HomeMy WebLinkAbout2235 FARADAY AVE; O; CB960604; Permitr
B U I L D I N G P E R M I T
{)4/25/9'6 15:52
Page 1 ~of 1
Permit No: CB960604
Project No: A9600840
Development No:
Job Address! 2235 FARADAY AV Suite: O
Permit Type: COMMERCIAL TENANT
Parcel No: 212-061-25-00 ·
IMPROVEMENT
Lot#~ 02
Valuation: · 160,680
Occupancy Group: Reference#:
Construct i on Typf:;-f'Ri''Q).'\J cis:,.:-· ~,.
Status: ISSUED ' '-{f.v
Description: 6180 SF IMPROVMENT
: COMBINE THREE SUITES TO ONE
Appl/Ownr : LEDSAM, DOUG
2231 FARADAY AVE #120
CARLSBAD, CA. 92008
619
Applied: 04/01/96
Apr/Issue: 04/25/96
Entered By: MDP
930-3430
..,, ,,. ... --~-~.. --,._ ----.. *** Fees Required **-,.. /~** Fees ·1:-0.llected & Credits *** ,.,./ ~-\ "" ..... ......_ ----------------------------/,/ ----;,..,.,: --~-1-~ ,./ ~ -{"', ---~...... --. -...... --------
Fees· 1,553.0):t ((,_ -.: .'{:\ 1·,,"-, '-..._ • ; •··~\ '/ \' \. .. ., , / ,..,..; \ / I.I/ /'\ • ·,~ Adjustments: _/t)o , ,\\ ... _..,Tcn;:all..~C.r::ed1ts:, .00
·rotal Fees: 1,55i,~O \,, 1,otal P~i:~n~};: \ 554.00
/ \ / ,.,;::.:-:. Balan¥t\·.f>µ~.~ \ \ 9 9 9 . o o
Fee description / -~-~--,. /" ;J!"j,;,,. i.JR,'.J, l:S ~Fe·fA;r_ni t\ Ext fee Data
---------------------,L-.r¼~-~~, ,.1 -----r :' -;._\_:,.,·:''s.. ______ ' \ \_;r ____ -\ ---------------
! f -.. I ---~-,
Building Permit / ·-~=:~: / ~--:;>, ..... , ""-::::--~:-:::.--··-\ ' 8 5 3. o O
Plan Check ! >-I ,, ·"""',,, ..... ,.,~-\ 554 00
Strong -Motion Fee / t: ··t f ~,, -,-...,. .Jt ~ ;4: oo
* BUILDING TOTAL l \'---· / • I ~ "' r)r. . 1441. 00
Enter "Y" for Plumbi~g Is,;u~ 'F'_'B./=~11)~ ~'\ (,;::(c i . } 20.00 y
Each Plumbing Fixturtf c,r Tra~~ '\,t};_~ ,3<):-~f i 7. 00 / 21. 00
* PLUMBING TOTAL \ \ ·"-~" C' tj;;,-j ,/ 41. 00
Enter "Y" for Electric I:;;sue E'.ee:>>;,,. -.. ;>-···-/ / 10.00 y·
Enter "Y" for Remodel\\ "-, Li> 1ncocs-:,0ot~~E~O / ""· I 10. 00 y '-, ., nl 1..,,.,1 / , •,. / * ELECTRICAL TOTAL \ 1 • /. ·,...._ 1Bs2 / ", , \;> ;._::, 1 2 0. 0 0
Enter 'Y' for Mechanical\Is·su~, ,Ff,e>'..,.·· ··· ___ ,.., ~,. (\\\\ \5 / 15. 00 Y
Install Furn/Ducts/Heat Pu~s":,; // ri_("-1 /".:·· ;;';'4. \~-:_:'_; '(; ¥,00 3 6. 00
* MECHANICAL TOTAL '-,..._ : .. ~,/I: : :" '.\,\ ,,"-\> / 51. 00
''-, ./ {, : \,,.. ~/ ~ ,'-~...,1 + ,,,,,..-/_,..,,./'
L------..illllilfM......,.....,_, __ _
CITY OF CARLSBAD
2075 Las Palmas Dr., Carlsbad, CA 92009 (619) 438-1161
PER.MIT APPIJCATION
City of Carlsbad Building Department
PLAN CHECK No.1' [p..... Go
2075 Las Palmas Dr., Carlsbad, CA 92009 (619) 438-1161
1. PERMIT 1YPE
From List 1 (see back) give code of Permit-Type: ___________ _
VAIJD.BY_.....,-jr-1<~'--------
DATE:...-__ ~-=4......_+-<,.._. _____ _
For Residential Projects Only: From List 2 (see back) give
Code of Structure-Type: _____________________ _
6800 O!i/0.1./96 000.1 Oi 02 Net Loss/Gain of Dwelling Units __________________ _ C··?f\MT
2. PROJECf INFORMATION FOR OFFICE USE ONLY
Address -2.. "2. :s s r--o.. n:::,,_Jq_ r Buildmg or Suite No. )ii) e, ~ ~
Nearest Cross Street b.c.. +-w ~ (l....J
mt o. P ase o.
CHECK BEIDW IF SUBMITTED:
D 2 Energy Gales D 2 Structural Gales D 2 Soils Report D 1 Addressed Envelope
ASSESSOR'S PARCEL EXISTING USE PROPOSED USE
DESCRIPTION OF WORK Te."l.ct&,\.+ :Ci..-i,ord11,Q.~ <l)+f:1~ lfl.} WL-,...,~ OFP,-~
SQ. FT. /;. I "cO # OF STORIES ;1_ # OF BEDROOMS 8 ~ f '.Y) # OF BATHROOMS 3-.><f:;~
:{. WN fACI PimsoN (lf dmerenf from applicant)
NAME (last.name first) Le.J~c:t""'-l b OwL'r° ADDRESS "'1.... '2-3. I F=°c;.J'-o.d...°"'( ~v-e_"': c.c.u-ls h ._/ CJ 4,.-t,QJo
4. ZJf.rCAN1 UCUNTJ:lAUUH s11rzrnN'l'FOH26~i~mR OOWNE~AYifMi~·?~5Ho~trrRO -..3'-/.31) G •
1 ,.'~ { ~ '-IS-:Sf
NAME (last name first) 'D.sa.lc.\.''t-1-e. «"T"DIA.c:.-f......~DRESS '"2 ... ;'l..~ l r=:~__, 11\-.....e. 1 ~(~ be\c{ '9"'l..E::lo8 .:t:J.. \'70
CI1Y STATE ZIP CODE DAY TELEPHONE "73. cJ-3 '-I 3.1)
s. ~~~~t ~=ef:}}rst) f't --c.:t-111.."l.. -Xvi. .r ~ ADDRESS '2 'L '3 ,3 F~ S-k?.-I ? .. :o
c11Y Cc.r-Ls6-Jl STATE C-/\-ZIP CODE '1.,_do'o DAYTELEPHONE t, Q.. t-/3,'2, ..... '--1"7...(:.
NAME (last name first) C 5 I.
CI1Y ~ J'\l\.olrCO,S STATE
ADDRESS t7:> VctUec-tte>.S 0-e_ Orv ~
ZIP CODE9~bC/ DAY TELEPHONE t / ( ~ ,5 8<f"
STATE LIC. # LICENSE CIASS CI1Y BUSINESS LIC. # l t 1 ? I YI
ast name 1rst
t. ~~~~ STATE ZIP CODE DAY TELEPHONE STATE LIC. #
SIGNATURE DATE
8. oWNER-BOnnmt. DECI.ARA'l'loN
D
D
D
Owner-Builder Declaration: I hereby afhrm that I am exempt from the ContractoPs Llcense law for the toliowmg reason:
I, as owner of the property or my employees with wages as their sole compensation, will do the work and the structure is not intended or
offered for sale (Sec. 7044, Business and Professions Code: The Contractor's License Law does not apply to an owner of property who builds
or improves thereon, and who does such work himself or through his own employees, provided that such improvements are not intended
or offered for sale. If, however, the building or improvement is sold within one year of completion, the owner-builder will have the burden
of proving that he did not build or improve for the purpose of sale.).
