Loading...
HomeMy WebLinkAbout1992-09-01; Municipal Water District; Resolution 808li 0 0 1 2 3 4 5 RESOLUTION NO. 808 A RESOLUTION OF THE BOARD OF DIRECTORS OF THE CARLSBAD MUNICIPAL WATER DISTRICT OF CARLSBAD, CALIFORNIA, ESTABLISHING FEES FOR ENGINEERING SERVICES WHEREAS, the Carlsbad Municipal Water District 6 authority to establish fees for engineering services; and 7 WHEREAS, from time to time said fees are revie 8 13 the purpose of defraying the cost of the review and appr 12 the Board of Directors of the Carlsbad Municipal Water Disti 11 Section I1 states the fees shall be established by resolu 10 for engineering services, and adoption of Ordinance No. - 9 evaluated to maintain an adequate fee structure recoverin connection with developmental review process of the ( 15 line and lateral installation, replacement and relocat 14 potable water, reclaimed water and sewer facilities, includ: 16 Carlsbad; and 17 WHEREAS, the Board of Directors has determined t 18 of providing general engineering services; and 19 WHEREAS, the Board of Directors finds it neces 20 recover the costs for general engineering services; and 21 WHEREAS, the Board of Directors has determined 1 22 are fair and reasonable in reaction to the services receir 23 fees shown in Exhibit A, attached hereto and made a part 25 WHEREAS, the Board of Directors has held the nc 24 public hearing and allowed the public comment on the estab: 26 of said fees. 27 NOW, THEREFORE, BE IT RESOLVED by the Carlsbad Mi 28 Water District of the City of Carlsbad, California that 1 L 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 e 0 schedule shown in Exhibit A attached, hereto and made hereof, is hereby adopted and shall become the offic: schedule for the Carlsbad Municipal Water District. Any f not included in said list shall remain under the con previous resolution by this Board. All fees shall become ef on the effective date of Ordinance No. 40 , estak procedure for setting fixed fees for engineering servi potable and reclaimed water and sewer facilities. PASSED, APPROVED AND ADOPTED at a meeting of the C Municipal Water District on the 1st day of SEPTEMBE 1992, by the following vote to wit: AYES: Board Members Lewis, Larson, Stanton, Nygaard NOES: None ABSENT: Board Member Kulch' &//&A# r f / B CLAUDE A': lLE,kIc, wPresident ATTEST : 1L ALETHA L. F?AU (SEAL) 2 * 0 . 1 0 EXHIBIT A 2 11 CARLSBAD MUNICIPAL WATER DISTRICT'S ENGINEERING SERVICE F 3 4 5 6 7 (i) Preliminary Potable Water, Reclaimed Water and Sewer Analysis Review (ii) Reclaimed Water Landscape Review (iii) Hydraulic Analysis Only (iv) Potable, Reclaimed and Sewer Improvement Plan Review: 8 9 MINIMUM ESTIMATED CONSTRUCTION FEE COSTS FEE PERCEN' $400 Under $80,000 1.00% 10 11 12 13 14 $800 $80,000 - $200,000 $1,400 $200,000 - $500,000 $2 , 250 $500,000 - $800,000 $2 , 800 $800,000 and over 0.70% 0.45% 0.35% to be calculi a project by basis 15 16 Recording (VI Easement Document Processing and $150 17 (vi) I/ Costs for Potable, Reclaimed and Sewer Standards and Specifications $ 18 (vii) Costs for Blueprinting of Standard Size 19 (24" x 36") Improvement Plan Sheet 20 (viii) Photo copying per sheet $0 21 22 23 24 25 26 27 28 li !! 3