Loading...
HomeMy WebLinkAbout2525 El Camino Real; 105; CBC2016-0076; PermitPrint Date: 11/02/2017 Job Address: Permit Type: Parcel No: Valuation: Occupancy Group: # Dwelling Units: Bedrooms: Project Title: 2525 El Camino Real, 105 BLDG-Commercial 1563020900 $646,960.18 City of Carlsbad 1635 Faraday Av Carlsbad, CA 92008 Commercial Pe:rmit www.carlsbadca.gov Work Class: Tenant Improvement Status: Lot#: Applied: Reference#: Issued: Construction Type: Fina led: Bathrooms: Inspector: Orig. Plan Check#: Plan Check#: Description: CHEESECAKE FACTORY: 8,982 SF Tl// ADD 458 SF FOR TOTAL RESTAURANT AREA OF 8,982 SF// OUTDOOR PATIO DINING 1,789 // INDOOR PATIO DINING 871 SF Applicant: JAMES GARTNER 2036 N Broadway Owner: R P I CARLSBAD LP Santa Ana, CA 92706-2612 714-560-9210 x102 1114 Avenue Of The Americas, Floor 45 New York, NY 10036-7700 214-660-5232 x215232 BUILDING PERMIT FEE $2000+ BUILDING PLAN CHECK FEE {BLDG) ELECTRICAL BLDG COMMERCIAL NEW/ADDITION/REMODEL FIRE A-2 & A-3 Occupancies -Tl GREEN BUILDING STANDARDS PLAN CHECK MECHANICAL BLDG COMMERCIAL NEW/ADDITION/REMODEL PLUMBING BLDG COMMERCIAL NEW/ADDITION/REMODEL PUBLIC FACILITIES FEES -outside CFO SB1473 BUILDING STANDARDS FEE STRONG MOTION-COMMERCIAL Total Fees: $12,768.42 Total Payments To Date: $12,768.42 Balance Due: Please take NOTICE that approval of your project includes the "Imposition" of fees, dedications, reservations, or other exactions hereafter collectively referred to as "fees/exaction." You have 90 days from the date this permit was issued to protest imposition of these fees/exactions. If you protest them, you must follow the protest procedures set forth in Government Code Section 66020{a), and file the protest and any other required information with the City Manager for processing in accordance with Carlsbad Municipal Code Section 3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack, review, set aside, void, or annul their imposition. You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capacity changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this project. NOR DOES IT APPLY to any fees/exactions of which you have previously been given a NOTICE similar to this, or as to which the statute of limitation has previously otherwise expired. Permit No: CBC2016-0076 Closed -Finaled 12/20/2016 02/13/2017 MColl $0.00 $2,478.00 $1,734.60 $242.00 $609.00 $166.00 $104.00 $124.00 $7,103.67 $26.00 $181.15 THE FOLLOWING APPROVALS REQUIRED PRIOR TO PERMIT ISSUANCE: 0PLANNING 0ENGINEERING 0BUILDING OFIRE 0HEALTH 0HAZMATIAPCD Building Permit Application 1635 Faraday Ave., Carlsbad, CA 92008 Ph: 760-602-2719 Fax: 760-602-8558 email: building@carlsbadca.gov www.carlsbadca.gov Plan Check No.~201~-·00flo Est. Value lfl 4lo °' i....QO - Plan Ck. Deposit 0 Date \2-20--ll.O JOB ADDRESS 2525 El Camino Real, Suite 105 SUITE#/SPACE#/UNIT# APN 105 CT/PROJECT# LOT# PHASE# # OF UNITS # BEDROOMS # BATHROOMS TENANT BUSINESS NAME CONSTR. TYPE OCC. GROUP The Cheesecake Factory DESCRIPTION OF WORK: Include Square Feet of Affected Area(s) We are constructing a brand new restaurant in a mostly existing space. The existing square footage is 8,982 square feet, the added space is 458 square feet. Total square footage is: 8,982 square feet. The outdoor patio is: 1,789. The indoor mall patio is: 871 square feet. EXISTING USE vacant retail APPLICANT NAME Primary Contact ADDRESS CITY PHONE EMAIL PROPOSED USE restaurant GARAGE (SF) James Gartner, AIA (Architect) STATE ZIP FAX PATIOS (SF) DECKS (SF) 1,789 PROPERTY OWNER NAME ADDRESS FIREPLACE YESC}I AIR CONDITIONING NO[{] YES[l]No0 Rouse Properties 555 Broadway, Suite 1019 CITY STATE ZIP Chula Vista CA PHONE FAX 760-444-0622 X 10622 EMAIL FIRE SPRINKLERS YES[l]NoO 91910 kyle.godat@rouseproperties.com DESIGN PROFE~SIONAL James Gartner & Assoicates Arch., Inc. CONTRACTOR BUS. NAME GB Mannisto, Inc. ADDRESS ADDRESS 2036 N. Broadway 14982 N. 83rd. Place, #200 CITY STATE ZIP CITY STATE ZIP Santa Ana CA 92706 Scottsdale AZ 85260 PHONE FAX PHONE FAX 714-560-9210 X 102 (480) 998-3030 EMAIL EMAIL jg@jgartner.com jas hton@gbman n isto.com STATE LIC. # STATE LIC.# CLASS CITY BUS. LIC.# CA 17450 (Sec. 7031.5 Business and Professions Code: Any City or County which requires a permit to construct, alter, improve, demolish or repair any structure, prior to its issuance, also requires the applicant for such permit to file a signed statement that he is licensed pursuant to the provisions of the Contractor's License Law !Chapter 9, commending with Section 7000 of Division 3 of the Business. and Professions Code} or that he is exempt therefrom, and the basis for the alleged exemption. Any violation of Section 7031.5 by any applicant for a permit subjects the applicant to a civil penalty of not more than five hundred dollars [$500}). Workers' Compensation Declaration: I hereby affirm under penalty of perjury one of the following declarations: D I have and will maintain a certificate of consent to self-insure for workers' compensation as provided by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued. D I have and will maintain workers' compensation, as required by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued. My workers' compensation insurance carrier and policy number are: Insurance Co. ____________________ Policy No.-------------~ Expiration Date ________ ~ This section need not be completed if the permit is for one hundred dollars ($100) or less. 0 Certificate of Exemption: I certify that in the performance of the work for which this permit is issued, I shall not employ any person in any manner so as to become subject to the Workers' Compensation Laws of California. WARNING: Failure to secure workers' compensation coverage is unlawful, and shall subject an employer to criminal penalties and civil fines up to one hundred thousand dollars (&100,000), in addition to the cost of compensation, damages as provided for in Section 3706 of the Labor code, interest and attorney's fees. 25 CONTRACTOR SIGNATURE 0AGENT DATE I hereby affirm that I am exempt from Contractor's License Law for the following reason: D D D I, as owner of the property or my employees with wages as their sole compensation, will do the work and the structure is not intended or offered for sale (Sec. 7044, Business and Professions Code: The Contractor's License Law does not apply to an owner of property who builds or improves thereon, and who does such work himself or through his own employees, provided that such improvements are not intended or offered for sale. If, however, the building or improvement is sold within one year of completion, the owner-builder will have the burden of proving that he did not build or improve for the purpose of sale). I, as owner of the property, am exclusively contracting with licensed contractors to construct the project (Sec. 7044, Business and Professions Code: The Contractor's License Law does not apply to an owner of property who builds or improves thereon, and contracts for such projects with contractor(s) licensed pursuant to the Contractor's License Law). I am exempt under Section Business and Professions Code for this reason: 1. I personally plan to provide the major labor and materials for construction of the proposed property improvement. 