Loading...
HomeMy WebLinkAbout2004-07-13; Municipal Water District; Resolution 12181 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 ,,I '1 ,,?\%( ' i - .< RESOLUTION NO. 1218 A RESOLUTION OF THE BOARD OF DIRECTORS OF CARLSBAD MUNICIPAL WATER DISTRICT (CMWD) TO APPROVE AND AUTHORIZE AN ENGINEERING SERVICES AGREEMENT FOR DESIGN OF SAN MARCOS BOULEVARD WATER TRANSMISSION PIPELINE REPLACEMENT PROJECT NO. 3956. WHEREAS, the CMWD proposes to replace the existing water transmission main in San Marcos Boulevard, referred to as San Marcos Boulevard Water Transmission Pipeline Replacement, Project No. 3956; and WHEREAS, on May 6, 2004, six statement of qualifications and proposals to perform ipeline design engineering services were submitted to the Engineering Department, and were ?eviewed and ranked by a selection committee composed of Engineering Department staff members. The firm of Daniel Boyle Engineering Corporation is recommended as the most qualified firm and most responsive proposal for this project; and WHEREAS, the Board of Directors of the Carlsbad Municipal Water District has jetermined it necessary, desirable, and in the public interest to enter into an agreement between 3ANIEL BOYLE ENGINEERING CORPORATION and the CMWD for Engineering Design Services to design the San Marcos Boulevard Water Transmission Pipeline Replacement, Project 10.3956; and WHEREAS, the approval of a one-year extension will be included for this agreement. NOW, THEREFORE, BE IT RESOLVED by the Board of Directors of Carlsbad Municipal Nater District (CMWD) of the City of Carlsbad, California, as follows: 1. 2. That the above recitations are true and correct. That the proposal by DANIEL BOYLE ENGINEERING CORPORATION in the amount of $249,940 for engineering design and construction services is accepted and approved. /I Il Il 11 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 3. That the President of the Carlsbad Municipal Water District is authorized and directed to execute the agreement with DANIEL BOYLE ENGINEERING CORPORATION for the design of San Marcos Boulevard Water Transmission Pipeline Replacement, Project No. 3956. PASSED, APPROVED AND ADOPTED at a special meeting of the Carlsbad Municipal Nater District held on the 13th day of July ) 2004 by the following vote, to wit: AYES:Board Members Lewis, Kulchin, Hall and Packard ABSENT: Board ATTEST: &m, h?5?z%d- WOOD, Secretary (SEAL)