Loading...
HomeMy WebLinkAboutCT 13-04; GOLDEN SURF; Planning CommissionSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSGARAGEGARAGE19'10'10'20'10'17'-2"18'-9"20'-11"18'15'-4"9'-11"10'10'10'8'-10"10'-3"10'9'-4"10'10'-6"16'-5"17'-6"28'-7"9'8'-6"8'-6"8'-6"1 5 '-2 "N00D32'19"W 115.95'74.98'N00D35'41"W 140.36'N89D00'16"W 149.99'N00D32'26"W 256.39'N88D59'20"W 225.11'CAMINO DE LAS ONDASPASEO DEL NORTELANDS END COURT10'LOT 3LOT 2LOT 1712 sq.ft.560 sq.ft.794 sq.ft.556 sq.ft.17.32'2090 sq.ft.27.75'15.37' 17.99'20'18'18'20'CHECKED BY:DRAWN BY:DRAWING FILE:PROJECT NO.:PROJECT ADDRESS:Conceptual Site Plan1"=20'NorthCLIENT:CT 13-04PUD 13-10CDP 13-33DESCRIPTIONDATEPLANNER / DESIGNER:COPYRIGHT 2014SHEET NO.:SHEET TITLE:ConceptualSite PlanAS1.0January 20,2015Guest Parking(3)6798 Paseo Del NorteCarlsbad, Ca 92011Golden Surf Holdings, LLC6798 Paseo Delk NorteCarlsbad, Ca 92011A1A1B2B2B3B3A4A4CustomResidencePROJECT INFORMATIONPROJECT:Golden Surf ProjectSTAMP:Owner:Golden Surf Holdings LLCFarzan Dehmoubed, Project Manager6798 Paseo Del NorteCarlsbad, Ca 92011Cell 760-688-9962 Fax 905-940-3997 Owners Agent:Karnak Planning & DesignRobert Richardson. PlannerPO Box 810Carlsbad, Ca 92018-0810760-434-8400, Fax 760-683-2269Existing Zoning:Zone SP-20Planned Community PC (No Master Plan approved)Coastal ZoneGeneral Plan:R-M 4-8 6 GMCP4-8 Units per acre GMC Point 6 Units per acreLot Size: 1.08 acresAPN Number: 214-531-51Legal Description: Lot 1 of Parcel Map 6136Project Address: 6798 Paseo Del NorteCarlsbad, Ca 92009Expected Processing:Tentative Subdivision Map CTPlanned Development PUDCoastal Development Permit CDPProcessed as One PhaseTotal Number of Lots: 3Density: 5.5 du/acOccupancy:R-1 All Living spaceS-2 GaragesType V non RatedComply w/ NFPA 13 Fire sprinkler systemCal Green Requirements per City of CarlsbadNo portion of the project is in the noise critical AreaAverage Daily Traffic (ADT)5 residential Units 5x 10= 50 ADTEarthwork:Cut100 cyFill3800 cyImport3700 cyExport0 cyRemedial500 cyRecreation Areas:Custom residence2090 sq.ft.Unit#1556 sq.ft.Unit#2794 sq.ft.Unit#3712 sq.ft.Unit#4560 sq.ft.Note:The developable area of the lot does not have any environmental sensitive lands per Section 21.53.230 of the CMC.CONSULTANT:Existing Residence &2nd Dwelling Unit2802 State Street, Suite C Carlsbad, CA 92008PHONE: 760.434.8400 FAX: 434.8493EMAIL: karnakarch@aol.comKarnak Planning & Design123HCADA Path of Travel2010 CALIFORNIA BUILDING CODE (BASED ON 1997 UBC)2010 CALIFORNIA MECHANICAL CODE (2009 UMC)2010 CALIFORNIA PLUMBING CODE (2009 UPC)2010 CALIFORNIA ELECTRICAL CODE (2008 NEC)2010 CALIFORNIA FIRE CODE2005 CALIFORNIA BUILDING CODE (TITLE 24)APPLICABLE CITY OF CARLSBAD CODES AND ORDINANCESGOVERNING CODESProject DescriptionDevelop the existing residence and lot (1.08 acres) into three separate projectsThe lots will be