I, as owner of the property, am exclusively contracting with licensed contractors to construct the project (Sec. 7044, Business and Professions
Code: The Contractor's license Law does not apply to an owner of property who builds or improves thereon, and contracts for such projects
with contractor(s) licensed pursuant to the Contractor's License Law).
I am exempt under Section _______ Business and Professions Code for this reason:
(Sec. 7031.5 Business and Professions Code: Any City or County which requires a permit to construct, alter, improve, demolish, or repair
any structure, prior to its issuance, also requires the applicant for such permit to file a signed statement that he is licensed pursuant to the
provisions of the Contractor's License Law (Chapter 9, commencing with Section 7000 of Division 3 of the Business and Professions Code)
or that he is exempt therefrom, and the basis for the alleged exemption. Any violation of Section 7031.5 by any applicant for a permit
subjects the applicant to a civil penalty of not more than five hundred dollars ($500]).
SIGNATURE DATE
COMPLETE THIS SECTION FOR NON-RESIDENTIAL BUILDING PERMITS ONLY:
Is the applicant or future building occupant required to submit a business plan, acutely hazardous materials registration form or risk management and
prevention program under Sections 25505, 25533 or 25534 of the Presley-Tanner Hazardous Substance Account Act?
DYES )i(_NO
Is the applicant or future building occupant required to obtain a permit from the air pollution control district or air quality management district?
DYES ~NO
Is the facility to be constructed withi'!.2>000 feet of the outer boundary of a school site?
DYES fll-l NO
1F ANY OF Tiffi ANSWERS ARE YF.S, A FINAL CERTIFICATE OF OCCUPANCY MAY NOf BE~ AFTER JULY I, 1989 UNLESS Tiffi APPLICANT
HAS MET OR IS MEETING Tiffi REQUIREMENTS OF Tiffi OFFICE OF EMERGENCY SERVICES AND Tiffi AIR POILUTION CON1ROL DISTRICT.
e per ormance o 1s permit 1s issue
LENDER'S NAME LENDER'S ADDRESS No t -e.\A
to. APPUCANT CRR'liFICJITION
I certify that I have read the apphcatJon and state that the above mformation 1s correct. I agree to comply with all City ordmances and State laws
relating to building construction. I hereby authorize representatives of the City of Garlsbad to enter upon the above mentioned property for inspection
purposes. I AISO AGREE 10 SAVE INDEMNIFY AND KERP HARMLF.SS Tiffi CfIY OF CARISBAD AGAINSf ALL IJABILITIES, JUDGMENTS, CDSl'S
AND EXPENSE.5 WIIlCH MAY IN ANY WAY ACCRUE AGAINSf SAID CfIY IN CONSEQUENCE OF Tiffi GRANTING OF THIS PERMIT.
OSHA: An OSHA permit is required for excavations over 5'0" deep and demolition or construction of structures over 3 stories in height.
Expiration. Every permit issued by the Building Official under the provisions of this Code shall expire by limitation and become null and void if the
building or work authorized by such permit is not commenced within 365 days from the da of such permit if the uilding or work authorized by
such permit is suspended or abandoned at any ti e after the wor is commenced for a pe od f ys ction 3(d) Uniform Buildi Code).
APPIJCANT'S SIGNA~r-J..,.. ........... ~r--...---~ !,-,'"'?'-'----DATE: ....:p:~..q...G
/ •
PERMIT# CB960604
CITY OF CARLSBAD
INSPECTION REQUEST
FOR 10/15/96 INSPECTOR AREA TP
PLANCK# CB960604
OCC GRP
DESCRIPTION: 6180 SF IMPROVMENT
TYPE: CTI
JOB ADDRESS:
APPLICANT:
CONTRACTOR:
OWNER:
COMBINE THREE SUITES TO ONE
2235 FARADAY AV
LEDSAM, DOUG
REMARKS: MW/DAVE/471-9380
SPECIAL INSTRUCT:
TOTAL TIME:
CONSTR. TYPE VN
LOT: STE: 0
PHONE: 619 930-3430
PHONE: /;
PHONE: // j
INSPECTOR -,~~--'-v_. ________ _
CD LVL DESCRIPTION ACT COMMENTS
19 ST Final Structural .Al!_------------29 PL Final Plumbing
39 EL Final Electrical
49 ME Final Mechanical +=----
---------------------------------------------------------
***** INSPECTION HISTORY *****
DATE DESCRIPTION ACT INSP COMMENTS
072496 Final Combo NR TP
051096 Final Combo co TP T-24 ISSUES
050396 Rough Combo AP' PK CEILING OK TO DROP
050196 Interior Lath/Drywall AP TP
050196 Rough Electric AP TP ELEC PANELS (SUB)
043096 Interior Lath/Drywall co TP NOT COMP
043096 Frame/Steel/Bolting/Welding AP TP FURRED WALLS
042996 Frame/Steel/Bolting/Welding PA TP N-INCL FURRED WALLS (BRACING) .
042996 Rough Electric AP TP WALLS
042996 Underground/Under Floor AP TP RESTRM H-CAP RETRO(NOTE C/L W
FINAL BUILDING INSPECTION
DEPT: BUILDING ENGINEERING~ PLANNING U/M
PLAN CHECK#: CB960604
PERMIT#: CB960604
PROJECT NAME: 6180 SF IMPROVMENT
COMBINE THREE SUITES TO ONE
ADDRESS: f-~ .2235 FARADAY AV SUITE# 0
CONTACT PERSON/PHONE#: MW/DAVE/471-9388
SEWER DIST: CA WATER DIST: CA
INSPECTED DATE 1/c;, BY: f'«-J~o:A-INSPECTED:
INSPECTED DATE
BY: INSPECTED:
INSPECTED DATE
BY: INSPECTED:
COMMENTS:
APPROVED
APPROVED
APPROVED
WATER
DATE: 07/24/96
PERMIT TYPE: CTI
DISAPPROVED
DISAPPROVED
DISAPPROVED
EsGil Corporation
Professiona{ Pfan !R.f,view 'Engineers
DATE: April 25, 1996
JURISDICTION: Carlsbad
PLAN CHECK NO.: 96-604
PROJECT ADDRESS: 2235 Faraday
PROJECT NAME: Office T. I.
SET: II
D APPU ANT
~ JURIS. D FIRE
D PLAN REVIEWER
D FILE
.D The plans transmitted herewith have been corrected where necessary and substantially comply
with the jurisdiction's *********** codes.
• The plans transmitted herewith will substantially comply with the jurisdiction's building codes
when minor deficiencies identified below are resolved and checked by building department staff.
D The plans transmitted herewith have significant deficiencies identified on the enclosed check list
and should be corrected and resubmitted for a complete recheck.
D The check list transmitted herewith is for your information. The plans are being held at Esgil
Corporation until corrected plans are submitted for recheck.
D The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant
contact person.
D The applicant's copy of the check list has been sent to:
D Esgil Corporation staff did not advise the applicant that the plan check has been completed.
• Esgil Corporation staff did advise the applicant that the plan check has been completed.
Person contacted: Dave Johnson
Date contacted: 4/25/96 (by: Abe) Telephone#: Appt.
• REMARKS: Compliance with Title 24 Disabled Access Regulations to be field verified by the city
Building Inspector.
By: Abe Doliente
Esgil Corporation
D GA D CM D GP D PC 4/25/96
Enclosures:
trnsmtl.dot
9320 Chesapeake Drive, Suite 208 + San Diego, California 92123 + (619) 560-1468 + Fax (619) 560-1576
EsGil Corporation
Professiona{ P{an !R.f.view 'Engineers
DATE: April 9, 1996
JURISDICTION: Carlsbad
PLAN CHECK NO.: 96-604
PROJECT ADDRESS: 2235 Faraday
PROJECT NAME: Office T. I.
