Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
2245 CAMINO VIDA ROBLE; ; CB880737; Permit
DECLARATIONSLENDERWORKER'S COMPENSATION OWNERJBUILDER CONTRACTOR While — Inspector Green — (1) Finance Yellow — Assessor Pink — Applicant Gold — Temporary File -SPECIAL CONDITIONS^J •!!•*V< — 1 i BUILDING^^rNB?^X ^r>CO^\->\~i»\3mci>2O>|-~^*.L*\?^ELECTRICALf\-• —s \\PLUMBING:*T]1-CALL FOR FINAL INSPECTION WHEITEMS ABOVE HAVE BEEN tg<i»5?' 3)oT33)s~-»rri VENTILATING SYSTEMSHEAT — AIR COND. SYSTEMS\4^ i • i • • • •&-t)UCT & PLEM., D REF. PIPING\x$*1SmnI>Z^BO>rJ D BONDING D POOLD ELECTRIC SERVICE D TEMPORARYROUGH ELECTRIC•N\ V\1 D ELECTRIC UNDERGROUND O UFFERi\Si ELECTRICALD WATER HEATER D SOLAR WATEROCOmW TUB AND SHOWER PANTOP OUT D WASTE D WATERUNDERGROUND D WASTE Q WATERnwmmjjzoCDOOD^OO PLUMBINGI^INTERIOR LATH & DRYWALL^TVv INSULATION |\j\EXTERIOR LATH•FRAME |^^^SHEATHING D ROOF D SHEAR |L -\^J1 SUB FRAME D FLOOR S'CEILINGN.'^GUNITE OR GROUT f /^Cv0 S>1H-<REINFORCED STEEL |FOUNDATION |^^;- 1 j -^^zmn ,- o •i! "f" • f ,:Jrmi> S <r,r--. Z JD < UJ TO ^w u; m ^ • -i T TlmDg rn O Z ; 1 O TJ0 0Z Wo HJj H H Zm i_n 'Zm O TJO -00^33 JJ[^ rn O o </><: — im 13JJ Cro (~>O -i0 CO -jj TJ >tr, r- OOZ O3D•nHrr Tl TJ COO JJ OZ ° "~> H O6°i z >111 <- TJ 0m 2tn TJ O -H Oz o m m 00 m ^ D Z "°TJ 0^ C/) O m TJ-mOc jjm D en mO > _Z mO— ) O TJm O O Cfl O m TlmD Z C/) TJmOH O JJm O 33O BUILDINGTImgm01TJmgO3) 09 * 3\^>j ^\ j Citp of Carlsfbab REQUEST FOR INSPECTION RECORD INSPECTO OWNER FOUNDATION C FOOT REINFORCING STEEL MASONRY GROUT - GUNITE FLOOR AND CEILING SUB FRAME SHEATHING il ROOF ij SHEAR FRAME EXTERIOR LATH INSULATION INTERIOR LATH OR DRYWALL FINAL TEMPORARY SERVICE UFFER GROUND ELECTRIC UNDERGROUND ROUGH ELECTRIC PLUMBING UNDERGROUND PLUMBING SEWER AND PL/CO TOP OUT PLUMBING TUB OR SHOWER PAN GAS TEST WATER HEATER SOLAR WATER FINAL ELECTRIC SERVICE FINAL SOLAR i , PATIO , ; POOL i i SIGN ij GRADING u DRIVEWAY ij FINAL SPA SPECIAL INSTRUCTIONS Ready For Inspec1(io D A.M. n P.M. Wednesday Thursday j Friday FINAL BUILDING INSPECTION PLAN CHECK NUMBER: PROJECT NAME: ADDRESS: PROJECT NO.: TYPE OF UNIT: CONTACT PERSON:. CONTACT TELEPHONE:. 330737 DATE: Puritan-Barmen Corp 2243 Camino Vida Robl* UNIT NUMBER: comm Tl NUMBER OF UNITS: PHASE NO.: Mike 7St?~f>11/ "»/ i i. I I INSPE BY: INSPECTED BY: INSPECTED BY: DATE INSPECTED: DATE INSPECTED: DATE INSPECTED: APPROVED APPROVED APPROVED o(DISAPPROVED DISAPPROVED DISAPPROVED COMMENTS: Rev. 1/86 WHITE: Suspense BLUE: Water District GREEN: Engineering CANARY: Utilities PINK: Planning GOLD: Fire FINAL BUILDING INSPECTION PLAN CHECK NUMBER: PROJECT NAME: ADDRESS: PROJECT NO.: TYPE OF UNIT: CONTACT PERSON:. CONTACT TELEPHONE:. 880737 Puritan-Bennett Corp DATE:9-14-i 22KS Camlno YicU Rohte UNIT NUMBER: conim Tl NUMBER OF UNITS: PHASE NO.: 7*7-1211 bidg, engin, plan, fire, h2o INSPECTED BY: INSPECTED BY: •___ INSPECTED BY: DATE INSPECTED: DATE INSPECTED: DATE INSPECTED: APPROVED APPROVED APPROVED DISAPPROVED DISAPPROVED DISAPPROVED COMMENTS: Rev. 1/86 WHITE: Suspense BLUE: Water District GREEN: Engineering CANARY: Utilities PINK: Planning GOLD: Fire FINAL BUILDING INSPECTION RECEIVED SEP 1 5 tSB8 PLAN CHECK NUMBER. PROJECT NAME: ADDRESS: PROJECT NO.: TYPE OF UNIT: CONTACT PERSON:. CONTACT TELEPHONE:, 0B0737 Puritan-Bennett Corp Camino Vida H UNIT NUMBER: im TI DATE: NUMBER OF UNITS: PHASE NO.; 7*7-1211 INSPECTED BY: INSPECTED BY: DATE INSPECTED: DATE INSPECTED: DATE INSPECTED: APPROVED APPROVED APPROVED DISAPPROVED DISAPPROVED DISAPPROVED COMMENTS://rt 7 Rev. 1/86 WHITE: Suspense BLUE: Water District GREEN: Engineering CANARY: Utilities PINK: Planning GOLD: Fire FINAL BUILDING INSPECTION PLAN CHECK NUMBER: PROJECT NAME: ADDRESS: PROJECT NO.: TYPE OF UNIT: CONTACT PERSON:. CONTACT TELEPHONE:. 880737 DATE: Puritan-Bennett Corp Casino Vida r?oble UNIT NUMBER: J Ti NUMBER OF UNITS: PHASE NO.: 747-1211 bidy, engirt, plan, fire, h2o INSPECTED BY: INSPECTED BY: INSPECTED BY: __ DATE INSPECTED: DATE INSPECTED: DATE INSPECTED: 9 '98-8 APPROVED APPROVED APPROVED DISAPPROVED DISAPPROVED DISAPPROVED COMMENTS: UOStaRear Municipal WaterDTstno* Engineering Department (619)438-3367 BLUE; Water District GREEN: Engineering CANARY: Utilities PINK: Planning GOLD: Fire DEVELOPMENT PROCESSING SERVICES DIVISION 2075 LAS PALMAS DRIVE CARLSBAD, CA 92009-4859 (619)438-1161 MISCELLANEOUS FEE RECEIPT Applicant Please Print And Fill In Shaded Area Only PLAN ID NO. 0018 06/07 OiOi OSHisc- 413-00 VALIDATION AREA CITY ESTMATED VALUATION PLAN CHECK FFF 001-810-00-00-8621 IF THE APPLICANT TAKES NO ACTION WITHIN 180 DAYS, PLAN CHECK FEES WILL BE FORFEITED. CHECK IF SUBMITTED: a 2 ENERGY CALCS M//T a 2 1987 ENERGY CALCS FOR NON RESIDENTIAL BLDGS a 2 STRUCTURAL CALCS V/S D 2 SOILS REPORTS tiff a 2 SELF ADDRESSED ENVELOPES DATE GIVEN/ SENT TO APPLICANT DATE APPLICANT'S SIGNATURE White - File Yellow •'Applicant Pink - Finance Gold - Assessor Citp of Cartefaab REQUEST FOR INSPECTION RECORD INSPECTOR OWNER BUILDING D FOUNDATION a FOOTING D SLAB :: REINFORCING STEEL r MASONRY I GROUT -GUNITE T FLOOR AND CEILING SUB FRAME L_: SHEATHING ID ROOF D SHEAR n FRAME T EXTERIOR LATH [' INSULATION C INTERIOR LATH OR DRYWALL P FINAL ELECTRICAL D TEMPORARY SERVICE D UFFER GROUND D ELECTRIC UNDERGROUND n ROUGH ELECTRIC D POOL BONDING Q-EtECTRIC SERVICE D FINAL "X PLUMBING T UNDERGROUND PLUMBING r SEWER AND PL/CO U TOP OUT PLUMBING G TUB OR SHOWER PAN D GAS TEST D WATER HEATER L:i SOLAR WATER G FINAL : CONDITIONED AIR SYSTEMS n SOLAR HEAT D PATIO D POOL G SPA (2 SIGN G GRADING G DRIVEWAY D FINAL SPECIAL INSTRUCTIONS Ready For Inspection: D Monday D A.M. D P.M. D Tuesday D Wednesday Friday Citp of Cartebab REQUEST FOR INSPECTION RECORD INSPECTOR OWNER ADDRESS PERMIT NO.Ho BUILDING n REINFORCING STEEL D MASONRY U GROUT-GUNITE [1 FLOOR AND CEILING SUB FRAME II SHEATHING D ROOF D SHEAR n FRAME D EXTERIOR LATH D INSULATION D INTERIOR LATH OR DRYWALL D FINAL ELECTRICAL TEMPORARY SERVICE UFFER GROUND ELECTRIC UNDERGROUND ELECTRIC D POOL BONDING D ELECTRIC SERVICE D Ell PLUMBING D UNDERGROUND PLUMBING D SEWER AND PL/CO D TOP OUT PLUMBING D TUB OR SHOWER PAN D GAS TEST D WATER HEATER D SOLAR WATER D FINAL MISCELLANEOUS D CONDITIONED AIR SYSTEMS D SOLAR HEAT 1 PATIO POOL D SPA D SIGN D GRADING D DRIVEWAY D FINAL SPECIAL INSTRUCTIONS Ready For Inspection: D Monday D A.M. D P.M. D Tuesday D Thursday D Friday W-c^^-v J 0 ESGIL CORPORATION 9320 CHESAPEAKE DR., SUITE 2O8 SAN DIEGO, CA 02123 (619) S6O-1468 DATE:All AUAT JURISDICTION: /L n Y 0 PLAN CHECK NO:SET: PROJECT ADDRESS / D fi . >? PROJECT NAME: T£t}filJ-T _ IECKERQFILE COPY DESIGNER The plans transmitted herewith have been corrected where necessary and substantially comply with the jurisdiction's building codes. The plans transmitted herewith will substantially comply with the jurisdiction's building codes when minor deficien- cies identified ; are resolved and checked by building department staff. The plans transmitted herewith have significant deficiencies identified on the enclosed check list and should be corrected and resubmitted for a complete recheck. The