broken down as follows:Density: Total Lot 1.08 acres 6du/1.08 acres = 5.55 du/acres Lot #1 Condominium Project of 4 unitsLot Size: 26,451 sq.ft. 0.61 acres Unit BreakdownPlan 1st 2nd Total Garage Balcony PorchesUnit #1A 934 1,279 2,213 544 65 42Unit #2B 1,097 1,159 2,256 504 40 83Unit #3B 1,097 1,159 2,256 504 40 83Unit #4A 934 1,279 2,213 544 40 42Total 8,938 2096 185 250 Lot Coverage: 24.92% ( 6,593 sq.ft.)Condominium Units to conform to Chapter 1 A section 1102 A of the 2013 CBC Multi-Story Condo UnitsLot #2 Custom ResidenceLot 7123 sq.ft. 0.16 acresResidenceFirst Floor 1865 sq.ft.Second Floor 1385 sq.ft.3250 sq.ft.2 Car Garage424 sq.ft.Balcony 174 sq.ft.Porches 178 sq.ft.Lot coveraged 34.6% (2467 sq.ft.) Setbacks ProposedFront: 29'-9"' at Garage 10' Front Living RoomSide: 7'-10"' (East side garage at 7'-10"' and west side at 8')Rear: +/- 22'-11"' NE Corner'Lot #3 Existing Residence to remainLot 13,598 sq.ft. 0.31 acresGarage 794 sq.ft.2nd Dwelling Unit 638 sq.ft.Occupany: R & S Type V non rated2nd dwelling Type V one hourLot Coverage3044 sq.ft. 32.3%SetbacksFront: Approximately 23'-6" Side: West side approxiately 15' and 10' east side Rear: 20'Water/Sewer District:City of CarlsbadProposed Sewer Generation: 5 EDUSchool District:Carlsbad Unfied School DistrictProposed Drainage (CFS): Q100 = 2.0 CFSMaster Drainage Basin: Basins C/DProposed Water Demand: All residences must have minimum 1" meters Fire DepartmentResidence 550 per x 5 = 2750 GPD SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSGARAGEGARAGE19'10'10'20'10'17'- 2"18'- 9"20'- 11"18'15'- 4"9'-11"10'10'10'8'-10"10'-3"10'9'-4"10'10'-6"16'- 5"17'-6"28 '-7"9'8'-6"8'-6"8'-6"15 '-2 "N00D32'19"W 115.95'74.98'N00D35'41"W 140.36'N89D00'16"W 149.99'N00D32'26"W 256.39'N88D59'20"W 225.11'CAMINO DE LAS ONDASPASEO DEL NORTELANDS END COURT10'LOT 3LOT 2LOT 1712 sq.ft.560 sq.ft.794 sq.ft.556 sq.ft.17.32'2090 sq.ft.27.75'15.37' 17.99'20'18'18'20'CHECKED BY:DRAWN BY:DRAWING FILE:PROJECT NO.:PROJECT ADDRESS:CLIENT:CT 13-04PUD 13-10CDP 13-33DESCRIPTIONDATEPLANNER / DESIGNER:COPYRIGHT 2014SHEET NO.:SHEET TITLE:January 20,20156798 Paseo Del NorteCarlsbad, Ca 92011Golden Surf Holdings, LLC6798 Paseo Delk NorteCarlsbad, Ca 92011PROJECT:Golden Surf ProjectSTAMP:CONSULTANT:2802 State Street, Suite C Carlsbad, CA 92008PHONE: 760.434.8400 FAX: 434.8493EMAIL: karnakarch@aol.comKarnak Planning & DesignConstraints Site Plan1"=30'North100 ft. Limit of InfluenceConstraintsSite PlanAS1.1 CHECKED BY:DRAWN BY:DRAWING FILE:PROJECT NO.:PROJECT ADDRESS:CLIENT:CT 13-04PUD 13-10CDP 13-33DESCRIPTIONDATEPLANNER / DESIGNER:COPYRIGHT 2014SHEET NO.:SHEET TITLE:January 20,2015Existing Site Conditions & UtilitesNo ScaleNorth6798 Paseo Del NorteCarlsbad, Ca 92011Golden Surf Holdings, LLC6798 Paseo Delk NorteCarlsbad, Ca 92011AS1.2Existing SiteConditions & UtilitiesPROJECT:Golden Surf ProjectCrime Prevention ConditionsSTAMP:CONSULTANT:2802 State Street, Suite C Carlsbad, CA 92008PHONE: 760.434.8400 FAX: 434.8493EMAIL: karnakarch@aol.comKarnak Planning & Design DN8'-3" x 16'-7"13'-6"5'-0"0'-5"12'-8"13'-0"8'-11"12'-8"8'-4"16'-11"8'-2"10'-7"21'-3"14'-7"BedroomOPEN BELOWBedroomBathMaster BathClosetMaster BedroomStairsLaundryMaster Bedroom Balcony174 sq.ft.F.F.E.