HomeMy WebLinkAbout2875 Whiptail Loop; ; CBC2018-0121; PermitCcityof
Carlsbad
Commercial Permit
Print Date: 10/01/2018 Permit No: CBC2018-0121
Job Address:
Permit Type:
Parcel No:
Valuation:
Occupancy Group:
# Dwelling Units:
Bedrooms:
2875 Whiptail Loop
BLDG-Commercial
2091200600
$300,000.00
Work Class:
lot#:
Reference#:
Construction Type:
Bathrooms:
Orig, Plan Check#:
Tenant Improvement Status:
Applied:
Issued:
Permit
Finaled:
Inspector:
Closed -Finaled
03/02/2018
06/12/2018
Plan Check#:
Final
Inspection: 10/1/2018 3:04:13PM
Project Title:
Description: SD HAT CO: HIGH PILE STORAGE RACK, 72,4DO SF
Applicant: Owner: Contractor:
CARRIE SHARIF
1815 Wright Ave
DAMES ROCKET 1031 LLC DISTRIBUTION PROPERTY SOLUTIONS INC
La Verne, CA 91750-5817
626-384-D481
BUILDING PERMIT FEE ($20DO+)
BUILDING PLAN CHECK FEE (BLDG)
FIRE High Piled Storage
2293 Cosmos Ct
CARLSBAD, CA 92011
GREEN BUILDING STANDARDS PLAN CHECK & INSPECTION
SB1473 GREEN BUILDING STATE STANDARDS FEE
STRONG MOTION-COMMERCIAL
Total Fees: $3,270.20 Total Payments To Date: $3,270.20
7700 Irvine Center Dr, 800
Irvine, CA 92618-2923
76D-S59-0467
Balance Due:
Please take NOTICE that approval of your project includes the "Imposition" of fees, dedications, reservations, or other exactions hereafter
collectively referred to as "fees/exaction." You have 90 days from the date this permit was issued to protest imposition of these
fees/exactions. If you protest them, you must follow the protest procedures set forth in Government Code Section 66020{a), and file the
protest and any other required information with the City Manager for processing in accordance with Carlsbad Municipal Code Section
3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack, review, set aside, void, or annul their
imposition.
You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection
fees and capadty changes, nor planning, zoning, grading or other s·1milar application processing or service fees in connection with this
project. NOR DOES IT APPLY to any fees/exactions of which you have previously been given a NOTICE similar to this, or as to which the
statute of limitation has previously otherwise expired.
$0.00
1635 Faraday Avenue, Carlsbad, CA 92DD8-7314 I 76D-602-2700 I 760-602-8560 f I www.carlsbadca.gov
$1,336.00
$93S.20
$733.0D
$170.00
$12.DO
$84.00
•
• ( City of
Carlsbad
JOBAOORESS,;i ~ 15 w ~.
CT/PROJECT# LOT#
Building Permit Application
1635 Faraday Ave .• Carlsbad. CA 92008
Ph: 780-602,271.9 Fax: 760-602-8558
email: bulldlng@carlsbadca.gov
www.carlsbadca.gov
SUITE#/SPACE#/UNIT#
# OF UNITS # BEDROOMS
oO b'D'D. --
PROPOSED USE GARAGE (SF) PATIOS (SF)
------------------STATE LIC #
Plan Che~D/'g-{)/;2.L
Est. Value /J O Cl C)C() ":-'
Plan Ck. Deposit
Date '3-.;)-!
APN
-----~C'O"NS~T~R'. TYP='E--OCC. GROUP
AIR CONDITIONING FIRE SPRINKLERS
NO • YES • NO • YES O NO •
STATE CA
!FAX
(Sec, 7031.5 Business and Professions Code: Any City or Coun_ty which requires a permit to construct, alter, improve, d olish or repair any structure, prior to its suance, also requires the applicant for such per_m1t to file a signed statement that he Is licensed pursuant to the provisions of the Contractor's License Law fChapter 9, commending with Section 70_00 of Division 3 of the B_usIness and Professions Code} or fhat he rs exempt therefrom, and the basis for the alleged exemption. Any vIolatIon of Section 7031.5 by any applicant for a permit subJects the applicant to a civil penalty of not more than five hundred dollars {$500)).
WORKERS' COMPENSATION
Workers' Compensation Oeclaralion: / hereby affirm under penalty of perjury one of the following declarations:
D, I have and will mainlain a certificate of consent to self•insure for workers' compensal'lon as provided by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued.
~ I have and will maintain workers' com pen lo as r ed by faction 3700 of the Labor Code, for the _perform~nce)?f ~e work for which this_ permit is issued. My workers' compens~tion ifurance carrier and policy
number are: Insurance Co. ~ ~ Policy No. ) ~ ~J Lt l cg -d: a J $?< Expiration Date 4 {&-21)) q
This section need not be completed if the permit is for one hundred dollars ($100) or less.
D Certificate of Exemption: I certify that in the performance of the work for which this permit is 'issued, I shall not employ any person in any manner so as lo become subject to the Workers' Compensation Laws of
California WARNING: Failure to secure workers' compensation verage is u wful, and shall subject an employer to criminal penalties and civil fines up lo one hundred thousand dollars (&100,000), in
addition to the cost of compen a es as provided for in e ion 3706 the Labor code'\,nlerest and attorney's fees.
~ CONTRACTORSIG1<i"'"aE---~-----• GENT
I hereby affirm that I am exempt from Contractor's License law for the following reason:
• I, as owner of the property or my employees with wages as their sole compensation, will do the work and the structure is not intended or offered for sale {Sec. 7044, Business and Professions Code: The Contractor's
License Law does not apply to an owner of property who builds or improves thereon, and who does such work himself or through his own employees, provided that such improvements are not intended or offered for
sale. If, however, the building or improvement is sold within one year of completion, the owner-Ouilder w'1II have the burden of proving that he d"1d not bu'1ld or improve for the purpose of sale).
O I, as owner of the property, am exclusively contracting with licensed contractors to construct the project (Sec. 7044, Business and Professions Code: The Contractor's License Law does not apply to an owner of
property who builds or improves thereon, and contracts for such projects with contractor(s) licensed pursuant to the Contractor's License Law)
• I am exempt under Section _____ Business and Professions Code for this reason·
1. I personally plan lo provide the major labor and materials for construction of the proposed property improvement • Yes • No
2. I (have/ have not) signed an application for a building permit for the proposed work.
3. I have contracted with the following person (firm) to provide the proposed construction (include name address I phone/ contractors' license number):
4. I ptan to provide portions of the work, but I have hired the following person to coordinate, supervise and provide the major work (include name/ address/ phone/ contractors' license number):
S. I will provide some of the work, but I have contracted (hired) the following persons to provide the work indicated (include name I address / phone I type of work):
,/l5 PROPERTY OWNER SIGNATURE •AGENT DATE
.,.
' ' '
.OMPLETE THIS SECTION FOR NON-RESIQiNTIA~ e,u1L,DING PERMITS ONLY
Is the app1'1cant or future build'ing occupant required to submit a business plan, acutely hazardous materials registration form or risk management and prevention program under Sections 25505, 25533 or 25534 of the
Presley-Tanner Hazardous Substance Account Act? D Yes • No
Is the applicant or future building occupant required to obtain a permit from the air pollution control district or air quality management district? • Yes • No
Is the facility to be constructed within 1,000 feel of the outer boundary of a school site? • Yes O No
If ANY OF THE ANSWERS ARE YES, A FINAL CERTIFICATE OF OCCUPANCY MAY NOT BE ISSUED UNLESS THE APPLICANT HAS MET OR IS MEETING THE REQUIREMENTS OF THE OFFICE OF
EMERGENCY SERVICES AND THE AIR POLLUTION CONTROL DISTRICT.
I certify that I have read the application and statethattheabove lnfonnation fsoorrectand that the lnfonnation on the plans is accurate. I agree to comply with all Ci1yordinancesand State laws relating to building construction.
I hereby authorize representative of the City of Carlsbad to enter upon the above mentioned property for Inspection purposes. I ALSO AGREE TO SAVE, INDEMNIFY AND KEEP HARMLESS THE CITY OF CARLSBAD
AGAINST ALL LIABILfTIES, JUDGMENTS, COSTS AND EXPENSES WHICH MAY IN ANY WAY ACCRUE AGAINST SAID CITY IN CONSEQUENCE OF THE GRANTING OF THIS PERMIT
OSHA: AA OSHA pennn is required for excavations 1JoJer 5'0' deep and demdilion or construction of structures over 3 stories in height.
EXPIRATION: Evel)' e Buik:ling Official under the rovistons of this Code shall exl)re by limitation ard become nug and void if the building or work authorized by such pennit is notC01M1enced 'Mthin
180 days from the da f such permit or e building orwork,,,.,,.M...,by such pennn is suspended or abandoned at any bme after the work is commenced for a pefiod of 180 days (Section 106.4.4 Uniform Buikting Code).
,f!S APPLICANT'S SIGNATURE DATE 3/J' /;;v\ '<
', ' PERMIT INSPECTION HISTORY REPORT (CBC2018-0121)
Permit Type; BLDG-Commercial Application Dato: 03/02/2018 Owner:
Work Class; Tenant Improvement Issue Date: 06/12/2018 Subdivision:
Status:
Scheduled
Date
09/11/2018
09/12(2018
10/01/2018
October 01, 2018
Closed -Finaled Expiration Date: 03/11/2019 Address:
Actual
Start Date
09/11/2018
09/1112018
10/01/2018
IVR Number: 9847
Inspection Type Inspection No.
BLDG-Final 069596-2018
Inspection
Checklist Item
BLDG-Building Deficiency
BLDG-Structural Final
BLDG-Electrical Final
BLDG-14 069852-2018
Frame/Steel/Bolting/
Welding (Decks)
BLDG-Final
Inspection
Checklist Item
BLDG-Building Deficiency
071555-2018
Checklist Item
BLDG-Building Deficiency
BLDG-Structural Final
BLDG-Electrical Final
Checklist Item
BLDG-Structural Final
BLDG-Electrical Final
BLOG-Fire Final 069759-2018
Checklist Item
FIRE-Building Final
Inspection Status Primary Inspector
Failed Andy Krogh
COMMENTS
Not ready
Passed Andy Krogh
COMMENTS
Add signs as noted on card
Failed Andy Krogh
COMMENTS
Left message for Scott ... not onsite
COMMENTS
Scheduled Cindy Wong
COMMENTS
DAMES ROCKET 1031 LLC
2875 Whiptail Loop
Carlsbad, CA 92010
Reinspection Complete
Reinspection Complete
Passed
No
Yes
No
Complete
Passed
No
Reinspection Complete
Passed
No
Yes
No
Passed
Yes
Yes
Incomplete
Passed
No
Page 1 of 1
«~~ ~ C I TY OF
CARLSBAD INSPECTION RECORD 1
CBC2018-0121
2875 WHIPTAIL LOOP Building Division SD HAT CO: HIGH PILE STORAGE RACK. 72,400 SF
0 INSPECTION RECORD CARD WITH APPROVED
PLANS MUST BE KEPT ON TifE JOB
0 CALL BEFORE 3:00 pm FOR NEXT WORK DAY INSPECTION
0 FOR BUILDING INSPECTION CALL: 760-602-2725 2091200600
3/2/2018
OR GO TO: www.Carfsbadca.gov/Buffding AND CLICK ON
"Request lnspectjon" CBC2018-0121
DATE:
If "YES" is checked below that Division's approval Is required rior t~-~stin a Final Building Inspection. If you have any questions
please call the applicable divisions at the phone numbers provided below. After all required approvals are signed off-fax to
760-602-8560, email to bid~ ections@c rlsb;idc;i_.~ or bring in a COPY of this card to: 1635 Faraday Ave .. Carlsbad.
"'"•·,
IF MARKED "YES-. IT IS REQUIRED PRIOR TO ANY CONSTRUCTION
STORM WATER PRECON MEETING REQUIRED 76()-602-2725 Allow 24 hours
IF MARKED "YES-. APPROVAL REQUIRED PRIOR TO REQUESTING BUILDING FINAL
Fire Prevention 760-602-4660 Allow 48 hours
Planning/Landscape 760-944-8463 Allow 48 hours
CM&I (Engineering Inspections) 760-438-389 I Call before 2 pm
Type of Inspection Type of Inspection
COOE # BUILDING Date Inspector CODE # ELECTRICAL
#11 FOUNDATION #31 D ELECTRIC UNDERGROUND D UFER
#12 REINFORCED STEEL #34 ROUGH ELECTRIC / EV CHARGER
#66 MASONRY PRE GROUT #33 • ELEC SERVICE #32OTEMPORARY
D GROUT D WALL DRAINS #35 PHOTO VOLTAIC
#10 TILT PANELS #38 SIGNS
#11 POUR STRIPS BLDG-FINAL
#11 COLUMN FOOTINGS
#14 SUBFRAME O FLOOR O CEILING UNDERGROUND DUCTS & PIPING
#15 ROOF SHEATHING • DUCT & PLENUM • REF. PIPING
#13 EXT. SHEAR PANELS HEAT-AIR COND. SYSTEMS
#16 INSULATION BLDG-FINAL ----------t------+------t #18 EXTERIOR LATH COD£ u COMBO INSPECT1ON
#17 INTERIOR LATH & DRYWALL #81 UNDERGROUND (11,12,21,31)
BLDG-FINAL #82 DRVWALL,EXT LATH, GAS TES (17,18,23)
#83 ROOF SH EATING, EXT SHEAR ( 13,15)
#22 D SEWER & Bl/CO O Pl/CO #84 FRAME ROUGH COMBO (14,24,34,44)
#21 UNDERGROUND •WASTE • WTR #85 T-Bar(14,24,34,44)
#24 TOP OUT D WASTE D WTR BLDG-ANAL OCCUPANCY
#27 TUB & SHOWER PAN FIRE
#23 0 GAS TEST D GAS PIPING A/S UNDERGROUND VISUAL
#25 WATER HEATER A/S UNDERGROUND HYDRO
#28 SOLAR WATER A/S UNDERGROUND FLUSH
BLDG-FINAL A/S OVERHEAD VISUAL
CODE# POOLS Date Ins ector A/S OVERHEAD HYDRDSTATIC
#51 POOL EXCAV / STEEL A/SANAL
#52 PLUMBING F/A ROUGH-IN
#53 ELEC /CONDUIT/WIRING F/AFINAL
#54 EQUIPOTENTIAL BOND FIXED EXTINGUISHING SYSTEM ROUGH-IN
#55 PREPLASTER / FENCE/ ALARMS AXED EXTING SYSTEM HYDROSTATIC TEST
#57 GUNITE FIXED EXTINGUISHING SYSTEM ANAL
BLDG-FINAL MEDICAL GAS PRESSURE TEST
MEDICAL GAS FINAL
REV9117
Date
Date
Date
Date
COPY OF CARO
REQUIRED
Inspector
Ins ector
Ins r
Ins or
Section 5416. Health and Safety Code, State of California
(a) There shall be not less than one water closet for each 20 employees or fractional part thereof working at a construction
job site. The water closet shall consist of a patented chemical type toilet.
(b) For the purpose of this section the term construction site shall mean the location on which actual construction of a
building is in progress.
(c) A violation of this section shall constitute a misdemeanor.
All construction or work for which a permit is required shall be subject to inspection and all such construction or work
shall remain accessible and exposed for inspection purposes until approved by the inspector. Work shall not be done
beyond the point indicated in each successive inspection without first obtaining the approval of the inspector.
Field Daily Report
Project# Job Name: _b_h--J_~-'~--'--() _M--r_,_lf_~ ______ _
Job Address:
Report Date:
Inspector: __ _J~:"Zlll~~Z..._f::l~:::::::i...-----Client: ______________ _
J.,icense # bO -If l~ Exp Date: __ ___:._.,.__ __ _ Contractor: _____________ _
Pennit II _____ Jurisdiction _____ _
'~--------------------'-----------------__J Offsite? Q'es ~o Offsite Location: ______________ _
~: WORK: {chock one)~ Concrele 0Prestres,oo Conaete OMasomy 0Welding
fRVrie, ( ~It(/\
€#.f 01 03 ,e,
'
DATE TASK# REGl ~-AR O.T. TIME IN TIMEOUT
"lr?/\8 . ... . (" I
' ~~ .
Inspector Name: Signature~ ~ .
Approved by: --""'£"-1-N~\L--=-=-\-'-"QCJ...l Ll.)[_ __ f:"'--'-{ .l,,,,O~\?:...;::if>i-.. ___ Signature: ---,tl-'--_,--_...;::,,L-=:;;.....;~........._\. __ _
(Print Name) 0
Field Daily Report
Project# Job Name: --=f::.rrN:..:....:..:____· ,r.r.c:.D_te'tp~~--'----' -*.:--~------
Job Address: _28_,_r_....:;..~-=-:..tt,;..:.;~'---'-"-.....;.;;;;;L--__,;;;,;lo::/~-#-I-=~==--_a_..;;_____;__......:;__ __ _
Report Date:
Inspector: Client: _____________ _
.License# 6t?i\:J\t8 Exp Date: __ .....;\_'2...._l _11__,( ___ 1~ __ Contractor: ____________ _
License Required for Inspection: ________ _ Contact at Site: ti'---}l!e.~U=,
Pennit # l/i:,(, '1a l0 Jurisdiction .. ~ _________________ .....__ __ -_O..c...(.:.;.).._, ___________ __,
Offsite? Qes D"o Offsite Location: _____________ _
TYPE OF WORK: (check one) Q.einforced Concrete 0Prestressed Concrete •Masonry OWelding
[]Other "'~ ,
Description of Work: HI-JIA-(.,,
.--:".." ,,.,
TASK# O.T.
Signature: __________ _
DATE: 5/31/2018
JURISDICTION: City of Carlsbad
PLAN CHECK#.: CBC2018-0121
✓• EsG1I
A SAFEbutlt COtYlpany
SET: II
PROJECT ADDRESS: 2875 Whiptail Loop
PROJECT NAME: Storage Racks for San Diego Hat Co.
D APPLICANT
D JURIS.
~ The plans transmitted herewith have been corrected where necessary and substantially comply
with the jurisdiction's building codes.
D The plans transmitted herewith will substantially comply with the jurisdiction's
codes when minor deficiencies identified below are resolved and checked by building
department staff.
D The plans transmitted herewith have significant deficiencies identified on the enclosed check list
and should be corrected and resubmitted for a complete recheck.
D The check list transmitted herewith is for your information. The plans are being held at EsGil
until corrected plans are submitted for recheck.
D The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant
contact person.
D The applicant's copy of the check list has been sent to:
~ EsGil staff did not advise the applicant that the plan check has been completed.
D EsGil staff did advise the applicant that the plan check has been completed.
Person contacted: // I\J, Telephone#:
Date contacted: (by:~) Email:
Mail Telephone Fax In Person
~ REMARKS: 1. Fire Department approval is required. . City to field verify that the path of travel
from the handicapped parking space to the rack ar and the bathrooms serving the rack area
comply with all the current disabled access requir ments.
By: David Yao
EsGil
5/23/18
Enclosures:
9320 Chesapeake Drive, Suite 208 • San Diego, Californ ia 92 123 • (858) 560-1 468 • Fax (858) 560-1576
..
'·
DATE: 3/12/2018
JURISDICTION: City of Carlsbad
✓• EsG1I
A SAf Ebu,tt Cornp,1ny
PLAN CHECK#.: CBC2018-0121
PROJECT ADDRESS: 2875 Whiptail Loop
SET: I
PROJECT NAME: Storage Racks for San Diego Hat Co.
• APPLICANT
;aJURIS.
D The plans transmitted herewith have been corrected where necessary and substantially comply
with the jurisdiction's codes.
D The plans transmitted herewith will substantially comply with the jurisdiction's
codes when minor deficiencies identified below are resolved and checked by building
department staff.
D The plans transmitted herewith have significant deficiencies identified on the enclosed check list
and should be corrected and resubmitted for a complete recheck.
12] The check list transmitted herewith is for your information. The plans are being held at EsGil
until corrected plans are submitted for recheck.
D The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant
contact person.
12] The applicant's copy of the check list has been sent to:
Carrie Sharifi
D EsGil staff did not advise the applicant that the plan check has been completed.
12] EsGil staff did advise the applicant that the plan check has been completed.
Person contacted: Carrie Sharifi Telephone #: 626-384-0481
D · Bl12 lie-(by~) Email: carriesharif@yahoo.com
-c~a~il~__:T~e~le~p~ho~n_i_se~t-""1-c,X In Person
0 REMARKS:
By: David Yao
EsGil
3/5/18
Enclosures:
9320 Chesapeake Drive, Suite 208 • San Diego, California 92123 • (858) 560-1468 • Fax (858) 560-1576
City of Carlsbad CBC2018-0121
3/12/2018
GENERAL PLAN CORRECTION LIST
JURISDICTION: City of Carlsbad
PROJECT ADDRESS: 2875 Whiptail Loop
DATE PLAN RECEIVED BY
ESGIL: 3/5/18
REVIEWED BY: David Yao
FOREWORD (PLEASE READ):
PLAN CHECK#.: CBC2018-0121
DATE REVIEW COMPLETED:
3/12/2018
This plan review is limited to the technical requirements contained in the International Building
Code, Uniform Plumbing Code, Uniform Mechanical Code, National Electrical Code and state
laws regulating energy conservation, noise attenuation and disabled access. This plan review
is based on regulations enforced by the Building Department. You may have other corrections
based on laws and ordinances enforced by the Planning Department, Engineering Department
or other departments.
The following items listed need clarification, modification or change. All items must be satisfied
before the plans will be in conformance with the cited codes and regulations. The approval of
the plans does not permit the violation of any state, county or city law.
• To facilitate rechecking, please identify, next to each item, the sheet of the plans upon
which each correction on this sheet has been made and return this sheet with the
revised plans.
• Please indicate here if any changes have been made to the plans that are not a result of
corrections from this list. If there are other changes, please briefly describe them and where
they are located on the plans. Have changes been made not resulting from this list?