SET: I
D APP. !CANT
JURIS D FIRE
D PLAN REVIEWER
D FILE
D The plans transmitted herewith have been corrected where necessary and substantially comply
with the jurisdiction's*********** codes.
D The plans transmitted herewith will substantially comply with the jurisdiction's ********** codes
when minor deficiencies identified below are resolved and checked by building department staff.
D The plans transmitted herewith have significant deficiencies identified on the enclosed check list
and should be corrected and resubmitted for a -complete recheck.
• The check list transmitted herewith is for your information. The plans are being held at Esgil
Corporation until corrected plans are submitted for recheck.
D The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant
contact person.
• The applicant's copy of the check list has been sent to:
Doug Ledsam
2231 Faraday Avenue, Suite 120, Carlsbad, CA 92008
• Esgil Corporation staff did not advise the applicant that the plan check has been completed.
D Esgil Corporation staff did advise the applicant that the plan check has been completed.
Person contacted:
Date contacted:
D REMARKS:
By: Abe Doliente
Esgil Corporation
(by:
D GA • CM O GP O PC
) Telephone#:
Enclosures:
4/2/96 trnsmtl.dot
9320 Chesapeake Drive, Suite 208 + San Diego, California 92123 + (619) 560-1468 + Fax (619) 560-1576
Carlsbad 96-604
April 9, 1996
PLAN REVIEW CORRECTION LIST
TENANT IMPROVEMENTS
PLAN CHECK NO.: 96-604
OCCUPANCY: B
TYPE OF CONSTRUCTION: V-N
ALLOWABLE FLOOR AREA: Existing
SPRINKLERS?: Yes
REMARKS:
DATE PLANS RECEIVED BY
JURISDICTION:
DATE INITIAL PLAN REVIEW
COMPLETED: April 9, 1996
FOREWORD (PLEASE READ):
JURISDICTION: Carlsbad
USE: Offices
ACTUAL AREA: 6,180 SF
STORIES: ?
HEIGHT:
OCCUPANT LOAD: 62
DATE PLANS RECEIVED BY
ESGIL CORPORATION: 4/2/96
PLAN REVIEWER: Abe Doliente
This plan review is limited to the technical requirements contained in the Uniform Building Code,
Uniform Plumbing Code, Uniform Mechanical Code, National Electrical Code and state laws
regulating energy conservation, noise attenuation and access for the disabled. This plan review
is based on regulations enforced by the Building Department. You may have other corrections
based on laws and ordinances enforced by the Planning Department, Engineering Department,
Fire Department or other departments. Clearance from those departments may be required
prior to the issuance of a building permit.
Code sections cited are based on the 1994 USC.
The following items listed need clarification, modification or change. All items must be satisfied
before the plans will be in conformance with the cited codes and regulations. Per Sec. 106.4.3,
1994 Uniform Building Code, the approval of the plans does not permit the violation of any
state, county or city law.
To speed up the recheck process, please note on this list (or a copy) where each
correction item has been addressed, i.e., plan sheet number, specification section, etc.
Be sure to enclose the marked up list when you submit the revised plans.
LIST NO. 40, TENANT IMPROVEMENTS WITHOUT SPECIFIC ENERGY DATA OR POLICY SUPPLEMENTS (1994UBC) tifoiw.dot
Carlsbad 96-604
April 9, 1996
1. Please make all corrections on the original tracings and submit two new sets of
prints, to:
Esgil Corporation, 9320 Chesapeake Drive, Suite #208, San Diego, CA 92123,
(619) 560-1468 or to the jurisdiction's building department.
2. Plans and calculations shall be signed by the California state licensed engineer
or architect where there are structural changes to existing buildings or structural
additions. Please include the California license number, seal, date of license
expiration and date plans are signed. Business and Professions Code.
3. Provide a statement on the Title Sheet of the plans that this project shall comply
with Title 24 and 1994 UBC, UMC and UPC and 1993 NEC.
4. On the first sheet of the plans indicate:
• The floor area of the remodeled area,
• Type of construction of the existing building,
• Present and proposed occupancy classifications of the remodel area,
• The floor where the tenant improvement is located,
• The occupant load of the remodel area(s).
5. The tenant space and new and/or existing facilities serving the remodeled area
must be accessible to and functional for the physically disabled. This will have to
be field verified by the city Building Inspector. See requirements for the single
accommodation toilet below.
6. Specify lever-type hardware for passage doors on floors accessible to the
disabled. Section 2-3304, Title 24.
+ ELECTRICAL & ENERGY PLAN REVIEW
+ JURISDICTION: Carlsbad DATE: 4/9/96
+ PLAN REVIEW NUMBER: 96-604 I
+ PLAN REVIEWER: Chuck Mendenhall
7. Specify the wiring method you intend to use for this project (i.e., EMT, Metal
Flex, NMC etc.).
8. Show the location of all panels. NEC 110-16,240-24,300-21.
Carlsbad 96-604
April 9, 1996
9. Provide GFI protected receptacle(s) within 25 feet of all new HVAC equipment.
NEC 210-8(b)2 & 210-63
10. Why are there only two new HVAC systems shown on the panel schedule 'P'?
the plans show that there are three new systems.
11. The HP units listed on sheet 1.M-1 of the plans do not match the units listed on
the energy documentation shown on sheet 1.A-7 of the plans. Please clarify.
12. The PERF-1 form on sheet 1.A-7 of the plans must be signed by the responsible
designer,
Note: If you have any questions regarding this electrical plan review list please
contact the plan reviewer listed above at (619) 560-1468. To speed the review
process, note on this list ( or a copy) where the corrected items have been
addressed on the plans.
•
• MISCELLANEOUS
13. To speed up the review process, note on this list (or a copy) where each
correction item has been addressed, i.e., plan sheet, note or detail number,
calculation page, etc.
14. Please indicate here if any changes have been made to the plans that are not a
result of corrections from this list. If there are other changes, please briefly
describe them and where they are located in the plans.
Have changes been made to the plans not resulting from this correction
list? Please indicate:
Yes D No D
The jurisdiction has contracted with Esgil Corporation located at 9320
Chesapeake Drive, Suite 208, San Diego, California 92123; telephone number of
619/560-1468, to perform the plan review for your project. If you have any
questions regarding these plan review items, please contact Abe Doliente at
Esgil Corporation. Thank you.
Carlsbad 96-604
April 9, 1996
DEPARTMENT OF STATE ARCHITECT NON RESIDENTIAL
TITLE 24 DISABLED ACCESS REQUIREMENTS
• REMODELS, ADDITIONS AND REPAIRS
1. When alterations, structural repairs or modifications or additions are made to an existing building,
that building, or portion of the building affected is required to comply with all of the requirements for
new buildings, per Section 11348.2. These requirements apply only to the area of specific alteration,
repair or addition and shall include:
a) A primary entrance to the building and the primary path of travel to the area in question,
and include the following items which serve the area in question:
i) Sanitary facilities.
ii) Drinking fountains.
iii) Public telephones.
• SANITARY FACILITIES
• SINGLE ACCOMMODATION FACILITIES
2. Revise plans to show a sufficient space in the toilet room for a wheelchair to enter the room and
close the door, per Section 11158.7.2. The space is required to be:
a) ::?::30" X 48".
b) ::?::60" diameter.
c) AT-shaped space as shown in Figure 11 B-12(a) and (b).
d) Doors are not permitted to encroach into this space.
3. Show that the water closet is located in a space, per Section 111587.2, which provides:
a) A minimum side clearance of either:
i) ::?::28" from a fixture.
ii) ::?::32" from a wall on one side.
b) ::?::48" clear space in front of the water closet.
