Loading...
HomeMy WebLinkAboutCT 91-03; George Wimpey Inc; 1995-0073833; Petition & Waiverc, I - ' -_ c RECORDING REQUESTED BY AND WHEN RECORDED MAIL TO: City Clerk CITY OF CARLSBAD 1200 Carlsbad Village Drive Carlsbad, CA 92008 1384 CX # 1995-0073833 21-FEB-1995 10~37 CIPl SM OIEGO CDUW RECORDER'S OFFICE OFFICIAL RECORDS GREGORY SHITHI CWNTY RECORDER FEE9 0.00 SPACE ABOVE THIS LINE FOR RECORDER'S USE Parcel Nos. 212-050-22, 29, 30 & 34 PETITION, WAIVER, AND CONSENT TO CREATION OF A FACILITY IMPACT FEE PROGRAM AND AGREEMENT TO PAY FAIR SHARE COST OF CANNON ROAD WEST ("AGREEMENT") A. WHEREAS, the undersigned Property Owner is processing for development within the City of Carlsbad ("City") a development project known and identified as Carlsbad Tract 91-03 ("Project"); and 8. WHEREAS, City has determined Project to be located within the boundaries of a proposed benefit area for a Facility Impact Fee Program known as Cannon Road West Facility Fee Program ("Fee Program"); and C. WHEREAS, Fee Program is intended to be formed to finance those improvements generally described in Paragraph 1 below; and D. WHEREAS, Fee Program may take the form of a bridge and thoroughfare area of benefit fee (pursuant to Government Code Section 66484 and Carlsbad Municipal Code (CMC) Section 20.08.140), amendment to the Traffic Impact Fee (CMC Chapter 18.42), a new Development Impact Fee enacted pursuant to Government Code Section 66000 gx~, any combination thereof, or otherwise; and 1 - E. WHEREAS, Property Owner desires to proceed with processing of the Project prior to City determination of the form or establishment of Fee Program; and F. WHEREAS, the Local Faciliiies Management Plan for Zone 24 requires a guarantee for the construction of the segment of Cannon Road, described in Paragraph 1 below, prior to the recordation of any final maps or the issuance of building permits within the zone; and G. WHEREAS, condition number 10 of the Tentative Tract Map approved for Carlsbad Tract 91-03 requires Property Owner to provide for the construction of certain public Improvements including a section of Cannon Road; and H. WHEREAS, compliance with the applicable Local Facilities Management Plans for Zone 24 and tentative map conditions is a condition of approval for the final map for the Project; and 1. WHEREAS, Ci and Property Owner desire to agree to a guarantee which insures the project's fairshare of the financing for the improvements described in Paragraph 1 herein that will allow Property Owner to proceed with the processing of a final map and development of the Project in advance of the formation of a Fee Program for the construction of Cannon Road West; and J. WHEREAS, City Council agrees that Property Owner, upon entering into this Agreement and upon payment of the fair share described herein, has met the requirement set forth in the Local Facilities Management Plan for Local Facilities Management Plan Zone 24 and related tentative map condition number 10 for Carisbad Tract Map CT 91-03, to provide a financial guarantee for the construction of those improvements described in Paragraph 1 below; and IC WHEREAS, Property Owner voluntarily enters into this Agreement; and L WHEREAS, the Ci Council has determined that due to the size of the Project, there will be no major impact on the circulation system at the present time if development of the 2 - Project is allowed to proceed with sufficient financial guarantees for actual construction to meet Property Owner's fair share of the circulation improvements; NOW, THEREFORE, in consideration of proceeding with the processing of Project, the undersigned Property Owner hereby agrees and certifies to the following: 1, Property Owner hereby petitions the City for the initiation of proceedings of a Fee Program which will cause the construction and installation and/or financing of the following improvements which are more specifically described as follows: 0 Cannon Road to Major arterial road standards from Paseo Del Norte to El Camlno Real (Cannon Road West.) The improvements proposed for inclusion include all curbs, gutters, sidewalk, base and pavement, median landscaping and irrigation, median hardscape, streetlights, street monumentation, gradingand excavation, storm drainage facilities, guardrails, two 485 foot muitispan bridges and one 156 foot single span bridge together with any incidentals necessary to complete a four lane major arterial roadway. Attached hereto as Exhibit 'A' and incorporated herein is the "Engineering Report for Proposed Cannon Road West Facility Fee" ("Report"). Report formed the basis for the determination of the amount of Property Owner's deposit. 2. The costs of construction, engineering, legal and other incidental expenses will be funded by the Fee Program, as more particularly described in Report. 