• Yes • No
€ity of Carlsbad CBC2018-0121
3/12/2018
[DO NOT PAY -THIS IS NOT AN INVOICE]
VALUATION AND PLAN CHECK FEE
JURISDICTION: City of Carlsbad
PREPARED BY: David Yao
BUILDING ADDRESS: 2875 Whiptail Loop
BUILDING OCCUPANCY:
BUILDING AREA Valuation
PORTION (Sq.Ft.) Multiplier
storage racks
Air Conditioning
Fire Sprinklers
TOTAL VALUE
Jurisdiction Code cb By Ordinance
Bldg. Permit Fee by Ordinance • I
Plan Check Fee by Ordinance 3
Type of Review: 0 Complete Review
D Repetitive Fee 3 Repeats
Comments:
D Other
D Hourly
EsGII Fee
PLAN CHECK#.: CBC2018-0121
DATE: 3/12/2018
Reg . VALUE ($)
Mod.
per city 300,000
300,000
$1 ,336.061
$868.441
D Structural Only
1------IHr @ • $761.551
Sheet of
City of Carlsbad CBC2018-0121
3/12/2018
Please make all corrections, as requested in the correction list. Submit FOUR new
complete sets of plans for commercial/industrial projects (THREE sets of plans for
residential projects). For expeditious processing, corrected sets can be submitted in one of
two ways:
1. Deliver all corrected sets of plans and calculations/reports directly to the City of
Carlsbad Building Department, 1635 Faraday Ave., Carlsbad, CA 92008, (760) 602-2700.
The City will route the plans to EsGil and the Carlsbad Planning, Engineering and Fire
Departments.
2. Bring TWO corrected set of plans and calculations/reports to EsGil, 9320 Chesapeake
Drive, Suite 208, San Diego, CA 92123, (858) 560-1468. Deliver all remaining sets of
plans and calculations/reports directly to the City of Carlsbad Building Department for
routing to their Planning, Engineering and Fire Departments.
NOTE: Plans that are submitted directly to EsGil only will not be reviewed by the City
Planning, Engineering and Fire Departments until review by EsGil is complete.
1. The tenant space and new and/or existing facilities serving the remodeled area must be
accessible to and functional for the physically disabled. Provide detail information on the
plan. Title 24, Part 2.
2. Obtain Fire Department approval.
3. Provide a note on the plans indicating if any hazardous materials will be stored and/or
used within the building which exceed the quantities listed in IBC Tables 307.7(1) and
307.7(2).
4. The structural calculation shows the lateral brace for all racks up to the top level. Sheet
SEO 1 of 1 not show the brace to the top level. Please revise the plan.
5. Provide calculation to show the weld between backer and column is adequate. (Detail 2
on SEO 1 of 1).
The jurisdiction has contracted with EsGil, located at 9320 Chesapeake Drive, Suite 208,
San Diego, California 92123; telephone number of 858/560-1468, to perform the plan
review for your project. If you have any questions regarding these plan review items,
please contact David Yao at Esgil. Thank you.
Structural
Engineering
$: Design, Inc
1815 Wright Ave
La Verne, Ca. 91750
Tel: 909-596-1351 Fax: 909-596-7186
Project Name: SAN D IEGO HAT CO
Project Number: LV-021918-2
Date : 02/26/18
Street Address: 2875 WHIPTAIL LOOP
City/State : CARLSBAD, CA 92010
Scope of Work : SELECTIVE
c.ec.ao, 1-01 ~, FEB 2 6 2018
Structural
Engineering & Design Inc.
1815 Wright Ave La Verne. CA 91750 Tel: 909.596.1351 Fax: 909.596.7186
By: ENHAO Project: SAN DIEGO HAT CO
TABLE OF CONTENTS
1itle Page ............................................................................................................. .
Table of Contents ................................................................................................. .
Design Data and Definition of Components ........................................................ .
Critical Configuration ............................................................................................ .
Seismic Loads ....................................................................................................... .
Column ................................................................................................................. .
Beam and Connector ........................................................................................... .
Bracing ................................................................................................................. .
Anchors ................................................................................................................ .
Base Plate ............................................................................................................ .
Slab on Grade ................................................................................................. .
Other Configurations ........................................................................................ .
1
2
3
4
5 to 6
7
8 to 9
10
11
12
13
14-21
SAN DIEGO HAT CO TYPE A Page 2 of 7-l
Project#: LV-021918-2
2/22/20 18
Structural
Engineering & Design Inc.
1815 Wright Ave La Verne CA 91750 Tel: 909.596.1351 Fax: 909 596.7186
By: ENHAO Project: SAN DIEGO HAT CO Project#: LV-021918-2
Design Data
1) Toe analyses herein conforms to the requirements of the:
2012 IBC Section 2209
2016 CBC Section 2209A
ANSI MH 16.1-2012 Spedfications for the Design of Industrial Steel Storage Racks ''2012 RMI Rack Design Manual"
ASCE 7-10, section 15.5.3
2) Transverse braced frame steel conforms to ASTM A570, Gr.55, with minimum strength, Fy=55 ksi
Longitudinal frame beam and connector steel conforms to ASTM A570, Gr.55, with minimum yield, Fy=SS ksi
All other steel conforms to ASTM A36, Gr. 36 with minimum yield, Fy= 36 ksi
3) Anchor bolts shall be provided by installer per ICC reference on plans and calculations herein.
4) All welds shall conform to A'NS procedures, utilizing E70xx electrodes or similar. All such welds shall be performed
in shop, with no field welding allowed other than those supervised by a licensed deputy inspector.
5) Toe existing slab on grade is 5" thick with minimum 4000 psi compressive strength. Allowable Soil bearing capacity is 750 psf.
Toe design of the existing slab is by others.
6) Load combinations for rack components correspond to 2012 RMI Section 2.1 for ASD level load criteria
Definition of Components
A Column
Beam ~ ~: :IJ======IJJ:=l:======IJ:: ~
Frame
Height Beam
Spacing
t=~~~~~=::::!=:+ =di:
Beam
Length
Front View: Down Aisle
(Longitudinal) Frame
SAN DIEGO HAT CO TYF'E A
Beam to Column
Connector
Base Plate and
Anchors
Page 3 of '2-\
L Frame __J 1 Deoth ~I
Section A: Cross Aisle
(Transverse ) Frame
Horizontal
Brace
Diagonal
Brace
2/22/2018
Structural
Engineering & Design Inc.
1815 Wright Ave La Vern e CA 91750 Tel: 909.596.1351 Fax: 909.596.7186
By: ENHAO Project SAN DIEGO HAT CO Project#: LV-021918-2
Configuration & Summary: TYPE A SELECTIVE RACK
-"r
68"
+
68"
+ 2 88" 68"
+ 28"
-'}-
40"
' .I
'
288"
~ k-------11
30" + ,____..,
54" / 4-,.__, _,
54" + ~
54" / +1<'---1
36" + I-----~ z /
**RACK COLUMN REACTIONS
ASDLOADS
AX.l4L DL= 188 lb
AX.l4L LL= 4,000 lb
SEISMIC AXIAL Ps=+/-5,6171b
BASE MOMENT= 8,000 in-lb
,-r -96" -----+ }-42"-,/--
Seismic Criteria # Bm Lvls Frame Depth Frame Height # Diagonals Beam Length Frame Type
Ss= 1.04, Fa= 1.084 5 42 in 288.0 in 6 96in Single Row
Component Description STRESS
Column Fy=SS ksi SPCRK FH-20/3x3xl 4ga P=2513 lb, M=11878 in-lb 0.43-0K
Column & Backer None None None N/A
Beam Fy=SS ksi SpaceRak SB306C 3 in x 0.06 in Lu=96 in I Capacity: 3220 lb/pr 0.5-0K
Beam Connector Fy=55 ksi Lvl 3: 3 pin OK I Mconn=9050 in-lb I Mcap=12691 in-lb 0.71-0K
Brace-Horizontal Fy=55 ksi Spcrack l-1/2x1-1/4xl 4ga 0.16-0K
Brace-Diagonal Fy=55 ksi Spcrack 1-l/2xl -1/4xl 4ga 0.36-0K
Base Plate Fy=36 ksi 8x5x0.375 I Rxity= 7604 in-lb 0.78-0K
Anchor 2 per Base 0.5'' x 3.25" Embed HIL TI KWIKBOLT TZ ESR 1917 Inspection Reqd (Net Seismic Uplift=3468 lb) 0.825-0K
Slab&Soil 5" t:hk x 4000 psi slab on grade. 750 psf Soil Bearing Pressure 0.51-0K
Level I Load** I Story Force I Story Force Column I Column I Conn. Beam
Per Level BeamSpcg Brace Transv Longit. Axial Moment Moment Connector
1 1,600 lb 40.0 in 36.0 in 601b 46 lb 4,188 lb 7,603 "# 6,223 "# 3 pin OK
2 1,600 lb 28.0 in 36.0 in 102 lb 78 lb 3,350 lb 5,434 "# 7,719 "# 3 pin OK
3 1,600 lb 68.0 in 54.0 in 2041b 155 lb 2,513 lb 11,878 "# 9,050 "# 3 pin OK
4 1,600 lb 68.0 in 54.0 in 305 lb 2331b 1,675 lb 9,238 "# 6,740 "# 3 pin OK
5 1,600 lb 68.0 in 54.0 in 4071b 311 lb 8381b 5,279 "# 3,507 "# 3 pin OK
30.0 in
** Load defined as product weight per pair of beams Total: I No
1,078 lb 822 lb
5AN DIEGO HAT CO TYF'E A Page 4-of'l-1 2/22/2018
Structural
Engineering & Design Inc.
1815 Wright Ave La Verne CA 91750 Tel: 909.596.1351 Fax: 909.596 7186
By: ENHAO Project: SAN DIEGO HAT CO
Seismic Forces Configuration: 1YPE A SELECTIVE RACK
Lateral analysis Is perfonned with regard to the requirements of tile 2012 RMI ANSI MH 16,1-2012 Sec 2,6 &ASCE 7-10 sec 15.5.3
Transverse (Cross Aisle) Seismic Load
V= Cs*Ip*Ws=Cs*Ip*(0.67*P*Prf+D)
Csl= Sds/R
= 0.1879 Cs-max* Ip= 0.1879
Vmin= 0.015 Cs2= 0.044*Sds
= 0.0331
Cs3= 0.5*51/R
= 0.0505
Cs-max= 0.1879
Eff Base Shear=Cs= 0.1879 I••nm:m: E,mtion
Base Shear Coeff=Cs= 0,1879
Level PRODUCT LOAD P P*0.67*PRF1
1 1,600 lb 1,072 lb
2 1,600 lb 1,0721b
3 1,600 lb 1,072 1b
4 1,600 lb 1,072 1b
5 1,600 lb 1,072 1b
sum: P=8000 lb 5,360 lb
Lonaitudinal (Downaisle) Seismic Load
Ws= (0.67*P4lFi * PL)+DL (RMI 2.6.2)
= 5,735 lb
Vtransv=vt= 0.1879 * (375 lb+ 5360 lb)
Etransverse= 1,078 lb
Limit Statl!s Li!Vi!I Transvl!l'u uismlc sitar pi!I' upright
DL hi wi*hi
751b 40 in 45,880
751b 68in 77,996
75 lb 136in 155,992
75 lb 204in 233,988
75 lb 272 in 311,984
375 1b W=5735 lb 825,840
Project#: LV-021918-2
Ss= 1.040
S1= 0.404
Fa= 1.084
Fv= 1.596
Sds=2/3*Ss*Fa= 0.752
Sd1=2/3*S1 *Fv= 0.430
Ca=0.4*2/3*Ss*Fa= 0.3006
(Transverse, Braced Frame Dir.) R= 4.0
Ip= 1.0
PRF1= 1.0
Pallet Height=hp= 48.0 in
DL per Beam Lvl= 75 lb
Fi R*(hi+hp/2)
59.9 lb 3,834-#
101.8 lb 9,366-#
203.6 lb 32,576-#
305.4 lb 69,631-#
407.2 lb 120,531-#
1,078 lb 1=235,938
Similarly for longitudinal seismic loads, using R=6.0 Ws= (0.67 * PLRF2 * P) + DL PRF2= 1.0 l,,,,,,I b,,,,,I ~ b,,,,~
Csl=Sdl/(T*R)= 0.1433 = 5,735 lb (Longitudinal, Unbraced Dir.) R= 6.0
f'"'''1 R f '"'i t,~,~ Cs2= 0.0331 Cs=Cs-max*Ip= 0.1433 T= 0.50 sec
Cs3= 0.0337 I Vlong= 0.1433 * (375 lb+ 5360 lb) I [';-:',';-;-1 R ~:\'~~j E:-;~1
Cs-max= 0.1433 Elongitudinal= 822 lb LimilSutMU ... /LongiL sokmkshsrperNprlght
Level PRODUC LOAD P P*0.67*PRF2 DL hi wi*hi Fi front Yiew
1 1,600 lb 1,072 lb 751b 40 in 45,880 45.7 lb
2 1,600 lb 1,072 lb 75 lb 68 in 77,996 77.6 lb
3 1,600 lb 1,072 lb 75 1b 136 in 155,992 155.3 lb
4 1,600 lb 1,072 lb 751b 204in 233,988 232.9 lb
5 1,600 lb 1,072 lb 751b 272 in 311,984 310.5 lb
sum: =======5=3=6=0=1b====;;:::;:::37=5=1b======W=====57=3=5=1b=====8=2=5=8=4=0 ======8=22===1b========
5AN DIEGO HAT CO TYPE A Page S-of 2) 2/22/2018
Structural
Engineering & Design Inc.
1815 W right Ave La Verne CA 91750 Tel: 909.596.1351 Fax: 909 596.7186
By: ENHAO Project: SAN DIEGO HAT CO Project#: LV-021918-2
Downaisle Seismic Loads Configuration: TYPE A SELECTIVE RACK
Determine the story moments by applying portal analysis. The base plate is assumed to provide partial fixity.
Seismic Story Forces
Vlong= 822 lb
Vcol=Vlong/2= 411 lb
Fl = 46Ib
F2= 78 lb
F3= 155 lb
Seismic Story Moments
r-96 • --1
Typical ("Im< m.de
of two column,
Conceptual System
Typ,cal Fr.ime m.de
, -✓-o~ ~columns
Mbase-max= 8,000 in-lb
Mbase-v= (Vcol*hleff)/2
<=== Default capacity hl-eff= hl -beam clip height/2
= 37 in
= 7,604 in-lb <=== Moment going to base
Mbase-eff= Minimum of Mbase-max and Mbase-v
= 7,604 in-lb
M 1-1= [Veal * hleff]-Mbase-eff
= (411 lb * 37 in)-7604 in-lb
= 7,603 in-lb
Mseis= (Mupper+Mlower)/2
Mseis(l -1)= (7603 in-lb+ 5434 in-lb)/2
= 6,519 in-lb
LEVEL hi Axial Load
1 40in 4,188 lb
2 28in 3,350 lb
3 68in 2,513 lb
4 68in 1,675 lb
5 68in 838 Ib
M 2-2= [Vcol-(Fl)/2] * h2
= [411 lb -38.8 lb]*28 in/2
= 5,434 in-lb
Mseis(2-2)= (5434 in-lb + 11878 in-lb)/2
= 8,656 in-lb
Summary of Forces
Column Moment** Mseismic** Mend-fixity
7,603 in-lb 6,519 in-lb 3,101 in-lb
5,434 in-lb 8,656 in-lb 3,101 in-lb
11,878 in-lb 10,558 in-lb 3,101 in-lb
9,238 in-lb 7,258 in-lb 3,101 in-lb
5,279 in-lb 2,639 in-lb 3,101 in-lb
Mconn= (Mseismic + Mend-fixity)*0.70*rho
Mconn-allow(3 Pin)= 12,691 in-lb
**all moments based on limit states level loading
SAN DIEGO HAT CO TYPE A Page b of L-i
Veal -i~trl=========::t!J-.
h2
h1
Beam to Column
Elevation
rho= 1.0000
Mconn** Beam Connector
6,734 in-lb 3 pin OK
8,230 in-lb 3 pin OK
9,561 in-lb 3 pin OK
7,251 in-lb 3 pin OK
4,018 in-lb 3 pin OK
2/22/2018
COL
Structural
Engineering & Design Inc.
1815 W right Ave La Verne. CA 91750 Tel· 909.596.1351 Fax: 909 596.7186
By: ENHAO Project: SAN DIEGO HAT CO Project #: L V-021918-2
Column (Longitudinal Loads) Configuration: TYPE A SELECTIVE RACK
Section Properties
Section: SPCRK FH-20/3x3x14ga
Aeff = 0.643 inA 2
Ix : 1.130 inA4
Sx = 0.753 inA3
rx = 1.326 in
.Qf= 1.67
Iy = 0. 749 in"4
Sy = 0.493 in" 3
ry = 1.080 in
Fy= 55 ksi
Kx = 1.7
Lx = 66.8 in
Ky= 1.0
Ly= 36.0 in
Cb= 1.0
~ 3.00: in ---i
1
y-·-· r ·-· -y 3.000 in
Cmx= 0.85
E= 29,500 ksi
Loads Considers loads at level 3
COLUMN DL= 112 lb Critical load cases are: RMI Sec 2.1
10,075 in
Jt
l=i--o,75 in
_J_
COLUMN PL= 2,400 lb Load Case S: : (1 +0.10S*Sds)D + 0.7S*(l. 4+0.l 4Sds)*B*P + 0. 7S*(0. 7*rho*E)<= 1. 0, ASD Method
Mcol= 11,877 in-lb axial load coeff: 0.7902426 * P seismic momentcoeff: 0.S62S * Meo/
Sds= 0.7516 Load Case 6:: (1+0.14*Sds)D + (0.8S+0.14Sds)*B*P + (0.7*rfJo*E)<= 1.0, ASD Method
1 +0.105*Sds= 1.0789 axial load coeff: 0.66866 seismic moment coeff: 0.7 * Meo/
By analysis, Load case 6 governs utilizing loads as such 1.4+0.1 4Sds= 1.5052
1+0.14Sds= 1.1052
0.85+0.14*Sds= 0.9552
B= 0.7000
rho= 1.0000
Axial Load=Pax= 1.105224*112 lb+ 0.955224*0.7*2400 lb
= 1,729 lb .
Moment=Mx= 0.7*rho*Mcol
Axial Analysis
KxLx/rx = 1. 7*66.75"/1.326" KyLy/ry = 1 *36"/1.08"
= 85.6 = 33.3
Fe= nA2E/(KL/r)max"2 Fy/2= 27.5 ksi
= 39.8ksi
Pn= Aeff*Fn Qc= 1.92
= 23,134 lb
P/Pa= 0.14 < 0.15
Bending Analysis
Check: P/Pa + Mx/Max :5 1.0
Pno= Ae*Fy
= 0.643 inA2 *55000 psi
= 35,365 lb
Max= My/Qf
= 41415 in-lb/1.67
= 24,799 in-lb
µx= {l/[l-(Qc*P/Pcr)]}"-1
= {l/[l-(l.92*17291b/25551 lb)]Y'-1
= 0.87
Combined Stresses
Fe> Fy/2
Fn= Fy(l-Fy/4Fe)
= 0.7 * 11877 in-lb
= 8,314 in-lb
= 55 ksi*[l-55 ksi/(4*39.8 ksi)]
= 36.0 ksi
Pa= Pn/Qc
= 23134 lb/1.92
= 12,049 lb
Pao= Pno/Qc Myield=My= Sx*Fy
= 353651b/1.92
= 18,419 lb
Per= n" 2EI/(KL)maxA 2
= nA2*29500 ksi/(1.7*66.75 in)"2
= 25,551 lb
= 0.753 in"3 * 55000 psi
= 41,415 in-lb
(1729 lb/12049 lb)+ (8314 in-lb/24799 in-lb)= 0.43 < 1.0, OK (EQ C5-3)
** For comparison, total column stress computed for load case 5 is: 42.0% q loads 2017.421056 !b Axial and M= 623S in-lb
5 AN DIEGO HAT CO TYf'E A Page l of ·2-( 2)22/2018
Structural
Engineering & Design Inc.
1815 Wright Aye La Verne CA 91750 Tel: 909 596 1351 fax· 909 596 7186
By: ENHAO Project: SAN DIEGO HAT CO
BEAM Configuration: 1YPE A SELECTIVE RACK
DETERMINE ALLOWABLE MOMENT CAPACITY
A) Check compression flange for local buckling (B2.1)
w= c -2*t -2*r
= 1.75 in -2*0.06 in -2*0.06 in
= 1.510 in
w/t= 25.17
l=lambda= (1.052/(k)"0.5] * (w/t) * (Fy/E)"0.5
= (1.052/(4)"0.5] * 25.17 * (55/29500)"0.5
= 0.572 < 0.673, Flange is fully effective
B) check web for local buckling per section b2.3
fl(comp)= Fy*(y3/y2)= 48.53 ksi
f2(tension)= Fy*(yl/y2)= 100.29 ksi
Y= f2/fl
= -2.067
k= 4 + 2*(1-Y)"3 + 2*(1-Y)
= 67.83
flat depth=w= yl +y3
Eq. B2.3-5
Eq. B2.3-4
Eq. B2.1-4
Eq. B2.1-1
= 2.760 in w/t= 46 OK
l=lambda= [1.052/(k)"0.5] * (w/t) * (fl/E)"0.5
= (1.052/(67.83)"0.5] * 2.76 * (48.53/29500)"0.5
= 0.238 < 0.673
be=w= 2.760 in
bl= be(3-Y)
= 0.545
b2= be/2
= l.38in
bl+b2= 1.925 in > 0.9 in, Web is fully effective
Determine effect of cold working on steel yield point (Fya) per section A7.2
Fya= C*Fyc + (1-C)*Fy (EQ A7.2-1)
C= 2*Lc/(Lf+2*Lc)
= 0.157 in
Eq B2.3-2
Project#: LV-021918-2
2.75 In 05in {
T
3.000 In
1.625 in
_J_
l~ 0.060 In
Beam= SoaceRak S8306C 3 in x 0.06 in
Ix= 0.830 in"4
Sx= 0.487 in"3
Ycg= 1.980 in
t= 0.060 in
Bend Radius=r= 0.060 in
Fy=Fyv= 55.00 ksi
Fu=Fuv= 65.00 ksi
E= 29500 ksi
top flange=b= 1.750 in
bottom flange= 2.750 in
Web depth= 3.(Y'" ;,., -Fy -
m Lcorner=Lc= (p/2) * (r + t/2)
0.141 in
Lflange-top=Lf= 1.510 in
m= 0.192*(Fu/Fy) -0.068
= 0.1590
(EQ A7.2-4) d~~ !
