Loading...
HomeMy WebLinkAbout2009-11-03; City Council; Resolution 2009-2771 2 3 4 5 10 11 14 15 16 17 18 19 20 21 22 23 24 25 26 RESOLUTION NO. 2009-277 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CARLSBAD, CALIFORNIA, AMENDING THE CITY OF CARLSBAD CAPITAL IMPROVEMENT PROGRAM TO INCLUDE THE EL CAMINO REAL AND COLLEGE BOULEVARD INTERSECTION IMPROVEMENT PROJECT. WHEREAS, the intersection of El Camino Real and College Boulevard will require improvements to provide a left-turn lane, three through lanes, a bicycle lane and a dedicated right- turn lane along southbound El Camino Real to accommodate projected traffic volumes resulting from future development; and WHEREAS, based on a preliminary project design layout the El Camino Real and College Boulevard improvements are estimated to cost $515,000. NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Carlsbad, California, as follows: 1. That the above recitations are true and correct. 2. That it is necessary and in the public interest to amend the City of Carlsbad Capital Improvement Program to include the El Camino Real and College Boulevard Intersection Project. 3. That the Council DETERMINES that AMENDING THE CITY OF CARLSBAD CAPITAL IMPROVEMENT PROGRAM TO INCLUDE THE EL CAMINO REAL AND COLLEGE BOULEVARD INTERSECTION IMPROVEMENT PROJECT is consistent with the General Plan based on the following findings: Findings: a. This project is consistent with Circulation Element, Streets and Traffic Control, Goal A.2, A City with an adequate circulation infrastructure to serve the projected population; Goal A.4, A City with properly maintained, smooth functioning and safe traffic control systems; Objective B.1, to provide an adequate circulation infrastructure concurrent with or prior to the actual demand for such facilities; and Objective B.2, which requires streets to be designed for safe and efficient movement of people, goods and services within the city. b. The project is consistent with the goals, objectives, and policies of the City's General Plan in that the project requires and ensures the provision of adequate 2' circulation infrastructure concurrent with or prior to need. 1 c. The project is consistent with the Circulation Element of the General Plan in that the project implements the goal requiring that the circulation infrastructure be 2 adequate to serve the projected population of the City. 3 d. As required by the General Plan, the proposed improvement is consistent with the City's Growth Management Plan in that the project ensures that the 4 necessary improvements are provided for circulation streets in accordance with the performance standards contained in the City's Growth Management 5 regulations. 6 e. That the projects will not be implemented until all required CEQA actions have been completed. 7 4. That the City of Carlsbad Capital Improvement Program is amended to include 8 the El Camino Real and College Boulevard Intersection Improvement Project with a total unfunded 9 budget of $515,000. 10 5. That the Finance Director is hereby authorized to appropriate funds that are received from developers for the purpose of implementing the El Camino Real and College Boulevard Intersection Improvement Project. 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 PASSED, APPROVED AND ADOPTED at a Regular Meeting of the City Council of the City of Carlsbad on the 3rd day of November. 2009, by the following vote to wit: AYES: Lewis, Kulchin, Hall, Packard, and Blackburn. NOES: None. ABSENT: None. ATTEST: I\S, Mayor