Loading...
HomeMy WebLinkAbout2008-06-24; Municipal Water District; Resolution 1323Exhibit 4 1 RESOLUTION NO. 1323 2 A RESOLUTION OF THE BOARD OF DIRECTORS OF CARLSBAD MUNICIPAL WATER DISTRICT (CMWD), 3 ADOPTING THE WATER DISTRICT FINAL OPERATING 4 BUDGET AND CAPITAL IMPROVEMENT PROGRAM FOR 2008-09. 5 6 7 WHEREAS, the Board of Directors of the Carlsbad Municipal Water District, 8 California, has held such public hearings as are necessary prior to the adoption of the 9 2007-08 Operating and Capital Improvement Budgets. 10 NOW, THEREFORE, BE IT RESOLVED by the Board of Directors of the Carlsbad Municipal Water District as follows: 12 1. That the above recitations are true and correct. 13 2. That certain documents now on file in the office of the Secretary entitled "City 14 of Carlsbad, 2008-09 Operating Budget and 2008-09 to Buildout Capital Improvement 15 Program - Preliminary," as amended in accordance with Exhibit 4-A attached hereto 16 and incorporated by reference herein, is hereby adopted as the Operating and Capital 17 Improvement Budgets for the Carlsbad Municipal Water District for the Fiscal Year 18 2008-09. 19 3. That the amounts reflected as estimated revenues for Fiscal Year 2008-09 20 are hereby adopted as the budgeted revenues for 2008-09. 21 4. That the amount designated as 2008-09 Budget in Exhibit 4-B is hereby 22 appropriated to the fund for which it is designated and such appropriation shall not be 23 increased except as provided herein. 24 5. That total appropriations may only be increased or decreased by the Board 25 of Directors by passage of a resolution amending the budget except as provided herein. 26 6. That the following controls are hereby placed on the use and transfers of 27 budget funds: 28 Exhibit 4 1 A. No expenditure of funds shall be authorized unless sufficient funds have 2 been appropriated by the Water Board or Executive Manager as described below. 3 i. The Executive Manager may authorize all transfers of funds from 4 account to account within the same fund in an amount up to $100,000 per transfer. 5 ii. The Executive Manager may delegate the authority to make budget 6 transfers. 7 iii. The Executive Manager may authorize budget adjustments 8 involving offsetting revenues and expenditures; the Executive Manager may authorize 9 increases in an appropriation for a specific purpose where the appropriation is offset by 10 unbudgeted revenue which is designated for said specific purpose. 11 iv. The Executive Manager may authorize increases in purchased 12 water appropriations in an amount equal to the same percent that water sales exceed 13 the amount of the original revenue estimate. 14 B. The Board of Directors must authorize any increase in the number of 15 authorized permanent personnel positions above the level identified in the final Budget. 16 The Executive Manager may authorize the hiring of temporary or part time staff as 17 necessary, within the limits imposed by the controls listed above. 18 7. That all appropriations and outstanding encumbrances as of June 30, 2008 19 are hereby continued into 2008-09 for such contracts and obligations. 20 8. All appropriations for Capital Improvement Projects remaining unexpended 21 at June 30, 2008, are hereby appropriated for such capital projects for the 2008-09 22 fiscal year. 23 24 25 '" 26 >» 27 28 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 PASSED, APPROVED AND ADOPTED at a Joint Special Meeting of the Carlsbad Municipal Water District Board of Directors, Carlsbad City Council and Carlsbad Housing and Redevelopment Commission held on the 24th day of June, 2008, by the following vote to wit: AYES: Board Members Lewis, Kulchin, Hall, Packard and Nygaard. NOES: None. ABSENT: None. ATTEST: LGJRRAIN (SEAL) £-.o -£:•«- CARLSBAD MUNICIPAL WATER DISTRICT - CAPITAL IMPROVEMENT PROGRAM 2008-09 