HomeMy WebLinkAbout2877 Trails Ln; ; CB153207; PermitResidential Permit
Print Date: 01/28/2020
Job Address:
Permit Type:
Parcel No:
Valuation:
Occupancy Group:
2877 Trails Ln
BLDG-Residential
1560904100
$387,913.00
Work Class:
Lot#:
Reference #:
Construction Type:
Single Family Attached
4
DEV04063
VB
# Dwelling Units: 1
3.00
Bathrooms: 3.50
Bedrooms: Orig. Plan Check#: PC130072
Plan Check#:
Project Title: TRAILS END
Description: TRAILS END-TYPE 2-UNIT 4-SF ATTACHED 2566 SF, 599 SF GAR, 131 SF DECK
Applicant: Owner:
4 DESIGN ARCHITECTURE
KENNITH L CHRISS
TRUST THE PEV FAMILY REVOCABLE TRUST
5505 Cancha De Golf
Rancho Santa Fe, CA 92091-4041
760-433-1785
BUILDING PERMIT FEE $2000+
BUILDING PLAN CHECK FEE (BLDG)
ELECTRICAL BLDG RESIDENTIAL NEW/ADDITION/REMODEL
GREEN BUILDING STANDARDS PLAN CHECK & INSPECTION
MECHANICAL BLDG RESIDENTIAL NEW/ADDITION/REMODEL
PLUMBING BLDG RESIDENTIAL NEW/ADDITION/REMODEL
PUBLIC FACILITIES FEES -outside CFD
SB1473 GREEN BUILDING STATE STANDARDS FEE
SDCWA SYSTEM CAPACITY CHARGE 5/8" Displacement
SEWER CONNECTION FEE (General Capacity all areas)
STRONG MOTION-RESIDENTIAL
TRAFFIC IMPACT Residential Condo Outisde CFD
WATER METER FEE 1" Displacement
WATER SERVICE CONNECTION FEE 5/8" DISPLACEMENT (P)
WATER TREATMENT CAPACITY CHARGE 5/8" Displacement
Total Fees: $29,695.67 Total Payments To Date: $29,695.67
Status:
Applied:
Issued:
Permit
Fina led:
(City of
Carlsbad
Permit No: CB153207
Closed -Finaled
09/29/2015
12/19/2017
Inspector: CRenf
Final
Inspection: 1/28/2020 10:33:36M
Balance Due: $0.00
$1,648.40
$653.88
$66.00
$166.00
$92.00
$182.00
$13,576.96
$16.00
$5,029.00
$934.00
$50.43
$2,632.00
$352.00
$4,169.00
$128.00
Please take NOTICE that approval of your project includes the "Imposition" of fees, dedications, reservations, or other exactions hereafter
collectively referred to as "fees/exaction." You have 90 days from the date this permit was issued to protest imposition of these
fees/exactions. If you protest them, you must follow the protest procedures set forth in Government Code Section 66020(a), and file the
protest and any other required information with the City Manager for processing in accordance with Carlsbad Municipal Code Section
3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack, review, set aside, void, or annul their
imposition.
You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection
fees and capacity changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this
project. NOR DOES IT APPLY to any fees/exactions of which you have previously been given a NOTICE similar to this, or as to which the
statute of limitation has previously otherwise expired.
1635 Faraday Avenue, Carlsbad, CA 92008-7314 I 760-602-2700 I 760-602-8560 f I www.carlsbadca.gov
PERMIT INSPECTION HISTORY REPORT (CB153207)
Permit Type: BLDG-Residential Application Date: 09/29/2015 Owner:
Work Class: Single Family Attached Issue Date: 12/19/2017 Subdivision:
Status: Closed -Finaled Expiration Date: 05/11/2020 Address:
IVR Number: 709465
Scheduled
Date
Actual
Start Date Inspection Type Inspection No.