= 185.0'UP19'-2"20'-5"8'-0"13'-2"21'-0"17'-10"8'-9"5'-0"19'-5"13'-6"15'-7"20'-2"20'-2"Back Porch53 sq.ft.FrontPorch71 sq.ft.DiningFFE 174.0'FFE 171.5'Living RoomEntryPdwrNookGreat RoomBedroom/DenBathroomKitchenDining Porch54 sq.ft.DrivewayGarageNorth1/4" = 1'-0"CHECKED BY:DRAWN BY:DRAWING FILE:PROJECT NO.:PROJECT ADDRESS:Custom Residence First Floor PlanCustom Residence Second Floor Plan1/4" = 1'-0"CLIENT:CT 13-04PUD 13-10CDP 13-33DESCRIPTIONDATEPLANNER / DESIGNER:COPYRIGHT 2014SHEET NO.:SHEET TITLE:January 20,2015A1.0First Floor 1865 sq.ft.Second Floor 1385 sq.ft.Total 3250 sq.ft.Garage 424 sq.ft.Balcony 174 sq.ft.PorchesFront 71 sq.ft.Side 54 sq. ft.Back 53 sq.ft.Lot Coverage:House 1865 sq.ft.Porches 178 sq.ft.Garage 424 sq.ft.Building coverage: 2467 sq.ft.Line of Floor aboveOccupancy: R, SType V non ratedNFPA 13 Fire sprinkler system6798 Paseo Del NorteCarlsbad, Ca 92011Golden Surf Holdings, LLC6798 Paseo Delk NorteCarlsbad, Ca 92011Custom ResidenceFloor PlansCustom ResidencePROJECT:Golden Surf ProjectSTAMP:CONSULTANT:2802 State Street, Suite C Carlsbad, CA 92008PHONE: 760.434.8400 FAX: 434.8493EMAIL: karnakarch@aol.comKarnak Planning & Design 4 : 124 : 124 : 124 : 124 : 124 : 124 : 124 : 124 : 124 : 124 : 124 : 124 : 124 : 124 : 124 : 12A1.1Custom ResidenceRoof PlansCHECKED BY:DRAWN BY:DRAWING FILE:PROJECT NO.:PROJECT ADDRESS:CLIENT:CT 13-04PUD 13-10CDP 13-33DESCRIPTIONDATEPLANNER / DESIGNER:COPYRIGHT 2014SHEET NO.:SHEET TITLE:January 20,20151/4" = 1'-0"Custom Residence First Floor Roof PlanCustom Residence Second Floor Roof Plan1/4" = 1'-0"6798 Paseo Del NorteCarlsbad, Ca 92011Golden Surf Holdings, LLC6798 Paseo Delk NorteCarlsbad, Ca 92011PROJECT:Golden Surf ProjectSTAMP:CONSULTANT:2802 State Street, Suite C Carlsbad, CA 92008PHONE: 760.434.8400 FAX: 434.8493EMAIL: karnakarch@aol.comKarnak Planning & DesignNote:All over hangs are 18" typical both floors.All Roof Slopes are 4:12 pitchDownspoutDownspouts 2x3 with strapping connected to a pvc collectorpipes and discharged to an approved drainage swale per theengineering design.4" PCV or Alum. Gutters 30'-0"18'-0"25'-7"25'-9"16'-9"25'-7"19'-1"27'-11"25'-7"30'-0"NotesCHECKED BY:DRAWN BY:DRAWING FILE:PROJECT NO.:PROJECT ADDRESS:CLIENT:1 Stucco - Spanish Lace Finish2 Wood Railing 42"high3 Concrete Tile Roof 4:12 Pitch Typical4 Foam Fascia Detailing5. Not used6 Not used7 2x12 Horizontal Foam Trim8 Stucco foam Fascia Detail w/ Aluminum 6" Gutter9 Finish Grade10 Roof Gutters11 Window Sill with Foam Molding and Trim12 Stucco column.13. 