Loading...
HomeMy WebLinkAbout2248 IVORY PL; ; CB044502; PermitCity of Carlsbad 1635 Faraday Av Carlsbad, CA 92008 09-.20-20.05 Residential Permit Permit No: CB044502 , Job Address: Permit Type: Parcel No: Valuation: Occupancy Group: 07/22/2005 # Dwelling Units: Bedrooms: Project Title: Building Inspection Request Line (760) 602-2725 2248 IVORY PL CBAD RESDNTL 2132022000 Sub Type: Lot#: SFD $452,902.00 Construction Type: 59 NEW CT02-20 Reference #: Structure Type: SFD 3 Bathrooms: 4.5 BACARNGREENS,PHS4,PLN3,4728SF LIV, 646 SF GAR,301 SF PCH, 182SF DECK Owner: Status: Applied: Entered By: Issued: Inspect Area: Orig PC#: Plan Check#: ISSUED 11/19/2004 SB Plan Approved: 07/22/2005 PC04-79 PC04-130 Applicant: PULTE HOMES REAL ESTATE COLLATERAL MANAGEMENT CO C/O LIZ LAYMAN/ MORROW DEV SUITE 200 4141 JUTLAND DR 92117 858-490-3111 Building Permit Add'I Building Permit Fee Plan Check Add'I Plan Check Fee Plan Check Discount Strong Motion Fee Park in Lieu Fee Park Fee LFM Fee Bridge Fee Other Bridge Fee STD #2 Fee BTD #3 Fee Renewal Fee Add'I Renewal Fee Other Building Fee Pot. Water Con. Fee Meter Size Add'I Pot. Water Con. Fee Reel. Water Con. Fee $1,633.80 $0.00 $1,061.97 $0.00 ($84.96) $45.29 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $2,999.00 D5/8 $0.00 $0.00 1903 WRIGHT PL #180 CARLSBAD CA 92008 Meter Size Add'I Reel. Water Con. Fee Meter Fee SDCWAFee CFD Payoff Fee PFF (3105540) PFF (4305540) License Tax (3104193) License Tax (4304193) Traffic Impact Fee (3105541) Traffic Impact Fee (4305541) Sidewalk Fee PLUMBING TOTAL ELECTRICAL TOTAL MECHANICAL TOTAL Housing Impact Fee Housing lnlieu Fee Housing Credit Fee Master Drainage Fee Sewer Fee Additional Fees TOTAL PERMIT FEES Total Fees: $20,466.82 Total Payments To Date: $20,466.82 Balance Due: Inspector: 1k ,/~ FINAL APPR?VAL Date: ~ j15 Ob Clearance: $0.00 $160.00 $2,004.00 $2,848.90 $8,242.82 $0.00 $0.00 $0.00 $660.00 $0.00 $0.00 $259.00 $60.00 $120.00 $0.00 $0.00 $0.00 $0.00 $0.00 $457.00 $20,466.82 $0.00 NOTICE: Please take NOTICE that approval of your project includes the "Imposition" of fees, dedications, reservations, or other exactions hereafter collectively referred to as "fees/exactions." You have 90 days from the date this permit was issued to protest imposition of these fees/exactions. If you protest them, you must follow the protest procedures set forth in Government Code Section 66020(a), and file the protest and any other required information with the City Manager for processing in accordance with Carlsbad Municipal Code Section 3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack, review, set aside, void, or annul their imposition. You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capacity changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this project. NOR DOES IT APPLY to any _, .