24-2002 13:17 95% P.01
P.02
Sm ithConsu ti ngArch itects
ARCHITECT'S FIELD BULLETIN
DISTRIBUTION
OWNER
ARCHITECT
CONSULTANTS
Field Bulletin #: 001
CONTRACTOR
FIELD
OTHER
-------------
D
D
D
Owner: _C_a_l,....la_w_a.,.y_G_o_l_f ______ _
Date: 4/24/02
Project No: 02120.T ------------Contractor: NIA _ __,. _ _._ ________ _ Project: CG -HQ HVAC Compressor
Issued By: Andrew Tarango Injection Molding
This Bulletin directs you to proceed as indicated:
CHANGE AUTHORIZATION: D
In order to expedite the work and ·avoid or minimize. delays in the work which may affect Contract Sum or
Contract Time, the Contract Documents are hereby amended as described below.
Proceed with this work promptly and submit final costs for Work involved and change in Contract Time (if any),
for inclusion in a subsequent Change Order.
CLARIFICATION NOTICE: ~ Clarification to the MP1 .drawing (see attached)
Execute promptly the instructions given herein, which interpret-the Contract Documents or order minor changes
in the work without change in Contract Sum or Contract Time. Indicate your acceptance of these instructions as
consistent with the Contract Documents and return a signed copy to the architect.
If you consider that a change in Contract Sum or Contract Time is required, submit an itemized proposal to the
architect immediately and before proceeding with this work. If your proposal is found to be satisfactory and in
proper order, this Bulletin will be superseded by a Change Order.
REQUEST FOR PROPOSAL: D
Changes described herein are being considered for incorporation into the work. Submit an itemized quotation, in
format required by the Contract Documents, indicating your proposed changes to the Contract Sum or Contract
Time.
Do not proceed with the changes described herein until further written instructions are issued by the Architect.
1:u20 El ·eamino Real
Suite 2qo
San Diego, CA 92130
g5a.793,,4m
351.793-47&7 fax
APR-24-2002 13:17 96% P.02
f'·. . .Ap,l·-~~-.--02 01: llP P.03
SmithConsu tingArchitects
ARCHITECT'S FIELD BULLETIN NO.001 continued
DESCRIPTION: See attached clarification to the MP1 drawing.
L:lfonns\ca\SCA-fldb.c:Joc
12220 £1 Camino Real
Suitc200
San Diego, CA 92130
&79Hm
858-79H787Fu
APR-24-2002 13=18 95¼ P.03
\. , ... -·.:J . Apli. :_i.--•02 01: l lP ~4,17/2002 12:51 858277976~ " .
.-C19\IJl.o.A,ldge-A-.e
Suff.C
SanDiaga,CA92tZJ
' :!·· ·' -: -~ \\ !;~ '
.. ·-. -· .. ., '
''.
i, APR 1 7 nn2 · ... ~ax·· liransm·1_ lta· 1 _· ~-.,1 CO .:..:.,ifiNL. ~ r, -----"~i1iw:,:, ·--·--· ...
oa,e: 04-\7-1-.o0'1_
f;uc~ 70\ b 47 f5 7 Pago: I ol 2--____ ....
~Pn>_icc_t_M_o._: ---'-,Z.:..-~_....;(o----"'0...--___ -'--....--P-f'OJ_·oc_t:-=-Q--'-,{.;,---.;...,_-_,_,\--'-~~Q.~
FOR YOUR u~ PER YOUR REQUEST a PU:ASE REPLY O NO ftESPONSI; NECESSARY 1
c Q'F:::1-el :;c tr::> f:P '.R.SEP& g \SS , , e J«::::l Es? :ru cc~Ce--rs> a,___
~\c... '{ f.N ~
PLEASE CALI.. lF YOU 00 NOT R£CElVE AU. PAGES AS INDICATED ABOVE.
APR-24-2002 13:19 95% P.04
~ Ap~-24-02 01:llP 04!~17 /201:'12 12: 51 858277975~ ..,_ .... f ..
""'4· .... 1D--40:l,1MS91UM _,,.. -:llfH. -La.-"'8-AT
Ulll1'c.oM&'f!CIIC.
111.2*_,.,
GAS PIPING DIAGRAM
CAUAWAY GOLF
H.Q. -tNACNE COIi AESSORADOl'110N
APR-24-2002 13:19
P.05
.. --MP-\
OA -\ '7 -'lcX:J 'L
95¾ P.05
'\'
Jun-26-02:~ 01: 06P P.01
Sm ithCons u lti ngArch itects
TRANSMITTAL
To: Bill Boothby
Company: ICS -----------------
Date: 6/26/02
Project No: 02120.T ---'---------
Project: Callaway Golt
HQ -HVAC/Comp. addition
ATTACHED:
Date Description No. Copies
1 6/24/02 RFI #2 -In-fill where new columns penetrate existing roofing/deck
6/24/02 . RFI #3 -Addition of plates to top of truss
TRANSMITTED VIA:
181 FAX (Sheet 1 of ID
D Mail
D Messenger
D Overnight Delivery
'D Other
REMARKS:
Bill,
Fax No. 760-599-0535
ACTION
D For your approval
D For your review and comment
181 As requested
181 For your use I files
181 Reviewed as noted
D No exceptions taken
D Revise / Resubmit
Please find attached the above referenced RFI responses. If you have any questions or need
additional information, please call me.
DISTRIBUTION: With EncL
SCA File D
Rich Ruzylo, Callaway Golf (760) 930-5350 181
Mike_ Majors, Callaway Golf {760} 804-4009 181
D
BY: Andrew Tarango
12220 El Camino Real
Suite 200
San Diego, CA 92130
g53,793 .. 4n7
a511,193-41a1 Fu
9S¾
W/O Encl.
~
D
D
D
P.01
Jun-26-02:l.Ql :06P
Jun .24 20 09:18a Quest Diagnostics 619-686-3088
P.02
p -1
!t1 1 . . .-i ll il."(y-{<..... /. .... ,:,,.1; •. ,
5f <;/),··,·,.-./ J.~.y:?,,·,,·.·:.<
(),.,/,· ·-' r . ,J < l,::1"·-'#•··• rL .. • .... .... -·--·-----·--•' ,/'
t /),.,,.,,. .. ;;.:-.:·
(: .. ' ···r·· .,, • _., ' . ' ,, --, . .:-r,, .. ,.... rv",·.;'.-tl'
fj ':.(· -~-1'(.' .. : .. .( '2:., ,.._,~ . .... . "f•' r: ... -,z, . .., . .,
/:J· r;
,,t/ ;n.
l[.t ,' ... l ,,}
!]-; r~-"ll(:,.... 11··1c.~l<" 1 ...... y_·· J ~ C • •,c -C.o•t
f·.'fS·-·7''? c_-(/ -;,c:. 7 -r I ,
•. ~ _\ I , .,,.. //
r r
0.;,f!all(llltTabll -~em . ..ciialllllf
Cl RtitctN . . D Rl'li11_ and RIIIIIIIII
0 Submit Spdlld Illa
,.. .. I.. ~:,,-;( ~ ,. ,,.. • /' / ..... •-;,t:c r·
Cllecklng Is 1111ly far 1eneral confirmation wftlt tfle D11111
Concept of the Project ano ceneral compliance wllll .!fit
Information given In the Contract Dacumanb.· Ai!J ICIICII
shown is subject to tile nquirem1nts of plaas , ..
1pacifications. Contractor is responsible ~ qualltilles;
dimensions which shaU be confirmed and coitelnd It 1111 Job site; fabrication processts and ttcbnlqlltl ti
cons1ruction; cooromation of Ids !<Ork wllll tllat al al •
I'
tradlS, d satisfactosy perlormanca of ~ NL
IJ nHCWU G~-
' .
.... ~~-:P I;.,, J/1•-:-~-fi .r .... ~ >"
/ G ... __..-.;/ c:-~-?te -• -~ J "I..
n, .. ~ ?
(
.. -.\ .
. ..... ·----·-·-··········· .... --.......... ··-······---·-··--.. -----·----·-·-,-... 1 ·-.. : -.. ,. ·----. --# 2-_ 7 I . ···--.. ·-·· -. ·---·---···· ... p,. f'!L RF~/ rJ/ -----
7 ·-·--
I? •.. ,.p /(',, l. (/_~)
_r, ., . • .. /N.P/tl. w/eoNUUtr f dn/Jlb ,,,,r~;;:-rl~ . r ~ "/1.JtJfM~ ;'° /./!WI {l{{rTJI((,
-r---'-~ ... ... _ .. !1 C. ' ~ ~ :14{ Kn•r/"'}.;:f.-.-• ..,.,,/
6--] /· (.i,'11...,, l ·-: .:J. ;.·•,· .. I'} -.. '5 -· .• -I (, -L.:..-:.:!: · /-c.A;., /\~cP <:;
... 1· r.: ..... , .• 1 .. -r: I ~· : --.;~ (. r--·, .,-.. , ··,--. '/ . ;..J.·. ;· .. s: r-,.-J '\._.__.,.,.. ,...__ ___ / . r .:..' . .. . ··r--L, ---·, . s ~:::::::::;::::::::::l·_.../ "--·-·,// . ....__ _ __,.. -lt[-,____ ,. "' ,r<rr
... ------------------···---.. --. ._ .... -.. -· -·-----~ ·---··-·---.. , .... _ .. _ .. ____ '.' -·--. :? l"c,, •• t ·-C. ,:·/ ,j S?"1i?c7 ··--·-·-·---··· ··-·····-·······---··--·--'·..:. ____ _ f>-1Nt1·
...-,
~._,.·, -~c-1.,,; m. ,.:, '·t''J (' .2. /, . .I~ (i /;; )
~ T }c 1.(/,,l·r·
J,,.;. iirl,~\ ~·,,-,.t.
(jc,)
{) (;..) r,.:,,.. \
P.02
.~ Jun-2s-021Ol:06P . Jun 24 20 os:oea Quest Diacnost1cs
,.~ . l)l/ ?J~ C·lf
c, ... .r-.re:)
.5:d.i /•·,.°ii,-,-1
Y--··· ('/ic:,••·1·( -· (• -I .
., () . . t, r.• 1 .. ,.. e .
(t 11)-5·,)c ·-Jl'i]
T,·-(Sc A) 6'/
}-..L ?'ti c,1/ fc ·· :l 't · o2. <1y.. G /
g-.S-J'·-'1?1-'--0 ri"l
619-68S-308B
f) . -t · / •• -:; JJ,1 t.,i/Jy· (:, r1! P ; .. fr':'#'.i L' t .. -' It., II I.
I /YJ ,~·rl S rr.. -S
{
·1 s· -I ") (a, .... ,.,>
I. c.; . I
(
~~J ' . I, .,.,. ,-fY) "' .~,1. ,_, .... .: "· 'l -----·------'---~---Pc.1 f?rv: S ,'. ,1.1•, • .'
-·--------·· _ ..
P.03 p. 1
----~---------·_ ... _______ .. ___ . -(i)
_ _r,.·
:· ,.
.. ~ -Ta~ D ._ ~ .._.
: 0 RaJtctad O Rivlsa ind ResulNIII
D Submit Sptclfftd lttrn
Che~inr is only far gene.ral CDl!ftrmelion wlt!I ffle Desllll
Concept of Iha Project and general compliance with lhl
Information given in the Contnict Documents. Anr action
shown is subject to the requlremenu ef plans 111cl
specifications. Contractor is responsible for quantities:
dimensions which shall be confirmed and C0111la1ed at 1111
Job site; la'llrication processes and techniques af
: construction; coordination of his-work wilh 1hat of all olhlr
trad nd e satisfactory. performance of his warl
MITH COHSU ING ~CHrTfC~ :
B · Data: "-f ?f rr :.
--~-----··~-----····----~-·· _.:-.......... ___ :..,·--·----·--..... <?}
-·---··---···-·----··--··------·. \.\\
\. ,\
:::..-=..-=-.-'i--·-·---··---·7
~/.5) 7-[;.J, · .., It . I
"-" . c;.:-.,,ai-:-·rc ,--*f P/11,e: /fLL) c.:-_J·---1 ___ .. ::.1.-~ ._.l( i.!;i,''
Rt-~·11
_ ~-·.. ___ '=...:1_':!'ik --····-f /,~, ·=1r
' I I ,. ) ' ,5·,"ct y, L· I(', __ ;
Tlr' J,·c.,._; A,Mt (_').. ... I· ., .. · ----------~J --~-------·--···-" Jf ?~ J'( ~,· ~ · l1,,.., .... )
X I \" "'I' -7 C ·-lti1.-ii ,., f 'L' ..
.(. ~· f.t , 5· -{,; 'l(f., )( 11;./I C,·.{(.l•"' p./ Pf C,"(( Or"v Tr.·· f ):: ;j ,t.,) ·re• . C'( •
P.03
JUN-26-2002 13:16
(i1Qir/< l c; ~ ~-.,,
/-?S-f .~ _79J-.1/777
/JJT--cPL/c',,_ /½t:::r/< ~-
?ftfg--793-4 7 S::-7
If ~ IJ/°me,._S',.wr-"1~l ~ 6-,, ··Sc.c/c/· r/lc-· /J~&7 r
.,. C->'I sr~ r--... ;_ N"c.;>-ctr
~ # ~ -:-=-.s/h: .•. ;J ~f1e.h:........., "~ c~~1 ... &./C..7 1,/r-
J<l'f!'r~ ,e;;,,Je-·fr~t'J Cb;o7 o/l Q,,.rf i-','c~~ ~..s,r..-
-· fJ~r i3 c.r-l'--.?
1 't>,e..,.. C
0 -----_ _ ,._.:2. .... & __ o/...t..lf.:~~A~ri~A'c.o~F---1..