16' Insulated Roll Up Garage Door & Automatic Remote Control OpenerCT 13-04PUD 13-10CDP 13-33DESCRIPTIONDATEPLANNER / DESIGNER:COPYRIGHT 2014SHEET NO.:SHEET TITLE:January 20,2015Right Side Elevation3/16" = 1'-0"6798 Paseo Del NorteCarlsbad, Ca 920113/16" = 1'-0"Left Side ElevationGolden Surf Holdings, LLC6798 Paseo Delk NorteCarlsbad, Ca 92011Front Elevation3/16" = 1'-0"Rear Elevation3/16" = 1'-0"A1.2Custom ResidenceExterior ElevationsCustom Residence4444PROJECT:Golden Surf ProjectHeight LimitHeight Limit111111223333333388111144449988881111STAMP:4499448888881313111188881111447777887799CONSULTANT:2802 State Street, Suite C Carlsbad, CA 92008PHONE: 760.434.8400 FAX: 434.8493EMAIL: karnakarch@aol.comKarnak Planning & Design412 Typical121212121212 UP6060497'-9"16'-10"5'5'29'-4"27'-7"24'-1"20'-7"21'-6"30'28'-6"24'-7"53'-1"GARAGEFAMILYBATHFAMILYCLOSETFront Porch 42 sq.ft.Plane 1KitchenPlane 2Plane 3Plane 4DN5'13'14'-7"3'-5"13'-7"11'-3"13'-2"5'6'-1"12'-7"19'-8"10'-2"10'-1"5'-11"9'CLOSETBEDROOMOPEN BELOWSTUDYCLOSETMASTER BEDROOMBEDROOMBEDROOMBalcony 65 sq.ft.CHECKED BY:DRAWN BY:DRAWING FILE:PROJECT NO.:Plan AFloor PlansUnit 1PROJECT ADDRESS:Plan A First Floor Plan "Unit 1"CLIENT:1/4"=1'-0"Plan A Second Floor Plan "Unit 1"CT 13-04PUD 13-10CDP 13-33First Floor 934 sq.ft.Second Floor 1279 sq.ft.Total2213 sq.ft.Garage 544 sq.ft.Balcony 65 sq.ft.Front Porch 42 sq.ft.DESCRIPTIONDATEPLANNER / DESIGNER:COPYRIGHT 2014SHEET NO.:SHEET TITLE:January 20,2015A2.0Occupancy: R, SType V non ratedNFPA 130 Fire sprinkler system6798 Paseo Del NorteCarlsbad, Ca 92011Golden Surf Holdings, LLC6798 Paseo Delk NorteCarlsbad, Ca 920111/4"=1'-0"PROJECT:Golden Surf ProjectSTAMP:CONSULTANT:2802 State Street, Suite C Carlsbad, CA 92008PHONE: 760.434.8400 FAX: 434.8493EMAIL: karnakarch@aol.comKarnak Planning & DesignPlan AUnit 1 DN4 : 124 : 124 : 124 : 124 : 124 : 124 : 124 : 12UP4 : 124 : 124 : 124 : 124 : 12CHECKED BY:Plan ARoof PlansDRAWN BY:DRAWING FILE:PROJECT NO.:PROJECT ADDRESS:CLIENT:A2.1CT 13-04PUD 13-10CDP 13-33DESCRIPTIONDATEPLANNER / DESIGNER:COPYRIGHT 2014SHEET NO.:SHEET TITLE:January 20,20156798 Paseo Del NorteCarlsbad, Ca 920111/4" = 1'-0"Plan A First Floor Roof PlanPlan A Second Floor Roof Plan1/4" = 1'-0"Golden Surf Holdings, LLC6798 Paseo Delk NorteCarlsbad, Ca 92011PROJECT:Golden Surf ProjectSTAMP:CONSULTANT:2802 State Street, Suite C Carlsbad, CA 92008PHONE: 760.434.8400 FAX: 434.8493EMAIL: karnakarch@aol.comKarnak Planning & DesignPlan AUnit 1Note:All over hangs are 18" typical both floors.All Roofs are a 4:12 pitch.DownspoutDownspouts 2x3 with strapping connected to a pvc collectorpipes and discharged to an approved drainage swale per theengineering design.4" PCV or Alum. Gutters UP6060497'-9"16'-10"5'5'29'-4"27'-7"24'-1"20'-7"21'-6"30'28'-6"24'-7"53'-1"GARAGEFAMILYBATHFAMILYCLOSETFront