•• L,-L ··-·· L--·-. -'··--."' ~,,.... ... ,,..r: <>imil<:>,fn fhio -. --·-... L,-L •'---·-···•-..nf . ; City of Carlsbad Bldg Inspection Request For: 09/18/2006 Permit# CB044502 Title: BACARA/GREENS,PHS4,PLN3,4728SF Description: LIV, 646 SF GAR,301 SF PCH,182SF DECK Type: RESDNTL Sub Type: SFD Job Address: 2248 IVORY PL Suite: Lot Location: APPLICANT PULTE HOMES Owner: PULTE HOME CORP Remarks: Total Time: CD Description 19 Final Structural 29 Final Plumbing 39 Final Electrical 49 Final Mechanical 59 Act Comment _fl_ J:: Comments/Notices/Hold Inspector Assignment: PS --- Phone: 6195200803 Inspector: f,4 G Requested By: JOHN Entered By: JANEAN Associated PCRs/CVs Original PC# PC04-79 lns12ection HistO[Y Date Description Act lnsp Comments 0811512006 39 Final Electrical PA PY EMR 0611912006 16 Insulation AP BN 0611912006 82 Drywall/Ext Lath/Gas Test AP BN 06106/2006 84 Rough Combo AP BN 0610112006 84 Rough Combo co PY MISSING SHEAR NAILING HOS LOOSE, NEED TOP OUT CLEARANCE@ VENT & FIREPLACE. 05/30/2006 84 Rough Combo CA BN PER JOHN 05123/2006 13 Shear Panels/HD's AP BN 0511612006 13 Shear Panels/HD's AP BN 0510212006 15 Roof/Reroof AP BN 1110112005 81 Underground Combo AP PS 1012112005 21 Underground/Under Floor AP PS 10121/2005 22 Sewer/Water Service AP PS 'GEOCON INOO_RPORATl!lD FOUNDATION LOCATION ("f 1 not entire UI mg ' ' ' Pt.AN FILE NO, PERMIT NOS: 5(., I (}BO'/'-l'./.9S FOUN0A TION TYPE: f51! C8 0"/'/507 □ ADDITIONAL OSSERV A TION REQUIRED ~NVENTIONAL 5e :C1Jo'-P-1.so1 ~ST ANTIAL CONFORMANCE POST·TENSIONED :1,,::, : C,/6 O.L/-<f .SO .;J- • ~SE OF OBSERVATION !!I' Verify soil eondilions exposed are similar to those anticipated ~ify footing excavations extend to minimum depth recommended in soil report □ Verify foundation reinforcement complies with minimum recommended in soil report D ~· slab reinforcement, sand bedding and moisture barrier comply with minimum recommended in soil report 0Verify footings have been extended to an appropriate bearing strata 0 Olher • APPLICABLE SOIL REPORT: er E( MEDIUM E: □ HIGH □ VERY HIGH • Ml~UM FOUND 'l'j..l<C\Jv,MMEN6A ONS: . · []"'Footing Depth: 12 Inches D 18 Inches ~ Inches OTHERJlt'=.;ii' ?3"Mll.J. @:,F;ey»..70f'oF &olr5u.'SI l Footing Reinforcement: □ No.4 T&B □ 2-No.4 T&B D 2-No.5 T&B ~st-Tension d OTHER:-----~-'-• Interior Slab Reinforcement: □ 6x6-10/10 0 6x6-6/6 □ No.3@24Inches D No.3@18Jnches ~st-Tensioned ?'"'+-Slab Bedding Material and Thickness: -'-"'-------------. _____ Vapor Barrier: ___,,,,,__-=-------..._ ,,,,.,. /1) Foundation Width : __.~,._.,.___.!!!.!=-..,!\,,._~ __________________ _ • O~RVATIONS: 19"Sj!t»tantial conformance with Soil Reports (see "Purpose of Observation") -·· !Ysubstantial conformance with Foundation Plans. Identify: ff fl.M.\~ Q){ ,DfW l!)®-:N a:oe-.tJo. l/gp'.h .DF'rihl) :olo-?2 ·D'S, D Other • COMMENTS:~~------------------------------ NOT&, IT I ASSUM&Cl THAT A~l FOoTIJ,,IC EXCAVATIONS WILL l!af CLEANED OP LOOSE MATEAVJ, PR10rt TO PLACING CONCRITT """°D THAT M &OIi. MOtSTI.IAE CONTSN1 W(LL 116 PAANr.A.INEO GEOCON REPRESENTATIVE SlN~llnSNOJ NOJ039 LEPB-899-898 24995 SOIL11o TESTIJrtt, IN• SOUTHERN CALIFORNIA SOIL & TESTING, INC. 6280 RIVERDALE STREET, POST OFFICE BOX 600627, SAN DIEGO, CA 92160-0627 Phone (6 I 9) 280-4321, FAX (619) 280-4717 . ,,_r-:-1/------/ -'I .,, ,L-. S S /. / j • / // ; / C & T FILE NO .. _--=--,,.