TO BUILDOUT Exhibit 4-A PROJECT TITLE WATER DISTRIBUTION SYSTEM AVIARA PARKWAY AT PLUM TREE BUENA VISTA PUMP STATION IMPROVEMENTS (STUDY) CALAVERA HILLS WATER BOOSTER STATION STANDBY GENERATOR CANNON ROAD EAST OF EL CAMINO REAL - Reimb CARLSBAD BOULEVARD - SOUTH OF AVENIDA ENCINAS CATHODIC PROTECTION PROGRAM COLLEGE BOULEVARD - CANNON TO BADGER LANE COLLEGE BOULEVARD (ECR TO CANNON ROAD) - Reimb CRESTVIEW DRIVE TRANSMISSION MAIN D RESERVOIR DRAINAGE IMPROVEMENTS (STUDY) D RESERVOIR - PHASE 1 D RESERVOIR - PHASE 11 DEMOLITION OF WATER FACILITIES AT PAJAMA DRIVE DESALINATION GROUNDWATER/SEAWATER STUDY EL CAMINO REAL - PALOMAR AIRPORT ROAD SOUTH EL CAMINO REAL BETWEEN COLLEGE AND JACKSPAR EL CAMINO REAL CROSSING AT KELLY DRIVE EL CAMINO REAL TRANSMISSION MAIN FROM FARADAY TO COUGAR DRIVE EL CAMINO REAL/CARLSBAD VILL DR PIPELINE REPL. EL FUERTE - NORTH OF LOKER - (Reimb) EL FUERTE AND CORINTIA STREET ELLERY WATER PUMP PROJECT FARADAY AVENUE - ORION TO MELROSE WATERLINE - (Reimb) FARADAY AVENUE EXTENSION - Reimb GROUNDWATER DEVELOPMENT - SAN LUIS REY RIVER (STUDY) LAKE CALAVERA RESERVOIR IMPROVEMENTS MAERKLE DAM FLOATING COVER DRAINPIPE REPLACE. MAERKLE FACILITY IMPROVEMENTS MAERKLE PUMP STATION IMPROVEMENTS MAERKLE PUMP STATION IMPROVEMENTS MAERKLE RESERVOIR BRIDGE REPLACEMENT MAERKLE RESERVOIR STORAGE (TAP #2) MAERKLE TRANSMISSION MAIN MARRON ROAD - PRESSURE REGULATING STATION TO OCEANSIDE MASTER PLAN UPDATE MELROSE DRIVE - PALOMAR AIRPORT ROAD TO FARADAY - (Reimb) METER REPLACEMENTS (TRANSFER TO OPERATING FUND) MISCELLANEOUS PIPELINE REPLACEMENT PROJECTS MISCELLANEOUS WATER RESERVOIR FENCING MISCELLANEOUS WATER VALVE REPAIRS/REPLACEMENTS OCEANSIDE INTERTIE UPGRADE PAR/ECR PUMP STATION PAR/ECR PUMP STATION POINSETTIA LANE - EL CAMINO REAL TO SKIMMER CT (Reimb) POINSETTIA LANE - SKIMMER CT TO CASSIA POINSETTIA LANE - SKIMMER CT TO CASSIA POINSETTIA LANE EAST OF BLACK RAIL ROAD 12" POINSETTIA LANE EAST OF BLACK RAIL ROAD 12" PRESSURE REDUCING STATION REPLACEMENT PUBLIC WORKS CENTER RANCHO CARRILLO OVERSIZING/EXTENSION SAN MARCOS BOULEVARD WEST OF SDCWA TANGLEWOOD PRESSURE REDUCING STATION REPLACEMENT TRI-AGENCIES WATER TRANSMISSION PIPELINE REPLACEMENT WATER PIPELINE REPLACEMENT - CAMEO ROAD TO ECR WATER SYSTEM INTERTIE CONNECTION SUBTOTAL WATER DISTRIBUTION SYSTEM RECYCLED WATER PROJECTSrCARLSBAD WATER RECYCLING FACILITY SCADA MODIFICATIONS CHESTNUT AVENUE RECYCLED WATER LINE ECR/TAMARACK PUMP STATION REMOVAL "\ I-5 RECYCLED WATER TRANSMISSION LINE PUMP STATION REMOVAL FUND WATER REPL WATER REPL WATER CONN WATER CONN WATER REPL WATER REPL WATER CONN WATER CONN WATER REPL WATER REPL WATER CONN WATER REPL WATER REPL WATER REPL WATER REPL WATER CONN WATER CONN WATER REPL WATER REPL WATER CONN WATER REPL WATER REPL WATER CONN WATER CONN WATER REPL WATER REPL WATER REPL WATER REPL WATER CONN WATER REPL WATER REPL WATER CONN WATER REPL WATER CONN WATER CONN WATER CONN WATER REPL WATER REPL WATER REPL WATER REPL WATER REPL WATER CONN WATER REPL WATER CONN WATER REPL WATER CONN WATER CONN WATER REPL WATER REPL WATER REPL WATER CONN WATER REPL WATER REPL WATER REPL WATER REPL WATER REPL WATER REPL WATER REPL WATER REPL WATER REPL WATER REPL TOTAL BUDGET 475.700 100.000 485.200 760.800 917,200 1,246,700 1,066,000 530,000 155,800 135.000 6.410.100 2.136,600 95.500 744,400 3,225,000 971,275 725.000 774.100 269.975 250.000 161,700 205,900 887,210 776.000 55.000 6.646.908 200.000 1,870.200 771.325 771.325 328.750 14.244.500 4,875.000 767,200 500,000 1,475,000 650,000 1,876,700 197,399 250,000 114,600 997,350 990,350 125.700 489,100 383,600 230,500 230,400 1,102,000 7,169.600 152.700 3,091,241 354.750 5,605.000 120,000 439,000 80.580,358 210.000 436.100 80.019 266.610 442.700 PRIOR EXP/ENC - . - 57.498 - 2,340.294 970.678 725.000 180.602 267.112 - - 44.819 11.739 5,962,344 196,156 135.923 44.322 24,833 3.698 - . - 256.409 37,177 - - 881,247 955,867 1,999 3,052.765 350.851 114,527 . 