check list transmitted herewith is for your information. The plans are being held at Esgil Corp. until corrected plans are submitted for recheck. The applicant's copy of the check list is enclosed for the jurisdiction to return to the applicant contact person. (| The applicant's copy of the check list has been sent to: Esgil staff did not advise the applicant contact person that plan check has been completed. I1 Esgil staff did advise applicant that the plan check has — been completed. Person contacted: Date contacted: REMARKS: Telephone # ESGIL CORPORATION Enclosures: ESGIL CORPORATION 9320 CHESAPEAKE DR., SUITE 2O8 SAN DIEGO, CA 92123 (619)560-1468 DATE:JULV £Q. J??P JURISDICTION: PLAN CHECK NO: (LiTJ Of SET: TT PROJECT ADDRESS: PROJECT NAME: (Lfiymtib VIQA JJURISDICTI01 ^_. AM CHECKER [jFILE COPY QUPS fjDESIGNER tT£,L>fil D The plans transmitted herewith have been corrected where necessary and substantially comply with the jurisdiction's building codes. The plans transmitted herewith will substantially comply with the jurisdiction's building codes when minor deficien- cies identified _ ; _ are resolved and checked by building department staff. The plans transmitted herewith have significant deficiencies identified on the enclosed check list and should be corrected and resubmitted for a complete recheck. The check list transmitted herewith is for your information. The plans are being held at Esgil Corp. until corrected plans are submitted for recheck. The applicant's copy of the check list is enclosed for the jurisdiction to return to the applicant contact person. The applicant's copy of the check list has been sent to: firm*.SftA)D/ran. Esgil staff did not advise the applicant contact person that plan check has been completed. Esgil staff did advise applicant that the plan check has been completed. Person contacted: Date contacted: REMARKS: Telephone I Enclosures; ESGIL CORPORATION n .R T SO 1 C T 1 ON :Da t c ADDRESS: p8 PLAN CORRECTION SHCET -Ian? Check No FOREWORD! PLEASE READ Plan check is limited to technical requirements contained in the Uniform Building Code, Uniform Plumbing Code, Uniform Mechanical Code, National Electrical Code and state laws regulating energy conservation, noise attenuation and access for the handicapped. The plan check is based on regulations enforced by the Building Inspection Department. You may have other corrections based on laws and ordinances enforced by the Planning Department, Engineering Department or other departments. The items circled below need clarification, modification or change. All circled items have to be satisfied before the plans will be in conformance with the cited codes and regulations. Per Sec. 303 (c), of the Uniform Building Code, the approval of the plans does not permit the violation of any state, county or city law. A. PUNS Please make all corrections on the original tracings and submit two new sets of prints, and any original plan sets that may have been returned to you by the jurisdiction. To facilitate rechecking, please identify, next to each circled item, the sheet of the plans upon which each correction on this sheet hag been made and return this check sheet »tth the revised plans. 0 The following items have not been resolved from previous plan reviews. The original correction number has been given for your reference. Please contact me if you have any questions regarding these items. Data plans received by plan checker 7/13/P.P Date iTL plan check completed (&) a, sfitss ft /Of TO ±. & A^TT^)f£fJ rft * II t f 1 1 It ESGIL CORPORATION 9320 CHESAPEAKE DR., SUITE 208 SAN DIEGO, CA 92123 (619) 56O-1468 DATE: _ J/JUr iL.ft?? _ Q APPLICANT JURISDICTION: q /T V OA CiJP-PL^rO _ QPLAN CHECKERDFILE COPY PLAN CHECK NO: 2?- r/^1 _ SET: . "Zl- _ DUPS [J DESIGNER . PROJECT ADDRESS; ^ta</5" G&mtrm \///0# £*£££ PROJECT NAME: T&/JMT The plans transmitted herewith have been corrected where necessary and substantially comply with the jurisdiction's building codes. The plans transmitted herewith will substantially comply with the jurisdiction's building codes when minor deficien- cies identified _ are resolved and checked by building department staff. D The plans transmitted herewith have significant deficiencies identified on the enclosed check list and should be corrected and resubmitted for a complete recheck. The check list transmitted herewith is for your information. The plans are being held at Esgil Corp. until corrected plans are submitted for recheck. D The applicant's copy of the check list is enclosed for the jurisdiction to return to the applicant contact person. The applicant's copy of the check list has been sent to: Esgil staff did not advise the applicant contact person that plan check has been completed. "| Esgil staff did advise applicant that the plan check has been completed. Person' contacted: RftVCr r^jlJt£u Date contacted: Telephone # <P39 ~ REMARKS: By; u^^_^ aJjL,^ Enclosures : IMup/^p TT ESGIL CORPORATION y FLAH COKKECnOB SHEET xmAHT PUR CHECK NO.:. JURISDICnOH: 8%-93*7 TO: PROJECT DATA OCCUPANCY: BUILDING USE:0 TYPE OF ACTUAL AREA: LU— hi ALLOWABLE AREA:. STORIES: HEIGHT: SPRINKLERS: OOCOPARX LOAD: REMARKS: Date plans received by jurisdiction: Date plans received by Esgil Corporation: 9 Date initial plan check completed: Bv: Applicant contact person: Tel . FOREHCRD: PlgASE READ Plan check is limited to technical requirements contained in the Uniform Building Code, Uniform Plumbing Code, Uniform Mechanical Code, National Electrical Code and state laws regulating energy conservation, noise attenuation and access for the handicapped. The plan check is based on regulations enforced by the Building Inspection Department. You may have other corrections based on laws and ordinances enforced by the Planning Department, Engineering Department or other departments. Code sections cited are based on the 1985 UBC. The circled items listed need clarification, modification or change. All items must be satisfied before the plans will be in conformance with the cited codes and regulations. Per Sec. 303(c)j, 1985 Uniform Building Code, the approval of the plans does not permit the violation of any state, county or city law. To speed up the recheck process, note on this list for a copyX where each correction item hAS been addressed, i.e.. plan sheet, specificatj.onT etc^ Be sure to enclose the marked UP list when you submit the revised plans. HOIK: FAGS BOMBERS ARE mm SHJUHU AS PACTS HAVITC IK) HKHS HEEDHC CCRRECTIGMS WERE EELZHD. LIST NO. 90, TENANT IMPROVEMENT WITHOUT SPECIFIC ENERGY ZONE DATA OR POLICY SUPPLEMENTS, 1985 UBC Please make all corrections on the original tracings and submit two new sets of prints, and any original plan sets that may have been returned to you by the jurisdiction, to: Esgil Corporation, 9320 Chesapeake Drive, Suite #208, San Diego, CA 92123, (619) 560-1468. Please make all corrections on the original tracings and submit two new sets of prints, and any original plan sets that may have been returned to you by the jurisdiction, to: The jurisdiction's building department. Indicate