(
.\. I
~ . r Ponm -----l ~~·~ ---_, -"
E::=:;~r:::::
-·-· --.. ---· ~ ---·-~---... -·----·---···· ...... --~-_ _...,,..___ -------.. ---. __ ,. ___ ,.. ____________ , .,_., .. ~·-·-.., ---····-· ---------_____ ,, __ ------. -. 1.C-----···-.....
Rr=:rJ-
Ae 9~< s, .few" Cha"i 'C
b I~ Ck( R "C".-1 .fJ.,.o -e. oJ ICS (fctt:t}-S'J.o-Jl'f3
5' h fri .11 t!e/ To ( ScA-) h1
Fa.v + fll CN /e,-'J..'1--o2..
s-5""8"-"793 -f;f7 fr 7
~ me..~,< J..t::,,_,de-,,,_
(z)
"-·
I
f I
' I I
I
·l
[Qi
3'. Ir
r----'-"-"'::..-..::..-.-/'Af /J/ht C ·7f~~/e· 2r
..::·, ..
.. , _ -': __ S,"cl-t l/,.b,.J :y,.,•y l " . • . '." . . . . • . .
X ll11 (}let<!. -{µttJ~J ,'-..,, f(ct-e)
To ~..,.:sr,,,..1 "Tc-5r::T ~ ')r(p 'A. Yj' C,c.{utr. ,.;
. , -:: . -
• C<f •• -~ .....
Plt..T-f ON
'7-01-2002-2:52PM FROM P. 1
' .
SrnithConsu tingArchitects
TRANSMITTAL
To: Bill Boothby .
Company: ICS --,---------------
Date: 7/1/02
Project No: 0212O.T ----------Project Callaway Golf
HQ -HVAC/Comp. addition
ATTACHED:
O~scription No. Copies
1
Date
7/1/02 Field Bulletin #2 -Revised structural details
TRANSMITTED VIA:
~ FAX (Sheet 1 of fil
D Mail
D Messenger
D Overnight Delivery
D Other
REMARKS:
-Bill,
Fax No. 760-599-0535
ACTION
D For your approval
D For your review and comment
~ N:. requested
Im For your use I files
~ R13viewed as noted
D No exceptions taken
D Revise/ Resubmit
Please find attached the above referenced field bulletin. If you have any questions or need
additional information, please call me.
DISTRIBUTION:
SCA File
Rich Ruzylo1 Callaway C3?lf (760) 930-5350
Mike Majors, Callaway Golf {'760) 804-4009
With Encl.
0
181
0
D
. BY: Andrew Tarango
1::iao El QrnillO Real
Sui1e200
San Oicgo, CA ~130
asa,193 .. m
&51,793,.41&7 Ftx
97¾
W/O Encl.
181
D
D
D
P.01
"7-01-2002 ::2 : 53PM FROM P.2
' ..
Sm ithConsu tingArchitects
ARCHITECT'S FIELD BULLETIN
DISTRIBUTION
OWNER
ARCHITECT
CONSUL TANT$
CONTRACTOR
FIELD
OTHER
D
D
.o
Field Bulletin #: 2 ------------O w n er: _c __ a=l=la .... w __ a .. Y ..... Go ...... lf _________ _
Date:· 7/1/02
Project No: 02120.T ---"-'--------------Contractor: ICS ....;.......,.. ___________ _ Project: CG -HQ HVAC Compressor
Issued By: Andrew Tarango Injection Molding
This Bulletin directs you to proceed as indicated:·
CHANGE AUTHORJZA TION: ~ Revised structural details
In order to expedite .the work and avoid or minimize del~ys in the work which may affect Contract Som or
· Contract Time, the Contract Documents are hereby amended as described below.
Proceed with this work promptly and s1.,1bmit final costs for Work involved and change in Contract Time (if any),
for inclusion in a subsequen.t Change Order.
CLARIFICATION NOTICE: D
Execute promptly the instructions given herein,. which interpret the Contract Documents or order minor changes
in the work without change in Contract Sum or Contract Time. Indicate your acceptance of these instructions as
consistent with the Contract Documents and return a signed copy to the architect .
. If you consider'that a change in Contract Sum or Contract Time is required, submit an itemized proposal to the
architect immediately and before proceeding with this work. If your proposal is found to be satisfactory and in
proper order, this Bulletin will be superseded by a Change Order.
REQUEST FOR PROPOSAL: D
Changes described herein are being considered for incorporation into the work. Submit an itemized quotation, in
format required by the Contract Documents, indicating your proposed changes to the Contract Sum or Contract
Time .
. Do not proceed with the changes described herein until further written instructions are issued by the .t\rchitect.
t:t~o £1 c.amlno Real
Sllilc:l<l¢
San Diego, CA 92130
85S-79Hm ass-m,.c.,a, F:r,,
7--01-2002·2~53PM FROM P.3
. .
Sm ithConsu ti ngArch itects
ARCHITECT'S Fl·ELD BULLETIN NO. 2 continued
DESCRIPTION:
Refer to attac~ed revised-structu·ra1 details 6 & 7, sheet_S1.
':I-.
L:lprojects\o2fiJes\02120\D2120.t fb2 070102. cJoc
1:wo El Camino Real
~ite2CO .
Sa9 Dqo, CA 9%130
mm-+m
~'93,,4787Fu
0 07
r 7-01-20@2.i2:53PM FROM P.A.
' . Ju1-01-O2 a1:13P P..02
Co.\l~wc.y G-o{f .APRIMEJob: ~
STRUClURAl Date: ~ • o~
.. '.,-..
H. Q. ... H VA c Cb-· Co ~p ~ssor Adc:litr""'. EMGlNEERS strt ~
r
8'-(!)N FIELD VE~IFY
EXIST.OPEN WI;B JOfSTS ·
FER FL.AN.
EXACT SIZE AND LOCATION
OF Nl:J.-.l OFENINC:: VERIFY WI
ARCH AND MECH. DWGS.
r I
! I . l
·/ I
1.-=--=r"'l'l=-=.,...,..;:::a.-:::::=--=a=-,~~~~-i!l=f,.~=-=~-=-=--=I I
NOTE: I. INT ALL ALL NEW TS. PRIOR TO 5AY-l CUT
OPENING OF E;X!ST. ROOF· DECK TYF.
~
S-f
. ' . 7-01-2002}2:SA.PM FROM
-..Jul-01•02 01: 14P
P.5
P.03 .. ..
CA~lAWO\y <?o [f
K&. • HVAC ~ Co.Mpre.ssor-Addrtion.
NE.W 5-AWCUT OFENING.
E-XACT SIZE AND LOCATION
A PRfMEJob: ~
STRUCTURAL Date:~
EIGIREERS snt .£::-
@-----
~NEW·T5FER
FLAN TYP. ®------
-~ -...... _ • '.1-.,
EsGil Corporation
In Partnership with Government for Building Safety
DATE: 4/16/02
JURISDICtlON: City of Carlsbad
PLAN CHECK NO.: 02-858 SET: II
PROJECT ADDRESS: 2180 Rutherford Rd
PROJECT NAME: Calloway Golf H.Q. -Mechanical Additions
D APPLICANT
D JURIS.
D PLAN REVIEWER
D FILE
·~ The plans transmitted herewith have been corrected where necessary and substantially comply
with the jurisdiction's building codes.
:D The plans transmitted herewith will substantially comply with the jurisdiction's building codes
when minor deficiencies identified below are resolved and checked by building department staff.
D The plans transmitted herewith have significant deficiencies identified on the enclosed check list
and should be corrected and resubmitted for a complete recheck.
D The check list transmitted herewith is for your information. The plans are being held at Esgil
Corporation 1;1ntil corrected plans are submitted for recheck.
D The applicant's copy of the check list is enclosed for the jurisdiction to .forward to the applicant
contact person.
D The applicant's Copy of the check list has been sent to: -
·~ Esgil' Corporation staff did not advise the applicant that the plan check has been completed.
D Esgil Corporation staff did advise the applicant that the plan check has been completed.
Person contacted: Telephone#:
Date contacted: (by: ) Fax #:
Mail Telephone Fax In Person
~ . REMARKS: The applicant to hand carry the plans directly to the city of Carlsbad, this does not
assure a permit will be issued the city may have other corrections.
By: :Poug Moody
Esgil Corporation
D GA D MB D EJ D PC
Enclosure$:
4/10/02 trnsmtl.dot
9320 Chesapeake Drive, Suite 208 + San Diego, California 92123 + (858) 560-1468 + Fax (858) 560-1576
EsGil Corporation
In Partnership with Government for Building Safety
DATE: 4/3/02
JURISDICTION: City of Carlsbad
PLAN CHECK NO.: 02-858
PROJEGT ADDRESS: 2180 Ruther.ford Rd
SET:I
PROJECT NAME: Calloway Golf H.Q. -Mechanical Additions
~~CANT
~-'
D PLAN REVIEWER
D FILE
D The plans transmitted herewith have been corrected where necessary and substantially comply
with the jurisdiction's building codes.
D The plans transmitted herewith will substantially comply with the jurisdiction's building codes
when minor deficiencies identified below are resolved and checked by building department staff.
D The plans transmitted herewith have significant deficiencies identified on the enclosed check list
and should be corrected and resubmitted for a complete recheck.
~ The check list transmitted herewith is for your information. The plans are being held at Esgil
Corporation until corrected plans are submitted for recheck.
D The applicant's co"py of the check list is enclosed for the jurisdiction to forward to the applicant
contact person.
~ The applicant's copy of the check list has been sent to:
Andrew Tarango
12220 El Camino Real, San Diego, CA 92130
D Esgil Corporation staff did not advise th.e applicant that the plan check has been completed.
C8:I Esgil Corporation staff did advise the applicant that the plan check has been completed.
Person contacted: Andrew Tarango Telephone·#: 858-793-4777
· Date contacted: L-1) !>ID:;. (by:fA~) Fax#: ( 85~) "?13 ... Ll7Sl-
Mail ~elephone _ Fax.,,,,. In Person
D REMARKS:
By: Doug Moody
Esgil Corporation
D GA D MB D EJ D PC
Enclosures:
3/'2,q(g?, trnsmtl.dot
9320 Chesapeake Drive, Suite 208 + San Diego, California 92123 + (858) 560-1468 + Fax (858) 560-1576
City of Carlsbad 02-858
4/3/02
PLAN REVIEW CORRECTION LIST
TENANT.IMPROVEMENTS
PLAN CHECK NO.: 02-858
OCCUPANCY: N/A
TYPE OF CONSTRUCTION: N / A
ALLOWABLE FLOOR AREA: N/ A
SPRINKLERS?: N/A
REMARKS:
DATE PLANS RECEIVED BY
· JURISDICTION: 3/22/02
DATE INITIAL PLAN REVIEW
. ·COMPLETED: 4/3/02
FOREWORD (PLEASE READ):
JURISDICTION: City of Carlsbad
USE: Mechanical
ACTUALAREA:N/A
STORIES:
HEIGHT:
OCCUPANT LOAD: N / A
DATE PLANS RECEIVED BY
ESGIL CORPORATION: 3/25/02
PLAN REVIEWER: Doug Moody
This plan review is limited to the technical requirements contained in the Uniform Building Code,
Uniform Plumbing Code, Uniform Mechanical Code, National Electrical Code and state laws
tegulating energy conservation., noise attenuation and access for the disabled. This plan review
is based on regulations enforced by the Building Deparfment. You may have other,corrections
based on laws and ordinances enforced by the Planning Department, Engineering Department,
Fire Department or other departments. Clearance from those departments may be required
prior to the issuance of a building permit.
Code sections cited are based on the 1997 UBC.
The following items listed need clarification, modification or change. All items must be satisfied
befote the plans will be in conformance with the cited codes and regulations. Per Sec. 106.4.3,
1997 Uniform Building Code, the approval of the plans does not permit the violation of any
state, county or·city law.
To speed up the recheck process, please note on this list (or a copy) where each
correction item has been addressed, i.e., plan sheet number, specification section, etc.
Be _sure to enclose the marked up list wherl:you submit the revised plans.
TENANT-IMPROVEMENTS WITHOUT SPECIFIC ENERGY DATA OR POLICY SUPPLEMENTS (1997UBC) tiforw.dot
City of Carlsbad 02-858
4/3/02
Please make all corrections on the original tracings, as requested in the correction
list. Submit three sets of plans for commercial/industrial projects (two sets of plans
for residential projects). For expeditious processing, corrected sets can be
submitted in one of two ways:
1. Deliver all corrected sets of plans and calculations/reports directly to the City of
Carlsbad Building Department, 1635 Faraday Ave., Carlsbad, CA 92008, (760)
602-2700. The City will route the plans to EsGil Corporation and the Carlsbad
Planning, Engineering ar1d Fire Departments.
2. Bring one corrected set of plans and calculations/reports to EsGil Corporation,
9320 Chesapeake Drive, Suite 208, San Diego, CA 92123, (858) 560-1468.
Deliver all remaining sets of plans and calculations/reports directly to the City of
Carlsbad Building Department for touting to their Planning, Engineering and Fire
Departments.
NOTE: Plans that are submitted directly to EsGil Corporation only will not be
reviewed by the City Planning, Engineering and Fire Departments until review by
EsGil Corporation is complete.
1. A complete description of the changes in the processes that require the addition
of the new equipment in this tenant space should be provided. Please provide a
hazardous materials update letter indicating any changes in materials as a result
of the changes.
2. Please attach the City of Carlsbad Policies and Procedures for Roof Mounted
Equipment to the plans.
3. On the cover sheet of the plans, specify any items requiring special inspection, in
a format similar to that shown below. Section· 106.3.2.
• REQUIRED SPECIAL INSPECTIONS
In additi.on to the regular inspections, the following checked items will also require
Special Inspection in accordance with Sec. 1701 of the Uniform Building Code.
