HomeMy WebLinkAbout2708 Gateway Rd; ; CBC2017-0546; Recycle'1:_.Cityof
Carlsbad
WASTE MANAGEMENT
PLAN
B-59
Development Services
Building Division
1635 Faraday Avenue
760-602-2719
www.carlsbadca.gov
Owner: Contractor:
Job Address:2.7o 3 C1~-te,W£7 12, D
Permit#: CJ?,C 20\ l -0 l '-l l
] 6·,Q ·-<1' 5-5--I :C2 l Phone Number: __ -'--'"-----C>=-=--'---{.-J_J ______ _
Estimated Cost of Project: $ _____________ _
Type of Project: D New Construction ¢'Remodel or T.I. D Residential D Commercial D Demolition
~heckall~~app~) DO~fil _____________________________ _
Non-hazardous construction waste generated during the course of this project shall be recycled and/or salvaged for re-use at a
minimum of 65% per CALGreen Sec. 5.408.1. Failure to comply may result in a penalty fee up to $1,000. For projects which
consist of mainly equipment and/or racking, that have a combined weight of new construction disposal that does not exceed 2
lbs per square foot of building area affected by this permit, may be deemed to meet the 65% minimum requirement upon
approval of Building Department.
ALTERNATIVE FORMS OF COMPLIANCE: (If selected, do not complete Tables 1 & 2 below)
D Construction waste shall not exceed 2 lbs. per sf. of area. All receipts shall be provided to the Building Official prior to
final. (This option not applicable for most construction projects.)
Square feet of construction area X 2 lbs. = lbs. of allowable waste.
D I plan on using a WASTE MANAGEMENT roll-off bin. All receipts shall be provided to the Building Official prior to final.
Table 1 -Estimated Waste (To be filled out prior to permit issuance -refer to example on Page 2.)
MATERIALS lbs. of waste to be taken to lbs. of waste to be Waste Hauling Company or Re-Use Method LANDFILL RE-USED or RECYCLED
Asphalt/ Concrete
Brick/ Masonry At I fJ.. All /1-A//Jf .. I
Cardboard
Drywall , qoo I q bo
Landscape Debris /.J/A ,,t'Jt 1//114
Lumber/ Wood ,
Metals
Mixed Waste
Trash I Garbage
Other:
TOTAL lbs:
Estimated Percentage to be Re-Used or Recycled. ______ %
I certi9' t~at the_ information provided herein, to the best of my knowledge, is true and correct.
t1.JZ/'11.! 2.-. Lo~
Contr Cto~Owner(prin~e). ... / . ./~'{ .. // . <c::-:-<·~-~ a-tu -
C~~~r or Owner (s~ature) Date
,{/f i·Official Use Only
17
D Plan Approved D Plan Denied D Project Valuation Approved
Reviewed/ Approved by: _________________ _
Page 1 of 2 REV.01-2017
Table 2 -Actual Waste (To be completed after construction.)
MATERIALS lbs. of waste taken to I bs. of waste Waste Hauling Company or Re-Use Method
LANDFILL RE-USED or RECYCLED (complete only if different than Table 1)
Asp ha It/ Concrete
Brick/ Masonry
Cardboard
Drywall
Landscape Debris
Lumber/ Wood
Metals
Mixed Waste
Trash I Garbage
Other:
TOTAL lbs.:
Actual Percentage Re-Used or Recycled ______ %
Official Use Only
D 65% Goal Achieved D 65% Goal Not Achieved D Alternative Compliance Achieved Penalty Paid $ _______ _
Reviewed/ Approved by: __________________ _
EXAMPLE: Use the following example as a guide to completing this form.
MATERIALS lbs. of waste to be taken to lbs. of waste to be
LANDFILL RE-USED or RECYCLED
Asphalt I Concrete 0 3000
Brick I Masonry iOO C)SO
Cardboard 0 1-50
Drywall 0 so
Landscape Debris 0 1-20
Lumber I Wood 500 0
Metals 300 200
Mixed Waste 1-500 0
Trash I Garbage 300 0
Other: 'PooL c::;uV\.,Lte 0 1300
TOTAL lbs.: 2700 5,3J-O
Percentage to be Re-Used or Recycled 6 7 %
Formula:
Total Re-used or Recycled X 100 = % Re-Used or Recycled
(Total Combined Waste)
Waste Hauling Company or Re-Use Method
A"t;C rtciuLLV\.,C\ Co.
WM I Re-used lsvie,R OV\.,-s.Lte
A"t;C 1-tciuLLV\.,C\ Co.
A"t;C rtciuLLV\.,C\ Co.