on the Title Sheet of the plans, the name of the legal owner and name of person responsible for the preparation of the plans. Section 302(a)7. Each sheet of the plans must be signed by the person responsible for their preparation, even though there are no structural changes. Business and Professions Code. Plans and calculations shall be signed by the California state licensed engineer or architect where there are structural changes to existing buildings or structural additions. Please include the California license number, seal, date of license expiration and date plans are signed. Business and Professions Code. Provide the correct address and suite number of tenant space on the plans. Section 302. Provide a note on the site plan indicating the previous use of the tenant space or building being remodeled. Section 302. When the character of the occupancy or use changes within a building, the building must be made to comply with current Building Code requirements for the new occupancy. Please provide complete details to show the building with comply. Section 502. UBC Section 304 requires the Building Official to determine the total value of all construction work proposed under this permit. The value shall include all finish work, painting, roofing, electrical, plumbing, heating, air conditioning, elevator, fire extinguishing systems and any other permanent equipment. Please provide a signed copy of the designer's or contractor's construction cost estimate of all work proposed. Provide a plot plan showing the distance from the building to the property lines and the location of tenant space (or remodel) within the building. /• On the first sheet of the plans indicate: Type of construction of the existing building, present and proposed occupancy classifications of the remodel area and the occupant load of the remodel areas and the floor where the tenant improvement is located. Provide a statement on the Title Sheet of the plans that this project shall comply with Title 24 and 1985 UBC, UMC and UPC and Z98fY NEC. Provide a fully dimensioned floor plan showing the size and use of all rooms or areas within the space being improved or altered. Draw the plans to scale and indicate the scale on the plan. Indicate the use of all spaces adjacent to the area being remodeled or improved. Show any existing fire rated area separation walls, occupancy separation walls, demising walls, shafts or rated corridors. Identify and provide construction details for proposed new fire rated walls. Specify on the plans the fire ratings of assemblies to protect proposed openings in existing or new fire walls. Identify existing walls to be removed,existing walls to remain and proposed new walls. Identify bearing walls, non-bearing walls, and shear walls.©Provide a section view of all new interiorpartitions. Show:Type, size and spacing of studs.Indicate gauge for metal studs. Specify manufacturer and approval number or indicate "to be ICBO approve^*7! ~™ Method of attaching top and bottom plates to structure. (NOTE: Top of partition must be secured to roof or floor framing^ unless suspended ceil ing has been des igned for partition lateral load). Wall sheathing material and details of attachment (size and spacing of fasteners). Show height of partition and suspended ceiling, and height from floor to roof framing or floor framing. 1/6/88 Provide notes and/or details to show that the floor and wall finish in toilet rooms are surfaced with a smooth hard non-absorbent material extending five inches up the wall. Similar surfacing shall be provided on the walls from the floor to a height of 4 feet around urinals and within water closet compartments . Section 510(b). Note on the plans: "All interior finishes must comply with Chapter 42 of the UBC". Specify "class 1J±- flame spread rating (minimum) for Lateral bracing for suspended ceiling must be provided. (UBC Table 23-J) Where ceiling loads are less than 5 PSF and not supporting interior partitions, ceiling bracing shall be provided by four No. 12 gauge wires secured to the main runner within 2 inches of the cross runner intersection and splayed 90_ from each other at an angle not exceeding 45_ from the plane of the ceiling. These horizontal restraint points shall be placed 12 feet o.c. in both directions with the first point within 4 feet of each wall. Attachment of restraint wires to the structure above shall be adequate for the load imposed. In buildings having floors and roofs of wood frame construction, other than dwelling or hotel occupancies, draft stop the area between the ceiling and floor abovq so that no concealed space exceeds 1 , 000 s . f . and no horizontal dimension exceeds 60 L.F. (if space has sprinklers, then 3,000 s.f. and 100 L.F.). In buildings having floors and roofs of wood frame construction, other than dwelling or hotel occupancies, draft stop the area between the ceiling and roof above so that no concealed space exceeds 3,000 s.f. and no horizontal dimension exceeds 60 L.F. (if space has sprinklers, then 9,000 s.f. and 100 L.F.). The tenant space and new and/or existing facilities serving the remodeled area must be accessible to and functional for the physically disabled. See the attached correction sheet. Title 24, Part 2. The width of the required level area on the side into which doors swing shall extend 24 inches past the strike edge for exterior doors and 18 inches past the strike edge for interior doors. Section 2-3304, Title 24. Specify lever-type hardware for passage doors on floors accessible to the disabled. Section 2-3304, Title 24. If both sexes will be employed and the number of employees exceeds four, provide separate toilet facilities for men and women. If "both sexes will be employed and the total number of employees will not exceed four", and only one restroom is provided, note the words in quotation above on the floor plan. Section 705. In areas where the occupant load exceeds two exits are required. See . Table 33-A. Provide an exit analysis plan (may be 8 1/2" x 11" or any convenient size). Exits should have a minimum separation of one- half the maximum overall diagonal dimension of the building or area served. Section 3303(c). The maximum number of required exits and their required separation must be maintained until egress is provided from the structure. Section 3303(a). Rooms with more than 10 occupants may have one exit through one adjoining room. Revise exits to comply. Section 3303(e). Exit signs are required for exits serving an occupant load exceeding 49. Show all required exit sign locations. Section 3314(a). Show that exits are lighted with at least one foot candle at floor level. Section 3313(a). Show the locations of existing exits from the building and show the path of travel from the remodel area to the existing exits. Note on the plans: "All exits are to be openable from inside without the use of a key or special knowledge". In lieu of the above, in a Group B occupancy, you may note "Provide a sign on or near the exit doors reading IBIS DOOR TO REMAIN UNLOCKED DURING BUSINESS