ITEM
FIELD WELDING
REQUIRED?
YES
REMARKS
4. When special inspection is required, the architect or engineer of record shall
prepare an inspection program which shall be submitted to the building official for
approval prior to issuance of the building permit. Please review Section
106.3.5. Please complete the attached form.
5. Please have the structural engineer provide calculations to show the attachment
of the new equipment platform (the welded attachments at the existing joists and
the frame) are design to withstand the lateral forces.
6. Please provide complete electrical plans.
City of Carlsbad 02-858
4/3/02
7. Please provide electrical load calculations.
8. Please provide panel schedules, indicate new and existing loads.
9. Please indicate on the plans the location of the electrical panels.
To speed up the review process, note on this list (or a copy) where each
correction item has been addressed, i.e., plan sheet, note or detail number,
calculation page, etc.
Please indicate here if any changes have been made to the plans that are not a
result of corrections from this list. If there are other changes, please briefly
describe them and where they are located in the plans.
Have changes been made to the plans not resulting from this correction list?
Please indicate:
Yes CJ No Cl
The jurisdiction has contracted with Esgil Corporation located at 9320
Chesapeake Drive, Suite 208, San Diego, California 92123; telephone number of
858/560-1468, to perform the plan review for your project. If you have any
questions regarding these plan review items, please contact Doug Moody at
Esgil Corporation. Thank you.
' .,
lUMBER: 80-6
CITY OF CARLSBAD
POLICIES AND PROCEDURE
SUBJECT: ROOF MOUNTED EQUIPMENT
:FFECTIVE: 5/1 /92 S~.CTION: BUILDING DEPARTMENT
3UPERSEDES: 80-6(9/10/8-0)
80-6(5/01 /81)
'URPOSE: PROVIDE INSTALLATION STANDARDS FOR ALL ROOF MOUNTED EQUIPMENT AND
PENETRATIONS ON COMMERCIAL AND INDUSTRIAL BUILDINGS.
NTENT:
'OLICY:
A.
8.
C.
1.
2.
3.
4.
·5.
6.
7.
Maintain roof integrity.
Prevent hazardous condition to firemen who must fight fire on the roof.
Provide an installation that is aesthetically sensitive to the building and the
adjoining properties.-
. All equipment shall. be concealed from view and the design* shall me.et the
approva.1 of the Planning Department. ·
All equipment shall be ·specifically designed and approved for exterior use and
shall be approved by the City of Carlsbad Building Department.
All roof mounted equipment shall be on a platform which shall be an integral
part of the roof--flashe~ and waterproofed. When a screen is ·approved, it. shall
have as few roof connections as possible and be structurally adequate.
All electrical, plumbing, mechanical duct work and related piping shall be inside.
the building ·and not on the roof. All connections related to equipment shall be
made ·in the same roof opening on the platform or have the prior approval from
the building official.
Sewer vents shall be brought to one main vent below the roof and have one
penetration where restrooms or other plumbing fixtures are back to back or in
the general proximity.
Air exhaust fans and other equipment shall be within the building and use the
same roof opening where restrooms a·nd other equip.ment are back to back or in
g~neral prox_imity.
Existing buildings and equipment, remodel or replacement, shall meet .th~--~bove
regulations or shall have the prior approval from _the building official.
Where new equipment is installed, unused or abahdoned equipment, including
all roof mounted piping, electric-al, mechanical, duct, and other related
appurtenances shall be removed from roof and unuse·d openings properly sealed l
,to maintain roof integrity. ·
*The architect should, through design, conceal the heating/AC '-'nit ~nd other equipment whether
they are pn the roof or elsewhere.. ··-
initiated By: C ~pp roved B (j _ f\ ) · . Ii t V ()~A-cc:__
City of Carlsbad 02-858
4/3/02 .
VALUATION AND PLAN CHECK FEE
:JURISDICTION: City of Carlsbad
PREPARED BY: Doug Moody
PLAN CHECK NO.: 02-858
DATE: 4/3./02
BUILDING ADDRESS: 2180 Rutherford Rd
BUII..DING OCCUPANCY: Fl TYPE OF CONSTRUCTION: VN
BUIL,DING AREA Valuation Reg. VALUE
PORTION ( Sq. Ft.) Multiplier Mod.
Tl N/A City Valuation
. ,
Air Conditioning
Fire Sprinklers
TOTAL VALUE
Jurisdiction Code cb By Ordinance
1994 !JBC Building Permit Fee I • I
1994 UBC Plan Check Fee I.., I
Type of Review: 0 Complete Review D Structural Only
0:Repetitive Fee =8 Repeats
Comments:
D Other
D Hourly · ._I ___ __.I Hour*
Esgil Plan Review Fee
($)
30,000
30,000
$242.991
$157.941
$136.071
Sheet 1 of 1
macvalue.doc
PLANNING/ENGINEERING APPROVALS
'RESIDENTIAL ·' ·
RESIDENnAL ADDITION MINOR
( < $10,000.00)
·oTHER
:·:-:TENANT IMPROVEMENT
· CARLSB"D COMPANY STORES
VILLAGE· FAIRE
COMPLETE OFFICE BUILDING
---------------------
PLANNER~z_
ENGINEER.~~
DotS/Mlsfonns/Planning Engineering Approvals
. DAT~Mz_
7
DATE Y/2,h'--
Carlsbad Fire Department 020858
1635 Faradc;1y Ave.
Carlsbad, CA 92008
Plan Review Requirements Category:
Fire Prevention
(760) 602-4660
Date of R~port: _04_1_08_!2_0_02 _________ _
Buil~ing Pia~
Reviewed by:
Name: SMITH CONSULT ARCH
Address: 12220 EL CAMINO REAL STE 200
City, State: SAN DIEGO CA 92130
Plan Checker: Job #: 020858 -------
Job Name: Bldg #: CB020858 ______________________ __,.;::;_ Callaway Golf
Job Address: 2180 Rutherford Rd Ste. or Bldg. No.
IZI Approved
LJ Approved
Subject to
U Incomplete
Review
FD Job#
The item you have submitted for review has been approved. The approval is
based on plans, information and / or specifications provided in your submittal;
therefore any changes to these items after this date, including field
modifications, must be reviewed by this office to insure continued conformance
with applicable codes and standards. Please review carefully all comments
attached as failure to comply with instructions in this report can result in
suspension of permit to construct or install improvements.
The item you have submitted for review has been approved subject to the
attached conditions. The approval is based on plans, information and/or
specifications provided in your submittal. Please review car~fully all comments
attached, as failure to comply with instructions in this repor:t can result in
suspension of permit to construct or install improvements. Please resubmit to
this office the necessary plans and / or specifications required to indicate
compliance with applicable codes and standards.
The item you have submitted for review is incomplete. At this time, this office
cannot adequately conduct a review to determine compliance with the
applicable codes and / or standards. Please review carefully all comments
_attached. Please resubmit the necessary plans and / or specifications to this
office for review and approval.
1st
020858.
2nd
FD File#
3rd Other Agency ID
PRIME STRUCTURAL ENGINEERS
11858 Bernardo Plaza Court, Suite 105C
San Diego, California 92128
Tel (858) 487-0311
STRUCTURAL
CALCULATIONS
Callaway Golf-H. Q.
HVAC and Compressor Addition
2K2-70
Sheets 1 thru 10
,.
;,' ,,;-
l,
I
/
----
Wp
r-_ C\p'. CC\· If' ( n1 ,..,
rp -R It 3 h~ ) Wp
1• J q& 1Fp
.· t-1&"
'I
C\p::. \t D, Cos.=-0,4-Ip= /_o
..--/
f<p ~ '3.0, h-x. "-hr-
-'-'p = (l.o)(0.4)(LO) c_· r+:2.1 .J r -----·-l .))v? 3 r
t 10 (' } =-O. S33 Wp-~ GOVERi'-lS.
//1<¼ Pf: t--Jf :=:-G3o~ tr MIN-Fp = o, l Co.-Ip, V\Jp :: o. 28-Wp
MAX. Fp = 4 Co--Ir;,. \/\Jp:: 1-b Wr
-/0 ?7, 3 #
37 ?--1, 8 « J t 1'-1~)
f~1r-12,,fl' tf, (H//.J)
;Jo vUf~JI,
( p <f--f f D ) ;) o-JC "' ? 771' 6 i/ .,:. ?-Bo of, r.(: ( ½ X:, )5 of d f; ~ /
(l33 r
ii. z: r-1-I -f , r //, I ~ 1 t itfdC--o'l.t SI ( V O(.S, -T ,4--::::: St/ K.B -.:=: r?i P' '-'?Ol1/~;-t,.._.1..J.
1f"g'7fe -=-17 b1 #= -~ &l-=1'''f£.F
I I,).{) c f?3, D f!,,f ';<. /!J C 46 cf:-0 ff
t=============~==========1 {;)l ~ I !.r, ("' X 6 t ~ /').,1/, D
,?'~ ~,)lf"' ( 86. 0
----~------~ ---+
_, -------~-·----·. --
: .,1 i ;
·. i -r---_ -~------~~~--~-_ · .• ;_:~ ~fui~
-· ·---·-. ·-·-----___ ., I ~ r~ ·.··· ".' r
-···--------··-·--· ____ 4.-,,
j -J+-----;r,r ~ ! -·· .. -· -.... ·-"-.i Si{-t--/ . ~
,-----· -..... ~ -------11· --· ., · ------------l~. ..,\ _ --
-1~; -·-·------·-----~-·--, . . --1t·
___L____ --. -. ---· --------·----I _L_ _ I ~M~J· ]-
i ··--------' --11 . . ---.
_i___ . --.. .. . j \~ ~..-v" --i ' i +-~ -~---~-~~ . " R,>J)_" --Jl
l
_:J, !] --·--. -----SM0 ~ r. . .
f =----------.,i::===============:====;::::::::±: ,l . / -/
! --· --··-___ ,. ___ . -Jr;., 1,
--... _ --· -·-· -·-·--·-.. _ -·-. ·-. . ·; /c.--) ---.:.. _ _ ___ l!x .. hr: :;:: _ s-, 14 ...
I --;--·--·---· -_, __ ---· -·--------. -· --1· -----· -..
~~------~-------~1.:..~ ~ -· _/---~-~ --.. ·--·--· -----. -! '
P ..--... ! • ;, ,_._ (-,, 2-t,2---JO I-< •1 r\· ;, 1 .•• .,,.,D. _:...,.,(_ ,, ... ,,,,._ V
STRU{"·"',tl~ol f"\,;.{a'-~ . ·-· V 1V1\ri1-uv .. v.~.....:;.._
, ~ENG!NEERSsht: -~
+·--:--··· .. ···-----------·--..... --··------.. -·_2------. -. .. . ·----·-· ·-···· .... ---+-· ____ : 7k; aJ11U1--?/4, _____ ~. ·-d. !':~-~ t~-,:.. -<. Jt.-._--:z_ .ts...-, c.._ _; [$,c.z=:.a6~ PJ.
, . ·--~-·--------·--. -.... -----I·-·. -: q~{~ ..... r-------'1><c = _ .'<1/?~1:/v'_""" ./-li3'<f' /:_<_: _ .. _ __ ., _____________________ ---.. --~--·-·---···· .. 1-~ ----:_ ~ -_{to/ ___ -:_ -J,;.~'{/2' .. ___ '/_~ '76h: -. _--. -.
,. ·-,----~~~~---~-! -~~~·{::·-~.~·~-~--~~--. --~--·-~-~?:ii---14;:, "j< ,-~-~~ 1/:jj--. ---.-~~-.;),c;,----·---·-------
~1. --. --~VI -,---------------·. --___ 1 ___ ·-·-----·-:--_._ .. ____ ·---·---··-·--··--· ... .. .. --. -
_::j I . :1·~--~~~~;;·--·~ . ...ll~~b,~;z-··~-~~P--~~-~=~b~~~-=~:;1~-~·~-----~ ..... , LlW-. -t4l~~-· .. -. :
; : T ~-• ~ =~i:~~-~~ ~., '(--.1-ic'I~ -;_. p : --------:.~ _c---~ -------l -~ . flf5t . -~··---·-·-. 4----· --·-·-··-. .. --·---~---·· . -·--...... . .. . -----..
-::-' -!*' 1J.(0ooi 11c.'.? Z.~· ' ; i,.,.-------------------~----------···-------·-----·---.. ----· --· -··· ... , _____ ·---------.._ --·-·---------
~~ i • --= ... ·-·· '--::--------··--·-,.. . -·-----------·-··· . ·-·---·-----··---· ---·-----. ·---· -···-------·--· -----·--···-... . .. --· -··· .
-------·-----..----.. -------
(
=---·--·-&w /hJAp >¥14 .. -~F-
----·--------·------·-··. -. ··---·----
• ---••---M •• --·-·-·-··I?-~-= ---/ ... ( ~ ;-....---_;; __ __q_(__r.cJ~s';_ _______ ---_ __: ___ .... ---·--···---------·-----·----__ · --------·-
---·---·--·-··· .... _ -·---------------.. -
Zv1. 7
-·-·---------------··--·---------·--·-r ... ----. ----. --·--··-·------·----------------------
'1;/21-=:. _ v-.f~~<V ==-~(/ t-!.~---::-· ---------------······-·---·-------·· ··---·-·-----------
---------.. -----·-------..... -----. ·-·--------· ··-··-· --·-·--·---··----····. ·-·-··-· . --·-···-··--
_·_·.,_. · ____ ~y ..f-A~1----~ ·-') ... 06/c-<< ___ )pf~~x~-.. -· -----~ o_rc...-_____________ -
---if J_~:~-=~=:-:=~r-=-:-::-_-~_:_:_ -:-~:-:~-~: __ -~~ ~~:~:--
----1to' o . 1>+-:-___::::.....=------:--">------.i.~------. -~-:=i-
-·.,·
.. ,. ~-
r ... ,.l. -·--------/ 77J-------·-·--
·---· -----------
------·--------------------
---------·-----------
-----·--------------
1:------------------------------------------
....,; m
..._ __ -----
------·--·----------
.,.