Porch 42 sq.ft.Plane 1KitchenPlane 2Plane 3Plane 4DN5'14'10'4'1'-8"14'-7"3'-5"13'-7"11'-3"13'-2"5'-3"6'-1"12'-10"19'-8"10'-2"10'-1"5'-11"9'CLOSETBEDROOMPlane 1Plane 2Plane 3OPEN BELOWSTUDYCLOSETMASTER BEDROOMBEDROOMBEDROOMBalcony 40 sq.ft.CHECKED BY:DRAWN BY:DRAWING FILE:PROJECT NO.:PROJECT ADDRESS:CLIENT:CT 13-04PUD 13-10CDP 13-33DESCRIPTIONDATEPLANNER / DESIGNER:COPYRIGHT 2014SHEET NO.:SHEET TITLE:January 20,2015Occupancy: R, SType V non ratedNFPA 130 Fire sprinkler systemPlan A First Floor Plan "Unit 4"1/4"=1'-0"6798 Paseo Del NorteCarlsbad, Ca 92011Plan A Second Floor Plan "Unit 4"First Floor 934 sq.ft.Second Floor 1279 sq.ft.Total2213 sq.ft.Garage 544 sq.ft.Balcony 40 sq.ft.Front Porch 42 sq.ft.1/4"=1'-0"A2.2Plan AFloor PlansUnit 4Golden Surf Holdings, LLC6798 Paseo Delk NorteCarlsbad, Ca 92011PROJECT:Golden Surf ProjectSTAMP:CONSULTANT:2802 State Street, Suite C Carlsbad, CA 92008PHONE: 760.434.8400 FAX: 434.8493EMAIL: karnakarch@aol.comKarnak Planning & DesignPlan AUnit 4 DN4 : 124 : 124 : 124 : 124 : 124 : 124 : 124 : 124 : 124 : 12UP4 : 124 : 124 : 124 : 124 : 12CHECKED BY:DRAWN BY:DRAWING FILE:PROJECT NO.:PROJECT ADDRESS:CLIENT:CT 13-04PUD 13-10CDP 13-33DESCRIPTIONDATEPLANNER / DESIGNER:COPYRIGHT 2014SHEET NO.:SHEET TITLE:January 20,20151/4" = 1'-0"6798 Paseo Del NorteCarlsbad, Ca 92011Plan A First Floor Roof PlanPlan A Second Floor Roof PlanGolden Surf Holdings, LLC6798 Paseo Delk NorteCarlsbad, Ca 92011Note:All over hangs are 18" typical both floors.All Roofs are 4:12 pitch1/4" = 1'-0"PROJECT:Golden Surf ProjectSTAMP:CONSULTANT:2802 State Street, Suite C Carlsbad, CA 92008PHONE: 760.434.8400 FAX: 434.8493EMAIL: karnakarch@aol.comKarnak Planning & DesignPlan AUnit 4A2.3Plan ARoof PlansDownspoutDownspouts 2x3 with strapping connected to a pvc collectorpipes and discharged to an approved drainage swale per theengineering design.4" PCV or Alum. Gutters 22'-8"25'-6"30'22'-8"25'-6"30'CHECKED BY:DRAWN BY:DRAWING FILE:PROJECT NO.:PROJECT ADDRESS:CLIENT:CT 13-04PUD 13-10CDP 13-33DESCRIPTIONDATEPLANNER / DESIGNER:COPYRIGHT 2014SHEET NO.:SHEET TITLE:January 20,20156798 Paseo Del NorteCarlsbad, Ca 92011Golden Surf Holdings, LLC6798 Paseo Delk NorteCarlsbad, Ca 92011PROJECT:Golden Surf ProjectSTAMP:CONSULTANT:2802 State Street, Suite C Carlsbad, CA 92008PHONE: 760.434.8400 FAX: 434.8493EMAIL: karnakarch@aol.comKarnak Planning & DesignNotes1 Stucco - Spanish Lace Finish2 Wood Railing 42"high3 Concrete Tile Roof 4:12 pitch Typical4 Foam Fascia Detailing6 Canvas Awning (optional)7 2x12 Horizontal Foam Trim8 Stucco foam Fascia Detail w/ Aluminum 6" Gutter9 Finish Grade10 Not used11 Window Sill with Foam Molding and Trim12 Stucco column.13. 