07/26/2019 07/26/2019 BLDG-17 Interior
Lath/Drywall
098822-2019
Checklist Item
BLDG-Building Deficiency
08/01/2019 08/01/2019 BLDG-82 Drywall, 099336-2019
Exterior Lath, Gas
Test, Hot Mop
Checklist Item
BLDG-Building Deficiency
BLDG-17 Interior Lath-Drywall
BLDG-18 Exterior Lath and
Drywall
BLDG-23 Gas-Test-Repairs
09/23/2019 09/23/2019 BLDG-21
Underground/Unde
104817-2019
rfloor Plumbing
Checklist Item
BLDG-Building Deficiency
11/13/2019 11113/2019 BLDG-33 Service 110537-2019
Change/Upgrade
01128/2020 01/28/2020 BLDG-Final
Inspection
January 28, 2020
Checklist Item
BLDG-Building Deficiency
117619-2020
Checklist Item
BLDG-Building Deficiency
BLDG-Plumbing Final
BLDG-Mechanical Final
BLDG-Structural Final
BLDG-Electrical Final
Inspection Status Primary Inspector
Partial Pass Chris Renfro
COMMENTS
1st Layer drywall at all party walls.
Partial Pass Chris Renfro
COMMENTS
Need to fill gas to 15 psi
Partial Pass Chris Renfro
COMMENTS
Back.flow PVC to Main connection
underground. OK to backfill
Passed Chris Renfro
COMMENTS
Passed Chris Renfro
COMMENTS
-. ------------------------
TRUST THE PEV FAMILY
REVOCABLE TRUST
2877 Trails Ln
Carlsbad, CA
Reinspection
Reinspection
Passed
Yes
Re inspection
Passed
Yes
Yes
Yes
No
Reinspection
Passed
Yes
Passed
Yes
Passed
Yes
Yes
Yes
Yes
Yes
Complete
Incomplete
Incomplete
Incomplete
Complete
Complete
Page4of4
PERMIT INSPECTION HISTORY REPORT (CB153207)
Permit Type: BLDG-Residential Application Date: 09/29/2015 Owner: TRUST THE PEV FAMILY
REVOCABLE TRUST
Work Class: Single Family Attached Issue Date: 12/19/2017 Subdivision:
Status: Closed -Finaled Expiration Date: 05/11/2020 -Address: 2877 Trails Ln
IVR Number: 709465 Carlsbad, CA
Scheduled Actual Date Start Date Inspection Type Inspection No. Inspection Status Primary Inspector Reinspection Complete
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
06/24/2019 06/24/2019 BLDG-16 Insulation 095390-2019 Partial Pass Chris Renfro Reinspection Incomplete
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
07/0312019 07103/2019 BLDG-13 Shear 096470-2019 Partial Pass Chris Renfro Re inspection Incomplete
Panels/HD (ok to
wrap)
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
07/1112019 07111/2019 BLOG-17 Interior 097173-2019 Partial Pass Chris Renfro Reinspection Incomplete
Lath/Drywall
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
07117/2019 07/1712019 BLDG-84 Rough 097764-2019 Passed Chris Renfro Complete
Combo(14,24,34,44)
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
BLDG-14 Yes
Frame-Steel-Bolting-Welding
(Decks)
BLDG-24 Rough-Topout Yes
BLDG-34 Rough Electrical Yes
BLDG-44 Yes
Rough-Ducts-Dampers
07/19/2019 07/19/2019 BLDG-27 Shower 098083-2019 Passed Chris Renfro Complete
PanfTubs
Checklist Item COMMENTS Passed
BLOG-Building Deficiency Yes
07/22/2019 07122/2019 BLDG-16 Insulation 098228-2019 Partial Pass Chris Renfro Re inspection Incomplete
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
07/23/2019 07/23/2019 BLDG-17 Interior 098360-2019 Partial Pass Chris Renfro Re inspection Incomplete
Lath/Drywall
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
January 28, 2020 Page 3 of4
-~--1/~•-.
PERMIT INSPECTION HISTORY REPORT (CB153207)
Permit Type: BLDG-Residential Application Date: 09/29/2015 Owner:
Work Class: Single Family Attached Issue Date: 12/1912017 Subdivision:
Status: Closed -Finaled Expiration Date: 05111/2020 Address:
IVR Number: 709465
Scheduled
Date
Actual Start Date Inspection Type Inspection No.
