Loading...
HomeMy WebLinkAbout1979-03-06; City Council; Resolution 57011 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 A RESOLUT RESOLUTION NO. 5701 ON OF THE CITY COUNCIL OF THE CITY OF CARLSBAD, CALIFORNIA, ESTABLISHING CHARGES FOR INSTALLATION OF SEWER LATERALS WHEREAS, present charges for the installation of sewer laterals are based upon a schedule which was adopted by the City Council in June of 1971; and WHEREAS, costs of labor and materials have risen substantially since 1971; NOW, THEREFORE, BE IT RESOLVED that the attached schedule, titled "Sewer Lateral Charge Summary," shall hereafter be used as the basis for such charges by the City of Carlsbad. PASSED, APPROVED AND ADOPTED by the City Council of the City of Carlsbad at a regular meet lowing vote, to w AYES : NOES : AEIS ENT : , 1979, by the fol- ng held the 6th day of March t: Councilmen Packard, Skotnicki, Anear, Lewis and None Councilwoman Casler None RONALD C. PACKARD, MAYOR ATTEST : &L 4 ALETHA L. RAUTENKRANZ, CITY CLERK (SEAL) Attachment to Res. #5701 SEWER LATERAL CHARGE SUMMARY A. FOUR-INCH (4") VITRIFIED CLAY PIPE SEWER (PLASTISOL JOINT): 1. 2. Unsurfaced street with a maximum depth of ten feet (10') at main and maximum horizontal run of thirty feet (30') -- $460.00. $7.00 per foot over and above ten feet (10') deep at the main for unsurfaced street. 3. $11.75 per foot over and above thirty feet (30') in horizontal length for unsurfaced street. 4. In computing the installation charge for a surfaced street, add thirty-five percent (35%) for resurfacing to the total charge. B. SIX-INCH (6") VITRIFIED CLAY PIPE SEWER (PLASTISOL JOINT): 1. Unsurfaced street with a maximum depth of ten feet (10') at main and maximum horizontal run of thirty feet (30') -- $540.00. 2. $7.00 per foot over and above ten feet (10') deep at the main for unsurfaced street. 3. $1 1.75 per foot over and above thirty feet (30') in horizontal length for unsurfaced street. 4. In computing the installation charge for a surfaced street, add thirty-five percent (35%) for resurfacing to the total charge. -. C. ALL OTHER 1. Applicant will pay the actual total cost of the installation in- cluding an assessment for administration overhead which shall be set at fifteen percent (15%) of cost as per current practices. D. CHARGE TO PLUG EXISTING LATERAL -- $250.00 March, 1979