34.774 16.650,634 - 911 BALANCE YEAR1 YEAR 2 YEARS YEAR 4 YEARS YEAR 6-10 FORWARD 2008-2009 2009-2010 2010-2011 2011-2012 2012-2013 2013-2018 760,800 _ 624.000 38,002 . 884,706 597 593.498 2.863 148,750 161,081 85.471 684,564 3,844 1,734,277 54.425 10,103 3,917 491.302 . . 743,591 160,222 116,103 34,483 150,701 38.476 3.899 160,473 120,000 404.226 8,214,374 133.305 441 .789 BUILDOUT 2018-2023 475.700 100,000 54.100 431,100 917.200 475.800 146.900 1,066,000 530,000 32,500 123,300 135.000 6,410.100 2,136.600 744,400 101.250 161.700 790,000 776,000 55,000 716,900 716,900 300.000 14.244,500 4.380,000 767.200 500.000 1 .475.000 650.000 433,000 443,700 125.000 125,000 114.600 125.700 489.100 383.600 230.500 230.400 1.102.000 7,169.600 330,000 5,000,000 11,639.250 6,809,800 7,928.900 16.262,700 123,300 12,184,200 767.200 210,000 436,100 80.019 133.305 CARLSBAD MUNICIPAL WATER DISTRICT - CAPITAL IMPROVEMENT PROGRAM 2008-09 TO BUILDOUT Exhibit 4-A PROJECT TITLE RECYCLED WATER LINE - BUSINESS PARK AND SEA CLIFF HOA RECYCLED WATER LINE - INNOVATION WAYANO GATEWAY RECYCLED WATER PH II - MAHR RESERVOIR IMPROV. RECYCLED WATER PH II - PUMP STATIONS RECYCLED WATER MASTER PLAN UPDATE SUBTOTAL RECYCLED WATER PROJECTS FUND RECL WATER RECL WATER RECL WATER RECL WATER WATER REPL TOTAL BUDGET 230.000 675.000 2.957,000 4,918.574 250,000 10,466,003 PRIOR EXP/ENC , 2.919.101 4.663.297 . 7,583,309 BALANCE YEAR1 YEAR 2 YEAR 3 YEAR 4 YEARS YEAR 6-10 BUILDOUT FORWARD 2008-2009 2009-2010 2010-2011 2011-2012 2012-2013 2013-2018 2018-2023 37,899 255.277 . 868.270 TOTAL ALL WATER PROJECTS 91,046,361 24,233,943 9,082,644 230,000 675,000 250.000 1.365,000 436,100 80.019 133,305 13,004,250 7,245,900 8,008,919 16,396,005 123,300 12,184,200 767,200 Exhibit 4B PROGRAM: FUND: PROGRAM GROUP: WATER OPERATIONS WATER ENTERPRISE MAINTENANCE & OPERATIONS ACCTNO. 5016310/5026310 PERSONNEL MAINTENANCE & OPERATIONS CAPITAL/DEBT/TRANSFERS GRAND TOTAL FULL TIME POSITIONS HOURLY/FTE POSITIONS 2005-06 ACTUAL $2,947,823 22,483,502 48,597 $25,479,922 35.75 0.00 2006-07 ACTUAL $5,860,507 36,261,846 2,983 $42,125,336 34.75 0.00 2007-08 BUDGET $3,418,275 26,686,428 915,200 $31,019,903 35.50 0.00 2008-09 BUDGET $3,398,739 30,318,960 946,875 $34,664,574 35.15 0.00 PROGRAM GROUP DESCRIPTION: The Carlsbad Municipal Water District, a subsidiary district of the City of Carlsbad, provides potable water service to approximately 85 percent of the City (86,140 customers). The District purchases 100% of its potable water as treated water from the OSan Diego County Water Authority. In FY 2005-06, the District's Phase II Recycled Water Plant began production. In addition, the District continues to buy recycled water from the Leucadia Wastewater Authority and Vallecitos Water District. PROGRAM ACTIVITIES: Water Operations • Provide operation and maintenance of the potable and recycled water reservoirs, pumping, regulating, and disinfection activities; collect water quality samples to ensure compliance with State and Federal regulations. Water Construction/Maintenance • Schedule and perform water system maintenance to ensure a safe and efficient water distribution system. Meter Services • Collect water customer usage data for utility billing to ensure financial viability of the District through timely and accurate revenue collections; provide customer service for water utility customers; and install, replace and maintain water meters. Cross-Connection Control • Implement and enforce cross-connection control of potable and recycled water systems to ensure a safe supply of potable water, and compliance with State and Federal regulations. PERFORMANCE/WORKLOAD MEASURES: Water Cost • Annual water loss not to exceed six percent as set by the California Department of Water