HomeMy WebLinkAboutSDP 96-14B; LEGOLAND PIRATES CLUSTER; Site Plan-
-'""'I. ~ I:()
'-.., " "t ~ '-... ~
'9 ~ fl) °) ~ Q.... ~~ Q " ~ CJ) "'-J Q.._ --
I I
----
' ' ' '
'·
SITE PL Ac._c___cN,______________ __ _
SCALE 1'•100'
···-------------------------
\
BOUNDARY OF NEW ~ EAST EXPANSION AREA 3 SITE PLAN
REFER TO SHEET E3 • 101
0 ••
•OM It,..., ,..
I
N
\ , ' I/ "--L-
PROJECT DATA
OWNER: PLAY US ACQUISITION CO., INC.
1 LEGOLAND DRIVE
CARLSBAD, CA. 92008
TEL: 760-91 B-5300
APPLICANT: LEGOLAND CALIFORNIA LLC
ONE LEGOLAND DRIVE
CARLSBAD, CA. 92008
TEL: 760-91 B-5300
APPLICATION: SITE DEVELOPMENT PLAN 96-14(9)
COASTAL DEVT PERMIT
SEWER DISTRICT: CARLSBAD MUNICIPAL
WATER DISTRICT
WATER DISTRICT CARLSBAD MUNICIPAL
WATER DISTRICT
SCHOOL D1S1RICT: CARLSBAD UNIFIED
SCHOOL DISTRICT
SITE PLAN
PROJECT ADDRESS: 1 LEGOLAND DR
CARLSBAD, CA 92008
A.P.N.
SITE ACREAGE:
INNERPARK:
OUTER PARK:
TOTAL:
EXISTING ZONE:
EXISTING LAND USE:
PROPOSED LAND USE:
TOTAL BUILDING COVERAGE:
BUILDING SQUARE FOOTAGE:
THE BEGINNING:
DUPLO VILLAGE·
FUNT OWN:
CASTLE HILL:
IMAGINATION CENTER:
MINILAND:
THE GARDEN:
THE RIDGE:
THE LAGOON:
SERVICE & ADMINISTRATION:
WEST EXPANSION AREA 1:
EAST EXPANSION AREA 3:
211-100-09
55.B ACRES
72.4 ACRES
128.2 ACRES
C-T-Q
THEME PARK
THEME PARK
3.5°/o
21,308 SF
13,731 SF
34,550 SF
19,560 SF
16,917 SF
3,581 SF
4,499 SF
350SF
2,266 SF
53,353 SF
1911 SF
r~........,-,,,,
~~)
EXPANSION AREA 4: 11,895 SF
,-~.C?.R~~~1S-~f~~~'!L-.-~.~~.~-.
! PIRATES: 2,946 SF \ \_.._,,._,_A_._~_.._.,._A_e_-_~_....,,._A_a_o __ ----._/-~-'-·--. .._.,._.__,,._.,_A_A___,_/
(~.c:::_~~,
TOTAL BUILDING AREA \_1~.'.-~!14-~F)
PERCENT LANDSCAPING:
INNERPARK: 54% 29.95 AC.(1,304,674 SF)
OUTER PARK: 46% 33.19 AC.(1,446,075 SF)
TOTAL: 49% 63.15 AC.(2,750,749 SF)
TOTAL PARKING SPACES PER SPA: 5,310 SPACES
GUEST PARKING:
AUTOMOBILES:
HANDICAPPED:
RECREATIONAL VEHICLES:
TOTAL GUEST PARKING:
PARKING EXPANSION & OVERFLOW:
EMPLOYEE PARKING:
BUS PARKING:
TOTAL PARKING SPACES PER SDP:
GUEST PARKING:
AUTOMOBILES:
HANDICAPPED:
RECREATIONAL VEHICLES:
TOTAL GUEST PARKING:
PARKING EXPANSION & OVERFLOW:
EMPLOYEE PARKING:
AUTOMOBILES:
HANDICAPPED:
TOTAL EMPLOYEE PARKING:
BUS PARKING:
AVERAGE DAILY TRAFFIC
GENERATED BY PROJECT:#
YEAR2000:
AUGUST FRIDAY:
3,410 SPACES
45SPACES
45SPACES
3,500 SPACES
1,150 SPACES
6DOSPACES
60SPACES
5,318 SPACES
3,456 SPACES
56 SPACES
45SPACES
3,557 SPACES
1,072 SPACES
615 SPACES
13 SPACES
628SPACES
61 SPACES
6,630 DAILY TRIPS
AUGUST SUNDAY: 10,680 DAILY TRIPS
PROJECT BUILDOUT (YEAR 2010):
AUGUST FRIDAY: 8,180 DAILY TRIPS
AUGUST SUNDAY: 13,330 DAILY TRIPS
EARTHWORK:
CUT: 2,549,300 CY
FILL: 2,001,300 CY
EXPORT: 548,000 CY
(QUANTITIES INCLUDE MASS GRADING FOR
LOTS 18 AND 19 OF CT 94-09 DWG NO 333-2Y)
EARTHWORK EXPORT: 540,000 C.Y. (+-) TO
UNIT 2, R & D LOTS (COMPLETED); 8,000 C.Y. EXPORT
FROM EXPANSION AREAS TO BE OFF SITE
LOCATION TO BE DETERMINED.
