HomeMy WebLinkAbout2011-06-21; City Council; Resolution 2011-146EXHIBITS 1 RESOLUTION NO. 2011-146 2 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF 3 CARLSBAD, CALIFORNIA, DETERMINING THAT THE FY 2011- 2012 CAPITAL IMPROVEMENT PROGRAM BUDGET IS 4 CONSISTENT WITH THE GENERAL PLAN ON PROPERTY GENERALLY LOCATED CITYWIDE. 5 6 WHEREAS, the City Council of the City of Carlsbad, California has reviewed the 7 Capital Improvement Program for FY 2011-12 and has held such public hearings as are 8 necessary prior to adoption of the Capital Improvement Program Budget; and 9 WHEREAS, on June 21, 2011 the City Council made a finding of General Plan 10 Consistency for all projects receiving an allocation of funds for FY 2011-12 pursuant to Carlsbad Municipal Code Section 2.24.065 (b); and 12 WHEREAS, at said hearing, upon hearing and considering all testimony and arguments, if any, of all persons desiring to be heard, said Council considered all factors relating to the City Council Determination; and 15 NOW, THEREFORE, BE IT HEREBY RESOLVED by the City Council as follows: A) That the foregoing recitations are true and correct. B) That based on the evidence presented at the hearing, the City Council determines that the Capital Improvement Program for FY 2011-12 is consistent with the General Plan based on the following findings: 19 .-. ,Findings: 1. The projects are consistent with the goals, objectives, and policies of the city's General Plan in that the projects are required to ensure the provision of adequate public facilities and services concurrent with or prior to need. 22 2. The projects are consistent with applicable goals, objectives, and policies of the Land Use, 23 Circulation, and Open Space and Conservation Elements of the General Plan, as described in Exhibit "A." 24 3. As required by the General Plan, the proposed improvements are consistent with the city's 25 Growth Management Plan in that the projects ensure that the necessary improvements are provided for drainage, sewer, water distribution, traffic signals, and street projects in accordance 26 with the performance standards contained in the city's Growth Management regulations. 27 28 1 2 3 4 5 6 7 8 9 10 11 12 13 14 16 17 18 19 20 21 22 23 24 25 26 27 28 PASSED, APPROVED AND ADOPTED at a Joint Special Meeting of the Carlsbad City Council, Carlsbad Municipal Water District Board of Directors, Carlsbad Housing and Redevelopment Commission held on the 21st day of June 2011, by the following vote to wit: AYES: Council Members Hall, Kulchin, Blackburn, Douglas, Packard. NOES: None. ABSENT: None. MATT HALL, Mayor ATTEST: ^LORRANNE M. WOOD, City Clerk (SEAL) Exhibit "A" FY 2011-2012 CAPITAL IMPROVEMENT PROGRAM PROJECT DESCRIPTIONS, GENERAL PLAN CONSISTENCY, AND ANTICIPATED ENVIRONMENTAL REVIEW CAPITAL PROJECT DESCRIPTION CARLSBAD VILLAGE DRIVE GUARD RAIL REPLACEMENT PROJECT NAME PROJECT NO. PROJECT LOCATION MAP:PROJECT LOCATION: Carlsbad Village Drive between Pontiac Drive and Victoria Avenue. PROJECT DESCRIPTION: Replace 1,225 feet of guard rail, posts, blocks and hardware along west bound Carlsbad Village Drive. PROJECT NEED: Replace 1,225 feet of guard rail, posts, blocks and hardware along west bound Carlsbad Village Drive. FINANCING: Purpose Design Construction Total Cost = Estimated Cost $ 5,000 $ 75,000 $ 80,000 Funding Source Gas Tax Gas Tax GENERAL PLAN CONSISTENCY: To design streets for the safe and efficient movement of people, goods and services within and through the City in the most environmentally sound and aesthetically pleasing manner possible. Circulation Element, Streets & Traffic Control, Objective B.2. ANTICIPATED ENVIRONMENTAL REVIEW: The project is exempt from environmental review per CEQA Guidelines Section 15301 (b) - Repair and maintenance of existing facilities. Carlsbad Village Drive guard rail replacement.docx CAPITAL PROJECT DESCRIPTION REPLACE PUMPS AT BATIQUITOS LIFT STATION PROJECT NAME PROJECT NO. PROJECT LOCATION MAP: PUMPS AT BATIQUITOS LIFT STATION PROJECT LOCATION: Batiquitos Sewer Lift Station at 7382 Gabbiano Lane. PROJECT DESCRIPTION: Replace the three pumps with new, more