Checklist Item
BLDG-Building Deficiency
05/30/2018 05/30/2018 BLDG-66 Grout 059424-2018
Checklist Item
BLOG-Building Deficiency
08/27/2018 08/27/2018 BLDG-11
Foundation/Fig/Pier
s (Rebar)
068025-2018
Checklist Item
BLDG-Building Deficiency
10/23/2018 10/23/2018 BLDG-11
Foundation/Fig/Pier
s (Rebar)
073881-2018
Checklist Item
BLDG-Building Deficiency
03/21/2019 03/21/2019 BLDG-14
Frame/Steel/Boltin
g/Weldlng (Decks)
086575-2019
Checklist Item
BLDG-Building Deficiency
04/08/2019 04/08/2019 BLDG-14
Frame/Steel/Boltin
g/Welding (Decks)
088197-2019
Checklist Item
BLDG-Building Deficiency
05/16/2019 05/16/2019 BLDG-15 092035-2019
Rool/ReRoof (Patio)
Checklist Item
BLDG-Building Deficiency
06/03/2019 06/03/2019 BLDG-18 Exterior 093456-2019
Lath/Drywall
Checklist Item
BLDG-Building Deficiency
06/05/2019 06/05/2019 BLDG-13 Shear
Panels/HO (ok to
wrap}
January 28, 2020
093742-2019
Inspection Status Primary Inspector
COMMENTS
Partial Pass Paul Burnette
COMMENTS
Cancelled Paul Burnette
COMMENTS
Partial Pass Tim Frazee
COMMENTS
Footings Check
Partial Pass Tim Frazee
COMMENTS
Passed Tim Frazee
COMMENTS
2nd floor sheathing nailing OK
Passed Paul Burnette
COMMENTS
Failed Chris Renfro
COMMENTS
Not ready
Passed Chris Renfro
TRUST THE PEV FAMILY
REVOCABLE TRUST
2877 Trails Ln
Carlsbad, CA
Reinspection Complete
Passed
Yes
Reinspection Incomplete
Passed
No
Re inspection Complete
Passed
No
Reinspection Incomplete
Passed
Yes
Reinspection Incomplete
Passed
Yes
Complete
Passed
Yes
Complete
Passed
No
Reinspection Complete
Passed
No
Complete
Page 2 of4
PERMIT INSPECTION HISTORY REPORT (CB153207)
Permit Type: BLDG-Residential Application Date: 09/29/2015 Owner: TRUST THE PEV FAMILY
REVOCABLE TRUST
Work Class: Single Family Attached Issue Date: 12/19/2017 Subdivision:
Status: Closed -Finaled Expiration Date: 05/11/2020 Address: 2877 Trails Ln
IVR Number: 709465 Carlsbad, CA
Scheduled Actual Inspection Type Inspection No. Inspection Status Primary Inspector Complete Date Start Date Reinspection
12/21/2017 12/21/2017 BLDG-21 044154-2017 Passed Paul Burnette Complete
Underground/Unde
rfloor Plumbing
Checklist Item COMMENTS Passed
BLOG-Building Deficiency Yes
01/23/2018 01/23/2018 BLDG-11 046586-2018 Partial Pass Paul Burnette Reinspection Incomplete
Foundation/Ftg/Pier
s (Rebar)
Checklist Item COMMENTS Passed
BLDG-Building Deficiency No
02/01/2018 02/01/2018 BLDG-11 047540-2018 Cancelled Paul Burnette Reinspection Complete
Foundatlon/Ftg/Pier
s (Rebar)
Checklist Item COMMENTS Passed
BLDG-Building Deficiency No
02/02/2018 02/02/2018 BLDG-11 047705-2018 Passed Tim Frazee Complete
Foundatlon/Ftg/Pler
s (Rebar)
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
02/22/2018 02/22/2018 BLDG-11 049585-2018 Partial Pass Paul Burnette Reinspection Incomplete
Foundatlon/Ftg/Pier
s (Rebar)
Checklist Item COMMENTS Passed
BLDG-Building Deficiency No
03/09/2018 03/09/2018 BLDG-11 051143-2018 Passed Paul Burnette Complete
Foundation/Ftg/Pier
s (Rebar)
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
05/08/2018 05/08/2018 BLDG-21 057306-2018 Passed Paul Burnette Complete
UndergroundlUnde
rfloor Plumbing
Checklist Item COMMENTS Passed
BLOG-Building Deficiency Yes
05/18/2018 05/18/2018 BLDG-11 058402-2018 Passed Paul Burnette Complete
Foundation/Ftg/Pier
s (Rebar)
January 28, 2020 Page 1 of4
. -'"-~--.-~
~~, RECORD COPY ~ CITY or, CB153207
2877 TRAILS LN CARLSBAD INSPECTION RECORD
Building Division TRAILS END-TYPE 2-UNIT 4-SF A TT ACHED 2566 SF. 599
SF GAR. 131 SF DECK
G:I INSPECTION RECORD CARD WITH APPROVED
PLANS MUST Bl! KEPT ON THE JOB
0 CALL BEFORE 3:00 pm FOR NEXT WORK DAY INSPECTION
0 FOR BUILDING INSPECTION CALL: 760-602•2725
OR GO TO: www.carJsbadca.goy/BuHding AND CLICK ON
"Request Inspection"
DATE: \Z.-
DEV04063
PC130072
1560904100
12/14/2017
CB153207
If "YES'" ls checlH:d below that Division·s ~ipptuval is rcquilcd prior to rc:qm:sting a Final Buiiding ln~,pcction. If you hil\lt: any lJlH!~liom,
please t;;tll the applic,1blc divisions at the phone 1111m1Jers provided below. After all requir1:tl ;ipproval~ are signed off· fax to
7b0-602-85li0. email to lildg11E:>()CCtions(,1carlsh<Hlca . .1,,~ov or hrrng in a COPY of this canl to: lGJ!) Faraday Ave. C;ul.,,had.
