HomeMy WebLinkAbout2008-11-05; Design Review Board; Resolution 3341 DESIGN REVIEW BOARD RESOLUTION NO. 334 2 A RESOLUTION OF THE DESIGN REVIEW BOARD OF THE CITY OF 3 CARLSBAD, CALIFORNIA, RECOMMENDING APPROVAL OF MAJOR REDEVELOPMENT PERMIT NUMBER RP 05-04 FOR FUTURE 4 REDEVELOPMENT OF THE ARMY/NAVY ACADEMY ON PROPERTY GENERALLY LOCATED ON THE EAST AND WEST SIDE OF CARLSBAD BOULEVARD BETWEEN MOUNTAIN VIEW DRIVE AND BEECH 6 AVENUE IN LAND USE DISTRICT 9 OF THE CARLSBAD VILLAGE REDEVELOPMENT AREA AND IN LOCAL FACILITIES MANAGEMENT 7 ZONE1. CASE NAME: ARMY/NAVY ACADEMY MASTER SITE PLAN 8 APN: 203-14-206,203-05-103,203-05-201,203-05-202,203-05- 9 301,203-04-102 CASE NO: RP 05-04 10 WHEREAS, Army/Navy Academy, "Applicant", has filed a verified application with 12 the Redevelopment Agency of the City of Carlsbad regarding property owned by the 13 Army/Navy Academy, "Owner", described as Assessor Parcel Numbers 203-14-206, 203-05-14 15 103, 203-05-201, 203-05-202, 203-05-301, 203-04-102 and more thoroughly described in 16 Attachment A, ("the Property"); and 17 WHEREAS, said application constitutes a request for a Major Redevelopment Permit, as 18 shown on Exhibits "A"-"H" dated November 5, 2008, on file in the Housing and 19 Redevelopment Department, "Army/Navy Academy Master Site Plan RP 05-04/CUP 94- 20 02X1A", as provided by Chapter 21.35.080 of the Carlsbad Municipal Code; and 22 WHEREAS, the Design Review Board did on the 5th day of November, 2008, hold a 23 duly noticed public hearing as prescribed by law to consider said request; and 24 WHEREAS, at said public hearing, upon hearing and considering all testimony and 25 arguments, if any, of persons desiring to be heard, said Board considered all factors related to 26 "Army/Navy Academy Master Site Plan." 27 28 1 NOW, THEREFORE, BE IT HEREBY RESOLVED, by the Design Review Board as 2 follows: 3 A. That the foregoing recitations are true and correct. 4 - B. That based on the evidence presented at the public hearing, the Design Review Board RECOMMENDS APPROVAL of Army/Navy Academy Master Site 6 Plan RP 05-04, based on the following findings and subject to the following conditions: 7 GENERAL AND REDEVELOPMENT PLAN CONSISTENCY FINDINGS;8 9 1. The Planning Director has determined that the project belongs to a class of projects that the State Secretary for Resources has found do not have a significant impact on the environment, 10 and it is therefore recommending approval of the Negative Declaration for the project. 2. The Design Review Board finds that the project, as conditioned herein and the j2 establishment of the RH density designation for the project, is in conformance with the Elements of the City's General Plan, the Carlsbad Village Area Redevelopment Plan, and the 13 Carlsbad Village Redevelopment Master Plan and Design Manual based on the facts set forth in the staff report dated November 5,2008 including, but not limited to the following: 14 . - a. The proposed project is consistent with the goals and objectives for the Village, as outlined within the General Plan, because it provides for a civic and cultural 16 use in an accepted location within the Village. This in turn serves to enhance and maintain the Army/Navy Academy as it is the only military boarding school 17 in California. The project reinforces the pedestrian-orientation desired for the downtown area because the school's proximity to the Village provides the students and its employees an opportunity to walk to shopping, recreation, and 19 mass transit functions. With the project being close to existing bus routes and mass transit, it will help to further the goal of providing new economic 20 development near transportation corridors. Furthermore, the Army/Navy Academy assists in encouraging complementary uses in the Village and adding 21 diversity to the Village population that helps create and/or enhance a lively and 22 interesting social environment. 23 b. The project is consistent with the Village Redevelopment Master Plan and Design manual in that the proposed project assists in satisfying goals and 24 objectives set forth for Land Use District 9 through the following actions: it stimulates property improvements and new development in the Village by providing for new development or rehabilitation of existing facilities; and it 26 improves the physical appearance of the Village Area by replacing outdated buildings with aesthetically pleasing buildings that will be using a Spanish 27 Colonial Revival architectural style along with attractive landscaping. Future construction at the Army/Navy Academy will incorporate appropriate site28 DRB RESO NO. 334 -2- planning, architectural design and materials that comply with City standards 2 and requirements. 3 c. The project as designed is consistent with the development standards for Land Use District 9, the Village Design Guidelines and other applicable regulations set forth in the Village Master Plan and Design Manual. d. The existing streets can accommodate the estimated ADTs and all required 5 public right-of-way has been or will be dedicated and has been or will be improved to serve the development. The pedestrian spaces and circulation have 7 been designed in relationship to the land use and available parking. Public facilities will be constructed to serve the proposed project as required with future construction. The project has been conditioned to develop and implement a program of "best management practices" for the elimination and reduction of pollutants which enter into and/or are transported within storm drainage 10 facilities. e. The proposed project will not have an adverse impact on any open space within the surrounding area. The project is consistent with the Open Space requirements for new development within the Village Redevelopment Area and 13 the City's Landscape Manual. 