Be= 3.69*(Fu/Fy) -0.819*(Fu/Fy)"2 -1.79
= 1.427
since fu/Fv= 1.18 < 1.2
and r/t= 1 < 7 OK
then Fye= Be * Fy/(R/t)"m (EQ A7.2-2)
= 78.485 ksi
Thus, Fya-top= 58.70 ksi (tension stress at top)
Fya-bottom= Fya*Ycg/(depth -Ycg)
= 113.94 ksi (tension stress at bottom)
Check allowable tension stress for bottom flange
Lftange-bot=Lfb= Lbottom -2*r*-2*t
= 2.510 in
Cbottom=Cb= 2*Lc/(Lfb+2*Lc)
= 0.101
Fy-bottom=Fyb= Cb*Fyc + (1-Cb)*Fyf
= 57.37 ksi
Fya= (Fya-top)*(Fyb/Fya-bottom)
= 29.56 ksi
(EQ A7.2-3)
if F= 0.95 Then F*Mn=F*Fya*Sx= I 13.67 in-k
Veg
y1
J_
yl= Ycg-t-r= 1.860 in
y2= depth-Ycg= 1.020 in
y3= y2-t-r= 0.900 in
Structural
Engineering & Design Inc.
1815 Wright Aye La Verne CA 91750 JeJ· 909 596 1351 fax· 909 596 7186
By: ENHAO Project: SAN DIEGO HAT CO
BEAM Configuration: 1YPE A SELECTIVE RACK
RMI Section 5.2, PT II
Section
Beam= SpaceRak SB306C 3 in x 0.06 in
Ix=Ib= 0.830 in"4
Sx= 0.487 in"3
t= 0.060 in
Fy=Fyv= 55 ksi
Fu= Fuv= 65 ksi
Fya= 58.7 ksi
E= 29500 ksi
F= 300.0
L= 96 in
Beam Level= 3
P=Product Load= 1,600 lb/pair
D= Dead Load= 75 lb/pair
1. Check Bending Stress Allowable Loads
Mcenter=F*Mn= W*L*W*Rm/8
W=LRFD Load Factor= 1.2*0 + 1.4*P+1.4*(0.125)*P
FOR DL=20/o of PL,
W= 1.599
Rm= 1 -[(2*F*L)/(6*E*Ib + 3*F*L)]
RMI 2.2, Item 8
1 -(2*300*96 in)/[(6*29500 ksi*0.83 in"3)+(3*300*96 in)]
= 0.753
if F= 0.95
Then F*Mn=F*Fya*Sx= 27.16 in-k
Thus, allowable load
per beam pair=W= F*Mn*8*(# of beams)/(L *Rm*W)
= 27.16 in-k * 8 * 2/(96in * 0.753 * 1.599)
= 3,760 lb/pair allowable load based on bending stress
Mend= W*L *(l-Rm)/8
= (3760 lb/2) * 96 in * (1-0.753)/8
= 5,572 in-lb @ 3760 lb max allowable load
= 2,371 in-lb @ 1600 lb imposed product load
2. Check Deflection Stress Allowable Loads
Dmax= Dss*Rd
Rd= 1 -(4*F*L)/(5*F*L + l0*E*Ib)
= 1 -(4*300*96 in)/[(5*300*96 in)+(10*29500 ksi*0.83 in"4)]
= 0.704 in
if Drnax= L/ 180 Based on L/180 Deffection Criteria
and Dss= 5*W*L "3/(384*E*lb)
L/180= 5*W*L" 3*Rd/(384*E*Ib*# of beams)
solving for W yields,
W= 384*E*I*2/(180*5*L "2*Rd)
= 384*0.83 in"4*2/[180*5*(96 in)"2*0.704)
= 3,220 lb/pair allowable load based on deflection limits
Project#: LV-021918-2
2.75 in
r,;Sin +
T 1.625 in
3.000 in -l
l~ 0.060 in
11111111 OO II IOI 1111111111111II1111111111111 ~=~~~~~~
~,-.-.-,-~,..;;--=.:----------
12 W
Beam
Length
Allowable Deflection= L/180
= 0.533 in
Deflection at imposed Load= 0.265 in
.. r,
Thus, based on the least capacity of item 1 and 2 above: Allowable load= 3,220 lb/pair
Imposed Product Load= 1,600 lb/pair
Beam Stress= . Beam at Level 3
Structural
Engineering & Design Inc.
1815 Wright Ave I a Verne CA 91750 Tel· 909 596 1351 Fax· 909 596 7186
By: ENHAO Project: SAN DIEGO HAT CO Project#: LV-021918-2
3 Pin Beam to Column Connection 1YPE A SELECTIVE RACK
I he beam end moments shown herein snow the result of the maximum induced nxed end monents form se1sm1c + static loads and the code
mandated minimum value ot 1.5%(DL+PL)
Mconn max= (Mseismic + Mend-fixityJ*0.70*Rho
= 9,561 in-lb Load at level 3
--P~~1n·
~112··
Connector Type= 3 Pin
Shear capacity of Pin
Pin Diam= 0.44 in
Ashear= (0.438 in)" 2 * Pi/4
= 0.1507 in"2
Pshear= 0.4 * Fy * Ashear
= 0.4 * 55000 psi* 0.1507in"2
= 3,315 lb
Bearing capacity of Pin
teal= 0.075 in
Omega= 2.22
Fy= 55,UU0 psi
Fu= 65,000 psi
a= 2.22
Pbearing= alpha ,. Fu ,. diam ,. tC0I/Omega
= 2.1.l. "' 05000 psi "' 0.438 in "' 0.075 ln/2.Ll
= 2,135 lb < 3315 lb
Moment capacity of Bracket
Edge Distance=E= 1.00 in Pin Spacing= 2.0 in
C= Pl +P2+P3 tdip= 0.18 in
= Pl +Pl *(2.5"/4.5")+Pl *(0.5"/4.5")
= 1.667 * Pl
Mcap= Sclip * Fbending
= 0.127 in"3 * 0.66 * Fy
= 4,610 in-lb
Pclip= Mcap/(1.667 * d)
C*d= Mcap = 1.667
= 4610.1 in-lb/(l.667 * 0.5 in)
= 5,531 lb
Thus, Pl= 2,135 lb
Mconn-allow= [Pl *4.5" +Pl *(2.5"/4.5")*2.5" +Pl *(0.5"/4.5")*0.5"]
= 2135 LB*[4.5"+(2.5"/4.5")*2.5"+ (0.5"/4.5")*0.5"]
= 12,691 in-lb > Mconn max, OK
5AN DIEGO HAT CO TYPE A Page 9 of 2-{
Fy= 55,000 psi
Sclip= 0.127 in" 3
d= E/2
= 0.50 in
rho= 1.0000
2/22/2018
Structural
Engineering & Design Inc.
1815 Wright Ave La Verne. CA 91 750 Tel: 909.596.1351 Fax· 909.596.7186
By: ENHAO Project: SAN DIEGO HAT CO Project#: LV-021918-2
Transverse Brace Configuration: 1YPE A SELECTIVE RACK
Section Properties
Diagonal Member= Spcrack 1-1/2x1-1/4x14ga
Area= 0.292 in" 2
r min= 0.430 in
Fy= 55,000 psi
K= 1.0
Qc= 1.92
Frame Dimensions
r 1.500 ,n -,
R}O•
Bottom Panel Height=H= 54.0 in
Frame Depth=D= 42.0 in
Column Width= B= 3.0 in
Diagonal Member
Horizontal Member= Spcrack 1-1/2x1-1/4x14ga
Area= 0.292 in" 2
r min= 0.430 in
Fy= 55,000 psi
K= 1.0
Clear Depth=D-B*2= 36.0 in
X Brace= NO
rho= 1.00
_.o I Load Case 6: : (L±.+(2.Q.110G4rP*!':!iS.'d.e.,~l}tJtJ'1+C--:lT7(0.0..885S+;:ioi..11-4.~rsct;~'S;,;J~*B*P + [0.7*rho*EJ<= 1. 0, ASD Method
Vtransverse= 1,078 lb
Vb=Vtransv*0.7*mo= 1078 lb * 0.7 * 1
= 7551b
Ldiag= [(D-B*2)" 2 + (H-6")" 2]" 1/2
= 60.0 in
Pmax= V*(Ldiag/D) * 0.75
= 809 lb
axial load on diagonal brace member
Pn= AREA*Fn
= 0.292 in"2 * 14961 psi
= 4,369 lb
Pallow= Pn/Q
= 4369 lb /1. 92
= 2,275 lb
(kl/r)= (k * Ldiag)/r min
= (1 x 60 in /0.43 in )
= 139.5 in
Fe= pi"2*E/(kl/r)"2
= 14,961 psi
Since Fe<Fy/2,
Fn= Fe
= 14,961 psi
Check End Weld
B 1'f
Lweld= 3.0 in
Fu= 65 ksi
tmin= 0.075 in
Typical Panel
Confiouration
T
1
Pn/Pallow= 0.36 <= 1.0 OK Weld Capacity= 0.75 * tmin * L * Fu/2.5
Horizontal brace
Vb=vtransv*0.7*mo= 755 lb
(kl/r)= (k * Lhoriz)/r min
= (1 x 42 in) /0.43 in
= 97.7 in
Since Fe>fy/2, Fn=Fy*(l -fy/4fe)
= 30,207 psi
Pn/Pallow= 0 .16
5AN DIEGO HAT CO T'i1'E A
<= 1.0 OK
Fe= pi"2*E/(kl/r)"2
= 30,502 psi
Pn= AREA*Fn
= 0.292in"2*30207 psi
= 8,820 lb
Paqe ( 0 of ~
= 4,388 lb OK
Fy/2= 27,500 psi
Pallow= Pn/nc
= 8820 lb /1.92
= 4,594 lb
2/22/2018
Structural
Engineering & Design Inc.
1815 Wright Ave La Verne. CA 91750 Tel: 909.596.1351 Fax: 909.596.7186
By: ENHAO Project: SAN DIEGO HAT CO
Single Row Frame Overturning Configuration: TYPE A SELECTIVE RACK
Loads
Critical Load case(s):
1) RMI Sec 2.2, item 7: (0.9-0.2Sds)D + (0.9-0.20Sds)*B*Papp -E*rho
Vtrans=V=E=Qe= 1,078 lb
DEAD LOAD PER UPRIGHT=D= 375 lb
PRODUCT LOAD PER UPRIGHT=P= 8,000 lb
Papp=P*0.67= 5,360 lb
Wst LCl=Wstl=(0.74968*O + 0.74968*Papp*1)= 4,299 lb
Product Load Top Level, Ptop= 1,600 lb
DL/Lvl= 75 lb
Seismic Ovt based on E, L(Fi*hi)= 235,938 in-lb
heiqht/depth ratio= 6.5 in
A) Fullv Loaded Rack
Load case 1:
Movt= r(Fi*hi)*E*rho
= 235,938 in-lb
Sds= 0.7516
(0.9-0.2Sds)= 0.7497
(0.9-0.2Sds)= 0.7497
B= 1.0000
rho= 1.0000
Frame Depth= Df= 42.0 in
Htop-lvl=H= 272.0 in
# Levels= 5
# Anchors/Base= 2
hp= 48.0 in
h=H+hp/2= 296.0 in
Mst= Wstl * Df/2
= 4299 lb * 42 in/2
= 90 279 in-lb
Project#: LV-021918-2
SIDE ELEVATION
T= (Movt-Mst)/Df
= (235938 in-lb -90279 in-lb)/42 in
= 3,468 lb Net Uplift per Column
I Net Seismic Uplift= 31468 lb
8) Ton Level Loaded Onlv
Load case 1:
0 Vl=vtop= Cs* Ip* Ptop >= 350 lb for H/D >6.0 Movt= [Vl*h + V2 * H/2]*0.7*rho
= 0.1879 * 1600 lb = 79,228 in-lb
= 301 lb T= (Movt-Mst)/Df
Vleff= 3501b Critical Level= 5 = (79228 in-lb -31093 in-lb)/42 in
V2=V0L= Cs*Ip*D Cs*Ip= 0.1879 = 1,146 lb Net Uplift per Column
= 70 1b
Mst= (0.74968*D + 0.74968*Ptop*l) * 42 in/2
= 31,093 in-lb
I Net Seismic Uplift= 1,146 lb
Anchor
Check (2) 0.5'' x 3.25" Embed HILTI KWIKBOLT TZ anchor(s) per base plate.
Special inspection is required per ESR 1917.
Fully Loaded:
Top Level Loaded:
Pullout Capadty=Tcap= 1,961 lb L.A. City Jurisdiction? NO
Shear Capacity=Vcap= 2,517 lb Phi= 1
(1734 lb/1961 lb)"l + (269 lb/2517 lb)"l =
(573 lb/1961 lb)"l + (87 lb/2517 lb)"l =
5AN DIEGO HAT CO TYFE A Page / / of 2-I
0.99
0.33
Tcap*Phi= 1,961 lb
Vcap*Phi= 2,517 lb
<= 1.2 OK
<= 1.2 OK
2/22/2018
Structural
Engineering & Design Inc.
1815 Wright Ave La Verne. CA 91750 Tel: 909.596.1351 Fax: 909.596.7186
By: ENHAO Project: SAN DIEGO HAT CO Project#: LV-021918-2
Base Plate Configuration: TYPE A SELECTIVE RACK
Section +-a-p
Baseplate= 8x5x0.375
Eff Width=W = 8.00 in a= 3.00 in Mb
Eff Depth=D = 5.00 in
Column Width=b = 3.00 in
Column Depth=dc = 3.00 in
Anchor c.c. =2*a=d = 6.00 in
N=# Anchor/Base= 2
Fy = 36,000 psi w L = 2.50 in
Plate Thickness=t = 0.375 in Down a isle Elevation
Down Aisle Loads Load Case 5:: (1 +0. 105*Sds)D + 0.75*{(1.4+0.14Sds)*B*P + 0.75*[0.7*rf1o*El<= 1.0, ASD Method
COLUMN DL= 188 lb Axial=P= 1.078918 * 187.5 lb+ 0.75 * (1.505224 * 0.7 * 4000 lb)
COLUMN PL= 4,000 lb = 3,363 lb
Base Moment= 8,000 in-lb Mb= Base Moment*0.75*0.7*rho
1+0.105*Sds= 1.0789 = 8000 in-lb* 0.75*0.7*rho
l.4+0.14Sds= 1.5052 ..--------=_4.,__,2_0_0_i_n_-l_b _______________ --.
B= .0.7000 Axial Load P = 3,363 lb Mbase=Mb = 4,200 in-lb
M 1= wl "2/2= fa*L" 2/2 Axial stress=fa = P/A = P/(D*W)
= 84 psi
Moment Stress=fb = M/S = 6*Mb/[(D*B"2]
= 78.8 psi
Moment Stress=fbl = fb-fb2
= 29.5 psi
M3 = (l/2)*fb2*L*(2/3)*L = (1/3)*fb2*L "2
= 103 in-lb
S-plate = (l)(t"2)/6
= 0.023 in"3/in
fb/Fb = Mtotal/[(S-plate)(Fb)]
0.72 OK
Tanchor = (Mb-(Plapp*0.75*0.46)(a))/[(d)*N/2]
= -1,450 lb No Tension
= 263 in-lb
Moment Stress=fb2 = 2 * fb * L/W
= 49.2 psi
M2= fbl *L" 2)/2
= 92 in-lb
Mtotal = Ml+M2+M3
= 458 in-lb/in
Fb = 0.75*Fy
= 27,000 psi
Pp= 0.7*Pc
= 2,800 psi
Tallow= 1,961 lb
OK
OK
Cross Aisle Loads ="" 1o«1 =• RNI s« 1.1, ,~m ,,. r1+0.1JSds)X + o+o.t4sos)PL'0.1S+EL•o.JS <• 1.0, A.SD 11ethod Check uplift load on Baseplate
Effc
Effe
Pstatic= 3,363 lb
Movt*0.75*0.7*rho= 123,867 in-lb
Frame Depth= 42.0 in
Pseismic= Movt/Frame Depth
= 2,949 lb
Check uplift forces on baseplate with 2 or more anchors per RMI 7.2.2.
When the base plate configuration consists of two anchor bolts located on either side
the column and a net uplift force exists, the minimum base plate thickness
all be determined based on a design bending moment In the plate equal
the uplift force on one anchor times 1/2 the distance from
P=Pstatic+Pseismic= 6,312 lb
b =Column Depth= 3,00 in
L =Base Plate Depth-Col Depth= 2.50 in
fa = P/A = P/(D*W)
= 158 psi
Sbase/in = (l)(t"2)/6
= 0.023 in"3/in
fb/Fb = M/[(S-plate)(Fb)]
= 0.78 OK
SAN DIEGO HAT CO TYPE A
M= wl "2/2= fa*L "2/2
= 493 in-lb/in
Fbase = 0.75*Fy
= 27,000 psi
Page {2 of 2/
e centerline of the anchor to the nearest edge of the rack column"
l~~L-~ 1a "~ ,,, t
Elevation
Uplift per Column= 3,468 lb
Qty Anchor per BP= 2
Net Tension per anchor=Ta= 1,734 lb
C= 2.50 in
Mu=Moment on Baseplate due to uplift= Ta*c/2
= 2,168 in-lb
Splate= 0.117 in"3
fb Fb *0.75= 0.514 OK
2/22/2018
Structural
Engineering & Design Inc.
1815 Wright Ave La Verne. CA 91750 Tel: 909.596.1351 Fax: 909.596.7186
By: ENHAO Project: SAN DIEGO HAT CO Project#: LV-021918-2
Slab on Grade Configuration: TYPE A SELECTIVE RACK
y
L
SLAB ELEVATION
~I
I -----c I ---_, Cross
Aisle
················t ::::::::r ... B --'-'---'-'-'-'-'--:-.i·~f ~:··
·. · .·. · .· .·.·.·.Down Aisle
Baseplate Plan View
Concrete
fc= 4,000 psi
tslab=t= 5.0 in
teff= 5.0 in
phi=0= O.~
SQi!
fsoil= 750 psf
Movt= 165,157 in-lb
Frame depth= 42.0 in
Sds= 0.752
0.2*Sds= 0.150 Base Plate
Effec. Baseplate width=B= 8.00 in
Effec. Baseplate Depth=D= 5.00 in
width=a= 3.00 in
depth=b= 3.00 in
;1.,= 0.600
0=8/D= 1.600
Pc"0.5= 63.20 psi
Column Loads
DEAD LOAD=D= 188 lb per column
unfactored ASD load
PRODUCT LOAD=P= 4,000 lb per column
unfactori!d ASD load
Papp= 2,680 lb per column
P-seismic=E= (Movt/Frame depth)
= 3,932 lb per column
unfactored Limit State load
8= 0.7000
rho= 1.0000
Sds= 0.7516
1.2 + 0.2*Sds= 1.3503
0. 9 -0.20Sds= 0.7497
Puncture
Apunct= [(c+t)+(e+t)]*2*t
= 195.0 in"2
Fpunctl= [(4/3 + 8/(3*0)] * ,, *(F'c"0.5)
= 113.8 psi
Fpunct2= 2.66 * ,,_ * (F'c"0.5)
= 100.9 psi
Fpunct eff= 100. 9 psi
Slab Bending
Pse=DL+PL+E= 8,158 lb
Asoil = (Pse* 144 )/(fsoil)
= 1,566 in"2
X= (L-y)/2
= 12.4 in
Fb= 5*(phi)*(fc)"0.5
= 189.74 psi
5AN DIEGO HAT CO TYPE A
midway dist face of column to edge of plate=c= 5.50 in
midway dist face of column to edge of plate=e= 4.00 in
Load Case 1) (1.2+0.2Sds)D + (l.2+0.2Sds)*B*P+ rho*E RMI sEc 2.2 EQTN s
= 1.35032 * 188 lb + 1.35032 * 0.7 * 4000 lb+ 1 * 3932 lb
= 7,967 lb
Load Case 2) (0.9-0.2Sds)D + (0.9-0.2Sds)*B*Papp + rho*E RMI sEc 2.2 EQTN 7
= 0.74968 * 188 lb+ 0.74968 * 0.7 * 2680 lb+ 1 * 3932 lb
= 5,479 lb
Load Case 3) 1.2*D + 1.4*P
= 1.2*188 lb+ 1.4*4000 lb
= 5,825 lb
Load Case 4) l.2*D + 1.0*P + 1.0E
= 8,158 lb
Effective Column Load=Pu= 8,158 lb per column
L= (Asoil)"0.5
= 39.57 in
M= w*x/\2/2
= (fsoil*x/\2)/(144*2)
= 403.1 in-lb
Page i 2:> of 2-/
fv/Fv= Pu/(Apunct*Fpunct)
0.415 < 1 OK
y= (c*e)"0.5 + 2*t
= 14.7 in
S-slab= 1 *teff/\ 2/6
= 4.17 in"3
fb/Fb= M/(S-slab*Fb)
0.510 < 1, OK
RMI SEC 2.2 EQTN 1,2
K:I .318·11 S« 92 I, EQtn9-5
2/22/2018
Structural
Engineering & Design Inc.