Required Prior to Requesting Building Final If Checked YES
Planning/Landscape 760-944-ll463 Allow 48 hours
CM&I (Engineering Inspections) 760-438-3891 Call before 2 pm
Fire Prevention 760-602-4660 Allow 48 hours
Type of Inspection
CODE it ELECTRICAL Date Inspector
#31 IC UNDERGROUND □ UFER
#12 REINFORCED STEEL #34
#66 .MASONRY PRE GROUT #33
□ GROUT □ WALL DRAINS
#10 TILT PANELS
#11 POUR STRIPS
#11 COLUMN FOOTINGS
#14 SUBFRAME OOR □ CEILING
#15 ROOF SHEATHING
#13 EXT. SHEAR PANELS
#16 INSUIATION
#18 EXTERIOR LATH
#17 INTERIOR LATH & DRYWALL
#51 POOL EXCA/STEEI/BOND/FENCE DRYWALL,EXT IATH, GAS TES (17,18,23)
#55 PREPLASIER/ANAL #83 ROOF SH EATING, EXT SHEAR (13,15)
#19 FINAL #84 FRAME ROUGH COMBO ( 14,24,34,44)
Ins ector #85 T-Bar 114,24,34,441
□ SEWER&B1/CO □ Pl/CO
#21 UNDERGROUND □WASTE □ WTR Ins
#24 TOP OUT D WASTE D WTR
#27 TUB & SHOWER PAN A/S UNDERGROUND HYDRO
#23 □GAS TEST 0 GAS PIPING A/5 UNDERGROUND RUSH
#2S WATER HEATER A/S OVERHEAD VISUAL
#28 SOIARWATER A/5 OVERHEAD HYDROSTATIC
#29 FINAL A/S ANAL
coor: n STORM WATER F/AROUGH•IN
#600 PRE-CONSTRUCTION MEEnNG F/AANAL
#603 FOLLOW UP INSPECTION FIXED EXTINGUISHING SYSTEM ROUGH-IN
#605 NOTICE TO CLEAN FIXED EXTING SYSTEM HYDROSTATIC TEST
#607 WRITTEN WARNING FIXED EXTINOUISHINO SYSTEM ANAL
#609 NOTICE OF VIOLATION MEDICAL OAS PRESSURE TEST
#610 VERBAL WARNING MEDICAL GAS ANAL
REV 1012016 SEE BACK FOR SPECIAL NOTES
, I --·-,.-W.0. bt.:"' -' ~ -'--
DATE / L-L--'l-I 7
NAME /:2.C,h..1SmA ✓~
HOURS. ______ _
_G_eotechnical • Coastal • Geologic • Environmental
FOOTING TRENCH OBSERVATION SUMMARY
Client Name: -=-l,_,i<./::::.-... P"-1 .;..r"la..1:A;;;:,_..,,b:::....:.;.::.;l..:..l ..l:.V.;;:·c,:....,1.-::;L;_{_'-="';:.._ ___ Project Name: _-. __ .,_/~(--=-:t,,'""d.'""' .. '-'-1-','-/'>'---CL=~----'-1.,;,;;·::;_. ______ _
j _,... / ,.,,,...... ~ ,/ --;--. r f • 1 l / , -r V'-/-JY Location/Tract: _,,:__, ~n::::.!':....'.!.J .l..i ,,::_.5---1.l ... -::-::'-•'?..!...::.)~. __;;;l..:.::..-·..:..1._;,_<-~1.::..-'__.b;..::. :.:::A.:..:J.::.' __ .::::l_,,::::;_,;,,...._ __ ..:.____,;;,._ ____________ _ .,
Unit/Phase/Lot(s): _i.,_"...;:-r_· =-J _..::.7..,:./-l-?"---'-._..:.7..!./..::.1u::..· _,_. __ /J:.,.:'l:...:;-=z;;__,,:____1_?.:...l .... •';_~_1/ ______________ _ , . I
.,..-, 'J' I ;·--J r / ,f' Referenced Geotechnical Report(s): ---='_,,,.:;..,., ..:..·:,;;;:..;" n;..;f-'-:....~-~.,_..:..li..::0:::......1 _:·-,_=-) ..:..;_·-:__.:1_...,,,__-:b::;.-·_-..,ab.::..-·--_l_b __________ _
,tr
Observation Summary
/,/ ,,.