14 f. Future construction associated with the proposed project will be conditioned to comply with the Uniform Building and Fire Codes adopted by the City to ensure that the project meets appropriate fire protection and other safety standards. 16 g. The proposed project is consistent with the Housing Element of the General 17 Plan, the City's Inclusionary Housing Ordinance, and the Redevelopment Agency's Inclusionary Housing Requirement, as the Army/Navy Academy will be subject to all inclusionary housing requirements at the time permits are , Q applied for residential units. 20 h. The proposed project meets all of the minimum development standards set forth in Chapter 21.45.080, and has been designed hi accordance with the concepts 21 contained in the Village Master Plan and Design Guidelines Manual, in that the overall plan for the project is comprehensive and incorporates many of the architectural features of surrounding developments. The buildings, 23 landscaping, and on-site amenities all conform to the Village Redevelopment Master Plan and Design Manual which serves as the adopted land use plan for 24 the area. The overall plan for the project provides for adequate usable open space, circulation, off-street parking, recreational facilities and other pertinent amenities. The parking is provided through surface level parking lots which are located in carious locations of the school campus. The project is compatible with surrounding land uses and will not negatively impact circulation patterns in the 27 area. The overall architecture is compatible with the surrounding area and consistent with the Village character as set forth in the Village Master Plan and 28 Design Manual. DRB RESO NO. 334 -3- 1 2 3. The Design Review Board hereby finds that the appropriate residential density for the project is RH (15-23 dwelling units per acre), which has a Growth Management Control Point 3 (GMCP) of 19 dwelling units per acre. Justification for the RH General Plan density designation is as follows: 4 ~ a. The density is compatible with the surrounding area, which contains a variety of uses including multi-family residential, single-family residential, commercial and 6 hotel. Application of the RH General Plan designation on the subject property would allow for future high density residential mixed-use development, which is 7 permitted in District 9, and would be compatible with the mixture of surrounding uses. 8 9 b. The RH General Plan density designation serves to satisfy the goals of the Village Redevelopment Master Plan by increasing the number, quality, diversity, 10 and affordability of housing units within this area of the Village. The high density designation allows for future development that would be consistent the 1 goals and objectives of the Redevelopment Master Plan. 12 c. The RH General Plan density designation serves to satisfy the objectives of Land 13 Use District 9 by increasing the number of residential units in close proximity to shops, restaurants, and mass transportation (Bus & Village Coaster Station). 14 High residential densities in close proximity to mixed-use areas with easy access to mass transportation promote greater job/housing balance and help solve regional issues such as reduced traffic congestion and improved air quality. 16 4. All necessary public facilities required by the Growth Management Ordinance will be 17 constructed or are guaranteed to be constructed concurrently with the need for them created by this project and in compliance with adopted City standards, in that all required public 1° facilities necessary to accommodate the proposed development have been provided or I n are required as conditions of project approval. 20 5. The project is consistent with the City-wide Facilities and Improvements Plan, the Local Facilities Management Plan for Zone 1, and all City public facility policies and ordinances. 21 The project includes elements or has been conditioned to construct or provide funding to ensure that all facilities and improvements regarding: sewer collection and treatment; water; drainage; circulation; fire; schools; parks and other recreational facilities; libraries; 23 government administrative facilities; and open space, related to the project will be installed to serve new development prior to or concurrent with need. Specifically, 24 a. The project has been conditioned to ensure that building permits will not be issued for the project unless the District Engineer determines that sewer service 26 is available, and building cannot occur within the project unless sewer service remains available and the District Engineer is satisfied that the requirements of 27 the Public Facilities Element of the General Plan have been met insofar as they apply to sewer service for this project. 