HomeMy WebLinkAbout2016-06-28; City Council; Resolution 2016-1331 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 RESOLUTION NO. 2016-133 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CARLSBAD, CALIFORNIA, DETERMINING THAT THE FY 2016-2017 CAPITAL IMPROVEMENT PROGRAM BUDGET IS CONSISTENT WITH THE GENERAL PLAN ON PROPERTY GENERALLY LOCATED CITYWIDE. EXHIBIT 8 The City Council of the City of Carlsbad, California, does hereby resolve as follows: WHEREAS, the City Council of the City of Carlsbad, California has reviewed the Capital Improvement Program for FY 2016-17 and has held such public hearings as are necessary prior to adoption of the Capital Improvement Program Budget; and WHEREAS, on June 28, 2016 the City Council REVIEWED FOR CONSISTENCY WITH THE General Plan goals and policies for all Capital projects receiving an allocation of funds for FY 2016-17 pursuant to Carlsbad Municipal Code Section 2.24.065 (b); and WHEREAS, at said hearing, upon hearing and considering all testimony and arguments, if any, of all persons desiring to be heard, said Council considered all factors relating to the City Council Determination. NOW, THEREFORE, BE IT HEREBY RESOLVED by the City Council as follows: A) That the foregoing recitations are true and correct. B) That based on the evidence presented at the hearing, the City Council determines that the Capital Improvement Program for FY 2016-17 is ·consistent with the General Plan based on the following findings: Findings: 1. The projects are consistent with the goals and policies of the city's General Plan in that 25 the projects are required to ensure the provision of adequate public facilities and services 26 concurrent with or prior to need. 27 28 Item No. 15 - AB #22,337 June 28, 2016 Page 115 of 179 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 2. The projects are consistent with applicable goals and implementing policies the Land Use and Community Design, Mobility, Public Safety, Open Space, Conservation, and Recreation, and Sustainability Elements of the General Plan, as described in Exhibit "A." 3. As required by the General Plan, the proposed improvements are consistent with the city's Growth Management Plan in that the projects ensure that the necessary improvements are provided for police and fire facilities, facility maintenance, parks, drainage, transportation, water, sewer and recycled water projects, in accordance with the performance standards contained in the city's Growth Management regulations. Ill Ill Ill Ill Ill Ill Ill Ill Ill Ill Ill Ill Ill Ill -2- 1 PASSED, APPROVED AND ADOPTED at a Joint Special Meeting of the Carlsbad 2 City Council, Carlsbad Municipal Water District Board of Directors, Carlsbad Public Financing 3 Authority Board of Directors, Community Development Commission, and City of Carlsbad as 4 Successor Agency to the Redevelopment Agency, held on the 28th day of June, 2016, by the 5 6 following vote to wit: 7 8 AYES: Hall, Wood, Schumacher, Blackburn, Packard. 9 NOES: None. 10 ABSENT: None. 11 12 13 14 15 16 ATTEST: 17 18 19 20 21 22 23 24 25 26 27 28 Item No. 15 - AB #22,337 June 28, 2016 Page 117 of 179 FY 2016-17 CAPITAL IMPROVEMENT PROGRAM PROJECT DESCRIPTIONS, GENERAL PLAN CONSISTENCY, AND ENVIRONMENTAL REVIEW m X :c c:, =i 00 j;. Item No. 15 - AB #22,337 June 28, 2016 Page 118 of 179 2 OCEAN STREET RESTROOM $ 3 TRAIL CONNECTIVITY TO CARLSBAD STATE BEACH AT TAMARACK 4 $ FACILITY MAINTENANCE 5 CITY FACILITIES ACCESSIBILITY UPGRADES $ 6 HOSP GROVE TOT LOT REFURBISHMENT $ 7 MONROE STREET POOL REPLACEMENT PROJECT STUDY REPORT $ 8 PARKS ELECTRONIC SCOREBOARD REPLACEMENT $ 9 FACILITY SAFm AND PARKING LOT LIGHTING ASSESSMENT $ 10 PINE PARK -SYNTHETIC TURF REPLACEMENT $ DRAINAGE 11 DRAINAGE MASTER PLAN UPDATE $ 12 DMP BAND BN MITIGATION WETLAND CREATION $ 13 HEADWALL REPLACEMENT PROGRAM $ 14 LAGUNA DRIVE STORM DRAIN DESIGN DEVELOPMENT/ENGINEERING $ 15 LAKE CALAVERA STORM DRAIN IMPROVEMENTS $ FY 2016-2017 CAPITAL IMPROVEMENT PROGRAM NEW PROJECTS 652,000 GCC 200 000 GCC GCC 300 000 IRF 848 000 IRF 250 000 IRF 60,100 IRF 65,000 IRF 868,000 IRF 750,000 PLD 955 000 PLD 510 000 IRF 370,000 Gas Tax 236 500 GCC 652,000 200,000 50,000 $ 100,000 $ 100 000 $ 100 000 $ 848 000 $ 250,000 $ 60,100 $ 65,000 $ 868,000 $ 750 000 $ 685 000 $ 270,000 $ 510 000 $ 370 000 $ 236,500 6/15/2016 Item No. 15 - AB #22,337 June 28, 2016 Page 119 of 179 FY 2016-2017 CAPITAL IMPROVEMENT PROGRAM NEW PROJECTS . Total Project . # Proiect Name Cost Funding Source 2016-17 2017-18 2018-19 2019-20 2020-21 2022-2026 2027-2031 TRANSPORTATION 16 ADA BEACH ACCESS STUDY· PINE TO TAMARACK $ 75 000 GCC $ 75 000 17 ADAPTIVE TRAFFIC SIGNAL PROGRAM $ 1 200 000 TransNet Local $ 1,200,000 18 B&TD #3 PROPERTY VALUATION $ 125 000 B &TD #3 $ 125,000 19 BRIDGE PREVENTIVE MAINTENANCE PROGRAM $ 1 500,000 IRF $ 350,000 $ 350,000 $ 300 000 $ 300,000 $200,000 20 CARLSBAD BLVD. PEDESTRIAN LIGHTING -TAMARACK AVENUE TO NORTHERLY CITY LIMITS $ 1,325,000 TransNet Local $ 610,000 $ 715,000 21 CHESTNUT AVENUE FROM 1-5 TO THE RAILROAD COMPLETE STREET PROJECT STUDY REPORT $ 85 000 TransNet Local $ 85,000 22 CHRISTIANSEN IMPROVEMENTS AT CARSLBAD BLVD. $ 310 000 TransNet Local $ 310,000 23 COMPLETE STREETS AND TRAFFIC CALMING IMPROVEMENT PROGRAM $ 1,500,000 Gas Tax $ 300 000 $ 300,000 $ 300 000 $ 300,000 $300,000 24 EL CAMINO REAL WIDENING· SUNNYCREEK TO JACKSPAR $ 3143 500 TransNet Local $3143 500 25 LEFT TURN LANE EXTENSIONS $ 200,000 Gas Tax $ 200,000 26 OCEAN STREET PROJECT STUDY REPORT $ 95,000 GCC $ 95,000 27 ROADWAY IMPROVEMENTS· INVENTORY, ANALYSIS AND IMPLEMENTATION PROG. $ 200 000 GCC $ 200,000 28 ROADWAY SLOPE STABILIZATION PROGRAM $ 450,000 Gas Tax $ 450 000 29 SIGNAL OPERATIONS MODIFICATIONS $ 150 000 Gas Tax $ 150,000 30 STATE STREET IMPROVEMENTS AT GRAND AVENUE $ 325,000 TransNet Local $ 325,000 31 UTILITY UNDERGROUNDING PROGRAM DEVELOPMENT STUDY $ 100,000 GCC $ 100 000 32 VILLAGE & BARRIO PUBLIC GATHERING SPACES $ 345,000 GCC $ 345,000 6/15/2016 Item No. 15 - AB #22,337 June 28, 2016 Page 120 of 179 34 SEWER MASTER PLAN UPDATE WATER 33b INTEGRATED SCADA MASTER PLAN 35 WATER MASTER PLAN UPDATE 36 CARLSBAD BLVD. WATERLINE REPLACEMENT ATTERRAMAR 37 MOTOR OPERATED VALVE INSTALLATION -700 PRESSSURE ZONE 38 WATER INFRASTRUCTURE CONDITION ASSESSMENT PROGRAM RECYCLED WATER 33c INTEGRATED SCADA MASTER PLAN 39 RECYCLED WATER MASTER PLAN UPDATE 40 RECYCLED WATER VALVE AND APPURTENANCE REPLACEMENT PROGRAM 41 RECYCLED WATER INFRASTRUCTURE CONDITION ASSESSMENT PROGRAM FY 2016-2017 CAPITAL IMPROVEMENT PROGRAM NEW PROJECTS $ 150,000 $ 360 000 Water Renl $ 200 000 Water Repl $ 1 930,000 WaterReol $ 260 000 Water Reol $ 2 000 000 Water Reol $ 80 000 Recvcled Water Reol $ 150 000 Recvcled Water Real $ 750,000 Recvcled Water Renl $ 2 000,000 Recvcled Water Repl 150,000 $ 360,000 $ 200 000 $ 1,930,000 $ 260,000 $ 200 000 $ 200 000 $200 000 $ 200 000 $200 000 $500 000 $500 000 $ 80,000 $ 150,000 $ 50,000 $ 50 000 $50 000 $ 50 000 $50 000 $250,000 $250 000 $ 200,000 $ 200 000 $200,000 $ . 