efficient pumps. PROJECT NEED: Useful life has been met on all three pumps. Replace pumps using a new pumping strategy to reduce overall station maintenance costs and increase reliability. FINANCING: Purpose Construction Total Cost = Estimated Cost $ 250,000 $ 250,000 Funding Source Sewer Replacement GENERAL PLAN CONSISTENCY: A City which maintains a system of public facilities adequate for the projected population. Land Use Element, Growth Management and Public Facilities, Goal, A.2. ANTICIPATED ENVIRONMENTAL REVIEW: The project is exempt from environmental review per CEQA Guidelines Section 15301 (b) - Repair and maintenance of existing facilities. CP REPLACE PUMPS AT BATIQUITOS LIFT STATION.docx CAPITAL PROJECT DESCRIPTION SEWER RELOCATION AT SUMMERWIND PLACE PROJECT NAME PROJECT NO. PROJECT LOCATION MAP: SEWER RELOCATION AT SUMMERWIND PLACE Sewer Relocation at Summerwind Place.docx PROJECT LOCATION: From the end of Summerwind Place to the North Agua Hedionda Interceptor Sewer (NAHI) which runs along the north side of Agua Hedionda Creek. PROJECT DESCRIPTION: Construct approximately 1,150 feet of new 8-inch diameter sewer main. The alignment is across property owned by individual property owners and the subdivision HOA. PROJECT NEED: The existing 8-inch sewer in Summerwind Place collects residential sewage from approximately 35 single-family homes and connects to the NAHI sewer. The connection point is at a manhole surrounded by wetland habitat and is not easily accessible for maintenance. Solids tend to settle out in the upper reach of the NAHI because of minimal sewage flow which can lead to an eventual stoppage and spill if not frequently cleaned. FINANCING: Purpose Environmental Property Design Construction Total Cost = Estimated Cost $ 15,000 $ 8,000 $ 47,000 $510,000 $ 580,000 Funding Source Sewer Replacement Sewer Replacement Sewer Replacement Sewer Replacement GENERAL PLAN CONSISTENCY: A City which maintains a system of public facilities adequate for the projected population. Land Use Element, Growth Management and Public Facilities, Goal,A.2. ANTICIPATED ENVIRONMENTAL REVIEW: Potential Mitigated Negative Declaration. CAPITAL PROJECT DESCRIPTION TRAFFIC SIGNAL PROGRAM PROJECT NAME PROJECT NO. PROJECT LOCATION MAP:PROJECT LOCATION: Throughout the city. PROJECT DESCRIPTION: Upgrade traffic signal equipment and create a traffic signal communications network to manage the traffic signals. PROJECT NEED: Improve traffic flow in the city. FINANCING: Estimated CostPurpose Equipment Construction Total Cost = $4,100,000 $ 1,510,000 $5,610,000 Funding Source GCC/IRF GCC/IRF GENERAL PLAN CONSISTENCY: A City with properly maintained, smooth functioning and safe traffic control systems. Circulation Element, Streets & Traffic Control, Goal A.4. ANTICIPATED ENVIRONMENTAL REVIEW: The project is exempt per CEQA Guidelines Section15301 - Repair and Maintenance of existing facilities. rv/A Traffic Signal Program. docx CAPITAL PROJECT DESCRIPTION SIMSBURY SEWER EXTENSION PROJEECT NAME PROJECT NO. PROJECT LOCATION MAP: SIMSBURY SEWER EXTENSION PROJECT LOCATION: From the Simsbury Lift Station along Simsbury Court to the future Quarry Creek Development and the Vista/Carlsbad sewer pipeline which runs along the SR-78 alignment. PROJECT DESCRIPTION: Construct a gravity flow sewer pipeline and remove the Simsbury Lift Station PROJECT NEED: The Simsbury Sewer extension project (Reach VCT-1C) allows for the removal of Simsbury Lift Station with the construction of a gravity pipeline connection to the future Quarry Creek Development. FINANCING: Purpose Environmental Design Construction Total Cost = Estimated Cost $ 20,000 $ 78,000 $ 630,000 $ 728,000 Funding Source Sewer Benefit "A" Sewer Benefit "A" Sewer Benefit "A" GENERAL PLAN CONSISTENCY: A City which maintains a system of public facilities adequate for the projected population. Land Use Element, Growth Management and Public Facilities, Goal, A.2. ANTICIPATED ENVIRONMENTAL REVIEW: Potential Mitigated Negative Declaration. Simsbury Sewer Extension.docx CAPITAL PROJECT DESCRIPTION SEWER COLLECTION SYSTEM - TAMARACK (5) RR