HOURS". Section 3304(c). Exit doors should be a minimum size of 3 feet by 6 feet 8 inches with a minimum door swing of 90 degrees. Maximum leaf width is 4 feet. Section 3304(e). Exit doors should swing in the direction of egress when serving an occupant load of 50 or more or when serving any hazardous area. Section 3303(b). Applies to door(s) 2/2/88 f- A. Regardless of occupant load, a floor or landing not more than 1/2 inch below the threshold is required on each side of an exit door used for disabled access (may be 1" maximum where not used for disabled access). Section 3304(h). Doors should not project more than 7 inches into the required corridor width when fully opened, nor more than one-half of the required corridor width when in any position. Section 3305(d). Revolving, sliding and overhead doors are not permitted as exit doors if the occupant load exceeds 9 or the exit door serves a hazardous area. Section 330**(g). Exit doors from assembly rooms with 50 or more occupants shall not be provided with a latch or lock unless it is panic hardware. Section 3318. Double acting doors are not allowed when serving a tributary occupant load of more than 100, or when part of a fire assembly, or part of smoke and draft control assemblies or when equipped with panic hardware. Section 3304(b). Corridors must provide continuous protection to the exterior of the building. Interruptions by an intervening room is not permitted. Foyers, lobbies or reception rooms constructed as required for corridors are not considered intervening rooms. Section 3305. Corridors and exterior exit balconies serving 10 or more occupants must be a minimus W» inches wide and 7 feet high to the lowest projection. Section 3305(b). When a corridor or exterior exit balcony isaccessible to the handicapped, changes in elevations shall be made by means of a ramp. Section 3305(f). When two exits are required, dead end corridors and exit balconies are limited to 20 feet. Section 3305(e). Corridors serving 30 or more have walls and ceilings construction except: occupants shall of one-hour /•Corridors greater than 30 feet wide when the occupants have an exit independent from the corridor. Exterior sides of exterior exit balconies. One story buildings housing Group B, Division 4 occupancies. Section 3305(g). f If non-rated corridors are used per 1985 UBC, Section 3305(g), Exc. 5, provide a reference to the corridors on the floor plan, noting: Corridors are non-rated per 3305(g), Exception 5, 1985 UBC. Section Smoke detection system must be listed by the State Fire Marshal 1 and be a supervised low voltage system with combination audible and visual signals with battery backup. Smoke detectors center. shall be maximum 30' on (fc.) Combined audible/visual signal device(s) shall be installed just inside of each exit door from the corridor, also all locations in the corridor must be in sight of a signal device. . 5.) Power supply shall be dedicated branch ^"^ circuit. Circuit disconnecting means shall be accessible only to authorized personnel and shall be clearly marked " FIRE AIARM CIRCUIT CONTROL, with a lock- on device. 1985 UBC Section 3305(g), Exception 5, cannot be used for non-rated corridors in a fully sprinklered office space if the occupant load in the space exceeds 100. 1985 UBC Section 3305(g), Exception 5, is applicable to the office space but does not apply to the common corridor where the tributary occupant load appears to exceed 100 occupants. When 1985 UBC Section 3305(g), Exception 5, is applied for corridors on one floor, the corridors on the lower level(s) must be rated if these lower corridors serve more than 100 occupants. The tributary load from the upper level(s) shall be the total occupant load from the above level(s). Clearly show where the non-rated corridor system terminates and a rated corridor system commences. One-hour fire-rated corridors shall have door openings protected by tight-fitting smoke and draft control assemblies rated 20 minutes, except openings in interior walls of exterior exit balconies. Doors shall be maintained self-closing or be automatic-closing by action of a smoke detector per Section *»306(b). Doors shall be gasketed to provide a smoke and draft seal where the door meets the stop on sides and top. Section 3305(h). 2/24/88 /• fi- Show rated corridors, lobbies, reception or foyers cross-hatched on the floor plans. Total area of all openings, except doors, in any portion of an interior corridor, shall not exceed 25 percent of the area of the corridor wall of the room which it is separating from the corridor. Such openings shall be protected by fixed, approved 1/4 inch thick wired glass installed in steel frames. Section 3305(h). Provide a complete architectural section of the corridor, or exterior exit balcony, showing all fire-resistive materials and details of construction for all floors, walls, ceiling and all penetrations. Section 3305(g). if fXtePT/b rt) SfZTtou $3$4(-<t.j /i/ji-^jsc^Show the location of fire dampers. Provide fire dampers at duct penetrations of fire- rated occupancy and area separations, shafts and corridor walIs and cei1ings. Section 4306(j). If building exceeds two stories, show corridor is separated from elevator shaft. Sections 3304(g)(h) and 1706(a)(b). (See I.C.B.O. interpretation). /• X Provide evidence of Health (for restaurants or for equipment). EUETRICAL Department approval tenants using X-ray Submit plan showing location of all panels. . Submit panels schedules. Submit electrical load calculations 64. Indicate existing service size. 65. Indicate existing building load. Indicate new additional loads. . Indicate wiring method. i . Show exit signs on the electrical lighting plan. Note: Power for exit lights and emergency lighting must conform to the 1985 UBC Sections 3313 and 3314. . Provide receptacle(s) within 25' of the roof mounted A/C units. UMC Section 509. 70. Provide multiple switch lighting controls perCAC, Title 24, 2-5319. 7/1 Provide an electrical plan for the alarm system ' showing compliance with criteria describedunder earlier correction number 49. . yf. /*• j*. MECHAHICAL Provide mechanical ventilation in all rooms capable of supplying a minimum of 5 cubic feetper minute ox outside air with a total circulation of not less than 15 cubic feet per minute per occupant. Section 605 and 705, UBC. Provide mechanical plans showing existing and proposed HVAC equipment, ducts and access to equipment. Detail access equipment. and working clearances to HVAC Cooling coils or cooling units located in attic or furred space, where damage may result from condensate overflow, shall be provided with an additional water tight pan of corrosion resistant material to catch overflow if primary condensate drain becomes clogged. Section 1205, UMC. One-hour corridors shall not be used as an integral part of a duct system. This includes the space above a dropped ceiling within the one-hour corridor. UMC Section 706(b). TUMBIHG Provide gas line plans and calculations, showing pipe lengths and gas demands. UPC Section 1219. Provide drain, waste and vent plans. Provide water line sizing calculations. UPC Section 1009. Detail how maintained. priming). floor drain trap seal is to be UPC Section 707 (floor drain trap Show P & T valve on water heater and detail drain line route from P & T valve to the exterior. UPC Section 1007(e). Show 1/4" per 12" slope on drain and waste lines. UPC Section 407. EXEKGY Provide complete energy design calculations, including all existing design and new energy design for this building. See attached non- residential energy design checklist. For remodels in an existing conditioned space,show that the remodeled space will use not more energy than the existing space or showthe remodeled space will conform to latest energy design standards. 