3. Property Owner acknowledges its right to notice of and participation in all phases of the establishment of Fee Program and expressly waives any right to protest or oppose the imposition of formation or Fee Program. Property Owner's waiver of its right to protest establishment or formation of the Fee Program shall not prevent Property Owner from protesting the amount of the fee or extent of the improvements for Cannon Road West. 4. a) Property Owner agrees to pay to City its fair share for the improvements described in paragraph one (1) above, currently estimated to be $500.00 per dwelling unit or $97,000.00 for Project as determined by Report, 3 1 3 8'7 b) Property Owner has posted a cash deposit with City in the amount of $97,000.00 ("Deposit") to guarantee payment of Property Owner's fairshare of said Fee Program. Deposit is made in fulfillment of Condition No. 10 of the tentative map to allow Ci to consider approval of the final map for Project In advance of the establishment of the Fee Program. c) The actual amount of Property Owners fair share payment under the Fee Program shall be conclusively determined by City Council at the time the Fee Program is established. d) Deposit by Property Owner of its fair share of improvement costs as determined hereln and the contractual covenant created by this Agreement satisfies Property Owner's obligations for the construction of the Improvements described in paragraph one (1) above, as required by the Local Facilities Management Plan for Zone 24 and Tentative Subdivision Map CT 91-03 condition number 10 as these conditions apply to CT 91-03. 5. Property Owner acknowledges that this Agreement to pay its fair share and participate in the financing of improvements is voluntary and that without this Agreement Property Owner would be precluded from obtaining final map approvals or building and other development permits under the provisions of the General Plan, Chapter 21.90 of the Carlsbad Municipal Code, applicable zone plan, financing plans and related documents until a satisfactory financing program had been developed to fund the construction of the improvements described in Paragraph 1 above. 6. Property Owner hereby waives his right to challenge the establishment or imposition of Fee Program. 7. This Agreement does not affect, in any way whatsoever, the obligation of Property Owner to pay any other fees or assessments associated with Property Owner's development, nor does this Agreement relieve Property Owner from providing other public facilities required under conditions of the Local Facilities Management Plan for Zone 24 or placed upon tentative map CT 91-03 by the Ci. 4 8. a) If prior to January 1, 1999, the Fee Program for Cannon Road West is established, subsequent to Deposit by Property Owner pursuant to this Agreement, Property Owner's financial obligation shall be recalculated at that time, using the fee formula established under the approved Fee Program. If the Fee Program obligation Is different from Deposit, plus acclued Interest; amount previously paid by Property Owner to City pursuant to Paragraph 4 hereof, Ci shall refund any excess, or Property Owner will pay to City any additlonal amount due (Shortfall). b) Any refund shall be made from funds available through the collection of fees and shall not be an obligation of Cis General Fund or other revenue sources. c) In the event that Insufficient funds are available from the fee revenues, Property Owner shall be reimbursed in the order in which funds were deposited with City as soon as sufficient funds become available, as determined by the Ci Council. d) No reimbursement is required until the City Council determines that Sufficient funds are available. e) If a Shortfall exists, Property Owner shall be notified of the amount of such Shortfall by the Finance Director via certified mail. The amount of said Shortfall shall be due and payable to City 30 days after the mailing of such notice. 9 The computation of the amount of any Shortfall shall not Include interest charges. g) If payment in full of the Shortfall is not made by Property Owner within ninety (90) days of notice of said Shortfall by the Finance Director, the amount due shall constitute a lien on any portion of the property within the'Project for which a building permit has not been issued by the Ci. City may deny the issuance of building permits and/or take any other action allowed by law to deny further development of Project property subject to this Agreement, and to collect such Shortfall including, but not limited to, enforcement of the lien on the property. Ciy's recordation of a lien shall not affect its ability to recover the Shortfall by other legal means 5 1389 concurrently, but no double recovery will be allowed. The cost of such collection shall be an obligation of Property Owner and shall be added to the amount of the Shortfall payment due City. h) Any payment received by the Ci under this Agreement shall be deposited in a special fund and may only be used to fund the construction of the facilities described herein. Upon the establishment of a Fee Program to fund these same facilities, any amount remaining in the special fund may be transferred to the Facility Fee Fund, at the discretion of the Finance Director. 