R-O-W SEWER RELOCATION PROJECT NAME PROJECT NO. PROJECT LOCATION MAP: TAMARACK @ RR R-O-W H SEWER RELOCATION PROJECT LOCATION: Tamarack Avenue on the east side of the railroad tracks. PROJECT DESCRIPTION: Replace approximately 200 lineal feet of the gravity sewer pipeline which crosses under the railroad tracks at Tamarack Avenue. The project includes the abandonment of that deteriorated portion and the construction of a replacement pipeline alignment. The alignment of the PVC 10-inch diameter pipeline will be modified and will no longer cross under the railroad tracks, but instead will connect directly to the Vista/Carlsbad Interceptor Sewer on the east side of the railroad tracks. PROJECT NEED: City staff discovered the deteriorated 10-inch diameter section of vitrified clay and iron pipeline during routine CCTV inspection. The cast iron pipeline portion is corroded and there are offsets in the joints of the VCP portion. FINANCING: Purpose Design Construction Total Cost = Estimated Cost $ 16,000 $ 236,000 $252,000 Funding Source Sewer Replacement Sewer Replacement GENERAL PLAN CONSISTENCY: A City which maintains a system of public facilities adequate for the projected population. Land Use Element, Growth Management and Public Facilities, Goal, A.2. ANTICIPATED ENVIRONMENTAL REVIEW: The project is exempt from environmental review per CEQA Guidelines Section 15301(b) - repair and maintenance of existing facilities involving negligible or no expansion and 15304(f) - minor trenching and backfilling. SEWER -TAMARACK @ RR R-O-W SEWER RELOCATION O CAPITAL PROJECT DESCRIPTION GATESHEAD SEWER LIFT STATION REMOVAL PROJECT NAME PROJECT NO. PROJECT LOCATION MAP: GATESHEAD SEWER LIFT STATION REMOVAL PROJECT LOCATION: 4779 Gateshead Road. PROJECT DESCRIPTION: Remove the existing Gateshead sewer lift station and extend sewer pipeline to connect to a gravity sewer line. PROJECT NEED: Construction of the final phase of the Robertson Ranch Development will provide an adjacent gravity flow sewer system that the Gateshead sewer lift station collection basin can connect to. The lift station will no longer be necessary to provide sewer service to that collection area. FINANCING: Purpose Design Construction Total Cost = Estimated Cost $ 3,240 $ 69,984 $ 73,224 Funding Source Sewer Replacement Sewer Replacement GENERAL PLAN CONSISTENCY: Manage the disposal or recycling of solid waste and sewage within the City. Land Use, Growth Management and Public Facilities, Implementing Policies and Action Programs C.10. ANTICIPATED ENVIRONMENTAL REVIEW: The project is exempt from environmental review per CEQA Guidelines Section 15301(l)(4)- Demolition and removal of small accessory structures. —*-^, Gateshead Sewer Lift Station Removal.docx CAPITAL PROJECT DESCRIPTION VANCOUVER SEWER EXTENSION PROJECT NAME PROJECT NO. PROJECT LOCATION MAP:PROJECT LOCATION: From the Vancouver Sewer Lift Station along Vancouver Street southwesterly to an existing sewer line in Via Topacio. PROJECT DESCRIPTION: Construct a gravity flow sewer pipeline and remove Vancouver Sewer Lift Station. PROJECT NEED: Existing downstream sewer infrastructure provides the opportunity to abandon the Vancouver Sewer Lift Station with the construction of a gravity flow pipeline. FINANCING: Purpose Environmental Design Property Acq. Construction Total Cost = Estimated Cost $ 39,902 $ 63,844 $ 5,000 $861,892 $ 970,638 Funding Source Sewer Replacement Sewer Replacement Sewer Replacement Sewer Replacement GENERAL PLAN CONSISTENCY: A City which maintains a system of public facilities adequate for the projected population. Land Use Element, Growth Management and Public Facilities, Goal, A.2. ANTICIPATED ENVIRONMENTAL REVIEW: Potential Mitigated Negative Declaration. Vancouver Sewer Extension.docx CAPITAL PROJECT DESCRIPTION BUENA INTERCEPTOR REHABILITATION AT ENCINA PROJECT NAME PROJECT NO. PROJECT LOCATION MAP: BUENA INTERCEPTOR REHABILITATION AT ENCINA PROJECT LOCATION: Approximately 300 feet of 30-inch diameter RCP sewer located at the Encina Water Pollution Control Facility between 1-5 and the Encina Influent Structure. PROJECT DESCRIPTION: Rehabilitate approximately 300 feet of the 30-inch diameter Buena Interceptor Sewer that is located on the Encina Water Pollution Control Facility site. The existing lining material on the pipe interior has failed and needs to be replaced to protect the pipe from further corrosion. PROJECT NEED: The existing lining on the pipe interior has failed and is in need of rehabilitation. The City of Vista is the majority owner of this pipe and will be the lead agency for the repair. Carlsbad's share is approximately 35% of the total project cost. FINANCING: Purpose Construction Total Cost = *Carlsbad share. Estimated Cost $100,000 $100,000* Funding Source Sewer Replacement GENERAL PLAN CONSISTENCY: A City which maintains a system of public facilities adequate for the projected population. Land Use Element, Growth Management & Public Facilities, Goal A.2. ANTICIPATED ENVIRONMENTAL REVIEW: The project is exempt from environmental review per CEQA Guidelines Section 15301(b) - Repair and maintenance of existing facilities involving negligible or no expansion. BUENA INTERCEPTOR REHABILITATION AT ENCINA.dOCX CAPITAL PROJECT DESCRIPTION ECR & COLLEGE BOULEVARD INTERSECTION IMPROVEMENT PROJECT NAME PROJECT NO. PROJECT LOCATION MAP: ECR & COLLEGE BOULEVARD INTERSECTION IMPROVEMENT PROJECT LOCATION: ECR & College Boulevard Intersection PROJECT DESCRIPTION: Improve the intersection by widening south bound El Camino Real to provide three through lanes and a dedicated right turn lane to west bound College Boulevard. PROJECT NEED: To improve the capacity of the intersection and to update the roadways to conform to the roadway classification as described in the circulation element. FINANCING: Purpose Environmental Design Property Acq. Construction Total Cost = Estimated Cost $ 16,000 $ 55,000 $ 34,000 $410,000 $515,000 Funding Source Developer/CUSD Developer/CUSD Developer/CUSD Dev/CUSD/Unfunded GENERAL PLAN CONSISTENCY: A City with an adequate circulation infrastructure to serve the project population. Circulation Element, Streets & Traffic Control, Goal A.2. ANTICIPATED ENVIRONMENTAL REVIEW: The project is exempt from environmental review per CEQA Guidelines Section 15301(c) - Minor alteration of existing facilities, including streets, involving negligible or no expansion. ECR and College Blvd Inersection Imp.docx CAPITAL PROJECT DESCRIPTION TRAFFIC SIGNAL - EL FUERTE ST. AND LOKER AVE. PROJECT NAME PROJECT NO. PROJECT LOCATION MAP:PROJECT LOCATION: Intersection of El Fuerte St. and Loker Ave. PROJECT DESCRIPTION: Installation of a four-leg fully-actuated traffic signal including a type 170-ATC Coldfire controller, video detection, battery back-up system, traffic signal interconnected system and appurtenant singing and striping. PROJECT NEED: Due to a number of collisions that have occurred at the intersection staff recommends proceeding with the installation of a traffic signal. The proposed traffic signal will assign the right-of-way for both motorists and pedestrians entering and crossing at this intersection. FINANCING: Purpose Design Construction Total Cost = Estimated Cost $ 8,000 $ 202,000 $210,000 Funding Source Gas Tax Gas Tax GENERAL PLAN CONSISTENCY: Provide traffic control devices along all roadway segments and at intersections. Circulation Element, Streets & Traffic Control, Policy C.7. ANTICIPATED ENVIRONMENTAL REVIEW: The project is exempt from environmental review per CEQA Guidelines Section 15301 - Minor alteration of existing facilities involving negligible or no expansion. El Fuerte and Loker-Traffic Signal.docx \ CAPITAL PROJECT DESCRIPTION NORTH AGUA HEDIONDA INTERCEPTOR SEWER INVERTED SIPHON REHABILITATION PROJECT NO. PROJECT NAME PROJECT LOCATION MAP:PROJECT LOCATION: Inverted siphon under the Bristol Cove channel. PROJECT DESCRIPTION: This project includes an investigative phase to assess the condition of the pipeline as well as a construction phase which would include the anticipated method of the pipeline rehabilitation (e.g. slip lining the pipeline with polymer pipeline.). PROJECT NEED: The existing 3 barrel inverted siphon cast iron pipelines which were