0Yes 0No 2. I (have I have not) signed an application for a building permit for the proposed work. 3. I have contracted with the following person (firm) to provide the proposed construction (include name address I phone I contractors' license number): 4. I plan to provide portions of the work, but I have hired the following person to coordinate, supervise and provide the major work (include name I address I phone I contractors' license number): 5. I will provide some of the work, but I have contracted (hired) the following persons to provide the work indicated (include name I address I phone I type of work): 25 PROPERTY OWNER SIGNATURE 0AGENT DATE STOP: THIS SECTION NOT REQUIRED FOR BUILDING PERMIT ISSUANCE. Complete the following ONLY if a Certificate of Occupancy will be requested at final inspection. Fax (760) 602-8560, Email building@carlsbadca.gov or Mail the completed form to City of Carlsbad, Building Division 1635 Faraday Avenue, Carlsbad, California 92008. CO#: (Office Use Only) CONTACT NAME OCCUPANT NAME ADDRESS BUILDING ADDRESS CITY STATE ZIP CITY STATE Carlsbad CA PHONE FAX EMAIL OCCUPANT'S BUS. UC. No. DELIVERY OPTIONS PICK UP: CONTACT (Listed above) OCCUPANT (Listed above) CONTRACTOR (On Pg. 1) MAIL TO: CONTACT (Listed above) CONTRACTOR (On Pg. 1) OCCUPANT (Listed above) MAIL/ FAX TO OTHER: ________________ _ A5 APPLICANT'S SIGNATURE ASSOCIATED CB#------------ NO CHANGE IN USE/ NO CONSTRUCTION CHANGE OF USE/ NO CONSTRUCTION DATE ZIP Tenant Improvement Closed -Finaled Scheduled Date 10/12/2017 Actual Start Date 10/12/2017 10/13/2017 10/13/2017 10/31/2017 10/31/2017 11/02/2017 11/02/2017 November 02, 2017 Inspection Type Inspection No. BLDG-91 Complaints Inspection BLDG-91 Complaints Inspection 037165-2017 BLDG-Building Deficiency BLDG-Building Deficiency BLDG-Building Deficiency 037554-2017 BLDG-Building Deficiency BLDG-Building Deficiency BLDG-Building Deficiency BLDG-Building Deficiency BLDG-Fire Final 033707-2017 BLDG-Final Inspection FIRE-Building Final 039331-2017 BLDG-Building Deficiency BLDG-Plumbing Final BLDG-Mechanical Final BLDG-Structural Final BLDG-Electrical Final BLDG-Building Deficiency BLDG-Fire Final 039289-2017 FIRE-Building Final 02/13/2017 03/20/2018 908 Inspection Status Cancelled Primary Inspector Paul Burnette Prelim final at cook line, prep, scullery & roof equip. Pre lim accessibility Continuation of pre lim final walk. Partial Pass Michael Collins Prelim final at cook line, prep, scullery & roof equip. TCO only, ok to occupy Unit. Need final Fire & building commissioning/recycling reports Pre lim accessibility Continuation of pre lim final walk. Partial Pass Cindy Wong All inspected with exception of FA tie in to mall system. Assembly permit issued. Passed Michael Collins Received final reports, accessibility elements in place &ok, occupancy signage ok Partial prelim Scheduled Cindy Wong All inspected with exception of FA tie in to mall system. Assembly permit issued. CARLSBAD TCT#76-18 2525 El Camino Real , 105 Carlsbad, CA 92008-1206 Re inspection Reinspection Passed Yes No Yes Reinspection Yes Yes No Yes Reinspection Yes Yes Yes Yes Yes Yes Yes Yes Complete Complete Incomplete Incomplete Complete Incomplete Page 9 of 9 Tenant Improvement 02/13/2017 CARLSBAD TCT#76-18 Closed -Finaled 03/20/2018 2525 El Camino Real , 105 908 Carlsbad, CA 92008-1206 Scheduled Actual Date Start Date Inspection Type Inspection No. Inspection Status Primary Inspector Re inspection Complete 08/22/2017 08/22/2017 BLDG-91 032344-2017 Partial Pass Michael Collins Reinspection Incomplete Complaints Inspection Passed BLDG-Building Deficiency Continuation of pre lim final walk. Yes 08/24/2017 08/24/2017 BLDG-91 032590-2017 Partial Pass Michael Collins Reinspection Incomplete Complaints Inspection Checklist BLDG-Building Deficiency Prelim final at cook line, prep, scullery & Yes roof equip. BLDG-Building Deficiency Continuation of pre lim final walk. Yes 09/12/2017 09/12/2017 BLDG-91 034395-2017 Partial Pass Michael Collins Reinspection Incomplete Complaints Inspection Checklist Item COMMENTS BLDG-Building Deficiency Prelim final at cook line, prep, scullery & Yes roof equip. BLDG-Building Deficiency Continuation of pre lim final walk. Yes 09/13/2017 09/13/2017 BLDG-91 034493-2017 Partial Pass Michael Collins Reinspection Incomplete Complaints Inspection Checklist item BLDG-Building Deficiency Prelim final at cook line, prep, scullery & Yes roof equip. BLDG-Building Deficiency Continuation of pre lim final walk. Yes BLDG-Building Deficiency Pre lim accessibility No 09/21/2017 09/21/2017 BLDG-84 Rough 035508-2017 Passed Michael Collins Complete Combo(14,24,34,44) BLDG-Building Deficiency Mechanical well frame & shaft liner Yes BLDG-14 Yes Frame-Steel-Bolting-Welding (Decks) 10/06/2017 10/06/2017 BLDG-91 037042-2017 Cancelled Paul Burnette Reinspection Complete Complaints Inspection BLDG-Building Deficiency Prelim final at cook line, prep, scullery & Yes roof equip. BLDG-Building Deficiency Continuation of pre lim final walk. Yes BLDG-Building Deficiency Pre lim accessibility No November 02, 2017 Page 8 of 9 Scheduled Date 07/21/2017 07/26/2017 08/02/2017 08/07/2017 08/18/2017 Tenant Improvement Closed -Finaled Actual Start Date Inspection Type Inspection No. BLDG-Building Deficiency BLDG-Building Deficiency 07/21/2017 BLDG-23 029451-2017 Gas/Test/Repairs BLDG-Building Deficiency 07/26/2017 BLDG-85 T-Bar, 029796-2017 Ceiling Grids, Overhead BLDG-Building Deficiency BLDG-14 Frame-Steel-Bolting-Welding (Decks) BLDG-24 Rough-Topout BLDG-34 Rough Electrical BLDG-44 Rough-Ducts-Dampers 08/02/2017 BLDG-31 030419-2017 Underground/Condu it-Wiring BLDG-Building Deficiency BLDG-Building Deficiency 08/07/2017 BLDG-85 T-Bar, 030934-2017 Ceiling Grids, Overhead BLDG-Building Deficiency BLDG-14 Frame-Steel-Bolting-Welding (Decks) BLDG-14 Frame-Steel-Bolting-Welding (Decks) BLDG-24 Rough-Topout BLDG-34 Rough Electrical BLDG-44 Rough-Ducts-Dampers 08/18/2017 BLDG-Final 032160-2017 Inspection Checklist BLDG-Building Deficiency November 02, 2017 02/13/2017 03/20/2018 908 Inspection Status Primary Inspector Start 24 hr clock for restaurant Start 24 hr clock for 9 patio heaters. Passed Michael Collins End 24 hr test. Partial Pass Michael Collins See card for notes. Failed Michael Collins Wrong code type, need SDGE work order for service address. Conduit only at Line 4-6 & H-M Passed Michael Collins See card for notes. Completion of T-grid/ overhead mechanical. Partial Pass Michael Collins Partial prelim CARLSBAD TCT#76-18 2525 El Camino Real . 