?
sSB BEAM #1
s1p12vis0b414BTBEAM ANALYSIS PR06RAMslp9v1s0b4148T
SPAN LENGTH = 12.00 ft
LEFT CANT= 0.00 ft
·RIGHT CANT = 2.00 ft
UNIFORM LOADS (k/ft t~ ft)
•,d •ii XI X2
(1,300 0.000 0.00 14, 00
REAGTIONS (k)
LOAD LEFT RIGHT
sOB03/19/02
2K2-70
(6.60ls0p10.00h12v0s0b3T
Dead 1. 750 2.450 !-ly Live 0.0(i(I 0,000
fotal 1.750 2.450
MAXIMUM FORCES
V max = !.850 k @ 12,(>0-ft
Vd max= 1.850 k @ 12.00-ft
N max = 5,104 kft@ 5.83 ft
Hd max= 5,104 kft I 5.83 ft
M min = -0,600 kft@ 12.00 ft
Md rain= -0.600 kft@ 12,00 ft
N = 0 kft@ 11.67 ft
DEFLECTIONS (EI= kin"2)
LOAD Def! (in) X (ft)
Total 130652/EI I"'" 0" J • ..i'I-
-65318/EI R.C.
Live 0/EI 0.00
(l/EI R.C.
Dead 130637iEI midspan
-65318/EI R. C.
Main Span Cant. (1 c,cal)
TOTAL Defl EI EI
L / 180 163315 3888
L / 240 217753 5184
L / 360 326630 7776
---= ---
~--~ ---fl:: •r ,·
s3B BEAM U s0B03/1'3/02
2K2-70
r· PR1fv'l1=Job: '}j(l~70
STRUCTURAL Date: Y-bv
~ . ENGINEERS sht: S:_
s!p12v1s0b4148TBEAM ANALYSIS PROGRAMslp'3vls0b414BT
SPAN LEN6TH = 12.00 ft
(6.60ls0p10.00hl2v0s0b3T
LEFT CANT= 0,00 ft
RIGHT GANT= 2.00 ft
UNIFORM LOADS (k/ft & ft)
wd wl Xi ,/•j !':.l..
0.072 0.000 0.00 14.00
REACTIONS (kl
LO/iD LEFT RIGHT
Dead 0.420 0.588
Live 0.000 0.000
fot;l 0.420 0.588
MAX !MUM FORCES
V max = 0.444 k @ 12.00-ft
Vd liiilX = 0.444 k @ !2.(H)-ft
Md r.iax = 1.225 kft @ 5.83 H
M min = -0,144 kft I 12.00 ft
Md min= -0.144 kit I 12.00 ft
K = 0 kit@ 11.67 ft
DEFLECTIONS (EI = kin·'2)
LOAD Def 1 (inJ V (ft) r,
Total 31356/EI 5. '34
-15676/El R.C:.
Live 0/EI 0.00
(!/EI f:~ (:,
Dead 31353/Ei midspan
-15676/EI R,C,
l'iain Span Cantt (lor:al)
TOTAL Dell EI EI
L I 180 39196 or,ri J,:l,J'
L I 240 52261 1244
L I 360 783"31 1866
Hf
-
,
' ·l
s3B BEAM #2
s1p12vis0b4i481BEAM ANALYSIS PROGRAMs1p9v1s0b414BT
SPAN LENGTH = 8,(l(l ft
rnililple Span)
UNIFORM LOADS (k/it & it)
wd wl X1 -X2
0.030 0.000 0.00 8.60
POINt LOADS (k & ftl
Pd Pl X
i-. 769 0,000 i. (l(l
sOB03/i9/02
2K2-70
PR f fvi EJob: .2!..C..':::.71)
SiRUCTURAL Date: > rt? V
. -:~ENGINEERSsht: ........f:?_
(6,60)s0p10.00h12v0s0b3T
REACTIONS 0:) My LOAD LEFT RIGHT
Dead 1,668 f!.341
Uve 0.000 0,000
fotal 1,668 (i,341
MAmmM FORCES
Y 1ax = 1.67 t @ 0.00 ft
Vd ffi~X = 1.67 k @ o.oo ft
11 roax = 1.65 kft @ 1.00 it
Md max= 1.65 kft ! 1.00 ft
DEFLECTIONS (EI = kiir"·2i
LOAD Defl (in) X (ft)
Total 14%5/EI 3.53
Live 0/EI 0.00
Dead .14737/EI reidspan
TO'iAL Defl EI
L / 180 28060
L / 240 37413
L / 360 56120
...... ----=------
s3B
...
·'
BEAM #2 sOB03/19/02
2K2-70
s1p12v1s0b4i48TBEAM ANALYSIS PRDBRANs1p9vlsOb414BT (6,60Js0p10.00h12v0s0b3T
SPAN LENGTH= 8,00 ft
(Simple Span)
UNIFORM LOADS (k/ft & ft)
wd wl XI X2
o.o3o o.oo·o 0.00 8.00
POINT LOADS (k & ft)
Pd Pi X
'}fl. 'l,_-71> PRIMEJob: --··
STRUCTURAL Date: _2:_e.:v
ENGINEERS silt /
1.010 0.000 1.00 t
REACTIONS Ck1
LOAD LEFT RIGHT
Dead
Live
fotal
1.004
0.000
1.004
MAXIMUM FORCES.
V lliax = 1.004 k @
\Id im = 1,{i(!4 k @
M max = 0.98'3 kft @
Md max = 0.989 kft @
DEFLECTIONS (EI = kin··-2:,
LOAD Defl (in)
Total 97!3/EI
Live 0/EJ
Dead %00/EI
TOTAL Defl EI
L / 180 18213
L / 240 24284
L / 360 36425
_CJ ms ---=-
0.246
0,0i)(l
0.246
(l,()(J ft
0.00 i~ I~
1, (H) ft
1. 00 ft
X (ft)
3,513
,j,(H)
midspan
~----_ ~-
-~
I ,:
.,,.
il" 4.;, .
ir·
.
oO lJ)
'I 1
°'P =-1 .. 0)
Rp -=-3.o
C -0 4. o,_-,.,
W p "' 8400 (bs
r1O'(od...., .. , ) 11' Fi ..__. J ~.;u.o. (tt3,~--)
p ::: :3,0 32.lt;'
.:: 0,34 I lN p <::---GoVf:R!',!S !
MtN. Fp-'= O.l C"--·Ip ·V\Jp" (6.7 )(0.4)(J.o)Wp.:: o.28:Mp
NA><.. Fp-::: 4 C0-· Ip-Wp ,._ 4 (0,4)(1. D) Wp::: I. 6 WF
-: Fp = O. 34l Wp =-(0. 34\) (84-DO) = 2864.4 lbs
34·· (
ME-ASP :-.. 2864.4 tb.S ;< '71'1" X --= '96G. 2. il-.c , L. L4 <-',..
I ! PD =-~ X: ltJp =-T x 840(? " 4200 (bs:. ) PE-ASP .: ['\O UPLIFT
PE-Aso + PD::: S/66. 2-fbs /L33.:: 3874 £ 1<
~ pp "-~ ;,( 840° ~ 56 00 ~ USS THlS ro CHE.CK E:xtsr G Bfv'\
...,.m
\.
J• *" I
'~ ~
, ...
t'z:J ,,, ,;;..
~ f,J;
~
.t\'.t
•'1i
!(k w1: i~ ~~
-------·· _ .. -.... -. ~ -
CHECK EXIST1G-2ND FL.R 6M W/
NEW COMPRESSOR
4' 5' p
5' t i,.11
(,J:,_
r' I I ,.,-I I
t 24'-4-1/.2 ,. T
Wt DL: (7! + 11 )psf 7-~I .:: 440 plf
LL=-200 psf ') 8'3' X -, ::; ~6 6 plf
CJ~·. LL= 200 psf t: 2, 11' : 434 plf
P FRDM NE·w CD MP RESS)R == 5Goo lbs
SEE. COH ru fE.R. au T PL{ T
0/< W/ EXIST'G W21 x.44
,_.,;. ms· ---=-----=--~---·
., .,
.:
' '
s3B
FLR BM
sip12v1s0b4i'4STBEAM ANALYSIS PROGRAMsip3v.1sOh4148T
SPAN LENHTH = 24.38 ft
(Simple Span)
\id wl
6,440 0.566
0.%0 0.434
PDHfi LDADS (k & ft)
Ptl Pl
\'< Id
0.00
(l,(H)
LOAD LEFT
2'4,36
4,00
24z3B
Live
Total iO 00~ .lUzi • .lt.l1 18,551
Y max = 18:88 ~ @ 0:00 ft
H ffiiX = 117s34 kft@ 11zOQ ft
LOAD D!2f 1 lin) X (ft)
LlV~ 5034238/EI 12r40
Gov, ~efiectic:n : Jcn;a! = L/24t
R2quir2d I= 354 tnA4
W 21 x 44 Fy = ?S ksisOB
STRESSES (ksf)
Fv =,14.40 fv = Z,bl i8 7.
F~ = 23.76 fb = 17.26 73 'l.
DffLECIIDNS (in)
Total ;: 0.51 = L i 571 42 ¼
live = 0,25 = L /1185 38 k
sOB03!(!&/02
2K2-70
PR I I\'t E ,lob: ~?.--J,o
STRUCTURAL Date: ?:ct?;::/
ENGINEERS Sht: , o
i
· 1
l i
I
·-~--~-... --.... ~--f:
-
Mar-19-02 09:59A MAR-05-2002 11:17 FRQM:PETER DAHLBECK 949-35&-9301
"J.S--M -roo:::B:Jd -,o~ ~3dCOI
** IO ·30Vd 7V.L01 u.
--< •
a• co
I -A~ . ,_, C l-:'-
-1 ~
H
~l2l TP2 Bl6(73.i ~rt:lt 200c?-l0-~tll-l
~
~ ____ 1. __ _ •
i
--
-
.,
,._
·" . ,
~----Mar-19-02 09:59A
MAR-05-2002 11:17 FRQM:PETER DAHLBECK 949-355-9301 r-.tJ01 · 1:.1= p -01
Illa -~ -~
----
f-
tt:
UJ
(.)
,....
0
0
0) s~
Wo1 Id-~-l<:c1ding Ma11ulJrtt1• t'r nl Dec;iff~nt Oehum1d1f1i,ltt0n Eqwpmcnt. --. -
ATTN: Mr. Andrew Tarango DATE: March 5, 2002
COIIIP-'NY: Smith Consulting Architects FA.Xi 858-793-4787
FROM: Peter H. 0. Dahlbeck PHONI!: 858-793-4777
RE: Callaway project PAGES: 2
S Hgrf 's Tb, Inf() You Reovestea. D FYI n Pleaff Comro,nt n f.{rptnt
Dear Andrew,
Attached please find the factory drawing of the Munters Cargocalre
HCD-9000-DGA dehumidification system.
If you have any questions, please let me know.
Sincerely,
Peter H. 0. Dahlbeck
MUNTER& CORPORATION -DEHUMIDIFICATION DIVISION
CARGOCAIRE AND DRYCOOL SALES
201 CALLE PINTORESCO
SAN CLEMENTE, CA 92572 U.S.A.
TEL: ta-2414055, FAX: Ml-3H-IS01
EMAIL: P.aer_O~rs.com
--®Munters
----~ ---
FAXED
" . f •• r. ' . _-_ . .'i ti/.
----rr,D-ll-Ul 11£,U 1·10 [JV! \,f\LL}Hlf\I \7U1,r r1u l'IV. '/!)U tiU4 4Ui:'.j
q21:09_ .. ~_:,~02 0G: 53 i . S.~2-903-lSGS . .. . A~RO COMl'R~SSO~ .. lNC .
r. 'L 02/03
• 1 J ,.~ 2· ····.~uUair)·2Q $i:ties Air Compressors. ' •.• .· · ~;~. · ~
1
TY ! · : .:,·. · ·Features.Options and Specifications l'l'~..,
........... ; .......................................................................................................... .
. ;
.·•
100{, l{!Ol{ ·mt. 1lllt 12SRH . 15(JL lSOH 150HH lSOXH 200l, 200H :Z:O<lli~ ,OQ~H
S6 5lS 694 6J! 560
\. 100 115 100 JI!' 140
100 100 !l~ m 12$
:20 120 120
. 7l il 12 .
6! 6S 6&
200 m>r, 62W
• a • • • • • • .. • 0
0
P.
!27 7SS fi94 598 1041 9 91 7~~
·100 IU 1~g 175 lOO !IS J.'(0 175
150. 150 150 ISO 200 2.00 200 200
r,o !20 !lO
72 72 T2
68 6S 6S
8400 8600 !600
I / b ( /D-1-~ (D' 'f,o
Solid sme 61~ctt 0
Full Vol1o•e S111:1.er • UFC Prtmlijm Etfkirncv Motor 0
iEFC Pr,mium IWk:lenc• fl}tl Motor • Emcr:iJd !-Y~r.H~ahb "66lll'lnu W • '>&YT I 10. Yeilr Air End W.utilJlJY) m 0
SOllnd A:i•nu&tin~ Enclosi:re C
S11lhur's Vci31tilc ConLrol s~11cm-YCS • Cold We~ther Paek;i!e C
E.r.ert> S/1lcicnc• S•stai, EES 0
\I) S,;J;Mr., S.i..<Jr warr,1111)' i,,,:V~i n!r C~, fflOIOf, lt.~nu,~ 1.,;civt1 and toolc,;J).
