Loading...
HomeMy WebLinkAbout1998-10-27; Municipal Water District; Resolution 1029+ 1 2 3 4 5 0 @ RESOLUTION NO. 1029 A RESOLUTION OF THE BOARD OF DIRECTORS OF THE CARLSBAD MUNICIPAL WATER DISTRICT OF CARLSBAD, CALIFORNIA, ACCEPTING BIDS AND AWARDING PROJECT NO. 3184 FOR THE CONSTRUCTION OF CANNON ROAD WEST REACH 1 WATER AND RECYCLED WATER TRANSMISSION MAINS TO HAZARD CONSTRUCTION COMPANY. 6 WHEREAS, the Board of Directors of the Carlsbad Municipal Water District, C 7 water transmission main with Cannon Road West Reach 1 plans and specifications, 8 California, has previously authorized combining a 16-inch water and 24-inch Project No. 88-602, Contract No. 35341; and 9 10 WHEREAS, the low bid received to construct said project submitted Brutoco Eng 11 WHEREAS, three (3) sealed bids were received on August 21, 1998 for said proje 12 and Construction, Inc., was found to be non-responsive; and 13 WHEREAS, the contract documents require that 50% of the project shall be perfo 14 determined because the Designation of Subcontractor Form was not completed; and 15 contractor’s own forces,, however, the low bidder’s total subcontracted amount could 16 WHEREAS, the low bidder did not fill out the Designation of Subcontractors B 17 Profit Amount were left blank on all subcontractor forms; and 18 form. The Amount of Item Subcontracted, Amount of Item by contractor and the Overh 19 WHEREAS, the second low bid received to construct said project submitted by 20 Construction Company, ‘did not attach an explanation to two subcontractors forms; and 21 WHEREAS, the total subcontracted amount of work would be 43% if the subcc 11 were to perform all work; and 22 WHEREAS, the failure to attach the explanations is a minor irregularity which c 23 contractor no advantage; and 24 WHEREAS, the bid from Hazard Construction Company is considered responsive WHEREAS, all bid documents received from all bidders have been reviewed in dl the Board of Directors does hereby find that the lowest responsive, responsible bid rea the construction of said project was submitted by Hazard Construction Company in the a1 25 26 27 28 $493,591; and 7. d 1 0 0 WHEREAS, funds in the amount of $593,591 to include construction of a 16-inc 2 $50,000 for inspection services, are needed to complete the project; and 3 and 24-inch recycled water transmission main, $50,000 for construction contingenci 4 WHEREAS, Subsection 3.28.1720(1) of the Carlsbad Municipal Code authorizes 5 award. 6 Manager to approve change orders in the amount of the contingency set at the time 0' 7 NOW, THEREFORE, BE IT RESOLVED by the Board of Directors of the ( 8 9 Municipal Water District of Carlsbad, California, as follows: 1. That the above recitations are true and correct. 10 2. That $593,591 remain available from the connection fee program 11 transmission mains. 12 3. That the bid amount of $493,591 submitted by Hazard Construction Cor 13 therefore, a copy of which is on file in the Office of the Secretary. 14 hereby accepted, and the President is hereby authorized and directed to execute the agr 15 16 4. That a construction contingency in the amount of $50,000 is hereby appro PASSED, APPROVED AND ADOPTED at a special meeting of the Carlsbad h 17 Water District held on the 27th day of October , 1998 by the following votc AYES: Board Members Lewis, Nygaard, Kulchin and Hall NOES: None 18 19 20 21 22 23 24 ATTEST: 25 26 4 Q-2L.J- ALETHA L. RAUTENKRANZ, Secretary 1 (SEAL) 27 II 28