1815 Wright Ave La Verne CA 91750 Tel: 909.596.1351 Fax: 909.596 7186
By: ENHAO Project: SAN DIEGO HAT CO Project#: LV-021918-2
Configuration & Summary: TYPE C-96 TUNNEL RACK
T
68"
288" + 68"
t
136"
I
288"
T ..----,
42"
**RACK COLUMN REACTIONS
ASDLOADS
AXIAL DL= 113 lb
AXIAL LL= 2,400 lb
SEISMIC AXTAL Ps=+/-3,745 lb
BASE MOMENT= 8,000 in-lb
,A"--,f -96" -----,j, ,I--42" -,Y
Seismic Criteria # Bm Lvls Frame Depth Frame Height # Dia onals Beam Length Frame Type
Ss=l.04, Fa=l.084 3 42 in 288.0 in 6 96in Single Row
Component Description STRESS
Column Fy=55 ksi SPCRK FH-20/3x3xl 4ga P= 1675 lb, M=6518 in-lb 0.25-OK
Column & Backer To Level 1 SPCRK FH20-FS-8/3x3xl 4ga/3xl -5/8xl 4ga p= 2513 lb, M= 24785 in-lb 0.84-OK
Beam Fy=55 ksi SpaceRak SB306C 3 in x 0.06 in Lu=96 in I Capacity: 3220 lb/pr 0.5-OK
Beam Connector Fy=55 ksi Lvl 2: 3 pin OK I Mconn=5245 in-lb I Mcap=12691 in-lb 0.41-OK
Brace-Horizontal Fy=55 ksi Spcrack 1-1/2xl -1/4xl 4ga 0.1-OK
Brace-Diagonal Fy=55 ksi Spcrack 1-1/2xl-1/4xl 4ga 0.21-OK
Base Plate Fy=36 ksi 8x5x0.375 I Rxity= 8000 in-lb 0.56-OK
Anchor 2 per Base 0.5'' x 3.25" Embed HILT! K\NIKBOLTTI ESR 1917 Inspection Reqd (Net Seismic Uplift=2456 lb) 0.575-OK
Slab &Soil 5" tnk x 4000 psi slab on grade. 750 psf Soil Bearing Pressure 0.25-OK
Level I Load** I Story Force I Story Force Column I Column I Conn. Beam
Per Level Beam Spcg Brace Transv Longit. Axial Moment Moment Connector
1 1,600 lb 136.0 in 36.0 in 1441b 110 lb 2,513 lb 24,785 "# 12,616 "# If pin OK
2 1,600 lb 68.0 in 36.0 in 216 lb 164 lb 1,675 lb 6,518 "# 5,245 "# 3 pin OK
3 1,600 lb 68.0 in 54.0 in 288 lb 2191b 838 lb 3,725 "# 2,963 "# 3 pin OK
54.0 in
54.0 in
42.0 in
** Load defined as product weight per pair of beams Total: 6471b 4931b
Notes I
BACKER UP TO 136"
4 PIN @ LEVEL 1 CONNECTION
5AN DIEGO HAT CO TYPE C-9G Page /lf,of 21 2)22/2018
Structural
Engineering & Design Inc.
1815 W right Ave La Verne CA 91750 Tel· 909.596.1351 Fax: 909.596.7186
By: ENHAO Project: SAN DIEGO HAT CO Project #: LV-021918-2
Configuration & Summary: TYPE C-144 TUNNEL RACK
T
68"
+
288" 68"
t-
36"
+
100"
J
'
y i.-----1
42" + ~
54" + IE-----t I
**RACK COLUMN REACTIONS
ASDLOADS
AXL4L DL= 150 lb
AXL4L LL= 4,000 lb
SEISMIC AXTAL Ps=+/-5,989 lb
BASE MOMENT= 8,000 in-lb
,,1<-r--144"---+ f'-42" --+
Seismic Criteria # Bm Lvls Frame Depth Frame Height # Diagonals Beam Length Frame Type
Ss=l.04, Fa=l.084 4 42 in 288.0 in 6 144 in Single Row
Component Description STRESS
Column Fy=55 ksi SPCRK FH-20/3x3x14ga P=2475 lb, M=10124 in-lb 0.33-0K
Column & Backer To Level 1 SPCRK FH20-FS-8/3x3x14ga/3xl -5/8xl 4ga p= 4150 lb, M= 31334 in-lb 0.89-0K
Beam Fy=55 ksi SpaceRak SB506C 5 in x 0.06 in Lu=144 in I Capacity: 4250 lb/pr 0.56-0K
Beam Connector Fv=55 ksi Lvl 2: 3 pin OK I Mconn=7966 in-lb I Mcap= 12691 in-lb 0.63-0K
Brace-Horizontal Fy=55 ksi Spcrack 1-1/2xl -1/4xl 4ga 0.16-0K
Brace-Diagonal Fy=55 ksi Spcrack 1-1/2xl -1/4xl 4ga 0.35-0K
Base Plate Fy=36 ksi 8x5x0.375 I Rxity= 8000 in-lb 0.8-0K
Anchor 2 per Base 0.5'' x 3.25" Embed HILTI KWIKBOLTTZ ESR 1917 Inspection Reqd (Net Seismic Upllft=3868 lb) 0.908-0K
Slab&Soil 5" thk x 4000 psi slab on grade. 750 psf Soil Bearing Pressure 0.51-0K
Level I Load** I Story Force I Story Force Column I Column I Conn. Beam
Per Level Beam Spcg Brace Transv Longit. Axial Moment Moment Connector
2 2,400 lb 36.0 in 36.0 in 223 1b 170 lb 3,713 lb 6,890 "# 7,966 "# 3 pin OK
3 2,400 lb 68.0 in 54.0 in 335 lb 255 1b 2,475 lb 10,124 "# 7,579 "# 3 pin OK
4 2,400 lb 68.0 in 54.0 in 446 1b 340 1b 1,238 lb 5,785 "# 4,036 "# 3 pin OK
54.0 in
42.0 in
•• Load defined as product weight per pair of beams I Notes I BACKER UP TO 1%"
Total: 1,064 lb 811 lb
5 AN DIEGO HAT CO TYFE C-144 Page / ) of 2./ 2)22)2018
Structural
Engineering & Design Inc.
1815 Wright Ave La Verne CA 91750 Tel: 909.596.1351 Fax: 909.596.7186
By: ENHAO Project: SAN DIEGO HAT CO Project#: LV-021918-2
Configuration & Summary: TYPE C-168 TUNNEL RACK
T
68"
288" t
68" 288"
t
136"
I
~
42"
+ 54" + 54" + 54" + 36"
+ 36"
/4--
,-,/
**RACK COLUMN REACTIONS
ASDLOADS
AXIAL DL= 113 lb
AXIAL LL= 3,600 lb
SEISMIC AxTAL Ps=+/-5,493 lb
BASE MOMENT= 8,000 in-lb
--r--168"----,} ,f-42" -,r
Seismic Criteria # Bm Lvls Frame Depth Frame Height # Diagonals Beam Length Frame Type
SS= 1.04, Fa= 1.084 3 42 in 288.0 in 6 168in Single Row
Component Description STRESS
Column Fy=55 ksi SPCRK FH-25/3x3x13ga P=2475 lb, M=9573 in-lb 0.31-OK
Column & Backer To Level 1 SPCRK FH25-FH-25/3x3x13ga/3x3x13ga p= 3713 lb, M= 40146 in-lb 0.9-OK
Beam Fy=55 ksi SpaceRak SB506C 5 in x 0.06 in Lu=168 in I Capacity: 3202 lb/pr 0.75-OK
Beam Connector Fy=55 ksi Lvl 2: 3 pin OK I Mconn= 7911 in-lb I Mcap=l5230 in-lb 0.52-OK
Brace-Horizontal Fy=55 ksi Spcrack 1-1/2xl-1/4x14ga 0.14-OK
Brace-Diagonal Fy=55 ksi Spcrack 1-l/2xl-1/4xl 4ga 0.31-OK
Base Plate Fy=36 ksi 8x8x0.375 I Rxity= 8000 in-lb 0.45-OK
Anchor 2 per Base 0.5'' x 3.25" Embed HILTI KWIKBOLTTZ ESR 1917 Inspection Reqd (Net Seismic Upllft=3600 lb) 0.842-OK
Slab &Soil 5" thk x 4000 psi slab on grade. 750 psf Soil Bearing Pressure 0.4-OK
Level I Load** I Story Force I Story Force Column I Column I Conn. Beam
Per Level Beam Spcg Brace Transv Long it. Axial Moment Moment Connector
1 2,400 lb 136.0 in 36.0 in 211 lb 161 lb 3,713 lb 40,146 "# 20,048 "# lj-pin D/<.
2 2,400 lb 68.0 in 36.0 in 316 1b 241 lb 2,475 lb 9,573 "# 7,91 1 "# 3 pin OK
3 2,400 lb 68.0 in 54.0 in 422 lb 3221b 1,238 lb 5,471 "# 4,561 "# 3 pin OK
54.0 in
54.0 in
42.0 in
** Load defined as product weight per pair of beams Total: 9491b 7241b
Notes I
BACKER UP TO 136"
4 PIN@ LEVEL 1 CONNECTION
5AN DIEGO HAT CO TYPE C-1 G8 Page ( 6 of 2..-j 2/22/2018
Structural
Engineering & Design Inc.
1815 Wright Ave La Verne CA 91750 Tel: 909.596.1351 Fax: 909.596.7186
By: ENHAO Project: SAN DIEGO HAT CO Project#: LV-021918-2
Configuration & Summary: TYPE D SELECTIVE RACK
T
68"
t
2 88" 68"
1---288"
68"
+
68"
I
-'r k--~
30" + ~
54" + ,..___.._.
54" + -54" + ,..____.,
36" + 1------'lll
36" -'4-,.____,
**RACK COLUMN REAmONS
ASDLOADS
AXIAL DL= 150 lb
AXIAL LL= 3,200 lb
SEISMIC AXIAL Ps=+/-4,679 !b
BASE MOMENT= 8,000 in-lb
--r -96" ----+ }-42" +
Seismic Criteria # Bm Lvls Frame Depth Frame Height # Diagonals Beam Length Frame Type
Ss= 1.04, Fa= 1.084 4 42 in 288.0 in 6 96 in Single Row
Component Description STRESS
Column Fy=55 ksi SPCRK FH-20/3x3x14ga P=3350 lb, M= 13353 in-lb 0.58-OK
Column & Backer None None None N/A
Beam Fy=55 ksi SpaceRak SB306C 3 in x 0.06 in Lu=96 in I Capacity: 3220 lb/pr 0.5-OK
Beam Connector Fy=55 ksi Lvl 1: 3 pin OK I Mconn=9851 in-lb I Mcap= 12691 in-lb 0.78-OK
Brace-Horizontal Fy=55 ksi Spcrack 1 • 1/2xl-1/4xl 4ga 0.13-OK
Brace-Diagonal Fy=55 ksi Spcrack 1-l /2xl -l/4xl 4ga 0.28-OK
Base Plate Fy=36 ksi 8x5x0.375 I Rxity= 8000 in-lb 0.64-OK
Anchor 2 per Base 0.5'' x 3.25" Embed HILT! KWIKBOLTTZ ESR 1917 Inspection Reqd (Net Seismic Uplift=2960 lb) 0.7-OK
Slab &Soil 5" thk x 4000 psi slab on grade. 750 psf Soil Bearing Pressure 0.37-OK
Level I Load** I Story Force I Story Force Column I Column I Conn. Beam
Per Level BeamSpcg Brace Transv Longit. Axial Moment Moment Connector
1 1,600 lb 68.0 in 36.0 in 86 lb 66 lb 3,350 lb 13,353 "# 9,851 "# 3 pin OK
2 1,600 lb 68.0 in 36.0 in 172 lb 131 lb 2,513 lb 10,052 "# 7,914 "# 3 pin OK
3 1,600 lb 68.0 in 54.0 in 259 lb 197 lb 1,675 lb 7,818 "# 5,960 "# 3 pin OK
4 1,600 lb 68.0 in 54.0 in 345 lb 263 lb 8381b 4,468 "# 3,223 "# 3 pin OK
54.0 in
30.0 in
** Load defined as product weight per pair of beams Total: 8621b 657 1b
SAN DIEGO HAT CO TYFE D Paqe f 1 of 2-I 2/22/2018
Structural
Engineering & Design Inc.
1815 Wright Ave La Verne CA 91750 Tel: 909 596.1351 Fax: 909 596.7186
By: ENHAO Project: SAN DIEGO HAT CO Project #: L V-021918-2
Configuration & Summary: TYPE E SELECTIVE RACK
T
68"
288" t
100"
t
100"
J
Seismic Criteria
Ss= 1.04, Fa= 1.084
Component
Column
Column & Backer
Beam
Beam Connector
Brace-Horizontal
Brace-Diagonal
Base Plate
Anchor
Slab&Soil
Level I Load**
Per Level
1 1,600 lb
2 1,600 lb
3 1,600 lb
288"
uRACK COLUMN REACTIONS
ASDLOADS
AXIAL DL= 113 lb
AXIAL LL= 2,400 lb
SEISMIC AXIAL Ps=+/-3,673 lb
BASE MOMENT= 8,000 in-lb
,-r -96" -----,,r ,f<-42" -..,f,
# Bm Lvls Frame Depth Frame Height # Dia onals Beam Length Frame Type
3 42 in 288.0 in 6 96 in Single Row
Description STRESS
Fy=55 ksi SPCRK FH-20/3x3x14ga P=2513 lb, M=15911 in-lb 0.81-OK
None None None N/A
Fy=55 ksi SpaceRak SB306C 3 in x 0.06 in Lu=96 in I Capacity: 3220 lb/pr 0.5-OK
Fy=55 ksi Lvl 1: 3 pin OK I Mconn=l0783 in-lb I Mcap=12691 in-lb 0.85-OK
Fy=55 ksi Srx:rack 1-1/2xl-l/4x14ga 0.1-OK
Fy=55 ksi Srx:rack 1-l/2xl-l/4xl 4ga 0.21-OK
Fy=36 ksl BxSx0.375 I Rxity= 8000 in-lb 0.56-OK
2 oer Base 0.5'' x 3.25" Embed HILTI KWIKBOLTTZ ESR 1917 Inspection Reqd (Net Seismic Uplift:=2384 lb) 0.558-OK
5" thk x 4000 psi slab on grade. 750 psf Soil Bearing Pressure 0.26-OK I Story Force I Story Force Column I Column I Conn, Beam
Beam Spcg Brace Transv Lonqit. Axial Moment Moment Connector
100.0 in 36.0 in 114 lb 87 lb 2,513 lb 15,911 "# 10,783 "# 3 pin OK
100.0 in 36.0 in 228 lb 1741b 1,675 lb 10,155 "# 6,598 "# 3 pin OK
68.0 in 54.0 in 305 lb 233 lb 838 lb 3,954 "# 3,044 "# 3 pin OK
54.0 in
54.0 in
30.0 in
** Load defined as product weight per pair of beams Total: 6471b 493 lb
5AN DIEGO t-lA T CO TYPE E Page / 3' of ~ 2/22/2018
Structural
Engineering & Design Inc.
1815 Wright Ave La Verne CA 91750 Tel: 909.596.1351 Fax: 909.596.7186
By: ENHAO Project: SAN DIEGO HAT CO Project#: LV-021918-2
Configuration & Summary: TYPE F SELECTIVE RACK
T 100" + 28" + 28"
288" + 28" + 28" + 28"
.I
+1<'----
54"
288" + 1---'JI
54" +-36" + 1----"I
36"
->l-"---ll
**RACK COLUMN R£4CTIONS
ASDLOADS
AXJAL DL= 225 lb
AXTAL LL= 4,800 lb
SEISMIC AXTAL Ps=+/-5,437 lb
BASE MOMENT= 8,000 in-lb
✓-r-96 .. ~ }-42" -f
Seismic Criteria # Bm Lvls Frame Depth Frame Height # Diagonals Beam Length Frame Type
Ss= 1.04, Fa= 1.084 6 42 in 288.0 in 6 96 in Single Row
Component Description STRESS
Column Fy=55 ksi SPCRK FH-20/3x3x14ga P=5025 lb, M=6162 in-lb 0.36-0K
Column & Backer None None None N/A
Beam Fy=55 ksi SpaceRak SB306C 3 in x 0.06 in Lu=96 in I Capacity: 3220 lb/pr 0.5-0K
Beam Connector Fy=55 ksi Lvl 1: 3 pin OK I Mconn=6130 in-lb I Mcap= 12691 in-lb 0.48-0K
Brace-Horizontal Fv=55 ksi Spcrack 1-l/2xl-1/4xl 4ga 0.2-0K
Brace-Diagonal Fy=55 ksi Spcrack 1-1/2xl-l/4xl 4ga 0.43-0K
Base Plate Fy=36 ksi 8x5x0.375 I Rxity= 6163 in-lb 0.85-0K
Anchor 2 per Base 0.5'' x 3.25" Embed HILTI KWIKBOLTTZ ESR 1917 Inspection Reqd (Net Seismic Uplift=2858 lb) 0.717-0K
Slab &Soil 5" thk x 4000 psi slab on grade. 750 psf Soil Bearing Pressure 0.58-0K
Level I Load** I Story Force I Story Force Column I Column I Conn. Beam
Per Level Beam Spcg Brace Transv Longit. Axial Moment Moment Connector
1 1,600 lb 28.0 in 36.0 in 551b 42 lb 5,025 lb 6,162 "# 6,130 "# 3 pin OK
2 1,600 lb 28.0 in 36.0 in 110 lb 841b 4,188 lb 6,609 ''# 6,081 "# 3 pin OK
3 1,600 lb 28.0 in 54.0 in 165 lb 126 lb 3,350 lb 6,024 "# 5,569 "# 3 pin OK
4 1,600 lb 28.0 in 54.0 in 219 lb 167 lb 2,513 lb 5,145 "# 4,851 "# 3 pin OK
5 1,600 lb 28.0 in 54.0 in 274 lb 209 1b 1,675 lb 3,974 "# 6,187 "# 3 pin OK
6 1,600 lb 100.0 in 30.0 in 470 lb 359 lb 838 lb 8,963 "# 4,797 "# 3 pin OK
** Load defined as product weight per pair of beams Total: 1,293 lb 9861b
5AN DIEGO HAT CO TYrE f Page i ~ of Z.., I 2/22/2018
Struatu ral
Engineering & Design Inc.
1815 Wright Ave La Verne CA 91750 Tel: 909.596.1351 Fax: 909 596.7186
By: ENHAO Project: SAN DIEGO HAT CO Project #: LV-021918-2
Configuration & Summary: TYPE H SELECTIVE RACK
T
112"
2 M"+
112"
'
Seismic Criteria # Bm Lvls
Ss= 1.04, Fa= 1.084 2
Component
Column Fy=55 ksi
Column & Backer None
Beam Fy=55 ksi
Beam Connector Fy=55 ksi
Brace-Horizontal Fy=55 ksi
Brace-Diagonal Fy=55 ksi
Base Plate Fy=36 ksi
Anchor 2 per Base
Slab &Soil
Level I Load**
Per Level Beam Spcg
1 1,600 lb 112.0 in
2 1,600 lb 112.0 in
** Load defined as product weight per pair of beams
Notes
5AN DIEGO HAT CO TYFE H
--r-k----il
30" +-54" +-54"
288" + t---____,,
54" + l<'-------i
36" +-36"
->le---
}-42" ,r
**RACK COLUMN REACTIONS
ASDLOADS
AX.l4L DL= 75 lb
AXIAL LL= 1,600 lb
SEISMIC AXIAL Ps=+/-2,161 lb
84SE MOMENT= 8,000 in-lb
Frame Depth Frame Height # Diagonals Beam Length Frame Type
42 in 288.0 in 6 96 in Single Row
Description STRESS
SPCRK FH-20/3x3x14ga P=1675 lb, M=9931 in-lb 0.55-OK
None None N/A
SpaceRak SB306C 3 in x 0.06 in Lu=96 in I Capacity: 3220 lb/pr 0.5-OK
Lvl 1: 3 pin OK I Mconn= 7285 in-lb I Mcap=12691 in-lb 0.57-0K
Spcrack 1-1/2xl-1/4xl 4ga 0.07-OK
Spcrack 1-1/2xl-1/4xl 4ga 0.14-OK
8x5x0.375 I Rxity= 8000 in-lb 0.47-OK
0.5'' x 3.25" Embed HILTI KWIKBOLT1Z ESR 1917 Inspection Reqd (Net Seismic Upllft=1302 lb) 0.308-OK
5" thk x 4000 psi slab on grade. 750 psf Soil Bearing Pressure
Brace
36.0 in
36.0 in
54.0 in
54.0 in
54.0 in
30.0 in
Total:
I Story Force I Story Force
Transv Longit.
144 lb 110 lb
2871b 219 lb
431 lb 329 lb
Page 2,,Q of 2-j
Column I Column I Conn.
Axial Moment Moment
1,675 lb 9,931 "# 7,285 "#
838 lb 6,140 "# 3,809 "#
0.18-OK
Beam
Connector
3 pin OK
3 pin OK
2/22/2018
Stru8tural
Engineering & Design Inc.
