Loading...
HomeMy WebLinkAbout1968-05-07; City Council; Resolution 1517l~ 28 1 IG, i l%r 1 I 20 I 1 ~ 21 ' 22 23 24 25 26 27 28 29 30 31 32 tentative map of CARLSBAD INDUSTRIAL PARK SUBDIVISION be approved; and WHEREAS, the City Council of the City of Carlsbad on the 7th day of May, 1968, considered the recommendation of the Planning Commi ssi on ; NOW, THEREFORE, BE IT RESOLV City Of the 3.41 15 tive map of CARLSBAD INDUSTRIAL PARK SUBDIVIS following requirements and conditions being p , subject to the Ormed by the upplied by the Carlsbad City Water Department. 2. All buildings constructed in this subd ision be ewered by the Carlsbad Public Sewer Syst 3. Sewer and water lines shall not aid in the same trench rt of this subdivision. Proper drainage shall be lltained throughout the sub- livision so as to prevent ponding and/or storage of surface water. One (1) G. B. - 92 - WB Hydrant shall be at the following 5. 1 ocati ons : (a) El Camino Real and "A" Streets. (b) "A" and Enterprise Streets. (c) (d) (e) (f) Lot line of Lots #13 and 814. "A" Street and Macario Road. Lot line of Lots #20 and #21. Lot line of Lots #18 and #19. I II 21 -.. 4 I 31 5i 4 0 0 (9) (h) El Camino Real and Macario Road. (i) Lot line of Lots #9 and #lo. (j) Lot line of Lots #11 and #12. 6. Macario Road and Enterprise Street. In the event tha access is provided to the lots adjacent 9 fU 12 93 (b) Located Lots #a and #8* (c) Located at the lot line of Lots #34 and #35. Rights of way shall be as shown on tentative map with 1 istreet names approved before filin 8. All distribution utility of the final map* l4Iof 15i the subdivision shall be placed und Ordinance. 21/indicated upon the tentative map shall be subject to revisions as 23/ 24j 25 26 imply acceptance as submitted. 12. Street widths as shown are satisfactory. 13. Specifications of the City of Carlsbad. All improvements shall comply with the Standard Plans and II 0 0 . .% *. /li I' I in streets* gutters shall be locate for s shall conform to City and requirements. 1k no less than five feet ( idth be 5 located contiguous to the curb along El Camin Only* No side- 6; j/ walks shall be required within th \I 17. All required street name signs, barricades and safety II 8 1 devices shall be installed. 91 I 18. 10 be satisfactory. II. streets to points of c ry* Adequate 3-21 inlets and conduits will be 3.3' waters from points of street concentration through 3-4! existing natural drainage channels with erosion protection beyond 15i as needed. l-6 j 11/ services to each lot shal 18:, Mater services and sprinkler systems to service eac Surface drainage of storm waters in El Camino Real shall I Surface drainage of storm waters in all other rated drainage asements to 19. Water mains, including one inch (l"] diameter minimum ted as required by the City* 1 3-91 I p1 area shall be required. shall I 221 23 conform to County each lot shall be constr sewer system will have to be constructed in El Camino Real. ted as required by the City* An offsite of San Diego plans for thi I ~ required by tY standards 22. Alignment, location and grade Of improvements subject to approval of the City Engineer. fications shall be submitted as required before const of rights of Complete plans and speci- checking and ction of any improvement is aY and the alignment and grade of El Camin0 Real im- Ommenced* The dedication S 25 26 27 28 29 I 30 I