Loading...
HomeMy WebLinkAbout2669 PARADISE RD; ; CB050068; PermitCity of Carlsbad I"' 1635 Faraday Av Carlsbad, CA 92008 .. 02-08-20C'I.> Residential Permit Permit No: CB050068 Building Inspection Request Line (760) 602-2725 Job Address: 2669 PARADISE RD CBAD Permit Type: RESDNTL Sub Type: SFD Status: Parcel No: 2131412400 Lot#: 123 Applied: Valuation: $262,144.00 Construction Type: VN Entered By: Occupancy Group: Reference#: CT020014 02/08/2005 # Dwelling Units: Structure Type: SFD Issued: Bedrooms: 4 Bathrooms: 3 Inspect Area: Project Title: WISTERIA-BRESSI-PLAN 4-PHS 2 Orig PC#: 2716 SF,477 SF GAR,103 SF PORCH Applicant: GREYSTONE HOMES 101 5973 AVENI DA ENCINAS CARLSBAD CA 92009 760-804-7700 Building Permit Add'I Building Permit Fee Plan Check Add'I Plan Check Fee Plan Check Discount Strong Motion Fee Park in Lieu Fee Park Fee LFM Fee Bridge Fee Other Bridge Fee BTD #2 Fee BTD #3 Fee Renewal Fee Add'I Renewal Fee Other Building Fee Pot. Water Con. Fee Meter Size Add'I Pot. Water Con. Fee Reel. Water Con. Fee $1,048.60 $0.00 $681.59 $0.00 ($54.53) $26.21 $2,436.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $2,999.00 D5/8 $0.00 $0.00 Plan Check#: Owner: GREYSTONE HOMES INC 1525 FARADAY AVE #300 CARLSBAD CA 92008 Meter Size Add'I Reel. Water Con. Fee Meter Fee SDCWA Fee CFD Payoff Fee PFF PFF (CFD Fund) License Tax License Tax (CFD Fund) Traffic Impact Fee Traffic Impact (CFD Fund) Sidewalk Fee PLUMBING TOTAL ELECTRICAL TOTAL MECHANICAL TOTAL Housing Impact Fee Housing lnLieu Fee Housing Credit Fee Master Drainage Fee Sewer Fee Addilional Fees TOTAL PERMIT FEES ISSUED 12/03/2004 RMA Plan Approved: 02/08/2005 TP PC030075 PC040136 $0.00 $160.00 $2,004.00 $2,848.90 $4,771.02 $0.00 $0.00 $0.00 $660.00 $0.00 $0.00 $161.00 $60.00 $85.00 $0.00 $0.00 $0.00 $0.00 $1,735.00 $457.00 $20,078.79 Total Fees: $20,078.79 Total Payments To Date: $0.00 Balance Due: $20,078.79 ~~ Inspector: . 7~«,I, (. 1412 02/08/05 0002 01 CGF" Clearance: NOTICE: Please take NOTICE that approval of your project includes the ··1mposit1on" of fees, dedications, reservations, or other exactions hereafter collectively referred to as "fees/exactions." You have 90 days from the date this permit was issued to protest imposition of these fees/exactions. It you protest them, you must follow the protest procedures set forth in Government Code Section 66020(a), and file the protest and any other required information with the City Manager for processing in accordance with Carlsbad Municipal Code Section 3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack, review, set aside, void, or annul their imposition. You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capacity changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this project. NOR DOES IT APPLY to any fees/exactions of which 11ou have nreviousl11 been "iven a NOTICE similar to this or as to which the statute of limitations has nreviousl11 otherwise exrired 02 20078-79 City of Carlsbad Bldg Inspection Request For: 08/23/2005 Permit# CB050068 Title: WISTERIA-BRESSI-PLAN 4-PHS 2 Description: 2716 SF,477 SF GAR,103 SF PORCH · Type: RESDNTL Sub Type: SFD Job Address: Suite: Location: 2669 PARADISE RD Lot 123 APPLICANT GREYSTONE HOMES Owner: GREYSTONE HOMES INC Remarks: Total Time: CD Description Act Comment 19 Final Structural A.I 29 Final Plumbing t 39 Final Electrical 49 Final Mechanical Associated PCRs/CVs lns11ection Histo[ll Date Description Act lnsp Comments 08/22/2005 89 Final Combo co BN 08/05/2005 39 Final Electrical AP PC EMA 06/22/2005 82 Drywall/Ext Lath/Gas Test AP TP 06/16/2005 16 Insulation AP PC 06/16/2005 84 Rough Combo AP PC Inspector Assignment: TP --- Phone: 7606441806 Requested By: JAMIE Entered By: cw 06/09/2005 84 Rough Combo co PC draft stoping check at lnsul 05/24/2005 13 Shear Panels/HD's AP TP 05/12/2005 15 Roof/Reroof AP PC 03/29/2005 11 Ftg/Foundation/Piers AP PC 03/23/2005 11 Fig/Foundation/Piers NA BN 03/09/2005 11 Fig/Foundation/Piers WC TP 03/09/2005 12 Steel/Bond Beam WC TP 03/09/2005 21 Underground/Under Floor AP TP 03/09/2005 31 Underground/Conduit-Wiring WC TP 03/08/2005 81 Underground Combo NA PC