1815 Wright Ave La Verne. CA 91750 Tel: 909.596.135 1 Fax: 909.596.7186
By: ENHAO Project: SAN DIEGO HAT CO Project#: LV-021918-2
Configuration & Summary: TYPE I SELECTIVE RACK
T
88" .. + 300 100"
t
100"
I
-'ts-k-----11
42"
300"
+--36"
+>------------al
36"
~ ,.___-I
**RACK COLUMN R£4CT7ONS
ASDLOADS
AX.l4L DL= 113 lb
AX.l4L LL= 2,400 lb
SEISMIC AXIAL Ps=+/-3,852 lb
84SE MOMENT= 8 000 in-lb
--r -96" ----+ . ,f-42" -f
Seismic Criteria # Bm Lvls Frame Depth Frame Height # Diagonals Beam Length Frame Type
Ss= 1.04, Fa= 1.084 3 42 in 300.0 in 6 96in Single Row
Component Description STRESS
Column Fy=SS ksi SPCRK FH-20/3x3x14ga P=2513 lb, M=15911 in-lb 0.81-0K
Column & Backer None None None N/A
Beam Fy=SS ksi SpaceRak SB306C 3 in x 0.06 in Lu=96 in I Capacity: 3220 lb/pr 0.5-0K
Beam Connector Fy=55 ksi Lvl 1: 3 pin OK I Mconn= 10809 in-lb I Mcap= 12691 in-lb 0.85-0K
Brace-Horizontal Fv=55 ksi Spcrack 1-1/2x1-1/4xl 4ga 0.1-0K
Brace-Diagonal Fy=55 ksi Spcrack 1-1/2x1-1/4x14ga 0.21-0K
Base Plate Fy=36 ksi 8x5x0.375 I Rxity= 8000 in-lb 0.56-0K
Anchor 2 per Base OS" x 3.25" Embed HILT! KWIKBOLT TZ ESR 1917 Inspection Reqd (Net Seismic Uplift:=2562 lb) 0.6-0K
Slab &Soil S" thk x 4000 psi slab on grade. 750 psf Soil Bearing Pressure 0.27-0K
Level I Load** I Story Force I Story Force Column I Column I Conn. Beam
Per Level Beam Spcg Brace Transv Longit. Axial Moment Moment Connector
1 1,600 lb 100.0 in 36.0 in 1101b 84 lb 2,513 lb 15,911 "# 10,809 "# 3 pin OK
2 1,600 lb 100.0 in 36.0 in 220 lb 168 lb 1,675 lb 10,230 "# 7,100 "# 3 pin OK
3 1,600 lb 88.0 in 54.0 in 317 1b 242 lb 838 1b 5,313 "# 3,519 "# 3 pin OK
54.0 in
54.0 in
42.0 in
** Load defined as product weight per pair of beams Total: 6471b 493 lb
SAN DIEGO HAT CO TYfE I Page ·L--( of ·2 / 2/22/2018
SJ>ECIAI. PRODU('TS CONVEYORS STORAGE RACKS OTHER SERVICES
TANK SUPPORTS TALL SUPPORTS SELECTIVE SEISMIC ANALYSIS
MACHINERY HEADER STEEL DRIVE-IN PERMIT AC'QUISl110N
RACKBLDGS SORT PLATFORMS PUSII BACK EGRESS PLANS
SHEDS PICK MODULES FLOW RACK STATE APPROVALS
MEZZANINES ROOF VERIFICAllON CANTILEVER PRODUCT TESTING
FOOTINGS
I 130 E. Cypress St
Licensed in 50 States
Analysis of Storage Racks
for
San Diego Hat Co
2875 Whiptail Loop, Carlsbad, CA 920 I 0
Job No. I 8-1043
• Covina. CA 91724 •
SHELVING
METAL
METAU\VOOD
MOVABLE
GONDOLAS
LOCKERS
CA1WALKS
(90!
SPECIAi, PRODUCTS
SHUTTLES
VLM
CAROUSELS
VRC
MODULAR OFFICES
FENCES
0 CO 0 ,-
<D 0
0~ o .._,.
N-,-co
0)
0 N
"t-
N
"t--
0 I
00
"t-o
N
0 m
0
MATERIAL HANDLING ENGIN ERING
EST.1986
TEL:(909)869-0989
1130 E CYPRESS ST, COVINA, CA 91724
PROJECT: San Diego Hat Co
FOR: Interlake-Mecalux_Jon
ADDRESS: 2875 Whiptail Loop
Carlsbad. CA
SHEET#: I
CALCULATED BY: ysun
DATE: 5/8/20 I 8
PROJECT#: 20180221 I 0
Table of Contents
Parameters ....... _ . _ . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2
Components and Specifications. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3
Loads and Distributions. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12
Basic Load Combinations ................................................. 14
Longitudinal Analysis .................................................... 15
Column & Backer Analysis ................................................ 16
Beam Analysis .......................................................... 18
Beam to Column Analysis ................................................. 2 1
Bracing Analysis ........................................................ 22
Anchor Analysis. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 24
Overturning Analysis ..................................................... 27
Baseplate Analysis ....................................................... 28
Slab and Soil Analysis .................................................... 29
Scope:
This storage system analysis is intended to determine its compliance with appropriate building codes
with respect to static and seismic forces.
The storage racks are prefabricated and are to be field assembled only, with no field welding.
,.
MATERIAL HANDLING ENGINEERING
EST 1985
TEL:(909)869-0989
1130 E. CYPRESS ST, COVINA, CA 91724
PROJECT: San Diego Hat Co
FOR: Interlake-Mecalux_Jon
ADDRESS: 2875 Whiptail Loop
Carlsbad, CA
SHEET#: 2
CALCULATED BY: ysun
DA TE: 5/8/20 18
PROJECT#: 20180221 10
The storage racks consist of several bays, interconnected in one or both directions,with the columns
of the vertical frames being comon between adjacent bays. This analysis will focus on a tributary
bay to be analyzed in both the longitudinal and transverse direction. Stability in the longitudinal
direction is maintained by the beam to column moment resisting connections, while bracing acts in
the transverse direction.
CONCEPTUAL ORA WING
Some components may not be used or may vary
TRIBUTARY AREA
Le2end ___ /_ ____
1. Column I
2. Base Plate 1l ! I ! I 3. Anchors
4. Bracing I I
I ----------' 5. Beam TRANSVERSE
6. Connector LONGITUDINAL
NOTE: ACTUAL CONFIGURATION SHOWN ON COMPONENTS & SPECIFICATIONS SHEET
~c
MATERIAL HANDLING ENGINEERING
EST. 1G85
TEL:(909)869-0989
1130 E CYPRESS ST COVINA CA 91724
PROJECT: San Diego Hat Co
FOR: Intcrlake-Mecalux_Jon
ADDRESS: 2875 Whiptail Loop
Carlsbad, CA
SHEET#: 3
CALCULATED BY: ysun
DA TE: 5/8/20 18
PROJECT#: 2018022 1 10
COMPONENTS AND SPECIFICATIONS Configuration I: Type A M 1.2
Analysis per section 2209 or the 20 16 CBC
Levels: 5 Panels: 6
288"
I
68"
68"
68"
.I
I
28"
.I
I
40"
.I
Load per Level
1600 lbs
1600 lbs
1600 lbs
1600 lbs
1600 lbs
t---96" ------,..
FRONT VIEW
FRAME
COLUMN
3.0 x 2.72 x 0.4 -0.Q75 (3 14)
Steel = 55000 psi
Stress= 44% (level 3)
HORIZONTAL BRACE
f.7953 X 1.378 -0.0625
Stress = 27% (panel I)
DIAGONAL BRACE
) .7953 X 1.378 -0.0625
Stress = 48% Coanel 3)
Base Plate
Steel = 36000 psi
7.75 in. x 5 in. x 0.375 in. 2 anchors/plate
Moment = 2650 in-lb. Stress = 8%
Seizmic Analyzer
S = 1.03 F = 1.09 I = I s'. = 0.4 F: = 1.6 SDC = D ,-~ ~-1\ ±v + 52" ~ t 1-------11
52• V i
24" l'----+-c--
24" v ~ t-42" -{
SIDE VIEW
BEAM
3.66 x 2.75 -0.063 (36E)
I' = 279 lbs 11::;,,~, = I 098 lbs.
pstahc = 4250 lbs.
P,,;,,,,;, = 4108 lbs.
CONNECTOR
Steel = 55 ksi Max Static Cap. = 4392 lb.
3 Tab 2" cc Connector (IM)
Stress = 26%
Stress = 38%
Max stress = 38% (level I)
Slab & Soil
Slab= 5" x 4000 psi
Sub Grade Reaction = 50 pci
Slab Bending Stress= 23% (S)
version 20180507
Max stress = 35% (level 3)
Anchors
1-Iilti Kwik Bolt TZ (KB-TZ) ESR-1917
0.5 in. x 2 in. Min. Embed.
Pullout Capacity = 1359 lbs.
Shear Capacity = 1463 lbs.
Anchor stress = 7 I%
IC> Copyright 1991-2016 Seizmlc Inc. All rights reserved
•
MATERIAL HANDLING ENGINEERING
EST 1saa5
TEL:(909)869-0989
I 130 E CYPRESS ST COVINA CA 91724
PROJECT: San Diego Hat Co
FOR: lnterlake-Mecalux_Jon
ADDRESS: 2875 Whiptail Loop
Carlsbad. CA
SHEET#: 4
CALCULATED BY: ysun
DA TE: 5/8/2018
PROJECT#: 20180221 I 0
COMPONENTS AND SPECIFICATIONS Configuration 2: Type C-96 M 1.2
Analysis per section 2209 of the 20 I 6 CBC
Levels: 3 Panels: 6
I
68"
68"
Load per Level
1600 lbs
1600 lbs
288" 1600 lbs
136"
'j.--96"--t
FRONT VIEW
FRAME
COLUMN
3.0 X 2.72 X 0.4 · 0.Q75 (3 14)
Steel = 55000 psi
Stress = 76% (level I)
HORIZONTAL BRACE
J .7953 X 1.378 -0.0625
Stress = 16% (panel I)
DIAGONAL BRACE
I. 7953 X J.378 -0.0625
Stress= 45% foanel 3)
Base Plate
Steel = 36000 psi
7.75 in. x 5 in. x 0.375 in. 2 anchors/plate
Moment = 5594 in-lb. Stress = 8%
Seizmic Analyzer
!j_, = 1.03 F0 = 1.09 I = I
.), = 0.4 F., = 1.6 SOC = D
t w\ t
M" I t
52" ~ t~
52• V +-1--------1 I
24" I'-----+-1------i I
24• v
~
1'-'" 42" --t
SIDE VIEW
BEAM
3.66 x 2.75 -0.063 (36E)
I' ..,,,,x = 167 lbs.
~-.. , = 659 lbs.
P,1a,,c = 2550 lbs.
P,,,;,.,,c = 291 3 lbs.
CONNECTOR
Steel = 55 ksi Max Static Cap.= 4392 lb.
3 Tab 2" cc Connector (IM)
Stress = 37%
Stress = 38%
Max stress= 38% (level I)
Slab & Soil
Slab = 5" x 4000 psi
Sub Grade Reaction = 50 pci
Slab Bending Stress= 15% (S)
version 20180507
Max stress = 37% (level I)
Anchors
Hilti Kwik Bolt TZ (KB-TZ) ESR-1917
0.5 in. x 2 in. Min. Embed.
Pullout Capacity = 1359 lbs.
Shear Capacity = 1463 lbs.
Anchor stress= 64%
C> Copyright 1991-2016 Seizmic Inc. All rights reserved
MATERIAL HANDLING ENGINEfRING
EST. 1985
TEL.(909)869-0989
I 130 E CYPRESS ST COVINA CA 91724
PROJECT: San Diego Hat Co
FOR: Interlake-Mecalux Jon
ADDRESS: 2875 Whiptail Loop
Carlsbad, CA
SHEET#: 5
CALCULATED BY: ysun
DATE: 5/8/20 I 8
PROJECT#: 2018022 1 IO
COMPONENTS AND SPECIFICATIONS Configuration 3: Type C-144 M 1.2
Analysis per section 2209 of the 20 16 CBC
Levels: 3 Panels: 7
288"
r
68"
68"
136"
Load per Level
2400 lbs
2400 lbs
2400 lbs
'!<:----144" ----,
FRONT VIEW
FRAME
COLUMN
S = 1.03 F = 1.09 I= I S'.= 0.4 F: = 1.6 SOC = D
r ~-v + t~ ., I i__
24" ~ +-t---11
24• v +-t--
24""" +-,,---,
24" / ~ t-42" 4-
SIDE VIEW
B.EAM
V ..ong = 236 lbs.
~'""' = 927 lbs.
P,ia,,c = 3660 lbs. P..,,,,,,,r = 3977 lbs.
CONNECTOR
3.0 X 2. 72 X 0.4 -0.) 05 (3 12)
Steel = 55000 psi
Stress = 74% (level I)
4.00 x 2.75 -0.063 (40E)
Steel = 55 ksi Max Static Cap. = 25 14 lb.
3 Tab 2" cc Connector (IM)
Stress = 69%
HO RIZO NT AL BRACE
I. 7953 X 1.3 78 -0.0625
Stress = 23% (panel I)
DIAGONAL BRACE
I .7953 x I .378 -0.0625
Stress = 65% (oanel 5)
Base Plate
Steel = 36000 psi
7.75 in. x 5 in. x 0.375 in. 2 anchors/plate
Moment= 6568 in-lb. Stress= 11 %
Seizmic Analyzer
Stress = 97%
Max stress = 97% (level I)
Slab & Soil
Slab = 5" x 4000 psi
Sub Grade Reaction = 50 pci
Slab Bending Stress= 2 1 % (S)
version 20180507
Max stress= 69% (level I)
Anchors
Hilti K wik Bolt TZ (KB-TZ) ESR-1917
0.5 in. x 2 in. Min. Embed.
Pullout Capacity = 1359 lbs.
Shear Capacity = 1463 lbs.
Anchor stress = 86%
e Copyright 1991-2016 Seizmic Inc. All rights reserved
MATERIAL HANDLING ENGINBERING
EST 1985
TEL.(909)869-0989
1130 E CYPRESS ST COVINA CA 91724
PROJECT: San Diego Hat Co
FOR: lnterlake-Mecalux _Jon
ADDRESS: 2875 Whiptail Loop
Carlsbad, CA
SHEET#: 6
CALCULATED BY: ysun
DA TE: 5/8/2018
PROJECT#: 20180221 10
COMPONENTS AND SPECIFICATIONS Configuration 4: Type C-168 M 1.2
Analysis per section 2209 of the 2016 CBC
Levels: 3 Panels: 7
I
68"
68"
288"
136"
Load per Level
2400 lbs
2400 lbs
2400 lbs
~:_ 1.03 F0 = 1.09 J= I
.:>,-0.4 F,,=1.6 SDC =D
r; t w\ t WV t~
24" ~ +-~
24" v +-
24" ~ +-~
24• v
1-
"", -----168"-----,
FRONT VIEW
i,--42" --4
SIDE VIEW
FRAME BEAM
COLUMN 5 x 2.75 -0.063 (SOE)
( ~.LJ/ls = 244 lbs. v.,0,, = 960 lbs.
P,,.11c = 3 750 lbs.
P,,,,m,, = 41 92 lbs .
CONNECTOR
3.0 X 2.72 X 0.4 -0.105 (3 12)
Steel = 55000 psi
Stress = 77% (level I)
Steel = 55 ksi Max Static Cap. = 3062 lb.
4 Tab 3" cc Connector
Stress = 27%
HORIZONTAL BRACE
1.7953 X 1.378 -0.0625
Stress = 23% (panel I)
DIAGONAL BRACE
1.7953 X 1.378 -Q.0625
Stress= 67% (oanel 5)
Base Plate
Steel = 36000 psi
7.75 in. x 5 in. x 0.375 in. 2 anchors/plate
Moment = 6568 in-lb. Stress = 11 %
Seizmic Analyzer
Stress = 81%
Max stress = 81 % (level 1)
Slab & Soil
Slab = 5" x 4000 psi
Sub Grade Reaction = 50 pci
Slab Bending Stress= 22% (S)
version 20180507
Max stress = 27% (level 1)
Anchors
Hilti KwikBoltTZ(KB-TZ) ESR-1 917
0.5 in. x 2 in. Min. Embed.
Pullout Capacity = 1359 lbs.
Shear Capacity = 1463 lbs.
Anchor stress = 92%
C, Copyright 1991-2016 Seizmlc Inc. All rights reserved
MATERIAL HANDLING ENGINEil=RING
EST 1~85
TEL (909)869-0989
I 130 E CYPRESS ST COVINA CA 91724
PROJECT: San Diego Hat Co
FOR: lnterlake-Mecalux_Jon
ADDRESS: 2875 Whiptail Loop
Carlsbad, CA
SHEET#: 7
CALCULATED BY: ysun
DA TE: 5/8/20 18
PROJECT#: 20 180221 10
COMPONENTS AND SPECIFICATIONS Configuration 5: Type D M 1.2
Analysis per section 2209 of the 20 16 CBC
Levels: 4 Panels: 6
Load per Level
1600 lbs
I
68"
1600 lbs
68"
288" 1600 lbs
68"
1600 lbs
68"
I
'J,-96"----+
FRONT VIEW
FRAME
COLUMN
3.0 X 2.72 X 0.4 -0.Q75 (3 )4)
Steel = 55000 psi
Stress = 40% (level I)
HORIZONTAL BRACE
J.7953 X J.378 -0.0625
Stress = 21 % (panel I)
DIAGONAL BRACE
J. 7953 X J.3 78 -0.0625
Stress= 48% (oanel 3)
Base Plate
Steel = 36000 psi
7.75 in. x 5 in. x 0.375 in. 2 anchors/plate
Moment = 3679 in-lb. Stress = 8%
Seizmic Analyzer
S = 1.03 F0 = 1.09 I = I I' = 223 lbs. P,,0,,c = 3400 lbs. /,()"~ -S, = 0.4 Fv = 1.6 SOC = D I Tran< -879 lbs. P,,,.m,, = 3429 lbs.
t -
\ 64"
t I 56" t -
~ 52" t / 52"
i ~ 24" +-24" 7 -;:I,--
t-42" --{
SIDE VIEW
BEAM CONNECTOR
3.66 x 2.75 -0.063 (36E)
Steel = 55 ksi Max Static Cap.= 4392 lb.
3 Tab 2" cc Connector (IM)
Stress= 35%
Stress = 38%
Max stress = 38% (level I)
Slab & Soil
Slab = 5" x 4000 psi
Sub Grade Reaction = 50 pci
Slab Bending Stress = 19% (S)
version 20180507
Max stress = 35% (level I)
Anchors
Hilti Kwik Bolt TZ (KB-TZ) ESR-1 917
0.5 in. x 2 in. Min. Embed.
Pullout Capacity = 1359 lbs.
Shear Capacity = 1463 lbs.
Anchor stress = 68%
C> Copyright 1991-2016 Seizmic Inc. All rights reserved
MATERIAL HANDLING ENGINE(::RING
EST 1!MS
TEL.(909)869-0989
I 130 E CYPRESS ST COVINA CA 91724
PROJECT: San Diego Hat Co
FOR: lnterlake-Mecalux_Jon
ADDRESS: 2875 Whiptail Loop
Carlsbad, CA
SHEET#: 8
CALCULATED BY: ysun
DATE: 5/8/2018
PROJECT#: 2018022 1 l 0
COMPONENTS AND SPECIFICATIONS Configuration 6: Type D2 M 1.2
Analysis per section 2209 of the 2016 CBC
Levels: 3 Panels: 6
I
68'
288' 100'
100"
Load per Level
1600 lbs
1600 lbs
1600 lbs
-j.---96" ----'t-
FRONTVIEW
FRAME
COLUMN
3.0 x 2.72 x 0.4 -0.D75 (3 14)
Steel = 55000 psi
Stress = 4 7% (level l)
HORIZONTAL BRACE
1.7953 X 1.378 -0.0625
Stress = 16% (panel I)
DIAGONAL BRACE
J .7953 X 1.378 -0.0625
Stress= 43% <oanel 3)
Base Plate
Steel = 36000 psi
7.75 in. x 5 in. x 0.375 in. 2 anchors/plate
Moment = 4091 in-lb. Stress= 7%
Seizmlc Analyzer
S = 1.03 F = 1.09 /= I s'. = 0.4 F: = 1.6 SDC = D
r-~-1\ t ~-v t-
52-~ +··~
52" / i)J-----j
24" ~ +-
24" ~ :r-
-j,-42' -{
SIDE VIEW
BEAM
3.66 x 2.75 -0.063 (36E)
11.,,,,R ':_ 167 lbs.
I r,m , -659 lbs.
P,,0,,, = 2550 lbs.
P.,,,.,;c = 2803 lbs.
CONNECTOR
Steel = 55 ksi Max Static Cap. = 4392 lb.
3 Tab 2" cc Connector (IM)
Stress = 36%
Stress = 38%
Max stress = 38% (level I)
Slab & Soil
Slab = 5" x 4000 psi
Sub Grade Reaction = 50 pci
Slab Bending Stress = 15% (S)
version 20180507
Max stress = 36% (level I)
Anchors
Hilti Kwik Bolt TZ (KB-TZ) ESR-1917
0.5 in. x 2 in. Min. Embed.
Pullout Capacity = 1359 lbs.
Shear Capacity = 1463 lbs.
Anchor stress = 63%
C Copyright 1991-2016 Seizmic Inc. All rights reserved
MATERIAL HANDLING ENGINEERING
EST 1~
TEL·(909)869-0989
I 130 E CYPRESS ST COVINA CA 91724
COMPONENTS AND SPECIFICATIONS
Analysis per section 2209 of the 2016 CBC
Levels: 6 Panels: 6
Load per Level
1600 lbs
100·
288" 1600 lbs
28"
.I 1600 lbs r
28"
.I 1600 lbs
I
28"
.I 1600 lbs
I
28"
.I 1600 lbs
I
28"
.I
'i,-96" --t
FRONT VIEW
FRAME
COLUMN
3.0 X 2.72 X 0.4 · 0.075 (314)
Steel = 55000 psi
Stress = 56% (level 6)
HORIZONTAL BRACE
1.7953 X J.378 -0.0625
Stress = 32% (panel I)
DIAGONAL BRACE
1.7953 X J.378 -0.0625
Stress = 53% (panel 3)
Base Plate
Steel = 36000 psi
7.75 in. x 5 in. x 0.375 in. 2 anchors/plate
Moment = 2177 in-lb. Stress = 9%
Seizmic Analyzer
PROJECT: San Diego Hat Co
FOR: lntcrlake-Mecalux_Jon
ADDRESS: 2875 Whiptail Loop
Carlsbad, CA
SHEET#: 9
CALCULATED BY: ysun
DA TE: 5/8/2018
PROJECT#: 20180221 10
Configuration 7: Type F M 1.2
S = 1.03 F = 1.09 I = I I' = 335 lbs. PSlaliC = 5100 lbs. S, = 0.4 F: = 1.6 SOC = D 11::, = 1318 lbs. P,.1111,,, = 4052 lbs.
t I\ 64"
t V 56" t ~ 52" t V 52"
+-~ 24" +-24" v -:.-t-42" -{
SIDE VIEW
BEAM CONNECTOR
3.66 x 2.75 -0.063 (36E) 3 Tab 2" cc Connector (IM)
Steel = 55 ksi Max Static Cap. = 4392 lb. Stress = 25%
Stress= 38%
Max stress = 25% (level I)
Max stress= 38% (level I)
Slab & Soil Anchors
Slab = 5" x 4000 psi Hilt i Kwik Bolt TZ (KB-TZ) ESR-1917
Sub Grade Reaction = 50 pci 0.5 in. x 2 in. Min. Embed.