£,,~· _./"---'/--'-· ,.;,;;,_,· ,-"'.,_'-..__,,=_,_.: __ __ _,. P.O. NO.: _________ _ _../ C /~ PL NC FIX PAGE __ OF FIELD INSPECTION REPORT FOR: □ REINFORCED CONCRETE □ REINFORCED MASONRY □ WELDING □ FIREPROOFING •/ 0 Q.C. CONCRETE □ ROOFING/WATERPROOFING l!J'.T. CONCRETE/STRESS □ EPOXY ANCHORS O H.S. BOLTING 0 PROJECT TITLE: -~-'-, //_ / E A ·.J..,;:,;. ..:.; '/""i I ---· T: ,.r/ _.. ARCHITECT: PHASE#;,: //? -.---- DSA FILE NO.: DSA APP. NO.: PERMIT NO.: ,, _ ,. /,,, , / ./J . ). .· 11,,: /' ,, .' :·/ ,1,,··::...£ / PLAN FILE NO.: ENGINEER:'..,.f - GENERAL CONTRACTOR: / ;,:--SUB CONTRACTOR: I--/ I ,--• r--'f"' --) -. ,' )/ ~ ' , )-. V ;: f.. ✓ 1/ ✓ •·'--~ / / ~-,:' ,~ : .... ~-... -. I ,_, . I / _, -~• '~ ~ LOCATION OF WORK INSPECTED: I . /'-" ~ 7 L-· MATERIAL CLASSIFICATION: ·-) ;fa L'J I DESCRIPTION OF WORK INSPECTED: TIME ARRIVED: ...:.._ ; ~--411 / . . .·?-. • __ , --I ~ -•. ,· l''/_,1.,,-. .. .,, h' /G t./' /,,.- -- I - _Li Ii~-- f •'t<~-=---I --r J , ~ -,-t_:_:: ,?-,,-. ·.,.,. I' .. ; ., ;J F ., ~? r-,./ // / -.,, ·f""> .. y. , -.,: __ f/ ./I . J::.·- 11 !-J z_ '!.- I~ --(;--... "., i' .-=-A .,... .... -.,1 .,.,. • -~"-- ,. .;-.i,-- / ------'~: .--.L -;,)._ ; ; UBC I hereby certify that I have inspected the above reported work. Unless noted otherwise, the work inspected is to the best 9f:'.'my knowledge in compliance with the approved plans, specifications and appl~(ei cjf6f,s of the governing building laws. r"' Inspector lnitials, ___ 4 /+,,._,_-!--------- _; I ,_ TIME DEPARTED: 'J....-••_;;; .• --' I •• -, i .,-! .L. I I F. •-1 . • ,,1 'I!' / · .-::.. ~ _:·., :..2 _r r -..1•--. -• . '.h" /_:,--.• •/¥ P.E. REVIEW: -~ ... · ,/ /,. DSA I hereby certify that J tlave iPl'spected the above reported work in accordance with the requirements of DSA a!!)proved documents. Sampling and testing were conducted in accordance with the requirements of the DSA approved documents. The work inspected complies with the DSA approved documents. 'SUPEAINTENBif"NTS SIGNATURE / ;? •signature authorizes the above work. I Yes: __ No: __ Inspector Initials. _______________ _ / SCST205 (REV 8/04) .. ~.:--~ 7 ,C.._.! .,.,.-... PLANNING ENGINEERING SURVEYING IRVINE LOS ANGELES RIVERSIDE SAN DIEGO DAVE HAMMAR LEX WILLIMAN ALISA VIALPANDO DAN SMITH RAY MARTIN 10179 Huennekens St. SanDiego,CA 92121 (858) 558-4500 PH (858)558-1414FX www.HunsakerSD.com lnfo@HunsakerSD.com HUNSAKER &ASSOCIATES S A N D I E G 0, I N C. October 26, 2005 City of Carlsbad Engineering Department 1635 Faraday Avenue Carlsbad, CA 92008-7314 Re: Building Form Setback Certification La Costa Greens Neighborhood 1.1 0 Carlsbad Tract 02-20/PUD 02-1 0(A) Drawing No. 406-58 Lots: 19, 56 and 60 Dear City Inspector: Please be advised the building foundation forms are in conformance with the precise grading plans as to horizontal and vertical location. The building setbacks were measured in relation to the property lines and were found to be in conformance with the approved precise grading plans for this property. Sincerely, I/ r-. '\ (J \\ \ U .. -~: MP:lm k:l2350\2005\c60.doc WO 2350.13 10/2612005 1:21 PM