200 000 $200 000 $500,000 $500 000 6/15/2016 Item No. 15 - AB #22,337 June 28, 2016 Page 121 of 179 PROJECT LOCATION MAP: Cannon Park Restroom CAPITAL PROJECT DESCRIPTION NORTHWEST QUADRANT PARKS -CANNON PARK RESTROOM PROJECT NAME PROJECT LOCATION: PROJECT NO. Cannon Park, at the corner of Cannon Road and Carlsbad Boulevard. PROJECT DESCRIPTION: Plan, design, permit and construct a restroom building at Cannon Park. PROJECT NEED: To improve adjacent beach amenities, especially those that support safe and enjoyable recreational opportunities for residents and tourists. A new restroom facility to serve the park and those who bike and walk along Carlsbad Boulevard as well as those who visit the beaches, and will provide for a more enjoyable recreational experience at the coast. FINANCING: Purpose Study & Reports Environmental Design Construction Total Cost= Estimated Cost $ 8,000 $ 7,000 $ 75,000 $510,000 $600,000 GENERAL PLAN CONSISTENCY: Funding Source GCC GCC GCC GCC Coordinate the planning of park facilities and trails with other recreation-oriented land uses such as open space. Open Space, Conservation, and Recreation Element, Beaches; Parks and Recreation, Goal 4-G.8. ANTICIPATED ENVIRONMENTAL REVIEW: The project is exempt from environmental review per CEQA Guidelines Section 15303( d) & ( e) -concerning new construction of small structures such as restroom facilities and utility extensions. Item No. 15 - AB #22,337 June 28, 2016 Page 122 of 179 PROJECT LOCATION MAP: Ocean Street Restroom CAPITAL PROJECT DESCRIPTION NORTH WEST QUADRANT PARKS -OCEAN STREET RESTROOM PROJECT NAME PROJECT LOCATION: PROJECT NO. At the base of the beach access stairway at Ocean Street and Grand Avenue. PROJECT DESCRIPTION: Plan, design, permit and construct restroom facility to serve beach visitors. PROJECT NEED: To improve beach access.and amenities, especially those that support safe and enjoyable recreational opportunities for residents and tourists. A new restroom facility to serve the beaches north of Oak Street. will provide a safe and enjoyable beach experience and serve a need expressed by the community to provide this type of facility for the northerly beach area of the city. FINANCING: Purpose Study & Reports Design Construction Total Cost= Estimated Cost $ 10,000 $ 70,000 $572,000 $652,000 GENERAL PLAN CONSISTENCY: Funding Source GCC GCC GCC Improve and maintain high quality beaches for residents and visitors, Open Space, Conservation, and Recreation Element Goal 4-G.9. ANTICIPATED ENVIRONMENTAL REVIEW: The project is exempt from environmental review per CEQA Guidelines Section 15303(d) & (e) -concerning new construction of small structures such as restroom facilities and utility extensions. Item No. 15 - AB #22,337 June 28, 2016 Page 123 of 179 CAPITAL PROJECT DESCRIPTION NORTHWEST QUADRANT PARKS PROJECT NO. TRAIL CONNECTIVITY TO CARSLBAD STATE BEACH AT TAMARACK AVENUE PROJECT NAME PROJECT LOCATION MAP: Trail to Carlsbad State Beach PROJECT LOCATION: Tamarack Beach parking lot, and shoreline trails in the vicinity of the Agua Hedionda Lagoon (AHL), Carlsbad Boulevard, and fisherman's beach. PROJECT DESCRIPTION: Complete an opportunities/constraints study, conduct public outreach, and develop conceptual design options for recreational trail access under the Carlsbad Boulevard cold water bridge-connecting the trail on the AHL north shore (east of Carlsbad Boulevard) to Tamarack State Beach parking lot. Studies and concept plans shall include ADA compliant access for the trails at both ends of the AHL north shore trail, including connection at the east end of the trail to route under the railroad bridge to the future Coastal Rail Trail -Reach 3. PROJECT NEED: To improve trail connectivity to the beaches and lagoons via non-motorized recreational trails. Providing trail connectivity for more opportunities to enjoy open space and an active, healthy lifestyle, while also providing non-motorized transportation alternatives to get to the coast. FINANCING: Purpose Study & Reports Total Cost= Estimated Cost $ 200,000 $ 200,000 GENERAL PLAN CONSISTENCY: Funding Source GCC Improve and enhance ... connectivity, access, and utilization for pedestrians and bicycles to... open spaces consistent with city planning documents. Mobility Element, Pedestrian and Bicycle Movement, Policy 3-P.28. Assure that, where feasible, developments near or adjacent to bodies of water provide open space that has public access to and views of the water. Open Space, Conservation, and Recreation Element, Special Resource Areas; Lagoons, Policy 4-P.36. ANTICIPATED ENVIRONMENTAL REVIEW: The project is exempt from environmental review per CEQA Guidelines Section 15262, Feasibility and Planning Studies. However, improvements may require additional CEQA review. Item No. 15 - AB #22,337 June 28, 2016 Page 124 of 179 CAPITAL PROJECT DESCRIPTION POLICE AND FIRE FACILITIES PROJECT NO. SAFETY TRAINING CENTER -RECIRCULATING WATER SYSTEM PROJECT STUDY REPORT PROJECT LOCATION MAP: Safety Training Center Recirculating Water System PROJECT NAME PROJECT LOCATION: Safety Training Center at 5750 Orion Street. PROJECT DESCRIPTION: Study the possibility of installing a water recirculating system for the fire training portion of the facility. PROJECT NEED: Due to future drought and other environmental impacts, city staff is investigating the upgrade of the Safety Training Center fire props, retrofitting them to a recirculating water system. Study will be conducted to determine if a recirculating system that re-uses water during firefighting operations can be installed into existing infrastructure and meet the fire department's training requirements. Current system does not allow for recirculating water and is an open. loop system that overflows to the storm water system. FINANCING: Purpose Study Total Cost= Estimated Cost $50,000 $50,000 GENERAL PLAN CONSISTENCY: Funding Source GCC Maintain safety services that are responsive to citizens' needs to ensure a safe and secure environment for people and property in the community. Public Safety Element, Goals and Policies, Goal 6-G.3. Reduce the city's reliance on imported water. Sustainability Element Goal 9-G.4. ANTICIPATED ENVIRONMENTAL REVIEW: The project is exempt from environmental review per CEQA Guidelines Section 15262 -Feasibility and Planning Studies. However, short or long term improvements may require additional CEQA review. Item No. 15 - AB #22,337 June 28, 2016 Page 125 of 179 PROJECT LOCATION MAP: City Facilities Accessibility Upgrades CAPITAL PROJECT DESCRIPTION FACILITIES MAINTENANCE CITY FACILITIES ACCESSIBILITY UPGRADES PROJECT NAME PROJECT LOCATION: City owned facilities. PROJECT DESCRIPTION: PROJECT NO. Implement accessibility upgrades as identified in the accessibility assessment. PROJECT NEED: In 2015 the Risk Manager completed an accessibility assessment of all city owned facilities. This project will implement specific accessibility upgrades identified in the assessment. FINANCING: Purpose Construction Total Cost= Estimated Cost $300,000 $300,000 GENERAL PLAN CONSISTENCY: Funding Source IRF Ensure that adequate public facilities and services are provided in a timely manner to preserve the quality of life of residents. Land Use & Community Design, Growth Management, Goal 2-G.21. ANTICIPATED ENVIRONMENTAL REVIEW: The project is exempt per CEQA Guidelines Section15301 -Repair and Maintenance of existing facilities. Item No. 15 - AB #22,337 June 28, 2016 Page 126 of 179 PROJECT LOCATION MAP: CAPITAL PROJECT DESCRIPTION FACILITIES MAINTENANCE -HOSP GROVE TOT LOT REFURBISHMENT PROJECT NAME PROJECT LOCATION: PROJECT NO. Hosp Grove Park -Jefferson Street and Marron Road. PROJECT DESCRIPTION: Tot lot equipment renovations to include new fencing, monument entry sign, new play equipment with a broader range of play value for children ages 3-12, as well as new picnic tables and benches. In addition, a new prefabricated restroom will replace the current portable restroom. The refurbishment will be in the same location as the existing tot lot area adjacent to the Jefferson Street parking lot. PROJECT NEED: The project improvements will better serve children and families who visit the park for hiking and using the play and picnic areas. FINANCING: Purpose Study & Reports Design Construction Total Cost= Estimated Cost $ 8,000 $ 90,000 $750,000 $848,000 GENERAL PLAN CONSISTENCY: Funding Source IRF IRF IRF Ensure that adequate public facilities and services are provided in a timely manner to preserve the quality of life of residents. Land Use & Community Design, Growth Management, Goal 2-G.21 . ANTICIPATED ENVIRONMENTAL REVIEW: The project is exempt from environmental review per CEQA Guidelines Section 15303(e), concerning new construction of small structures Hosp Grove Tot Lot Refurbishment Item No. 15 - AB #22,337 June 28, 2016 Page 127 of 179 PROJECT LOCATION MAP: ... CAPITAL PROJECT DESCRIPTION FACILITIES MAINTENANCE MONROESTREETPOOLREPLACEMENTPROJECTSTUDYREPORT PROJECT NAME PROJECT LOCATION: Monroe Street Pool at 3401 Monroe Street. PROJECT DESCRIPTION: PROJECT NO. Prepare a Project Study Report to identify the scope and budget to replace the Monroe Street Pool. PROJECT NEED: The pool is starting to deteriorate beyond the level of maintenance that can be addressed by spot repairs and needs to be replaced. FINANCING: Purpose Study & Reports Total Cost= Estimated Cost $250,000 $250,000 Funding Source IRF Monroe Street Pool Replacement / Project Study Report GENERAL PLAN CONSISTENCY: -'~' Monroe Street Pool Replacement Project Study Report Ensure that adequate public facilities and services are provided in a timely manner to preserve the quality of life of residents. Land Use & Community Design, Growth Management, Goal 2-G.21 . Relevant Climate Action Plan Measure F-1 , energy efficiency retrofits for city- owned buildings. ANTICIPATED ENVIRONMENTAL REVIEW: The project is exempt from environmental review per CEQA Guidelines Section 15302(c) -Replacement or reconstruction of existing facilities involving ne Ii ible or no ex ans ion of ca acit . Item No. 15 - AB #22,337 June 28, 2016 Page 128 of 179 CAPITAL PROJECT DESCRIPTION FACILITIES MAINTENANCE -PARKS ELECTRONIC SCOREBOARD REPLACEMENT PROJECT NAME PROJECT NO. PROJECT LOCATION MAP: Parks Electronic Scoreboard Replacement PROJECT LOCATION: Aviara, Calavera and Poinsettia Community Parks PROJECT DESCRIPTION: Replacement of 5 electronic scoreboards: 3 at Poinsettia, 1 at Calavera Hills, and 1 at Aviara Park. PROJECT NEED: The existing scoreboards are in substantial disrepair or completely unusable. The technology of the existing boards is outdated. The new boards include modern technology and wireless controllers. FINANCING: Purpose Construction Total Cost= Estimated Cost $60,100 $60,100 GENERAL PLAN CONSISTENCY: Funding Source IRF Ensure that adequate public facilities and services are provided in a timely manner to preserve the quality of life of residents. Land Use & Community Design, Growth Management, Goal 2-G.21. ANTICIPATED ENVIRONMENTAL REVIEW: The project is exempt from environmental review per CEQA Guidelines Section 15302(c) Replacement or reconstruction of existing facilities involving negligible or no expansion of capacity Item No. 15 - AB #22,337 June 28, 2016 Page 129 of 179 PROJECT LOCATION MAP: CAPITAL PROJECT DESCRIPTION FACILITIES MAINTENANCE FACILITY SAFETY AND PARKING LOT LIGHTING ASSESSMENT PROJECT NAME PROJECT LOCATION: City owned properties PROJECT DESCRIPTION: PROJECT NO. Perform a condition assessment of all post mounted safety lights and parking lot lights on city properties. PROJECT NEED: Staff has identified several facility lighting standards that are in poor condition and there were a couple of failures during 2015. All of the lighting standards should be assessed and a program developed for repair and/or replacement with high-efficiency lights as warranted. FINANCING: Purpose Study & Reports Total Cost= Estimated Cost $30,000 $30,000 GENERAL PLAN CONSISTENCY: Funding Source IRF Ensure that adequate public facilities and services are provided in a timely manner to preserve the quality of life of residents. Land Use & Community Design, Growth Management, Goal 2-G.21. Promote energy efficiency and conservation in the community, Sustainability Element, Goals and Policies, Goal 9-G.3. Relevant Climate Action Plan Measure F-1, energy efficiency retrofits for city- owned buildings. ANTICIPATED ENVIRONMENTAL REVIEW: The project is exempt from environmental review per CEQA Guidelines Section 15262 -Feasibility and Planning Studies and 15301 -Repair and Maintenance of existin facilities. Facility Safety and Parking Lot Lighting Assessment Item No. 15 - AB #22,337 June 28, 2016 Page 130 of 179 PROJECT LOCATION MAP: CAPITAL PROJECT DESCRIPTION FACILITIES MAINTENANCE PINE AVENUE PARK -SYNTHETIC TURF REPLACEMENT PROJECT NAME PROJECT LOCATION: Pine Avenue Community Park. PROJECT DESCRIPTION: PROJECT NO. Removal of existing synthetic turf at the soccer field, hauling away of turf carpet materials and infill, installation of new synthetic turf including new infill. The base materials will remain intact and utilized for the replacement of the new upper layers of artificial carpet (thatch) and rubber resilient fill pellets. PROJECT NEED: The Pine Avenue Community Park soccer field turf was installed in 2005 when the park opened and has been heavily utilized over more than a decade, resulting in considerable wear, splits/tears, and a diminished overall quality and playability of the synthetic turf. The synthetic turf warranty has expired. FINANCING: Purpose Construction Total Cost= Estimated Cost $868,000 $868,000 GENERAL PLAN CONSISTENCY: Funding Source IRF Ensure that adequate public facilities and services are provided in a timely manner to preserve the quality of life of residents. Land Use & Community Design, Growth Management, Goal 2-G.21. ANTICIPATED ENVIRONMENTAL REVIEW: The project is exempt per CEQA Guidelines Section15301 -Repair and Maintenance of existing facilities. Pine Avenue Park Synthetic Turf Replacement Item No. 15 - AB #22,337 June 28, 2016 Page 131 of 179 PROJECT LOCATION MAP: Drainage Master Plan Update CAPITAL PROJECT DESCRIPTION DRAINAGE PROJECTS -DRAINAGE MASTER PLAN UPDATE PROJECT NAME PROJECT LOCATION: Various locations throughout the city. PROJECT DESCRIPTION: PROJECT NO. Update the city's Drainage Master Plan (DMP) based on current growth projections and the requirements of the Clean Water Act (CWA), the city's Habitat Management Plan (HMP), and the California Environmental Quality Act (CEQA). PROJECT NEED: The DMP update is necessary to identify and finance the facilities needed to provide storm water and flood control infrastructure in accordance with the current regulations and development standards. FINANCING: Purpose Study & Reports Total Cost= Estimated Cost $750,000 $750,000 GENERAL PLAN CONSISTENCY: Funding Source PLDA Require compliance with Growth Management Plan public facility performance standards, as specified in the citywide Facilities and Improvements Plan, to ensure that adequate public facilities are provided prior to or concurrent with development. Land Use & Community Design Element, Growth Management and Public Facilities, Policy 2-P.58; Open Space, Conservation, and Recreation Element Goal 4-G.14, Policies 4-P.60, 4-P.64, and 4-P.65; Public Safety Element Goal 6-G.1, Policies 6-P.2, 6-P. 7, and 6-P.8. ANTICIPATED ENVIRONMENTAL REVIEW: Potential Program Environmental Impact Report Item No. 15 - AB #22,337 June 28, 2016 Page 132 of 179 PROJECT LOCATION MAP: DMP B and BN Wetland Creation CAPITAL PROJECT DESCRIPTION DRAINAGE PROJECTS -WETLAND CREATION (DRAINAGE MASTER PLAN FACILITY B AND BN) PROJECT NAME PROJECT LOCATION: PROJECT NO. East of College Boulevard, north of Cannon Road. PROJECT DESCRIPTION: Complete the design and construct approximately five acres of wetland habitat as contemplated by the Drainage Master Plan, projects B and BN. PROJECT NEED: The wetland habitat will provide mitigation habitat for various drainage projects. FINANCING: Purpose Study & Reports Design Construction Total Cost= Estimated Cost $ 50,000 $330,000 $575,000 $955,000 GENERAL PLAN CONSISTENCY: Funding Source PLDA "B PLDA"B" PLDA"B" Require compliance with Growth Management Plan public facility performance standards, as specified in the citywide Facilities and Improvements Plan, to ensure that adequate public facilities are provided prior to or concurrent with development. Land Use & Community Design Element, Growth Management and Public Facilities, Policy 2-P.58; Open Space, Conservation, and Recreation Element Policies 4-P.9, 4-P.57, and 4-P.65. ANTICIPATED ENVIRONMENTAL REVIEW: Item No. 15 - AB #22,337 June 28, 2016 Page 133 of 179 PROJECT LOCATION MAP: Headwall Replacement Program CAPITAL PROJECT DESCRIPTION DRAINAGE PROJECTS -HEADWALL REPLACEMENT PROGRAM PROJECT NAME PROJECT LOCATION: · Various locations throughout the city. PROJECT DESCRIPTION: PROJECT NO. This program is composed of multiple maintenance projects that address the repair, replacement, and improvement of storm water facility end treatments throughout the city. PROJECT NEED: Deficient end conditions of various drainage facilities throughout the city have been reported and documented by maintenance staff and this project will implement maintenance improvements that will enable the drainage infrastructure to operate as planned and designed. FINANCING: Purpose Study & Reports Design Property Acquisition Construction Total Cost= Estimated Cost $ 80,000 $125,000 $ 15,000 $290,000 $510,000 GENERAL PLAN CONSISTENCY: Funding Source IRF IRF IRF IRF _Ensure that adequate public facilities and services are provided in a timely manner to preserve the quality of life of residents. Land Use & Community Design, Growth Management, Goal 2-G.21; Public Safety Element Goal 6-G.1, Policy 6-P.2. ANTICIPATED ENVIRONMENTAL REVIEW: Potential Mitigated Negative Declaration Item No. 15 - AB #22,337 June 28, 2016 Page 134 of 179 CAPITAL PROJECT DESCRIPTION DRAINAGE PROJECTS -LAGUNA DRIVE STORM DRAIN IMPROVEMENT PROJECT NAME PROJECT NO. PROJECT LOCATION MAP: PROJECT LOCATION: Laguna Drive Storm Drain Laguna Drive starting at the cul-de-sac on Laguna Drive, west of 1-5, and terminating at the system outfall located northwest of the intersection of State Street and Laguna Drive. PROJECT DESCRIPTION: The project will increase the capacity of the main line and modify the associated laterals, inlets, and cleanouts as needed to connect to the modified main line. PROJECT NEED: The storm drain main line that services this drainage basin needs to be enlarged to accommodate storm flows from past storm drain system projects and future development projects. FINANCING: Purpose Study & Reports Design Total Cost= Estimated Cost $ 20,000 $350,000 $370,000 GENERAL PLAN CONSISTENCY: Funding Source Gas Tax Gas Tax Ensure that adequate public facilities and services are provided in a timely manner to preserve the quality of life of residents. Land Use & Community Design , Growth Management, Goal 2-G.21; Open Space, Conservation, and Recreation Element Policy 4-P.60; Public Safety Element Goal 6-G.1. ANTICIPATED ENVIRONMENTAL REVIEW: Potential Mitigated Negative Declaration Item No. 15 - AB #22,337 June 28, 2016 Page 135 of 179 PROJECT LOCATION MAP: Lake Calavera Storm Drain Improvements CAPITAL PROJECT DESCRIPTION DRAINAGE PROJECTS LAKE CALEVERA STORM DRAIN IMPROVEMENTS PROJECT NAME PROJECT LOCATION: PROJECT NO. Lake Calavera Preserve, easterly of Tamarack Avenue, northerly of the access road to the dam and westerly of Lake Calavera. PROJECT DESCRIPTION: Drainage system improvements and mosquito abatement through the removal of accumulated sediment; thinning dense vegetation to limit locations for mosquito refuge; and construction of a new storm drain pipe to drain the area from standing water. PROJECT NEED: Due to sediment buildup the area no longer drains and homeowners near the area, and the visiting public, have cited mosquito problems. It has been determined that the treatments by the County of San Diego are no longer effective and a structural solution is required. FINANCING: Purpose Study & Reports Environmental Design Construction Total Cost= Estimated Cost $ 28,000 $ 86,000 $ 39,000 $ 83,500 $236,500 GENERAL PLAN CONSISTENCY: Funding Source GCC GCC GCC GCC Ensure that adequate public facilities and services are provided in a timely manner to preserve the quality of life of residents. Land Use & Community Design, Growth Management, Goal 2-G.21 ; Open Space, Conservation, and Recreation Element Policy 4-P.65; Public Safety Element Goal 6-G.1. ANTICIPATED ENVIRONMENTAL REVIEW: Potential Mitigated Negative Declaration Item No. 15 - AB #22,337 June 28, 2016 Page 136 of 179 CAPITAL PROJECT DESCRIPTION CIRCULATION SYSTEM STREET PROJECTS PROJECT NO. ADA ACCESS TO THE BEACH FROM PINE AVENUE TO TAMARACK AVENUE PROJECT NAME PROJECT LOCATION MAP: ADA Access to the Beach from Pine to Tamarack Avenue PROJECT LOCATION: Coastal access between Carlsbad Boulevard and the ocean, from Tamarack Avenue to Pine Avenue. PROJECT DESCRIPTION: Prepare an opportunities I constraints study, conduct public outreach, and develop conceptual design options for ADA accessibility improvements down, to, and across the sand to the beach at both ends of the main seawall. PROJECT NEED: While ramps to the beach exist for able-bodied individuals and vehicles, those same access points are difficult for persons with disabilities. This project would examine feasible options to improve conditions to meet ADA and Public Rights of Way Accessibility Guidelines (PROWAG). FINANCING: Purpose Study & Reports Total Cost= Estimated Cost $75,000 $75,000 GENERAL PLAN CONSISTENCY: Funding Source GCC Improve connectivity for residents, visitors and businesses. Land Use and Community Design Element, Goals and Policies, Policy 2-P.50; Mobility Element, Goals and Policies, Goal 3-G.2. ANTICIPATED ENVIRONMENTAL REVIEW: The project is exempt from environmental review per CEQA Guidelines Section 15262 -Feasibility and Planning Studies. However, short or long term improvements may require additional CEQA review. Item No. 15 - AB #22,337 June 28, 2016 Page 137 of 179 CAPITAL PROJECT DESCRIPTION CIRCULATION SYSTEM TRAFFIC SIGNALS -ADAPTIVE TRAFFIC SIGNAL PROGRAM PROJECT NAME PROJECT NO. PROJECT LOCATION MAP: Adaptive Traffic Signal Program PROJECT LOCATION: Aviara Parkway -Poinsettia to Palomar Airport Road, Cannon Road -1-5 to Faraday and Rancho Santa Fe Road -Calle Barcelona to San Elijo Road. PROJECT DESCRIPTION: Install fiber optic communications, traffic measurement system equipment and adaptive signal control equipment along Aviara Parkway, Cannon Road and Rancho Santa Fe Road. PROJECT NEED: To improve the performance of the traffic signal systems and thereby reduce travel times. FINANCING: Purpose Design Construction Total Cost= Estimated Cost $ 100,000 $ 1,100,000 $ 1,200,000 GENERAL PLAN CONSISTENCY: Funding Source TransNet Local TransNet Local Implement transportation demand and traffic signal management techniques to improve mobility. Mobility Element, Goals and Policies, Goal 3-G.5, Policy 3-P.8. NTICIPATED ENVIRONMENTAL REVIEW: The project is exempt from environmental review per CEQA Guidelines Section 15303( d) -New construction of small facilities or structures and other utility extensions, including street improvements and Section 15304(f) -minor trenching and backfilling. Item No. 15 - AB #22,337 June 28, 2016 Page 138 of 179 CAPITAL PROJECT DESCRIPTION CIRCULATION SYSTEM STREET PROJECTS -B& TD #3 PROPERTY VALUATION PROJECT NAME PROJECT