4. Show, or note, on the plans that the accessible water closets meet the following requirements,
California Plumbing Code:
a) The seat is to be ~17" but :S:19" in height.
b) The controls are:
i) Operable with one hand.
ii) Does not require tight grasping, pinching or twisting of the wrist.
c) The controls for flush valves shall be:
i) Mounted on the side of the toilet area.
ii) Be :S:44" above the floor.
d) The force to activate the controls shall be :S:5# of force.
Carlsbad 96-604
April 9, 1996
5. Show that accessible lavatories comply with the following,-per Sections 1115B.9.1 and California
Plumbing Code:
a) ~30" x 48" clear space is provided in front for forward approach. The clear space may
include knee and toe space beneath the fixture.
i) ~29" high x 30" wide x 8" deep at the top.
ii) ~9" high x 30" wide and 17" deep at the bottom.
iii) The counter top is ::,;34" maximum above the floor.
b) Hot water pipes and drain lines are insulated.
c) The faucet controls, and·operating mechanism are:
i) The type which does not require tight grasping, pinching or twisting of the wrist.
ii) Has an operc;1ting force of :::;;s#.
d) If self-closing valves are used, they shall remain open for ~1 O seconds.
6. Revise plans to show that grab bars comply with the following, per Section 1115B.8:
a) Grab bars shall be located on each side or one side and the back of the water closet stall or
compartment.
b) They shall be securely attached 33" above the floor, and parallel.
NOTE: Where a tank-type toilet is used which obstructs placement at 33", the grab bar may
be installed as high as 36".
c) Grab bars at the side shall be located:
i) 15" to 16½" (±1 ") from the center line of the water closet stool.
ii) Be ~42" long with the front end positioned 24" in front of the stool.
iii) Total length of bars at the back shall be ~36".
d) The diameter, or width, of the grab bar gripping surface is ~1 ¼" but::,; 1 ½", or the shape shall
provide an equivalent gripping surface.
e) If mounted adjacent to a wall, the space between the wall and the grab bar shall be 1 ½".
f) Be designed to support 250#.
7. Revise plans to show :::;;40" height for:
a) The operable parts of at least 1;
i) Paper towel dispenser.
ii) Sanitary napkin dispenser.
iii) Waste paper disposal.
iv) Other similar dispensing and/or disposal fixtures.
b) The bottom edge of mirrors.
8. Revise plans to show that the toilet tissue dispensers are located ::,; 12" from the front edge of the
water closet stool, per Section 1115B.9.3.
Carlsbad 96-604
April 9, 1996
VALUATION AND PLAN CHECK FEE
JURISDICTION: Carlsbad
PREPARED BY: Abe Doliente
BUILDING ADDRESS: 2235 Faraday
II BUILDING PORTION
Office T. I.
Air Conditioning
Fire Sprinklers
TOTAL VALUE
USC Building Permit Fee:
use Plan Check Fee:
BUILDING AREA
(sq. ft.)
6,180 SF
Comments: ESGIL FEE= 0.80 X 554.45 = $ 443.56
PLAN CHECK NO.: 96-604
DATE: April 9, 1996
BUILDING OCCUPANCY: B
TYPE OF CONSTRUCTION: V-N
VALUATION
MULTIPLIER
26.00
VALUE
($)
160,680
160,680
$ 853.00
$ 554.45
Sheet 1 of 1
valuefee.dot
l
:
PLANNING/ENGINEERING APPROVALS
PERMIT-NUMBER CB °!fo6 (o CJ 1-
RESIDENTIAL
RESIDENTIAL ADDITION MINOR
( < $10,000.00)
DATE .f-; 7-9b
TENANT IMPROVEMENT
PLAZA CAMINO REAL
VILLAGE FAIRE
COMPLETE OFFICE BUILDING
OTHER. _______________________ _
PLANNER ________________ DATE _______ _
ENGINEE~'.2z2~ DATE _,/-~/'J :z:6
C:\WP51\FILES\BLDG.FRM Rev 11/15/90
_j
>, >, >, .a .a .a
...-C\J C') 'II: 'II: 'II:
.:.:: .:.:: .:.:: ~ ~ ~ .c: .c: .c: (..) (..) (..)
c:: c:: c::
n¼ ~
PLANNING DEPARTMENT
BUILDING PLAN CHECK REVIEW CHECKLIST
Plan Check No. CB t/6-6? V
Planner Van Lynch
Address 2--?JS-A 12-4:Mv-
Phone (619) 438-1161 ext. 4325
(Name)
APN: Z.{?_-QG/--2 ~
Type of Project and Use: IN/) (I I '/M/Jt-/::L:-.
Zone: C /(V/ Facilities Management Zone: _r-
CFD (ciwlcnrt})# _________ _
;~ (If property in, complete SPECIAL TAX CALCULATION
WORKSHEET provided by Building Department)
Legend
~ Item Complete
(g Item Incomplete -Needs your action
Environmental Review Required: YES NO ~ TYPE ___ _
DATE OF COMPLETION: _______ _
Compliance with conditions of approval? If not, state conditions which require action.
Conditions of Approval ____________________ _
Discretionary Action Required: YES NO_K_ TYPE __ _
APPROVA~RESO.NO. ______ DATE _____ _
PROJECT NO. -----OTHER RELATED CASES: __________________ _
Compliance with conditions or approval? If not, state conditions which require action.
Conditions of Approval ____________________ _
California Coastal Commission Permit Required: YES NO IX
DATE OF APPROVAL: ______ _
San Diego Coast District, 3111 Camino Del Rio North, Suite 200, San Diego, CA 92108
(619) 521-8036
Compliance with conditions of approval? If not, state conditions which require action.
Conditions of Approval ____________________ _
'
lnclusionary· Hou~_ing Fee ·required. YES --'-'-NO -/>(
(Effective date of lrfolus·ionary Housir:ig Ordinan'ce _. May 21, 1993) .
. Sit~ Plan: '
1. Provide a fully dimensioned site plan drawn to scale. Show: North arrow, property
lines, easem~nts, existing and proposed _ structures, streets, existir:ig street
iniprovenientS, right-of:.way Width, dimensioned setbacks and existing topographical
lines.. · ·
1
/~~ 0 2. Provide legal description of pr0perty, at,d -assessor's parcel number.
'
f Zoning:
~D D 1. Setb,;,cks: ' . {L
·. 1/J-:;(,..
'
~.oN~-. ;;;0 · DAJ/43.
4.
Front
lr:it. Side:
Street Side:
Rear:
Lot Cov~rage:
HeiQht:
··Parking:
.Required Shown ----'-----_Reqt1ired ___________ Shown _____ _
Required Shown --.....,.,....---
'Required . Shown ___ ...;...;.. __
Required• Shown ,--------------,---
Requited Shown ,------,-,---,,----------,--
.A§J·~ Spaces Required . / -z?. . Shown _-f_?._ct:>_-__ · _____ _
Guest Spaces Required · Shown -----,----
I@~ Additional Comments @/Llb1J't/6 _ 5 W/J.t/ · 9/-r?Ptlt/J /N C..UlfJtsr' <219R'£-GFI
(c,UIJWRvttts< dJ/J/J · IMIJ,lliC/~fu ~ Alo MP4> ll~(.)-S &1;.J s 1ztr; · '
.. ,~-~--. -o'K TO ISSUE AND ENTERED APPROVAL INTO COMPUTER------~-----------DATE lf-lR;-f{
• I
. K:\ADMIN\COUN7FER\PLANCk.FRM' 1-17-96
..,,
City of Carlsb~d . · · 96079
Fire Department • Bureau of Prevention
Plan Review: Requirements Category: Building Plan Check
I
Date of Report: Tuesday, April 9, 1996 Reviewed by: M± A~J_
Contact Name
Address
City, State
Doug Ledsam
2231 Faraday
Carlsbad CA 92008
Bldg. Dept. No. _96_-_6_0_4 ___ _
Job Name Deloitte & ToucheLLP
Planning No.