28 DRB RESO NO. 334 -4- b. All necessary public improvements have been provided or will be required as 2 conditions of individual project approvals. c. The project has been conditioned to provide proof from the Carlsbad Unified 3 School District that the project has satisfied its obligation to provide fees for school facilities. 4 <- d. Park-in-lieu fees are required by Carlsbad Municipal Code Chapter 20.44, and will be collected prior to the issuance of building permit. 6 e. The Public Facility fee is required to be paid by Council Policy No. 17 and will 7 be collected prior to the issuance of building permit. o 6. The project is consistent with the City's Landscape Manual. 9 7. The Design Review Board has reviewed each of the exactions imposed on the Developer 10 contained in this resolution, and hereby finds, in this case, that the exactions are imposed to mitigate impacts caused by or reasonably related to the project, and the extent and the degree 1 of the exaction is in rough proportionality to the impact caused by the project. 12 GENERAL CONDITIONS: 13 Note: Unless otherwise specified herein, all conditions shall be satisfied prior to the issuance of 14 building permits. 1. If any of the following conditions fail to occur; or if they are, by their terms, to be 16 implemented and maintained over time, if any of such conditions fail to be so implemented and maintained over time, if any such conditions fail to be so implemented 17 and maintained according to their terms, the City/Agency shall have the right to revoke or modify all approvals herein granted; deny or further condition issuance of all future building permits; deny, revoke or further condition all certificates of occupancy issued 19 under the authority of approvals herein granted; record a notice of violation on the property title; institute and prosecute litigation to compel their compliance with said 20 conditions or seek damages for their violation. No vested rights are gained by Developer or a successor in interest by the City's/Agency's approval of this Major Redevelopment 21 Permit. 22 2. Staff is authorized and directed to make, or require the Developer to make, all corrections 23 and modifications to the Major Redevelopment Permit Master Site Plan documents, as necessary to make them internally consistent and in conformity with the final action on 24 the project. 25 3. The Developer shall comply with all applicable provisions of federal, state, and local laws 26 and regulations in effect at the time of building permit issuance. 27 4. If any condition for construction of any public improvements or facilities, or the payment of any fees in-lieu thereof, imposed by this approval or imposed by law on this Project are 2% challenged, this approval shall be suspended as provided in Government Code Section DRB RESO NO. 334 -5- 66020. If any such condition is determined to be invalid this approval shall be invalid 2 unless the Housing and Redevelopment Commission determines that the project without the condition complies with all requirements of law. 3 5. The Developer/Operator shall and does hereby agree to indemnify, protect, defend and hold harmless the Redevelopment Agency of the City of Carlsbad, its governing body c members, officers, employees, agents, and representatives, from and against any and all liabilities, losses, damages, demands, claims and costs, including court costs and 6 attorney's fees incurred by the Agency arising, directly or indirectly, from (a) Agency's approval and issuance of this Major Redevelopment Permit, (b) Agency's approval or 7 issuance of any permit or action, whether discretionary or non-discretionary, in connection with the use contemplated herein, and (c) Developer/Operator's installation and operation of the facility permitted hereby, including without limitation, any and all 9 liabilities arising from the emission by the facility of electromagnetic fields or other energy waves or emissions. This obligation survives until all legal proceedings have been 10 concluded and continues even if the Agency's approval is not validated. 6. The Developer shall submit to the Housing and Redevelopment Department a reproducible 24" x 36", mylar copy of the Major Redevelopment Permit reflecting the conditions approved by the final decision making body. 13 7. The Developer shall include, as part of the plans submitted for any future permit plan check, a reduced legible version of all approving resolution(s) in a 24" x 36" blueline 1, drawing format. 16 8. Prior to the issuance of a building permit, the Developer shall provide proof to the Director from the Carlsbad School District that this project has satisfied its obligation to 17 provide fees for school facilities. 18 9. This project shall comply with all conditions and mitigation measures which are required 19 as part of the Zone 1 Local Facilities Management Plan and any amendments made to that Plan prior to the issuance of any future building permits. 20 10. Approval is granted for Major Redevelopment Permit RP 05-04 as shown on Exhibits 21 "A"-"H", dated November 5, 2008, on file in the Housing and Redevelopment 22 Department and incorporated herein by reference. 11. This approval is granted subject to the approval of the Negative Declaration of the 23 project and is subject to all conditions 12. This approval is granted subject to the approval of the Negative Declaration and »<- adoption of Conditional Use Permit No. CUP 94-02X1A and is subject to all conditions contained in Planning Commission Resolutions No. 6493 and 6495 for these other 26 approvals and incorporated by reference herein. 