Resources. Distribution system losses commonly range between 6% and 15%. The American Water Works Association recommends that the loss after treatment be maintained at 10% or less. Also, the annual cost of service will not exceed $811 per acre-foot of water produced. This benchmark was established based on results of a survey conducted by the American Water Works Association (AWWA) in February 2006. Fiscal Year 2002-03 2003-04 2004-05 2005-06 2006-07 Water Loss 5.2% 6.1% 5.0% 6.0% 2.0% Cost per Acre-Foot $755 $784 $828 $901 $936 H-32 Exhibit 4B PROGRAM: FUND: PROGRAM GROUP: WATER OPERATIONS WATER ENTERPRISE MAINTENANCE & OPERATIONS PAGE TWO ACCTNO. 5016310/5026310 PERFORMANCE/WORKLOAD MEASURES (continued) Potable Water Quality • Ninety-eight percent (98%) of bacteria samples free of coliform bacteria as adopted by the City's Performance Measurement Team. The State requirement is that less than 5 percent of all samples collected during any month are total coliform-positive. Fiscal Year 2002-03 2003-04 2004-05 2005-06 2006-07 No. Samples Collected 1,719 1,752 1,724 1,719 1,716 Percent Bacteria-Free 99.9% 99.9% 99.8% 99.9% 100% Water Service Delivery • Complete 90% of planned maintenance of water distribution valves and fire hydrants each year based on a standard of maintenance. Measures the level of care with which the integrity of the water distribution system is being maintained. Fiscal Year 2002-03 2003-04 2004-05 2005-06 2006-07 % of Planned Valve Maintenance 8% 24% 28% 56% 74% Maintenance Fire Hydrant Maintenance 10% 35% 35% 67% 73% Complete 90% of planned testing and inspections of recycled water use sites. Measures the level at which operations staff is performing required inspections and testing of recycled water use sites. Activity % of Planned Testing/Inspections FY2003 FY2004 FY 2005 FY 2006 FY 2007 Planned Testing Cross Connection Test 4-Yr. Cross Connection Test Planned Inspections Walk-Through Inspections Benchmark 90% 90% Benchmark 90% 100% 100% 96% 71% 200% 81% 86% 125% 91% 100% 200% 90% 100% 235% 75% SIGNIFICANT CHANGES: A total of 0.35 positions have been reallocated to other programs to better reflect each program's workload. H-33 Exhibit 4B PROGRAM: FUND: PROGRAM GROUP: FINANCE GENERAL/ENTERPRISE FINANCE ACCTNO. 0011310 PERSONNEL MAINTENANCE & OPERATIONS CAPITAL OUTLAY GRAND TOTAL FULL TIME POSITIONS HOURLY/FTE POSITIONS GENERAL FUND WATER ENTERPRISE STORM WATER SOLID WASTE SEWER ENTERPRISE TOTAL FUNDING 2005-06 ACTUAL $2,231,484 760,099 0 $2,991,584 28.00 2.50 $2,526,184 325,800 0 0 139,600 $2,991,584 2006-07 ACTUAL $2,547,488 951 ,700 70,705 $3,569,893 28.00 1.00 $3,037,750 376,401 0 0 155,742 $3,569,893 2007-08 BUDGET $2,714,664 941,793 3,000 $3,659,457 28.00 1.00 $3,049,051 396,764 15,260 15,260 183,122 $3,659,457 2008-09 BUDGET $2,794,712 979,726 0 $3,774,438 28.00 1.00 $3,134,377 416,039 16,002 16,002 192,018 $3,774,438 MISSION STATEMENT: Our mission is to ensure that the City of Carlsbad makes sound financial decisions. We take pride in accomplishing this mission by maintaining individual and departmental credibility; working together as a team while respecting each other's differences; and consistently striving to go above and beyond expectations. PROGRAM ACTIVITIES: Long-Ranqe Financial Planning and Budget Management • Prepare ten-year operating forecasts incorporating various "what-if scenarios to facilitate decision-making for the City Council and City departments. • Prepare and monitor annual capital and operating budgets to allocate resources in a cost-effective manner in alignment with the City Council's goals. • Perform bi-annual review of all City fees and annual cost allocation plan. General Accounting and Reporting • Accurately bill, collect, record, and report all City revenues including follow-up of delinquent accounts. • Prepare checks for City