Job Address 2235 Faraday ----~-------------Ste. ·or Bldg. No. _o ___ _
~ Approved -The item you have submitted for review has been approved. The approval is
based on plans; information and/or specifications provided in your submittal;
therefore any changes to these items after this date, including field modifica-
tions, must be reviewed by this office to insure continued conformance with
applicable codes. Please review carefully all comments attached, as failure
to comply with instructions in this report can result in suspension of permit to
construct or install improvements.
D Disapproved -Please see the attached report of deficiencies. Please make corrections to
plans or specifications necessary to indicate compliance with applicable
codes and standards. Submit corrected plans and/or specifications to this
office for review.
For Fire Department Use Only
Review 1st'-----2nd __ _ 3rd. __ _
Other Agency ID
CFD Job# __ 96_0_7_9 __ File# ___ _
2560 Orion Way • Carlsbad, California 92008 • (619) 931-2121
....
City of Carlsbad·
Fire Department
General Comments:
Date of Report: Tuesday, April 9, 1996
Contact Name
Address
City, State
Doug Ledsam
2231 Faraday
Carlsbad CA 92008
96079
• Bureau of Prevention
Bldg. Dept,. No. _9_6-_6_04 ___ _ Planning No. _____ _
Job Name Deloitte & ToucheLLP
Job Address 2235 Faraday ----"---------------Ste. or Bldg. No. _o ___ _
Tenant improvement may effect sprinkler coverage. Licensed sprinkler contractor needed for compliance as per key notes.
2560 Orion Way • Carlsbad, California 92008 • (619) 931-2121
·.
TITLE 24 REPORT FOR:
DT/Carlsbad
2235 Faraday Ave., Suites N, O & P
Carlsbad, CA
PROJECT DESIGNER:
Florenza von Berger & Associates
2500 Broadway, Suite 301
Santa Monica, CA 90404
(310) 829-4216
REPORT PREPARED BY:
Steve Balderrama, CEPE
Haynal & Co., Inc.
425 West Fifth Street
Escondido, CA 92025
(619) 743-5408
Job Number:
Date: 3/25/1996
The COMPLY 24 computer program has been used to perform the calculations
summarized in this compliance report. This program has approval and is
authorized by the California Energy Commission for use with both the
Residential and Nonresidential Building Energy Efficiency Standards.
This program developed by Gabel Dodd Associates (510) 428-0803.
q0 -Goy
,
>.
Table Of Contents for Title 24 Report
Cover Page . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1
Table of Contents . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2
Nonresidential Performance Title 24 Forms ........................... 3
Form ENV-3 Construction Assemblies .................................. 17
PERFORMANCE CERTIFICATE OF COMPLIANCE (part l of 3) PERF-1 page 3 of 20
Run Initiation Time: 12:42:40 Runcode: 2875-544826688
Project Name: DT/Carlsbad
Address: 2235 Faraday Ave., Suites N, o & P
Carlsbad, CA
Designer: Florenzo von Berger & Associates
Documentation: Haynal & Co., Inc.
STATEMENT OF COMPLIANCE
jDate: 3/25/1996 , _______ _
!Building Permit No , _______ _
Jchecked by/ Date
I
!COMPLY 24 User 2875
This Certificate of Compliance lists the Building features and performance
specifications needed to comply with Title 24, Parts 1 and 6, of the State
Building Code. This certificate applies only to a Building using the
performance compliance approach.
The Principal Designers hereby certify that the proposed building design
represented in the construction documents and modelled for this permit
application are consistent with all other forms and worksheets, specifi-
cations, and other calculations submitted with this permit application.
The proposed building as designed meets the energy efficiency requirements
of the State Building Code, Title 24, Part 6, Chapter 1.
1. I hereby affirm that I am eligible under the provisions of Division 3 of
the Business and Professions Code to sign this document as the person
responsible for its preparation; and that I am licensed as a civil
engineer, mechanical engineer, electrical engineer or architect.
2. I affirm that I am eligible under the exemption to Division 3 of the
Business and Professions Code by Section 5537.2 of the Business and
Professions Code to sign this document as the person responsible for its
preparation; and that I am a licensed contractor preparing documents for
work that I have contracted to perform.
3. I affirm that I am eligible under the exemption to Division 3 of the
Business and Professions Code by Section ____ of the
Code to sign this document as the person responsible for its
preparation; and for the following reason: ______________ _
SCOPE OF COMPLIANCE (Designers should circle applicable paragraph numbers)
ENVELOPE -Required Forms: ENV-1, ENV-2
Location of Mandatory Measures on Plans
Principal Designer
Florenzo von Berger & Associates l 2 3
(310)829-4216 (Signature) (Date) (Circle)
LIGHTING -Required Forms: LTG-1, LTG-2
Location of Mandatory Measures on Plans
Principal Designer
(619) (Signature)
l 2 3
(Date) (Circle)
MECHANICAL -Required Forms: MECH-1, MECH-2, MECH-3, MECH-4
Location of Mandatory Measures on Plans
Principal Designer
J.A. Fergus Heating & Air Conditioning
(619)723-8950 (Signature)
1 2 3
(Date) (Circle)
, . PERFORMANCE CERTIFICATE OF COMPLIANCE (part 2 of 3)
Run Initiation Time: 12:42:40
PERF-1 page 4 of 20
Runcode: 2875-544826688
Project Name: DT/Carlsbad JDate: 3/25/1996
I
Documentation: Haynal & Co., Inc. jCOMPLY 24 User 2875
ANNUAL SOURCE ENERGY USE SUMMARY (K.Btu/sqft-yr)
Energy Component
Space Heating
Space Cooling
Indoor Fans
Heat Rejection
Pumps
Domestic Hot Water
Lighting
Receptacle
Process
TOTALS
GENERAL INFORMATION
Conditioned Floor Area:
Glass Area/ Wall Area:
Front Orientation:
Number of Zones:
ZONE INFORMATION Floor
Area
Zone Name (sqft)
-----------------------
PBX/LAN 204
General Office 636
Office 1079
Warehouse 856
0
Standard Proposed Compliance
Design Design Margin
--------------------------
3.28 3.60 -0.31
34.86 26.42 8.44
22.82 15.63 7.19
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
47.06 38.77 8.29
25.48 25.48 0.00
0.00 0.00 0.00
--------------------------
133.51 109.90 23.61
1919 Average Ceiling Height: 9.0
0.20 Average Glazing U-Value: 1.20
deg (N) Number of Stories: 1
4 Number of Occupancies: 1
Display Inst Tailored Process Tailored
Perim. LPD Lighting Loads Vent.
(ft) (w/sf) (watts) (w/sf) (y/n)
-----------------------------------
0 1. 06 0 0 N
0 1.36 0 0 N
0 1.34 0 0 N
0 0.00 0 0 N
1 >
·. PERFORMANCE CERTIFICATE OF COMPLIANCE {part 3 of 3) PERF-1 page 5 of 20
Run Initiation Time: 12:42:40 Runcode: 2875-544826688
Project Name: DT/Carlsbad !Date: 3/25/1996
I
Documentation: Haynal & Co., Inc. jCOMPLY 24 User 2875
The documentation preparer hereby certifies that the documentation is
accurate and complete.
DOCUMENTATION AUTHOR
Steve Balderrama, CEPE
(619) 743-5408 {Signature)
EXCEPTIONAL CONDITIONS COMPLIANCE CHECKLIST
{Date)
The local enforcement agency should pay special attention to the items
specified in this checklist. These items require special written
justification and documentation, and special verification to be used with
the performance approach. The local enforcement agency determines the
adequacy of the justification, and may reject a building or design that
otherwise complies based on the adequacy of the special justification and
documentation submitted.
BUILDING DEPARTMENT APPROVAL OF EXCEPTIONAL FEATURES JUSTIFICATION:
The exceptional features listed in this performance approach application
have specifically been reviewed. Adequate written justification and
documentation for their use have been provided by the applicant.
authorized signature or stamp
,, . CERTIFICATE OF COMPLIANCE -Envelope
Run Initiation Time: 12:42:40
Project Name: DT/Carlsbad
Documentation: Haynal & Co., Inc.
