HomeMy WebLinkAbout2842 CORTE PAPAYA; ; CB003338; Permit09/21/2000,
Job Address
Permit Type
Parcel No
Valuation
Occupancy Group
09/21/2000
# Dwelling Units
Bedrooms
Project Title
City of Carlsbad
1635 Faraday Av Carlsbad, CA 92008
Residential Permit Permit No CB003338
Building Inspection Request Line (760) 602-2725
2842 CORTE PAPAYA CBAD
RESDNTL Sub Type SFD Status ISSUED
2553112100 Lot# 1061 Applied 08/23/2000
$288,746 25 Construction Type VN Entered By RMA
6 Reference # CT88-03 Plan Approved
1 Structure Type SFD Issued 09/21/2000
5 Bathrooms 325 Inspect Area NF
GREYSTN COLL-LA COSTA-VIL K&L Ong PC# PC990147
PLAN 4-PHS 5, 3344 SF+628 GAR+13 PORCH Plan Check# PCOO-113
Applicant
GREYSTONE HOMES
101
5973 AVENIDA ENCINAS
CARLSBAD CA 92009
760-804-7700
Owner
LENNAR OCEANSIDE L L C
5780 FLEET ST #300
CARLSBAD CA 92008
Total Fees $13,00906 Total Payments To Date $000 Balance Due $13,00906
Building Permit
Add'l Building Permit Fee
Plan Check
Add'l Plan Check Fee
Plan Check Discount
Strong Motion Fee
Park in Lieu Fee
Park Fee
LFM Fee
Bridge Fee
Other Bridge Fee
BTD #2 Fee
BTD #3 Fee
Renewal Fee
Add'l Renewal Fee
Other Building Fee
Pot Water Con Fee
Meter Size
Add'l Pot Water Con Fee
Reel Water Con Fee
$1,28258 Meter Size
$0 00 Add'l Reel Water Con Fee
$833 68 Meter Fee
$0 00 SDCWA Fee
$0 00 CFD Payoff Fee
$28 87 PFF
$0 00 PFF (CFD Fund)
$0 00 License Tax
$310 00 License Tax (CFD Fund)
$0 00 Traffic Impact Fee
$0 00 Traffic Impact (CFD Fund)
$0 00 LFMZ Transportation Fee
$0 00 Sidewalk Fee
$0 00 PLUMBING TOTAL
$0 00 ELECTRICAL TOTAL
$000 MECHANICAL TOTAL
$0 00 Housing Impact Fee
Housing InLieu Fee
$0 00 Master Drainage Fee
$0 00 Sewer Fee
TOTAL PERMIT FEES
$000
$000
$000
$4,374 25
$5,255 18
$000
$000
$000
$580 00
$000
$000
$000
$19600
$6000
$8850
$000
$000
$000
$000
$13,00906
Inspector
FINAL APPROVAL
Date q-JLft-d |Clearance
NOTICE Please take NOTICE that approval of your project includes the "Imposition" of fees, dedications, reservations, or other exactions hereafter collectively
referred to as "fees/exactions" You have 90 days from the date this permit was issued to protest imposition of these fees/exactions If you protest them, you must
follow the protest procedures set forth in Government Code Section 66020(a), and file the protest and any other required information with the City Manager for
processing in accordance with Carlsbad Municipal Code Section 3 32 030 Failure to timely follow that procedure will bar any subsequent legal action to attack
review, set aside, void, or annul their imposition
You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capactiy
changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this project NOR DOES IT APPLY to any
fees/exactions of which you have previously been given a NOTICE similar to this, or as to which the statute of limitations has previously otherwise expired
\
City of Carlsbad
Final Building Inspection MAR26200I
S3AD
Dept: Building Engineering Planning CMWD St
Plan Check #
Permit #
Project Name
Address
Contact Person
Sewer Dist
Inspected
Bv
Inspected
Bv
Inspected
Bv
PCOO-113
CB003338
GREYSTN COLL-LA COSTA-VIL K&L
PLAN 4-PHS 5, 3344 SF+628 GAR+13 PORCH
2842 CORTE
TOM
LC
£%>
PAPAYA
Phone 7606331401
Water Dist O
Inspected 3/£sl°J
Date
Inspected
Date
Inspected
Lite Fire
Date
Permit Type
Sub Type
Lot 1061
Approved '
Approved
Approved
03/26/2001
RESDNTL
SFD
Disapproved
Disapproved
Disapproved
Comments
City of Carlsbad Bldg Inspection Request
For 03/26/2001
Permit# CB003338
Title GREYSTN COLL-LA COSTA-VIL K&L
Description PLAN 4-PHS 5, 3344 SF+628 GAR+13 PORCH
Inspector Assignment NF
Type RESDNTL Sub Type SFD
Job Address 2842 CORTE PAPAYA
Suite Lot 1061
Location
APPLICANT GREYSTONE HOMES
Owner
Remarks
Phone 7606331401
Inspector J\Ji
Total Time Requested By TOM
Entered By CHRISTINE
CD Description
19 Final Structural
29 Final Plumbing
39 Final Electrical
49 Final Mechanical
Act Comments
Associated PCRs
Inspection History
Description Act Insp CommentsDate
03/05/2001 39 Final Electrical
03/05/2001 39 Final Electrical
02/02/2001 23 Gas/Test/Repairs
02/01/2001 23 Gas/Test/Repairs
01/24/2001 17 Interior Lath/Drywall
01/23/2001 17 Interior Lath/Drywall
01/23/2001 18 Exterior Lath/Drywall
01/19/2001 16 Insulation
01/09/2001 84 Rough Combo
01/08/2001 84 Rough Combo
12/13/2000 83 Roof Sheathing/Ext Shear
12/11 /2000 83 Roof Sheathing/Ext Shear
10/19/2000 11 Ftg/Foundation/Piers
10/19/2000 12 Steel/Bond Beam
10/11/2000 21 Underground/Under Floor
10/11 /2000 22 Sewer/Water Service
AP NF
AP NF EMR
AP NF
CO NF
AP NF
CA NF
AP NF
AP NF
AP NF
NR NF
AP NF
NR NF
AP RB PLUS DECK FTGS
AP RB
AP PD
AP PD