# TRAFFIC STUDY FOR THE CARLSBAD LEGO FAMILY PARK
CARLSBAD, CA., APRIL 1994 PREPARED BY KAKU ASSOC.
• LEGOLA ll
CALIFORNIA
1 LEGOLAND Drive, Ca~sbad CA 92008
SITE DEVELOPMENT PLAN AMENDMENT
CITY PROJECT No. SOP 96-14(8)
"··~-.:--~" "'"'""""""" "'.'.:.::·~.'!1'1"'.'r~;:;;.--:~:-= . ~t-2'?· ··_, -:-~t : ~-
''\\re.it ::··1: ..
.. _, . 6 -
I
Prepared by:
The Collaborative West
Landscape Architecture
100 Avenida Miramar
San Clemente, Ca. 92672
949 366 6624
NOTICE
The contents of this document constitute proprietary
infonna1ion of LEGOLAND California LLC and/or other
LEGO entities. Any party receiving this document does
so in confidence and agrees that the informatioo
contained herein shall not be duplicated in whole or in
part, nor disclosed to others without the express prior
written consent of LEGOLAND Galifomia LLC.
Issue No. Description Issue Date
SDP SUBMITTAL 12-19-96
SDP REVISION #1 1-31-97
SOP REVISION #2 3-5-97
SDP SUBSTANTIAL CONFORMANCE 5-15-97
SDP SUBSTANTIAL CONFORMANCE B-27-97
EXPANSION AREA 3 9-16-99
PRELIMINARY CITY REVIEW SUBMITIAL
SDP AMENDMENT FOR EXPANSION AREAS 3-24-00
1 & 3 and BAT FLYER ATTRACTION
SDP SUBSTANTIAL CONFORMANCE S-07-00
REVISIONS TO EXPANSION ARl:A 3-TO REFLECT DETAILED DESIGN
$DP SUBSTANTIAL CONFORMANCE 01-02-03
CONSISTENCY DETERMINATION 1-25-05 TO ADD KNIGHTS TOURNAMENT ATTRACTION
CONSISTENCY DETERMINATION 05-04-05
TO ADD GOLF ATTRACTION
SITE DEVELOPMENT PLAN AMENDMENT 12-09-05
NEW PIRATES CLUSTER & REVISION TO EAST E>CF'ANSIONAREA 3
PARK WIDE
Site Plan
PW 001
Scale as shown
December 09, 2005
Sheet Number
1 of :}lff--5
----
I
I
\
I
/
/'
I
\
I \
\
\
-· -, ,,
I
\
I
I \ 1\
\ \
\
\
\
\
I
I
PIRATES CLUSTER SITE PLAN
C:
FUTURE EXPANSION AREA
I
I '
,0
----
I I I
\
I
EXISTING SERVICE ROAD
,_('
I
-_-:~=:-(
'·--
,,, ,-"J~,
))
-·--~ -==---
-------------. --
\\ I
',
r1--~ ----__
I
11
I 1:~x--:" I -,:
----
-----
I
I
I r·<-' /I
/ /I ;I /i
/ /
I I I / ;I /
/' l i J I
I
ii Jf---1/ // '
EXISTING RESTAURANT
-- ---ll~ --
--+sn-
----------------·
I; /i
EXISTING
RESTROOM
BLDG,
'
EXISTING
ELECTRICAL
SUBSTATION
' I
I
I
I
I
/i ,1 ;,
.'/ i/
I/
!1
'! I,
" /I Ii
··--::-=-:: ________ ----C,/
PC el2
--------
I
Fire Notes:
I I
I
I
I I
I
I I
I
I I
I I
I
I
I
I
· 1. Alf buildings and enclosed accessory sfrudures
shall be protected throughouf by automatic fire
sprinklers, including, but not limited fo restaurants,
retail stores, frosh enclosures, and uffached shade
structures having sc/id roof systems as per fhe
Mast-er Agreement. .,.-----
I
2. Building shall be identified ~n their exteriors in
accordance with Phase No. 1 requirements.