(;)$vT.lir'1 ~Xi ~r;r.1y irn:!udcs 3-)'tOtH• ~,. ,ng19r, ;;rfnvi4 "'cd..-.r "'d <o01c~;.
Series T! -20--50 Hz 1.oot 100a lOO!n{ 12SL 1:m ustflt 12sXH -1soL ma HOHi{ lfOX.U 200a 2w1DS :z~XH
C~OilCil• C 3/minJ 15 14.2
Motor (kV . , 7S-7S
l)irntnrioas J d Wd•ht. En<ll>f1!r.. Air•C<><>led
Ltti:tll (n, ) . 30'° 3050,
Widch £rnn, !830 li)O .
12.2. . 19.5. 17J . IU 14.l
9.7 6.9 7.9 9.7 12.1
75 93 93 93 9)
30$0 3050 3050 31.lSO 3050
1§3~
l727 1727
3575 ]120
:m
~?20
mo
1727
* ... * * *
)727
poeurop -1r .,. * * * ...
22.4' 20.S 19.S
6.9 1,9 9.7
112 l12 112
3050 3050 3050 isJo mo mo
1727 1717 1127
3!l0
IS 26.6 25.6 :u.,
12.l 7.9 9.7 12.l
112 l4Q 149 149
30SO "ln~o 3050 mo 1830 mo
rm· 1'?7 m;
· :JSlO 39CO · 390Q
S,,JW,,~t..,.,ok,,
V'•"'··k-fi¼ c..,,_.1A,1, C44"41•, ,,.,.,.,,1 fr 1/f. v .. wswr,
D<,..+,,r.lof,..,.rz:-
5111l&ld1 cqmr.-.i111:d 10, ~oiram if cll!!tin~au, l1:1erow11t"'-· 1M~~r ~!14 ,mifir1Ji9111 mil)' tb.n{t wl\bolll nolln. ~l\l'.1 your 5u1f:ir n:prncn::d,t ., :oo:,t..,,;ud Svllllil cr.11rill1119r, •
SVU-All'-00 fO~'l'IOI'(, A. SIII\Cwil\i! Climpa117, 37t-O E.11fahil~n Jll•d .. Mlchi:in (:i1.r. lN ~~m Tolcphon~; l-100-3,7,6737
lfleltlons t1,t,J01:1 J., woi,, wlr/--'11lt 11<ili~c. ¢ C<ip111;!,t )999 Sllllair Corp0ntlo11. Al! rigl,1, n:scrvid. i.lvlmfl
!1
I
·j
1
,·
~ '
~ .......... -,. -·~ . .,.
J • ,._ --:-·, ~:;:-__ .
1'0f: 6
,? .,_,.-:;;:; l ,,~ t< r,, V / I •
I :
f it1 /17 tJ:;,-Jl-Al7~~ _ ·-
1,/ (if-'Tl'.,v v~Jv' WIJ-;e.. l :·.'7-J
i-,i t1 1fJy . ud v .
~ 1rr2--a-J 11 e-fY--i' .r;.., r.,,,
1,f:? / p
f0,0
sJ:J
_,,/
i;B,c1 ft;,/
1'-0
I -~
100 f'C-71 ( r~ c112A 0111
t; r. e:-r;;8 ( o (/J )
\:,,:/. <:"///•;\!)\~ .
-...:, f \ '\"Tr" \ ,
I :::;o. t? J°;;,, r
L-L 1/
J.,. ~ "
'?,,,(?\ 0
~v~ v v; c, .-1 b-1 p7 p
'1-..,:6r:; f ;
-i.-4 bo t ~ 4' I, l f.f / z, :;;, 1-'J-b
1r'f
b (> lVLrO
5Lo-{'?,-y0
~'fr~~.,) c (00 ·1,)
. 1=-(f"'{t-&-l[U-J,'1 J
JJ. <,
~~LA/16, ~11 J '
i)~iif-t.A-(
--~-1 \.
•'\ '-1--... ·-::,
~ Q
.._J -::~· !;.. -~; -=·, --..I ~ i -~ ....... ~; ,.
\'.0'.
~i ! ~l l
i
"i---1 ;
;--.'\
N -.....
~ ~
G ~ --....J
~~
~ -
.. :r:
..._,...
:. . , ~-:.·~.-..--
I
I -( I ! I • ' ·--
lDv~ \L--f~,O pL..r')( Y\
tvi-~
(I I '{-·i'/,,&·J.{.::,.
i-{ (\ J-1(-;..
ir;,J, • I
: :?--
1/· f;, q k
\ (
I -..b
~
r e,
,e r
(:?
-::::.-
,;;.
/(0t-fl~
( ;;r~;--,,,.
/' I
I,,._ --, )
r·· ···. '":: . . J~'l. i1-?!,-,)il
l_ r-.··.:: JJ-b. ... -r-
' , 1 -I • • _,,. _._,,.:) ..,.:; • ? I
/
a,. ·h2i <7 ~ \~11! ./ o, ';),~,-'.) : .t LL I ., .... -. ,/ : . I ./ ~A ···---~ --------.. ------'----·--
=
: I
;~a JV
J t·O
I ' ,,to-_· ,....,,, (; I P--1 .,JJJ) •;;;,-(_,'•-,. VJ
L'-lr .----I r I \' i -,... --~ r· c.-::: !,.) ~,;;:. t I• , . I
;: ..
,I
} '-,.....:·
~-.' ·--~·
!
j·
\: t\ .,
~. \
\ ~
\
\
PRIME .>03 :WF2, CJ:!
S"ffiUCilJRAL DA"'.'.:: !/-'1?.-
Ei\'GiNEERS SHT : t..J
........ _._:·
~2.,;.{J.y-,;.
M V.t,y.;;.
;< b? /Y&
/~[0 rcr
A PRIME x,g. /'}-, ..,_, "· /;,~ CffiLJC11 m A I • _::'/-+ -.>c•-f~.-,, .... J IUl'V-'11.. DATI:: 1• ci""" ...;;-,1._~ ENGINEERS 9-fT • :__ ' ·---
-~-"·
'
:,
~ r -~· ... ~----
0-I .J... . . ,. ' I J •. 0 JJ/111. 1----.f c,.. vu., /, , -·
A PRIME .os. "'P--zi~-" ~uc:71 In A I • -1 • ,·J/J \Jll't IUIV-.,. DATE: 1,_c,:,.. -
ENGINEERS ~ : -I,, . '
!
l:J o -:. i \ e cf-1'l-l ·F
lvl.,, ~ /192
/7(-V (L-f'
f) ,.,(2,( c-., t/ f-fl..f,y. ,:;:::. VI , , I
,/ ,..-.,_,;::_,'? I I{./ r"t;-l_c,,y-:::.. //V1 I
.-"
\\ t? Lr ('-lp-
w v ~ 1/0 1 tb / 16<.7
1 ~LrLP pLf
v.u.Jt,,,-,/()0,:..8·.-J.V'rt\ l!,2_\J/ / ,(u,U/ I voj
0, /oO'-'r ,\ \ 1·.'.i \ ~ \C~ t'~ ~ --..!..:(,/:::_·~v_rM' _ _..:..,:I -;_'i'_l.l'-1-//0~/ b..:.__C? __ e_.,.._g_· ?J ___ ?_
l t-r;,, .• c/ r~.-t~
,-; .,
.J:=--
l'V'-. f * i Op -I ~t LA,.;t)?.
e ev·t/' D/ v . !·
STRESS ,.n..NALYSIS: 48LH980/J -~~ Tl0O ;1Zo::J
SNa0075,01 CALI.JI.WAY Gl
BASE LENGTH
54-1 1/4/
.::-r-~ " ' . ! :
WORKING LENGTH
53-9 1/4
10-0 5 BC
48
P.Zl.NELS AT 8-3C PP.NLS LE=
TC PJI.NLS LE=
FIRST HALF LE=
FIRST DIJI_G LE=
4-9 El\11) STRITT TILTED
1-0 5/8 SPECIAL 1ST COMP
11-0 5/8
0
DEPTHS LE= 48.000 CENTERLINE= 48.ooo----
'1ULTIPLE LO.A.DING: DL + LL
N 5-30-98
EPTH CJJ/
RE= 10-0
RE= 4-9
RE= 1-0 5/8
RE= 11-0 5/8
RE= 48.000
?T LOJI.D OF 9,500-LBS AT PJ.I_NEL PT
3XTRA SHEJ.1 .. R }l..DDED TO EACH WEB= 47.5 0 ~--
7 2 7 . 0 5 1 LE ,...-2 7 . 0 5 1 RE
rJNIFORM TC LOJI.D= 980 r UNIFORl-1. BC LOJ.I.D= 0
REACTIONS Rl= +31,097.71 R2= +31,097.71 MIN SHR= 7,774.43
-------------STRESS JI.NALYSIS -------------
:~O MEM TC F BC F SHEJI..R WEB F CSC WEB L
l W2 -74,660 0 28,851 93,218 2.774 126.50
rILTED END STRUT
VlS -67,291
2 W3 -67,291
3 W4 -93, 244
4 W5 -93,244
~ W6 -119,750
It .W7 . -119, 750
l~ ·w7 -119,750
8 W6 -119,750
9 W5 -93, 244
10 W4 -93,244
11 .W3 -67,291
rILTED El\'l) STRUT
VlS -74,660
12 W2 -74v660
SE SQ EJ:\TD
Vl END PNL
V2 INTERIOR
0
73,802
73,802
108,560
108,560
126,813
126,813
108,560
108,560
73,802
73,802
73,802
0
-----STD
TC COMPRESSION=-119,750.07
5,333
23,518
18,470
14,550
10,630
6,710
-6,709
-10,629
-14,549
-18,469
-23,518
5,333
-28,851
VERTICJI .. LS
31,097
5,333
3,919
l".!Jl..X
13
A
15
111.X
111.X INT TC ~ZU\IEL LENGTH= 48.00
....
.. ~-....;_~---
-9,096
-29,331
33,713
-28,021
22,330
-16,638
-16,638
22,330
-28,021
33,713
-29,331
-9,096
93,218
1.705
-1.037
1.451
-1.451
1.451
-1.451
1.451
-1.451
1.451
-1.451
1.037
77.77
47.31
66.20
66.20
66.20
66.20
66.20
66.20
66.20
66.20
47.31
-1. 705 77. 77
-2.774 126.50
-31,097 1.000 45.60
-9,096 1.705 77.77
-3,919 1.000 45.60
BC TENSION= 126,813.23
INT BC PJI..NEL LENGTH =
TL=
./
62,195.42
PP DISTJlJ~CE
0-2
4-9
10-0
. -·i-r:-· ·-o
15-0
19-0
23-0
27-0
31-0
35-0
39-0
43-0
5/8
5/8
5/8
5/8
5/8
5/8
5/8
5/8
5/8
49-
44-
4 1/4
1 1/4
96.00
_..,,, ___ --:: ,---.
--::..• ,
;TRESS ,Jl.NALYSIS: 48LH980 /J '"'~
3N010075-',01 CJI.LLAWAY Gl
Tl o o I rz.c;o
3ASE LENGTH
54-1 1/4 ,,_,
Ji,. ...
WORKING LENGTH
53-9 1/4
I:3PTH
48
3C PJJ.NLS LE=
'i:'C PJI.NLS LE=
~IRST 1-T..ALF LE=
?IRST DIAG LE=
10-
4--
1-
0
9
0 5/8
5 BC PJl~~ELS AT 8-0
END STRUl' TILTED
SPECIAL 1ST COMP
11-0 5/8
)EPTHS LE= 48.000 CENTERLINE= 48.000
WLTIPLE LOJ:l.D!NG: DL + /-WL
?T LOJI.D OF 9,500-LBS AT PP..NEL PT
{ORIZONTAL FORCES AT ENDS
LEFT El\TD TC= 13,100.00.,, BC=
RIGHT E:ND TC= -13, 100. 00 _. BC=
~XTRA SHEJLR. .!l..DDED TO EACH WEB= 4 7 5 0 .,,
7
0.00
0.00
JNIFORM TC LOJI.D= 857 ,,;.· t3NIFORJ'1 BC LO;!l..D= 0
EFF DEPTH
45.6
RE= 10-
RE= 4-
RE= 1-
RE= 11-
0
9
0
0
RE= 48.000
:EACTIONS Rl= +27,790.80· R2= +27,790.&0 MIN SHR= 6,947.70
-------------STRESS ?~~ALYSJS -------------
U MEM TC F BC F SHEAR WEB F CSC WEB L
1 W2 -79,932 0 25,826 84,826 2.774 126.50
"ILTED EJ.\i""D STRUT
VlS -73,488
2.-· W3 -73,488 t__ ;r4 -9 6, 97 6
4 WS ~96,976
5 W6 -lil,410
6 W7 -121,410
7 W7 -121,410
8 W6 -121,410
9 W5 -96;976
O W4 -9~1 976
1 W3 -73,488
ILTED END STRUT
Vl-8 -79,932
2 W2 -79,932
3 SE SQ ENb
A Vl END PNL
5 V2 INTERIOR
0
66,247
66,247
97,898
97,898
115,114
115,114
97,898
97,898
66,247
66,247
4,664
21,162
16,748
13,320
9,892
6,464
--6,464
-9,892
-13,320
-16,748
-21,162
66,247 4,664
0 -25,826
-----STD VERTICALS
27,790
4,664
3,427
AX TC COMPRESSION=--121,410.66 Jv1.Jl.X
.?U{ INT TC PJi..NEL LENGTH = 48.00 MJ.I.X
... -~ . ?""......._, ..