Slab Bending Stress = 25% (S) Pullout Capacity = 1359 lbs.
Shear Capacity = 1463 lbs.
Anchor stress = 69%
version 20180507 C> Copyright 1991-2016 Seizmic Inc. All rights reserved
MATERIAL HANDLING ENGINEERING
EST. 1985
TEL·(909)869-0989
1130 E CYPRESS ST COVINA CA 91724
PROJECT: San Diego Hat Co
FOR: lnterlake-Mecalux_Jon
ADDRESS: 2875 Whiptail Loop
Carlsbad, CA
SHEET#: IO
CALCULATED BY: ysun
DA TE: 5/8/2018
PROJECT#: 20180221 I 0
COMPONENTS AND SPECIFICATIONS Configuration 8: type H M 1.2
Analysis per section 2209 of the 20 I 6 CBC
Levels: 2 Panels: 6
288"
112"
112"
Load per Level
1600 lbs
1600 lbs
-j.---96" --'f-
FRONTVIEW
FRAME
COLUMN
3.0 X 2.72 X 0.4 -0,075 (314)
Steel = 55000 psi
Stress = 36% (level I)
HORIZONTAL BRACE
J.7953 X 1.378 -0.0625
Stress = I I% (panel I)
DIAGONAL BRACE
J. 7953 X J.3 78 -0.0625
Stress= 30% (panel 3)
Base Plate
Steel = 36000 psi
7.75 in. x 5 in. x 0.375 in. 2 anchors/plate
Moment = 3052 in-lb. Stress = 5%
Seizmlc Analyzer
S, = 1.03 F0 = 1.09 I = I
S1 = 0.4 F. = 1.6 SDC = D
}-42" -'\-
SIDE VIEW
BEAM
3.66 x 2.75 -0.063 (36E)
~)""'K ':_ 111 lbs.
I .. .,.., .. -439 lbs.
P,,0,,, = 1700 lbs.
P_,..,,m,, = 1748 lbs.
CONNECTOR
Steel = 55 ksi Max Static Cap. = 4392 lb.
3 Tab 2" cc Connector (IM)
Stress = 28%
Stress = 38%
Max stress= 38% (level I)
Slab & Soil
Slab = 5" x 4000 psi
Sub Grade Reaction = 50 pci
Slab Bending Stress = 9% (S)
version 20180507
Max stress= 28% (level I)
Anchors
Hilti KwikBolt TZ (KB-TZ) ESR-1 917
0.5 in. x 2 in. Min. Embed.
Pullout Capacity = 1359 lbs.
Shear Capacity = 1463 lbs.
Anchor stress = 53%
Q Copyright 1991-2016 Seizmic Inc. All rights reserved
~c
MATERIAL HANDLING ENGINEERING
EST. 1985
TEL (909)869-0989
1130 E CYPRESS ST COVINA CA 91724
PROJECT: San Diego Hat Co
FOR: lnterlake-Mecalux Jon
ADDRESS: 2875 Whiptail Loop
Carlsbad, CA
SHEET#: 11
CALCULATED BY: ysun
DATE: 5/8/2018
PROJECT#: 20180221 10
COMPONENTS AND SPECIFICATIONS Configuration 9: Type I M 1.2
Analysis per section 2209 of the 2016 CBC
Levels: 3 Panels: 6
88"
300" 100·
100·
Loaa per Leve,
1600 lbs
1600 lbs
1600 lbs
-t--96" -----'I-
FRONT VIEW
FRAME
COLUMN
3.0 X 2.72 X 0.4 -0.Q75 (3 14)
Steel = 55000 psi
Stress = 4 7% (level I)
HORIZONTAL BRACE
J.7953 X 1.378 -0.0625
Stress = 16% (panel I)
DIAGONAL BRACE
J.7953 X 1.378 -0.0625
Stress= 43% (oanel 3)
Base Plate
Steel = 36000 psi
7.75 in. x 5 in. x 0.375 in. 2 anchors/plate
Moment = 4091 in-lb. Stress= 7%
Seizmic Analyzer
S = 1.03 F0 = 1.09 I = I 1, = 0.4 F. = 1.6 SOC = D
t "I\ tv t~
52" ~ t-~
52• V 4-,.____..,
24" ~ +-~
24" / ~
-j.--42" -'I-
SIDE VIEW
BEAM
3.66 x 2.75 -0.063 (36E)
V ,mg= 167 lbs.
iJ'.'""' = 659 lbs.
P.,0,,c = 2550 lbs.
P,.,,.,"';' = 2979 lbs.
CONNECTOR
Steel = 55 ksi Max Static Cap.= 4392 lb.
3 Tab 2" cc Connector (IM)
Stress = 36%
Stress= 38%
Max stress = 38% (level I)
Slab & Soil
Slab = 5" x 4000 psi
Sub Grade Reaction = 50 pci
Slab Bending Stress= 15% (S)
version 20180507
Max stress = 36% (level I)
Anchors
1-lilti KwikBoltTZ(KB-TZ) ESR-19 17
0.5 in. x 2 in. Min. Embed.
Pullout Capacity= 1359 lbs.
Shear Capacity = 1463 lbs.
Anchor stress= 73%
C Copyright 1991-2016 Selzmlc Inc. All rights reserved
MATERIAL HANDLING ENGINEERING
EST. 1Q85
TEL (909)869-0989
1130 E CYPRESS ST COVINA CA 91724
Loads and Distributions: Type A
PROJECT: San Diego Hat Co
FOR: lnterlakc-Mecalux_Jon
ADDRESS: 2875 Whiptail Loop
Carlsbad, CA
SHEET#: 12
CALCULATED BY: ysun
DA TE: 5/8/2018
PROJECT#: 20180221 10
Determines seismic base shear per Section 2.6 of the RMI & Section 2209. ofthe 2016 CBC
# of Levels: 5 SOC:
Pallets Wide: 2 Wr1 :
Pallets Deep: I WDL:
Pallet Load: 800 Fv:
Total Frame Load: 8500 lbs
S,,,, = 2/3 · S, · F, = 0.75
S = 2/3 ·S ·F = 01 I \ 0.43
W,=0.67·WP1 +WDL = 5860 lbs
Seismic Shear per RMI 2012 2.6.3:
Longitudinal
v1o"l!, =C,·1,,·w .
= SD, / (T,_. Ri,) . I,,. w.
= 0.43 I ( I .5 · 6) · I · 5860 = 279.98 lbs
V..., need not be greater than:
= 0.75 I 6 · I · 5860 = 732.5 lbs
D
8000
5001bs
1.6
v, .. ,..i
IfS, >= 0.6, then V..., shall not be less than:
=C ·I ·W I -p I
= 0.5 · S, /I\.·'• W,
= 0.5 · 0.4 · I · 5860 = 195.33 lbs
V..., shall not be less than:
Y,,,,., =C,·I,,·W,
= Max(0.044 · SDS, 0.5 · S, / R, , 0.03] ·I,.· W,
= Max[0.03, 0.03, 0.03] · I · 5860 = 195.33 lbs
Since: 279.98 <= 732.5
& 279.98 >= 195.33
& 279.98 >= 195.33
V,.., = 279 lbs
RL:
R,.:
Fa:
Tl:
6
4
1.09
1.5
Ss:
SI:
Ip:
v t1111ul
V transl
EL,
1.03 ~ / Fn
EL6
/ F5 0.4 V ----
I EL•
'"
"'
El I
.. -
I-. -J
Transverse
V ..... need not be greater than:
=C ·I ·W • r ,
= SDS / R, ·I,.. w.
/ F•
-/"
/ F1
= 0.75 I 4 ·I · 5860 = 1098.75 lbs
IfS, >= 0.6, then V ..... shall not be less than:
=C·I ·W • p •
= 0.5 · s, / R,. · '· w.
= 0.5 · 0.4 · I · 5860 = 293 lbs
V .... shall not be less than:
v .. ,,,, = C,·l,,·W,
= Ma:x[0.044 · S,:,s , 0.5 · S, / R,, 0.03] ·I,,· W,
= Max(0.03, 0.05, 0.03] · I · 5860 = 293 lbs
Since: 1098.75 >= 293
& I 098. 75 >= 293
V..., = 1098 lbs
MATERIAL HANDLING ENGIN6~RING
EST. 1985
TEL.(909)869-0989
1130 E. CYPRESS ST, COVINA. CA 91724
Loads and Distributions: Type A (Page 2)
Level hx wx
I 40 1700
2 68 1700
3 136 1700
4 204 1700
5 272 1700
PROJECT: San Diego Hat Co
FOR: Interlake-Mecalux_Jon
ADDRESS: 2875 Whiptail Loop
Carlsbad, CA
SHEET#: 13
CALCULATED BY: ysun
W,l"f; f,=V---
LW,H,
Longitudinal
w,rhx r,
68000 15.5
115600 26.35
231200 52.7
346800 79.05
462400 105.4
DA TE: 5/8/20 18
PROJECT#: 20180221 10
Transverse
w, w,J1x r,
1700 68000 61
1700 11 5600 103.7
1700 231200 207.4
1700 346800 311.1
1700 462400 414.8
PROJECT: San Diego Hat Co
FOR: lnterlake-Mecalux_Jon
ADDRESS: 2875 Whiptail Loop
Carlsbad. CA
SHE ET#: 14
MATERIAL HANDLING ENGINEERING
EST. 196~ CALCULATED BY: ysun
DATE: 5/8/2018
TEL (909)869-0989
I 130 E CYPRESS ST, COVINA, CA 91724 PROJ ECT#: 20180221 I 0
Fundamental Period of Vibration (Longitudinal)
Per FEMA 460 Appendix A -Development of An Analytical Model for the Displacement Based Seismic
Design of Storage Racks in Their Down Aisle Direction
Where:
W"' = the weight of the ith pallet supported by the storage rack
h"" = the elevation of the center of gravity of the ith pal let
with respect to the base of the storage rack
g = the acceleration of gravity
NL = the number of loaded levels
k, = the rotational stiffness of the connector
k,~ = the flexural rotational stiffness of the beam-end
kb = the rotational stiffness of the base plate
k00 = the flexural rotational stiffness of the base upright-end
N, = the number of beam-to-upright connections
Nb = the number of base plate connections
k = 6Elb
be L
k" =
4EI,
H
k = El,
h H
L = the clear span of the beams
H = the clear height of the upright
1. = the moment of inertia about the bending axis of each beam
I, = the moment of inertia of each base upright
E = the Young's modulus of the beams
Calculated T = 2.73
Since the calculated Tis greater than 1.5, the more conservative value of 1.5 is
used in the calculations
(A-7)
# of levels 5
min.# of bays 3
N, 60
k, 230 kip-in/rad
k,,, 2442 kip-in/rad
ks 89 kip-in/rad
k" 359 kip-in/rad
lb 1.32 in'
L 96in
I, 0.83 in'
H 272 in
E 29500 ksi
Level hr, w ...
I 51 in I kip
2 99in I kip
3 167in I kip
4 235 in I kip
5 304 in I kip
MATERIAL HANDLNG ENGINEl;RING
PROJECT: San Diego Hat Co
FOR: lnterlake-Mecalux_Jon
ADDRESS: 2875 Whiptail Loop
Carlsbad, CA
SHEET#: 15
EST. 1985 CALCULATED BY: ysun
DATE: 5/8/2018
TEL:(909)869-0989
1130 E CYPRESS ST COVINA, CA 91724 PROJECT#: 20180221 10
LRFD Basic Load Combinations: Type A
2016 CBC& RMI I ANSI MH 16.1
V ,.,..., = 1,098 lbs
V Lo.,,. = 279 lbs
P = Product Load I 2 = 4,000 lbs
D = Dead Load · 0.5 = 250 lbs
M,.,..,,
E Tr&.n~
MLon,i
ELo"•
= rf,.,..0, • h, = 213,988 in-lbs p
= M,.,,,,, I frame depth = 5,094 lbs p
= rfLo"" · h, = 54,374 in-lbs p
= M,008 I frame width = 566 lbs SDS
L = Live Load = 0 lbs S = Snow Load = 0 lbs R = Rain Load = 0 lbs
Lr = Live Roof Load = 0 lbs W = Wind Load = 0 lbs
Basic Load Combinations
1. Dead Load = I .4 D + 1.2 P
2. Gravity Load
3. Snow/Rain
4. Wind Load
5A. Seismic Load
= ( 1.4 · 250) + (1.2 · 4,000)= 5,150 lbs
= 1.2 D + 1.4 P + 1.6 L + 0.5 (L, or S or R)
= ( 1.2 · 250) + (I .4 · 4,000) + ( 1.6 · 0) + (0.5 · O)= 5,900 lbs
= 1.2D + 0.85P + (0.5L or 0.5W) + I .6(L, or Sor R)
= ( 1.2 · 250) + (0.85 · 4,000) + (0.5 · 0) + ( 1.6 · O)= 3,700 lbs
= 1.2D + 0.85P + 0.5L + 1.0W + 0.5(L, or Sor R)
= ( 1.2 · 250) + (0.85 · 4,000) + (0.5 · 0) + (1.0 · 0) + (0.5 · O)= 3,700 lbs
(Transverse)= (1.2 + 0.2Sns)D + (1.2 + 0.2S0s)PP + 0.5L + pE,..0, + 0.2S
= 0.7
= 1. 0 (Uplift combination only)
=I
=.75
5B. Seismic Load
= (1.2 + 0.2· .75)·250 + (1.2 + 0.2 · .75)·0.7·4,000 + 0.5 0 +I · 5,094 + 0.2 ·0= 9,212 lbs
(Longitudinal)= (1 .2 + 0.2SDs)D + {1.2 + 0.2SDS)PP + 0.5L + pELong + 0.2S
6. Wind Uplift
7. Seismic Uplift
8. Product/Live/Impact
= (1.2 + 0.2 · .75)·250 + (1.2 + 0.2· .75)·0.7-4,000 + 0.5·0 +I · 566 + 0.2 ·0= 4,683 lbs
= 0.9D + 0.9P'"'' + I .OW
= 0.9 · 250 + 0.9 · 4,000 + 1.0 · 0 = 225 lbs
= {0.9 -0.2SDs)D + {0.9 -0.2Sns)PP,,,,, -pE,,..,,
= (0.9 -0.2· .75)·250 + (0.9 -0.2 .75)· I 4,000-I ·5,094= -1,907 lbs
For a single beam, D = 32 lbs P = 800 lbs I = 100 lbs
= 1.2D + I .6L + 0.5(SorR) + I .4P + 1.41
(l.2·32) + (1.6·0) + (0.5 ·0) + (1.4-800) + (I.4· 100) = 1,298 lbs
ASD Load Combinations for Slab Analysis
I. (I + 0.1 OSS'05)D + 0.75((1.4 + O. I 4S0s)PP + 0.7pE)
={I + 0.105 · .75)·250 + 0.75((1.4 + 0.14 .75)·0.7·4,000 + 0.7 · I · 5,094)= 6,105 lbs
2. ( l + 0.14Sn,)D + (0.85 + O. I 4S05}PP + 0. 7pE
= (I + 0.14 · .75) · 250 + (0.85 + 0.14 · .75) · 0.7 ·4,000 + 0.7 · I · 5,094= 6,516 lbs
3. D + P
= 250 + 4,000 = 4,250 lbs
MATERIAL HANDLING ENGINEERING
EST 1985
TEL (909)869-0989
1130 E. CYPRESS ST, COVINA, CA 91724
Longitudinal Analysis: Type A
PROJECT: San Diego Hat Co
FOR: lnterlake-Mecalux_Jon
ADDRESS: 2875 Whiptail Loop
Carlsbad. CA
SHEET#: 16
CALCULATED BY: ysun
DATE: 5/8/20 18
PROJECT#: 20180221 10
TI1is analysis is based on the Portal Method, with the point of contra 0exure of the columns assumed at mid-height between
beams, except for the lowest portion, where the base plate provides only partial fixity and the contra nexure is assumed to
occur closer to the base (or at the base of pinned condition, where the base plate cannot carry moment).
M~ ... = ((MUppC< + M,. .... J / 2) + MEnd,
V Col= v,_ I# of columns = 140 lbs
M,.,,. = 2650 in-lbs
Ml.ow"= ((V ool. h,) . MllaK
(140 lbs · 38 in.) -2650 in-lbs = 2670 in-lbs
Levels h,
I 40
2 28
3 68
4 68
5 68
~
8
13
26
40
53
~8------i•'" ;;; }j;;,;; }j)}, ,;;
Axial Load Moment
4,250 2,670
3,400 1,852
2,550 4,049
1,700 3,153
850 1,809
FRONT ELEVATION
Bean1 End Connector
Moment Moment
1,466 3,727
1,466 4,416
1,466 5,067
1,466 3,947
1,466 2,370
MATERIAL HANDLING ENGIN61:RING
EST. 1985
TEL.(909)869-0989
1130 E CYPRESS ST. COVINA, CA 91724
COLUMN ANALYSIS: Type A ( Level 3 )
Analyzed per RMI. AISI 2012 0-,RFD} and the 2016 CBC.
PROJECT: San Diego Hat Co
FOR: lnterlake-Mecalux_Jon
ADDRESS: 2875 Whiptail Loop
Carlsbad, CA
SHEET#: 17
CALCULATED BY: ysun
DATE: 5/8/2018
PROJECT#: 20180221 10
Section subj ect to torsional or flexural-torsion buckling (Section C4. I .2)
K, · L, I R, = 1.2 · 66 / I. I 03
K, ·L, I R, = l ·24 / 0.945
KUR,,,.,
r;, =(r;, l + fy2 + X/)'12
= 59,85
= 25.4
= 59.85
= ( 1.103' + 0.945' + -2.3482)'12 = 2.76 in.
p = 1 -(Xo/ro)2
= I -(-2.348/2.76)' = 0.277
F,, = n2E I (K.Llr),,,., 2
= 3. 142 · 29500 I 59.852 = 81.273 ksi
F,2 =(l I 2f3)((a,._, + a,Y-(4/Ja,,a,))'12)
= ( I / (2 · 0.277)((81 .273 + 202.536) -(81 .273 + 202.536)'
-(4 · 0.277 · 8 I .273 · 202.536))112)= 61.713 ksi
where:
a,, =n2E I (K,L, I R,)2
= 3.14'·29500 I 59.852 = 81.273 ksi
a, = 1 I Ai;, '(GJ + (n2ECW) I (K,L,)')
= l /0.682·2.76'(11300·0.00I
+ (3.142 ·29500 · l.314)/ (0.8 ·24)2) = 202.536 ksi
F, = Min(F;.,, F,2) =61.713 ksi
P, = A,n· · F,,
A, =(F;_I F,)'12= (55 / 6 1.713)112 = 0.944
Since\< I .5 :
F,, = (0.658"(A,')) · F, = 37.876
Thus:
P, = 20211 lbs
P, = 17179 lbs
(Eq. C3. I .2. 1-
7)
(Eq C4. I .2-3)
(Eq C4.1.1-1)
(Eq C4.1.2-l)
(Eq C3.l.2-11)
(Eq C3. I .2-9)
(Eq C4.1-1)
(Eq C4. l-4)
(Eq C4. l-2)
3.0 X 2. 72 X 0.4 -0.075
SECTION PROPERTIES
Depth 2.717 in.
Width 3 in.
I 0,075 in.
Radius 0.14 in.
Area 0.682 in.2
AreaNet 0.575 in.'
I, 0.829 in.4
s, 0.553 in.3
S :,cN<!t 0.504 in.3
I\ 1.103 in. ,, 0.609 in.'
s, 0.364 in.3
I\ 0.945 in.
J 0.001 in.'
c" 1.314 in.6
J, 2.547 in.
x, -2.348 in.
K, 1.2
L, 66 in.
K, I
Lr 24 in.
K, 0.8
F ) 55 ksi
F" 65 ksi
Q 0.9
G 11300ksi
E 29500 ksi
cm)( 0.85
C, -I
Cb I
c,, I
Phib 0.9
Phi, 0.85
MATERIAL HANDLING ENGIN .(:RING
EST 1965
TEL·(909)869-0989
I 130 E CYPRESS ST COVINA CA 91724
COLUMN ANALYSIS: 'fype A ( Level 3 )
Analyzed per RMI. AISI 2012 {LRFD) and the 2016 CBC.
Lateral-torsional buckling strength [Resistance] (Section C3.1.2)
P,., = P,,.¢, = 24946 lbs
Where:
P,., = A,F;, = 0.534 · 55 = 29349 lbs
M, = M. = S,F, = S.,,.F,
F, =Cbr0A(a,,0;)'12 I S,= 436.912 ksi
F. = C,Aajj + C,(F + r0
2(a, I a,.))112) I (Cr,S,) = 250.676 ksi
F. = (Cbn 2Ed~.)l (S,(K,L,)2= 1511.979ksi
F,.,,;. = 250.676 ksi
Since: F, >= 2. 78F,
F, = (S, I S,
i.e. F, = F, = 55 ksi
Reduced F,.,fl = 1 -(( 1 -Q) I 2) · (F, I F,)0 · F, = 52.2 ksi
M •. , = 26293 in-lbs M., = 18985 in-lbs
M.,<Pb = 23663 in-lbs M.,.<Pb = 17086 in-lbs
Ps.. = n2EI, l (K,L_,)2= 55436 lbs
P,,, = n'EI, I (K,L,)2= 307682 lbs
a, =(I -(¢,P I P,.))=0.96
a, =(I -(¢,P I P,,))=0 .993
P,,.., = 9,212 lbs P,.,,,= 4,683 lbs
M. = M, = 4049 in-lbs
P._,, = (1.2 · D) + (I .4-P) = 3540 lbs
M =M . c n,m,n
P._,, I P, = 3540 I 17179 = 0.3 Static Stress = 30%
Since: P, I P,>= 0.15
Stress 1 = P, I P, + M, I ( ¢.M •. ,) + M, I ( ¢.M.,)
= (( 4,683 I 17 I 79) + ( 4049 / 23663) + (I / 17086)) = 44%
Stress2 = P, I P,0 + C .. ,M, I (¢.M,,a.) + C .. ,.M, I (¢.M.,a,)
PROJECT: San Diego Hat Co
FOR: Interlake-Mecalux_Jon
ADDRESS: 2875 Whiptail Loop
Carlsbad, CA
SHEET#: 18
CALCULATED BY: ysun
DA TE: 5/8/20 18
PROJECT#: 20180221 I 0
3.0 X 2.72 X 0.4 · 0.075
(Eq C3.l.2.1-I)
(Eq 3.1.2.1-4)
(Eq 3.1.2.1-10)
(Eq C3.1. l-3)
(Eq C5.2.2-6)
(Eq C5.2.2-7)
(Eq C5.2.2-4)
(Eq C5.2.2-5)
(Eq C5.2.2-2)
(Eq C5.2.2-2)
(Eq C5.2.2-1)
SECTION PROPERTIES
Depth 2.717 in.