NO. PROJECT LOCATION MAP: B& TD #3 Property Valuation PROJECT LOCATION: Cannon Road between Car Country Drive and El Camino Real. PROJECT DESCRIPTION: Property valuation and reimbursement of funds from Bridge and Thoroughfare District No. 3 (B& TD #3) to the City of Carlsbad and final reconciliation and close out of the district. PROJECT NEED: B& TD #3 still needs to reimburse the City of Carlsbad for the value of the land that was used for habitat mitigation as required for the construction of Cannon Road. In addition, there is one remaining parcel of land which is currently owned by San Diego Gas and Electric (SDG&E) that will pay into the B& TD #3 when development occurs. When that occurs, the district finances will need to be reconciled prior to closing out the district. FINANCING: Purpose Study & Reports Total Cost= Estimated Cost $ 125,000 $125,000 GENERAL PLAN CONSISTENCY: Funding Source B & TD#3 Protect environmentally sensitive lands, wildlife habitats, and rare, threatened or endangered plant and animal communities. Open Space, Conservation, and Recreation Element, Biological Resources and Open Space for Conservation, Goal 4-G.3. ANTICIPATED ENVIRONMENTAL REVIEW: The project is exempt from environmental review per CEQA Guidelines Section 15262 -Feasibility and Planning Studies. Item No. 15 - AB #22,337 June 28, 2016 Page 139 of 179 PROJECT LOCATION MAP: Bridge Preventive Maintenance Program CAPITAL PROJECT DESCRIPTION CIRCULATION SYSTEM STREET PROJECTS BRIDGE PREVENTIVE MAINTENANCE PROGRAM PROJECT NAME PROJECT LOCATION: Various bridge locations throughout the city. PROJECT DESCRIPTION: PROJECT NO. Perform preventive maintenance activities, such as deck sealing, concrete patching, repair spalls, etc., to increase the life of the bridge structures. PROJECT NEED: Correct minor structural deficiencies early in the bridges' life, rather than wait until a bridge has major problems requiring costly rehabilitation, reconstruction or replacement FINANCING: Purpose Design Construction Total Cost= Estimated Cost $ 300,000 $ 1,200,000 $1,500,000 GENERAL PLAN CONSISTENCY: Funding Source IRF IRF Provide for safe and efficient movement of goods throughout the city. Mobility Element, Goals and Policies, Goal 3-G.7. ANTICIPATED ENVIRONMENTAL REVIEW: The project is exempt from environmental review per CEQA Guidelines Section 15301 (b) -Repair and maintenance of existing facilities. Item No. 15 - AB #22,337 June 28, 2016 Page 140 of 179 CAPITAL PROJECT DESCRIPTION CIRCULATION SYTEM STREET PROJECTS PROJECT NO. CARLSBAD BOULEVARD PEDESTRIAN LIGHTING -TAMARACK AVENUE TO THE NORTHERLY CITY LIMITS PROJECT LOCATION MAP: Carlsbad Blvd Pedestrian Lighting Tamarack to northerly City limits PROJECT NAME PROJECT LOCATION: Carlsbad Boulevard from Tamarack Avenue to the northerly city limits. PROJECT DESCRIPTION: Install pedestrian scale lighting along both sides of Carlsbad Boulevard to match the lighting in the Village. The lights will be 13-foot concrete/marblelite poles with black metal toppers. · PROJECT NEED: The improvements will provide continuous pedestrian scale lighting on Carlsbad Boulevard from Tamarack Avenue to the northerly city limits. FINANCING: Purpose Design Construction Total Cost= Estimated Cost $ 100,000 $1,225,000 $1,325,000 GENERAL PLAN CONSISTENCY: Funding Source TransNet Local TransNet Local Provide inviting streetscapes that encourage walking and promote livable streets. Land Use and Community Design Element, Goals and Policies, Policy 2-P.48, 2-P.72; Mobility Element, Goals and Policies, Goal 3-G.3. ANTICIPATED ENVIRONMENTAL REVIEW: The project is exempt from environmental review per CEQA Guidelines Section 15303(d) -New construction of small structures and Section 15304(f) -minor trenching and backfilling. Item No. 15 - AB #22,337 June 28, 2016 Page 141 of 179 CAPITAL PROJECT DESCRIPTION CIRCULATION SYSTEM STREET PROJECTS PROJECT NO. CHESTNUT AVENUE-1-5 TO THE RAILROAD, COMPLETE STREET PROJECT STUDY REPORT PROJECT LOCATION MAP: Chestnut Avenue-1-5 to Railroad Complete Street Project Study Report PROJECT NAME PROJECT LOCATION: Chestnut Avenue from 1-5 west to the Coastal Rail Trail at the railroad right-of- way. PROJECT DESCRIPTION: Preparation of a Project Study Report which identifies the scope of work for a complete street project consistent with the draft Village and Barrio Master Plan. PROJECT NEED: To implement the public improvements envisioned in the Village and Barrio Master Plan in conjunction with project specific input from the community for this location. FINANCING: Purpose Study & Reports Total Cost= Estimated Cost $85,000 $85,000 GENERAL PLAN CONSISTENCY: Funding Source TransNet Local Implement a comprehensive livable streets network. This network identifies the transportation modes that shall be accommodated, based on street typology, to ensure accessibility of the city's street system to persons of all ages and abilities. Mobility Element, Implementing Policies, Street Typology and Multimodal Levels of Service, Policy 3-P.1 . ANTICIPATED ENVIRONMENTAL REVIEW: The project is exempt from environmental review per CEQA Guidelines Section 15262 -Feasibility and Planning Studies. However, short or long term improvements may require additional CEQA review. Item No. 15 - AB #22,337 June 28, 2016 Page 142 of 179 PROJECT LOCATION MAP: Christiansen Avenue Improvements CAPITAL PROJECT DESCRIPTION CIRCULATION SYSTEM STREET PROJECTS CHRISTIANSEN AVENUE IMPROVEMENTS PROJECT NAME PROJECT LOCATION: PROJECT NO. The northerly half of Christiansen Avenue from Carlsbad Boulevard east 100 feet. PROJECT DESCRIPTION: Roadway and parkway improvements along the northern half of Christiansen Avenue. PROJECT NEED: To provide roadway, parking and pedestrian improvements along the northern half of this segment of Christiansen Avenue. FINANCING: Purpose Environmental Design Construction Total Cost= Estimated Cost $ 10,000 $ 90,000 $210,000 $310,000 GENERAL PLAN CONSISTENCY: Funding Source TransNet Local TransNet Local TransNet Local Improve connectivity for residents, visitors and businesses. Mobility Element, Goals and Policies, Goal 3-G.2. ANTICIPATED ENVIRONMENTAL REVIEW: The project is exempt from environmental review per CEQA Guidelines Section 15301 (c) -minor alteration of existing facilities including streets, sidewalks, gutters, and similar facilities involving negligible or no expansion. Item No. 15 - AB #22,337 June 28, 2016 Page 143 of 179 PROJECT LOCATION MAP: CAPITAL PROJECT DESCRIPTION CIRCULATION SYSTEM STREET PROJECTS COMPLETE STREETS AND TRAFFIC CALMING PROGRAM PROJECT NAME PROJECT LOCATION: Throughout the city. PROJECT DESCRIPTION: PROJECT NO. This project funds the Carlsbad Residential Traffic Management Program (CRTMP) and it expands the program to include complete street improvements related to bikes and pedestrians. PROJECT NEED: The project facilitates implementation of the Mobility Element of the General Plan. FINANCING: Purpose Design Construction Total Cost= Estimated Cost $ 300,000 $1,200,000 $1,500,000 GENERAL PLAN CONSISTENCY: Funding Source Gas Tax Gas Tax Implement a comprehensive livable streets network. This network identifies the transportation modes that shall be accommodated, based on street typology, to ensure accessibility of the city's street system to persons of all ages and abilities. Mobility Element, Implementing Policies, Street Typology and Multimodal Levels of Service, Policy 3-P.1; ; explore funding opportunities for existing streets, to minimize traffic volumes and/or speed, as appropriate, within residential neighborhoods, without compromising connectivity for emergency first responders, bicycles and pedestrians, Policy 