9. If the Fee Program has not been established for any reason by January 1,1999, the amount paid by Property Owner underthis Agreement shall be deemed to represent Property Owner's fair share cost for provision of those facilities described in paragraph one (1) above and no further payment will be due from or reimbursement due to Property Owner. 10. Compliance with this Agreement will be accepted by Cii as an alternate to the method described in the current Local Facilities Management Plan for Zone 24 for financing the improvements described in paragraph one (1) above. This Agreement does not require Ci to issue building permits or other development permits or grant approvals or relieve Property Owner of the obligation to comply with all applicable provisions of law, including but not limited to, Carlsbad Municipal Code Titles 18, 19, 20 and 21. 11. Compliance with the provisions of this Agreement is a condition of all future discretionary approvals for the Project. If Property Owner does not comply with the provisions of this Agreement, approval of the Project will not be consistent with the General Plan, the Growth Management Program, the Local Facilities Management Plan, or the applicable financing plan for Zone 24 and all subsequent discretionary approvals and permits for the Project shall be withheld by Cii. 12. The Ci may, at its discretion, elect to pursue any remedy, legal or equitable against Property Owner or Property Owner's successors, heirs, assigns, and transferees, with the 6 exception of owners of individual lots for which building permits have been issued, to secure compliance with this Agreement. 13. Ci shall not, nor shall any officer or employee of City, be liable or responsible for any loss or damage incurred by Property Owner or any successor or assign of Property Owner, or by any occupant in Project, as a result of the exercise of any remedies provided to City in this Agreement. Property Owner agrees to indemnify City for any liabilities incurred by Ci as a result of Cis exercise of these remedies. 14. This Agreement and the covenants contained herein shall be binding upon and inure to the benefit of the successors,'heirs, assigns, and transferees of Property Owner and Ci, and run with the real property and create an equitable servitude upon the real property. 15. All notices provided for under this Agreement shall be in writing and shall be delivered in person or served by certified mail postage prepaid. Delivery of notice to Propelty Owner shall be presumed to have been made on the date of mailing regardless of receipt by Property Owner. Notices required to be given to Property Owner shall be addressed as follows: Robert W. Laing, Vice President George Wirnpey, Inc. 9171 Towne Centre Drive, Suite 355 San Diego, CA 92122 Notices to the City shall be delivered to the Finance Director, Ci of Carlsbad, 1200 Carlsbad Village Drive, Carlsbad, California, 92008. Each party shall notii the other immediately of any changes of address that would require any notice delivered hereunder to be directed to another address. 16. The obligation and benefits of this Agreement shall be transferred upon sale of the Project. As used in this Agreement, 'Property Owner" shall be the owner of the real property which comprises the Project, except as to any real property for which residential permits have been issued. Notwithstanding any provision of this Agreement to the contraty, upon written 7 .. - 1391 notice to the Ciy pursuant to Paragraph 15 above, all obligations, benefits and responsibiliiies of this agreement shall move to the new owner of the real property which comprises the Project. 17. The undersigned entity further states, under penalty of perjury, that it is the owner of the property described herein, or an authorized agent of the owner, and has the authority to sign this document including the creation of the covenants herein. Executed this 30 - day of (x~U~~~ ,I& PROPERTY OWNER CITY OF CARLSBAD, a Municipal George Wimpey, Inc., a Delaware Corporatio By: &&;I* (sign here) R. h/. LA/A,)G . (print name here) fic6 /as/Dm- (tit YdArganization of signatory) (print name here) L &d,./LL- (tile and organization of signatory) (NO(ar*rl acWedgnmni ol execution by PROPERTY OWNER mu& b. &ached.) (President a vkopresident and secretary or assictant secretmy must sign for corpondlan fi only one officer ri~ns. the cwpomlion must attach a resdution certified by the secretary or assistant secretary under corporate seal empowew thd dficer to bind the coiporation.) APPROVEDASTOFORM: Ci Attorney RONALD R. BALL BY 8 CALIFORNIA ALL-PURPOSE ACKNOWLEDGMENT 1392 NO. 07 personally appeared to be the person(s) whose name(s) islare subscribed to the within instrument and ac- knowledged to me that helshelthey executed the same in hislherltheir authorized capacity(ies), and that by hislherltheir signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument. WITNESS my hand and official seal. Though the data below is not required by law, it may prove valuable to persons relying on the document and could prevent fraudulent reattachment of this form. CAPACITY CLAIMED BY SIGNER DESCRIPTION OF AllACHED DOCUMENT 0 AlTORNEY-IN-FACT NUMBER OF PAGES 0 GUARDIAN/CONSERVATOR SIGNER IS REPRESENTING: SIGNER@) OTHER THAN NAMED ABOVE ~"""""""" 01993 NATIONAL NOTARY ASSOCIATION. 