IL/i-7 .
/_,,·
fl,, /i 1
'
---· ·, . .;'~ ,,..,.
nk1 ,
/-·
tl-/n
'
Initials
Date
Initials
Date
Initials
Date
Initials
Date
A representative of GeoSoils, Inc. observed onsite soil and footing trench conditions. Soil conditions
in the trench are generally free of loose soil and debris, non-yielding and uniform, and plumb; and
are in general conformance with those indicated in the geotechnical report.
A representative of GeoSoils, Inc. observed and reviewed footing excavation depth/width. Footing
excavations generally extend to proper depth and bearing strata, and are in general conformance
with recommendations of !he geotechnical report.
A representative of GeoSoils, Inc. reviewed footing setbacks from slope face (if applicable). The
setback was in general accordance with the recommendations of the geotechnical report.
I
Notes to Superintendent/Foreman
3.
4.
Footing excavations should be cleaned of loose debris and thoroughly moistened just prior to placing concrete.
Based on expansion potential of underlying soils, presoaking of soil below slabs may be recommended. Consult
the geotechnical report for presoaking recommendations. We note that clayey soils may tak~!:_xtended
period of time for such, and the contractor should schedule according!YJVY €c:.:? /'-7v/ .r I'~
In the event of a site change subsequent to our footing observation and prior to concrete placement (i.e., heavy
rain, etc.), we should be contacted to perform additional site observations and/or testing.
This memo does not confirm the minimum footing dimension as required by the project structural engineer's
design, if different from the geotechnical report.
Notes to Building Inspector
Soil compaction test results, as well as depth of fill, relative compaction, bearing values, corrosivity, and soil expansion
index test results are contained in the As-Graded Geotechnical or Final-Compaction Report provided at the completion
~grading. ,,.1// _ ,,,-:, / /./ .
t??:.:2.___~-----·-·-· -
5741 Palmer Way
Carlsbad, CA 92008
(760) 438-3155
1446 E. Chestnut Ave.
Santa Ana, CA 92701
(714) 647-0277
Representative of GeoSoils, Inc.
26590 Madison Ave.
Murrieta, CA 92562
(951) 677-9651
[ /UeSDA-'-{ \
W.0. 0 ½35 -C
DATE_l_-_1-._-_l_t?,~-
NAME 1\..-t t kE ..5c:r-..V\-
HOURS __ 1-_. o ___ _
Geotechnical • Coastal • Geologic • Environmental
FOOTING TRENCH OBSERVATION SUMMARY
Client Name: D 6 N N A Dn..,\/E:, lcL C Project Name: 1,n., v\-i t__ s ~Nb
Location/Tract: J(l A 1 1.-s i::::=-ND C Ai"<.l S /3 AP c., 01--1-/Lf
Unit/Phase/Lot(s): __ l---=o--'-r""""s'---_\ '-/ -'-"2...---,-----"3:;....:_/ Y;~J-"""".5~/-=fo:....,,.,1r-------'(~1 _-_(,._..;) _______ _
Referenced Geotechnical Report(s): ---'D;....;..rt_,_·, ___ ,... E:_____._Q _ __._/-=()_-__ 3:;;..l;...-_1_7.a.......___b-"'---_---=6"------'-/--'(,'---_______ _
I
Observation Summary
tM5 Initials
l / -:d 19, Date
A representative of GeoSoils, Inc. observed onsite soil and footing trench conditions. Soil conditions
in the trench are generally free of loose soil and debris, non-yielding and uniform, and plumb; and
are in general conformance with those indicated in the geotechnical report.