TO CASTLE HILL
7 CLUSTER >
1
" ' I
/! /!
\
''\.
-==...-:--::-_-_r.C:::::--c::~..,-1=------
__ -:::;:;-·:::=---
};,;·;;
:1_r:
/ .1h~11 .•.
; I
/ /
' I
/; i/ 'i
---------~-"-
\\
SCALE 1 "=20'
' -t-•. ,_j
<:-_
• LEGOLA ll
CAL FOR NIA
SITE DEVELOPMENT PLAN AMENDMENT
CITY PROJECT No. SOP 96-14(B)
~--··--»~c.-•••-·,--·-·---,-.-..... ,. .• • .. •,,-.. ••
APPROVED ,,, ,,
1--------,-·----------
NOTICE
The contents of this document constitute proprietary
information of LEGOLAND GalWomia LLC and/or
other LEGO entities_ Any party receiving this
document does so in confidence and agrees that the
information contained herein shall not be duplicated
in whole or in part, nor disclosed to others without
the express prior written consent of LEGOLANO
Galifornla LLC,
Prepared by:
The Collaborative West
Landscape Architecture
100 Avenida Miramar
Sen Clemente, Ca. 92672
949 366 6624
Description
Key PIAn
Date
Pirates Cluster
Site Plan
P -101
Scale as shown
December 9, 2005
Sheet Number
2 ofti.3
GRADING LEGEND
~ ~ ·.· ·· Existing Contour
, 180 Proposed Contour Grading
(102)
~· Existing Spot Elevation
181.6 Proposed Spot Elevation
Direction of Surface Flow (2o/o min)
: VI[ Slopes
--Retaining Wall
DRAINAGE and UTILITIES LEGEND
-ss Existing Sewer Main
-Rw Existing Reclaimed Water Main
-w Existing Potable Water Main
-G Existing Gas Main
-£ Existing Electrical Main
J Existing Main Storm Drain
==""'=EJ,11!:)] w/ Inlet & Stub
Existing Fire Hydrant
{Private system)
New Main Storm Drain Pipe
[!]]] New Catch Basin
O New Storm Drain Clean Out
fol New Curb Inlet
NOTES
1. Main storm drain lines shown only.
Detailed drainage design to be provided
at permit drawing phase. Secondary drain
lines and inlets will connect to main storm
drain lines shown here.
2. Grading Quantities:
Cut: 19,928 cu. yd.
Fill: 0
Net: 19,928 cu. yd. cut
Excess spoils will be placed on northern expansion
area #2, or alternatively, exported off site to soil
broker if available.
ABBREVIATIONS
Ex. = Existing
FFE = Finish Floor Elevation
FS = Finish Surface Elevation
FG = Finish Grade Elevation
TC= Top of Curb Elevation
BC = Bottom of Curb Elevation
TW = Top of Wall Elevation
BW = Bottom of Wall Elevation
PAD= Pad Elevation
I
\
I !
/ I
II;
I
I
\
•j
'f
'
I
\
I
I
I
\ I
\
I
I
'
• I I I
r
I
i
I
I \
+ . I
I
I
.(
/
A -~ . + .· . \
.~; . !
...j.. I \
I
!
I
\
~
\
I
\
I
I
I I I
SITE PlAN
BOUNDARY
/C
\ I
,,-r . -~ -·· '! . \
I \
I
I
I
\... _J/ \ /
--~ .~ ' I
-ir~---<
I I I P 1
II r I
ii \·,
I I I ..
I
.•• -it-_ " .
/ .. ·:,,_ . ··,
" i {h /.
,0 r, . I
¥ .
b
:;:c·c--C:-------
11
i \
I \ I .
I \
""·--I \ ; \ i ---·--. I ,' ,, ·l.. _j_
·\
I
\
\ ,I)
\ f . I . I
• EXISTING ~LAZ.a:>
\ / . ---
·1-f
I I . I
\ I \ '
\ / V
,,/" \
.1/r-0-. "'-.-,--,._-___ -_,,,_ ,..,=-
-RIDE ATIRACTION
FUTURE EX~ANSION AREA
PIRATES CLUSTER CONCEPTUAL GRADING, DRAINAGE & UTILITIES PLAN
::=-----
( .