2/2/88 85.) Please see additional corrections or remarks that follow. Hie jurisdiction has contracted with Esgil Corporation located at 9320 Chesapeake Drive, Suite 208, San Diego, California 92123; telephone number of 619/560-1U68, to perform the plan check for your project. If you have any questions regarding these plan check items, please contact at Esgil Corporation Thank you. Enclosures: 1. 2. 3. 2/2/88 © SHELL BUILDING FIRST GENERATION NONRESIDENTIAL ENERGY FOREWORD If any part of the energy design for the shell building had previously been approved under the First Generation Non- residential Standards, the rest of the energy design can be completed for each of the first tenants under the standard design originally used for the shell building, as long as copies of the original approved energy design are provided and the new design follows the original approved design. Provide all new, and existing, energy designs subject to this building and this project. Complete the Certificate of Compliance (CF-1) (See attached "Guideline for Completing Form CF-1 when First Generation Nonresidential Standards are used"). 1/88 GUIDELINE FOR COMPLETING FORM CF-1 WHEN FIRST GENERATION NON-RESIDENTIAL STANDARDS ARE USED.. FOREWORD The values for the Certificate of Compliance, form CF-1, for first generation nonresidential buildings may be readily determined from information on compliance forms for those standards, and is quite simple for anyone familiar with basic heal transfer and simple HVAC design for buildings. Those not having this basic understanding should avoid responsibility for energy compliance documentation. In some cases U may be beneficial to use the new forms CF-2, CF-3, CF-4, & CF-5 as worksheets to calculate the values for entry onto CF-1. The CF-1 is not necessarily a summary of compliance information for the building although it may also serve such a purpose. The CF-1 il the set of requirements imposed on all future alterations until compliance is redemons- trated for the building as a whole. or until an entirely new set of regu- lations supersedes the CF-1- The new standards are in effect standards for whole buildings that allow tradeoffs in various aspects of building design. For example, the designer may convince the building owner or her/his agent to build an all glass daylight-designed envelope which requires daylighting controls on all lights. All future tenants would be required to install daylighting controls on all lights as specified in a CF-1 unless the whole building was shown to. comply with the standards. Because of this use of the CF-1, the proposed entries are the same as the required entries for first generation applications, since what has been designed and proposed will be what is required for alterations. CORRECTIONS (OIHOLDD NUMBERS INDICATE ITEMS NEEDING CORRECTION) 1. Line 5 - The Rt values for roofs (incl. roof/ceilings), floors (incl. "soffits"), and walls may be readily determined from either CF-2 or Form 2 for the first generation standards. When using Form 2, the area weighted Rt value is found by taking entry 19 divided by entry 20 of Form 2. 2. Line 7 The floor Rt value may be calculated from the entries on Form 2. In fact, the floor Rt is equal to entry 44 divided by entry 45 on Form 2 or the inverse-of U0f. Line 9 Similarly the wall Rt may be found from the data used to calculate the entries 1. and 2. of Form 2. The wall areas may be taken from Form 2 and the product of the wall areas and their U values' (also entered on Form 2) should be summed. The sum of the U values times the corresponding wall areas should be divided into the sum of the same wall areas to yield the wall Rt- For the CF-1 only the opaque wall areas should be included in the totals and the HCF factor used in Form 2 is not used. 1/88 4. Line 10 The heat capacity for the opaque walls can be determined from the wall weight per square foot of area given on Form 3 for the first generation nonresiden- tial standards and Table 3-5 on page 3-11 of the EEM (publication #P400-86- 010). Or Table 3-5 may be used directly. It may be necessary to calculate an area-weighted average heat capacity. If so, it is advised that the applicant document this calculation using the format of the new CF-2 form to organize this calculation. Optionally the applicant may list the heat capacities and wall areas separately and include them as an integral part of the CF-1. 5. Line 12 The exterior wall area entry for CF-1 is the same as entry no. 7 on Form 2 for the first generation standards. 6. Line 13 Total glazing area is the same as entry no, 5 on Form 2. 7. Line 14 The proposed (and required) percent is calculated as indicated on the CF-1 form. 8. Line 15 The average shading coefficient is the area-weighted shading coefficient for all glazing in walls. This value may be determined from the part of the data used to calculate entry 15 on Form H. Again it would be more useful to transfer this data to the section called Glazing in Walls on page 2 of CF-2 to calculate the area-weighted averages if you are unfamiliar with such calculations. See the instructions regarding CF-2 for more details. 9. Line 16' For first generation standards, the allowed equals the proposed as long as -compliance is met for the Uovera]i and OTTV calculations on Form 2.- 10. Line 17 Determine the areas of the west-facing (+45 degrees) walls and windows from both the plans and Form 2. Enter the sum of these areas on ine 17. 11. Line 18 Enter the total west-facing glazing area on Line 18. 12. Line 19 Divide Line 18 by Line 17 and muliply times 100 and enter on Line 19. 13. Line 20 Calculate the area-weighted shading coefficient for the west-facing glazing using form CF-2 if necessary. Enter this value on Line 20. 14. Line 21 If your OTTV meets the requirements of the regulations, enter the proposed west glazing percent from Line 19 onto Line 21. 1/88 15. Lines 22 to 29 . .Document the areas of skylights used in the project. Again for the first generation standards the proposed areas - the allowed areas so long as the requirements of the Uoverall and OTTV limits are met. 16. Line 30Enter the total of the column called Design Watts from all Form 5 pages on Line 30. Note that- the first generation standards have no credits for special lighting controls. 