105 Carlsbad, CA 92008-1206 Reinspection Passed Yes Yes Passed Yes Reinspection Yes Yes Yes No No Reinspection No Yes Pessod Yes Yes Yes Yes No No Reinspection Pessod Yes Complete Complete Incomplete Complete Complete Incomplete Page 7 of 9 Tenant Improvement 02/13/2017 CARLSBAD TCT#76-18 Closed -Finaled 03/20/2018 2525 El Camino Real , 105 Carlsbad, CA 92008-1206 908 Scheduled Actual Date Start Date Inspection Type Inspection No. Inspection Status Primary Inspector Reinspection Complete Passr;d BLDG-Building Deficiency No BLDG-14 No Frame-Steel-Bolting-Welding (Decks) BLDG-24 Rough-Topout No BLDG-34 Rough Electrical No BLDG-44 No Rough-Ducts-Dampers 07/11/2017 07/11/2017 BLDG-82 Drywall, 028403-2017 Passed Michael Collins Complete Exterior Lath, Gas Test, Hot Mop BLDG-17 Interior Lath-Drywall Bakery walls Yes BLDG-18 Exterior Lath and DensGlass at entry tower. Yes Drywall 07/13/2017 07/13/2017 BLDG-82 Drywall, 028698-2017 Failed Michael Collins Reinspection Complete Exterior Lath, Gas Test, Hot Mop Chcic!dist Item BLDG-Building Deficiency No BLDG-17 Interior Lath-Drywall No BLDG-18 Exterior Lath and No Drywall BLDG-23 Gas-Test-Repairs No 07/14/2017 07/14/2017 BLDG-82 Drywall, 028841-2017 Partial Pass Paul York Reinspection Incomplete Exterior Lath, Gas Test, Hot Mop BLDG-Building Deficiency No BLDG-17 Interior Lath-Drywall No BLDG-18 Exterior Lath and No Drywall BLDG-23 Gas-Test-Repairs No 07/17/2017 07/17/2017 BLDG-82 Drywall, 028939-2017 Passed Michael Collins Complete Exterior Lath, Gas Test, Hot Mop BLDG-Building Deficiency Yes BLDG-17 Interior Lath-Drywall Soffits except cook line Yes BLDG-18 Exterior Lath and North exterior Yes Drywall 07/20/2017 07/20/2017 BLDG-23 029351-2017 Passed Michael Collins Complete Gas/Test/Repairs November 02, 2017 Page 6 of 9 Tenant Improvement 02/13/2017 CARLSBAD TCT#76-18 Closed -Finaled 03/20/2018 2525 El Camino Real , 105 Carlsbad, CA 92008-1206 908 Scheduled Actual Date Start Date Inspection Type Inspection No. Inspection Status Primary Inspector Re inspection Complete 06/29/2017 06/29/2017 BLDG-84 Rough 027472-2017 Partial Pass Paul York Reinspection Incomplete Combo(14,24,34,44) Check!isl BLDG-Building Deficiency No BLDG-14 No Frame-Steel-Bolting-Welding (Decks) BLDG-24 Rough-Topout No BLDG-34 Rough Electrical No BLDG-44 No Rough-Ducts-Dampers 07/03/2017 07/03/2017 BLDG-82 Drywall, 0277 42-2017 Partial Pass Paul York Reinspection Incomplete Exterior Lath, Gas Test, Hot Mop Checklist Item COMMENTS BLDG-Building Deficiency No BLDG-17 Interior Lath-Drywall No BLDG-18 Exterior Lath and No Drywall BLDG-23 Gas-Test-Repairs No BLDG-84 Rough 027869-2017 Partial Pass Paul York Reinspection Incomplete Combo(14,24,34,44) Checklist Item COMMENTS BLDG-Building Deficiency No BLDG-14 No Frame-Steel-Bolting-Welding (Decks) BLDG-24 Rough-Topout No BLDG-34 Rough Electrical No BLDG-44 No Rough-Ducts-Dampers 07/06/2017 07/06/2017 BLDG-83 Roof 027993-2017 Partial Pass Paul York Reinspection Incomplete Sheating, Exterior Shear (13,15) Checklist !tem COMMENTS BLDG-Building Deficiency No BLDG-13 Shear Panels-HD (ok No to wrap) BLDG-15 Roof No Sheathing-Reroof BLDG-84 Rough 027994-2017 Partial Pass Paul York Reinspection Incomplete Combo(14,24,34,44) November 02, 2017 Page 5 of 9 Tenant Improvement Closed -Finaled Scheduled Date Actual Start Date 06/19/2017 06/19/2017 06/20/2017 06/20/2017 06/22/2017 06/22/2017 06/27/2017 06/27/2017 November 02, 2017 Inspection Type Inspection No. Checklist BLDG-Building Deficiency BLDG-17 Interior Lath/Drywall 026623-2017 BLDG-Building Deficiency BLDG-24 Rough/Topout 026550-2017 BLDG-Building Deficiency BLDG-44 Rough/Ducts/Dampe rs 026661-2017 Checklist !tern BLDG-Building Deficiency BLDG-82 Drywall, Exterior Lath, Gas Test, Hot Mop 026660-2017 BLDG-17 Interior Lath-Drywall BLDG-84 Rough Combo(14,24,34,44) 026945-2017 BLDG-Building Deficiency BLDG-14 Frame-Steel-Bolting-Welding (Decks) BLDG-34 Rough Electrical BLDG-84 Rough Combo(14,24,34,44) 027181-2017 BLDG-Building Deficiency BLDG-14 Frame-Steel-Bolting-Welding (Decks) BLDG-24 Rough-Topout BLDG-34 Rough Electrical 02/13/2017 03/20/2018 908 Inspection Status Primary Inspector Partial Pass Michael Collins Walls only at Line 5.5-6.5 & K-L Passed Michael Collins Water supply at walls only, Line 5.5-6.5 & H.5-M.5 Passed COMMENTS Spiral duct seal at Line E J-N& 4-6. Passed Michael Collins Michael Collins Walls only at Line H-K & 5.5-6.5, except scullery. Passed Michael Collins Mall side wall frame through Patio Passed Michael Collins Exterior only except at Tower, see card for EOR clarification. CARLSBAD TCT#76-18 2525 El Camino Real , 105 Carlsbad, CA 92008-1206 Re inspection P2issed No Reinspection Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Complete Incomplete Complete Complete Complete Complete Complete Page 4 of 9 Tenant Improvement Closed -Finaled Scheduled Actual Date Start Date 06/05/2017 06/05/2017 06/08/2017 06/08/2017 06/15/2017 06/15/2017 06/16/2017 06/16/2017 November 02, 2017 Inspection Type Inspection No. BLDG-Building Deficiency BLDG-14 Frame-Steel-Bolting-Welding (Decks) BLDG-24 Rough-Topout BLDG-34 Rough Electrical BLDG-44 Rough-Ducts-Dampers BLDG-13 Shear 025313-2017 Panels/HD (ok to wrap) Checklist ltom BLDG-Building Deficiency BLDG-84 Rough Combo(14,24,34,44) 025682-2017 Checklist Item BLDG-Building Deficiency BLDG-14 Frame-Steel-Bolting-Welding (Decks) BLDG-24 Rough-Topout BLDG-34 Rough Electrical BLDG-44 Rough-Ducts-Dampers BLDG-44 Rough/Ducts/Dampe rs 026434-2017 Checklist Item BLDG-Building Deficiency BLDG-Building Deficiency BLDG-84 Rough Combo(14,24,34,44) 026332-2017 Checklist Item BLDG-Building Deficiency BLDG-14 Frame-Steel-Bolting-Welding (Decks) BLDG-24 Rough-Topout BLDG-34 Rough Electrical BLDG-44 Rough-Ducts-Dampers BLDG-24 Rough/Topout 026483-2017 02/13/2017 03/20/2018 908 Inspection Status Primary Inspector Passed Michael Collins Dog House shear, see card. Passed Michael Collins COMMENTS Demising wall & cook Line only, Line 5.5-6.5 & H7-K.8 Passed Michael Collins 1st layer grease duct wrap, Line5.5-6.5 & H.7-K Through chase Passed Michael Collins Walls only except water supply, see card. Partial Pass Paul York CARLSBAD TCT#76-18 2525 El Camino Real, 105 Carlsbad, CA 92008-1206 Reinspection No No No No No Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Reinspection Complete Complete Complete Complete Complete Incomplete Page 3 of 9 Tenant Improvement 02/13/2017 CARLSBAD TCT#76-18 Closed -Finaled 03/20/2018 2525 El Camino Real , 105 Carlsbad, CA 92008-1206 908 Scheduled Actual Date Start Date Inspection Type Inspection No. Inspection Status Primary Inspector Reinspection Complete Passed BLDG-Building Deficiency Start 24 hr clock for 9 patio heaters. Yes BLDG-31 022776-2017 Partial Pass Michael Collins Reinspection Incomplete Underground/Condu it-Wiring Passed BLDG-Building Deficiency Conduit only at Line 4-6 & H-M Yes 05/16/2017 05/16/2017 BLDG-12 Steel/Bond 023425-2017 Passed Michael Collins Complete Beam BLDG-Building Deficiency SOG steel/ dowels & freezer pad. Yes 05/18/2017 05/18/2017 BLDG-14 023851-2017 Passed Michael Collins Complete Frame/Steel/Bolting/ Welding (Decks) Checklist Item COMMENTS BLDG-Building Deficiency HVAC curb frame (6),see card. Yes BLDG-44 023791-2017 Passed Michael Collins Complete Rough/Ducts/Dampe rs BLDG-Building Deficiency Transition duct to EF-1, seam welds Yes 05/22/2017 05/22/2017 BLDG-15 024058-2017 Passed Michael Collins Complete Roof/ReRoof (Patio) Chocldist lt0m COMMENTS Pass ad BLDG-Building Deficiency HVAC curbs. Yes BLDG-44 024059-2017 Partial Pass Michael Collins Rei11spection Incomplete Rough/Ducts/Dampe rs Passed BLDG-Building Deficiency Through chase Yes 05/25/2017 05/25/2017 BLDG-11 024491-2017 Passed Michael Collins Complete Foundation/Ftg/Pier s (Rebar) Passed BLDG-Building Deficiency Exterior patio footing/steel. Yes 06/01/2017 06/01/2017 BLDG-84 Rough 025037-2017 Partial Pass Paul York Reinspection Incomplete Combo( 14,24,34,44) November 