MuLe,vied _c=; Re-used OV\.,-s.Lte
wci.ste M&1V1.,&1C\eVIA.,eV\.,t
WM I A"t;C rtciuLLV\.,g
WM
WM
used ci.s ems.vied 1;ci.se OV\.,-s.Lte
5370 X 100 = 67% Re-Used or Recycled
(2700 + 5370)
Since 67% exceeds the minimum requirement of 65%, this plan complies.
Page 2 of 2
11358
WASTE & RECYCLING SERVICES
"We'll Take Care of It''-
Construction & Demolition Diversion Certificate
Received & Date:
Processed At : CDI -SAN MARCOS
Customer: Ticket# 0
Total Tons Received: ___ Tons Diversion Percentage: O/o ----
Scale House Operator's Signature: _________ _
This certifies that the company listed above has utilized a EDCO facility to divert construction demolition materials in accordance
with LEED requirements. The diversion tonnage is based on an overall tonnage percentage of the respective EDCO facility.
,
I
FI(XI JIASTE t, RBCYCL-lN<, {i'll:~!CFS, JOC
?'!4 S. !AS Kf..'..Jw. Rll
~N Mffl'".S ~ (~ ~~~)'1.f\
( ;;f,J.n ?4~-VO(,
',rj~tt:: l~ffl
J~t<t1>::: <~1M7
.. . .,; . • •"-.;.. # ....
ln: ,1 ;00 '!MA!.ic (~('<~
,Ul)tt.:: U :::10 ci:~t.aJl!lt'r::-
~,t~: ~5,
OM .... v.l!t:: Ot::ro ~.AY ~ll
tr.n~A
f):~lit.y Klf!ll'I:& ~~· ~~
~ ~ll ffl~fAt ~-. l~ ~_cl)t) I~ '{(tlll iff!-~
t~~u~~~ 17."':~) .. n?$ Hw! i6l: ·r;;iiN· u,,q}tl{I). !~~"flt. ~t.! ,~,.,~. u~1
r:-~10 a~~ ?.m oo
r[R -t~<\4
~i,-ft Oew>lt.'\l<'M. ~siU"« ~i.{i.~ -Oivu:si"4 ~ mt:
\\ts ~m·~ th\ \~ ~ l\g™ WM Mt 1'\\Utt,4 U (LIOO (tttm, ,, (!nr\ ~t .. mlmoa N1tl'ida i! !CtvPdW:f
;im un ~11fflt1\. 1\f} ti"fl'.nl" \rJ!Wt t~ btiM ~ u m!tH \""~ ~\tit ~r ,~ ~i!,,. t~ ht.im,.
'
-
9021-608
tJJSs
9021-608
,
113SO
WASTE & RECYCLING SERVICES
''We'll Take Care of It"
Construction & Demolition Diversion Certificate
Received & Date:
Processed At : COi -SAN MARCOS
... -
l,,61-1 Ticket #
, ?0 Customer:
1 -R-
Project: Number/Description _____ _J_.: ____ /t _______ ~_#_IA
Total Tons Received: I Tons
This certifies that the company listed above has utilized a EDCO facility to divert construction demolition materials in accordance
with LEED requirements. The diversion tonnage is based on an overall tonnage percentage of the respective EDCO facility.
11360
WASTE & RECYCLING SERVICES
"We'll Take Care of It"
Construction & Demolition Diversion Certificate .. I
Received & Date:
Processed At : CDI -SAN MARCOS
Customer:
Project: Number/Description
Total Tons Received:
1 11 7 ~ Tons
Ticket# {!)(JO 0
-00 rA~ ~11u f!.ch
DiversiqJl PefCE;ntage: 'Jb 0/o
1-f R /.4~',J-C/
Scale House Operator's Signature: __ r _7 __ , _____ _
I .-This certifies that the company listed above has utilized a EDCO facility to divert construction demolition materials in accordance
with LEED requirements. The diversion tonnage is based on an overall tonnage percentage of the respective EDCO facility.
9021-606 ... ,. 12163
WASTE & REC YCLING SERVICES
"We-'ll Take Care of Ir-
'.··· : ..
Construction & Demolition Diversion Certificate
I
Received & Date: .?// Ox/101-:;-
Processed At : CDI -SAN MARCOS (
Customer: ft/)(:r. l;fJH /2., (.//-l"icket # 0
Project: Number/Description _C _____________ _
. i{.,!t,)
11Rllfll1U"J. !fl Percentage~ % .,. '.
,
Total Tons Received: Tons ---
Scale House Operator's Signature: ----------------
This certifies that the company listed above has utllized a EDCO facility to divert construction demolition materials in accordance
with LEED requirements. The diversion tonnage is based on an overall tonnage percentage of the respective EDCO facility.