,)A S Initials A representative of GeoSoils, Inc. observed and reviewed footing excavation depth/width. Footing
excavations generally extend to proper depth and bearing strata, and are in general conformance
with recommendations of the geotechnical report.
I h/18 Date
t'vi. S Initials A representative of GeoSoils, Inc. reviewed footing setbacks from slope face (if applicable). The
setback was in general accordance with the recommendations of the geotechnical report. 1 I "2 I I a Date
vL,t 5 Initials PE.Rf-.on.w.Eb 51=L.G-c.r ,,.., Pn..c,RtN(, ON UNDEn.'5LCAd vnur--f T.-:Z€.-Jl'..t1i::-:r. l"'\<..11 ,iz
1/ 1-l 1R Date P,r'tof:\\r-•'(,, I.r,H"'.>l CY,tcJ Tt+t'<-r ,..-z..el'.IC.H£s lJ>"lc.kr-,1..1.. tS R.&L,;--,,,;11'-/ c_o,,,,..,p v+<...T
A~I) S'u(rA t"\LE f"on... "Tl"lE .J:°V'--lfta=..-,Ot;C> u.5€"
Notes to Superintendent/Foreman
Ci.-;
2.
3 .
4.
Footing excavations should be cleaned of loose debris and thoroughly moistened just prior to placing concrete.
Based on expansion potential of underlying soils, presoaking of soil below slabs maybe recommended. Consult
the geotechnical report for presoaking recommendations. We note that clayey soils may take an extended
period of time for such, and the contractor should schedule accordingly. ;¾--/<6e p Mo Is r ~
In the event of a site change subsequent to our footing observation and prior to concrete placement (i.e., heavy
rain, etc.), we should be contacted to perform additional site observations and/or testing.
This memo does not confirm the minimum footing dimension as required by the project structural engineer's
design, if different from the geotechnical report.
Notes to Building Inspector
Soil compaction test results, as well as depth offill, relative compaction, bearing values, corrosivity, and soil expansion
index test results are contained in the As-Graded Geotechnical or Final Compaction Report provided at the completion
of grading.
5741 Palmer Way
Carlsbad, CA 92008
1446 E. Chestnut Ave.
Santa Ana, CA 92701
Representative of Giro-SOils, Inc.
26590 Madison Ave.
Murrieta, CA 92562
January 3, 2018
. . ;,~,
1
GEOCENTRIC
LA~D SI RVLY!Ni~ .,\.;'\D MAP'Pl'.\t;
To Whom It May Concern:
Subject: Trails End, Donna Drive, Carlsbad
Geocentric Land Surveying performed an as-built field survey on January 3, 2018 and found the
lower level building forms for buildings numbers 1 through 14 to substantially conform to the line
and grade as shown on the approved Precise Grading Plan. As such conforms to all building
setbacks.
Sincerely,
Lorne DaPron
PLS 7824 No. 7B24
'.: l.'5() \ Ctnt.n.: (·!LY Pkv,y Ssi!lt..: B, FsconJid,1 l :\. 9:?.l\26
uJ ?fil.1 2tJ7.'782-t fa:,,_ 760.7·L5 /~24
\-V \ \'\V -SCDCC!1 l r.t '-.:'-ill rvey .(0.ff)
May 17, 2018
To Whom It May Concern:
Subject: Trails End, Donna Drive, Carlsbad
Geocentric Land Surveying performed an as-built field survey on May 9, 2018 and found the
first floor building forms for buildings numbers 3 through 6 to substantially conform to the line
and grade as shown on the approved Precise Grading Plan. As such conforms to all building
setbacks.
