RESOLUTION NO. 2004-184
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
CARLSBAD, CALIFORNIA, APPROVING PLANS AND
SPECIFICATIONS AND AUTHORIZING THE CITY CLERK TO ADVERTISE FOR BIDS FOR THE CONSTRUCTION OF THE INDUSTRIAL PARK PIPELINES, FOR THE ENCINA BASIN
WATER RECLAMATION PROGRAM, PHASE II PROJECT,
AND TRANSFER FUNDS.
PROJECT NOS. 3887-C, 3667, AND 3930 AND TO APPROPRIATE
WHEREAS, the City Council of the City of Carlsbad, California, has determined it
necessary, desirable, and in the public interest to construct the Industrial Park pipelines for the
Encina Basin Water Reclamation Program, Phase II Project, Project Nos. 3887-C, 3667, and
3930; and
WHEREAS, the Project also includes a pavement overlay component on the following
streets: Faraday Avenue, Rutherford Road, Aston Avenue, Farnsworth Court, Balfour Court,
Pascal Court, Priestly Drive, La Place Court, Geiger Court, Landau Court, Pasteur Court,
Darwin Court, and Camino Vida Roble; and
WHEREAS, the Project also includes a fiber optic conduit component along Faraday
Avenue between the City’s Faraday Building, Farmer’s Building and the Safety Center; and
WHEREAS, the plans and specifications for furnishing of all labor, materials, tools,
equipment, transportation, and other expenses necessary or incidental to said project have been
prepared and are on file in the Engineering Department of the City of Carlsbad and are
incorporated by reference herein; and
WHEREAS, the pavement overlay component of the project is estimated to cost
$1,705,100 and sufficient TransNet Local funds are allocated and will be appropriated with the
2003-04 Capital Improvement Program; and
WHEREAS, the fiber optic conduit component of the project is estimated to cost $93,600
and an appropriation from the General Capital Construction Fund is required to complete this
portion of the overall project.
Ill
Ill
Ill
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Carlsbad,
California, as follows:
1.
2.
That the above recitations are true and correct.
That the plans, specifications, and contract documents on file in the City Engineer’s
office, as described above for the Industrial Park Pipeline, for the Encina Basin Water
Reclamation Program, Phase II Project Nos. 3887-C, 3667, and 3930 are hereby approved.
3. The District Secretary of the Carlsbad Municipal Water District is hereby authorized
and directed to publish, in accordance with State law, a Notice to Contractors Inviting Bids for the
construction of the Industrial Park Pipelines, for the Encina Basin Water Reclamation Program,
Phase II Project, Project Nos. 38874, 3667, and 3930 in accordance with the plans,
specifications, and contract documents referred to herein.
4. That the Finance Director is authorized to appropriate $93,600 from the General
Capital Construction Fund for the fiber optic conduit portion of the project.
PASSED, APPROVED AND ADOPTED at a regular meeting of the Carlsbad City Council
held on the 8th day of June ,2004 by the following vote, to wit:
, Kulchin, Hall and Packard
ATTEST:
Resolution No. 2004-184
Page Two
(SEAL)
7