HomeMy WebLinkAboutPRE 2020-0008; 941-947 OAK AVENUE; Admin Decision LetterFILE March 18, 2020 ~11-,,,d ~ 3\ ~/;;;}o.;u) Travis Deal 300 Carlsbad Village Dr. #108A Carlsbad, CA 92008 SUBJECT: PRE 2020-0008 {DEV2020-0040}-941-947 OAK AVENUE APN: 204-111-04-00, 204-111-05-00 Ccityof Carlsbad Thank you for submitting a preliminary review for the addition of a three-unit apartment building to an existing developed site proposed at 941-947 Oak Avenue. The project site, an approximately 21,000 square foot (0.48 acre) lot, currently is developed with 11 apartment units. In response to your application, the Planning Division has prepared this comment letter. Please note that the purpose of a preliminary review is to provide you with direction and comments on the overall concept of your project. This preliminary review does not represent an in-depth analysis of your project. It is intended to give you feedback on critical issues based upon the information provided In your submittal. This review is based upon the plans, policies. and standards in effect as of the date of this review. Please be aware that at the time of a formal application submittal, new plans. policies, and standards may be in effect and additional issues of concern may be raised through a more specific and detailed review. Planning: General 1. General Pian and zoning designations for the property are as follows: a. General Plan: Village-Barrio (V-B), 23-30 dwelling units per acre (du/ac); Growth Management Control Point (GMCP) of 25 du/ac b. Zoning: Village-Barrio (V-B) Zone c. Village & Barrio Master Plan; Barrio Perimeter (BP) Land Use District 2. The project requires the following permits issued by the Planning Division: a. Minor Site Development Plan (SDP). A Minor SDP is required pursuant to the provisions outlined within Section 6.3.3(A) of the Carlsbad Village & Barrio Master Plan (p. 6-4). b. Nonconforming Construction Permit (NCPl. An NCP may be required per Carlsbad Municipal Code (CMC) Chapter 21.48 if the new building connects to an existing nonconforming building or is subject to a permit for another reason. Not enough information was provided to make this determination. These permits require approval by the City Planner pursuant to Section 6.3.4(A) of the Carlsbad Village & Barrio Master Plan (p. 6-5). Community Development Department Planning Division I 1635 Faraday Avenue Carlsbad, CA 92008-7314 I 760-602-4600 I 760-602-8560 I I www.carlsbadca.gov PRE 2020-0008 (DEV2020-0040)-941-947 OAK AVENUE March 18, 2020 Pa e 2 3. Per the Housing Crisis Act of 2019 (SB 3;1~~Lielma Application process is required as a first step in the planning process for housing development projects with two or more dwelling units, to be followed by the formal development application process already required under Government Code (Gov. Code) §§ 65940, 65941, and 65941.5, and CMC § 21.42.050. Submittal of a complete SB 330 Preliminary Application will vest the project for 180 days in accordance with the ordinances, policies and standards in effect at the time of submittal of the Preliminary Application. The city is developing the application forms and process for SB 330 Preliminary Applications. Please contact planning@carlsbadca.gov for more information. 4. Per the Housing Crisis Act of 2019 (SB 330), any project that includes the removal or demolition of a "protected unit" is required to provide the occupants with 1) relocation benefits (Gov. Code § 7260 et seq.), and 2) right of first refusal for a comparable unit available in the new housing development.. (Gov. Code § 66300 (d)(2)(D).) "Protected units" are generally defined by Gov. Code § 66300(d)(2)(E)(ii) as including residential units subject to affordability restrictions, price controls, or occupied by low income households. The formal submittal of the project will need to include documentation regarding any existing "protected units" if any units are proposed to be removed or demolished. 5. New requirements related to the city's goals to reduce greenhouse gas (GHG) emissions will likely impact development requirements of this project. A formal application submittal will need to include a completed Climate Action Plan Checklist (Form P-30) to determine what requirements will apply to the project. New GHG reduction requirements are related to energy efficiency, photovoltaic, electric vehicle charging, water heating and traffic demand management requirements, as set forth in the California Green Building Standards Code and in Carlsbad Municipal Code Chapters 18.21, 18.30 and 18.51 which is available on the city's website at the following address: http://www.gcode.us/codes/carlsbad/view.php?topic=18&frames=on To the extent that new GHG reduction requirements are in effect at the time of application for grading or building permits, the project will be required to comply with the effective requirements even if different than what is proposed in the project's planning approvals. GHG reduction requirements may impact, but are not limited to, site design and local building code requirements. If incorporating new GHG reduction requirements results in substantial modifications to the project after planning approvals are obtained, then prior to issuance of grading or building permits, the applicant may be required to submit and receive approval of a Consistency Determination or an Amendment application for the project through the Planning Division .. 