02, 2017 Page 2 of 9 Scheduled Date 04/28/2017 05/01/2017 05/03/2017 05/04/2017 05/09/2017 Tenant Improvement Closed -Finaled Actual Start Date Inspection Type Inspection No. 04/28/2017 BLDG-11 021513-2017 Foundation/Ftg/Pier s (Rebar) BLDG-Building Deficiency 05/01/2017 BLDG-11 021904-2017 Foundation/Ftg/Pier s (Rebar) BLDG-Building Deficiency BLDG-21 021646-2017 Underground/Underf Joor Plumbing BLDG-Building Deficiency 05/03/2017 BLDG-21 022038-2017 Underground/Underf loor Plumbing Checklist !tom BLDG-Building Deficiency BLDG-Building Deficiency BLDG-44 022037-2017 Rough/Ducts/Dampe rs BLDG-Building Deficiency 05/04/2017 BLDG-21 022216-2017 Underground/Underf loor Plumbing Checklist Item BLDG-Building Deficiency 05/09/2017 BLDG-21 022777-2017 Underground/Underf loor Plumbing BLDG-Building Deficiency BLDG-23 022775-2017 Gas/Test/Repairs November 02, 2017 02/13/2017 03/20/2018 908 Inspection Status Primary Inspector Failed Michael Collins COMMENTS Passed Michael Collins Spread footings at Line N & 4.2-4.5 Partial Pass Michael Collins Partial at Line 5.5-6.5 & H-L(GW), Line 5.3-6.5 & H-K(SAN) Passed Michael Collins GW & SAN waste at Line K-N & 5-7 Partial at Line 5.5-6.5 & H-L{GW), Line 5.3-6.5 & H-K(SAN) Passed Michael Collins Pre lim seam/edge welding for vertical section of 30"x40" grease duct. Passed Michael Collins COMMENTS Completion of waste at Line L-N Passed Michael Collins Water supply to areas 103-104 & 112-113. Partial Pass Michael Collins CARLSBAD TCT#76-18 2525 El Camino Real , 105 Carlsbad, CA 92008-1206 Reinspection Reinspection No Yes Reinspection Yes Yes Yes Passed Yes Passed Yes Yes Reinspection Complete Complete Complete Incomplete Complete Complete Complete Complete Incomplete Page 1 of 9 John G Leonard -5311990 \13e1nfc\fce<J,.Concrete.~al Inspector -Exp 11/28/2015 Spray-applied FireproOfi pecial Inspector -Exp 11/28/201 S1rudura1Sleel and Bolting Spec;;ial Inspector -Exp 10/1012017 NAJIONAl l__ ~OD~ ~OUNCIL .. C ~ John S Leonec-d -5311990 ils SP,:cial l<l&pect~~xp. 07/18/2017 St~u,;;'I' asonry SpeciaUl'\Spedor -Exp 11/28/2015 ICC INllRNAIIONAt ODE COUN I Ci?)C 2D I \..0 -(X) 1 l.o ~(_()JU_ fa..__....._ G~0S EJ <_(~\ ~ CITY OF CARLSBAD Building Division INSPECTION RECORD CBC2016-0076 2525 EL CAMINO REAL # 105 0 INSPECTION RECORD CARD WITH APPROVED PLANS MUST BE KEPT ON THE JOB CHEESECAKE FACTORY: 8.982 SF Tl II ADD 458 SF FOR TOT AL RESTAURANT AREA OF 8.982 SF II OUTDOOR PATIO DINING 1.78911 INDOOR PATIO DINING 871 SF 0 CALL BEFORE 3:00 pm FOR NEXT WORK DAY INSPECTION 0 FOR BUILDING INSPECTION CALL: 760-602-2725 1563020900 12/20/2016 OR GO TO: www.Carlsbadca.gov/Building AND CLICK ON "Request Inspection" DATE: ;i. ,~ 1 7 CBC2016-0076 Required Prior to Requesting Building Final If Checked YES Planning/Landscape 7 60-944-8463 Allow 48 hours CM&I (Engineering Inspections) 760-438-3891 Call before 2 pm 76o-602-4660 Allow 48 hours Type of Inspection ~ate oS ??t7 REINFORCED STEEL #66 MASONRY PRE GROUT #33 OGROUT 0 WALL DRAINS #35 PHOTO VOLTAIC #10 TILT PANELS #53 ELEC/CONDUIT/WIRING #11 POUR STRIPS f:£A;,f::io.t.-#39 FINAL #11 COLUMN FOOTINGS #14 SUBFRAME O FLOOR O CEILING #41 #15 ROOF SHEATHING #44 #13 EXT. SHEAR.PANELS #43 #16 INSULATION #18 EXTERIOR LATH #17 INTERIOR LATH & DRYWALL #51 POOL EXCA/STEEL/BOND/FENCE #82 .DRYWALL,EXT LATH, GAS TES (17,18,23) #55 PREPLASTER/ANAL #83 ROOF SHEATING, EXT SHEAR (13,15) #84. FRAME ROUGH COMBO (14,24,34,44) Inspector #85 T-Bar (14,24,34,44) #22 0 SEWER & BL/CO D PL/CO #89 RNAL OCCUPANCY (19,29,39,49) #21 UNDERGROUND ASTE OWTR l-1 #24 TOP OUT OWASTE OWTR A/S UNDERGROUND VISUAL #27 TUB & SHOWER PAN A/S UNDERGROUND HYDRO #23 AS TEST 0 GAS PIPING A/S UNDERGROUND FLUSH #25 WATER HEATER A/S OVERHEAD VISUAL #28 SOLAR WATER A/S OVERHEAD HYDROSTATIC #29 FINAL A/SFINAL CODE# STORM WATER F / A ROUGH-IN #600 PRE-CONSTRUCTION MEETING #603 FOLLOW UP INSPECTION #605 NOTICETO CLEAN FIXED EXTING SYSTEM HYDROSTATIC TEST #607 WRITTEN WARNING FIXED EXTINGUISHING SYSTEM ANAL #609 NOTICE OF VIOLATION MEDICAL GAS PRESSURE TEST #610 VERBAL WARNING MEDICAL GAS FINAL REV 10/2016 SEE BACK FOR SPECIAL NOTES Section 5416. Health and Safety Code, State of California (a) There shall be not less than one water closet for each 20 employees or fractional part thereof working at a construction job site. The water closet shall consist of a patented chemical type toilet. (b) For the purpose of this section the term construction site shall mean the location on which actual construction of a building is in progress. (c) A violation of this section shall constitute a misdemeanor. All construction or work for which a permit is required shall be subject to inspection and all such construction or work shall remain accessible and exposed for inspection purposes until approved by the inspector. Work shall not be done beyond the point indicated in each successive inspection without first obtaining the approval of the inspector. DATE ADDIITIONAL NOTES 0 Section 5416. Health and Safety Code, State of California (a) There shall be not less than one water closet for each 20 employees or fractional part thereof working at a construction job site. The water closet shall consist of a patented chemical type toilet. (b) For the purpose of this section the term construction site shall mean the location on which actual construction of a building is in progress. (c) A violation of this section shall constitute a misdemeanor. All construction or work for which a permit is required shall be subject to inspection and all such construction or work shall remain accessible and exposed for inspection purposes until approved by the inspector. Work shall not be done beyond the point indicated in each successive inspection without first obtaining the approval of the inspector. DATE ADDITIONAL NOTES ? D~ · n> Gouf:/l ~ )<\'t.{Zl ce._ Ll~ t,_\ ~ 4- o/<C- Section 5416. Health ;and Safety Code, State of Caliifornia (a) There shall be not less than one water closet for each 20 employees or fractional part thereof working at a construction job site. The water closet shall consist of a patented chemical type toilet. (b) For the purpose of this section the term construction site shall mean the location on which actual construction of a · · building is in progress. (c) A violation of this section shall constitute a misdemeanor. All construction or work for which a permit is required shall be subject to inspection and all such construction or work shall remain accessible and exposed for inspection purposes until approved by the inspector. Work shall not be done beyond the point indicated in each successive inspection without first obtaining the approval of the inspector. DATE ADDl"i"IONAL NOTES // (2Dr--.l \ Cavt 'l-e-ALL-Meu-t:~ tG'.