Const OPAQUE SURFACES
Assembly Name Type Location/Comments
R-11 Demising Wall(MTL)
R-19 Roof(R-19 on Tile)
Carpeted Slab On Grade
6" Concrete Wall
FENESTRATION Frame
Orient Panes Type
--------
Back (S) 1 Metal
Back (S) 1 Metal
Metal
Wood
None
None
Exterior Shade OH
-----------------------
None N
None N
ENV-1 page 6 of 20
Runcode: 2875-544826688
JDate: 3/25/1996
I
JCOMPLY 24 User 2875
Glazing Type
Note to
Field
-----------------------
Single Tinted
Single Tinted
V ' CERTIFICATE OF COMPLIANCE -Lighting
Run Initiation Time: 12:42:40
Project Name: DT/Carlsbad
Documentation: Haynal & Co., Inc.
INSTALLED LIGHTING SCHEDULE
No of
Name Lamp Type Lamps
------------------
Fluorescent 3
Incandescent 1
MANDATORY AUTOMATIC CONTROLS
Control
Watts/
Lamp
------
34
75
Ballast
Type
----------
Standard
n/a
LTG-1 page 7 of 20
Runcode: 2875-544826688
!Date: 3/25/1996
I
!COMPLY 24 User 2875
Ballasts/ No of Note to
Luminaire Fixt. Field
----------------
1. 5 22
n/a 2
Note to
Control Location ID Control Type Zone Controlled Field
CONTROLS FOR CREDIT
Control Note to
Control Location ID Control Type Zone Controlled Field
CERTIFICATE OF COMPLIANCE -Mechanical (part 1 of 2) MECH-1 page 8 of 20
Run Initiation Time: 12:42:40 Runcode: 2875-544826688
Project Name: DT/Carlsbad
Documentation: Haynal & Co., Inc.
SYSTEM FEATURES
Zone Name PBX/LAN
Time Control __ s __
Setback Control None
#of Isolation Zones n/a
HP Thermostat
Electric Heat
Fan Control
VAV Min Position
Simul. Heat/Cool
Heat Supply Reset
Cool Supply Reset
Ventilation
OA Damper Control
Economizer Type
Outdoor Air CFM
Heat Equip Type
Make & Model No.
Cool Equip Type
Make and Model
Yes
0.0 KW
Constant Volume
n/a
n/a
Constant Temp
Constant Temp
B
A
No Economizer
31
Heat Pump
Rheem RQKA-A018
DX
Zone Name Office
Time Control __ s __
Setback Control None
#of Isolation Zones n/a
HP Thermostat
Electric Heat
Fan Control
VAV Min Position
Simul. Heat/Cool
Heat Supply Reset
Cool Supply Reset
Ventilation
OA Damper Control
Economizer Type
Outdoor Air CFM
Heat Equip Type
Make & Model No.
Cool Equip Type
Make and Model
Code Tables
Time Control
S:Prog Switch
O:Occ Sensor
M:Man Timer
Yes
0.0 KW
Constant Volume
n/a
n/a
Constant Temp
Constant Temp
B
A
No Economizer
162
Heat Pump
Rheem RJKA-A036
DX
Ventilation
B:Air Balance
C:OA Cert.
M:OA Measure
D:Demand Cont
N:Natural
jDate: 3/25/1996
I
jCOMPLY 24 User 2875
General Office
s
None
n/a
Yes
0.0 KW
Constant Volume
n/a
n/a
Constant Temp
Constant Temp
B
A ----No Economizer
95
Heat Pump
Rheem RQKA-A030
DX
OA Damper
.A:Auto
G:Gravity
Note to
Field
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
CERTIFICATE OF COMPLIANCE -Mechanical (part 2 of 2) MECH-1 page 9 of 20
Run Initiation Time: 12:42:40 Runcode: 2875-544826688
Project Name: DT/Carlsbad
Documentation: Haynal & Co., Inc.
DUCT INSULATION
System Name Type Duct Location
-------------------------------------------------
Rheem RQKA-A018 Heating Ducts in Attic
Cooling Ducts in Attic
Rheem RQKA-A030 Heating Ducts in Attic
Cooling Ducts in Attic
Rheem RJKA-A036 Heating Ducts in Attic
Cooling Ducts in Attic
PIPE INSULATION Insul
System Name Pipe Type Required
Domestic Hot Water y I N
NOTES TO FIELD -For Building Department Use Only
JDate: 3/25/1996
I
jCOMPLY 24 User 2875
Duct Tape
Allowed
-------
y I N
y I N
y I N
y I N
y I N
y I N
Insul
R-Val
4.2
4.2
4.2
4.2
4.2
4.2
Note to
Field
-------
Note to
Field
ENVELOPE COMPLIANCE SUMMARY -Performance (part 1 of 3)ENV-2 page 10 of 20
Run Initiation Time: 12:42:40 Runcode: 2875-544826688
Project Name: DT/Carlsbad
Documentation: Haynal & Co., Inc.
GENERAL INFORMATION BY ZONE
Zone Name
PBX/LAN
General Office
Office
Warehouse
Occupancy
Office
Office
Office
Unconditioned
Flr
No
1
1
1
1
Total
jDate: 3/25/1996
I
jCOMPLY 24 User 2875
Floor Display
Area Volume Perim.
-------------
204 1836 0
636 5724 0
1079 9711 0
856 7704 0
2775
ENVELOPE COMPLIANCE SUMMARY -Performance (part 2 of 3)ENV-2 page 11 of 20
Run Initiation Time: 12:42:40 Runcode: 2875-544826688
Project Name: DT/Carlsbad JDate: 3/25/1996
I
Documentation: Haynal & Co., Inc. JCOMPLY 24 User 2875
OPAQUE SURFACES Act Solar
Type Area U-Val Azm Tilt Gains Form 3 Reference Location/Comments
Wall
Roof
Slb
Wall
Wall
Roof
Slb
120 0.752 270
204 0.045 0
204 0.134 0
133 0.752 180
270 0.752 270
636 0.045 0
636 0.134 0
Wall 123 0.752 180
Wall 280 0.192 Int
Roof 1079 0.045 0
Slb 1079 0.134 0
90 Yes
22 Yes
180 No
90 Yes
90 Yes
22 Yes
180 No
90 Yes
90 No
22 Yes
180 No
6" Concrete Wall PBX/LAN
R-19 Roof(R-19 on Tile) PBX/LAN
Carpeted Slab On Grade PBX/LAN
6" Concrete Wall General Office
6 11 Concrete Wall General Office
R-19 Roof(R-19 on Tile) General Office
Carpeted Slab On Grade General Office
6" Concrete Wall Office
R-11 Demising Wall(MTL) Office
R-19 Roof(R-19 on Tile) Office
Carpeted Slab On Grade Office
\
ENVELOPE COMPLIANCE SUMMARY -Performance (part 3 of 3)ENV-2 page 12 of 20
Run Initiation Time: 12:42:40 Runcode: 2875-544826688
Project Name: DT/Carlsbad
Documentation: Haynal & Co., Inc.
FENESTRATION SURFACES
# Type Area Frame Div U-Val
-------------
1 Wdw Back (S) 90.0 Metal No 1.19
2 Wdw Back (S) 27.0 Metal No 1.23
3 Wdw Back (S) 90.0 Metal No 1.19
4 Wdw Back (S) 27.0 Metal No 1.23
OVERHANGS/SIDE FINS
--Window--
# Type Ht Wd
-----Overhang------
Len Ht LExt RExt
JDate: 3/25/1996
I
jCOMPLY 24 User 2875
SC
Act Glass
Azm Tilt Only Location/Comments
---------------------
180 90 0.69 General Office
180 90 0.69 General Office
180 90 0.69 Office
180 90 0.69 Office
---Left Fin---
Dist Len Ht
---Right Fin--
Dist Len Ht
LIGHTING COMPLIANCE SUMMARY -Performance
Run Initiation Time: 12:42:40
Project Name: DT/Carlsbad
Documentation: Haynal & Co., Inc.