16' Insulated Roll-up Garage Door & Automatic OpenerRight Side Elevation1/4" = 1'-0"1/4" = 1'-0"Left Side ElevationFront ElevationPlan A ExteriorElevations1/4" = 1'-0"Rear Elevation1/4" = 1'-0"A2.4Plan AUnit 1Height LimitHeight Limit412 Typical11112222223333333388888888889999111111111111444411111111121212121313887777 22'-8"25'-6"30'30'25'-6"22'-8"CHECKED BY:DRAWN BY:DRAWING FILE:PROJECT NO.:PROJECT ADDRESS:CLIENT:CT 13-04PUD 13-10CDP 13-33DESCRIPTIONDATEPLANNER / DESIGNER:COPYRIGHT 2014SHEET NO.:SHEET TITLE:January 20,20156798 Paseo Del NorteCarlsbad, Ca 92011Golden Surf Holdings, LLC6798 Paseo Delk NorteCarlsbad, Ca 92011Notes1 Stucco - Spanish Lace Finish2 Wood Railing 42"high3 Concrete Tile Roof 4:12 pitch Typical4 Foam Fascia Detailing6 Canvas Awning (optional)7 2x Horizontal Foam Trim8 Stucco foam Fascia Detail w/ Aluminum 6" Gutter9 Finish Grade10 Not used11 Window Sill with Foam Molding and Trim12 Stucco column.13. 16' Insulated Roll-up Garage Door & Automatic OpenerRight Side Elevation1/4" = 1'-0"1/4" = 1'-0"Left Side ElevationFront ElevationPlan A ExteriorElevations1/4" = 1'-0"Rear Elevation1/4" = 1'-0"A2.5Plan AUnit 4PROJECT:Golden Surf ProjectSTAMP:CONSULTANT:Height LimitHeight Limit2802 State Street, Suite C Carlsbad, CA 92008PHONE: 760.434.8400 FAX: 434.8493EMAIL: karnakarch@aol.comKarnak Planning & Design412 Typical111122223333333388888888889999111111111111444411111111121212121313887777 UPSB42B29DCB36RB36D/WDishwasher (control panel)B18RGas Range [29 1/2W]B30B12RSB42B29DCB36RB36Dishwasher (control panel)B18RGas Range [29 1/2W]B30B12R636346U381790W2736W2736DCW2436RW3036W3018W3918W1236R160806080 6040LS6040LS3040LS60683030LS4016LS2468466810980266850682668411802630LS6040LS6'-8"13'6'23'-10"20'-7"12'-6"19'-10"5'14'3'26'-10"29'-8"15'-8"6'34'21'-6"24'-5"30'-6"54'-11"BEDROOMBEDROOMBATHPlane 1Plane 3Plane 2Plan BGARAGEPlane 4Front Porch83 sq.ft.DNSB36SB42SB42SB42SB36SB42SB42SB42U321896W3436W33362630LS3030LS2630LS4040LS3030FX3030FX3030FX3030FX3030FX5040LS3268236849687068266826682 6 6 8 5036LS5068210742668266866684640LS7'1'-7"10'1'-6"4'14'-10"17'-3"13'13'10'-2"10'-2"OPEN BELOWMASTER BDRMCLOSETHALLBEDROOMBEDROOMCOURTCLOSETBATHPlane 1Plane 2Plane 3Balcony 40 sfMASTER BATHPlan B First Floor PlanCHECKED BY:DRAWN BY:DRAWING FILE:PROJECT NO.:PROJECT ADDRESS:1/4"=1'-0"Plan B Second Floor Plan1/4"=1'-0"CLIENT:First Floor 1097 sq.ft.Second Floor 1159 sq.ft.Total 2256 sq.ft.Garage 504 sq.ft.Balcony 40 sq.ft.Front Porch 75 sq.ft.CT 13-04PUD 13-10CDP 13-33DESCRIPTIONDATEPLANNER / DESIGNER:COPYRIGHT 2014SHEET NO.:SHEET TITLE:January 20,2015Occupancy: R, SType V non ratedNFPA 13 fire sprinkler system6798 Paseo Del NorteCarlsbad, Ca 92011Golden Surf Holdings, LLC6798 Paseo Delk NorteCarlsbad, Ca 92011A3.0Plan BFloor PlansPROJECT:Golden Surf ProjectSTAMP:CONSULTANT:2802 State Street, Suite C Carlsbad, CA 92008PHONE: 760.434.8400 FAX: 434.8493EMAIL: karnakarch@aol.comKarnak Planning & Design UP4 : 124 : 124 : 124 : 124 : 12DN4 : 124 : 