Width 3 in.
t 0.075 in.
Radius 0.14 in.
Area 0.682 in.2
AreaNet 0.575 in.2
I, 0.829 in.4
S, 0.553 in.1
Sx Net 0.504 in.3
R, 1.103 in.
I y 0.609 in.'
s y 0.364 in.3
R,. 0.945 in.
J 0.001 in.'
C " 1.314 in.6
J ' 2.547 in.
x. -2.348 in.
K,. 1.2
L, 66 in.
K, I
L,. 24 in.
K, 08
F )' 5S ksi
F. 65 ksi
Q 0.9
G 11300 ksi
E 29500 ksi
cn,s 0.85
C, -I
Ch I
C,r I
= (4,683 / 24946) + (0.85 · 4049 / 23663 · 0.96)) + (0.85 · I / 17086 · 0.993))) = 33%
Stress3 P, I P 00 = 9,212 / 24946 =36%
Phi•
Phi,
0.9
0.85
Column Stress = Max(Stress I, Stress2, Stress3, Static)= 44%
MATERIAL HANDLING ENGIN6ERING
EST. 1985
TEL.(909)869-0989
I 130 E CYPRESS ST COVINA CA 91724
BEAM ANALYSIS Type A
Determine allowable bending moment per AISI
Check compression flange for local buckling (82.1)
PROJECT: San Diego Hat Co
FOR: Jnterlake-Mecalux_Jon
ADDRESS: 2875 Whiptail Loop
Carlsbad, CA
SHEET#: 19
CALCULATED BY: ysun
DA TE: 51812018
PROJECT#: 20 I 8022 1 I 0
Effective width w = C -21 -2r = 1.5 -(2 · 0.063) -(2 · 0.09) = 1.19 in.
wit = I.I 94 1 0.063 = 18.95
,,.v __ B --,..r'✓
A = (1.0521 k112) • (w/t) · (f~.I £)112 = (1.052 12) · 18.952 · (55 129500)112 = 0.43
A.<= 0.673: Flange is fully effective.
Check web for local buckling (B2.3)
./;(comp)= FY·(y3 l y2) = 55* 1.81 1 1.96 = 50.72 ksi
!;(tension) = ~. · (y1 I y2) = 55 * 1.54 I 1.96 = 43.21 ksi
'11 = -(Iii/) = -(43.21 I 50.72) = -0.85
Buckling coefficient k = 4 + 2 · (I -'11)3 + 2 · (I -'11)
= 4 + 2( I --0.85)3 + 2( I --0.85) = 20.41
Flat Depth w = y I + y3 = 1.54 + 1.81 = 3.354
wit = 3.35410.063 = 53.24 wit < 200: OK
A = (1.052 I k112) ·(wit)· (t; I £)112 = (1.05212) · 53.238 · (50.72 129500)112 =
0.51
b I = w · (3 -'11) = 3 · (3 --0. 85) = 12.92
b2 = wl2 = 1.68
bl + b2 = 12.92 + 12.92 = 14.6 Web is fully effective
Determine effect of cold working on steel yield point (FY A) per section A 7.2
Corner cross-sectional area Le = (TT I 2) · (r + t I 2)
= (TT I 2) · (0.09 + 0.063 I 2) = 0.191
L1 = effective width = J.J94
C = 2·Lc/Lf+2·Lc = 2·0.19l l l.194+2·L. = 0.2422
m = 0.192 · (F,, I F)-0.068 = 0.192 · (65 I 55)-0.068 = 0.1589
BC = 3.69 · (F,, I F)-0.819 · (F,, I F/-1.79
= 3.69·(65155)-0.819·(65155)2 -t.79 = 1.43
Fu/Fy = 65 I 55 = I < 1.2
rlt = 0.09 I 0.063 = 1.429 <= 7= OK
FJ~ = Bc · F;. I (r I f)"' = 1.43 · 55 I ( 1.429)"' = 74
F_m-top = C ·Fye + (I -C) · r;, = 0.242 · 74 + (I -0.242) · 55 = 60
r~, .. -bottom = r; ... ,op · )'cg I (A -Y.K) = 60 · 1.7 I (3.66 -1.7) = 51
-~C-{
I'
A
'
[
_ _J
3.66 X 2. 75 -0.063
Top flange width C = 1.5 in.
Bottom width B = 2.75 in.
Web depth A = 3.66 in.
Beam thickness t = 0.063 in.
Radius r = 0.09 in.
Fy = 55
Fu = 65
Y I = 1.54
Y2 = 1.96
Y3 = 1.81
Ycg = 1.7
Ix= 1.32
Sx = 0.67
E= 29500
FBeam F = 230
Beam Length L = 96
MATERIAL HANDLING ENGINEERING
EST. 1965
TEL.(909)869-0989
I 130 E CYPRESS ST COVINA CA 91724
BEAM ANALYSIS Type A
Check Allowable Tension Stress for Bottom Flange
PROJECT: San Diego I lat Co
FOR: lnterlake-Mecalux_Jon
ADDRESS: 2875 Whiptail Loop
Carlsbad. CA
SHEET#: 20
CALCULATED BY: ysun
DA TE: 5/8/2018
PROJECT#: 20180221 10
l floni;,-bOI = B -(2 · r) -(2 · I) = 2.75 -(2 · 0.09) -(2 · 0.063) = 2.44 / B--,..,,,1,
c booom = 2 ·l )(Lµ.,,K,-bul +2·L) = 2·0.19 1/(2.44 +2·0.191) = 0.135
Fy-«JI/Om = cbol/om · F )'C + (I -Cbot,om) · F)' = 0.135 · 74 + (I -0.135) · 55 = 57.59
F )'O = F )O•IOp = 59.64 ksi
'
,~c-t
'
[
A "<::r:=:z:::r.'_j_
Determine Allowable Capacity For Beam Pair (Per Section 5.2 of the RMI, PT II)
Check Bending Capacity
M,,,"" = (j> • M. = W · L · Q · Rm I 8
Q = LR.FD load Factor = (1.2 · DL + 1.4 ·Pl+ 1.4 · 0.125 · Pl)/ Pl
For DL = 2% of Pl:
Q = 1.2 · 0.02 + 1.4 + I .4 · 0. I 25 = 1.6
Rm = I -((2 · F · L) I (6 · E · I,+ 3 · F · l))
= I -((2 · 230 · 96) / (6 · 29500 · 1.32 + 3 · 230 · 96)) = 0.85
(j> • M. = <P · F!'" · S, = 38.22 in-kip
W = <P · M. · 8 · (# ofBeams) / (L · Rm · Q) = (38.22 · 8 · 2) / (96 · 0.85 · 1.6)
= 4670 lbs/pair
Check Deflection Capacity
t!i. = t!i. · R max n d
t!i.,,,,,, = l/ 180
R,1 = l -(4·F·l)/(5·F·l + 10·£·/,)
= I -(4 · 230 · 96) / (5 · 230 · 96 + IO· 29500 · 1.32) = 0.82
t!i.,, = (5 · W· L3)/(384 · E· I,)
L I 180 = (5 · W · l 3 • R) I (384 · E · I, · (# of Beams))
W = (3 84 · E · I, · 2) I ( 180 · 5 · L2 · R)
= (384 · 29500 · 1.32 · 2) I ( 180 · 5 · 962 • 0.82) · I 000 = 4392 lbs/pair
' '
3.66 X 2. 75 · 0.063
Top flange width C = 1.5 in.
Bollom w idth B = 2.75 in.
Web depth A = 3.66 in.
Beam thickness t = 0.063 in.
Radius r = 0.09 in.
Fy= 55
Fu = 65
YI = 1.54
Y2 = 1.96
Y3 = 1.81
Ycg = I. 7
Ix = 1.32
Sx = 0.67
E = 29500
FBcarn F = 230
Beam Length L = 96
~c
MATERIAL HANDLING ENGIN6ERING
EST.1~5
TEL.(909)869-0989
I 130 E CYPRESS ST, COVINA. CA 91724
PROJECT: San Diego Hat Co
FOR: lnterlake-Mecalux Jon
ADDRESS: 2875 Whiptail Loop
Carlsbad, CA
SHEET#: 21
CALCU LATED BY: ysun
DATE: 5/8/2018
PROJECT#: 20180221 10
Allowable and Actual Bending Moment at Each Level
Ma/low.sflll/C = wallow.~·taf/c . f2 I 8
Level Ms,au, Ma/Jow.~wfic M st?lsm1e; M a/Jow,Je1sm1c Result
I 10.176 26.352 1,864 26,352 Pass
2 10,176 26,352 2,208 26,352 Pass
3 10,176 26,352 2.534 26.352 Pass
4 10,176 26,352 1,974 26,352 Pass
5 10,176 26,352 1,185 26,352 Pass
MATERIAL HANDLING ENGINE~RING
EST. 1985 '
TEL.(909)869-0989
1130 E. CYPRESS ST, COVINA, CA 91724
Beam to Column Analysis: Type A
1. Shear Strength ofTab
Height of the Tab h = 0.6 in.
Thickness of the Tab t, = 0.135 in.
F, = 55000 psi
C,= LO
Y .. = 0.6 · F, ·A"· CV= 2673 lbs
P'"'" = <j>·V. = 0.9·2673 = 2405 lbs
2. Bearing Strength of Tab
Thickness of the column t, = 0.08 in.
A,,.,= h · t, = 0.05 in.
R .. = 1.8 · F, ·A,,..= 4455 lbs
P ,k,ring = <I>' R.. = 0.75 ·4455 = 3341 lbs
3 Moment Strength ofBracket
Edge Dist. = 1 in.
T c,,p = 0.179 in.
Sc,,,,= 0.127 in.'
A1SCG2-1
AlSl J7 -I
PROJECT: San Diego Hat Co
FOR: lnterlake-Mecalux_Jon
ADDRESS: 2875 Whiptail Loop
Carlsbad, CA
SHEET#: 22
CALCULATED BY: ysun
DA TE: 5/8/2018
PROJECT#: 20 180221 10
M. = S, · F, = 6985 in-lbs AISI C3.1.I -1
MS,re>tt>th = <PM,= 0.9 · M. = 0.9 · S Chp · F, = 6286.5 in-lbs
C = 1.67
d = Edge Dist. I 2 = 0.5 in.
Ms.,..,tl, = c . d . p ctir
P c1ip = M,.,,.,h I ( c · d) = 7542 lbs
Minimum Value of Pl Governs
P, = Min(Psi.,,,, P13e.,..,, Pc,;r) = 2405 lbs
Mco,n-Allo" = (P, · 4.5) + (P, · (2.5 / 4.5) · 2.5) + (P, · (0.5 / 4.5) · 0.5) = 14296.39 in-lbs
MATERIAL HANDLING ENGINEERING
EST HJ85
TEL·(909)869-0989
1130 E CYPRESS ST, COVINA, CA 91724
BRACE ANALYSIS Type A (Panel 3)
Analyzed per RMI. AISI 2012 (LRfD) and the 2016 CBC.
PROJECT: San Diego Hat Co
FOR: lnterlake-Mecalux_Jon
ADDRESS: 2875 Whiptail Loop
Carlsbad, CA
SHEET#: 23
CALCU LATED BY: ysun
DA TE: 5/8/2018
PROJECT#: 20180221 10
Section subject to torsional or fl exural-torsion buckling (Section C4.1.2)
K,,·L,I R, =1·59 /0.736
~ · L, IR,. = I · 59 / 0.448
KLIR,,..,
= 80.15
= 131.64
= 131.64
= (0. 7362 + 0.4481 + -0.9952)112 = 1.317 in.
~ = 1 -(Xolro)1
= I -(-0.995/1.317}2 = 0.428
F,, = n1E I (KUr)...,, 1
= 3.141 · 29500 I 13 1.642 = 16.802 ksi
F,1 =(l I 2{3)((a" + a,)1 -(4{3a"a,))'12)
={I / (2 ·0.428)((45.32 + 12.379)-(45.32 + 12.379)2
-(4·0.428·45.32· 12.379))112)= 10.55ksi
where:
a,.., =n1E I (K,,L, I R,)1
= 3. 142 · 29500 / 80.152 = 45.32 ksi
a, = 1 I Ar,,1(01 + (n1ECJ I (K.L.)')
= I /0.257· 1.3172(11 300·0
+ (3.142 · 29500 · 0.025) I (0.8 · 59)2) = 12.379 ksi
F, = Min(F,,, F,,) =10.55 ksi
11., = (F, I F,)'12 = (36 I I 0.55)112 = 1.847
Since \>= 1.5:
F. = (0.877 I 11./) ·FY= 9.252
Thus:
P. = 2374 lbs
P, = 2018 lbs
(Eq. C3.l.2.l-
7)
(Eq C4. I .2-3)
(Eq C4.1.l-1)
(Eq C4.1.2-I)
(Eq C3.1.2-1 I)
(Eq C3.1.2-9)
(Eq C4.J-I)
(EqC4.1-4)
(Eq C4.1-3)
I. 7953 X 1.378 -0.0625
SECTION PROPERTIES
Depth 1.795 in.
Width 1.378 in.
t 0.06 in.
Radius 0.118 in.
Area 0.257 in.2
AreaNet 0.257 in.2
I, 0.139in.'
s, 0.156 in.3
s, Ne! 0.156 in.1
~ 0.736 in.
I> 0.052 in.'
s> 0.056 in.1
1\ 0.448 in.
J o· • m.
c,. 0.025 in.6
J, 1.337 in.
x. -0.995 in.
K, I
L, S9 in.
K, I
L, 59 in.
K. 0.8
F ) 36 ksi
F. 42 ksi
Q I
G 11300ksi
E 29S00 ksi
cmx 0.85
c, -I
c. I
C,r I
Phih 0.9
Phi, 0.85
MATERIAL HANDLING ENGINEl;RING
EST. 1985
TEL:(909)869-0989
I 130 E CYPRESS ST, COVINA CA 91724
BRACE ANALYSIS Type A (Panel 3)
Analyzed per RMI AISI 2012 /LRFD) and the 2016 CBC.
Lateral-torsional buckling strength [Resistance] (Section C3. I .2)
P~ = P00qi, = 7851 lbs
Where:
P,., =Al;.= 0.257 · 36 = 9237 lbs
M,, = M,, = S,F; = S,,,.F,,
F,, =C • .r;,A(a,,a,)'12 I Sr= 51.262 ksi
F; = C,Aa,.(j + C,(j2 +r0
1(a, I a,,))'12) I (Cr,-Sr) = 12.416 ksi
F,, = (C.n1Ed~,) I (S/f\,L,)1 = 49.54 ksi
F'"''" = 12.416 ksi
Since: F,, <= 0.56F,
F, = F, = 12.416 ksi
Reduced F,,,crr = 1 -(( 1 -Q) I 2) · (F, I F,)Q · F,, = 12.4 ksi
M._, = 1935 in-lbs M,,, = 691 in-lbs
M.,qi. = 1742 in-lbs M,,,qi.= 622 in-lbs
PE., = n'EI, I (K,L.)2= 11626 lbs
P0r = n2 El, I (K,L,)2 = 4307 lbs
Max P, = 2374 lbs
V,,rms = 709 lbs
M =M C Jl,Jlltn
Lm,, = ((L -6)2 + (D -28)2)112 = 59.21 in.
VD,.tg = (Vrnn, · Lo;.,) I D = 1149 lbs
Brace Stress = V0,.8 I P, = 48%
PROJECT: San Diego Hat Co
FOR: lnterlake-Mecalux_Jon
ADDRESS: 2875 Whiptail Loop
Carlsbad, CA
SHEET#: 24
CALCULATED BY: ysun
DATE: 5/8/2018
PROJECT#: 20180221 10
1.7953 X J.378 -0.0625
(Eq C3.l.2.l-1)
(Eq 3.1.2.1-4)
(Eq 3.1.2.1-10)
(Eq C3. l.2. 1-3)
(Eq C5.2.2-6)
(Eq C5.2.2-7)
SECTION PROPERTIES
Depth 1.795 in.
Width l.378 in.
l 0.06 in.
Radius 0.118 in.
Area 0.257 in.2
AreaNet 0.257 in.2
l, 0.139 in.'
s, 0.156 in.3
SK Net 0.156 in.'
R., 0.736 in.
1, 0.052 in.'
s, 0.056 in.3
'\, 0.448 in.
J o· ' m.
c" 0.025 in.6
J, 1.337 in.
x. -0.995 in.
K, I
L, 59 in.
K, I
L, 59 in.
K, 0.8
F, 36ksi
F. 42 ksi
Q I
G l l300ksi
E 29500 ksi
Cm.__ 0.85
C, -l
Cb l
c,r I
Phib 0.9
Phi, 0.85
MATERIAL HANDLIN{S ENGINEERING
EST. 191l5
TEL:(909)869-0989
1130 E CYPRESS ST, COVINA, CA 91724
PROJECT: San Diego Hat Co
FOR: lnterlake-Mecalux Jon
ADDRESS: 2875 Whiptail Loop
Carlsbad, CA
SHEET#: 25
CALCULATED BY: ysun
DA TE: 5/8/2018
PROJECT#: 20180221 10
POST-INSTALLED ANCHOR ANALYSIS PER ACI 318-14, CHAPTER 17 Configuration I Type A
Assumed cracked concrete application
Anchor Type
ICC Report Number
Slab Thickness (h0)
Min. Slab Thickness (h,,,,,,)
Concrete Strength if,)
Diameter (d.)
Nominal Embedment (h110.,)
Effective Embedment (h,}
Number of Anchors (n)
e'N
e'V
From ICC ESR Repo11
A,.
Cac
Np.er
Tension Capacity= 1812 lbs
Shear Capacity = 1951 lbs
1/2" dia, 2" hef, 4" min slab
ESR-1 917
= 5.000 in.
= 4 in.
= 4000 in.
= 0.5 in.
= 2.5 in.
= 2 in.
=2
=O
=O
=0.101 sq.in.
= 106000 psi
= 2.75 in.
= 2.75 in.
= 5.5 in.
=NIA
0.75
0.75
C = 12 al
C = 12 a2
S1 = 5 in.
s} = 0 in.
Adj. Strength
1359 lbs
1463 lbs
1.5 · h,1 = 3 in.
useC01_adi = 3 in.
useC02_00 = 3 in.
3·h = 6 in. •I
Use SI.adj = 5 in.
useS2_adj = 0 in.
PROJECT: San Diego Hat Co
FOR: lnterlake-Mecalux_Jon
ADDRESS: 2875 Whiptail Loop
Carlsbad, CA
SHEET#: 26
MATERIAL HANDLING ENGINEERING
EST. 1~6.5
CALCULATED BY: ysun
DATE: 51812018
TEL (909)869-0989
1130 E CYPRESS ST, COVINA. CA 91724 PROJECT#: 2018022 1 I 0
ANCHOR ANALYSIS -TENSION STRENGTH Configuration 1 Type A
Steel Strength
<I> = 0.75
<PN,0 = <PnA,/..,0 = 0.75 · 2 · 0.101 · 106000 = 16,059 lbs
Concrete Breakout Strength <PNcbg
<I>= 0.65
A Ne = (Co,.a<IJ + sl,adj + I.Sh,). (Ca2.adJ + s2.adJ + l.5h,) = 66.0 sq.in .
ANco = 9h,/ = 36.0 sq.in.
Check if ANco > A Ne
't' = I ec.N
'+',d.N = I
'+'c,N= I
k = 17 C
A0 = I
Nb = kc,1,0(fc)05(h,/ 5 = 3,041 lbs
'+',p.N = I
<PNcbg = <P(A Ne I A N,.)('+',._N)('t' ed.N)('t' c,N)('t' cpN)(Nb)
0.65 · (66.0 I 36.0) · I · l · I · I · 304 1 = 3,624 lbs
Pullout Strength q,N1.,
<I>= 0.65
't' = I cp
<PN,,,, = NIA
Steel Strength ( <PN,0) = 16,059 lbs
Embedment Strength -Concrete Breakout Strength (<l>Ncbn) = 3,624 lbs
Embedment Strength -Pullout Strength (<!>NP") = NIA
17.4.1
17.3.3. a i
17.4.1.2
17.4.2
17.3.3 b i
17.4.2.4
17.4.2.5
17.4.2.6
17.4.2.2
17.4.2.2 d
17.4.2.7
17.4.2.1
17.4.3
17.4.2
17.4.3.6
17.4.3.1
I .,.,,,ftir..i·
~c
MATERIAL HANDLING ENGIN61;,:RING
EST 1085
TEL·(909)869-0989
I 130 E CYPRESS ST, COVINA. CA 91724
ANCHOR ANALYSIS -SHEAR STRENGTH
Steel Strength <W,a Vm = 5495 1 Anchor --per report
<f> = 0.65
<W,a = qm · v,a = 0.65 · 2 · 5495 = 7,144 lbs
Concrete Breakout Strength <f>Vcbg
<f> = 0.7
A Ve = ( I .5C01 + S1_odJ + I .5C01)h0 = 205 sq.in.
A Vea = 3C"1h" = 180 sq.in.
