Loading...
HomeMy WebLinkAbout1984-02-15; Municipal Water District; Resolution 446RESOLUTION NO. 446 RESOLUTION OF THE BOARD OF DIRECTORS OF COSTA REAL MUNICIPAL WATER DISTRICT ESTABLISHING CONSTRUCTION CHARGES FOR WATER SERVICE LINE CONNECTIONS AND INSTALLATION OF FIRE HYDRANTS WHEREAS, COSTA REAL MUNICIPAL WATER DISTRICT has been col- lecting construction charges for water service line connections and installation of fire hydrants within the prior retail water service area of COSTA REAL MUNICIPAL WATER DISTRICT: and WHEREAS, CITY OF CARLSRAD has been collecting construction charges for water service line connections and installation of fire hydrants within the prior retail water service area of the CITY OF CARLSRAD: and WHEREAS, under the Water Service Agreement, executed May 25, 1983, between CITY OF CARLSRAD and COSTA REAL MUNICIPAL WATER DIS- TRICT, all construction of water service line connections and instal- lation of fire hydrants will now be performed by COSTA REAL MUNICIPAL WATER DISTRICT: and WHEREAS, it is deemed to be to the best interest of all parties desiring to secure water service line connections and fire hydrants within the boundaries of COSTA REAL MUNICIPAL WATER DIS- TRICT to establish a uniform rate for construction charges for all water service connections and installation of fire hydrants within the boundaries of COSTA REAL MUNICIPAL WATER DISTRICT, constructed and/or installed by COSTA REAL MUNICIPAL WATER DISTRICT: 7 -1- NOW, THEREFORE, THE BOARD OF DIRECTORS OF COSTA REAL MUNICI- - PAL WATER DISTRICT DOES HEREBY RESOLVE AND ORDER AS FOLLOWS: 1. The construction charges for a water service connection constructed by COSTA REAL MUNICIPAL WATER DISTRICT shall be as fol- lows: Pipe Size 1 inch 2 inch Any pipe size in excess of 2 inches Charge $ 400.00 $ 600.00 Actual construction cost, with a deposit made on basis of es- timated construction charge 7 2. The construction charges for installation of a fire hy- drant installed by COSTA REAL MUNICIPAL WATER DISTRICT shall be the actual installation cost, with a deposit of $2,500.00 per fire hy- drant. 3. In any event where an individual is required to post a deposit for construction charges of a water service connection or installation of a fire hydrant, the individual shall be responsible for paying the actual construction cost or installation cost. In the event that the actual construction cost or installation cost is less than the deposit, the individual shall receive a refund of any excess funds deposited over the actual construction costs or instal- - lation costs. 4. The CITY OF CARLSRAD Street Department shall be utilized for all paving and patching of streets where required as a result of -2- 4 the construction of a water service connection or installation of a fire hydrant. COSTA REAL MUNICIPAL WATER DISTRICT will pay to the CITY OF CARLSBAD $185.00 for the services rendered by the CITY OF CARLSBAD Street Department. Such $185.00 shall be a portion of the construction charges established herein for water service line con- nections and installation of fire hydrants. c PASSED, APPROVED AND ADOPTED this 15th day of February, 1984. ,A&d N. M. ALMACK c / President of the Board of Directors of COSTA REAL MUNICIPAL WATER DISTRICT ATTEST: of the Board of Disctors of COSTA REAL MUNICIPAL WATER DISTRICT -3- STATE OF CALIFORNIA 1 COUNTY OF SAN DIEGO 1 1 ss. I, ALLAN 0. KELLY, Assistant Secretary of the COSTA REAL MU- NICIPAL WATER DISTRICT and of the Board of Directors thereof, do here- by certify that the foregoing Resolution was duly adopted by the Board of Directors of said District at a regular meeting of the Board held on the 15th day of February, 1984, and that it was adopted by the following vote: AYES: NOES : ABSENT: Directors: ALMACK, RONAS, KELLY and MacLEOD Directors: None Directors: MAERKLE ALLAN 0. KELLY', Ass(i$tant Secretary of the Board of Eirectors of COSTA REAL MUNICIPAL WATER DISTRICT ~ -4-