\.L Section 5416. Health and Safety Code, State of California (a) There shall be not less than one water closet for each 20 employees or fractional part thereof working at a construction job site. The water closet shall consist of a patented chemical type toilet. (b) For the purpose of this section the term construction site shall mean the location on which actual construction of a · · building is in progress. (c) A violation of this section shall constitute a misdemeanor. All construction or work for which a permit is required shall be subject to inspection and all such construction or work shall remain accessible and exposed for inspection purposes until approved by the inspector. Work shall not be done beyond the point indicated in each successive inspection without first obtaining the approval of the inspector. DATE AODITIONAL NOlrES Section 5416. Health and Safety Code, State of California (a) There shall be not less than one water closet for each 20 employees or fractional part thereof working at a construction job site. The water closet shall consist of a patented chemical type toilet. (b) For the purpose of this section the term construction site shall mean the location on which actual construction of a building is in progress. ( c) A violation of this section shall constitute a misdemeanor. All construction or work for which a permit is required shall be subject to inspection and all such construction or work shall remain accessible and exposed for inspection purposes until approved by the inspector. Work shall not be done beyond the point indicated in each successive inspection without first obtaining the approval of the inspector. DATE ADDITIONAL NOTES EsGil Corporation In (J!artnersliip witli government for (}Jui{aing Safety DATE: January 26, 2017 JURISDICTION: Carlsbad PLAN CHECK NO.: C2016-0076 SET: II PROJECT ADDRESS: 2525 El Camino Real, #105 PROJECT NAME: Cheesecake Factory TI Q APPLICANT \Q""'JURIS. Q PLAN REVIEWER Q FILE [2s] The plans transmitted herewith have been corrected where necessary and substantially comply with the jurisdiction's building codes. D The plans transmitted herewith will substantially comply with the jurisdiction's codes when minor deficiencies identified below are resolved and checked by building department staff. D The plans transmitted herewith have significant deficiencies identified on the enclosed check list and should be corrected and resubmitted for a complete recheck. D The check list transmitted herewith is for your information. The plans are being held at EsGil Corporation until corrected plans are submitted for recheck. D The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant contact person. D The applicant's copy of the check list has been sent to: James Gartner ~ EsGil Corporation staff did not advise the applicant that the plan check has been completed. D EsGil Corporation staff did advise the applicant that the plan check has been completed. Person contacted: James Gartner Telephone#: 714-560-9210 x102 Date contacted:--(~ V) Email: JG@JGartner.com Mail Telephone Fax In Person D REMARKS: By: Kurt Culver EsGil Corporation 0 GA ~ EJ O MB O PC Enclosures: 1/20/17 9320 Chesapeake Drive, Suite 208 + San Diego, California 92123 + (858) 560-1468 + Fax (858) 560-1576 EsGil Corporation In (J!artnersliip witli government for (}3ui(aing Safety DATE: January 6, 2017 JURISDICTION: Carlsbad PLAN CHECK NO.: C2016-0076 SET: I PROJECT ADDRESS: 2525 El Camino Real, #105 PROJECT NAME: Cheesecake Factory TI PLICANT RIS. . AN REVIEWER CJ FILE D The plans transmitted herewith have been corrected where necessary and substantially comply with the jurisdiction's codes. D The plans transmitted herewith will substantially comply with the jurisdiction's codes when minor deficiencies identified below are resolved and checked by building department staff. D The plans transmitted herewith have significant deficiencies identified on the enclosed check list and should be corrected and resubmitted for a complete recheck. ~ The check list transmitted herewith is for your information. The plans are being held at EsGil / · Corporation until corrected plans are submitted for recheck. D The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant contact person. cg] The applicant's copy of the check list has been sent to: James Gartner D EsGil Corporation staff did not advise the applicant that the plan check has been completed. EsGil Corporation staff did advise the applicant that the plan check has been completed. Telephone#: 714-560-9210 x102 Person contacted: James Garyyr Date contacted: l---\.o (b~ ) Email: { Mail')( Telephone·~ \\J\ Fax In Person JG@JGartner.com D REMARKS: By: Kurt Culver EsGil Corporation 0 GA ~ EJ O MB O PC Enclosures: 12/27/16 9320 Chesapeake Drive, Suite 208 + San Diego, California 92123 + (858) 560-1468 + Fax (858) 560-1576 Carlsbad C2016-0076 January 6, 2017 PLAN REVIEW CORRECTION LIST TENANT IMPROVEMENTS PLAN CHECK NO.: C2016-0076 OCCUPANCY: A-2 TYPE OF CONSTRUCTION: III-B REMARKS: DATE PLANS RECEIVED BY JURISDICTION: DATE INITIAL PLAN REVIEW COMPLETED: January 6, 2017 FOREWORD (PLEASE READ): JURISDICTION: Carlsbad USE: Restaurant ACTUAL AREA: 11,642 DATE PLANS RECEIVED BY ESGIL CORPORATION: 12/27/16 PLAN REVIEWER: Kurt Culver This plan review is limited to the technical requirements contained in the California version of the International Building Code, Uniform Plumbing Code, Uniform Mechanical Code, National Electrical Code and state laws regulating energy conservation, noise attenuation and access for the disabled. This plan review is based on regulations enforced by the Building Department. You may have other corrections based on laws and ordinances enforced by the Planning Department, Engineering Department, Fire Department or other departments. Clearance from those departments may be required prior to the issuance of a building permit. Code sections cited are based on the 2013 CBC, which adopts the 2012 IBC. The following items listed need clarification, modification or change. All items must be satisfied before the plans will be in conformance with the cited codes and regulations. Per Sec. 105.4 of the 2012 International Building Code, the approval of the plans does not permit the violation of any state, county or city law. To speed up the recheck process, please note on this list (or a copy) where each correction item has been addressed, i.e., plan sheet number, specification section, etc. Be sure to enclose the marked up list when you submit the revised plans. Carlsbad C2016-0076 January 6, 2017 • GENERAL 1. Please make all corrections, as requested in the correction list. Submit FOUR new complete sets of plans for commercial/industrial projects (THREE sets of plans for residential projects). For expeditious processing, corrected sets can be submitted in one of two ways: 1. Deliver all corrected sets of plans and calculations/reports directly to the City of Carlsbad Building Department, 1635 Faraday Ave., Carlsbad, CA 92008, (760) 602-2700. The City will route the plans to EsGil Corporation and the Carlsbad Planning, E:ngineering and Fire Departments. 2. Bring TWO corrected set of plans and calculations/reports to EsGil Corporation, 9320 Chesapeake Drive, Suite 208, San Diego, CA 92123, (858) 560-1468. Deliver all remaining sets of plans and calculations/reports directly to the City of Carlsbad Building Department for routing to their Planning, Engineering and Fire Departments. NOTE: Plans that are submitted directly to EsGil Corporation only will not be reviewed by the City Planning, Engineering and Fire Departments until review by EsGil Corporation is complete. • PLANS 2. Each sheet of the plans must be signed by the person responsible for their preparation. California State Law. 3. There are no architectural/life-safety corrections. • ADDITIONAL 4. See the following sheets for MEP corrections. 