17. Line 31 Enter the total of the column called Allotted Watts from all Form 5 pages on Line 31. 18. Line 32 . ' . •You may enter N/A for not applicable or you may select one of the HVAC sets for the appropriate climate zone for offices. 19. Line 33 Calculate the total wattage of all ventilation fans used to move ventilation air at design cooling conditions for the space. Enter this value as Line 33. . You may use any information or defaults established for the second generation standards. Likewise the use of CF-4 a'nd its instructions may assist your calculations, although you are not required to submit it. 20. Line 34 Enter the entry on Line 33. 21. Line 35 You may either calculate the CPI or you may enter the installed cooling capacity and EER of the cooling equipment instead. If you enter the in- stalled capacity of equipment and the EER, so indicate. Please note that this becomes a maximum capacity for the space in question and a minimum EER for that space for all future alterations. 22. Line 36 ' Either re-enter the CPI calculated for Line 35 or use this line to enter the minimum EER to be installed that complies with the regulations. 23. Line 37 Similar to Lines 35 & 36 you may either calculate the HP! based on your equipment, choose a reasonable HPI from the second generation ACPs, or enter the maximum heating capacity and minimum efficiency for the heating equipment for the space. If the latter choice is. entered you need to indicate the units for capacity and efficiency measure if applicable and the particular measure of efficiency used (steady state, COP, ACOP, AFUE, etc.). 24. Line 38 Either re-enter the value for HPI on line 37 or enter the minimum efficiency to be installed and allowed for all future alterations. 1/88 SECOND GENERATION NON-RESIDENTIAL STANDARDS (APPLICABLE TO PERMIT APPLICATIONS SUBMITTED AFTER JANUARY 1, 1987 FOR OCCUPANCIES A, B, E, OR H FOR NSW BUILDINGS, INCLUDING "SHELL AND "SPECULATIVE" BUILDINGS, AND TENANT IMPROVEMENTS AND OTHER ALTERATIONS AND ADDITIONS) APPLICATION OF THE STANDARDS © © © © A Certificate of Compliance (Porn CF-1) gust be Included with all building permit applications submitted after January 1, 1987, subject to energy conservation i.e., second generation non-residential standards, first generation non-residential standards adopted in 1982, single family homes and apartment buildings and other low-rise residential buildings of three stories or less and first generation residential standards for hotels and motels and high-rise residential buildings of four stories or more. The Certificate of Compliance must be signedby the professional (or professionals) responsible for design and the owner. These signatures represent a commitment to make future buildingImprovements or modifications according to the standards indicated on the Certificate of Compliance. Section 1403 (all of the standards requires that the energy calculations be signed by a person eligible to sign the plans under the Business and Professions Code. Under the terms and restrictions of some licenses, for example, an electrical engineer may be able to sign some documents and specifications each as electrical plans and lighting energy documentation, but no HVAC plans and documenta- tion. The section does not require that the documen- tation be prepared by a licensed person, only that the documentation be signed by an authorized person who will take responsibi- lity for their correctness In showing compliance with the building energy efficiency standards. For example, computer runs and calculations that are prepared by an unlicensed energy consultant must be signed by the responsible person, such as a registered architect or civil engineer. 4.)k copy of Form CF-1, complete and signed. Bust be permanently printed on the plans. This enables the code enforcement official to verify that the copies of form CF-1 submitted with future permit applications (for modifications to the building) are consistent with theoriginal Form CF-1. © © Note on the plans that a separate copy of Form CF-1 was retained by the building owner to be passed on to future owners or tenants of the building so that they will have a record of the energy efficiency standards that will apply to future modifi- cations. It is the responsibility of futute building permit applicants to resubrait the previously approved Form CF-1 with subsequent permit applications. Xf the building applicant does not have a copy of the energy standards compliance forms originally approved, the applicant must comply with the standards presentlyin effect. © Construction that does not increase condi- tioned space in an existing building, where applications for the existing building permit was before January 1, 1587, cannot Increase the overall U-value or overall thermal transfer value, new HVAC systems or equipment must comply with the prescripture requirements of the second generation non-residential standards including the HVAC power indices that may apply and when improvements or modifications to the lighting system increase the connected load, then the proposed improvements must comply with the set of standards that are in effect for the occupancy type at the time the permit application for the lighting improvements are proposed. This has special significance for speculative buildings that are originally permitted under the first generation standards, but for which tenant improvements are made after the second generation energy standards have become mandatory. (See attached examples 1-1 and 1-2) For construction in an existing building, that increases the conditioned floor area, the set of standards that are in effect at the time of the permit application apply to the increased conditioned floor area as though it were a separate new :. building. The conditioned floor area of a building is usually increased 'in one of two waysi • Space is added to the building, such as additional floors or a new wing. Heating and/or cooling systems are extended to spaces that were previously unconditioned. When either of these two events occur, the envelope and lighting requirements of the prescriptive standard apply to the increased conditioned space only. It is not necessary to upgrade the envelop* or lighting system of the existing building. (See attached example 1-1 and 1-2) The mandatory measures apply to all new construction, regardless of the date of the original permit or whether conditioned •pace is increased. The mandatory measures only apply to building components, systems or specific pieces of equipment that are part of the construction project. The mandatory switching requirements, for instance, would only apply if reclr- cuiting were proposed as part of the Project. Existing buildings, for which the original permit application was made after January 1, 1987, should have the Certificate of Compliance available to allow comparing the design of proposed alterations. {no increase in conditioned space) or additions (conditioned space increased) with the original design assumed when the building was constructed, the alteration* or additions must be consistent