6. Project Density. The BP District of the Carlsbad Village & Barrio Master Plan allows 23 -30 du/ac with a GMCP of 25 du/ac. The property has a net area of approximately 21,000 square feet (0.48 acre) and, therefore, the project site would accommodate 11 to 14 units with 12 units atthe GMCP. The project's proposed density of 29.1 du/ac is within the allowed density range of the BP District but above the GMCP. Therefore, the proposed project would need to qualify for and receive an allocation of two "excess" dwelling units, pursuant to City Council Policy No. 43. The two existing lots shall be merged to create one project for density and common access purposes. PRE 2020-0008 (DEV2020-0040)-941-947 OAK AVENUE March 18, 2020 Pa e 3 7. Roof Protrusions. The proposal did not identify any roof equipment or structures. The project is required to meet the standards below: a. All roof structures, including protrusions such as parapets and equipment screening, and roof decks and their amenities shall complement and be consistent with the design of the building. b. No roof structure shall be taller than the minimum height needed to accommodate, screen, or enclose the intended use. c. New development that results in additional height above the building height maximum (refer to comment 10.d) shall abide by the following regulations: i. All roof structures (excluding architectural features) shall be set back a minimum offive feet from all building faces. ii. Guardrails or other barriers for roof deck amenities shall not exceed 42 inches above the maximum building height. iii. Housing elevators or stairways, ventilating fans or similar equipment shall not exceed ten feet above maximum height. However, structures permitted to exceed five feet in height shall be set back at least an additional one foot for every foot above five feet. 8. Permitted intrusions into required yard. Pursuant to CMC Section 21.46.120, unenclosed stairways and balconies are allowed to intrude in the side and rear yard setbacks by two feet. 9. Parking. Pursuant to Table 2-3 on p. 2-22 of the Master Plan, multiple-family dwellings in the BP District require two spaces per dwelling for units with two or more bedrooms. The spaces can be covered or uncovered, and tandem parking is permitted. One visitor parking space is required for the proposed three-unit project (0.3x3=0.9 rounded up to 1). These parking spaces shall be in addition to the existing parking spaces on-site. Therefore, the proposed three-unit project requires seven additional parking spaces. The project proposes four tandem parking spaces for a total of eight spaces. However, the parking space depth is substandard. A two-car tandem parking space shall be at least 8.5 feet in width and 40 feet in depth. Spaces adjacent to a wall or other barrier shall be a minimum of 10 feet wide. A back-up distance of at least 24 feet is required behind all parking spaces. Please clearly show all proposed and existing parking on-site, the dimensions, and any required back-up distance. 10. Barrio Perimeter (BP) Supplemental District Standards. The project is subject to the Barrio Perimeter {BP) Supplemental District Standards beginning on p. 2-64 within Section 2.7.6 of the Master Plan. The following should be addressed in a formal submittal: a. Setbacks. Front setbacks require a minimum of ten feet. Side and rear yard setbacks require a minimum of five feet. The proposed project complies with these setback requirements. b. Lot Coverage. Lot coverage in the BP District is 80 percent. Please include a Lot coverage calculation compliant with CMC Section 21.04.061. c. Open Space. Open space is required on a project basis, as well as on an individual unit basis. i. A minimum of 25 percent of the property must be maintained as open space. Open space may be dedicated to landscaped planters, open space pockets, roof gardens/patios, balconies, or other patios. No parking spaces or aisles are permitted in the open space. Indicate how the project meets this requirement. ii. Residential private open space, such as patios, balconies or private yards, shall be a minimum of 100 square feet per unit, with a minimum dimension of six feet in any direction. PRE 2020-0008 (DEV2020-0040)-941-947 OAK AVENUE March 18, 2020 Pa e4 This requirement may be satisfied by more than