5. To speed up the review process, please note on this list (or a copy) where each correction item has been addressed, i.e., plan sheet, note or detail number, calculation page, etc. 6. Please indicate here if any changes have been made to the plans that are not a result of corrections from this list. If there are other changes, please briefly describe them and where they are located in the plans. Have changes been made to the plans not resulting from this correction list? Please indicate: D Yes D No 7. The jurisdiction has contracted with Esgil Corporation located at 9320 Chesapeake Drive, Suite 208, San Diego, California 92123; telephone number of 858/560-1468, to perform the plan review for your project. If you have any questions regarding these plan review items, please contact Kurt Culver at Esgil Corporation. Thank you. Carlsbad C2016-0076 January 6, 2017 PLUMBING, MECHANICAL, ELECTRICAL, and ENERGY COMMENTS PLAN REVIEWER: Eric Jensen PLUMBING (2013 CALIFORNIA PLUMBING CODE) 1. Provide calculations to show compliance with CPC Section 422 & Table 422.1. (Minimum Plumbing Facilities). The architectural summary on sheet uses IBC 2902? (Also check the urinal substitution design) 2. Identify the extent of the private sewer, water, and gas systems on the plumbing site plan. Clearly specify, on the plans, which City Department is responsible for the permitting, plan check, and inspections for the private utility systems. If the City Building Department is the agency responsible for permitting the site plumbing systems and the site plumbing is included under the scope of this building permit, then provide complete civil site utility plans for plan review. 3. All water supply systems that have quick closing valves installed therein (washing machines, flush valve fixtures, etc.) shall have devices installed to control the effects of water hammer. Please detail. CPC 609.10 4. Between the floorplans and the waste isometric many FS's & FD's show venting on a common manifold that does not address the 6" floodrim requirement. Please address. 5. Include the water heater expansion tank sizing calculations. MECHANICAL (2013 CALIFORNIA MECHANICAL CODE) 6. Mechanical design plans have not been included with this submittal. Plan check will commence after plans have been included. Be sure to include shaft detailing (@2nd floor) as well as refrigeration design.) ELECTRICAL (2013 CALIFORNIA ELECTRICAL CODE) 7. Hard to tell about the electrode system: o The electrode described is "building steel" yet so far as I may tell the building is existing concrete block with "building steel unavailable for connection to the new distribution board. Please review. o Check the electrode system to the transformer with the following concept: The water piping may not be an electrode (plastic?) and/or the building steel in not an electrode (not effectively grounded). 8. Room 124 (large transformer) ventilation to be reviewed after mechanical plans have been submitted. Carlsbad C2016-0076 January 6, 2017 ENERGY (2013 CALIFORNIA BUILDING ENERGY STANDARDS) o I believe the Title 24 Energy design is with the non-submitted mechanical plans. 9. A complete energy plan check will be preformed after completed and/or the corrected energy design has been provided. Note: If you have any questions regarding this Electrical, Plumbing, Mechanical, and Energy plan review list please contact Eric Jensen at (858) 560-1468. To speed the review process, note on this list (or a copy) where the corrected items have been addressed on the plans. Carlsbad C2016-0076 January 6, 2017 [DO NOT PAY -THIS IS NOT AN INVOICE] VALUATION AND PLAN CHECK FEE JURISDICTION: Carlsbad PLAN CHECK NO.: C2016-0076 PREPARED BY: Kurt Culver DATE: January 6, 2017 BUILDING ADDRESS: 2525 El Camino Real, #105 BUILDING OCCUPANCY: A2 BUILDING AREA Valuation PORTION ( Sq. Ft.) Multiplier Tl Air Conditioning Fire Sprinklers TOTAL VALUE Jurisdiction Code cb By Ordinance Bldg. Permit Fee by Ordinance -~ j Plan Check Fee by Ordinance i ~j Type of Review: 0 Complete Review D Repetitive Fee ~;,j Repeats Comments: D Other D Hourly EsGil Fee Reg. VALUE ($) Mod. 646,960 646,960 $2,478.261 $1,610.871 D Structural Only i------lHr. @ • $1,387.831 Sheet 1 of 1 macvalue.doc + SHIMAJI L A S C O L A structural engineers 23682 birtcher drive lake forest, ca. 92630 (949)770-9967tel (949) 770-9542/ax ARCHITECT: STRUCTURAL CALCULATIONS for THE CHEESECAKE FACTORY TENANT IMPROVEMENT THE SHOPPES AT CARLSBAD CARLSBAD, CA James Gartner & Associates, Architects, Inc. CBC2016-0076 2525 EL CAMINO REAL # 105 CHEESECAKE FACTORY: 8,982 SF Tl // ADD 458 SF FOR TOTAL RESTAURANT AREA OF 8,982 SF //OUTDOOR PATIO DINING 1.789 // INDOOR PATIO DINING 871 SF 1563020900 12/20/2016 CBC2016-0076 .. SHIMAJI & LASCOLA structural engineers THE CHEESECAKE FACTORY RESTAURANT, CARLSBAD, CA DESIGN LOADS: ROOF: (Existing) DEAD: 15.0 psf(Assumed) LIVE: 20.0 psf (Flat Roof) FLOOR: (Existing) DEAD: 15.0 psf(Assumed) SHEET __ _ JOB ____ _ LIVE: 75.0 psf(From original shell building drawings) 2013 California Building Code Loads16059 A1 •USGS Design Maps Summary Report , User-Specified Input Report Title The Cheesecake Factory, The Shoppes at Carlsbad, Carlsbad, CA Thu Octobe< 6, 2016 16:29:44 l!TC Building Code Reference Document ASCE 7-10 Standard (whoch utlizes USGS hazard data avalable in 2008) Site Coordinates 33.1786°N, 117 .33001 °W Site Soil Classification Site Class D -"Stiff Soil" Risk Category I/II/III USGS-Provided Output S. = 1.109 g s, = 0.427 g SNS = 1.172 g SN,= 0.672 g s •• = 0.781 g s., = 0.448 g For information on how the ss and 51 values above have been calculated from probabilistic (risk-targeted) and deterministic ground motions in the direction of maximum horizontal response, please return to the appiicatlon and select the "2009 NEHRP" building code reference document. ] • Ill MCE,. Response Spectrum I 20 I 01 O." 0.1.C 0.72 0 •• ... 0.1, . ,. 012 0.00 +--+--+----<>--+--+--+--+--<>--+----< o oo o 20 o.,o o.'° a.to 1.00 1 20 1.,0 1 ,o 1 to 2.00 Period, T (secl OH Design Response Spectrum 0 10 0 12 0" ... ] ... : 0 •• 0 )2 o.:zc • 1, ... • 00 +--+--+--t--+--+--+--+-->--+--1 0 00 0 20 0 '° o.,o O 10 1.00 l 20 l 40 1 '° 1 IO 2.00 Period. T C sec) For PGA", TL, C11.s, and Cu values, please view the detailed reoort. Although thiS nrormat,on Is a produa of the U.S. Geological Survey, we provide no warr11nty, expressed or h'lplied, as to the Keuracy of the data c:onta~ed therel'l, This tool ls not a substitute for technical subJec:t·matter-knowtedoe. A2 SH/MAJ/ & LASCOLA structural engineers JOB. _______ _ ENGINEER. ______ _ DESIGN OF: MALL ENTRY CANOPY ENTRY CANOPY BEAM CB1 : Lcb1 :=6 ft wcbl := 5.0 ft· ( 15 psf + 20 psf) = 175 plf 2 Wcbl •Lcbl f ---= 3150 ft• lb 2 M 12 in cbl • 1 ft -----=l.37in3 0.6. 