Check if Avco > A vc
4',c.v = I
\Jl,dV = 0.9
4' = I c.V
\fl h.V = 1.897
d0 = 0.5 in.
I, = 0.5 in.
,l = I .
A Ve I A Vea = 1.139
PROJECT: San Diego Hat Co
FOR: lnterlake-Mecalux_Jon
ADDRESS: 2875 Whiptail Loop
Carlsbad. CA
SHEET#: 27
CALCULAT ED BY: ysun
DATE: 5/8/2018
PROJECT#: 20180221 10
Configuration 1 Type A
17.5.1
17.3.3. Condition a ii
I 7.5. l.2a
17.5.2
17.3.3 Condition bi
17.5.2.5
17.5.2.6
17.5.2.7
17.5.2.8
17.5.2.2
17.2.6
The smaller of 7(/, / d0)0,(d0)0 5 .lJJ,)° 5 col 1 5 and 9-l.(l,)° 5 col 1 5 = 14,948 lbs
<f>Vcbg = <f>(Avc I Avco)(4',,y)(l.f',dv)(4',_v)(\Jlh.v)(Vb)
17.5.2.2 a. 17.5.2.2 b
17.5.2.1
0.7 · (205 / 180) · I · 0.9 · I · 1.897 · 14.948 = 20,350 lbs
Pryout Strength <f>V ~
<f> = 0.7
K = I cp
N,bg = 5,575 lbs
<f>l'cpg = <f>Kq,N,.0g = 0.7 · I · 5575 = 3,902 lbs
Steel Strength (<f>V,.) = 7,144 lbs
Embedmcnt Strength -Concrete Breakout Strength (<f>V,bx) = 20,350 lbs
Embedment Strength -Pryout Strength (<f>l'cpg) = 3,902 lbs
17.5.3
17.3.3 Condition b
17.5.3.1
PROJECT: San Diego Hat Co
FOR: lnterlake-Mecalux_Jon
ADDRESS: 2875 Whiptail Loop
Carlsbad, CA
SHEET#: 28
MATERIAL HANDLING ENGINEERING
EST tg85 CALCULATED BY: ysun
DATE: 5/8/20 18
TEL (909)869-0989
1130 E CYPRESS ST, COVINA, CA 91724 PROJECT#: 201 80221 10
OVERTURNING ANALYSIS Type A
Per RMI Sec 2.6.9 and ASCE7-10. Sec 15.5.3.6. Weight of rack w/ every level loaded 67% capacity. & Top Loaded only
EVERY LEVEL LOADED TO 67% CAPACITY.
FULLY LOA DED
w,,, = 80001bs. Wd1 = 500lbs.
Wp1 · 67% = 8000 · 0.67 = 5360lbs.
VTmm = (2/3 · 1.09 · 1.03 · I · ((0.67 · 5360) + 500)) / 4 = 7671bs. Per RMI 2012 2.6.9
M,,,,, = V7-,0,,, • Ht = 767 · 225 = 172575 in-lbs
M" = :E(Wp1 + W,11)·d / 2 = (5360 + 500) · 42 / 2 = 123060 in-lbs
Pup1ifi = I ·(Mov,-Mst)/d = (l72,575-123,060)/42 = 1,1781bs
PMaxDown = I ·(Mm.,+M,,)/d = (172,575 + 123.060)/42 = 7038 1bs
TOP SHELF LOADED
Shear = 393 lbs
M,,.,, = V,0,, • Ht = 393 · (272 + ((68 -I 0) / 2)) = 118293 in-lbs
M,, = L(Wp1+ Wd1)·d=(l600 +500)·42 = 44100 in-lbs
P,,p1ifl = I · (Mov, -M,,) Id = ( 11 8.293 -44, I 00) / 42 = 1,766 lbs
ANCHORS
No. of Anchors : 2
Pull Out Capacity per Anchor : 1359 lbs
Shear Capacity per Anchor : 1463 lbs
COMBINED STRESS
Fully Loaded
Top Shelf Loaded
Seismic Uplift Critical (LC#78)
= ((1178 /2)/ 1359)+((767 /4))/ 1463)
= (( 1766 / 2) / 1359) + ((393 / 4 )) / 1463)
= ((1907 /2)/1359) /I
w
= 0.56
= 0.72
= 0.7
MATERIAL HANDLIN(~ ENGINEERING
EST 1985
TEL (909)869-0989
I 130 E CYPRESS ST. COVINA. CA 91724
BASE PLATE ANALYSIS Type A
PROJECT: San Diego Hat Co
FOR: lnterlake-Mecalux_Jon
ADDRESS: 2875 Whiptail Loop
Carlsbad, CA
SHEET#: 29
CALCULATED BY: ysun
DATE: 5/8/2018
PROJECT#: 20 180221 10
The base plate will be analyzed with the rectangular stress resulting from the vertical load P, combined with the triangular
stresses resulting from the moment Mb (if any). Three criteria are using in determining Mb:
I. Moment capacity of the base plate
2. Moment capacity of the anchor bolts
3. Vcol * h/2 (full fixity)
Mb is the smallest value obtained from these three criteria.
FY = 36000 psi
Pco1 = 4250 lbs
M&,,, = 2650.5 in-lbs
PIA = Pco1 I (D · 8) = 4250 lbs / (7.75 · 5) = 109.68 1>si
f,, = M11a,, I (D · B2 I 6) = 2650.5 / (5 · 7.752 I 6) = 52.95 psi
f,,2 = f,, · (2 · b, I B) = 52.95 · (2 · 2.38 / 7.75) = 32.46 psi
J,,, = f,, -f,,2 = 52.95 -32.46 psi = 20.5 psi
Mb = wb,2 I 2 = (b,2 I 2) ·if.+ f,,1 + 0.67 ·J;,i)
= (2.382 / 2) · (109.68 + 20.5 + 0.67 · 32.46) = 428.16 in-lbs
S&n, = (B · 12) / 6 = 0.18 sq.in.
F 11a,, = 0.75 · F1, = 27000 psi
f,, I Fb = Mb I (SHas, · F &,,.) = 428.16 / (0.18 · 27000) = 0.09
t b1-t--:---t-b1t
111111 I lilHI
Plate width B 7.75 in.
Plate depth D 5 in.
Plate thickness t 0.375 in.
Column width b 3 in.
bl 2.375in.
,
PROJECT: San Diego Hat Co
FOR: Interlake-Mecalux_Jon
ADDRESS: 2875 Whiptail Loop
Carlsbad, CA
SHEET#: 30 MATERIAL HANDLING ENGINEERING
EST 198> CALCULATED BY: ysun
TEL·(909)869-0989
I 130 E CYPRESS ST, COVINA. CA 91724
Equation for Maximum Considered Earthquake Base Rotation
Per RM I 2012 Commentary 2.6.4
DA TE: 5/8/20 18
PROJECT#: 20 180221 I 0
a, -the first iteration of the second order amplification term
computed using W.,. from section 2.6.4 of the Commentary
Where:
W.,. = the weight of the ith pal let supported by the storage rack
h,,. = the elevation of the center of gravity of the ith pallet
with respect to the base of the storage rack
NL = the number ofloaded levels
k, = the rotational stiffness of the connector
k.,. = the flexural rotational stiffness of the beam-end
k0 = the rotational stiffness of the base plate
k.., = the flexural rotational sti ffness of the base upright-end
N, = the number of beam-to-upright connections
N. = the number of base plate connections
6Elb 4EI, El,
k.,.= --k.,.= --k,= --
L H H
L = the clear span of the beams
H = the clear height of the upright
lb = the moment of inertia about the bending axis of each beam
I, = the moment of inertia of each base upright
E = the Young's modulus of the beams
a,= 0.52
Per RMI 2012 7.1.3
Per RMI 2012 2.6.6,
Cd= the deflection amplification factor per section 2.6.6
Mb= the base moment from analysis
0.= 0.62
in unbraced di rection, seismic separation for rack structure is 0.05 h.,..,. Therefore
tan0.,.,=0.5 0..,, =2.862 rad >0• ok
Maximum moment in base plate
# of levels 5
min.# of bays 3
N, 60
Nb 8
k, 230 kip-in/rad
k"' 2442 kip-in/rad
k• 89 kip-in/rad
k .. 359 kip-in/rad
1. 1.32 in'
L 96in
I, 0.83 in'
H 272 in
E 29500 ksi
Level h.,. w " I 51 in I kip
2 99 in I kip
3 167in I kip
4 235 in I kip
5 304in I kip
M,,w,= if one anchor, then 0 O R(# of anchors / 2) • anchor pull out capacity• spacing of anchor(Sx)
M.,.,,=6,795 kip-in >= M. OK
PROJECT: San Diego Hat Co
FOR: Interlake-Mecalux_Jon
ADDRESS: 2875 Whiptail Loop
Carlsbad. CA
SHEET#: 3 1 MATERIAL HANDLING ENGINEERING
EST tffl CALCULAT ED BY: ysun
DA TE: 5/8/2018
TEl.;(909)869-0989
1130 E CYPRESS ST, COVINA, CA 91724 PROJECT#: 20180221 10
Type A
SLAB AND SOIL ANALYSIS (LRFD)
P ,_ = Seismic_Load (see Basic Load Combinations)= 9212 lbs
1,· = 7.5 • ~ )112 = 474 psi
d,req'd = (Pmax/(¢,· l.72·((k,·r1 /e)· 104 +3.6)·/,))112 = 2.161 in.
b = (ec·d.req'd3 !(12·(1-µ2)·k,))114 = 15.779in.
b, req'd = 1.5 · b = 24 in.
I\ = 1.72[(k, · r1 I ec) · 104 + 3.6) ·J,' · 12
= 1.721(50 · 3.11 / 3604996) · I 04 + 3.6) · 474 · (5)2 = 82233 lbs
P0 = ¢, · P0 = 0.6 · 82233 = 49340 lbs
P.,.xf P. = 0.19
SLAB AND SOIL ANALYSIS (ASD)
P mox = MAX(ASD Load Combo I, ASD Load Combo 2, ASD Load Combo 3)
= 6516 lbs
1,· = 7.5 · ifc )112 = 474 psi
P,, = l.72[(k, · r1 I e) · 104 + 3.6] ·I,'· 12
= 1.72((50 · 3.11 / 3604996) · 104 + 3.6] · 474 · (5)2 = 82233 lbs
d.req'd = (P maxi (¢,· 1.72 · ((k, · r1 I ec) · 104 + 3.6) ·f,))112 = 2.161 in.
b = (ec · d, req'd3 I ( 12 · ( I -µ2) • k,))114 = 15.779 in.
b, req'd = 1.5 · b = 24 in.
P0 = P" I Q = 82233 / 3 = 27411.04
P mox/ P0 = 0.24
Base Plate
Width B
Depth W
Frame
Frame depth d
Concrete
Thickness t
Jc
¢,
Q
A.
ks
r I
ec
Soil
!soil
•
7.75 in.
5 in.
42 in.
5 in.
4000 psi
0.6
3
I
50
3.11
3604996
I 000 psf
SAN DIEGO REGIONAL
HAZARDOUS MATERIALS
QUESTIONNAIRE
OFFICE USE ONLY
RECORD ID # __________________ 1 PLAN CHECK# __________________ ,
BP DATE
Applicant E-mail
l c,, A b @c R£S . cou_,,
The following questions represent the facility's activities, NOT the specific project description. l.n,
PART I: FIRE DEPARTMENT -HAZARDOUS MATERIALS DIVISION: OCCUPANCY CLASSIFICATION: not re uired for ro ects wlllf~
Diego): Indicate by circling the item, whether your business will use, process, or store any of the following hazardous materials. If any of the ite
applicant must contact the Fire Protection Agency with jurisdiction prior to plan submittal.
Occupancy Rating: Facility's Square Footage (including proposed project):
1. Explosive or Blasting Agents 5. Organic Peroxides 9. Water Reactives
2. Compressed Gases 6. Oxidizers 1 o. Cryogenics
3. Flammable/Combustible Liquids 7. Pyrophorics 11. Highly Toxic or Toxic Materials
4. Flammable Solids 8. Unstable Reactives 12. Radioactives
PART II: SAN DIEGO COUNTY DEPARTMENT OF ENVIRONMENTAL HEALTH -HAZARDOUS MATERIALS DIVISION (HMO): If the answer to any of the
questions is yes, applicant must contact the County of San Diego Hazardous Materials Division, 5500 Overland Avenue, Suite 110, San Diego, CA 92123.
Call (858) 505-6700 prior to the issuance of a building permit.
FEES ARE REQUIRED Project Completion Date: Expected Date of Occupancy: 0 CalARP Exempt
I
1.
2.
3.
4.
5.
6.
7.
8.
YES NO B I
D ti!
D D D
D
D
~ I
(for new construction or remodeling projects)
Is your business listed on the reverse side of this form? (check all that apply).
Will your business dispose of Hazardous Substances or Medical Waste in any amount?
Will your business store or handle Hazardous Substances in quantities greater than or equal to 55 gallons, 500
pounds and/or 200 cubic feet?
Will your business store or handle carcinogens/reproductive toxins in any quantity?
Will your business use an existing or install an underground storage tank?
Will your business store or handle Regulated Substances (CalARP)?
Will your business use or install a Hazardous Waste Tank System (TIiie 22, Article 10)?
Will your business store petroleum in tanks or containers at your facility with a total facility storage capacity equal to
or realer than 1.320 allons? California's Above round Petroleum Stora e Act .
Date Initials
0 CalARP Required
I
Date Initials
0 CalARP Complete
I
Date Initials
PART Ill: SAN DIEGO COUNTY AIR POLLUTION CONTROL DISTRICT {APCD): Any YES• answer requires a stamp from APCD 10124 Old Grove Road, San
Diego, CA 92131 apcdcomp@sdcounty.ca.qov (858) 586-2650). [°No stamp required if Q1 Yes and Q3 Yes and Q4-Q6 No). The following questions are intended
to identify the majority of air pollution issues at the planning stage. Projects may require additional measures not identified by these questions. For comprehensive
requirements contact APCD. Residences are typically exempt, except -those with more than one building• on the property: single buildings with more than four
dwelling units; townhomes; condos: mixed-commercial use: deliberate burns: residences forming part of a larger project. ['Excludes garages & small outbuildings.]
1.
2.
3.
YES NO
§ !
4. D
5.
6.
D
D
Will the project disturb 160 square feet or more of existing building materials?
Will any load supporting structural members be removed? Notification may be required 10 working days prior to commencing demolition.
(ANSWER ONLY IF QUESTION 1 or 2 IS YES) Has an asbestos survey been performed by a Certified Asbestos Consultant or Site Surveillance
Technician?
(ANSWER ONLY IF QUESTION 3 IS YES) Based on the survey results, will the project disturb any asbestos containing material? Notification
may be required 10 working days prior to commencing asbestos removal.
Will the project or associated construction equipment emit air contaminants? See the reverse side of this form or APCD factsheet
(www.sdapcd.org/info/facts/permits.pdO for typical equipment requiring an APCD permit.
(ANSWER ONLY IF QUESTION 5 IS YES) Will the project or associated construction equipment be located within 1,000 feet of a school
bounda
Name of Owner or Authorized Agent
FIRE DEPARTMENT OCCUPANCY CLASSIFICATION: _______________________________ _
BY: _________________________ _ DATE:--~/ --~/ __
EXEMPT OR NO FURTHER INFORMATION REQUIRED RELEASED FOR BUILDING PERMIT BUT NOT FOR OCCUPANCY RELEASED FOR OCCUPANCY
COUNTY-HMO• APCD COUNTY-HMO APCD COUNTY-HMO APCD
. . •A stamp in this box only exempts businesses from complellng or updating a Hazardous Materials Business Plan. Other permitting requirements may still apply .
HM-9171 (08/15) County of San Diego -DEH -Hazardous Materials Division
LIST OF BUSINESSES WHICH REQUIRE REVIEW AND APPROVAL FROM THE COUNTY OF SAN DIEGO
DEPARTMENT OF ENVIRONMENTAL HEALTH-HAZARDOUS MATERIALS DIVISION
Check all that apply:
AUTOMOTIVE
D Battery Manufacturing/Recycling
D Boat Yard
D Car Wash
D Dealership Maintenance/Painting
D Machine Shop
D Painting
D Radiator Shop
D Rental Yard Equipment
D Repair/Preventive Maintenance
D Spray Booth
D Transportation Services
D Wrecking/Recycling
CHEMICAL HANDLING
D Agricultural supplier/distributor
D Chemical Manufacturer
D Chemical Supplier/Distributor
D Coatings/Adhesive
D Compressed Gas Supplier/Distributor
D Dry Cleaning
D Fiberglass/Resin Application
D Gas Station
D Industrial Laundry
D Laboratory
D Laboratory Supplier/Distributor • Oil and Fuel Bulk Supply
D Pesticide Operator/Distributor
CHEMICAL HANDLING
D Photographic Processing
D Pool Supplies/Maintenance
D Printing/Blue Printing
D Road Coatings
D Swimming Pool
D Toxic Gas Handler
D Toxic Gas Manufacturer
METAL WORKING
D Anodizing
D Chemical Milling/Etching
D Finish-Coating/Painting
D Flame Spraying
D Foundry
D Machine Shop-Drilling/Lathes/Mills
D Metal Plating
D Metal Prepping/Chemical Coating
D Precious Metal Recovery
D Sand Blasting/Grinding
D Steel Fabricator
D Wrought Iron Manufacturing
AEROSPACE
D Aerospace Industry
D Aircraft Maintenance
D Aircraft Manufacturing
OTHERS AND MISCELLANEOUS
0 Asphalt Plant
D Biotechnology/Research
D Chiropractic Office
D Co-Generation Plant
D Dental Clinic/Office
D Dialysis Center
D Emergency Generator
D Frozen Food Processing Facility
D Hazardous Waste Hauler
D Hospital/Convalescent Home
D Laboratory/Biological Lab
D Medical Clinic/Office
D Nitrous Oxide (NO,) Control System
D Pharmaceuticals
0 Public Utility
D Refrigeration System
D Rock Quarry
D Ship Repair/Construction
D Telecommunications Cell Site
D Veterinary Clinic/Hospital
D Wood/Furniture Manufacturing/Refinishing
ELECTRONICS
D Electronic Assembly/Sub-Assembly
D Electronic Components Manufacturing
D Printed Circuit Board Manufacturing
NOTE: THE ABOVE LIST INCLUDES BUSINESSES, WHICH TYPICALLY USE, STORE, HANDLE, AND DISPOSE OF HAZARDOUS SUBSTANCES.
ANY BUSINESS NOT INCLUDED ON THIS LIST, WHICH HANDLES, USES OR DISPOSES OF HAZARDOUS SUBSTANCES MAY STILL REQUIRE
HAZARDOUS MATERIALS DIVISION (HMO) REVIEW OF BUSINESS PLANS. FOR MORE INFORMATION CALL (858) 505-6880.
LIST OF AIR POLLUTION CONTROL DISTRICT PERMIT CATEGORIES
Businesses, which include any of the following operations or equipment, will require clearance from the Air Pollution Control District.
CHEMICAL
47 -Organic Gas Sterilizers
32 -Acid Chemical Milling
33 -Can & Coil Manufacturing
44 -Evaporators, Dryers & Stills Processing
Organic Materials
24 -Dry Chemical Mixing & Detergent Spray
Towers
35 -Bulk Dry Chemicals Storage
55 -Chrome Electroplating Tanks
COATINGS & ORGANIC SOLVENTS
27 -Coating & Painting
37 -Plasma Arc & Ceramic Deposition Spray
Booths
38 -Paint, Stain & Ink Mfg
27 -Printing
27 -Polyester Resin/Fiberglass Operations
METALS
18 -Metal Melting Devices
19 -Oil Quenching & Salt Baths
32 -Hot Dip Galvanizing
39 -Precious Metals Refining
ORGANIC COMPOUND MARKETING
(GASOLINE, ETC)
25 -Gasoline & Alcohol Bulk Plants & Terminals
25 -Intermediate Refuelers
26 -Gasoline & Alcohol Fuel Dispensing
COMBUSTION
34 -Piston Internal -Combustion Engines
13 -Boilers & Heaters (1 million BTU/hr or larger)
14 -Incinerators & Crematories
15 -Burn Out Ovens
16-Core Ovens
20 -Gas Turbines, and Turbine Test Cells & Stands
48 -Landfill and/or Digester Gas Flares
ELECTRONICS
29 -Automated Soldering
42 -Electronic Component Mfg
FOOD
12 -Fish Canneries
12 -Smoke Houses
50 -Coffee Roasters
35 -Bulk Flour & Powered Sugar Storage
SOLVENT USE
28 -Vapor & Cold Degreasing
30 -Solvent & Extract Driers
31 -Dry Cleaning
ROCK AND MINERAL
04 -Hot Asphalt Batch Plants
05 -Rock Drills
06 -Screening Operations
07 -Sand Rock & Aggregate Plants
08 -Concrete Batch, CTB, Concrete Mixers, Mixers
& Silos
1 O -Brick Manufacturing
OTHER
01 -Abrasive Blasting Equipment
03 -Asphalt Roofing Kettles & Tankers
46 -Reverse Osmosis Membrane Mfg
51 -Aqueous Waste Neutralization
11 -Tire Buffers
17 -Brake Debonders
23 -Bulk Grain & Dry Chemical Transfer & Storage
45 -Rubber Mixers
21 -Waste Disposal & Reclamation Units
36 -Grinding Booths & Rooms
40 -Asphalt Pavement Heaters
43 -Ceramic Slip Casting
41 -Perlite Processing
40 -Cooling Towers -Registration Only
91 -Fumigation Operations
56 -WWTP (1 million gal/day or larger) & Pump
Station
NOTE: OTHER EQUIPMENT NOT LISTED HERE THAT IS CAPABLE OF EMITTING AIR CONTAMINANTS MAY REQUIRE AN AIR POLLUTION
CONTROL DISTRICT PERMIT. IF THERE ARE ANY QUESTIONS, CONTACT THE AIR POLLUTION CONTROL DISTRICT AT (858) 586-2600.
HM-9171 (08/15) County of San Diego -DEH -Hazardous Materials Division