ACTUAL LIGHTING POWER
Name Description
48" T-12 Low Watt /3 Lamp (Tandem)
75w Recessed Incandescent
LTG-2 page 13 of 20
Runcode: 2875-544826688
jDate: 3/25/1996
I
jCOMPLY 24 User 2875
No of Watts Total
Lumin
22
2
per Default Watts
108.0
75.0
y --y
2376
150
SubTotal 2526
Less Control Credits (LTG-3) O
Total Proposed Watts 2526
* If not CEC Default value, please provide supporting documentation.
MODELLED LIGHTING POWER BY ZONE
Zone Name
PBX/LAN
General Office
Office
Occupancy
Office
Office
Office
TOTALS
Modelled
Floor LPD
Area (w/sf)
------
204 1.059
636 1.358
1079 1.340
------
1919 1. 316
Total Tailored
(watts) (watts)
--------------
216 0
864 0
1446 0
--------------
2526 0
* Note: Tailored Allotment requires supporting documentation on form LTG-4.
MECHANICAL EQUIPMENT ZONING SUMMARY -Performance
Run Initiation Time: 12:42:40
Project Name: DT/Carlsbad
Documentation: Haynal & Co., Inc.
SYSTEM/ZONING SUMMARY
System/Zones Served Central/Zonal System
MECH-2 page 14 of 20
Runcode: 2875-544826688
!Date: 3/25/1996
I
!COMPLY 24 User 2875
System Type
No
Sys
PBX/LAN Rheem RQKA-A018 Packaged Heat Pump 1
PBX/LAN
General Office Rheem RQKA-A030 Packaged Heat Pump 1
General Office
Office Rheem RJKA-A036 Packaged Heat Pump 1
Office
Warehouse
MECHANICAL EQUIPMENT SUMMARY -Performance
Run Initiation Time: 12:42:40
Project Name: DT/Carlsbad
Documentation: Haynal & Co., Inc.
CENTRAL SYSTEM SUMMARY
Sys
No System Name System Type
No
MECH-3 page 15 of 20
Runcode: 2875-544826688
!Date: 3/25/1996
I
!COMPLY 24 User 2875
Sys Economizer Type
1 Rheem RJKA-A036
2 Rheem RQKA-A030
3 Rheem RQKA-A018
Packaged Heat Pu 1 No Economizer
Packaged Heat Pu 1 No Economizer
Packaged Heat Pu 1 No Economizer
CENTRAL SYSTEM RATINGS
Sys-------Heating----------------------------------Cooling-----------
No Type Output Aux KW EFF Type Output Sensible EER SEER
-----------------------------------------------
1 Heat Pump 36000 0.0 7.20 DX 36000 26703 11. 00 12.10
2 Heat Pump 29000 0.0 6.80 DX 29000 19000 9.05 10.00
3 Heat Pump 17200 0.0 6.80 DX 17400 12500 9.50 10.00
CENTRAL FAN SUMMARY ------------Supply Fan -----------Return Fan
Sys
No Fan Type Motor Location
------------------------------
1 Constant Volume Draw-Through
2 Constant Volume Draw-Through
3 Constant Volume Draw-Through
ZONAL FAN SUMMARY
Zone Name No CFM
None
CFM BHP
------
1200
1000
600
Zonal Fan
Mtr
BHP Eff
0.24
0.20
0.12
Drv
Eff
Mtr Drv Mtr Drv
Eff Eff CFM BHP Eff Eff
---
60 100 None
60 100 None
49 100 None
-------Exhaust Fan
Mtr
No CFM BHP Eff
---
Drv
Eff
MECHANICAL VENTILATION -Performance
Run Initiation Time: 12:42:40
Project Name: DT/Carlsbad
Documentation: Haynal & Co., Inc.
VENTILATION SUMMARY BY ZONE
Zone Name T Occupancy
-------------------------------------
PBX/LAN Office
General Office Office
Office Office
Floor
Area
204
636
1079
MECH-4 page 16 of 20
Runcode: 2875-544826688
!Date: 3/25/1996
I
jCOMPLY 24 User 2875
Tran
sqft CFM Dsg Min sfer
/Occ /Occ CFM CFM CFM
------
130 15.0 24 31 7
130 15.0 73 95 22
130 15.0 125 162 37
------
TOTALS 221 288
WARNING -Total Design Mechanical Ventilation is less than Minimum Required
Tailored OA (T=*) requires supporting documentation on MECH-5, Tailored
Ventilation and Process Loads Worksheet
PROPOSED CONSTRUCTION ASSEMBLY
Project Name: DT/Carlsbad
Documentation: Haynal & Co., Inc.
COMPONENT DESCRIPTION
Sketch of Construction Assembly
ASSEMBLY U-VALUE
Construction Components
Outside Air Film
1. Gypsum or Plaster Board
2. Insulation, Mineral Fiber, R-11
3. Gypsum or Plaster Board
4.
5.
6.
7.
8.
9.
Inside Air Film
ENV-3 page 17 of 20
jDate: 3/25/1996
I
jCOMPLY 24 User 2875
Assembly Name: R-11 Demising Wall(MTL)
Assembly Type: Wall
Assembly Tilt: 90 deg (Vertical)
Framing Material: Metal
Framing Spacing: II 0.C.
Framing Percent: 15.0 %
Absorptivity: 0.70
Roughness: Smooth Plaster, Metal
Th
Fr (in)
R-Value
Cavity Frame
0.17
0.500 0.45
* 3.500 11.00
0.500 0.45
0.68
0.17
0.45
11. 00
0.45
Unadjusted R-Values 12.75
0.68
0.00
Weight:
Heat Capacity:
4.3 lb/sqft
1.11
TOTAL U-VALUE = 0.192
TOTAL R-VALUE = 5.20
PROPOSED CONSTRUCTION ASSEMBLY
Project Name: DT/Carlsbad
Documentation: Haynal & Co., Inc.
COMPONENT DESCRIPTION
Sketch of Construction Assembly
ASSEMBLY U-VALUE
Construction Components
Outside Air Film
1. Roofing, Built-Up
2. Membrane, Vapor-Permeable Felt
3. Plywood
4. A,ir Space
5. Insulation, Mineral Fiber, R-19
6. Gypsum or Plaster Board
7.
8.
9.
Inside Air Film
ENV-3 page 18 of 20
JDate: 3/25/1996
I
JCOMPLY 24 User 2875
Assembly Name: R-19 Roof(R-19 on Tile)
Assembly Type: Roof
Assembly Tilt: 22 deg (Tilted Up)
Framing Material: Wood
Framing Spacing: II 0.C.
Framing Percent: 10.0 %
Absorptivity: 0.70
Roughness: Concrete, Asph. Shingles
Th
Fr (in)
0.375
0.010
0.500
* 6.000
6.000
0.500
R-Value
Cavity Frame
0.17 0.17
0.33 0.33
0.06 0.06
0.62 0.62
0.80 5.94
19.00 19.00
0.45 0.45
0.61 0.61
Unadjusted R-Values 22.04 27.18
ADJUSTMENT FOR FRAMING
(1 /22.04) X (0.90) + (1 /27.18) X (0.10)
Weight:
Heat Capacity:
7.8 lb/sqft
2.47
0.045
TOTAL U-VALUE = 0.045
TOTAL R-VALUE = 22.46
PROPOSED CONSTRUCTION ASSEMBLY
Project Name: DT/Carlsbad
Documentation: Haynal & Co., Inc.
COMPONENT DESCRIPTION
Sketch of Construction Assembly
ASSEMBLY U-VALUE
Construction Components
Outside Air Film
1. Earth
2. Concrete, 140 lb, Not Dried
3. Flooring, Carpet and Fibrous Pad
4.