\ I
I \ \' ,.,
EXISTING SERVICE ROAD
I,
I(
I
-.jJ,
>\'
_j
POND EDGE
--fd3.80
(TYi'.)
I
I
EXISTING MIDWAY
r-
.. -_J_r
iL I '
/1 4/ •,
' !
I '
\I I 'i' I
" ----
---- -
. . .. . . .. n· cc:c·. ~:~
I I I I,~
~::..:.. --·
l'ONDEDGE
165.89
--~ 1.:=:-0-----
·.
i' '' I I
• I
//~
.. II
SITE PLAN
SCALE 1 "=20'
ii
·l'-1
'
I
I
(>.
""'\ \; \
;,1 \
\I
\I \I ,, • -':
,,;< ,, ,,
// /i ./ ,/i
I
J----1,
/
ll
CALIFORNIA
SITE DEVELOPMENT PLAN AMENDMENT
CITY PROJECT No. SDP 96-14(6)
,--------··-····-----~---------,
A.PPROV:ED
;; .. ' -
THlS rs THE 1IYFF.OVED"TFNfATIVE MAP/SITE
-------·--------------.. ;,
NOTICE
The contents of this document constitute proprietary
infom,ation of LEGOLAND California LLC and/or
other LEGO entities. Any party receiving this
document does so in confidence and agrees that the
information contained herein shall not be duplicated
in whole or in part, nor disclosed to others without
the express prior written consent of LEGOLAND
California LLC.
I L:_ __ _
Prepared Dy:
The Collaborative West
Landscape Architecture
100 Avenida Miramar
San Clemente, Ca. 92672
949 366 6624
Description
Key Plan
Date
Pirates Cluster
Conceptual Grading,
Drainage & Utilities Plan
P -103
Scale as shown
December 9, 2005
Sheet Number
-3•ot~5
r
/
'(\<?.
12
1,\0~
00
04
b2
lbO
---
' I I
I
(
. '
, ,.
C
'
' I
I
?-;· ~::·:-:-:1~-~-~----------
EXISTING
AQUA ZONE
ATTRACTION
---
EAST EXPANSION AREA 3 -SITE PLAN
PROP ED
BU)G_' '
RTOSH eTE3-105.
-\f_i'l --
--lf;I ----
0 , ,
.. / ..
ff 169.60
PMJ 169. JO
\ \
\ \ \
I'
I
I.
\
'
I I
\ \ I
LANDSCAPE;
RIDE CO RSE
QUEUE
FF 169.50
PAD I 69.00
,._ .. '
----____ : -'!~---------...... --------... ~-'
-rw._114.aa_ -=-
-~ -\ "' ' I
\ \
L.--'r---i\ __ ,,...__
./) -, , ~-~-
\ ~,,,yA~
RIDE COU~SE + . -v '\
(( : EXISTING ~
''\ 1 ELECTRICAL
'\' SUBSTATION
LANDSCAP~+ \'-~ ~'o':, ~ ·,~+ +/".f 0'?-'J) ,v ~ .... ~ ' ~~
~~;;;;;:;;;;;;:: LEGO MODEL
~;;;;LSOCATION
---_,(_'--
• •
!
! !
' /
\
Fire Notes:
J. All buildings and enclosed accesso,y slrucfvres
sho.1/ be pro~ected throughotJt by automatic fire
sprinklers, incrlJding, but not limited to restatirants,
retail stores, trash erclosures, and oftached shade
structu~s having solid roof systems as per the
Master Agreement.
2. Building shal! be Kientlfied on their exterJO."S in
accordance with Plrose ,l\fo. J requirements.
\
' /
/ / /
\ \ '.
'
I I '
' ; I
/ ; '/
!
• I
I / ; /
' / ,-'
/ '//,' //
! !
,' ,' i I
• !
I / ' ' / ; ,
' i , I I ,
, i // /
/ / / / /
• ! ' / /
! !
i ' ' I
! • ..
!
-!
'/ / \J J'
' ' ,' /
-!