46000 lbf 2 (1 in) R cbl := wcbl • L cbl = 1050 lbf Use HSS 6 x 4 x 1 /4 ENTRY CANOPY COLUMN CC1 : H co1:=16 ft Use HSS 5 x 5 x 3/8 R1;op:=84 lbf+113 lbf=197 lbf R00t := 84 lbf + 113 lbf = 197 lbf A3 .. SHEET NO .. ______ _ DATE. _______ _ Shimaji & Lascola, Inc 23~e,'2 Birtcher Drive Lake Forest, CA 92630 (949) 770-9967 Title Block Line 6 'Steel ColuijTHh' Description : Mall Entry Canopy Column CC1 . Cwe·References. Project Title: The Cheesecake Factory, Carlsbad, CA 16059 A4 Engineer: Project ID: Proiect Descr: Calculations per AISC 360-10, IBC 2012, CBC 2013, ASCE 7-10 Load Combinations Used: ASCE 7-10 General Information Steel Section Name : Analysis Method : Steel Stress Grade Fy : Steel Yield E : Elastic Bending Modulus Applied'foads HSS5x5x3/8 Allowable Strength 46.0 ksi 29,000.0 ksi Overall Column Height 16.0 ft Top & Bottom Fixity Top & Bottom Pinned Brace condition for deflection (buckling) along columns : X-X (width) axis : Fully braced against buckling along X-X Axis Y-Y (depth) axis: Fully braced against buckling along Y-Y Axis Service loads entered. Load Factors will be applied for calculations. Column self weight included : 357 .920 lbs * Dead Load Factor AXIAL LOADS ... Axial Load at 9.50 ft, D = 0.450, LR= 0.60 k BENDING LOADS ... Moment acting about X-X axis, D = 1.350, LR= 1.80 k-ft DESIGN SUMMAR¥. Bending & Shear Check Results PASS Max. Axial+Bending Stress Ratio = Load Combination Location of max.above base At maximum location values are ... Pa: Axial Pn I Omega : Allowable Ma-x : Applied Mn-x I Omega : Allowable Ma-y : Applied Mn-y I Omega : Allowable PASS Maximum Shear Stress Ratio= Load Combination Location of max.above base At maximum location values are ... Va: Applied Vn I Omega : Allowable ···· Load CombinationResults Load Combination D Only +D+Lr +D+0.750Lr +1.1090 +1.0820 +0.600 +0.49070 Maximum Reactions Load Combination DOnly +D+Lr +D-+-0.750Lr -+-0.600 Lr Only 0.1336 : 1 +D+Lr 0.0 ft 1.408 k 170.228 k -3.150 k-ft 24.331 k-ft 0.0 k-ft 24.331 k-ft 0.004317 : 1 +D+Lr 0.0 ft 0.1969 k 45.601 k Maximum Axial + Bending Stress Ratios Stress Ratio Status Location 0.058 PASS 0.00 ft 0.134 PASS 0.00 ft 0.115 PASS 0.00ft 0.064 PASS 0.00 ft 0.063 PASS 0.00 ft 0.035 PASS 0.00 ft 0.028 PASS 0.00 ft X-X Axis Reaction @Base @Top k k k k k Maximum SERVICE Load Reactions .. Top along X-X Bottom along X-X Top along Y-Y Bottom along Y-Y Maximum SERVICE Load Deflections ... AlongY-Y -0.1445in at for load combination :+D+Lr Along X-X 0.0 in at for load combination : Maximum Shear Ratios 0.0 k 0.0 k 0.1969 k 0.1969 k 6.765ft above base 0.0ft above base Stress Ratio Status Location 0.002 PASS 0.00 ft 0.004 PASS 0.00 ft 0.004 PASS 0.00 ft 0.002 PASS 0.00 ft 0.002 PASS 0.00 ft 0.001 PASS 0.00 ft 0.001 PASS 0.00 ft Y-Y Axis Reaction @Base @Top -0.084 -0.084 k -0.197 -0.197 k -0.169 -0.169 k -0.051 -0.051 k -0.113 -0.113 k Note: Only non-zero reactions are listed. Axial Reaction @Base 0.808 k 1.408 k 1.258 k 0.485 k 0.600 k Shimaji & Lascola, Inc 23682 Birtcher Drive Lake Forest, CA 92630 (949) 770-9967 Description : Mall Entry Canopy Column CC1 .JAi:iximum Deflections for Load Combinations Load Combination Max. X-X Deflection DOnly 0.0000 in +D-+lr 0.0000 in +D+0.750Lr 0.0000 in +0.60D 0.0000 in Lr Only 0.0000 in Distance 0.000 0.000 0.000 0.000 0.000 Project Title: Engineer: Proiect Descr: The Cheesecake Factory, Carlsbad, CA 1605;0. AS Project ID: ~ "· Max. Y-Y Deflection Distance ft -0.062 in 6.765 ft ft -0.145 in 6.765 ft ft -0.124 in 6.765 ft ft -0.037 in 6.765 ft ft -0.083 in 6.765 ft City of Carlsbad 1635 Faraday Av Carlsbad, CA 92008 Print Date: 11/02/2017 Permit Permit No: PREV2017-0092 www.carlsbadca.gov Job Address: Permit Type: 2525 El Camino Real, 105 BLDG-Permit Revision 1563020900 Work Class: Residential Permit Revisi Status: Completed 05/11/2017 05/25/2017 Parcel No: Valuation: Occupancy Group: # Dwelling Units: Bedrooms: Project Title: $ 0.00 Lot#: Reference#: Construction Type: Bathrooms: Orig. Plan Check#: CBC2016-0076 Plan Check#: Description: CHEESECAKE FACTORY: FIELD REVISIONS Applicant: JAM ES GARTNER 2036 N Broadway Santa Ana, CA 92706-2612 714-560-9210 x102 MANUAL BUILDING PERMIT FEE Total Fees: $ 375.00 Owner: R P I CARLSBAD LP 1114 Avenue Of The Americas, Floor 45 New York, NY 10036-7700 214-660-5232 x215232 Total Payments To Date : $ 375.00 Applied: Issued: Fina led: Inspector: MColl $375.00 Balance Due: $ 0.00 (city of Carlsbad PLAN CHECK REVISION APPLICATION B-15 Development Services Building Division 1635 Faraday Avenue 760-602-2719 www.carlsbadca.gov Plan Check Revision No.PREN' 2.0 1,-ocf\ 2. Original Plan Check No. CBC2016-0076 Project Address The Shoppes, 2525 El Camino Real, Suite 105 Date 05-11 -1 7 Contact James Gartner Ph 714-560-9210 X 102 Fax Email jg@jgartner.com Contact Address 2036 N. Broadway City Santa Ana Zip 92706 General Scope of Worl< Field Revisions Original plans prepared by an architect or engineer, revisions must be signed & stamped by that person. 1 . Elements revised: 0 Plans D Calculations D Soils D Energy D Other 2. 3. 4. Describe revisions in detail List page(s) where List revised sheets each revision is that replace shown existing sheets The attached narratives describe in detail the revisions made to the See narratives See narratives attached plans. 5. Does this revision, in any way, alter the exterior of the project? D Yes 0No 6. Does this revision add ANY new floor area{s)? D Yes 7. Does this revision affect any fire related issues? D Yes ___ ..__. 8. Is this a complete set? D Yes 0 No 1635 Faraday Avenue, Carlsbad, CA 92008 Ph: 760-602-2719 Fax: 760-602-8558 Email: building@carlsbadca.gov www.carlsbadca.gov DATE: May 22, 2017 JURISDICTION: Carlsbad EsGil Corporation In Partnersfiip witfi government for <J3ui{rfing Safety PLAN CHECK NO.: CBC2016-0076 REV SET: I ~2.arl-coC\2. PROJECT ADDRESS: 2525 El Camino Real, #105 PROJECT NAME: The Cheesecake Factory Revisions DpPPLICANT ~ JURIS. D PLAN REVIEWER D FILE ~ The plans transmitted herewith have been corrected where necessary and substantially comply with the jurisdiction's building codes. D The plans transmitted herewith will substantially comply with the jurisdiction's codes when minor deficiencies identified below are resolved and checked by building department staff. D The plans transmitted herewith have significant deficiencies identified on the enclosed check list and should be corrected and resubmitted for a complete recheck. D The check list transmitted herewith is for your information. The plans are being held at EsGil Corporation until corrected plans are submitted for recheck. D The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant contact person. D The applicant's copy of the check list has been sent to: ~ EsGil Corporation staff did not advise the applicant that the plan check has been completed. D EsGil Corporation staff did advise the applicant that the plan check has been completed. Person contacted.<:--. C) Telephone#: Date contacted: (t({Y,f) Email: Mail Telephone Fax In Person ~ REMARKS: PREV2017-0092 By: Kurt Culver EsGil Corporation D GA D EJ D MB D PC Enclosures: Previously-approved plans 5/15/17 9320 Chesapeake Drive, Suite 208 + San Diego, California 92123 + (858) 560-1468 + Fax (858) 560-1576 Carls.jad CBC2016-0076 REV May 22, 2017 [DO NOT PAY -THIS IS NOT AN INVOICE] VALUATION AND PLAN CHECK FEE JURISDICTION: Carlsbad PLAN CHECK NO.: CBC2016-0076 REV PREPARED BY: Kurt Culver DATE: May 22, 2017 BUILDING ADDRESS: 2525 El Camino Real, #105 BUILDING OCCUPANCY: BUILDING AREA Valuation PORTION ( Sq. Ft.) Multiplier Air Conditioning Fire Sprinklers TOTAL VALUE Jurisdiction Code cb By Ordinance Bldg. Permit Fee by Ordinance •] Plan Check Fee by Ordinance 3 Type of Review: D Complete Review D Repetitive Fee =---~] Repeats * Based on hourly rate Comments: D Other 0 Hourly EsGil Fee Reg. VALUE Mod. D Structural Only 31 Hrs.