6236 Remmel Ave., P.O. BOX 7164- Calloga Park, CA 91309-7184 APPENDIX A 1393 ENGINEERING REPORT FOR PROPOSED CANNON ROAD WEST FACILITY FEE PURPOSE The purpose of this report is to define the project, estimate the cost of improvement, determine a reasonable area of benefit, and establish a fair method of allocating cost for the construction of Cannon Road from Paseo del Norte to El Camino Real (referred to as Cannon Road West). The report identifies the properties which have a responsibility as well as a general benefit from the construction of Cannon Road West and spreads the cost to improve this section of roadway to undeveloped properties within an established benefit area based upon average daily traffic projections. The report includes a project description, cost estimation for Cannon Road West, an identification of existing funding sources, a description of the area of benefit, an estimate of traffic to be generated from future developments within the benefit area, a description of the fee calculation methodology and a recommended fee structure. PROJECT DESCRIPTION The project consists of the completion of Cannon Road to major arterial standards from Paseo del None to El Camino Real, also known as Cannon Road West. The improvements proposed for inclusion in the fee program include all curbs, gutters, sidewalk, base and pavement, median landscaping and irrigation, median hardscape, streetlights, street monumentation, grading and excavation, storm drainage facilities, guardrails and other incidentals necessary to complete a four-lane major arterial roadway. The project also includes two (2) 485-foot multi-span bridge structures across the saltwater wetlands at the north end of Macario Canyon and a 156-foot single-span bridge across the Agua Hedionda Creek at El Camino Real. In addition, the project includes the cost for full mitigation of the environmental impacts of the construction of the improvements noted above. The project does not include any utility, water, or sewer improvement costs. These costs are included within other fee programs or are assumed to be the responsibility of adjacent developing projects which require the need for the facility. - Cost estimates were prepared for the project improvements using the latest plan revisions for Cannon Road West. The cost estimates prepared by Crosby, Mead, Benton and Associates as included within the Cannon Road Assessment District 1 1 1/4/94 .. *. I394 Engineer's Report prepared by NBSlLowry in November of 1989, were used as a source for the bridge construction cost estimation. The items evaluated in the cost estimate were limited to the surface improvements which included grading, pavement, curb and gutter, sidewalk, median curbs, median landscaping, storm drains, street lights and erosion control. In order to evaluate the difference between shared center lane costs and those frontage improvements which would normally be required of the adjacent development projects, the cost estimates were further divided relative to inside and outside lane requirements. The "shared ' two (2) 18-foot paved sections divided by a raised unimproved median. Only the inside lanes" also called the "common improvements' consist of full road bed grading, drainage improvements necessary to serve the center lanes and to protect the roadway grading were included in the "common improvement" cost estimate (ie. drainage improvements servi.ng the frontage go with the frontage improvements). For the purpose of project funding, the cost of the frontage improvements along properties which have a general plan designation of Open Space and which are environmentally constrained are included in the shared project costs and not listed as frontage obligation to the adjoining property owner. The cost estimate was divided into seven (7) segments or reaches for the purpose of allocating improvement costs. Table A summarizes the engineer's estimates for the Detailed cost estimates are included as Appendix A of this report. (Note: segments "common", frontage and total combined improvement costs for the seven segments. 