Sincerely,
Lorne DaPron
PLS 7824 No. 7824
2L50 ~-Centre ("ity Pk\vy Suitt: B, Escondid() C:A. 92026
tel: 760.207.782-¾ fax: 760.745.7824
· \V\V\:;,r_g1,;ocemr.icsurvt:y.~om
I
!~ )
I I
PA0~2::1.5;, PLAN t
31070
231.72 31071
231.BIJ 31072 ____ •231.ea
31075 _____ 229.lO .___ 031075
229.71
/
,
/
/
fi!j . .:;1:, .::. m~•;cr•"-
-S·,:-' ,' •
. . . :: ,•' ~
w.o. &(.,,.85 -c--='~ DATE-....... _~-=~=,-,1-i ~.;_;::;
NAME '£:c; HOURS--~-=-~--
(( 1eotechnical • Coastal • Geologic • Environmental
FOOTING TRENCH OBSERVATION SUMMARY
Client Name: ____ / .... -a:;.:.91.;;.V..,;.,.V,._',(_,_(' ____ ;::._'r;::,; __ · J/4_'/t ___ C,-__ 1 __ l __ (!_ .. ______ Project Name: _----.... 11/ ...... ...,i ...,lw-=-· ..,.k ..._,1,,/4.;;tl_' ----------
Location{f ract: _..._/.._.~....,.@ .... ~ ... S', .... ""l1=11)_._-__ l _p_/..:1 __ --_· __ v_1-,-_1 ___ l __ ?f._' -_/ __ . 'f _____________________ _
./, ,-/;
Unit/Phase/Lot(s): _ __._.'=4 .... T_-7Sf .... 11'-;',--·.," __ /_v:t_---.(/,:-;r/;--''P_li£_-___________________ _ , ,, I ' ,'
J I
Referenced Geotechnical Report(s): __ ... _,-..:,.11. ..... -n'""'E...,.v"'-· __._/,--:'lrl.._371, .... ~1_·1_--_--1 __ &7/_tt-;-1_,,I_~ ______________ _
I / , r
Observation Summary
t 5::' Initials
5,,./lf /19 Date
-I
A representative of GeoSoils, Inc. observed onsite soil and footing trench conditions. Soil condition:
in the trench are generally free of loose soil and d~bris, non-yielding and uniform, and plumb; anc
are in general conformance with those indicated in the geotechnical report.
,,,-_,;. Initials
.i': !rt i,,!' Date
I /'
A representative of GeoSoils, Inc. observed and reviewed footing excavation ~epth/width. Footing
excavations generally extend to proper depth and bearing strata, and are in general conformance
with recommendations of ~he geotechnical report.
( 1?.:C-Initial* A represente.tive of GeoSoils, Inc. reviewed footing setbacks from slope face (if applicable). The
. < /11 !!fl' Date s~tback was ·in general .accordance with the ,recommend~tions of the geotechnical report.
' I J~,xv/;f67_ /':P£ :f.,,µf,:;;-tHC41'70/} ;t:l,f.<,i-/,C,,,41'}',,) ~l>:f,"111_!_.v /'1,f'>4__j. ¥·'fr"9-VY'.<e r~tFrATJI?µ / //71P'M; _ ~-,..-, . . tbtlc ' ,..,U-;,..,.,?;-1 f"lfi;t> 727 e~.Cf -7Tv ~V~t..~ .~,t!/:,,d., N r I'(' (?It./ _;::e l'f1'1'i?, V/3'£:r;"~ ,':/ffey-""'#.~ r.lZ>r.', ,.; ,¢
t;:C'" Initials (<,( ,r,,;;,;IK'{7?,uo,&/iJNf!/M#?; 7¥#. lfy tt> v.r.c.:r:!-ot<rN r?cw-'> J:M U/fa-5 NP 4UA1.1~e; .. W'N Ji~~,
_;::-/11/Jrr Date tn>,(/~l/7/Yl/,77r>l,//'5j.J/t.'t</Nh·' r.W'7 /.j ,/,· --r'll..t. l!., l FY. ,'i';',.if,i<~,r, /. .,.~
' I 7 -ro ./'{Jvw7it' .. --Jl~WA'J r.-· ,'; '?iP!//°e&.o ,,-¼/,.P!Z. Tb .'#1..R::J',c-A~ 4 ,.~ rN,VJr f7/.P,t,> 11
f) F ~ '/;17 c;;(; Mt> 1<';1 /If PG{,,!... 1")C-7/ t'4 1l>/Z,e>..r~ I !I .;-/f/(' le.I,.~ 12PA 7'" I 111~;=, i az_ / ' t-"'m r !PC/
Notes to Superintendent/Foreman 't~"l.::.~r /:'-At:/.lo/?L-;_j ·V/ 7 ,iru · r't;?t::: 7M Jt<I 1ih-Il'f:jl' 0?:..5€ J;~11 A