constructed in 1965 cross under the Bristol Cove channel on the north shore of the Agua Hedionda Lagoon. The soils under the lagoon are highly corrosive and it is expected that the exterior of the cast iron pipelines have corroded. FINANCING: Purpose Design Construction Total Cost = Estimated Cost $ 15,024 $ 202,954 $217,988 Funding Source Sewer Replacement Sewer Replacement GENERAL PLAN CONSISTENCY: A City which maintains a system of public facilities adequate for the projected population. Land Use Element, Growth Management and Public Facilities, Goal,A.2. ANTICIPATED ENVIRONMENTAL REVIEW: The project is exempt from environmental review per CEQA Guidelines Section 15301(b) - Repair and maintenance of existing facilities involving negligible or no expansion. NAH-INVERTED SIPHON REHABILITATION.docx CAPITAL PROJECT DESCRIPTION OCCIDENTAL SEWER IMPROVEMENTS PROJECT NAME PROJECT NO. PROJECT LOCATION MAP: OCCIDENTAL SEWER IMPROVEMENTS PROJECT LOCATION: Along Avenida Encinas from the Poinsettia Coaster Station to the Encina Water Pollution Control Facility. PROJECT DESCRIPTION: Rehabilitate or replace eight severely deteriorated manholes and replace and or repair multiple cracked and broken sections of 39-inch diameter pipeline. PROJECT NEED: Inspection of the Occidental Sewer has found severely damaged manholes and severely cracked pipe sections in need of repair. The sewer is jointly owned by the City of Carlsbad, Leucadia Wastewater District (LWD) and the City of Encinitas. According to a interagency agreement the City of Carlsbad is the lead agency responsible for maintenance. LWD and the City of Encinitas pay the City of Carlsbad for maintenance and repair costs based upon their ownership percentage which is as follows: Encinitas 19.7%, LWD 40.3%, Carlsbad 40%. FINANCING: Purpose Environmental Design Construction Total Cost = Estimated Cost $ 15,000 $ 27,247 $ 490,432 $ 532,679* Funding Source Sewer Replacement Sewer Replacement Sewer Replacement 'Carlsbad's share is 40% or $213,072 based on the current estimate. GENERAL PLAN CONSISTENCY: A City which maintains a system of public facilities adequate for the projected population. Land Use Element, Growth Management and Public Facilities, Goal,A.2. ANTICIPATED ENVIRONMENTAL REVIEW: Potential Mitigated Negative Declaration. OCCIDENTAL SEWER IMPROVEMENTS.docx CAPITAL PROJECT DESCRIPTION ODOR AND CORROSION PREVENTION ASSESSMENT PROJECT NAME PROJECT NO. PROJECT LOCATION MAP: THROUGHOUT THE SEWER SERVICE AREA PROJECT LOCATION: Various locations within the city where odor complaints are most prevalent typically at sewer manholes and lift stations. PROJECT DESCRIPTION: Investigate the cause of odor complaints, perform air and liquid phase sampling as needed and develop recommendations for long term solutions. Incorporate short term mitigation improvements as appropriate. PROJECT NEED: The odor complaints are most prevalent during the hot weather, however the odors can create health and safety concerns or at a minimum a significant nuisance FINANCING: Purpose Study Total Cost = Estimated Cost $100,000 $ 100,000 Funding Source Sewer Replacement GENERAL PLAN CONSISTENCY: A City which ensures the timely provision of adequate public facilities and services to preserve the quality of life of residents. Land Use Element, Growth Management & Public Facilities, Goal A.1. ANTICIPATED ENVIRONMENTAL REVIEW: The investigative and recommendations phase of the project are exempt from environmental review per CEQA Guidelines Section 15262, Feasibility and Planning Studies. However, short or long term improvements may require additional CEQA review. ODOR AND CORROSION PREVENTION ASSESSMENT.docx OQ CAPITAL PROJECT DESCRIPTION RAISING BURIED STORM DRAIN CLEANOUTS PROJEECT NAME PROJECT NO. PROJECT LOCATION MAP: Raise Buried Storm Drain Cleanouts PROJECT LOCATION: Throughout the city. PROJECT DESCRIPTION: Raise approximately 40 sunken and buried storm drain cleanouts. PROJECT NEED: The condition of the cleanouts is unknown. Raising the cleanouts will improve the ability of staff to contain spill events and perform other maintenance. FINANCING: Purpose Construction Total Cost = Estimated Cost $ 50,000 $ 50,000 Funding Source GCC GENERAL PLAN CONSISTENCY: To control storm water pollutants. Open Space & Conservation Element, Objective, B.1. ANTICIPATED ENVIRONMENTAL REVIEW: Potential Mitigated Negative Declaration. RAISING BURIED CLEANOUTS.docx CAPITAL PROJECT DESCRIPTION REPLACE FLOW METERS AT EIGHT LIFT STATIONS PROJEECT NAME PROJECT NO. PROJECT LOCATION MAP: REPLACE FLOW METERS AT EIGHT LIFT STATIONS REPLACE FLOW METERS AT EIGHT LIFT STATIONS PROJECT LOCATION: The eight sewer lift stations are located at Chinquapin, Fox's, Villas, Poinsettia, Cannon, Simsbury, Knots and Sand Shell. PROJECT DESCRIPTION: Replace flow meters at the above locations with in-line Sparling-Tigermag flow meters. PROJECT NEED: Currently three flow meters are not working and the rest are failing. These old units are not recording accurate flow from the lift station to the SCADA system where the data is used to diagnose inefficiencies. FINANCING: Purpose Construction Total Cost = Estimated Cost $ 100,000 $100,000 Funding Source Sewer Replacement GENERAL PLAN CONSISTENCY: A City which maintains a system of public facilities adequate for the projected population. Land Use Element, Growth Management and Public Facilities, Goal, A.2. ANTICIPATED ENVIRONMENTAL REVIEW: The project is exempt from environmental review per CEQA Guidelines Section 15301(b) - Repair and maintenance of existing facilities. Replace-8-flow-meters.docx CAPITAL PROJECT DESCRIPTION RECYCLED WATER CONNECTION -ALGA ROAD PROJECT NAME PROJECT NO. PROJECT LOCATION MAP: RECYCLED WATER CONNECTION -ALGA ROAD PROJECT LOCATION: Alga Road just east of El Camino Real PROJECT DESCRIPTION: Currently La Costa Golf Course receives recycled water from Poinsettia Lane or from the Gafner treatment plant. Recycled water is put into lakes blended with potable water then pumped into the golf course irrigation system. Construction of a new recycled water connection from Alga Road to the golf course would allow the south course to be irrigated without blending in the lakes and pumping. This connection would also make it possible to serve the entire golf course demands without purchasing recycled water from Leucadia Wastewater District's Gafner treatment plant. PROJECT NEED: La Costa is planning a major golf course remodel including the installation of a new duel irrigation system and in addition the Leucadia Wastewater District recycled water purchase agreement has expired. This additional recycled water connection would increase recycled water sales to the golf course and thereby save potable water use. FINANCING: Purpose Design Construction Total Cost = Estimated Cost $10,000 $ 65,000 $ 75,000 Funding Source Water Replacement Water Replacement GENERAL PLAN CONSISTENCY: A city that conserves natural and man-made resources. Open Space & Conservation Element, Implementing Policies and Action Programs, Goal, A.6. ANTICIPATED ENVIRONMENTAL REVIEW: The project is exempt from environmental review per CEQA Guidelines Section 15302(c) - Replacement or reconstruction of existing facilities involving negligible or no expansion of capacity. Recycled Water Connection-Alga Rd.docx CAPITAL PROJECT DESCRIPTION MAERKLE RESERVOIR FLOATING COVER REPLACEMENT PROJECT NAME PROJECT NO. PROJECT LOCATION MAP:PROJECT LOCATION: Maerkle Reservoir. PROJECT DESCRIPTION: Project will first explore options for replacing the existing cover including the feasibility of adding photocells on the reservoir cover. PROJECT NEED: The existing cover was installed in 1996 and is approaching the end of its 20 year useful life. FINANCING: Purpose Environmental Design Construction Total Cost = Estimated Cost $130,000 $650,000 $9,220,000 $10,000,000 Funding Source Water Replacement Water Replacement Water Replacement GENERAL PLAN CONSISTENCY: A City which maintains a system of public facilities adequate for the projected population. Land Use Element, Growth Management and Public Facilities, Goal, A.2. ANTICIPATED ENVIRONMENTAL REVIEW: Potential Mitigated Negative Declaration. ^•"•fc* VJ\Maerkle Floating Cover Replacement.docx