one private open space area. Clearly show the required private open space per unit and provide a calculation table on the plans. iii. Residential common open space shall be provided at a minimum of 25 square feet per unit, with a minimum dimension of ten feet in any direction. Common open space shall be purposefully designed as active or passive recreational facilities. Rooftop open space may satisfy this requirement, provided it is available for use by all residents. Clearly show the required private open space per unit and provide a calculation table on the plans. d. Building Height. Building height is a maximum of 35 feet. Please show building height measured from existing or finished grade, whichever is less (not from finished floor). Refer to comment 7 regarding permitted roof protrusions. e. Building Massing. No building fa~ade visible from any public street shall extend more than 30 feet in length without a two-foot minimum variation in the wall plane, as well as a change in roof line. Although the proposed building is set back from Oak Avenue, please add articulation to all elevations including the elevations visible from Oak Avenue. 11. Area-Wide Design Guidelines -Site Planning. The project is subject to the Site Planning section of the Master Plan beginning on p. 2-71 within Section 2.8.2. The following should be addressed in a formal submittal, along with all other applicable guidelines in this Section: a. Subsection B -Parking and access. Locate parking behind buildings and away from the street. The proposal satisfies this requirement by providing all required parking underneath the proposed building and does not face the street. The drive-aisle should be enhanced with decorative pavement or pavers toward the entry from Oak Avenue. Use pervious paving materials throughout the site, whenever possible. b. Subsection F -Mechanical Equipment and Service Areas. Place public utility equipment, meter pedestals, and transformers underground or away from sidewalks and pedestrian areas where feasible. Please take care in siting the electrical transformer in an area that is not easily seen from the street and meets the clearance standards of SDG&E. Please show any proposed transformer on the plans. c. Subsection G -Landscaping. Landscaping was not included with this submittal. Therefore, comments relating to the project landscaping have not been provided. A formal submittal will require compliance with Section 2.8.2(G) and the Carlsbad Landscape and Design Manual. d. Subsection H -Fences and walls. Although no detailed fences or walls are shown on the submittal · plans, they will need to meet the requirements of Section 2.8.2(H). Walls and fences are limited to six feet in height as measured from the lowest adjacent grade. A tiered wall may be permitted, provided that a minimum of three feet of planter area is located between the walls. 12. Area-Wide Design Guidelines-Building Form and Massing. The project is subject to the Building Form and Massing section of the Master Plan beginning on p. 2-79 with Section 2.8.3. The following should be addressed in a formal submittal, along with all other applicable guidelines: a. Subsection A -Building Form and Articulation. The project is required to meet the standards below. i. Utilize techniques to reduce massing, such as variation in wall plane and height and variation in roof form and levels. The proposed three-unit building shall add articulation to the flat exterior elevations. ii. Consider adjacent low-density uses surrounding the project site, and avoid balconies overlooking rear yards. Consider smaller, raised windows along elevations that face adjacent rear yards. The proposed roof deck is located internal to the site with a ··--·-·-------------------- PRE 2020-0008 (DEV2020-0040)-941-947 OAK AVENUE March 18, 2020 Pa e 5 landscaped buffer from the side property line which minimizes the effect on existing surrounding properties. iii. Utilize light and neutral base colors for the building. iv. Exterior lighting should match the building architecture. b. Subsection D-Roof Forms. The project is required to meet the standards below. i. Ensure that roof materials and colors are consistent with the desired architecture. ii. Avoid long, unbroken, horizontal roof lines. iii. Avoid flat roofs unless sufficient articulation of detail is provided, such as precast treatments, continuous banding or projecting cornices, lintels, caps, corner details, or variety in pitch (sculpted), height, and roofline. If a flat roof is proposed, additional details and articulation will be required. 13. Site Plan: The site plan must accurately show all existing buildings, hardscape, and landscape areas. The site plan shall be fully dimensioned and shall also include all existing and proposed walls and fences with heights from the lowest adjacent grade. 