Loading...
HomeMy WebLinkAbout2018-03-13; City Council; Resolution 2018-035RESOLUTION NO. 2018-035 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CARLSBAD, CALIFORNIA, AUTHORIZING AMENDMENT NO. 1 TO THE AGREEMENT WITH PACIFIC ARCHITECTURE & ENGINEERING, INC. TO INCORPORATE STRUCTURAL ENGINEERING SERVICES INTO THE DESIGN WORK FOR AN AMOUNT NOT TO EXCEED $15,293 FOR THE FARADAY CENTER REFURBISHMENT, PROJECT NO. 4720. EXHIBIT 1 WHEREAS, on June 21, 2017, the city manager executed an Agreement with Pacific Architecture & Engineering, Inc. to design the Faraday Center Refurbishment, Project No. 4720, for an amount not to exceed $97,941; and WHEREAS, the City Council of the City of Carlsbad, California has determined that structural engineering design services should be added to the scope of design services for the Faraday Center Refurbishment, Project No. 4720; and WHEREAS, Pacific Architecture & Engineering, Inc. has tendered a proposal for these structural engineering design services for an amount not to exceed $15,293; and WHEREAS, the total value of the contract with Pacific Architecture & Engineering, Inc. as amended requires City Council approval; and WHEREAS, Amendment No. 1 to the Agreement has been prepared for the mayor's signature and is attached hereto as Attachment A. NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Carlsbad, California, as follows: 1. That the above recitations are true and correct. 2. That the mayor is authorized and directed to execute Amendment No. 1 to the Agreement with Pacific Architecture & Engineering, Inc. March 13, 2018 Item #4 Page 3 of 8 EXHIBIT 1 PASSED, APPROVED AND ADOPTED at a Regular Meeting of the City Council of the City of Carlsbad on the 13th day of March, 2018, by the following vote, to wit: AYES: NOES: ABSENT: M. Hall, K. Blackburn, M. Schumacher, C. Schumacher, M. Packard. None. None. (SEAL) March 13, 2018 Item #4 Page 4 of 8 GS1563 AMENDMENT NO. 1 TO AMEND AGREEMENT FOR STRUCTURAL DESIGN SERVICES FOR FARADAY CENTER ROOF AND HVAC REPLACEMENT PACIFIC ARCHITECTURE & ENGINEERING This Amendment No. 1 is entered into and effective as of the \ ~ day of j'/\ :@V CV) , 201&'._, extending and amending the agreement dated June 21, 2017, (the "Agreement") by and between the City of Carlsbad, a municipal corporation, ("City"), and Pacific Architecture & Engineering, a California corporation, ("Contractor") (collectively, the "Parties") for develop structural drawings and specifications for HVAC units. RECITALS A. The Parties desire to alter the Agreement's scope of work to include structural calculations and reinforcement design for HVAC units; and B. The Parties have negotiated and agreed to a supplemental scope of work and fee schedule, which is attached to and incorporated in by this reference as Exhibit "A", Scope of Services and Fee. NOW, THEREFORE, in consideration of these recitals and the mutual covenants contained herein, City and Contractor agree as follows: 1. In addition to those services contained in the Agreement, as may have been amended from time to time, Contractor will provide those services described in Exhibit "A". With this Amendment, the total annual Agreement amount shall not exceed one hundred thirteen thousand two hundred thirty four dollars ($113,234). 2. City will pay Contractor for all work associated with those services described in Exhibit "A" on a time and materials basis not-to-exceed fifteen thousand two hundred ninty three dollars ($15,293). Contractor will provide City, on a monthly basis, copies of invoices sufficiently detailed to include hours performed, hourly rates, and related activities and costs for approval by City. 3. Contractor will complete all work described in Exhibit "A" by June 21, 2018. 4. All other provisions of the Agreement, as may have been amended from time to time, will remain in full force and effect. 5. All requisite insurance policies to be maintained by the Contractor pursuant to the Agreement, as may have been amended from time to time, will include coverage for this Amendment. Ill Ill Ill City Attorney Approved Version 1 /30/13 March 13, 2018 Item #4 Page 5 of 8 GS1563 6. The individuals executing this Amendment and the instruments referenced in it on behalf of Contractor each represent and warrant that they have the legal power, right and actual authority to bind Contractor to the terms and conditions of this Amendment. CONTRACTOR PACIFIC ARCHITECTURE & ENGINEERING, a California corporation By: (sign here) 7lTfr HN---L- (print name/title) CITY OF CARLSBAD, a municipal corporation of the State of California By: f JJU M~ Mayor ATTEST: City Clerk If required by City, proper notarial acknowledgment of execution by Contractor must be attached. If a corporation, Agreement must be signed by one corporate officer from each of the following two groups: Group A Chairman, President, or Vice-President Group B Secretary, Assistant Secretary, CFO or Assistant Treasurer Otherwise, the corporation must attach a resolution certified by the secretary or assistant secretary under corporate seal empowering the officer(s) signing to bind the corporation. APPROVED AS TO FORM: CELIA A. BREWER, City Attorney BY:_~_,--~-~--- Deputy City Attorney City Attorney Approved Version 1 /30/13 2 March 13, 2018 Item #4 Page 6 of 8 Attachment 'A' EXHIBIT "A" Scope of Services and Fees Task Outline: Structural Calculations to verify existing gravity framing in place is acceptable to support replacement AC units, and provide details to either reinforce existing framing or to distribute loads out to an acceptable level where capacities have been exceeded. The work will include structural calculations to tabulate additional seismic weight added to the existing building for review by the Owner. An increase in more than 5% of building weight will trigger a seismic retrofit per California Building Code requirements. Seismic retrofit design is excluded from this scope of work. Fee Schedule: Hourly Rate: Hours: Total: Project Manager $171 8 $1,368 Project EnQineer $190 5 $950 Engineer $145 55 $7,975 Jr Engineer $125 40 $5,000 Total Fee: $15,293 City Attorney Approved Version 1/30/13 3 March 13, 2018 Item #4 Page 7 of 8