PALOMAR TRANSFER STA
5960 EL CAMINO REAL
CARLSBAD, CA 92008
08/19/2017 09:06:43
Card#
Chip Card:
AID:
ATC:
TC:
SEQ#:
Batch#:
INVOICE
Approval Code:
Entry Method:
Mode:
Tax Amount:
CREDIT CARD
VISA SALE
'/.JmXXYY.JJ.X2749
Visa Credit
A0000000031010
OOGE
F4077720186450A3
15
206
17
875640
Chip Read
Issuer
io.oo
SAlEAMOUNT $55.19
CUSTOMER COPY
Signature:
54 Ticket #: 1640558
Weighmaster: RAMOSAL
CUSTOMER
. 2
i40
)00
340
l. 00
ion
Scale In
Tare Out
100%
In: --migust 19, 2017
Out: August 19, 2017
Vehicle: A36053
Ref:
BOL:
INBOUND
CASH
Rate Extension
$67.30 $55.19
.EDIT
Tax
$0.00
Total
Paid
Change
CARD-SCALE
9:06 am
9:06 am
100%
Total
$55.19
$55.19
$55.19
$0.00
V
t
PAL0t"IAK"l AAttofER ST A
5%0 EL CAMINO REAL
CARLSBA01 CA 92008
13:46:06 09/08/2017 ? CREDIT CARD C VlSASALE
Card# /,tf) 'JY..XX'f/,'f/,~
Chip Card: . CAPlT AL ONE IJ1SA
AID: A0000000031010
ATC: 0012
TC: 27EBDD1822BB1CCB
SEQ#: 65
Batch#: 226
INVOICE 75
Approval Code: 081949
Entry Method: Chip Read
Mode: Issuer
Tax Amount $O.OO
5 Ticket #: 1650162
Weighmaster: padilan
K CUSTOMER
'tr. 2
, 320 Scale In
, 900 Tare Out
,420
0.00
tion
100%
In: September 08, 2017
Out: September 08, 2017
Vehicle: A36053
Ret:
BOL:
INBOUND
CASH
Rate Extension
$67.30 $182.38
Tax
$0.00
SALE AMOUNT $182.38 ~
CUSTOMER COPY
Signature:
Total
Paid
Change
.EDIT CARD-SCALE
1:45 pm
1:45 pm
Tot.a:
$J.82. 38
$182.38
$182.38
$0.00
V
,.. '? PAtvMAR Tl\AtlSfER STA
/ 596.0 EL CAMINO REAL
CARLSBAD1 CA 92008
~
CARD#
Chip Card:
Chip Card AID:
ATC:
TC:
INVOICE
SEQ#:
Batch#:
Approval Code:
Entry Method:
Mode:
Tax Amount:
09:19:46
CREDIT CARD
VISA SALE
XX~XXXX1155
VI~T
A0000000031O10
001E
89C7CB9DF0614133
0017
0017
000135
091946
Chip Read
Issuer
$0.00
SALE AMOUNT
CUSTOMER COPY
Signature:
ECK CUSTOMER
E Yr. 2
14,000 Scale In
10,900 Tare Out
3,100
0.00
:iption
1
54 Ticket #: 1606366
Weighmaster: juareom
-· In: June 09, 2017
Out: June 09, 2017
'ilehicle; A36053
Ref;
BOL:
rr~Bou,ir.}-
CAS H
Rate
.30
Total
Paid
Change
.EDIT CARD-SCALE
9:19 am
9:19 am
Total
$104.32
$104.32
$104.32
$0.00
V
• tl i\LOMAR TRANSFER ST A .. Z 5960 EL CAM!f~O REAL
CARLSBAD, CA 92008
07/06/2017 08:+2:29
CREDIT CARD
54 Ticket #: 1619072
Weighmaster: gomezda
In: July 06, 2017
VISA SALE :CK CUSTOMER Out: July 06, 2017
Vehicle: A36053 CARD l/
Chip Card:
Chip Card AID:
ATC:
TC:
INVOICE
SEQ it:
Batch rt;
Apprnv al Code
Entr I Mett10d:
Mode:
Tax Amount:
SAlE AMOUNT
I\ ,\,, ,, 1\._t X'tl.XXYXYX!_X"t1:a,..