1A thru 1F coorespond to the former Reach 1 of Cannon Road) The total estimated cost for Cannon Road West is $1 1,778,819. ..:<,- TABLE A 1A 18 1c 1D 1E 1F 2 Road Saomant Dascriotion Pasao Del None to Car Country Driva Station 7+38 io 18+77.95 Car Country Dr to Annda Dr Statlon 18 + 77.95 10 37 + 70 Station37+70to50+OO Ada Dr to Cmlsbd Ranch Boundary Carlabd Ranch Boundary to M.cario Bridge SutionK)+OOto64+50 Mwuio WW Station W+50 to 69+35 Macario Wdqe to KaV Ranch Bounday Station 69+35 to 72+61.30 Kelly Ranch Boundary la 0 Cdno Rad TOW. $1,526,721 $477.397 81,475,758 84.602.200 8384.ea8 $3.246.806 $1.060.312 $466.409 8248.567 $227.830 $1.475.758 $0 $4.W1.200 *O 8384,688 $0 $1,030.31 1 $1.216.495 $11,778,819 $9,802.834 81,975,984 2 1 1/4/94 3 FUNDING SOURCES There are presently two (2) funding sources identified in the City's Capital are identified as follows: Improvement Program for the construction of Cannon Road West. The two sources TransNet Highway Funds- Cannon Road West is designated on the Regional Transportation Improvement Program (RTIP) as a regional facility and was allocated $3,450,000 in Transnet funds. The Transnet funds are limited to funding one-half of the construction costs of a basic four lane facility excluding outside curb and gutter, sidewalks, streetlights, median landscape and median hardscape improvements. The detailed cost estimates presented in Appendix A include a column entitled "SANDAG Allowable" which summarizes the facility costs eligible for Transnet funding. Community Facilities District (CFD) #1 Funds- The list of improvements to be funded by CFD #1 includes provision for $3,950,000 to be applied towards the construction of Cannon Road West. The following table shows how the costs for Cannon Road West are allocated among the various funding sources: Fundina Sour= cost SANDAG Estimate Frontage Transnet Fee CFD X1 Obligations Program $11,778,819 $3,450,000 $3,950,000 $1,975,984 92,402,835 4 1 114194 AREA OF BENEFIT 1397 The area of benefit for the proposed Cannon Road West Facility Fee is shown on Figure 2 bordered by a heavy solid line. The area includes portions of Local Facility Management Zones 5, 8, 13 and 24. With one exception, each of the properties within the proposed benefit area is obligated by virtue of a condition of development approval or Local Facility Management Plan (LFMP) requirement to finance all or some portion of Cannon Road between Paseo Del Norte and El Camino Real. The relationship between developing properties within the area of benefit and the need to construct Cannon Road is discussed in more detail on a zone by zone basis in the following paragraphs. LFMP Zone !j There are twenty parcels under two separate ownerships in LFMP Zone 5 that are included within the proposed area of benefit. The 18 parcels under the ownership of Upland Industries are fully developed parcels created with Phase V of the Carlsbad Research Center (CRC). These 18 parcels are subject to a tentative map condition of approval which requires construction of a secondary access prior to issuance of building permits on any of the parcels. Secondary access would occur with the extension of Faraday Avenue to Cannon Road and Cannon Road east to El Camino Real or west to the existing terminus of Cannon Road. Interim secondary access may be allowed by the City from Halley Way to Camino Hills Drive; however, City approval of the interim secondary access is conditioned upon the owner's participation in the financing of Cannon Road. The remaining two parcels under the ownership of the lvar Company are undeveloped and do not have any development approvals pending or otherwise. therefore, any development of the property would be subject to the same However, access to the lvar property must occur through Phase V of CRC and this reason, the two lvar properties are included within the proposed area of requirement for secondary access as was applied to the CRC properties. For benefit for the Cannon Road West Facility Fee. LFMP Zone 8 There are two parcels under two separate ownerships in LFMP Zone 8 that are included within the proposed area of benefit. All properties within LFMP Zone 8 are subject to a LFMP requirement to guarantee funding of Cannon Road from El Camino Real to Car Country Drive prior to development of the property. LFMP Zone 8 properties which have been excluded from the area of benefit include City owned property in Macario Canyon and privately owned property located along the north shore of the Agua Hedionda Lagoon. The property within Zone 8 located on the north shore of the Lagoon will access the freeway and other regional routes by way of Park Drive and Tamarack Avenue and thus were not included in the proposed facility fee program. LFMP Zone 13 There are twelve parcels under four separate ownerships in LFMP Zone 13 that 5 1 114194 1398 are included in the proposed area of benefit. Each of these parcels is subject to a LFMP requirement to financially participate in the funding of all or some portion of Cannon Road West. Three parcels in LFMP Zone 13 located along Paseo Del Norte are not within the area of benefit and would not be subject to the Cannon Road West Facility Fee. The three excluded parcels are considered to have responsibility for Palomar Airport Road and are included in the existing Assessment District (AD) No. 86-1 for the construction of Palomar Airport Road from Paseo Del Norte to Palomar Oaks Way. Three other parcels within LFMP Zone 13, identified as parcels 31, 32 and 34 on the Area of Benefit Map, are also included within the boundaries of AD No. 86-1 and thus, subject to the assessment for the construction of Palomar Airport Road. Recent mapping efforts revised and extended the boundary line of the original parcels to include