-7,955
-26,887
31,213
-26,235
21,258
-16,281
-16,281
21,258
-26,235
31,213
-26,887
-7,955
84,826
-27,790
-7,955
-3,427
1.705
-1.037
1.451
-1.451
1.451
-1.451
1.451
-1.451
1. 451
-1.451
1.037
77.77
47.31
66.20
66.20
66.20
66.20
66.20
66.20
66.20
66.20
47.31
-1. 705 77. 77
-2.774 126.50
1.000 45.60
1.705 77.77
1.000 45.60
BC TENSION= 115,114.87
lNT BC PP-.NEL LENGTH =
R't.JN ON 5-30-98
5/8
5/8
TL= 55,581.60
PP DISTJL'l\lCE
0-2
10-
11-
15-
19-
23-
27-
31-
35-
39-
4-9
0
0
0
0
0
0
0
0
0
0 43-:-
5/8
5/8
5/8
5/8
5/8
5/8
5/8
5/8
5/8
49-4 1/4
44-1 1/4
96.00
~--.
. STRESS J.,.NALYSIS: 48LH980/: ~-~
3N00075,-01 CltLLAWAY G\.. .
TlOO -r-3,:;0 l I . ;
BASE LENGTH
54-1 1/4
/
BC P..Zl..NLS J.·E=
TC P..Zl.NLS LE=
FIRST HJ, .. LF LE=
FJ;RST DIAG LE=
DEPTHS LE=
WORKING LENGTH
53-9 1/4
DEPTH
48
10-0
4-9
1-0
11-0
48.000
5/8
5/8
5 BC P.!\..NELS AT 8-0
END STRUT TILTED
SPECIAL 1ST COMP
CENTERLINE= 48.000
MULTIPLE LOJl.DING: DL +/-WL
EFF DEPTH
45.6
RE= 10-
RE= 4-
RE= 1-
RE= 11-
0
9
0
0
RE= 48.000
RlJN CN
5/8
5/8
PT LOJl.D OF 9, 500--LBS AT P.Zl.NEL PT 7 27. 05 1 LE/' 27. 05 1 RE .
HORIZONTAL FORCES AT ENDS
LEFT END TC= -13,100.00? BC=
RIGHT END TC= 13,100.00 / BC=
EXTRA SHEAR Jl..DDED TO EFaCH WEB= 4750__..
0.00
0.00
UNIFORM TC LOJl.D= 857 .,,-lJNIFOR.M BC LO..Zl.D= 0
5-30-98
REACTIONS Rl= +27,790.80 R2= +27,790.80 MIN SHR= 6,947.70
-------------STRESS F~~ALYSIS -------------
TL= 55,581.60
NO MEM TC F BC F SHEJ:_1<
1 W2 -53,732 0 25,826
TILTED END STRUT
VlS -47,288
;? W3 -47,288
·w4 -70, 776
.:~ W5 -70,776
'5 W6 -95,210
-6 W7 -95,210
7 W7 -95,2.10
8 W6 -95,210
9 W5 -70,776
10 W4 -70,776
11 W3 -47,288
TILTED END STRUT
VlS -53,732
12 W2 -53,732
SE SQ END
Vl END PNL
V2 INTERIOR
0
66,247
66,247
97,898
97,898
115,114
115,114
97,898
97,898
66,247
66,247
66,247
0
-----STD
TC COMPRESSION= -95,210.66
4,664
21,162
16,748
13,320
9,892
6,464
-6,464
-9,892
-13,320
-16,748
-21,162
4,664
-25,826
VERTICALS
27,790
4,664
3,427
M.JI..X
13
14
J,5
~.x
MAX INT TC PANEL LENGTH= 48.00 MJl.X
WEB F csc WEB L pp DIST.Z: .. NCE
84,826
-7,955
-26,887
31,213
-26,235
21,258
-16,281
-16,281
21,258
-26,235
31,213
-26,887
-7,955
84,826
2.774
1.705
-1.037
1.451
-1.451
1.451
-1.451
1.451
-1. 451
1.451
-1. 451
1.037
-1. 705
-2.774
126.50 0-2
77.77 4-9
47.31 10-0
66.20 11-0
66.20 15-0
66.20 19-0
66.20 23-0
66.20 27-0
66.20 31-0
66.20 35-0
66.20 39-0
47.31 43-0
77.77 49-4
126.50 44-1
-27,790 1.000 45.60
~7,955 1.705 77.77
~3,427 1.000 45.60
BC TENSION= 115,114.87
INT BC P..Zl.NEL LENGTH= 96.00
------,..,_-.
5/8
5/8
5/8
5/8
5/8
5/8
5/8
5/8
5/8
1/4
1/4
3TRESS ·ANALYSIS: 48Lli980/J"'.q_, Tl00,, 12",;z>
3Np0075~-0l CALLAWAY Gl
BASE LENGTH
54-1 1/4 --("
BC PJl.NLS LE=
TC PJl.NLS LE=
FIRST HALF LE=
FIRST DIAG LE=
WORKING LENGTH
53-9 1/4
;)EPTH
48
10-
4-
1-
1 i--
0
9
0
0
5/8
5/8
5 BC PJl..NELS AT 8 -0
END STRUT TILTED
SPECIAL 1ST COMP
DEPTHS LE= 48.000 CENTERLINE= 48.000
MULTIPLE LOJl.DING: DL + 0. 75 (LL +/-WL)
EFF DEPTH
45.6
RE= 10-
RE= 4-
RE= 1-
RE= 11-
0
9
0
0
RE= 48.000
5/8
5/8
PT LOJl.D OF 9,500/LBS AT PP.NEL ?? 7 27.05 1 LE -27.05 1 RE
HORIZONTAL FORCES AT ENDS
LEFT END TC= 9,825.00/ BC= 0.00
RIGHT END TC= -9,825.00/ BC= 0.00
EXTRA SHEAR .Zl..DDED TO E.io,CH WEB= 4 7 5 0/
UNIFORM TC LOJl.D= 949. 25 / lJNIFORM BC LOJl.D= 0
REACTIONS Rl= +30,270.98 R2= +30,270.98 MIN SHR= 7,567.75 TL= 60,541.96
-------------STRESS Jl.NALYSIS
NO MEM TC F
·l W2 -82,528
TILTED END STRUT
VlS -75,390
2-W3 -75,390
· ( W4 -10 0, 7 2 7
• 4:'" W5 --100, 727
5 W6 -126,715
-·6 W7 ,..126,715
7 W7 -126,715
8 W6 -126,715
9 W5 -100,727
10 W4 -100,727
11 W3 -75,390
TILTED END STRUT
VlS -82,528
12 W2 -82,528
SE SQ El\l"D
Vl END PNL
V2 INTERIOR
BC F
0
0
71,913
71,913
105,894
105,894
123,888
123,888
105,894
105,894
71,913
71,913
71,913
-0
-----STD
TC COMPRESSION=-126~715.22
SHEA:<.
28,095
5,166
22,929
18,039
14,242
10,445
6,648
-6,648
-10,445
-14,242
-18,039
-22,929
5,166
-28,095
VERTICALS
30,270
5,166
3,796
MJl..X
13
14
15
MJl...X
MJl..X INT TC PJl.NEL LENGTH= _48.00 M.:.:ri..x
,.
~ .....
;-
WEB F
91,120
CSC 11JEB L PP DISTJlJ\'CE
0 --2
-8,811
-28,720
33,088
-27,575
22,062
-16,549
-16,549
22,062
-27,575
33,088
-28,720
2.774 126.50
1.705
-1.037
1.451
-1.451
1.451
-1.451
1. 451
-1.451
1.451
-1.451
1. 037
77.77
47.31
66.20
66.20
66.20
66.20
66.20
66.20
66.20
66.20
47.31
-8,811 -1.705 77.77
91,120 -2.774 126.50
-30,270 1.000 45.60
-8,811 1.705 77.77
-3,796 1.000 45.60
BC TENSION= 123,888.64
INT BC PJl..NEL LENGTH=
4-9
10-0
11-0 5/8
15-0 5/8
19-0 5/8
23-0 5/8
27-0 5/8
31-0 5/8
35-0 5/8
39-0 5/8
43-0 5/8
49-4 1/4
44-1 1/4
96.00
--==--...---~ -
STRESS ,ANALYSIS: 48LH980/J-~
8NO00 7 5~01 CALLAWAY Gl
BASE LENGTH
54-1 1/4
BC P.ZL°l'JLS
TC PJl.NLS
LE=
LE=
WORKING LENGTH
53-9 1/4
10-0 5 BC
4-9 El\l"D
DEPTH
48
PJl..NELS AT 8-
STR1JT TILTED
FIRST B.A.LF LE= 1-0 5/8 SPECIAL lS'r COMP
FIRST DIAG LE= 11-0 5/8
DEPTHS LE= 48.000 CENTERLINE= 48.000
>1ULTIPLE LOJl.DING: DL + 0.75(LL +/-WL)
0
EFF DEPTH
45.6
RE= 10-
RE= 4-
RE= 1-
RE= 11-
0
9
0
0
RE= 48.000
RUN ON 5-30-98
97~
5/8
5/8
PT LOJl.D OF 9,500.,,LBS AT PJ-..NEL PT 7 27.05'LE-27.0S'RE:
:{ORIZONTAL FORCES AT ENDS
LEFT EHD TC= -9,825.00-BC= 0.00
RIGHT E:NlJ TC= 9,825.00 -· BC= 0.00
3:XTRA SHEJl.R .Zi.DDED T') EACH WEB= 4 7 5 0
.JNIFORJ-1 TC LOJl.D= 949. 25 .,, t...TNIFORM BC LOJl.b= 0
1EACTIONS Rl= +30,270.98 R2= +30,270.98 MIN SHR= 7,567.75 TL= 60,541.96
-------------STRESS -7:U\i.ZI.LYSIS ------· ------
m MEM TC .., ~ BC F SHE.Zi.R WEB F csc WEB L pp DISTJ:.1'JCE
1 W2 -62,878 0 28,095 91,120 2.774 126.50 0-2
rILTED END STRlJT
VlS -55,740 0 5,166 -8,811 1.705 77.77 4-Q .,,
') W3 -55,740 71,913 22,929 -28,720 -1.037 47.31 10-0
W4 -81,077 71,913. 18,039 33,088 1. 451 66.20 11-0 5/8 4' W5 -81,077 105,894 14,242 -27,575 -1.451 66.20 15-0 5/8
5 W6 -107,065 105,894 10,445 22,062 1.451~.20 19-0 5/8
6 W7 -107,065 123,888 6,648 -16,549 -1. 45:1. 6. 20 23-0 5/8
7 W7 -107,065 123,888 -6,648 -16,549 1.451 6 .20 27-0 5/8
8 W6 -107,065 105,894 -10,445 22,062 -1.451 66.20 31-0 5/8
9 W5 -81,077 105,894 -14,242 -27,575 1.451 66.20 35-0 5/8
_Q W4 -81,077 71,913 -18,039 33,088 -1.451 66.20 39-0 5/8
.1 W3 -55,740 71,913 -22,929 -28,720 1.037 47.31 4:3 -0 5/8
-"'ILTED El\llJ STRUT
VlS -62,878 71,913 5,166 -8,-811 -1.705 77.77 49-4 1/4
.2 W2 -62,878 -0 -28,095 91,120 -2.774 126.50 44-1 1/4
-----STD VERTICALS
·:_3 SE SQ El\llJ 30,270 -30,270 1. 000 45.60
J.4 Vl END PNL 5,166 -8,811 1.705 77.77 -_5 V2 INTERIOR 3,796 -3,796 1.000 45.60
111.X TC COMPRESSION=-107,065.22 Jv1.JtX BC TENSION= 123,888.64
1AX INT TC PJI..NEL LENGTH = 48.00 MJI.X INT BC PP..NEL LENGTH = 96.00
~-----
,, ;, ,, .,
f,
r1
" 48LH980/123 Tl O O 7 1Za::>
SN0007S-01 CJi.LL.ZI.W A Y GOLF
--/':----= -------MULTIPLE ~.NALYSIS Su"MMARY -------
:-1.1.. TC TEN TC COM BC TEN 3C COM
1 0 -82,528 0 0
2 0 -75,390 73,802 0
3 0 -100,727 73,802 0
4 0 -'-100,727 108,560 0
5 0 -126,715 108,560 0
6 0 -126,715 126,813 0
7 0 -126,715 126,813 0
8 0 -126,715 108,560 0
9 0 -100,727 108,560 0
10 0 -100,727 73,802 0
11 0 -75,390 73,802 0
12 0 -82,528 0 -0
13 0 0 0 0
14 0 0 0 0
15 0 0 0 0
MJi...XIMUM iJNIFORl-1 LO.AD: TOP CHORD= 980
-------CONSOLIDATE LEFT & ::ZIGHT
MEM TC TEN TC COM BC TEN BC COM
·1 0 -82,528 0 -0
2 0 -75,390 73,802 0
3 0 -100,727 73,802 0
/! 0 -100,727 108,560 0
t 0 -126,715 108,560 0
0 -126,715 126,813 0
7 0 0 0 0
8 0 0 0 0
9 0 0 0 0
MJI.XIMUM tJNIFORM LO~..D: TOP CHORD= 980
·' --
WEB TEN
93,218
0
33,713
0
22,330
0
0
22,330
0
33,713
0
93,218
0
0
0
--------
WEB TEN
93,218!"'