14. Trash: Please show the location of existing and proposed trash enclosures. Please provide a letter from Waste Management stating that they will serve the project for pick-up from any new trash enclosures on-site. 15. Noise: A noise study will be required with the project submittal that shows the project complies with the city's Noise Guidelines. The Noise Guidelines can be found online at: http://www.carlsbadca.gov/civicax/filebank/blobdload.aspx?Blob1D=24094 All necessary application forms, submittal requirements, and fee information are available at the Planning counter located in the Faraday Building at 1635 Faraday Avenue or online at http://www.carlsbadca.gov/services/depts/planning/default.asp. You may also access the General Plan Land Use Element and the Zoning Ordinance online at the website address shown; select Department Listing; select Planning Home Page. Please review all information carefully before submitting. Land Development Engineering: 1. Complete a Stormwater Standards Questionnaire. This questionnaire will guide you and the City in determining what type of reports and storm water mitigation must be completed to satisfy state and City storm water quality requirements. The questionnaire can be printed from the following website link: http://www.carlsbadca.gov/civicax/filebank/blobdload.aspx?Blob1D=22711 Preliminary analysis suggests that the project is a Standard Development Project and must comply with standard stormwater requirements of the BMP Manual. A "Standard Project Requirement Checklist Form E-36 must be prepared and submitted at time of application. 2. A preliminary hydrology study will be required to determine the pre-development and post- development discharge flows. Provide preliminary recommendatio'ns to mitigate any increase in flows. PRE 2020-0008 (DEV2020-0040)-941-947 OAK AVENUE March 18, 2020 Pa e 6 3. Provide a preliminary Geotechnical study that identifies feasibility and recommendations for the proposed project including design recommendations for proposed pollutant control BMPs and hydromodification facilities. 4. A recent Preliminary Title Report (PTR) will be required with formal project application submittal. 5. All easements and encumbrances identified in the PTR must be indicated on the site plan. 6. Show complete property boundary data on the site plan, including bearings and distances. 7. Provide a typical street cross section of Oak Ave showing existing improvements. 8. On the site plan, show and identify all existing surface improvements (curb, gutter, sidewalk, paving, manholes, inlets, street lights, adjacent driveways, vaults, transformers, etc.) at the project frontage and within SO feet. 9. Show existing and proposed contour lines onsite and extend at least SO feet beyond property lines. 10. Show the locations of all existing and proposed buildings, walls, fences, and permanent structures onsite and within 50 feet of site. 11. Provide multiple cross-sections of the site to demonstrate differences in grade, including adjacent properties. 12. Indicate the volume of grading (cut, fill, import, export, remedial) proposed for the project in cubic yards. 13. Show the location of the driveway for access from the street. Note that the maximum width of a driveway is 40% of lot frontage. 14. Show proposed finished floor elevations for structures. 15. Show existing and proposed wa~er services and sewer laterals. 16. Show the location of the trash enclosure for the apartments. 17. Please be advised that in order to make a more in-depth review of the proposed development, a more complete design of the project is required. 1. The site plan does not comply"with Fire Department access requirements. The buildings exceed the 150-foot Fire Department requirement of the Fire Code. The property does not permit on-site Fire PRE 2020-0008 (DEV2020-0040)-941-947 OAK AVENUE March 18, 2020 Pa e 7 Department access due to the lack of a conforming turnaround. Additionally, the drive-aisle width is less than the required 24 feet. Building: 1. The building codes need to be updated to 2019 codes. 2. The project shall comply with state accessibility requirements and the city's Climate Action Plan {CAP). If you would like to schedule a meeting to discuss this letter with the commenting departments, please contact Chris Garcia at the number below. You may also contact each department individually as follows: • Planning Division: Chris Garcia, Associate Planner, at {760) 602-4622 • Land Development Engineering: Allison McLaughlin, Project Engineer, at {760) 602-2732 • Fire Department: Randy Metz, Fire Inspections, at {760) 602-4661 • Building Division: Mike Peterson, Building Official, at {760) 602-2721 Sincerely, DON NEU, AICP City Planner DN:CG:mf c: Oak Avenue Carlsbad LLC, 1164 Santa Barbara Street, San Diego, CA 92107 Allison McLaughlin, Project Engineer Fire Prevention HPRM/File Copy Data Entry