property that was formerly north of the original assessment district boundary. It is proposed that an area equal to the original amount of area included within AD No. 86-1 be excluded from the proposed Cannon Road West Facility Fee program. This area of exclusion is identified by hatch marks on the Area of Benefit Map on Figure 2. The value of the current PAR assessment for the excluded areas when compared on an ADT basis is approximately $lOOlADT or twice what is proposed for the Cannon Road Facility Fee. The remainder of parcels 31, 32 and 34 lying north of the excluded area are included with the area of benefit and their potential traffic impact has been incorporated within the fee calculation for the Cannon Road West Facility Fee. It is anticipated that minor adjustment to the exclusion boundary will be necessary in the future to make the area of benefit coincide with future parcel boundaries. LFMP Zone 24 There are fourteen parcels under seven separate ownerships in LFMP Zone 24 that are included in the proposed area of benefit. The existing mobile home park within Zone 24 is not included within the area of benefit. The approved Zone 24 LFMP requires that a financing plan guaranteeing the construction of Cannon Road from El Camino Real to Car Country Drive be approved by the City prior to any development occurring within the zone. This requirement was placed on development within Zone 24 because the traffic on Cannon Road West generated by the development of Zone 24 is projected to exceed the Growth construction of the facility. Management threshold requiring implementation of a financing plan requiring 6 1 114194 c 1399 1400 ADT The approved LFMP Zone plans, proposed and approved tentative maps and recorded final maps, were utilized to determine the projected land uses and development Traffic (ADT) totals were then estimated using traffic generation rates obtained from potential of each parcel included within the area of benefit. Projected Average Daily the October 1993 edition of the SANDAG Trip Generation Table (included in Appendix E). The ADT projections for each parcel are listed within Table B of this report. The traffic projections listed on Table B are for future development only and do not include ADT figures for existing residences located on property within the proposed area of benefit. Existing residences are exempt from the proposed fee program: however, any additional development in excess of the existing units on such a property is subject to the Facility Fee. There are presently three existing units within the proposed area of benefit, two in LFMP Zone 24 and one in LFMP Zone 8. FEE CALCULATION The Cannon Road West Facility Fee is calculated by dividing the total unfunded costs for Cannon Road West by the total number of average daily trips anticipated to be generated by the undeveloped property within the established area of benefit. The unfunded costs were detsrmined by totaling the Cannon Road West costs and subtracting out the SANDAG Transnet contribution, the Community Facilities District No. 1 contribution and the future frontage obligations of the adjoining property owners. As shown below, the total unfunded cost of Cannon Road West which is to be generated through the collection of benefit area fees is $2,402,835. Total Facility Cost $11,778,819 Less SANDAG Transnet Funds 3,450,000 Less CFD #1 Funds 3,950,000 Less Frontage Obligations 1.975.984 Total Unfunded Cost $2,402,835 The total number of Average Daily Trips (ADT's) expected to be generated by the undeveloped property within the benefit area subtotaled by Local Facility Management (LFMP) zone is 48,642 trips. 5 8 13 4,718 7,788 33.05 1 24 _;tpeB Total 48,565 8 1 1/4/94 1402 The Benefit Area Fee calculated by dividing the unfunded costs by the total ADT is S 50IADT. Benefit Area Fee $2,402,835 = SSOIADT 48,565 ADT The actual fee for a developing property within the Benefit Area is calculated by multiplying the benefit area fee of SSOIADT by the total ADT generated by the proposed development. Table 6 shows the development potential, general plan land use, estimated ADT, proposed benefit area fee; and frontage obligations for each of the parcels included within the established area of benefit. It should be noted that the fees listed in Table A are estimates based upon existing proposed land uses and growth management approved land use and the trip generation rates projected at the time building permits projections. The actual fee will be determined at time of development based upon the are issued. It is proposed that the fee charged per ADT will be adjusted annually based upon the incremental increase in the Engineering News Record, Los Angeles Construction Cost Index. 