124 : 124 : 124 : 124 : 124 : 124 : 124 : 124 : 124 : 12CHECKED BY:DRAWN BY:DRAWING FILE:PROJECT NO.:PROJECT ADDRESS:CLIENT:CT 13-04PUD 13-10CDP 13-33DESCRIPTIONDATEPLANNER / DESIGNER:COPYRIGHT 2014SHEET NO.:SHEET TITLE:January 20,2015A3.16798 Paseo Del NorteCarlsbad, Ca 920111/4" = 1'-0"Plan B First Floor Roof PlanPlan B Second Floor Roof Plan1/4" = 1'-0"Golden Surf Holdings, LLC6798 Paseo Delk NorteCarlsbad, Ca 92011Plan BRoof PlansNote:All over hangs are 18" typical both floors.All Roofs are 4:12 pitch.PROJECT:Golden Surf ProjectSTAMP:CONSULTANT:2802 State Street, Suite C Carlsbad, CA 92008PHONE: 760.434.8400 FAX: 434.8493EMAIL: karnakarch@aol.comKarnak Planning & DesignDownspoutDownspouts 2x3 with strapping connected to a pvc collectorpipes and discharged to an approved drainage swale per theengineering design.4" PCV or Alum. Gutters 1 Stucco - Spanish Lace Finish2 Wood Railing 42"high3 Concrete Tile Roof 4:12 pitch typical4 Foam Fascia Detailing5. Not used6. Not used7 2x12 Horizontal Foam Trim8 Stucco foam Fascia Detail w/ Aluminum 6" Gutter9 Finish Grade4'30'25'-7"23'-6"CHECKED BY:DRAWN BY:DRAWING FILE:PROJECT NO.:PROJECT ADDRESS:CLIENT:CT 13-04PUD 13-10CDP 13-33DESCRIPTIONDATEPLANNER / DESIGNER:COPYRIGHT 2014SHEET NO.:SHEET TITLE:January 20,20156798 Paseo Del NorteCarlsbad, Ca 92011Golden Surf Holdings, LLC6798 Paseo Delk NorteCarlsbad, Ca 92011Notes10 Not used11 Window Sill with Foam Molding and Trim12 Stucco column.13. 16' Insulated Roll Up Garage Door & Automatic Remote control OpenerRight Side Elevation1/4" = 1'-0"1/4" = 1'-0"Left Side ElevationFront ElevationPlan B ExteriorElevations1/4" = 1'-0"Rear Elevation1/4" = 1'-0"A3.2Plan BPROJECT:Golden Surf ProjectSTAMP:111122333344778888CONSULTANT:991111121211881313111111111212888833332277111133992802 State Street, Suite C Carlsbad, CA 92008PHONE: 760.434.8400 FAX: 434.8493EMAIL: karnakarch@aol.comKarnak Planning & Design412 Typical1'-6"4'25'-7"23'-6"30' 1 Stucco - Spanish Lace Finish2 Wood Railing 42"high3 Concrete Tile Roof 4:12 Pitch typical4 Foam Fascia Detailing6 Not Used7 2x12 Horizontal Foam Trim8 Stucco foam Fascia Detail w/ Aluminum 6" Gutter9 Finish Grade4'30'25'-7"23'-6"CHECKED BY:DRAWN BY:DRAWING FILE:PROJECT NO.:PROJECT ADDRESS:CLIENT:CT 13-04PUD 13-10CDP 13-33DESCRIPTIONDATEPLANNER / DESIGNER:COPYRIGHT 2014SHEET NO.:SHEET TITLE:January 20,20156798 Paseo Del NorteCarlsbad, Ca 92011Golden Surf Holdings, LLC6798 Paseo Delk NorteCarlsbad, Ca 92011Notes10 Roof Gutters11 Window Sill with Foam Molding and Trim12 Stucco column.13. 