(.ji',o'Tfiidl fl lcA·l, .. :, l/.t-1/'lf"PI #/. . . I
1. Footing excavations should be cleaned of loose debris and thoroughly moistened just prior to placing concrete.
2. Based on expansion potential of underlying soil~. presoaking of soil below slabs may be recommended. Consult
the geotechnical 'report for presoaking recommendations. We note that clayey soils may take an extended
period of time for such, and the contractor should schedule accordingly. -/-,eer-, ffJ(ll~
3. In the event of a site change subsequent to our footing observation and prior to concrete placement (i.e., heavy
rain, etc.), we should be contacted to perform additional site observations and/or testing.
4. This memo does not confirm the minimum footing dimension as required by the project structural engineer's
design, if different from the geotechnical report.
Not•sl o Building Inspector
Soil compaction test results, as well as depth of fill, relative compaction, bearing values, corrosivity, and soil expansion
index test results are co,ptainecfin UJ.e As-Graded Geotechnical or Final Compaction Report provided at the completion
of grading. _ .1 _.,, · ,/
/ :,__,/ / ,• / / ),, .. -· ,,,,,, .,,,,,,-, ,--_.,,V..._ ___ _
✓,,. .)'.,._ . .,, ,;' _,,,,,,. ,; .......
5741 PalmerWay
Carlsbad, CA 92008
· (760\ 438-~1!.1' ,., .. ,., A..&-----
i . ' ,' ',, .. --, ~·
;. > .:-,,<~ I ' --I/' Ax--.1/! .... ,;(_ A ,
Representative of Ge6Soils, Inc.
26590 Madison Ave.
Murrieta. CA 925fl::>
·~· Cl' ,. JNfJ. .,_C:_og"!t,$ ction Testing & Engineeri~ ·tnt:: --,, ,.. , ---~•
.,,-,~,,--~ · • Inspection I Testing I Geotechnical I Environmental & Construction Engineering I Civil Engineering I Suiveying
INSPECTION REPORT PAGE _J_ OF _j_
PROJECT NAME J;:,;//s £..-/ /fo~,...e, . INSPECTION
ADDRESS .D/J4 If¢ Ar, <f C.~e:k /2Ac(!},J/t7jl [),,. 0 CONCRETE
C:,1ccls b.&d /&_' REINF. STEEL
ARCHITECT i IJ.es1 :r,,. kf. ?cfuru □ MASONRY
ENGINEER H ~:r:;< □ P.T. CONCRETE
CONTRACTOR P11c.1£;.t, lwl ffs'j-;,.,/4 S,.,Jluru s O FIELD WELDING
OTHER Q )1/ r O SHOP WELDING
INSPECTION DATE
PLAN FILE/OTHER
BLDG. PERMIT/OTHER
CTEJOBNO./O-/315 '7
REPORT NO.
MATERIAL IDENTIFICATION
CONC. MIX NO. & lb/in2
GROUT MIX NO. & lb/in2
MORT AR TYPE & lb/in2
REINF. STEEL GR/SIZE /J& I 5 ,-, r & 6 _.
STRUCTURAL STEEL
HIGH-STRENGTH BOLT ____ _
MASONRY BLOCK
OTHER
0 BATCH PLANT
□ EXP. ANCHOR
0 OTHER ------=----------
MATERIAL SAMPLING
□ CONCRETE □ MORTAR □ GROUT
□ REINFORCING STEEL □ STRUCTURAL STEEL
□ FIREPROOFING □ MASONRY BLOCK
□ BOLTS □ OTHER
:<-ltiSPECTIONS PERFORMED, MATERIAL IDENTIFICATION, PROGRESS, WORK REJECTED, REMARKS
'ti~. 'PLEASE NOTE Y RE-I SPECl;ION TESTING, OR OTHER PROJECT ISSUES.
}' r I
/,,:,.,,.....,
Certification of Compliance: All work, unless otherwise noted, compiles with applicable codes and the approved plans and specifications.
PRINTED NAME Ddn nu dz._/1;,..._ 7
CERTIFICATION NO. JC:-.C-oS5",712C/ s~~1?, SIGNATURE Wt.._~-JK ~--
1 ,:::_..-,,-
1441 Montiel Road, Suite 115 I Escond!do, CA92026 I Ph (760) 746-4955 I Fax (760) 746-9806 I www.cte-inc.net