3-P.16. ANTICIPATED ENVIRONMENTAL REVIEW: The project is exempt from environmental review per CEQA Guidelines Section 15301 (c) minor alteration of existing facilities including streets, sidewalks, gutters, and similar facilities involving negligible or no expansion. Complete Street and Traffic Calming Program Item No. 15 - AB #22,337 June 28, 2016 Page 144 of 179 PROJECT LOCATION MAP: CAPITAL PROJECT DESCRIPTION CIRCULATION SYSTEM STREET PROJECTS EL CAMINO REAL IMPROVEMENTS -SUNNYCREEK TO JACKSPAR PROJECT NAME PROJECT LOCATION: PROJECT NO. El Camino Real from Sunny Creek Road to Jackspar Drive. PROJECT DESCRIPTION: Improvements to add an additional northbound lane, bike lane and sidewalk from Sunny Creek Road to Jackspar Drive. PROJECT NEED: To complete the construction of El Camino Real to match the adjacent sections so as to improve pedestrian, bike and vehicular operations. FINANCING: Purpose Study & Reports Environmental Design Property Acquisition Construction Total Cost= Estimated Cost $ 37,500 $ 119,000 $ 540,000 $ 165,000 $ 2,282,000 $ 3,143,500 GENERAL PLAN CONSISTENCY: Funding Source TransNet Local TransNet Local TransNet Local TransNet Local TransNet Local Improve connectivity for residents, visitors and businesses and provide inviting streetscapes that encourage walking and promote livable streets. Mobility Element, Goals and Policies, Goals 3-G.2 and 3-G.3. ANTICIPATED ENVIRONMENTAL REVIEW: Potential Mitigated Negative Declaration. El Camino Real Widening Sunnycreek to Jackspar Item No. 15 - AB #22,337 June 28, 2016 Page 145 of 179 PROJECT LOCATION MAP: Left Turn Lane Extensions CAPITAL PROJECT DESCRIPTION CIRCULATION SYSTEM STREET PROJECTS LEFT TURN LANE EXTENSIONS PROJECT NAME PROJECT LOCATION: PROJECT NO. Left turn lanes at the intersection of El Camino Real and La Costa Avenue, El Camino Real and Alga Road, El Camino Real and Palomar Airport Road and El Camino Real and Faraday Avenue. PROJECT DESCRIPTION: Extend the left turn lanes. Construction will include the modification of existing roadway paving, median curbs, signing and striping, median paving and median landscaping. PROJECT NEED: The project is needed to reduce vehicular congestion and improve traffic operations at these locations. Current left turn volumes at these locations can exceed the capacity of the existing turn lanes, causing congestion to overflow into the through travel lanes. FINANCING: Purpose Design Construction Total Cost= Estimated Cost $ 40,000 $ 160,000 $ 200,000 GENERAL PLAN CONSISTENCY: Funding Source Gas Tax Gas Tax Provide for the safe and efficient movement of goods throughout the city. Mobility Element, Goals and Policies, Goal 3-G.7. ANTICIPATED ENVIRONMENTAL REVIEW: The project is exempt from environmental review per CEQA Guidelines Section 15301(c) -minor alteration of existing facilities including streets, sidewalks, utters, and similar facilities involvin ne Ii ible or no ex ansion. Item No. 15 - AB #22,337 June 28, 2016 Page 146 of 179 PROJECT LOCATION MAP: Ocean Street Project Study Report CAPITAL PROJECT DESCRIPTION CIRCULATION SYSTEM STREET PROJECTS OCEAN STREET PROJECT STUDY REPORT PROJECT NAME PROJECT LOCATION: PROJECT NO. Ocean Street, from Oak Avenue to Carlsbad Boulevard (via Mountain View). PROJECT DESCRIPTION: Prepare a Project Study Report incorporating public input to identify the opportunities I constraints and conceptual design options for Ocean Street. PROJECT NEED: Ocean Street serves as a pedestrian gateway to the northern segment of coastline, yet Ocean Street has no designated walkways, no bikeways, haphazard parking and conflicting traffic movements. The street can be reconfigured to designate space for walking, biking and parking together with the space for vehicular traffic. FINANCING: Purpose Study & Reports Total Cost= Estimated Cost $ 95,000 $ 95,000 GENERAL PLAN CONSISTENCY: Funding Source GCC Improve connectivity for residents, visitors, and businesses. Mobility Element Goal 3-G.2. Implement a comprehensive livable streets network. This network identifies the transportation modes that shall be accommodated, based on street typology, to ensure accessibility of the city's street system to persons of all ages and abilities. Mobility Element, Implementing Policies, Street Typology and Multimodal Levels of Service, Policy 3-P.1 . ANTICIPATED ENVIRONMENTAL REVIEW: The project is exempt from environmental review per CEQA Guidelines Section 15262 -Feasibility and Planning Studies. However, short or long term im rovements ma re uire additional CEQA review. Item No. 15 - AB #22,337 June 28, 2016 Page 147 of 179 CAPITAL PROJECT DESCRIPTION CIRCULATION SYSTEM STREET PROJECTS PROJECT NO. ROADWAY IMPROVEMENTS INVENTORY, ANALYSIS AND IMPLEMENTATION PROGRAM PROJECT NAME PROJECT LOCATION MAP: Inventory Analysis and Implementation Program PROJECT LOCATION: West of 1-5 from Buena Vista Lagoon to Agua Hedionda Lagoon PROJECT DESCRIPTION: Complete a comprehensive parking, red curb, abandoned driveway inventory, "alternative streets" applicability analysis, and implementation plan (driveway closures, red curb rules, update "alternative streets" map, etc.) for all streets west of 1-5, along with a comprehensive study, vehicle lane striping/parking design layouts, and implementation plan for all major roadways, in the area west of 1-5 from Buena Vista Lagoon to the Agua Hedionda Lagoon PROJECT NEED: To develop and implement a program of roadway improvements within the project area. FINANCING: Purpose Estimated Cost Funding Source Study & Reports $ 200,000 GCC Total Cost= $ 200,000 Item No. 15 - AB #22,337 June 28, 2016 Page 148 of 179 PROJECT LOCATION MAP: Roadway Slope Stabilization Program CAPITAL PROJECT DESCRIPTION CIRCULATION SYSTEM STREET PROJECTS ROADWAY SLOPE STABILIZATION PROGRAM PROJECT NAME PROJECT LOCATION: PROJECT NO. West side of Batiquitos Drive near the intersection with Poppy Lane and the north side of Faraday Avenue within Veterans Memorial Park. PROJECT DESCRIPTION: Stabilization of existing slopes to address the deposition of sediment on the public right-of-way. PROJECT NEED: To eliminate the ongoing erosion of the slopes and the associated deposition of silt and eroded materials on the roadway and the associated need to perform maintenance after most rain events. FINANCING: Purpose Environmental Design Construction Total .Cost = Estimated Cost $ 200,000 $ 50,000 $ 200,000 $ 450,000 GENERAL PLAN CONSISTENCY: Funding Source Gas Tax Gas Tax Gas Tax Provide for the safe and efficient movement of goods throughout the city. Mobility Element, Goals and Policies, Goal 3-G.7. ANTICIPATED ENVIRONMENTAL REVIEW: Potential Mitigated Negative Declaration. Item No. 15 - AB #22,337 June 28, 2016 Page 149 of 179 CAPITAL PROJECT DESCRIPTION CIRCULATION SYSTEM TRAFFIC SIGNALS -SIGNAL OPERATIONS MODIFICATIONS PROJECT NAME PROJECT NO. PROJECT LOCATION MAP: Signal Operations Modifications PROJECT LOCATION: At the intersections of El Camino Real and Hosp Way, El Camino Real and Town Garden and El Camino Real and Cassia Road. PROJECT DESCRIPTION: The improvements at each intersection are as follows: El Camino Real and Hosp Way: remove split phase and convert to 8 phase · El Camino Real and Town Garden: remove split phase and convert to 8 phase · El Camino Real and Cassia Road: remove north pedestrian crosswalk PROJECT NEED: To update signals or crosswalk configurations to be more responsive to traffic needs at these intersections. FINANCING: Purpose Design Construction Total Cost= Estimated Cost $ 15,000 $135,000 $150,000 GENERAL PLAN CONSISTENCY: Funding Source Gas Tax Gas Tax Implement transportation demand and traffic signal management