16' Insulated Roll Up Garage Door & Automatic Remote control Opener14. Coronado Stone Veneer TypicalRight Side Elevation1/4" = 1'-0"1/4" = 1'-0"Left Side ElevationFront ElevationPlan B ExteriorElevations1/4" = 1'-0"Rear Elevation1/4" = 1'-0"A3.3Plan BAlternate ElevationLot #3PROJECT:Golden Surf ProjectSTAMP:CONSULTANT:141414141414141414142802 State Street, Suite C Carlsbad, CA 92008PHONE: 760.434.8400 FAX: 434.8493EMAIL: karnakarch@aol.comKarnak Planning & DesignSee A3.2 for all call outs exceptfor the stone veneer.412 Typical1'-6"4'25'-7"23'-6"30' 1/18/2015 5:57 PM C:\Users\Miertschin\Documents\AutoCAD LT 2002\_DMLA\_CLIENTS\_KAR\KAR_13.01 Golden Surf\Development\13-172BS- LANDSCAPE.dwgPLOT DATE:ALL IDEAS, DESIGNS, & ARRANGEMENTS REPRESENTED HEREON ARE THE PROPERTY OF SPEAR & ASSOCIATES CIVIL ENGINEERING & SHALL BE USED FOR THIS PROJECT ONLY EXCEPT WITH THE WRITTEN PERMISSION OF SAID ENGINEER. ANY CHANGE MADE BY PARTIES OTHER THAN SAID CIVIL ENGINEER SHALL RELIEVE CIVIL ENGINEER OF RESPONSIBILITY FOR THE FACILITY OR AFFECTED PORTION THEREOF. CONTRACTORS SHALL VERIFY ALL DIMENSIONS AND CONDITIONS PRIOR TO THE START OF ANY WORK & SHALL REPORT ANY DISCREPANCY TO THE CIVIL ENGINEER. ALL IDEAS, DESIGNS, & ARRANGEMENTS REPRESENTED HEREON ARE THE PROPERTY OF SPEAR & ASSOCIATES CIVIL ENGINEERING & SHALL BE USED FOR THIS PROJECT ONLY EXCEPT WITH THE WRITTEN PERMISSION OF SAID ENGINEER. ANY CHANGE MADE BY PARTIES OTHER THAN SAID CIVIL ENGINEER SHALL RELIEVE CIVIL ENGINEER OF RESPONSIBILITY FOR THE FACILITY OR AFFECTED PORTION THEREOF. CONTRACTORS SHALL VERIFY ALL DIMENSIONS AND CONDITIONS PRIOR TO THE START OF ANY WORK & SHALL REPORT ANY DISCREPANCY TO THE CIVIL ENGINEER.1/18/2015 6:30 PM C:\Users\Miertschin\Documents\AutoCAD LT 2002\_DMLA\_CLIENTS\_KAR\KAR_13.01 Golden Surf\Development\13-172BS- LANDSCAPE.dwgPLOT DATE:÷÷÷÷÷÷÷÷÷÷÷÷÷÷÷÷÷÷÷÷÷÷÷÷÷÷÷÷ 1/18/2015 5:58 PM C:\Users\Miertschin\Documents\AutoCAD LT 2002\_DMLA\_CLIENTS\_KAR\KAR_13.01 Golden Surf\Development\13-172BS- LANDSCAPE.dwgPLOT DATE:ALL IDEAS, DESIGNS, & ARRANGEMENTS REPRESENTED HEREON ARE THE PROPERTY OF SPEAR & ASSOCIATES CIVIL ENGINEERING & SHALL BE USED FOR THIS PROJECT ONLY EXCEPT WITH THE WRITTEN PERMISSION OF SAID ENGINEER. ANY CHANGE MADE BY PARTIES OTHER THAN SAID CIVIL ENGINEER SHALL RELIEVE CIVIL ENGINEER OF RESPONSIBILITY FOR THE FACILITY OR AFFECTED PORTION THEREOF. CONTRACTORS SHALL VERIFY ALL DIMENSIONS AND CONDITIONS PRIOR TO THE START OF ANY WORK & SHALL REPORT ANY DISCREPANCY TO THE CIVIL ENGINEER. 1/18/2015 5:58 PM C:\Users\Miertschin\Documents\AutoCAD LT 2002\_DMLA\_CLIENTS\_KAR\KAR_13.01 Golden Surf\Development\13-172BS- LANDSCAPE.dwgPLOT DATE:ALL IDEAS, DESIGNS, & ARRANGEMENTS REPRESENTED HEREON ARE THE PROPERTY OF SPEAR & ASSOCIATES CIVIL ENGINEERING & SHALL BE USED FOR THIS PROJECT ONLY EXCEPT WITH THE WRITTEN PERMISSION OF SAID ENGINEER. ANY CHANGE MADE BY PARTIES OTHER THAN SAID CIVIL ENGINEER SHALL RELIEVE CIVIL ENGINEER OF RESPONSIBILITY FOR THE FACILITY OR AFFECTED PORTION THEREOF. CONTRACTORS SHALL VERIFY ALL DIMENSIONS AND CONDITIONS PRIOR TO THE START OF ANY WORK & SHALL REPORT ANY DISCREPANCY TO THE CIVIL ENGINEER.