0
33,713
0
22,330
0
0
0
0
RUN ON 5-30-98
97ft
WEB COM
0
-29,331
0
-28,021
0
-16,638
-16,638
0
-28,021
0
-29,331
0
-31,097
-9,096
-3,919
iVEB COM
0
-29,331
0
-28,021
0
-16,638
-31,097
-9,096
-3,919
----,-:--
~
MEMBER SIZES: 48LH980/123 TlOO.,, -rzev
BN00075-01 CALLAWAY GOLF
r-=
B __ . .oING LOJl..D =
OUTSIDE DEP':.:"ii =
50,000.000
980.000
48.000
Fb =
Jl...-SSUJ·'.3D FORCE =
.Z\.SS1}:-'.:SD EFF. DEPTH=
30,000.000
126,715.221
45.600
BC = 42
Jl....REA = 2.8590 y(x) = 1.1380 Ryy = 2.0512
3.8304
Rz
Ss
= 0.7880
1.5230 BC UNIF LOJ:l..D = 187. 500 / Sl = =
TC == 42
Jl....REA == 2.8590 Rx = 1.2350
y _ 1.1380 Sl = 3.8304
ACTUAL EFF DEPTH= 45.724
CORRECTED LOJ:l.D TC= 126,371.579
L/Rx == 29.149 USING L = 48.00
L/Rz == 30.456 USING L = 24.00
Fa= 27,096.1 USING L/R= 30.45
MID PJl...NEL MOMENT = 7,840.000
)1 ID P F..N"E L f b = 1' , 0 2 3 . 3 9 0
fa/Fa = 0.815
:1Jl..X LOJl..D (FILLERS)= 143,821.82
NO INTERIOR FILLERS REQUIRED
Rz -0.7880 Ryy = 2.0512
Ss = 1.5230 Qs = 1.0000
GAP =3TWEEN CHORD= 1.000
BC = 126,469.325
L/Ryy= 17.550 USING L = 36.00
WITH ?ILLE~S K= 0.75
F'e= 175,743.82 Cm= 0.94969
PJLl\tEL POINT MOM = iS,680.000
PF-~EL POINT fb = 5,147.529
BEl\TD:i:-JG RATIO = 0. 03 7
VJl.X I.:QJIJ) NO FILLER= 139,082.46
TOP CHORD mp= 0.85269 USING TC= 42 = 4 X 4 X .375
pp= 27,248.19031
:1Jl.X SHE.ZI.R CK= 11,358.40370 AT JOINT 7
3C STRESS = 22,117.75546 USING BC= 42 = 4 X 4 X .375
'1JI.X SHE.Z\.R CK= 11,810.97586 .Z\.T JOINT 2
C.... 3INED BOTTOM CHORD STRESSES
>1ID-PJl...NEL = 22,900.962 P.ZLl\tEL POil\l'"T = 26,057.191
El\!'"D PJl..NEL CHECK W= 980
E!~l) PJL1'JEL CHECK = LEFT EJ:\''"D LENGT:i = 55.00
Z0CIAL LOJ:I..D = ~2,304.75 J;..XIAL STRESS fa = 14,393.97
Fa = 20,975.35 F 1 e = 75,293.88
fb PJ.I..NEL PT 12,415.16 .t=• MID-PJl..NEL 1,940.50 = J..0 = ·:;m = 0.942 fa/Fa = 0.686
.?ANEL PT= 26,809.1 MID p_Z1_1'JEL= 0.7616 NO FILLERS L/R= 69.79
?IRST PJL1'J.EL CHECK = LEFT El'm LENGTH = 75.63
!DCIAL LOJ:I.D = 75,186.54 Jl..XIAL STRESS fa = 13,149.09
:?a = 15,624.96 F 1 e = 39,824.86
fb PJl...NEL PT = 12,415.16 fb MID-PJl.-1-JEL = 3,133.35 :m = 0.867 fa/Fa = 0.841
?Jl.NEL PT= 25,564.2 MID PJ;..NEL= 0.9768 NO FILLERS L/R= 95.97
-30TTOM CHORD L/Rz= 121.827 TC OJl..L/Ryy = 314.561
1AX BRIDGING CHECK TC= 29.05 1 BC= 41.02 1
10MENT OF INERTIJ.1.= 5,994.7 LL 360=1,440.5 LEN/360= 1. 79 11
•;i,..,.,, ...
RUN ON 5-30-98 ,,:
f
,,
........
: ~
'lEB DESIGN·: 48LH980/123 Tl0O -rzco
3N000 7S-01 CALLAWAY GOLF ;
TC= 42 = 4 X 4 X .375 BC= 42 = 4 X 4 X .375
RUN ON 5-30-98
97/
------WEB DESIGN ------
l\'TlJ1'mER SIZE QTY ACTUJ.l_L T ALLOW T ACTuAL C ALLOW C WELD J!_~GLE NAME
1. W2 32 2 B 93,218 97,384 0 42,319 25.2 3 X 3 X .281
2 W3 22 2 B 0 40,783 29,331 30,412 11..3 2 X 2 X .176
3 W4 20 2 B 33,713 36,360 0 21,353 14.6 2 X 2 X .156
4 ws 24 2 B 0 49,510 28,021 29,885 8.8 2 X 2 X .216
5 W6 15 2 B 22,330 29,088 0 14,967 10.6 1 3/4 X 1 3/4 X .143
6 W7 20 2 B 0 36,360 ~6,638 21,353 7.2 2 X 2 X .156
----ST.7:l)\TDF-~ VERTICALS ----
7 SE 23 2 B 0 43,207 31,0r:37 33,238 11.2 2 X 2 X .187
8 Vl 27 1 0 30,754 9,728 10,936 3.1 2 1/2 X 2 1/2 X .212
9 V2 15 1 0 14,544 4,551 7,165 2.2 1 3/4. X 1 3/4 X .143
I'OTAL WELD= 364 K = 0.75 MIN COMP= 0.25
~-=:-·. -
:':. :------
---. -·--~-------
STRESS JI.NALYSIS: 48LH980/1--~ T102., 1?,,l)'Z
8N00075~01 CALI.Ji.WAY GC
BJi.SE :LENGT~
54-O 1/2 r~
WORKING LENGTH
53-8 1/2
!)EPTH
48
;
BC PJI.NLS
TC PJI.NLS
FIRST P..ALF
FIRST DIAG
LE= 10-0
LE= 4-9
LE= 1-0
LE= 11-0
DEPTHS LE= 4-8. 000
1/4
1/4
MULTIPLE LOJI.DING: DL + LL
5 BC P.!Ll\JELS AT 8 -0
END STRUT TILTED
SPECIAL 1ST COMP
CENTERLINE= 48.000/
EFF DEPTH
45.6
RE= 10-
RE= 4-
RE= 1-
RE= 11-
0
9
0
0
RE= 48.000
RlJN ON 5 -3 0 -9 8
1/4
1/4
PT LOJI.D OF 9, 5 0 0... LBS Jl.T PJ>...,_°l\JEL PT 7 27. 02 1 LE'"° 27.02 1 R:S
EXTRA SHEJ:1,.R J>.DDED TO EACH WEB= 4 7 5 a-
UNIFORM TC LOJi.D= 980 ,,-lJNIFORM BC LO..Z,.D= 0
RE.~CTIONS Rl= +31,067.08 R2= +31,067.08 MIN SHR= 7,766.77
-------------STRESS J:l.:.NALYSIS -------------
NO MEM TC F BC F SHEJL~ WEB F CSC WEB L
1 W2 -74,581 0 28,821 93,134 2.774 126.50
TILTED END STRUT
VlS -67,233
2 W3 -67, 233
3 W4 -92,989
4 W5 -92, 989
r W6 -119,494
t '--.... W7 -119,494
7 W7 -119,494
8 W6 -119,494
9 W5 -92,989
10 W4 -92,989
11 ,W3 -67,233
TILTED END STRUT
VlS -74,581
12 W2 -74,581
13 SE SQ El\i1)
14 Vl EN1) PNL
15 V2 INTERIOR
0
73,547
73,547
108,304
108,304
126,557
126,557
108,304
108,304
73,547
73,547
73,547
-0
STD
:'1AX TC COMPRESSION=-119,494.46
5,318
231502
18,470
14,550
10,630
6,710
-6,710
-'10, 630
-14,550
-18,470
-23,502
5,318
-28,82],
VERT I CF.LS
-9,070
-29,254
33,713
-28,021
22,330
-16,638
-16,638
22,330
-28,021
33,713
-29,254
-9,070
93,134
l.7C5
-1.035
1. 451
-1.451
1.451
-1.451
1.451
-1.451
1.451
-1.451
1.035
77.77
47.21
66.20
66.20
66.20
66.20
66.20
66.20
66.20
66.20
47.21
-1.705 77.77
-2.774 126.50
31,067 -31,067 1.000 45.60
5,318 -9,070 1.705 77.77
3,919 -3,919 1.000 45.60
Mll..X INT TC P..Z,.NEL LENGTH= 48.00
MJLX BC TENSION= 126,557.62
M.Zi..X INT BC PJi.NEL LENGTH =
TL= 62,134.17
PP DI ST.ZI .. NC:2:
0-2
4-9
11-
_15-
19-
23-
27-
31-
35-
10-0
0
0
0
0
0
0
0
0
0
39-
43-
1/4
1/4
1/4
1/4
1/4
1/4
1/4
1/4
1/4
49-
44-
3 1/2
0 1/2
96.00
-------.. --,·.
STRESS' .71..NALYSIS: 48LH980/1 "'".::i
8N~o'o7s ... 01 CALLI.I.WAY GC
T102 ;2,oZ
,/
BASE LENGTH
54-._-0 1/2
WORKING LENGTH
53-8 1/2
DEPTH
48 ,. ...
'
BC PJI..NLS LE= 10-0 5 BC PJl..NELS AT 8-
TC PJI.NLS LE= 4-9 E1'J"D STRlJT TILTED
FIRST F..ALF LE= 1-0 1/4 SPECIAL 1ST COMP
FIRST DIAG LE= 11-0 1/4
DEPTHS LE= 48.000 CENTERLINE= 48. 00·0
MULTIPLE LOJl..DING: DL + /-WL
0
EFF DEPTH
45.6
RE= 10-
RE= 4-
RE= 1-
RE= 11-
0
9
0
0
RE= 48.000
RUN CN 5-30-98
9ti
1/4
1/4
PT LOAD OF 9, 50CY LBS .½.T PJ.1...NEL PT 7 27. 02 1 LE-27. 02 1 RE
HORIZONTAL FORCES AT EN"DS
LEFT E:N""D TC= 47,000.00.,,, BC= 0. 00
RIGHT EN""D TC= -47, 000. 00 ...-BC= 0. 00
EXTRA SHEJL"R. ADDED TO EACH WEB= 4 7 5 0.,,,
UNIFORJ-1 TC LOJtD= 857 / lJNIFORM BC LOJI.D= 0
REACTIONS Rl= +27,764.02 R2= +27,764.02 MIN SHR= 6,941.01 TL= 55,528.04
STRESS JLl\JALYSIS
NO MEM TC F
1 W2 -113,763
TILTED E1'J"D STRUT
VlS -107,337
--·-, W3 -107, 33 7
~ '·· .· W 4 -13 0 , 6 4 8
4 W5 -130,648
5 W 6 -15 5 , 0 8 2
6 W7 -155,082
7 W7 -155,082
8 W6 -155,082
9 W5 -130,648
10 W4 -130,648
11 W3 -107,337
TILTED EN"D STRUT
VlS -113,763
12 W2 -113,763
13 SE SQ END
14 Vl EN"D PNL
15 V2 INTERIOR
BC F SHEAR
0 25,800
0
66,019
66,019
97,669
97,669
114,886
1.14, 886
97,669
97,669
66,019
66,019
4,651
21,149
16,748
13,320
9,892
6,464
-6,464
-9,892
-13,320
-16,748
-21,149
66,019 4,651
0 -25,800
-----STD VERTICALS
27,764
4,651
3,427
MAX TC COMPRESSION=-155,082.22 Jv'JJI.X
MJl...X INT TC PJl...NEL LENGTH = 48.00 MAX
WEB F
84,752
-7,932
-26,817
31,213
-26,235
21,258
-16,281
-16,281
21,258
-26,235
31,213
-26,817
CSC WEB L
2.774 126.50
1.705
-1.035
1.451
-1.451
1.451
-1.451
1. 451
-1.451
1.451
-1.451
1.035
77.77
47.21
66.20
66.20
66.20
66.20
66.20
66.20
66.20
66.20
47.21
-7,932 -1.705 77;77
84,752 -2.774 126.50
-27,764 1.000 45.60
-7,932 1.705 77.77
-3,427 1.000 45.60
BC TENSION= 114,886.43
INT BC PJl..NEL LENGTH =
PP DIST):._1'-JCE
0-2
4-9
iO-0
11-0 1/4
15-0 1/4
19-0 1/4
23-0 1/4
27-0 1/4
31-0 1/4
35-0 1/4
39-0 1/4
43-0 1/4
49-3 1/2
44-0 1/2
96.00
---=---I r
3TRESS 1Ji.NJl.LYSIS: 48LH980/1 "'4, T102 ./ 'T2.o2-
3N00075t01 CALL.JI.WAY GC ·
3ASE LENGTH
54-O 1/2
t--~
3C PJ.1.NLS LE=
re PJ.1..NLS LE=
?IRST HJI.LF LE=
?IRST DIAG LE=
WORKING LENGTH
53-8 1/2
DEPTH
48
10-
4-
1-
11-
0
9
0
0
1/4
1/4
5 BC P.i'Ll\JELS .-n. T 8 -0
END STRUT TILTED
SPECIAL 1ST COMP
;)EPTHS LE= 48.000 CENTERLINE= 48.000
1ULTIPLE LOJl.DING: DL + 0.75(LL +/-WL)
R1JN ON 5-30-98
EFF DEPTH 910 45.6
RE= 10-0
RE= 4-9
RE= 1-0 1/4
RE= 11-0 1/4
RE= 48.000
PT LOJ.1..D OF 9,500/LBS AT PJi.i~EL PT 7 27.02'LE 27.02'RE
:IORIZOJ\J"'TAL FORCE'S AT El\1DS
LEFT El\11) TC= 35,250.00.-BC= 0.0·0
RIGHT El\il) TC= -35,250.00.,.... BC= 0.00
EXTRA SHEAR Jl..DDED TO E.Z1.CH W:SB= 4 7 5 0 ..-:-
UNI FORM TC LOJI.D= 949. 25" 1JNIFORM BC LOJl.D= 0
REACTIONS Rl= +30,241.32 R2= +30,241.32 MIN SER= 7,560.33 TL= 60,482.64
-------------STRESS )Ll\JALYSIS --· ----------
NO MEM TC F
·l W2 -107,876
TILTED E:t-m STRu"'T
VlS -100,759
:'-W3 -100,759
W4 -125,904
4 W5 -125,904
5 W6 -151, 891
6 W7 -151,891
7 W7 -151,891
8 W6 -151,891
9 W5 -125,904
10 W4 -125,904
11 W3 -100,759
TILTED El\il) STRu"'T
VlS -107,876
12 W2 -107,876
SE SQ Erm
Vl END PNL
V2 INTERIOR
BC F
0
0
71,665
71,665
105,646
105,646
123,639
123,639
105,646
105,646
71,665
71,665
71,665
-0
-----STD
TC COMPRESSION=-151,891.40
SHEJtR
28,065
5,151
22,914
18,039
14,242
10,445
6,648
-6,648
-10,445
-14,242
-18,039
-22,914
5,151
-28,065
"yERTICALS
30,'241
5,151
3,796
l"JJ.1..X
13
14
15
MltX
Ml1.X INT TC PJ.I.NEL LENGTH= 48.00 l"JJ.I..X
WEB F
91,038
-8,786
-28,645
33,088
-27,575
22,062
-16,549
-16,549
22,062
-27,575
33,088
-28,645
CSC WEB L
2.774 126.50
1.705
-1.035
1. 451
-1.451
1.451
-1.451
1. 451
-1.451
1.451
-1.451
1.035
77.77
47.21
66.20
66.20
66.20
66.20
66.20
66.20
66.20
66.20
47.21
-8,786 -1.705 77.77
91,038 -2.774 126.50
-30,241 1.000 45.60
-8,786 1.705 77.77
-3,796 1.000 45.60
BC TENSION= 123,639.82
INT BC PJ.1.NEL LENGTH=
PP DIST.l'.l..NCE
0-2
4-9
10-0
11-0 1/4
15-0 1/4
·19-0 1/4
23-0 1/4
27-0 1/4
31-0 1/4
35-0 1/4
39-0 1/4
43-0 1/4
49-3 1/2
44-0 1/2
96.00
BJl.SE LENGTH ~4'-.z O 1/2
BC PJl.NLS LE=
TC PJl.NLS LE=
FIRST F.ALF LE=
FIRST DIP.G LE=
T102 I t2D2
WORKING I,,ENGTH
53-8 1/2
uEPTH
48
10-0 5 BC PJ:l.NELS AT 8-
4-9 El\'"D STR'GT TILTED
1-0 1/4 SPECIAL 1ST COMP
11-0 1/4
DEPTHS LE= 48.000 CENTERLINE= 48.000
MULTIPLE LOJl..DING: DL + 0. 7 5 (LL + /-WI..)
