Loading...
HomeMy WebLinkAbout2005-12-06; Municipal Water District; Resolution 12631 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 L+fv7/7 2 RESOLUTION NO. 1263 A RESOLUTION OF THE BOARD OF DIRECTORS OF CARLSBAD MUNICIPAL WATER DISTRICT (CMWD) TO APPROVE AND AUTHORIZE AN ENGINEERING SERVICES AGREEMENT WITH DANIEL BOYLE ENGINEERING FOR DESIGN OF THE EL CAMINO REAL POTABLE WATER SYSTEM PROJECTS, PROJECT NOS. 38441, 391 1 1, 391 51, 50021, AND 50031, AND APPROPRIATE FUNDS. WHEREAS, the CMWD proposes to replace existing and install new transmission main in El Camino Real from College Boulevard to Carlsbad Village Drive and pressure reducing station at El Camino ReaVCarlsbad Village Drive, referred to as The El Camino Real Potable Water System Projects. The potable water system projects are part of the Water Distribution System, Project Nos. 38441,391 1 1,391 51,50021, and 50031 ; and WHEREAS, The El Camino Real Water System Improvement Projects involves preparing one set of contract bid documents including plans, specifications, and cost estimates for five separate Capital Improvement Projects to the CMWD water system along El Camino Real; and WHEREAS, Project No. 50031 was scheduled to occur in fiscal year 201 5-201 6; and WHEREAS, an early start to this project is being requested to ensure there are no operational problems due to the new developments in the area and construction in El Camino Real is required for the other pipeline projects; and WHEREAS, on October 27, 2005, four statement of qualifications and proposals to perform pipeline design engineering services were submitted to the Engineering Department. The qualifications and proposals were reviewed and ranked by a selection committee composed of Engineering Department staff members. The firm of Daniel Boyle Engineering is recommended as the most qualified firm and most responsive proposal for this project; and WHEREAS, the Board of Directors of the Carlsbad Municipal Water District has determined it necessary, desirable, and in the public interest to enter into an agreement between DANIEL BOYLE ENGINEERING and the CMWD for Engineering Design Services to design the El Camino Real Potable Water System Projects, Project Nos. 38441, 391 11, 391 51, 50021, and 50031 ; and 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 WHEREAS, additional funds totaling $691,600 are needed at this time to begin this project prior to fiscal year 201 5-201 6 for Project No. 50031 ; and NOW, THEREFORE, BE IT RESOLVED by the Board of Directors of Carlsbad Municipal Water District (CMWD) of the City of Carlsbad, California, as follows: 1. 2. That the Finance Director is authorized to appropriate $691,600 from the Water Connection Fund to cover engineering design and construction services for Project No. 50031, and reduce the CIP funding for year 201 5-201 6 by the same amount. That the above recitations are true and correct. 3. That the proposal by DANIEL BOYLE ENGINEERING in the amount of $198,549 for engineering design services is accepted and approved. 4. That the President of the Carlsbad Municipal Water District is authorized and directed to execute the agreement with DANIEL BOYLE ENGINEERING for the design of El Camino Real Potable Water System Projects, Project Nos. 38441, 391 11, 391 51, 50021, and 50031. PASSED, APPROVED AND ADOPTED at a meeting of the Carlsbad Municipal Water District held on the 6th day of December ,2005 by the following vote, to wit: AYES: Board Members Lewis, Hall, Kulchin, Packard, Sigafoose NOES: None