Loading...
HomeMy WebLinkAbout2006-06-20; Municipal Water District; Resolution 1275RESOLUTION NO. 127S 2 3 4 5 PROJECT NOS. 38441.39111. 39151. 50021. AND 50031. 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 A RESOLUTION OF THE BOARD OF DIRECTORS OF CARLSBAD MUNICIPAL WATER DISTRICT (CMWD), APPROVING PLANS AND SPECIFICATIONS AND AUTHORIZING THE DISTRICT SECRETARY TO ADVERTISE FOR BIDS FOR EICAMINO REAL POTABLE WATER SYSTEM PROJECTS, WHEREAS, the Board of Directors of Carlsbad Municipal Water District has determined it necessary, desirable, and in the public interest to construct El Camino Real Potable Water System Projects, Project Nos. 38441, 39111, 39151, 50021, and 50031; and WHEREAS, the plans and specifications for furnishing of all labor, materials, tools, equipment, transportation, and other expenses necessary or incidental to said project have been prepared and are on file in the Engineering Department of the City of Carlsbad and are incorporated by reference herein; and WHEREAS, the estimated project costs for the El Camino Real Potable Water System Projects is $3,012,000; and WHEREAS, the appropriation totaling $1,662,100 for the El Camino Real Potable Water System Projects, Project Nos. 38441, 39111, 39151, 50021, and 50031 is insufficient to complete the project; WHERAS, additional funds from the Water Connection fund and from the Water Replacement fund are needed to complete the project and will be requested at the time the construction contract is awarded; and WHEREAS, this project is categorically exempt from the environmental review process under Section 15302(c) of Title 14 of the California Code of Regulations. NOW, THEREFORE, BE IT RESOLVED by the Board of Directors of Carlsbad Municipal Water District as follows: 1. That the above recitations are true and correct. 2. That the plans, specifications, and contract documents, on file in the City Engineer's office as described above for the El Camino Real Potable Water System Projects, Project Nos. 38441, 39111, 39151, 50021, and 50031, are hereby approved. 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 3. The District Secretary of the Carlsbad Municipal Water District is hereby authorized and directed to publish, in accordance with State law, a Notice to Contractors Inviting Bids for the construction of the El Camino Real Potable Water System Projects, Project Nos. 38441, 39111, 39151, 50021, and 50031, in accordance with the plans, specifications, and contact documents referred to herein. „ 27 // 28 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 PASSED, APPROVED AND ADOPTED at a Special Meeting of the Carlsbad Municipal Water District of the City of Carlsbad on the 20th day of June 2006, by the following vote: AYES: Commission Members Lewis, Hall, Kulchin, Packard, Sigafoose NOES: None ABSENT: None LEWIS, Mayor ATTEST: /kJ^cdbuJa- LORRAINE M. WOOD (SEAL)={m«