27 13. Building permits will not be issued for future development unless the local agency providing water and sewer services to the project provides written certification to the City that adequate water service and sewer facilities, respectively, are available to the project DRB RESO NO. 334 -6- at the time of the application for the building permit, and that water and sewer capacity 2 and facilities will continue to be available until the time of occupancy. 3 14. Approval of this Master Site Plan is a guiding land use document and does not grant any permits for construction of any specific buildings or facilities on campus. The construction and development of buildings on campus will require approval of a <. Redevelopment Permit and any other associates permits at a later date. 6 15. All future development shall comply with the requirements of the District 9 development standards as described in the Carlsbad Village Master Plan and Design Manual and Title 7 21 of the Carlsbad Municipal Code. o 16. Development of buildings and facilities shall occur consistent with the Buildout Parking Requirements and phasing of the Master Site Plan. 10 17. Total enrollment of the Army/Navy Academy shall not exceed 440 students at build out. 18. Total number of employees shall not exceed 116 at build out. 12 19. The architecture of future buildings and facilities shall comply with the design guidelines 13 outlined within the Carlsbad Village Master Plan and Design Manual. 14 MISCELLANEOUS CONDITIONS: 20. Developer shall pay the citywide Public Facilities Fee imposed by City Council Policy #17, the License Tax on new construction imposed by Carlsbad Municipal Code Section 5.09.030, and CFD #1 special tax (if applicable), subject to any credits authorized by 17 Carlsbad Municipal Code Section 5.09.040. Developer shall also pay any applicable Local Facilities Management Plan fee for Zone 1, pursuant to Chapter 21.90. All such ° taxes/fees shall be paid at issuance of building permit for each approved individual development. If the taxes/fees are not paid, this approval of the Master Site Plan and future developments will not be consistent with the General Plan and shall become void. 20 21. All future buildings shall have roof appurtenances, including air conditioners, that are 21 architecturally integrated and concealed from view and the sound buffered from adjacent properties and streets, in substance as provided in Building Department Policy No. 80-6, to the satisfaction of the Directors of Community Development and/or Housing and 23 Redevelopment. 24 NOTICING CONDITIONS: 25 22. Prior to the issuance of the first building permit following approval of the subjected Master Site Plan, Developer shall submit to the City a Notice of Restriction to be filed in the office of the County Recorder, subject to the satisfaction of the Housing and 27 Redevelopment Director, notifying all interested parties and successors in interest that the City of Carlsbad has issued a Major Redevelopment Permit by Design Review Board Resolution No. 334 on the real property owned by the Developer. Said Notice of DRBRESONO. 334 -7- Restriction shall note the property description, location of the file containing complete 2 project details and all conditions of approval as well as any conditions or restrictions specified for inclusion in the Notice of Restriction. The Housing and Redevelopment 3 Director has the authority to execute and record an amendment to the notice which modifies or terminates said notice upon a showing of good cause by the Developer or successor in interest. 5 ON-S1TE CONDITIONS: 6 23. With future development, the developer shall construct trash receptacle and recycling 7 areas with gates pursuant to the City Engineering Standards and Carlsbad Municipal Code Chapter 21.105. Location of said receptacles shall be approved by the Housing & Redevelopment Director. Enclosure shall be of similar colors and/or materials of the 9 project and subject to the satisfaction of the Housing & Redevelopment Director. 10 24. No outdoor storage of material shall occur onsite unless required by the Fire Chief. When so required, the Developer shall submit and obtain approval of the Fire Chief and Housing & Redevelopment Director of an Outdoor Storage Plan, and thereafter comply 12 with the approved plan. 13 25. The developer shall submit and obtain Housing & Redevelopment Director approval of an exterior lighting plan with future parking areas. All lighting shall be designed to reflect downward and avoid any impacts on adjacent homes or property. 15 ENGINEERING CONDITIONS: 16 26. The Carlsbad Blvd. Pedestrian Bridge is shown on the Army Navy Academy Master Site 17 Plan (Phase 17) as an information item only. This bridge will require This bridge will require separate approvals.18 19 27. As stated in Chapter 5 of the Master Site Plan text, Developer shall fund and initiate the Alternative Street Design Process for this project in accordance with the Street and 20 Sidewalk Policy Committee Report as adopted by City Council 8/1/2000. 28. Concurrent with any development fronting Carlsbad Blvd. or Beech Ave. (Planning Area "A" or Planning Area "E"), Developer shall design and provide for the construction of missing or damaged improvements to Beech Ave., Carlsbad Blvd., or Mountain View 23 Drive as determined by the City Engineer. 