@* i------$-1_0_0 __ 0....,0 ~---- ($) $375.ooj $300.ooj Sheet 1 of 1 macvalue.doc + DATE: May 3, 2017 TO: JGA ATTENTION: Glen Kanzelmeyer MAY 11 2017 FROM: Dan Moss PROJECT: The Cheesecake Factory -Carlsbad, CA Project MEP #: 16190 E-Cloud-3 -Revisions: Sheet E2.0 1. Revised circuit #6, panel "C" to "Spare" to reflect removed of the patio water I fire feature as indicated. 2. Provided connected load, description and 15A-1 P circuit breaker to circuit #43, panel "C" for connection of new TriMark Raygal kitchen item #144D as indicated. 3. Provided connected load, description and 15A-1 P circuit breaker to circuit #45, panel "C" for connection of new TriMark Raygal kitchen item #211 G as indicated. Sheet E3.0 1. Revised fixture type "UR2a" to "Not Used" to reflect removal of the patio water I fire feature as indicated. 2. Revised dimming circuit #68, panel "DMC" to "Spare" to reflect removal of the patio water I fire feature lighting fixtures "UR2a" as indicated. Sheet ES.O 1. Revised Plan Note #7 to "Not Used" as indicated. 2. Eliminated (10) ten fixture types "UR2a" from patio to reflect removal of the patio water I fire feature as indicated. Sheet E6.0 1. Removed switches, junction boxes and underground conduit I conductors to reflect the removal of the patio water I fire feature as indicated. 2. Revised Plan Note #54 for the connection of hood heat sensors to TriMark Raygal's new kitchen item #144D as indicated. 3. Provided Plan Note #57 for the connection of hood heat sensors to TriMark Raygal's new kitchen item #211G as indicated. 4. Provided power connections to TriMark Raygal's new kitchen items #114D & #211G as indicated. Sheets E12.0, E12.1 & E12.2 1. Updated Title 24 forms to reflect the removal of (10) ten "UR2a" exterior patio water I fire feature fixtures as indicated. --END -- Project MEP, Inc. Mechanical, Electrical and Plumbing Engineering 1221 E. Dyer Road• Suite 260 • Santa Ana, CA• 92705-5636 • (949) 428-8800 TE: TO: ATTENTION: FROM: PROJECT: ENGINEERING GROUP, INC. Mechanical I Electrical Plumbing May 3, 2017 James Gartner & Associates Architects, Inc. Glen E. Kanzelmeyer Conrad Orr, Jr The Cheesecake Factory-Carlsbad, CA Delta #2 & 3 Narrative: P1.0 1. Added 'DN-2' specification to the Plumbing Fixture Schedule. P2.0 1. Formally issuing SK-03 changes under Delta #2, see clouded. 2. Removed drain line of fire/water feature. 3. Removed vent line of drain line to water feature. 4. Removed notes #20 & 21. P3.0 1. Removed water piping to fire/water feature. 2. Removed note #74. P4.0 1. Formally issuing SK-01 changes under Delta #2, see clouded. 2. Added overflow drain piping and terminations for added overflow drains to main roof per removal of existing overflow scuppers. 3. Revised Plan Notes, see clouded. 4. Removed gas piping to fire/water feature. 5. Down sized gas piping as required to accommodate revised gas demand. 6. Removed notes #28, 29, and 40. PS.O 1. Added overflow drains to main roof per removal of existing overflow scuppers. 2. Revised Plan Notes, see clouded. P6.0 1. Revised waste and vent piping isometric to reflect P2.0 P6.1 1. Revised water piping isometric to reflect P3.0. P6.2 1. Revised gas piping isometric to reflect P4.0. End of Revision Narrative. 18652 Florida St • Suite #100 • Huntington Beach • CA • 92648 Phone: 714-847-7100 • E-mail: info@croeg.com • Fax: 714-841-6000 m& ~, mmm • si1.m CA mob m: 7lUU,mo ~ FAX: 7JU6Um Date: 04May2017 Project: TCF -Carlsbad ShtNo. A2.0 A2.1 The Shoppes at Carlsbad Carlsbad, CA Description of Chan2es Dimension revised New cow tongue added To: DELTA2-3 City of Carlsbad, Building Division 1635 Faraday Ave. Carlsbad, CA 92008 Ori2;in/Cause TCF Revision TCF Revision Keynote 50 revised, ADA seating moved, bar storefront revised TCF Revision A2.2 Dimension revised TCF Revision A2.4 Detail 2 revised TCF Revision A4.0 New overflow added, existing roof drain added TCF Revision A5.0 Keynote 23 revised TCF Revision A7.0 Door width revised TCF Revision A7.l Detail I and 34 revised TCF Revision A7.2 Sill height revised TCF Revision A8.0 Detail 9 revised TCF Revision James Gartner & Associates Page 1 of 1 SHIMAJI LASCOLA structural engineers 23682 birtcher drive lake forest, ca. 92630 (949)770-9967tel (949) 770-9542/ax PROJECT: THE CHEESECAKE FACTORY, CARLSBAD, CA (16059) REVISION: DELTA 2 DATE: MARCH 30, 2017 STRUCTURAL NARRATIVE OF CHANGES S3.0: a. Updated floor framing at new duct shaft to reflect Landlord modifications. S5.0: a. Added detail 21. b. Updated details 5 and 10. S5.2: a. Added detail 10. 16059 Delta2 narrative SHIMAJI LASCOLA structural engineers 23682 birtcher drive lake forest, ca. 92630 (949)770-9967tel (949)770-9542/ax PROJECT: THE CHEESECAKE FACTORY, CARLSBAD, CA (16059) REVISION: DELTA 3 DATE: MAY04, 2017 STRUCTURAL NARRATIVE OF CHANGES S1 .0: a. Added pad footing schedule. S2.0: a. Deleted erroneous detail reference 7/S4.0. S4.0: a. Clarified bottom of new footings to match bottom of adjacent existing footings in details 17 and 19. l 6059 Delta 3 narrative PLAN CHECK REVISION APPLICATION B-15 Development Services Building Division 1635 Faraday Avenue 760-602-2719 www.carlsbadca.gov Plan Check Revision No. Original Plan Check No. C2016-0076 Project Address 2525 El Camino Real #105 Date Contact Ph Fax Email Contact Address City Zip General Scope of Work Original plans prepared by an architect or engineer, revisions must be signed & stamped by that person. 1 . Elements revised: [Z] Plans D Calculations D Soils D Energy D Other 2. 3. 4. Describe revisions in detail List page(s) where List revised sheets each revision is that replace shown existing sheets See narratives attached for complete list of revisions to drawings See narratives 5. Does this revision, in any way, alter the exterior of the project? D Yes [Z] No 6. Does this revision add ANY new floor area(s)? D Yes [Z] No 7. Does this revision affect any fire related issues? [Z] Yes D No 8. ls this a complete set? D Yes [Z] No ~Signature~~~~~~~~~~~~~~~~~~~~~~~~~~~~ 1635 Faraday Avenue, Carlsbad, CA 92008 Ph: 760-602-2719 Fax: 760-602-8558 Email: building@carlsbadca.gov www.carlsbadca.gov IJll§TriMark .Raygal Foodservice Design, Equipment and Supplies 2801 McGaw Avenue Irvine, CA 92614-6269 Tel : 949-474-1000 Fax: 949-474-1122 Revisions Summary Project Name: The Cheesecake Factory@ Carlsbad, CA Job Number: 56147 Revision Issue: Delta 3 Revision Title: Revisions Revision Dates: 2017-04-18 Sheets Revised: 1. K-5.1 -Added interconnecting wirings for hood heat sensors and temp control box to be field wired by EC. -Adjustment of the mounting height of the electrical outlets for the rice cookers (item 133). 2. Sheet K-6.1 -Corrected length of platform deck for remote compressor on roof. 3. Sheet K-8.1 -Updated hood shop drawing that includes the heat sensors information and requirement. 4. Sheet K-8.2 -Updated hood shop drawing that includes the heat sensors information and requirement. Prepared by: Vonnel Mendoza