with the original design assumption*. The designer may choose to modify the original Certificate of Compliance by showing the modified design complies with the standards. The new Certificate of Compliance would govern any future modifications or additions.If the original Certificate of Compliance cannot be located then the entire building, including the proposed alterations or additions, must be shown to comply with the current standards. Speculative buildings are defined «s those buildings where the occupancy type is known at the time of building permit application, but the plans and specifications do not include designdetails about the lighting system and/or the final HVAC improvements. The lighting and/or final HVAC improvements are to b* made by the tenants on a space-by- space basis as the building is leased. At the time of the original building permit, assumptions regarding future lighting and HVAC Improvements must be mad* to determine if the building will comply with, the standards. This is especially important with the performance, approach. When the original plans for a speculative building are submitted to the enforcement agency, the Certificate of Compliance should specify the assumptions required about future building improvements. When using the prescriptive approach, the Certificate of Compliance should specify the alternative component package used to show compliance at the time of the initial permit application. This same package would be applied to any future work that is performed on the building, unless compliance is redemon- strated for the whole building at the time of the future work. Shell buildings are defined as those struc- tures where the ultimate occupancy of the building is not known when the original building permit application is filed. The structure, for example could eventually be used as an office, warehouse, restaurant or retail space, depending on market demand. This means that the building could be covered by the first generation nonresidential energy standards or the second. To address this potential problem, it is recommended that multiple compliance* documentation be submitted for shellbuildings. Multiple documentation ensures that the structure will comply with whatever energy conservation standards are applicable to the eventual occupancy type. Subsequent permit applications for completion of the building should also be submitted with multiple documentation unless the occupancy has been clearly identified and falls within a single set of standards. Future changes of occupancy would requiredocumentation that verifies satisfaction of the appropriate set of standards. As with speculative buildings, a Certificate of Compliance would be submitted to document assumptions made about future building improvements. In the case of shell buildings, multiple Certificates of Compliance may be required along with multiple documentation. It is also suggested that performance calculations, which specify less than 1.4 Watts/sf be accepted only when the designer can demonstrate a capability to construct a building with lighting loads of the proposed level. Also air conditioning units with an SEER greater than 10 should be accepted only when there is documentation of at least two available brands meeting the proposed requirements. Mixed use buildings must comply with . the specific standards pertinent to the various occupancies with the building. If mixed use building design has a single predominant occupancy with other smallersubordinate occupancies the building need only meet the provisions of the. predominant occupancy so long as: (1) the subordinate occupancies total less than 1,000 square feet and are less than 30 percent of the total conditioned floor area or (2) the subordinate occupancies constitute less than 10 percent of the total conditioned floor area. When one of the above exceptions do not apply* either the prescriptive or performanceapproach may be applied according to the following guidelines: With the prescriptive approach, each . occupancy must be analyzed and shown to comply separately. The appropriatecompliance documentation should be completed for each occupancy. Ho trade- . offs are allowed between occupancies under this approach. With the performance approach, the occupancies may be analyzed together or separately, depending on special circumstances. It Is generally necessary to analyze the occupan- cies separately when they are covered by different standards. For instance low- rise residential and office space within the same building would have to be analyzed separately since they are covered by two separate standards, each with its own approved calculation methods, operating assumptions, etc. If retail and office were together in the same building, it would be possible to analyze both occupancies together since they are covered by the same standard. When occupancies are analyzed together, there may be tradeoffs between occupancies; otherwise, tradeoffs are not possible. Processing for fast-track processing is a mechanism established through cooperation between the developer and the local jurisdic- tion to speed development review time and to facilitate the ability to apply for and receive approval for permits in stages. The enforcement issue with fast-tract buildings is much the same as for speculative buildings. Assumptions must be made early on about lighting and/or HVAC designs that have not yet been drawn up. The problem is slightly less complicated since fast- track buildings are often carried to completion by the same design/developerteam. Since the Issues are similar, the recommendations for shell and speculativebuildings would generally apply. Page 1 of 2 Remodel Or Tenant Improvement Information Tom Plan File No. Jurisdiction _^_ Project Address Date RtHODEX PR TENANT IffROVDCNT BUILDING CODE INFORMATION REQUIRED PRIOR TO PLAN SUBMITTAL In order to complete a plan review of a remodel or tenant improvement within an existing building it is necessary that the information in Items 1-11 be provided or the approved plans be provided for the existing building. • «iitii«i<it>ii«i<«<tiiiii »»• •••i>-»««<«iii-»«-«Hli****«-»tiiii«-«*>-*«-»-B«*-i>iiiiitnm«i«t>««ti«-m»iitii«€«-n 1. Circle the existing type of construction for this building: I, II-FR., Il-lhr., II-N, III-lhr., I1I-N, IV., V-lhr., V-N 2. Does this building have fire sprinklers throughout? Yes No 3. Does the proposed project create a change in use or occupancy classification? Yes No Describe the previous use of the project area * Describe the proposed use of the project area ft. Existing Building Area Improvement Area 5. How many stories are in this building? What story is the improvement on? 6. Does this project involve alterations to: Existing fire walls Yes No Existing floor or roof loads Yes No Existing building structure Yes No Existing HVAC equipment Yes No If "YES", see *10 below Existing electrical service loads Yea No Existing lighting Yes No If "YES", see 110 below 7. What is the approximate date that construction of the existing building was permitted? 