techniques to improve mobility. Mobility Element, Goals and Policies, Goal 3-G.5. NTICIPATED ENVIRONMENTAL REVIEW: The project is exempt from environmental review per CEQA Guidelines Section 15303( d) -New construction of small facilities or structures and other utility extensions, including street improvements. Item No. 15 - AB #22,337 June 28, 2016 Page 150 of 179 CAPITAL PROJECT DESCRIPTION CIRCULATION SYSTEM STREET PROJECTS PROJECT NO. STATE STREET IMPROVEMENTS AT NORTHWEST CORNER WITH GRAND AVENUE PROJECT NAME PROJECT LOCATION MAP: State Street Improvements at Northwest corner with Grand Avenue PROJECT LOCATION: State Street at the northwest corner of State Street and Grand Avenue. PROJECT DESCRIPTION: Reconstruct the curb return, curb line and parkway along State Street and close the driveway entrance to the parking lot via State Street and thereby provide a wider roadbed to accommodate additional on street parking. PROJECT NEED: The project will eliminate the driveway crossing of the State Street parkway and sidewalk thereby providing additional angled parking spaces along State Street. FINANCING: Purpose Design Construction Total Cost= Estimated Cost $100,000 $225,000 $325,000 GENERAL PLAN CONSISTENCY: Funding Source TransNet Local TransNet Local Improve connectivity for residents, visitors and businesses. Mobility Element, Goals and Policies, Goal 3-G.2. ANTICIPATED ENVIRONMENTAL REVIEW: The project is exempt from environmental review per CEQA Guidelines Section 15301 (c) -minor alteration of existing facilities including streets, sidewalks, gutters, and similar facilities involving negligible or no expansion. Item No. 15 - AB #22,337 June 28, 2016 Page 151 of 179 PROJECT LOCATION MAP: CAPITAL PROJECT DESCRIPTION CIRCULATION SYSTEM STREET PROJECTS UTILITY UNDERGROUNDING PROGRAM DEVELOPMENT STUDY PROJECT NAME PROJECT LOCATION: Overhead utilities throughout the city. PROJECT DESCRIPTION: PROJECT NO. Prepare a study to identify alternative approaches to fund and implement the undergrounding of the overhead utilities throughout the city. PROJECT NEED: To identify alternative approaches to underground overhead utilities and thereby improve the community design and character while at the same time improving safety along the public rights-of-way. FINANCING: Purpose Study & Reports Total Cost= Estimated Cost $100,000 $100,000 GENERAL PLAN CONSISTENCY: Funding Source GCC Enhance Carlsbad's character and image as a desirable residential, beach and open-space oriented community. Land Use & Community Design Element, Community Character, Design, and Connectedness, Goal 2-G.16. ANTICIPATED ENVIRONMENTAL REVIEW: The project is exempt from environmental review per CEQA Guidelines Section 15262 -Feasibility and Planning Studies. Utility Undergrounding Program Development Study Item No. 15 - AB #22,337 June 28, 2016 Page 152 of 179 PROJECT LOCATION MAP: Village Public Gathering Spaces CAPITAL PROJECT DESCRIPTION DOWNTOWN AREA PROJECTS VILLAGE & BARRIO PUBLIC GATHERING SPACES PROJECT NAME PROJECT LOCATION: Carlsbad Village and Barrio. PROJECT DESCRIPTION: PROJECT NO. Conduct outreach to determine the best locations for public gathering spaces. Once locations have been identified, prepare design concepts illustrating outdoor gathering places with varied amenities. Consider temporary installation(s), to help gauge public response, as part of the public review of the concepts. PROJECT NEED: To develop public gathering spaces as noted in the draft Village and Barrio Master Plan. FINANCING: Purpose Design Outreach Construction Total Cost= Estimated Cost $105,000 $ 120,000 $120,000 $345,000 GENERAL PLAN CONSISTENCY: Funding Source GCC GCC GCC Encourage use of public space and rights-of-way for periodic community events such as farmers markets, street fairs, and athletic events. Land Use & Community Design, Community Connectedness, Policy 2-P.56. ANTICIPATED ENVIRONMENTAL REVIEW: The project is exempt from environmental review per CEQA Guidelines Section 15301 (c) -minor alteration of existing facilities including streets, sidewalks, gutters, and similar facilities involving negligible or no expansion and Section 15311 placement of temporary structures in publicly owned parks or facilities desi ned for ublic use. Item No. 15 - AB #22,337 June 28, 2016 Page 153 of 179 PROJECT LOCATION MAP: Integrated SCADA Master Plan CAPITAL PROJECT DESCRIPTION SEWER. WATER AND RECYCLED WATER SYSTEM PROJECTS INTEGRATED SCADA MASTER PLAN PROJECT NAME PROJECT LOCATION: Throughout the city. PROJECT DESCRIPTION: PROJECT NO. Prepare a study to upgrade and integrate the Supervisory Control And Data Acquisition (SCADA) operating system for the city's Water, Sewer and Recycled Water infrastructure. PROJECT NEED: The study is needed to identify integrated SCADA upgrades required to utilize current technology and monitoring systems. FINANCING: Purpose Study & Reports Study & Reports Study & Reports Total Cost= Estimated Cost $ 80,000 $360,000 $ 80,000 $520,000 GENERAL PLAN CONSISTENCY: Funding Source Sewer Repl. Water Repl. Recycled Water Repl. Ensure that adequate public facilities and services are provided in a timely manner to preserve the quality of life of residents. Land Use & Community Design, Growth Management, Goal 2-G.21. Related Climate Action Plan Measure N-1, Improve water utilities (including water supply, wastewater, and recycled water) conveyance, treatment and distribution, and other system improvements. ANTICIPATED ENVIRONMENTAL REVIEW: The project is exempt from environmental review per CEQA Guidelines Section 15262 -Feasibilit and Plannin Studies. Item No. 15 - AB #22,337 June 28, 2016 Page 154 of 179 PROJECT LOCATION MAP: Sewer Master Plan Update CAPITAL PROJECT DESCRIPTION SEWER SYSTEM PROJECTS -SEWER MASTER PLAN UPDATE PROJECT NAME PROJECT LOCATION: City-wide PROJECT DESCRIPTION: Prepare an update to the Sewer Master Plan PROJECT NEED: PROJECT NO. Utilities Master Plans should be updated on a regular basis and the Sewer Master Plan is due for an update to remain current. FINANCING: Purpose Study & Reports Total Cost= Estimated Cost $150,000 $150,000 GENERAL PLAN CONSISTENCY: Funding Source Sewer Repl. Require compliance with Growth Management Plan public facility performance standards, as specified in the citywide Facilities and Improvements Plan, to ensure that adequate public facilities are provided prior to or concurrent with development. Land Use & Community Design Element, Growth Management and Public Facilities, Policy 2-P.58. Related Climate Action Plan Measure N-1, Improve water utilities (including water supply, wastewater, and recycled water) conveyance, treatment and distribution, and other system improvements. ANTICIPATED ENVIRONMENTAL REVIEW: Potential Program Environmental Impact Report Item No. 15 - AB #22,337 June 28, 2016 Page 155 of 179 PROJECT LOCATION MAP: Water Master Plan Update CAPITAL PROJECT DESCRIPTION WATER SYSTEM PROJECTS -WATER MASTER PLAN UPDATE PROJECT NAME PROJECT LOCATION: City-wide PROJECT DESCRIPTION: Prepare an update to the Water Master Plan PROJECT NEED: PROJECT NO. Utilities Master Plans should be updated on a regular basis. The Water Master Plan is due for an update to remain current. FINANCING: Purpose Study & Reports Total Cost= Estimated Cost $200,000 $200,000 GENERAL PLAN CONSISTENCY: Funding Source Water Repl. Require compliance with Growth Management Plan public facility performance standards, as specified in the citywide Facilities and Improvements Plan, to ensure that adequate public facilities are provided prior to or concurrent with development. Land Use & Community Design Element, Growth Management and Public Facilities, Policy 