0
EFF DEPTH
45.6
RE= 10-
RE= 4-
RE= 1-
RE= 11-
0
9
0
0
RE= 48.000
RUN ON 5-30-98
99;
1/4
1/4
PT LOJ:l..D OF 9,500/LBS AT PJ:l.NEL PT 7 27.02'LE -27.02 1 RE
HORIZONTJI.L FORCES AT ENDS
LEFT END TC= -35,250.oo-BC= 0.00
RIGHT El\J"D TC= 35,250. co ----BC= o. oo
EXTRA SHEJ.1.R Jl.DDED TO EACH WEB= 4 7 5 0 / UNIFORM TC LOJ:l..D= 949. 25 lJNIFORJ-l BC LOJl..D= 0
REACTIONS Rl= +30,241.32 R2= +30,241.32 MIN SHR= 7,560.33 TL= 60,482.64
-------------STRESS .2'...J."IJALYSIS -----------
NO MEM TC F
1 W2 -37,376
TILTED END STRUT
VlS -30,,259
f _W3 -30,259
t,~.· . W 4 -5 5 , 4 0 4
4 WS -55, 404
5 W6 -81,391
6 W7 -81,391
7 W7 -81,391
8 W6 -81,391
9 ws -55,404
10 W4 -55,404
11 W3 -30,259
rILTED END STRtJT
VlS -37,376
12 W2 ~37,376
13 SE SQ END
14 Vl END PNL
15 V2 INTERIOR
1.ll..X TC COMPRESSION=
BC F
0
0
71,665
71,665
105,646
105,646
123,639
J,.23,639
105,646
105,646
71,665
7.1, 665
SHEF .. R
28,065
5,151
22,914
18,039
14,242
10,445
6,648
-6,648
-10,445
-14,242
-18,039
-22,914
71,665 5,151
-0 -28,065
-----STD VERTICALS
30,241
5,151
3,796
-81, 391.40 Mfl.X
1.ll.X INT TC PJI.NEL LENGTH = 48.00 MJl.X
.. .....
::_._ . ..._ __
WEB F
91,038
-8,786
-28,645
33,088
-27,575
22,062
-16,549
-16,549
22,062
-27,575
33,088
-28,645
-8,786
91,038
-30,241
-8,786
-3,796
CSC WEB L
2.774 126.50.
1.705
-1.035
1.451
-1.451
1.451
-1.451
1.451
-1.451
1.451
-1.451
1.035
77.77
47.21
66.20
66.20
66.20
66.20
66.20
66.20
66.20
66.20
47.21
-1.705 77.77
-2.774 126.50
1.000 45.60
l.705 77.77
1.000 45.60
BC TENSION= 123,639.82
INT BC PJI.NEL LENGTH=
PP DISTJIJ\ICE
0-2
4-9
to-o
11-0 1/4
15-0 1/4
19-0 1/4
23-0 1/4
27-0 1/4
31-0 1/4
35-0 1/4
39-0 1/4
43-0 1/4
49-3 1/2
44-0 1/2
. 96. 00
~---_ ..
., f '
~ ~ \ ' 18LH980/123 T102;1 -rzoz
3N00075-0i CALLAWAY GOLF
~:.. -------MULTI.PLE Jl..NALYSIS s ul'iM]I..R y -------r TC COM EC COM 1. TC TEN BC TEN WEB TEN
1 0 -113,763 0 0 93,134
2 0 -107,337 73,547 0 0
3 0 -130,648 73,547 0 3,3,713
4 0 -130,648 108,304 0 0
5 0 -155,082 108,304 0 22,330
6 0 -155,082 126,557 0 0
'7 0 -155,082 126,557 0 0
8 0 -155,082 108,304 0 22,330
9 0 -130,648 108,304 0 0
10 0 -130,648 73,547 0 33;713
11 0 -107,337 73,547 0 0
12 0 -113,763 0 -0 93,134
13 0 0 0 0 0
14 0 0 0 0 0
15 0 0 0 0 0
:'1Jl..XIMUM lJ"NIFORM LOJUJ: TOP CHORD= 980
.;.. ------CONSOLIDATE LEFT & RIGHT --------
>1EM TC TEN TC COM BC TEN BC COM WEB TEN
·1 0 -113,763 0 -0 93,134
2 0 -107,337 73,547 0 0
3 0 -130,648 73,547 0 33,713
~ 0 -130,648 108,304 0 0
0 -155,082 108,304 0 22,330
0 0 -155,082 126,557 0 0
7 0 0 0 0 0
8 0 0 0 0 0
9 0 0 0 0 0
:1AXIMUM UNIFORM LOJtD: TOP CHORD= 980
~--.. ··~·.. .
WEB COM
0
-29,254
0
-28,021
0
-16,638
-16,638
0
-28,021
0
-29,254
0
-31,067
-9,070
-3,919
WEB COM
0
-29,254
0
-28,021
0
-16,638
-31,067
-9,070
-3,919
RUN ON 5-30-98
.
~-=-:-_ -
MEi~JiR tSIZES: 48LH980/123 Tl02.., 7-zc:;'Z
BNOOO?S-01 CALLli.WAY GOJ;,F
F,:-· -=
=
=
50,000.000
980.000
48.000
Fb
Jl_Ssln,'.ED FORCE =
F.SSF-'.ED EFF DEPTH=
30,000.000
155,082.228
45.600 L ~ING LOJl-.D
OUTSIDE DEPTH
BC = 42 ]I.REA= 2.8590 y(x) = 1.1380 Ryy = 2.0512 Rz
BC UNIF LOJl-.D = 187. 500/ Sl = 3. 8304 Ss
= 0.7880
1.5230
TC = 43
·]I.REA·= 3.3120 Rx = 1.2260
y = 1.1610 Sl = 4.2885
ACTUAL EFF DEPTH= 45.701
CORRECTED L01'.D TC= 154,739.493
L/Rx = 29.363 USING L = 48.00
L/Rz = 30.573 USING L = 24.00
Fa= 27,081.6 USING L/R= 30.57
MID PJl-J--JEL MOMEl\J'"T = 7,840.000
M.ID P.ltNEL fb = 914. 063
fa/Fa = 0.862
=
Rz = 0.7850 Ryy = 2.0645
Ss = 1.7537 Qs = 1.0000
GAP z:STWEEN CHORD= 1.000
BC = 126,277.927
L/Ry_/= 17.437 USING L = 36.00
WITH ?'ILLERS K= 0. 7 5
F'e= 173,191.70
P.ZL..'I\J:SI..: POI2'J'"T MOM
PJl.NEL POINT fb
BE:t\'"DI:'.'JG RATIO
=
=
=
Cm= 0.94604
15,680.000
4,470.327
0.033
MJI.X LOJ.1.D (FILLERS)= 171,095.75 MJl.X LCJl.D NO ?ILLER= 161,602.77
NO INTERIO~ FILLERS REQUIRED
TOP CHORD mp=
PP=
MJI.X SHEJtR CK=
BC STRESS =
MJI.X SHEAR CK=
.,.,
C 3INED BOTTOM ' M'.!.D-PJLN'EL
END PJ.IJ--JEL CEECK
]I.X I AL LOJ)..D
Fa
fb PJ.IJ--JEL PT
Cm
0.89591 USING TC= 43 = 4 X
27,830.75820
9,786.07856 JI.T JOINT 7
22,084.28248 USING BC= 42 = 4 X
13,~26.85931 AT JOINT 6
CHORD STRESSES
= 22 I 867 • 489 p_Zl_l\iEL POINT
El\TD PJ>_'l\'EL CHECK i\7= 9 8 0
= LENGT:I
=
Jl..XI.Zl.L STRESS fa
F'e
= fb MID-PJl_l\iEL
= .:::a/P-J.. ... a
4 X .438
4 X .375
= 26,023.718
=
=
=
=
=
LEFT El\'"D
= 113,511.90
20,925.97
10,708.63
0.930
MID P.ZIJ--JEL= ·pJl-J--JEL PT= 27,845.0 0.8892 NO FILLERS
55.00
17,136.45
74,200.47
1,743.60
0.818
L/R= 70.06
FIRST P..zu,rnL CHECK =
Jl-.XIAL LOJI.D = Fa =
f.b PJl.J--JEL PT =
Cm = PJl-J--JEL PT= 26,877.2
BOTTOM CHORD L/Rz=
MAX BRIDGING CHECK
MOMENT OF INERTIA=
LEFT 31\t"D LE:NGTi-I
107,100.78 Jl.XIAL STRESS fa
22,480.81 F'e
10,708.63 fb MID-PJlJ--JEL
0.836 fa/Fa
MID PJIJ--JEL= 0.8494 FILLERS
121.827 TC OAL/Ryy
TC= 29.24 1 BC= 41.02 1
6,428.2 LL 360=1,550.1
= 75.25
= 16,168.59
= 39,638.67
= 2,764.85
= 0.719
L/R= 61. 37
= 312.179
LEN/360= 1.79"
R1JN ON 5-30-98
J J L-'IR
-~ .ft _t, ,.
.J \\\ .l' ..,,
WEB DESIGN: 48LH980/123 T192,,, ,2o Z
8N00075-0l CALLJI.WAY GOLF RUN ON 5-30-98
TC= 43 = 4 X 4 X .438 BC= 42 = 4 X 4 X .375 99/
NlJ1'1BER SIZE QTY ACTUAL T
1 W2 32 2 B 93,134
2 W3 22 2 B 0
3 W4 20 2 B 33,713
4 ws 24 2 B 0
5 W6 15 2 B 22,330
6 W7 20 '2 B 0
7 SE 23 2 B 0
8 Vl 27 1 0
9 V2 15 1 0
I'OTAL WELD= 364
~-' ···-·
------WE3 DESIGN ------
ALLOW T ACTUAL C ALLOW C WELD
97,384 0 42,319 25.1
40,783 29,254 30,440 11.2
36,360 0 21,353 14.6
49,510 28,021 29,885 8.8
29,088 0 14,967 10.6
36,360 16,638 21,353 7.2 ----:-STJl..l\l"DJl._'l:ill VERTICALS ----
43,207 31,067 33,238 11.2
30,754 9,844 10,936 3.2
14,544 4,693 7,165 2.3
K = 0.75 MIN COMP=
Jl..NGLE NJl..ME
3 X 3 X .281
2 X 2 X .176
2 X 2 X .156
2 X 2 X .216
1 3/4 X 1 3/4
2 X 2 X .156
2 X 2 X .187
2 1/2 X 2 1/2
1 3/4-x 1 3/4
0. 25 -
--=--~-
X .143
X .212
X .143