9 1 1/4/94 TABLE B Fee Sprud I402 k50r'l UO COmmnndlRu FseIADT P-lNa Acru Acre, Land Use ADT hr Fee Obligaicm oblig&ca Gras Ncl GencralPlyl Rapxed Frmugc Toul """""_ "" ""-"""- Zone 5 1 2 3 4 5 6 7 8 9 11 10 12 14 13 15 16 17 19 18 m zotrc 8 21 22 Zom 13 23 24 u 26 27 28 29 30 31 32 33 34 zoos 24 36 35 37 38 39 40 41 42 43 U 45 46 48 47 Toul 212-"17 212-UO-19 212-w-18 212-UO-m 212-130-21 212-w-22 212-w-23 212-UO-24 212-w-u 212-130-26 212-130-27 212-"28 212-UO-29 212-130" 212-UO-31 212-UO-32 212-UO-33 212-w-34 212-MO-41 212-M0-43 Subloul 208-m0-28 212-010-03 Subroul 212-010-14 211-010-19 211-010-23 211-mo-m 211-010-24 211-023-01 211-m-03 211-023-04 211-m2-06 211-m2-05 211-023-05 211-023-06 Subtoul 212-Ma-13 212-0-3 212-0-39 212-Mo-36 212-0-37 212-0-33 212-0-32 212-Ma-40 212-0-29 212-Ma" 212-am-34 212-MO-22 212-0-35 208-m0-17 Sub& 233 1.92 13 293 1.79 2.22 2.44 2.08 6.19 2% 8.16 2.69 239 224 7.24 8.W 629 4.10 1.83 14.28 83.78 333.93 21.90 3s5.63 5630 3.00 147.04 49.95 1.40 47.18 10.06 7.70 27.95 149.14 71.96 12w 583.88 SM 129 1.12 110 139 932 ab( 5628 14.42 22- 4837 134 1 R9 242 16.534 118963 21 13 11 21 13 1.8 1.7 1 A 27 33 1.1 1.1 3.4 1.1 4.1 4.3 33 0.7 5.7 oa M.0 11.0 0.0 0.0 0.0 0,o 0.0 10.1 10.9 7.7 45.4 73 120 66.7 4.9 1.1 13 11 9.4 1.4 194.0 13.1 0.0 OR 0.0 os 24 a7 PI PI PI PI PI PI PI PI PI PI PI PI PI PI PI PI PI PI PI PI RJ.UlR RL os os os os TR UA om1 om1 Ol?I'* O/PI" om1 UA RLM RLM RLM RLM RLM RLM RLM RLM RLM RLM RLM RLM RLM RM 1 wo 125 1J7 157 m 188 178 146 282 84 345 11s 115 355 115 429 470 345 76 5% 4718 7678 nas. 110 0 0 0 0 18544 1Mo urn 1303 784 4746 1255 3420 33051 157 35 42 3 45 301 10 290 1940 . . . m 130 3wn 48565 s10m 17.841 %173 17.841 flO3n 19,409 18886 17318 114.113 s4.182 117250 1s.750 15.750 15,750 117,777. $21,432 123,322 117250 129.795 S3.816 s235m Ulum 15m u89,4m so Io Io 1927m Io SlWp03 15om W.150 S39W 12373u S6zm S171W 11552395 nw $1,760 UOBO 11920 115w nw, S14m ua, snw Io so 11m Io s6m 11503m 12428.299 Io so so so so Io Io Io so Io so so Io so so Io Io Io Io Io so 11216,495 Io 11216.4s so Io s412310 so 1233m so Io Io so Io s1139u Io 1759.489 Io Io so Io Io so to Io Io so Io so Io so Io 11975984 s10.m $7.841 16273 17W1 19.409 58886 17318 114.113 1172% $4.182 15,750 u.750 15,750 117.777. 121.432 1172% 13816 129.795 1235m slosn swn 11m.4l5 sm 11hM9U so Io WlU'ID 19272al Io 1283.m sioom %5.150 139201 12373u 162726 1284.9u 12,412.W 17,340 11.760 12080 11920 115w SWO Sl4S-I ua, 197m Io so so 16m slm suo38o n.aw . .c APPENDIX A .. 1403 1 1/4/94 - - Slation 7+38.07 to 18+77.95 (Reach 1A) :ann00 Rod - Pauo Del Nortc to Car Count., Drive 1404 "-""""""" """" Frmugc ImpmucmcnU awtiy unit unit colt AIUOUO~ 0 0 0 0 0 0 0 0 0 0 0 0 Io Io Io Io Io 30 Io Io so Io to Io 0 1140 0.62 2 510 3m 1140 3% 13700 1 5 57m umm 5m.m 3m 030 ZJO 18.m 9-50 9.m ua 0.12 uo.m nom 30 $930 flmo 1570 11275 IBW f1W 13325 111.m flM4 sua $900 L .. Station 18+77.9S to 37+70 (Reach 16) :amon Road - Car Country Dr to Armada Dr 1405 . Ba~i Common trnproxmenu turn Qumtity Unit Unit Cal Amount MCbiii 1LS 40000 Mom Clearing and Grubbing UnclPvihWh u9Mo CY 14 MU 1sw.m 121m 2.93 15983M Erorim Gnud Asphalt Cnncruc Paviog 14 kru 2301 Tm 7so SlO300 fku It AgBrsgur BUC UOo Ton 28.00 s64.428 Subgrade Rr+uUioa 71012 SF 950 123,754 % G Curb and Gutur off 9.00 so 0.12 f8321 PCC siwalk 0 SF 2.00 so TLps %-l'Mcdi~ Curb mff Tenured Cooueu Paviog 0 SF 260 Io 6.00 S216U Medm L & I 0s Sueel Suney Monument 230 3EA Io 350.00 11054 Trpflic Si@ 3w 180.00 uu) Io 0.15 u8 so 18'RCP off Io U ?A' RCP 36off Io MXCP 48 S17380 8ff 42' RCP 102J ff so t4m ~'A-4'auoOUt 80 f8m vu 2700 Io 1w urn s23m so 2500 s7m % D-7J Braw Ditch Rip Rap 114 Tm %CY 1040 ff 65 SZ/10 10 SlO,~ Subwl Cootingsrviu (U%) f838.191 11u.m R~P OEA m.m sviping mff s4rcclegJll 0 EA 2700.W ?,Ireellight Cmduil off 12m ~~-1'cUrbInkl "@e T Ink1 o u Moom wing ~~pe ne&d 3EA """""- """"""" Frwtag? Imprwcmcnu Quvlury Unit Unit Cat Amount CombiDed SANDAG Amount AUauabk 1Ls 0 MU OCY OASrrr lS33 Tm 1664 Ton 47m SF WLF 18420 SF 20992 SF off 5320 SF OEA 5EA 1EA 7168 ff 6EA mff eaff u3ff S76 ff 1n ff 3w OEA mom lsMa 250 7Jo 950 0.12 9.00 zsm 2.00 6.00 2.80 350.00 2-70 1mm 0.1s 2700.W 1zm U 48 50 80 uom 2700 m SlSW so Io so s42.924 SUB08 S33.156 UP76 136840 8 PA MooM) SUMO OEA m so om off 65 10 so Io 3368.703 SJJW U8W U8Mo 121m 121m fS98a.W 15983M SlOJOO Sl0300 S10739. SlU739. S39358 1395S8 S14.197 114,197 S33.156 133.1J6 u6.840 121.624 121624 so 558.778 so $133 11,024 11,OJO Io suo 11.440 11.440 Io fl.ll3 11.113 S16W so 124DW so UBJU S38JU u8n U8fZ S29W 129UY) 123960 123960 s.1~ s.Im SUMO 124m SUM sm 17m s7500 s2210 12210 110.403 910,403 11.206894 SlLl57.326 1181rn 11S86W 1406 Buic Common Imprmcmenu Frontage Impnemeou """"""""""""- Combbed SANDAG llcm Qualily Unit Unit Cat Amount Quantity Unit Unit Cat Amwnl Amounl Aumvlbk """ """-""""""""" 1Ls 39% CY 5- 1517 Tm 5 Auu 1647 Tm 44280 SF ow 2460 w ow 0 SF OSF 1w ow 1EA ow off 100 w 1%.00 7J60 230 750 9s 0.12 9.00 6.00 280 333.00 230 180.00 2700.00 0.15 10 zam zm 1z.m 17260 17m 1Ls 198,750 0 Acru s3.750 om sa476 0 Auu 115647 997 Tm 1082 Ton S3t4 m50 SF Io Io 1m SF 246ow $14.760 Io 14Mo SF ow 1350 Io 3640s ow 5180 Io 4EA 4920 I2 Io Io mff 4eA 1%.00 6920 250 750 9s 0.12 200 6.00 280 350.00 2Jo 180.00 0.15 28.00 9m nmm 12m SlMO ow 10 S6.920 114.480 Io 17x0 Io 198.750 Io 127916 17032 110179 s23926 urn 19.004 u;750 122140 122140 124Mo 124dOo Io 114.760 Io 1350 