24 29. Concurrent with any discretionary permits for this project that proposes a building permit, as identified in Chapter 5 of the Master Site Plan, Developer shall prepare separate detailed studies, prepared by a Registered Engineer, to determine whether facilities (sanitary sewer, potable water, and storm drain) are adequate to serve the needs of this project. These studies shall demonstrate that Growth Management Standards are met for 27 the facilities within this zone, and as it relates to impacts from this Project. These studies shall be prepared to the satisfaction of the City Engineer. If deficiencies are identified, Developer is responsible to construct or otherwise financially guarantee the necessary DRB RESO NO. 334 -8- facility improvements. 2 30. Concurrent with any discretionary permits for this project, Developer shall study and 3 address undergrounding of existing overhead utilities within and adjacent to the project boundary. 4 31. Prior to the approval of any application for development or redevelopment including building permits, Developer shall submit to the City Engineer proof that the existing lots 5 within this project have been adjusted, consolidated or merged in accordance with the Carlsbad Municipal Code. 7 32. Prior to the approval of any application for development or redevelopment including building permits, Developer shall cause property owner to execute and submit to the City Engineer for recordation the City's standard form Drainage Hold Harmless Agreement regarding drainage across the adjacent properties. 10 33. Prior to the approval of any application for development or redevelopment including building permits, Developer shall submit for City approval a "Storm Water Pollution Prevention Plan (SWPPP)" and a "Storm Water Management Plan (SWMP)." Each plan shall demonstrate compliance with the City of Carlsbad Standard Urban Stormwater 13 Mitigation Plan (SUSMP), Order R9-2007-0001 issued by the San Diego Region of the California Regional Water Quality Control Board and City of Carlsbad Municipal Code. 14 The SWMP shall address measures to avoid contact or filter said pollutants from storm water, to the maximum extent practicable, for the construction and post-construction stage of the project. At a minimum, the plans shall: 16 a. Identify existing and post-development on-site pollutants-of-concern. 17 b. Identify the hydrologic unit this project contributes to and impaired water bodies that could be impacted by this project. 1 ° c. Recommend source controls and treatment controls that will be implemented with this project to avoid contact or filter said pollutants from storm water to the maximum extent practicable before discharging offsite; 20 d. Establish specific procedures for handling spills and routine cleanup. Special considerations and effort shall be applied to employee education on the proper 21 procedures for handling cleanup and disposal of pollutants. e. Ensure long-term maintenance of all post-construction BMPs in perpetuity. f. Identify how post-construction runoff rates and velocities from the site will not 23 exceed the pre-construction runoff rates and velocities to the maximum extent practicable. 24 33. Prior to the approval of any application for development or redevelopment including building permits, Developer shall cause property owner to process, execute and submit an executed copy to the City Engineer for recordation a City standard Permanent Stormwater Quality Best Management Practice Maintenance Agreement for the perpetual 27 maintenance of all treatment control, applicable site design and source control, post- construction permanent Best Management Practices prior to the issuance of a grading 28 permit or building permit, whichever occurs first for this Project. DRB RESO NO. 334 -9- 1 STANDARD CODE REMINDERS: 2 The project is subject to all applicable provisions of local ordinances, including but not limited to 3 the following code requirements. General 34. Approval of this request shall not excuse compliance with all applicable sections of the 6 Zoning Ordinance and all other applicable City Ordinances in effect at the time of future building permit issuance, except as otherwise specifically provided herein. 7 35. Premise identification (addresses) shall be provided consistent with Carlsbad Municipal 8 Code Section 18.04.320 for all future development. 9 36. Any signs proposed for future development shall at a minimum be designed in 10 conformance with the approved plans and the sign criteria contained in the Village Redevelopment Master Plan and Design Manual and shall require review and approval of the Housing & Redevelopment Director prior to installation of such signs. 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 DRBRESONO. 334 -10- 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 PASSED, APPROVED, AND ADOPTED at a meeting of the Design Review Board of the City of Carlsbad, California, held on the 5th day of November, 2008, by the following vote to wit: AYES: BAKER, PRIETTO, LAWSON AND SCHUMACHER NOES: WHITTON ABSENT: NONE ABSTAIN: NONE ANTHONY LAWSON, CHAIRPERSON DESIGNAEVIEW BOARD ATTEST: DEBBIE FOUNTAIN HOUSING AND REDEVELOPMENT DIRECTOR DRB RESO NO. 334 -11-