'/
1
SITE PLAN
SCALE 1 '=20'
' '
ll
CALIFORNIA
SITE DEVELOPMENT PLAN AMENDMENT
CITY PROJECT No. SOP 96-14(8)
r--· · APJ'~()V'ED···
'
TfUS 11, THE il!'PRCiVJ!D !EN'T'A 1'1Vf. MAP/SITE
PLAN Pi R co,mn w .'/ NO. __ !Q ___ OF PLANNING
C:0~-1 ·.~,JC•t•, RfSOLlJTlON NO. ____ (pg -:z.4
I~ -./ •. • -,~~ ~-i!:,d.,. %,qti, l f,,ngin (v[Jh ,Je:.:1 --1.,:!i"(:" rcn:g l)ept.-{Jijl'}
t.---·""··---.. ·-·· .. --·-······-.. ·-·-----------~--'
NOTICE
The contents of this document constitute proprietary
information of LEGOLAND California LLC and/or
other LEGO entities. Any party receiving this
document does so in confidence and agrees that the
information contained herein shall not be duplicated
in whole or in part, nor disclosed to others without
the express prior written consent of LEGOLANO
California LLC.
Prepared by:
The Collaborative West
Landscape Architecture
100 Avenida Miramar
San Clemente, Ca. 92672
949 366 6624
Description
Key Ptan
Date
East Expansion Area 3
Site Plan
E3 -101
Scale as shown
December 9, 2005
Sheet Number
4 W of '65
GRADING LEGEND
Existing Contour
......._ 180 -Proposed Contour Grading
•-Existing Spot Elevation
1B1.6 Proposed Spot Elevation
Direction of Surface Flow (2% min)
rr Slopes
=== 4" -6" high cone. curb
-=-=-=-• Retaining Wall
DRAINAGE and lfTILITIES LEGEND
-ss Existing Sewer Main
-RW--Existing Reclaimed Water Main
-v----Existing Potable Water Main
-G Existing Gl!!s Main
r Existing Electrical Main
Existing Main Storm Drain
'--•~~-'iii w/ Inlet & Stub
Existing Fire Hydrant
(Private system)
New Main Storm Drain Pipe
11]] New Catch Basin
O New Storm Drain Clean Out
JQL New Curb Inlet
NOTES
1 _ Main storm drain lines shown only.
Detailed drainage design to be provided
at permit drawing phase. Secondary drain
lines and inlets will connect to main storm
drain lines shown here.
2. Grading Quantities:
Cut: 1,537 cu. yd.
Fill: 83 cu. yd.
Net: 1,454 cu. yd. cut
Existing site was mass graded
during original park construction.
Any excess spoils resulting from fine grading will be
disposed of off site to soil broker, or placed on site at
northern expansion area #2.
ABBREVIATIONS
Ex. = Existing
FFE = Finish Floor Elevation
FS = Finish Surface Elevation
FG = Finish Grade Elevation
TC = Top of Curb Elevation
BC = Bottom of Curb Elevation
TW = Top of Wall Elevation
BW = Bottom of Wall Elevation
PAD= Pad Elevation
0 s. " '
----
I
EXISTING
AQUA ZONE
ATTRACTION
/,' ----e-,., ·-----
0 ---~ --
' \ 1 • I '
l I, I I I . •
1-i_
'./ I
EAST EXPANSION AREA 3 · CONCEPTUAL GRADING, DRAINAGE & UTILITIES PLAN
•
•
1\ \, ~
\\
\I
\I
1,
~I-
t t I I
I I
I
I
I
I
I
I I
I
I '.
I I
ti . '
'
' ..•
I.\ \
I
' ~
. ·.\ \·. \
\ '·.\ ' .
' '
. ' ' . .
i / /
/ / '
' . !,
' '
/ I
; '
/ / I
' / '
' / /
/', I /
I I ! / ,
/ / ' / /
( ' ' / , l//,!/,1,'
,1 i;,Jli . . .
'•////';/·, • •
'/ /
f I I / / . ' .. . . '
'/ / (
"\ \ ' '
: I :
....,, / ' ' I I
/ i '/
/ /
//
-J
II
SITE PLAN
SCALE 1 "=20'
-
-
-
-
ll
C.ALIFORNIA
SITE DEVELOPMENT PLAN AMENDMENT
CITY PROJECT No. SDP 96-14(9)
AlPPR()VED
~----··-----.. -·-·-------
NOTICE
The contents of this document constitute proprietary
information of LEGOLAND California LLC and/or
other LEGO entities. Any party receiving this
document does so in confidence and agrees that the
information contained herein shall not be duplicated
in whole or in part, nor disclosed to others without
the express prior w!itten consent of LEGOLAND
California LLC.
F'repared by:
The Collaborative West
Landscape Architecture
100 Avenida Miramar
San Clemente, Ca. 92672
949 366 BB24
Description
Key Plan
Date
East Expansion Area 3
Conceptual Grading,
Drainage & Utilities
E3 -103
Scale as shown
December 9, 2005
Sheet Number 5•ot•o