SM 3900 SlOBOo . SlOBDO 5738 1738 u4m SUMO Io SlMO 114.480 17500 s98,750 s3.750 170392 sum 1u.140 19m 114.760 Io so 1350 Io 1900 1738 Io 11MO Io Slrlion 5O+W lo 64+50 (Reach 1D) muon Road - Carlsbad Ranch Boundary Io Marurio Bridge 1407 """" """_ """"" Bnic Commm Impormenu Frcaug Immmcm Item Qumtity Unil Unit Cot Amounl Quantity Unil UnilCal Amounl Amaual Allwabk Combmd WAG hiobiion Cluriog rod Grubbing 8 AUU 15m.m 512000 1Ls 28500 szsm 0 AUU 1500.00 1 Ls loo00 s1om SUIJOO SUI500 UoshW Exuwioil Io SlLoOo SlZMo lsMm CY 250 1450MD OCY UO Eraion Control 8 ' 'AUU Io S450m S45oMD &ph.Lt Conuuc Pa~g 750 s6m 1692 Tca OAUU 730 Io s6m %m 28.00 147376 1175 Tm 28.00 UZWO W.276 W276 1837 Ton 950 517.452 1275 Tm Subgrade Prcpralion 9-30 f12.113 129264 S29m 5uoO SF 0.12 %a4 36.750 SF 0.12 S43m S10614 110614 QQC G Curb ad Gutter OLE 9.m Io 2900 LF 9.00 swm m,1m SZ,SJOO KC SiWrlL OSF zm Io 14500 SF QQCTI-l'MediCurb 2900 LF 6.W 517,*00 ow Io Tenured Wrclc Paving 6.00 OSF 280 Io 1WM SF Io f17.400 117,400 Medm L & 1 OSF 2-30 Io 5600 SF ZBO u3340 553340 Io Guard Rail OLF 2s.m Io 1500 LF 25.00 u7m s37300 UO f14m S14m Io SucclSuMy Monument 1FA 3mm u50 o FA 350m Io Tnflic Sip 2FA Io u50 5350 """""""""-""" Qnu I1 Aggrepc B..c zm s29m s29m laom ubo 5 FA 1w.m s900 51260 s1m SUcclligbl Strec1tigh1 cimduil svipkls OLF 0.15 Io 5800 LF 0.u S870 urn 1870 o FA 27m.m Io OLF 1z.m Io mLF Io 18'RCP 231 LF u S1O.IM 0x3 12.W S24,WO SZCmO Io 24' RCP QQC 'A-4* -1 5 FA nmm mxa mxa U 10 sww ~10.1~ 1642 LP 5FA 48 2100 513W ow 2700 Io fl3JW f13W so ma16 n8a16 QQC T 1dc1 QQCTI-1'curbInlsl 2FA uoo um OFA uoo c EA m.m s~~m 0 EA m.00 Io Io f18Dm s18m um urn Wmg QQC Hcaiwlll 3FA m nxa Rip Rap IN Tm mCY om 6.3 a250 uoo om Io nxa nm QQC D-75 Braw Ditch mLF 10 528m 65 ow Io 10 #yo urn Io fzBm s28m Subtoul n499n Conliiposiu (15%) 5112.490 Subtoul 186242l Habitat Mitiplion 48 ma16 off - f2.%3?3 flaOBJO( S831.164 u8*7@6 5151276 s12s.Sa ~2~3~8 ~1,159,780 5962.733 Imp & Cocvr staking (10%) 186242 S29.736 511598 396274 UMmO SZOO~ s2aOM3 TOI8.l 11.148661 53nm s1.475.758 51zs9.012 i - Camnoa Rod - Msrurio Bridge Sta~ion 64+SO 10 69+3J (Reach LE) 1408 Buic CmUMn lmprovcmenu """"""" """""- Frontage lmprmcmsnu Ilcm Combined SANDAG Qu~tity Unit UNt Cat Amount Quantity Unit Unit Cat Amount Amount AUwablc Mobili7&iin 1Is 32wQ1 1320Mo IIs 0 Bridge COoluuctLon (48S3 SO s320003 1320003 IIs 0 SO 13.16OMo S3.16OMo ""- -"------ ""- """ "" I Is 3160000 S3.16OMo lum Cannon Road - Marcario Bridge 10 Kelly Rancu Boundary Slalion 69+3S to 72+61.30(Reach 1F) Basii Common Improvemenu 1409 Combined SANDAG Amount ALl0Srek.k MobiiOU Clearing rod Grubbing 1LS 7s00 17300 uoclruw Excavuim 656a) CY 3 Acru 1333.00 um 1-50 tl64rn Fxaion Cnnwol 3 Acru 750 1230 Ch 11 Agrc(pLs Base 380 Ton 413 Ton 28.00 510,640 950 13924 11736 SF 0.12 11,4@3 TLp G Curb and Gutter PCC Sidewalk off 9.00 0 SF Io 2.00 h '8- 1' Median Curb Io 652 ff 6.00 13.912 Asphall Cnncrus hhg ..Sub@ Preparation Sublocrl Contingeociu (15%) SF ff. 2.80 EA 350.00 U.00 M 180.00 ff 0.15 w 2700.00 LF 1100 EA 270.00 ff 44.00 Io Io 1350 1360 Io Io Io Io Io 1198844 329827 o AWU 1m.m 1Ls 2.500 12Jm Io OCY uo OACru Io 750 Io w TOO u).m 17392 286 Ton 950 12.111 81% SF 652 LF 0.12 9.00 u868 5978 3260 SF 100 165m off 6.00 Io 11oDa) 31oDa) u3m tam 5164.w m4Mn 118.032 mD32 12m suo 16641 16b41 12386 $2386 55868 ssm %520 13,912 13,912 Io 112bU 51262.5 17304 57504 13% 1350 1540 11% 1540 fS.400 11% Io u8m Io 13652 s3.652 SS.400 u.uM sw5n 1247.855 s39w s37.178 Sublwl Habbilu Mitigation Inrp. & Glut. stating (1056) T4 183,150 u84688 1363537 - Cannon Road - Kelly Ranch Boundary IO El Camino Red Slalion 72+61.3 IO 124+JO(Rcach 2) 1420 _" - Baaii Common lmprwcmeau Frontage Impmvcmcou Ium Combmd """"""""""""- """" olvnuty Udl UniilCat Amounl Qulnlity Udl UdlCal Amounl Amaunl 1 61310 63Ol 6833 186800 0 9978 0 0 0 9 0 0 W 8 0 0 5460 mo 268 333 313 2 2 5 2 m .. " 1s TOO CY TOO SF ff SF ff Y- SF EA ff FA EA EA LF LF SF SF LF ff LF EA L= EA EA EA CY urn0 2.50 0.12 930 9.00 2.m 6.M 280 350.M 2.50 U0.W 25.M 0.15 lZu) 75.m 23s U 48 6s 80 2500 uoo 65 zB.m 1m.m 2700.00 ztm 3oM.m smzn 54om 1176,4(D W914 122,416 Io S59868 Io Io 13,134 Io Io 11.440 Io f60 so Io S1357 111.792 SUO84 f2034S Io um 1S.W s1sm um Slrn wwrn I 0 1533 1664 1Mm) 10178 So890 0 m 19320 0 4913 4 urn0 21 21 Bmo 7800 1130 110 0 110 4 0 4 40 4 ns Is TOO CY TOO SF LF SF LF SF SF EA LF EA EA EA ff LF 1s Ls ff LF' ff EA LF EA EA EA CY 58ooo 2.50 28.00 950 0.12 2.m 6M ZBO 23 9.m 334.00 25.m 1w.m z7m.m lzm 75.m U0.m 0.15 235 U 48 65 80 27W wa wx) 65 3oM.m APPENDIX B 1 114194 . lWOT801 - San Mego ASSOCL4TION OF GOVERNMENTS .. - BRIEF EUlDE OF VEHICUI TRAFFIC GENERATION RATES - FOR THE SAN DlEGO REGION 141 2 u.IID.mhwnm~ 60ll000Dah'SWl" 7011000 IE. h 700la'" . . ... .. . ." .~ 12011000.4.h 12W/m.'.' 4Wl000 IE. h 4WI" 16011WO.s.h.10001aw.'" .OO,,C@nd 11" . . . , . " . . 700llWO .g. R" 6011WO10. R. MOI" 6% 16.61 n 1L6l 11% 1661 8% I461 11% IC61 n it61 11% 1661 1.6 6. I 6.1 3.6 4.3 8.9 4.a 5.0 6.0 3.4 3.7 31 A"" F.mk SO/" lo/-.' ?muuIoI* - 3s 74 11.2 8.8 100 *.O 8.4 6.4 6.3 0.I 7.a 4.7