5.
6.
7.
8.
9.
Inside Air Film
ENV-3 page 19 of 20
!Date: 3/25/1996
I
!COMPLY 24 User 2875
Assembly Name: Carpeted Slab On Grade
Assembly Type: Floor
Assembly Tilt: 180 deg (Horizontal Floor)
Framing Material: None
Framing Spacing: 11 o. C.
Framing Percent: o.o %
Absorptivity: 0.70
Roughness: Concrete, Asph. Shingles
Th R-Value
Fr (in) Cavity
24.000
3.500
0.250
0.17
4.00
0.28
2.08
0.92
Frame
0.17
4.00
0.28
2.08
0.92
Unadjusted R-Values 7.45 7.45
ADJUSTMENT FOR FRAMING
(1 / 7.45) X (1.00) + (1 / 7.45) X (0.00)
Weight:
Heat Capacity:
210.9 lb/sqft
42.19
0.134
TOTAL U-VALUE = 0.134
TOTAL R-VALUE = 7.45
PROPOSED CONSTRUCTION ASSEMBLY
Project Name: DT/Carlsbad
Documentation: Haynal & Co., Inc.
COMPONENT DESCRIPTION
Sketch of Construction Assembly
ASSEMBLY U-VALUE
Construction Components
Outside Air Film
1. Concrete, 140 lb, Not Dried
2.
3.
4.
5.
6.
7.
8.
9.
Inside Air Film
ADJUSTMENT FOR FRAMING
ENV-3 page 20 of 20
!Date: 3/25/1996
I
!COMPLY 24 User 2875
Assembly Name: 6" Concrete Wall
Assembly Type: Wall
Assembly Tilt: 61 deg (Tilted Up)
Framing Material: None
Framing Spacing: 11 O.C.
Framing Percent: 0.0 %
Absorptivity: 0.70
Roughness: Concrete, Asph. Shingles
Th
Fr (in)
6.000
Unadjusted R-Values
R-Value
Cavity
0.17
0.48
0.68
1.33
Frame
0.17
0.48
0.68
1.33
(1 / 1.33) X (1.00) + (1 / 1.33) X (0.00) 0.752
Weight:
Heat Capacity:
70.0 lb/sqft
14.00
TOTAL U-VALUE 0.752
TOTAL R-VALUE = 1.33
MANDATORY REQUIREMENTS
ENVELOPE MANDATORY MEASURES (NONRESIDENTIAL)
1. Exterior manufactured doors, windows, and fenestration products shall meet the infiltration and U-value certification requirements
of Section 116(a).
2. Site-construced doors, skylights, and windows shall be caulked and weather-stripped per Section 116(6).
3. All joints and openings which are potential sources of air leakage shall be caulked, gasketed, weather-stripped or otherwise sealed to
limit infiltration and exfiltration per Section 117.
4. Certified insulation materials per Section 118(a).
5. Urea Formaldehyde foam insulation installed per Section 118(6).
6. Insulation installed to meet flame spread and smoke density requirements per Section 118(c).
LIGHTING MANDATORY MEASURES
1. Each enclosed area shall have independent controls (per Section 131(a) and exceptions).
2. Lighting shall be uniformly reducible by one half in areas which are greater than 100 sf, exceed 1.2 watts/sf, and have more than one
luminaire (per Section 131(6) and exceptions; exceptions include lights in corridors).
3. Daylit areas larger than 250 sf shall be separately controlled and uniformly reducible by one half (per Section 131(c) and exceptions).
4. Separately metered spaces 5,000 sf or greater shall have automatic shutoff controls (per Section 131(d) and exceptions).
5. Display lighting shall be separately switched on circuits that are 20 amps or less (per Section 131(e), no exceptions).
6. Exterior lighting controlled from a lighting panel within the building shall be automatically controlled (per Section 131(±) and
exceptions).
7. Pairs of one-lamp and three-lamp fluorescent luminaires shall be tandem-wired where reasonable (per Section 132 and exceptions).
SERVICE WATER HEATING SYSTEMS
1. Temperature controls and recirculating pump controls shall meet the requirements of Section 113(a) & (6).
2. Flow rates and temperature controls for public lavatories shall meet the requirements of Section 113(b)3.
3. Unfired service water heater storage tanks and backup tanks for solar water heating shall comply with Section 113(6)4.
MECHANICAL AND PLUMBING MANDATORY MEASURES
Equipment and Systems Efficiency
1. HV AC and service water heating equipment shall meet Appliance Efficiency Regulations, per Sections 111 and 112.
2. Piping, except those conveying fluids at temperatures between 60 and 105 degrees F, or within HV AC equipment, shall be insulated
in accordance with Section 123.
3. Air handling duct systems shall be sealed in accordance with the SMACNA HV AC Ducts Construction Standards, Metal and
Flexible, 1985, per Section 124(a) and (6). Ducts shall be installed and insulated as provided in UMC, Chapter 10.
4. Pilot lights shall not be installed for natural gas central furnaces, and pool and spa heaters, per Section 115.
Ventilation
1. Every space in a building shall be designed to have outdoor air ventilation according to Section 121(a), (6) and (e).
2. Operation and control of outdoor air shall meet the time-of-occupancy and pre-occupancy requirements of Section 121(c).
3. When a return plenum is used to distribute outdoor air to a covered HV AC unit, the ducted discharge shall be in accordance with
Section 121(d).
4. Systems shall meet the completion and balancing requirements of Section 121(±).
Controls
1. Each space conditioning zone shall be controlled by an individual thermostatic control that responds to temperature within the
zone. Heating shall be adjustable down to 55 degrees or lower, and cooling shall be adjustable up to 85 degrees or higher. The
control shall provide a dead-band of 5 degrees between heating and cooling. Section 122(a) and (6).
2. Heat pumps with supplementary electric resistance heaters shall have controls per Section 112(6).
3. Each space conditioning system shall be installed with an automatic time switch, able to shut off operation during off-hours of up
to four hours, per Section 122(e)1.
4. Thermostat setup and setback controls are required if the summer design dry bulb temperature is more than 99 degrees F, or if the
winter design temperature is less than 33 degrees, per Section 122(e)2, and its exceptions.
5. Outdoor air supply and exhaust equipment shall be installed with dampers that automatically close during periods of non-use for the
areas served by the equipment, per Section 122(±).
6. Each space conditioning system serving multiple zones with a combined conditioned floor area more than 25,000 square feet shall be
designed, installed, and controlled to serve isolation areas, per Section 122(g).
PARKING RATIO:
Unit No.
0101 01-100
0101 01-120
0101 01-140
0101 01-150
0201 02-A
0201 02-8CKLM
0201 02-D&E
0201 02-F
0201 02-G
0201 02-H,l&J
0301 03-Q
0301 03-R
0301 03-S
0301 03-N&O**
0301 03-P**
0401 04-100
0401 04-120
TOTAL SQ.FT.
TOT AL SPACES
* * D& T new space
22 3 r F%~D/o/
KOLL COMMERCE CENTER
PARKING STUDY
PHASE 1
4 spaces per 1,000 s.f. of office
1 space per 1,000 s.f. of warehouse.
Office Warehouse
3,515 0
2,550 0
1,600 0
1,686 0
1,009 1,009
9,820 1,091
599 3,392
776 1,163
291 1,648
1,329 5,315
1,003 1,002
732 2,929
0 1,023
4,055 0
2,125 0
7,085 0
2,146 0
40,320 18,573
160 19
C:\_WRKFLS\HOUSKEEP\NEWSPACE.XLS Print Date: 4/1/96
~ Pc-foo/ 11'1 /JN/J o0IL -t"o f;'GJt-yAI lo ""t-1flfL
f/s8-l[e-G J
Total
3,515
2,550
1,600
1,686
2,018
10,911
3,991
1,939
1,939
6,644
2,005
3,661
1,023
4,055
2,125
7,085
2,146
58,893
179