2-P.58. Related Climate Action Plan Measure N-1, Improve water utilities (including water supply, wastewater, and recycled water) conveyance, treatment and distribution, and other system improvements. ANTICIPATED ENVIRONMENTAL REVIEW: Potential Program Environmental Impact Report Item No. 15 - AB #22,337 June 28, 2016 Page 156 of 179 CAPITAL PROJECT DESCRIPTION WATER SYSTEM PROJECTS PROJECT NO. TERRAMAR WATERLINE REPLACEMENT -CARLSBAD BOULEVARD AND CANNON ROAD PROJECT LOCATION MAP: Terramar Waterline Replacement -Carlsbad Blvd and Cannon Road PROJECT NAME PROJECT LOCATION: Cannon Road and Carlsbad Boulevard in the Terramar area. PROJECT DESCRIPTION: Replace approximately 4,000 linear feet of asbestos cement water pipeline and valves. PROJECT NEED: Water pipelines and valves have reached their useful life. FINANCING: Purpose Design Construction Total Cost= Estimated Cost $ 160,000 $1 ,770,000 $1,930,000 GENERAL PLAN CONSISTENCY: Funding Source Water Repl. Water Rep Ensure that adequate public facilities and seNices are provided in a timely manner to preserve the quality of life of residents. Land Use & Community Design, Growth Management, Goal 2-G.21 . ANTICIPATED ENVIRONMENTAL REVIEW: The project is exempt from environmental review per CEQA Guidelines Section 15302(c) concerning replacement or reconstruction of existing utility systems involving negligible or no expansion of capacity. Item No. 15 - AB #22,337 June 28, 2016 Page 157 of 179 PROJECT LOCATION MAP: CAPITAL PROJECT DESCRIPTION WATER SYSTEM PROJECTS MOTOR OPERATED VALVE INSTALLATION -700 PRESSURE ZONE PROJECT NAME PROJECT LOCATION: PROJECT NO. In El Fuerte Street near the intersection of Rancho Pancho. PROJECT DESCRIPTION: Install a vault and motorized operating valve, provide power and telemetry to connect to the district's· Supervisory Control And Data Acquisition (SCADA) system. PROJECT NEED: A motorized valve will allow SCADA control of the valve that is utilized during a variety of operations such as San Diego County Water Authority (SDCWA) shutdowns, to address water quality issues and to move water between the north and south 700 pressure zones. FINANCING: Purpose Construction Total Cost= Estimated Cost $260,000 $260,000 GENERAL PLAN CONSISTENCY: Funding Source Water Repl. Ensure that adequate public facilities and services -are provided in a timely manner to preserve the quality of life of residents. Land Use & Community Design, Growth Management, Goal 2-G.21 . ANTICIPATED ENVIRONMENTAL REVIEW: The project is exempt from environmental review per CEQA Guidelines Section 15303(d}, concerning new construction of small structures such as utility equipment. Motor Operated Valve Installation -700 Pressure Zone Item No. 15 - AB #22,337 June 28, 2016 Page 158 of 179 PROJECT LOCATION MAP: CAPITAL PROJECT DESCRIPTION WATER PROJECTS WATER INFRASTRUCTURE CONDITION ASSESSMENT PROGRAM PROJECT NAME PROJECT LOCATION: PROJECT NO. Throughout the Carlsbad Municipal Water District service area. PROJECT DESCRIPTION: Condition assessment of water infrastructure such as pipelines, valves, pump stations, etc. PROJECT NEED: Condition assessment of infrastructure is needed to more accurately determine the end of useful life for existing facilities. FINANCING: Purpose Study & Reports Total Cost= Estimated Cost $2,000,000 $2,000,000 GENERAL PLAN CONSISTENCY: Funding Source Water Repl. Ensure that adequate public facilities and services are provided in a timely manner to preserve the quality of life of residents. Land Use & Community Design, Growth Management, Goal 2-G.21. Related Climate Action Plan Measure N-1, Improve water utilities (including water supply, wastewater, and recycled water) conveyance, treatment and distribution, and other system improvements. ANTICIPATED ENVIRONMENTAL REVIEW: The project is exempt from environmental review per CEQA Guidelines Section 15262 -Feasibility and Planning Studies. However, short or long term im rovements ma re uire additional CEQA review. Water Infrastructure Condition Assessment Program Item No. 15 - AB #22,337 June 28, 2016 Page 159 of 179 CAPITAL PROJECT DESCRIPTION RECYCLED WATER PROJECTS -RECYCLED WATER MASTER PLAN UPDATE PROJECT NAME PROJECT NO. PROJECT LOCATION MAP: Recycled Water Master Plan Update PROJECT LOCATION: Carlsbad Municipal Water District service area. PROJECT DESCRIPTION: Prepare an update to the Recycled Water Master Plan PROJECT NEED: Utilities Master Plans should be updated on a regular basis and the Recycled Water Master Plan is due for an update to remain current. FINANCING: Purpose Study & Reports Total Cost= Estimated Cost $150,000 $150,000 GENERAL PLAN CONSISTENCY: Funding Source Recycled Water Repl. Reduce the city's reliance on imported water. Sustainability Element Goal 9-G.4, Policy 9-P.5. Related Climate Action Plan Measure N-1, Improve water utilities (including water supply, wastewater, and recycled water) conveyance, treatment and distribution, and other system improvements. ANTICIPATED ENVIRONMENTAL REVIEW: Potential Program Environmental Impact Report Item No. 15 - AB #22,337 June 28, 2016 Page 160 of 179 CAPITAL PROJECT DESCRIPTION RECYCLED WATER PROJECTS PROJECT NO. RECYCLED WATER VALVE AND APPURTENANCE REPLACEMENT PROGRAM PROJECT NAME PROJECT LOCATION MAP: Recycled Water Valve and Appurtenance Replacement Program PROJECT LOCATION: Various locations throughout the Carlsbad Municipal Water District service area. PROJECT DESCRIPTION: Replace recycled water system valves and appurtenances. PROJECT NEED: To properly and effectively operate the system the recycled water valves and appurtenances need to be replaced as they reach the end of their useful lives. FINANCING: Purpose Construction Total Cost= Estimated Cost $750,000 $750,000 GENERAL PLAN CONSISTENCY: Funding Source Recycled Water Repl. Ensure that adequate public facilities and services are provided in a timely manner to preserve the quality of life of residents. Land Use & Community Design, Growth Management, Goal 2-G.21. ANTICIPATED ENVIRONMENTAL REVIEW: The project is exempt from environmental review per CEQA Guidelines Section 15302(c) concerning replacement or reconstruction of existing utility systems involving negligible or no expansion of capacity. Item No. 15 - AB #22,337 June 28, 2016 Page 161 of 179 CAPITAL PROJECT DESCRIPTION RECYCLED WATER PROJECTS PROJECT NO. RECYCLED WATER INFRASTRUCTURE CONDITION ASSESSMENT PROGRAM PROJECT NAME PROJECT LOCATION MAP: Recycled Water Infrastructure Condition Assessment Program PROJECT LOCATION: Throughout the Carlsbad Municipal Water District. PROJECT DESCRIPTION: Condition assessment of recycled water infrastructure such as pipelines, valves, pump stations, etc. PROJECT NEED: Condition assessment of infrastructure is needed to more accurately determine the end of useful life for existing facilities FINANCING: Purpose Study & Reports Total Cost= Estimated Cost $2,000,000 $2,000,000 GENERAL PLAN CONSISTENCY: Funding Source Recycled Water Repl. Ensure that adequate public facilities and services are provided in a timely manner to preserve the quality of life of residents. Land Use & Community Design, Growth Management, Goal 2-G.21. Reduce the city's reliance on imported water, Sustainability Element Goal 9-G.4. Related Climate Action Plan Measure N-1, Improve water utilities (including water supply, wastewater, and recycled water) conveyance, treatment and distribution, and other system improvements. ANTICIPATED ENVIRONMENTAL REVIEW: The project is exempt from environmental review per CEQA Guidelines Section 15262 -Feasibility and Planning Studies. However, short or long term im rovements ma re uire additional CEQA review.