Vlsa Credit
AOOllOOOOOi1Dl 0
0060
H01B077EW+0455
0009
0008
000162
950988
Chip Re..id
Issuer
$0 00
.r.Dn.:t7~ ~·
CUSIOMER COPY
Signature:
Yr. 2
14,480
10,900
3,580
0.00
::-iption
Scale In
Tare Out
100%
Ref:
BOL:
INBOUND
CASH
Rate Extension
$67.30 $120.47
Tax
$0.00
Total
Paid
Change
.EDIT CARD-SCALE
8:41 am
8:41 am
Total
$120.47
$120.47
$120.47
$0.00
V
PALOMAR J.'!¥,~l~~R ST A
5960 EL CAMINO REAL
CARLSBAD I CA 92008
08:09:37 04/04/2017
CARD#
Chip Card:
Chip Card AID:
ATC:
TC:
INVOICE
SEQ#:
Batch#:
Approval Code:
Entry Method:
Mode:
Tax Amount:
CREDIT CARD
VISA SALE
~4709
V1SADEffiT
A0000000031010
0180
6BE746980DDC19B3
0007
0005
000070
35W~
Chip Ri
Issuer
$0.00
SALE AMOUNT ~-
CUSTOMER COPY
Signature:
54 Ticket#: 1575215
Weighmaster: juareom
::K CUSTOMER
Yr. 2
3,080
), 900
7,180
0.00
pt ion
Scale In
Tare Out
100%
In: April 04, 201 7
Out: April 04, 2017
Vehicle: A36053·
Ref:
BOL:
INBOUND
CASH
Rate Extension
$66.00 $236.94
.EDIT
Tax
$0.00
Total
Paid
Change
CARD-SCALE
--am 8:09
8:09 am
Total
$236.94
$236.94
$236.94
$0.00 •
V
G)
PACOMAR TRANSFER STA
5960 EL CAMINO REAL
CARLSBAD I CA 92006
04/11/2017 15:50:38 -·--CREDIT CARD
54 Ticket#: 1578967
Weighmaster: gomezda
In;-April 11, 2017
./
VISASALE CK CUSTOMER Out: April 11, 2017
Vehicle: A36053 CARD#
Chip card:
Chip Card AlD:
ATC:
TC:
INVOICE
SEQ#:
Batch#:
Approval Code:
Entry Method:
Mode:
Tax Amount:
SALE AMOUNT
XXXXXXXXXXXX2749
liisa Credit
A0000000031010
0040
7827FOEFB9715009
0080
0058
000077
109796
Chip Read
Issuer
$0.00
CUSTOMER COPY
Signature:
Yr. 2
3,300
0,900
2,400
0.00
iption
Scale In
Tare Out
100%
Ref:
BOL:
INBOUND
CASH
Rate Extension
$66.00 $79.20
Tax
$0.00
Total
Paid
Change
EDIT CARD-SCALE
3:50 pm
3:50 pm
Tor '
$79.20
$79.20
$79.20
$0.00
V
? /J· PALOMARlAANSFER STA
C/ iU 5960 EL CAMINO REAL
CARLSBAD1 CA 92008
09/28/2017 14:20:05
CREDIT CARD
54 Ticket #: 1659936
Weighmaster: maharda
In: September 28, 2017
VlSASALE CK CUSTOMER Out: September 28, 2017
Vehicle: A36053
Card#
Chip Card:
AID:
ATC:
TC:
SEQ#:
Batch#:
IN101CE
oval Code:
Method:
Mode:
Tax Amount:
'l.:J:ttf:l'f:l,Y~
Visa Credit
A0000000031010
OOOE
82558F38741FD010
83
246
89
610673
Yr. 2
4,220
0,900
3,320
0.00
Chip Read .pt ion
Issuer
$0.00
SALE AMOUNT i111.72 --
CUSTOMER COPY
Signature:
Scale In
Tare Out
100%
Ref:
BOL:
INBOUND
CASH
Rate Extension
$67.30 $111.72
v
Tax
$0.00
!~ \J
Total
Paid
Change
.EDIT CARD-SCALE
2: 19 pm
2:19 pm
Total
$111.72
$111. 72
$111.72'
$0.00
V
) .,.,
L PALOMAR TRANSFER ST A
JIL\J? 5960 El· CAMINO REAL
CARLSBAD, CA 92008
OB/17/2017 09:13:23
DEBIT CARD
DEBIT SALE
Card# XXXXXXXXXXXX1155
Network: VISA
Chip Card: US DEBIT
AlD: A0000000980840
ATC: 0020
TC: 95E10507434EFFA8
SEQ#: 19
Batch#: 204
INVOICE 23
Approval Code: 091323
Entry Method: Chip Read
Mode: Issuer
Tax Amount: $0.00
SAlEAMOUNT $164.89
CUSTOMER COPY
Signature:
54 Ticket #: 1639505
Weighmaster: ESCOTES
~CK CUSTOMER
; Yr. 2
15,800
10,900
4,900
0.00
:iption
Scale In
Tare Out
100%
In: August 17, 2017
Out: August 17, 2017
Vehicle: A36053
Ref:
BOL:
INBOUND
CASH
Rate Extension
$67.30 $164.89
Tax
$0.00
Total
Paid
Change
.EDIT CARD-SCALE
9:12 am
9:12 am
Total
$164.89
$164.89
$164.89
$0.00
V