8. ENERGY CONSERVATION Which of the following were checked and approved for Title 24 Energy Conservation at the time the original building was approved: Building envelope Yes No HVAC equipment Yes No Area lighting Yes No Water heating Yes No Will the proposed project significantly alter any element that was approved? Yes, No If "YES", see *10 below 9. HANDICAPPED ACCESS FACILITIES Which of the following has been approved for compliance with the handicapped access standards of Title 26, CAC: Parking & access to the building Yea No Building entrance doors Yes No Building stairs & elevators Yes No Existing public restrooms Yes No 10. ENERGY DOClfCNTATION a. Remodels to existing conditoned spaces require that a Form CF-1 (attached) be completed, signed and imprinted on the plans. Additionally, if the building envelope, lighting or HVAC equipment are to be altered or added, appropriate State required documentation must be submitted. b. Provide copies of all existing CF-1 Forms for this building. c. Provide a copy of any existing approved energy design for the building. 12/16/87 Page 2 of 2 11. PUUg a. Plans shall clearly show all demolition and new construction proposed. b. Plans shall clearly show exit systems, fire rated construction details, occupancy require- ments, handicapped access provisions and other requirements necessary to show the work will comply with adopted codes and ordinances. c. If structural revisions or increased 3ive or dead loads are proposed the structural plans details and calculations shall be provided and shall be signed by a California licensed engineer or architect. d. If electrical system revisions or increased electrical loads are needed provide electrical plans and specifications showing location of panels, panel schedules, existing service size, existing building load, additional loads, wiring method, exit signs and emergency lighting when required. e. If plumbing revisions or additions are proposed provide plumbing layout, details and specifi- cations. Include sizing calculations when necessary to justify pipe sizes. f. All sheets of the plans are requried to be signed by the responsible designer. Information is provided by Title Date Jurisdiction Prepared by» VALUATION AND PLAN CHECK FEE p Bldg. Dept, D Esgil PLAN CHECK NO.__£j£Z5-Z BUILDING ADDRESS \Jl&ft APPLICANT/CONTACT f?. DtLMCfiti BUILDING OCCUPANCY 8~£ PHONE NO. DESIGNER PHONE TYPE OF CONSTRUCTION CONTRACTOR PHONE BUILDING PORTION T^/J . imp. Air Conditionine Commercial Residential Res. or Comm. Fire Snrinklers Total Value BUILDING AREA &3Q VALUATION MULTIPLIER //.^2> '§ @ e VALUE Jt>5~ Q2& • }t>&QSlD Building Permit fee $, Plan Check Fee S C 0 M HE NT Si SHEET 12/87 m n n n n n n n Date:-Z&-8& ENGINEERING CHECKLIST LEGEND Plan Check No. Project Address:Z2*l£Vton Project Name: Tl- ~ Field Check Date: Coef. Item Complete I tern 1 ncomplete Your Action - Needs 1,2,3 By: Number in circle indicates plancheck number that deficiency was identified LEGAL REQUIREMENTS Site Plan 1. Provide a fully dimensioned site plan drawn to scale. Show: North arrow, property lines, easements, existing and proposed structures, streets, existing street improvements, right-of-way width and dimensioned setbacks. 2. Show on Site Plan: Finish floor elevations, elevations of finish grade adjacent to building, existing topographical lines, existing and proposed slopes, driveway and percent (%) grade and drainage patterns. 3. Provide legal description of property. 4. Provide assessor's parcel number. n PERMITS REQUIRED Grading 5. Grading permit required. (Separate submittal to Engineering Department required for Grading Permit). 6. Grading plans in plan check PE . 7. Need the following completed prior to building permit issuance: A. Grading plans signed. B. Grading permit issued. C. Grading completed. D. Certification letter and compaction reports submitted. E. Grading inspected and permit signed off by City Inspector. 8. Right-of-Way Permit required for work in public right-of-way (e.g., driveway approach, sidewalk, connection to water main, etc). 9. Industrial Waste Permit application required. To be filled out completely and returned to Development Processing. FEES REQUIRED r~) M 10' Park-in-Lieu fees required. Quadrant: Fee Per Unit: , Total Fee Fl PI n< Traffic impact fee required.U ^ " Fee Per Unit: — . Total Fee: ft/i I [ r~] 12. Bridge and Thoroughfare fee required. , Fee Per Unit: — , Total Fee: n 0 LJ LJ 13. Public facilities fee required. 13T [I] D 1I** Facilities management fee required. Fee: j£\ r—i n 15- Additional EDU's required: J.9O Ux L_i Sewer connection fee: Z3T/y^- Sewer permit no. 16- Sewer lateral required: REMARKS: 77P O.K. to issue: -f Date: If you have any questions about any of the above items identified on this plan check, please call the Development Processing Department at 438-1161. 0) CD OS r- CM m =* *l =* u u uCL Q. a. HDD n a n a a n ana Plan Check No. _BQo7S>7 PLANNING CHECKLIST Address Type of Project and Use / J- . Zone /SM Use Allowed? YES Setback: Front Aj/A~ Side J&- Rear NO Facilities Management Zone O School District: San Dieguito _ Carlsbad ^ Discretionary Action Required YES Environmental Required YES Landscape Plan Required YES Comments Enctnitas San Marcos NO OC NO NO Type Coastal Permit Required Additional Comments YES NO OK TO ISS DATE <3 Office of the City Engineer (Etta 0f 2075 LAS PALMAS DRIVE • /XS^.B TELEPHONE CARLSBAD, CALIFORNIA 92009-4859 M^aW JM (619)438-1161 DATE: Ernie Ferrer COUNTY OF SAN DIEGO Department of Public Works Building 1 Operations Center 5555 Overland Avenue San Diego, CA 92123 INDUSTRIAL WASTE PERMIT APPLICATION NO Enclosed is a copy of the application for an Industrial Waste Discharge Permit from the subject applicant. Your review and recommendations on this application will be appreciated prior to the issuance of a waste disposal permit. LLOYD B. HUBBS City Engineer LBH:SEE:rp Enclosure: Application No. c: Building department Fred Rowlen, Encinas Plant Arnie Wing, Department of Health Services COMMERCIAL/INDUSTRIAL APPLICATION FORM FOR INDUSTRIAL WASTE DISCHARGE PERMIT CITY OF CARLSBAD APPLICATION: NEW ^ BUILDING P.C. NO (CHECK ONE) REVISED APPLICATION NO.: INDUSTRIAL CLASS > a^CrSg^ggL^ DATE:•• -1. .. *- , i £>«—r-r ignature of City Representative APPLICATION FOR INDUSTRIAL WASTE DISCHARGE PERMIT A. GENERAL: SITE - .Uo Vi£?A APPL ICANT ; Q3J<VrQKJL - B¥ U M &-TT TYPE OF BUSINESS; Ml£Dl£AL E.c^ APPLICANT'S ADDRESS;^^)^ (-"/WiiMn UtrPia v?r>PJ.F B. WASTES AND PROCESSING: (Check where applicable) IZt Domestic Waste Only |~| Industrial Waste |~| Industrial Waste NOT Discharged to Sewer Discharged to Sewer GENERAL DESCRIPTION OF WASTE (Chemical and Physical Characteristics of proposed waste): GENERAL DESCRIPTION OF PROCESS (If Applicable): C. WASTES TO BE DISCHARGED TO SEWER: WASTE: TREATED: QUANTITY: AVERAGE GPD (Check One) UNTREATED? X (Daily) MAXIMUM ~ GPD (Gallons Per Day) 4'-1 APPLICANT OR REPRESENTATIVE OF FIRM: U^y-T AM— *R TITLE; MAM AO--.FC t1 AC f L.lTIF:^ SIGNATURE: ^ / - >^ . j sl&yU -— . DATE: t 3?/ ?.'