employees and for service and commodity suppliers. • Prepare and maintain finance records and documents in conformity with generally accepted accounting principles and applicable legal and contractual provisions. • Prepare Comprehensive Annual Financial Report in conformity with generally accepted accounting principles. • Provide the City Council and City management with timely monthly financial reports. • Perform in-house internal control reviews as needed. Assessment District/Community Facilities District (CFD) Administration • Assist in evaluation and formation of new districts. • Issue bonds for capital projects when required. Pay debt service and provide continuing disclosure information. • Provide administration of CFDs and assessment districts as required by formation documents and State law. Purchasing • Issue and manage formal bid and quotation processes. • Track and renew annual commodity and service contracts and joint agency contracts. • Assist City departments in the creation and administration of contracts. D-3 Exhibit 4B PROGRAM: FUND: PROGRAM GROUP: FINANCE GENERAL/ENTERPRISE FINANCE PAGE TWO ACCTNO. 0011310 PROGRAM ACTIVITIES (continued): Receiving. Messenger, and Mail Services • Act as shipping and receiving for the Faraday Administration Center. • Direct disposal of surplus and lost/unclaimed property. • Collect outgoing City mail and apply postage. • Sort and distribute all incoming City mail. WORKLOAD AND PERFORMANCE INDICATORS: • Average number of days to issue Monthly Financial Status Report • Awards received for CAFR • Awards received for Annual Budget • Number of business licenses processed • Number of account payable checks processed • Number of payroll checks issued • Number of electronic payroll checks issued • Outstanding debt issues administered • Number of purchase orders issued • Dollar amount of purchase orders issued • Pieces of mail processed FY2005 12.8 GFOA GFOA Distinguished Budget Presentation 8,576 15,399 7,831 18,124 $100 million 1,842 $89 million 172,408 FY2006 10.3 GFOA CSMFO Excellence in Operational Budget & Public Communications and Most Distinguished Budget Cover 8,955 15,315 6,473 18,495 $117 million 1,411 $126 million 174,282 FY2007 11.6 GFOA CSMFO Excellence in Operational Budget & Public Communications 8,926 14,538 6,379 20,420 $131 million 1,501 $105 million 164,919 KEY GOALS FOR 2008-09: Financial Health • Continue to monitor the economy and the impact to the 10 Year Financial Forecast to ensure the General Fund remains in balance. • Implement Council Policy 74 - General Fund Reserve Guidelines approved by the City Council April 2008. • Partner with Economic Development Program in developing an economic strategic plan to document the current economic conditions within the City of Carlsbad and develop action plans and opportunities for improved economic sustainability in the future. • Continue to audit internal operations of the City as well as external vendors as appropriate. SIGNIFICANT CHANGES: • None. D-4 Exhibit 4B PROGRAM: FUND: PROGRAM GROUP: ENGINEERING GENERAL/WATER & SEWER ENTERPRISE ENGINEERING SERVICES ACCTNO. 001571X/5XX6310 PERSONNEL MAINTENANCE & OPERATIONS CAPITAL OUTLAY GRAND TOTAL FULL TIME POSITIONS HOURLY/FTE POSITIONS GENERAL FUND WATER ENTERPRISE SANITATION ENTERPRISE TOTAL FUNDING 2005-06 ACTUAL $5,433,968 1,705,035 3,875 $7,142,878 51.20 1.00 6,077,519 639,215 426,144 7,142,878 2006-07 ACTUAL $5,599,801 1 ,850,562 21,103 $7,471,466 54.60 0.50 6,312,869 695,162 463,435 7,471,466 2007-08 BUDGET $6,905,571 3,116,567 50,713 $10,072,851 56.90 1.50 8,827,909 746,965 497,977 10,072,851 2008-09 BUDGET $7,042,843 2,445,898 0 $9,488,741 55.90 2.00 8,650,627 502,868 335,246 9,488,741 WORK PROGRAM: The Engineering Department supports the City Council's goals by providing high-quality service in transportation engineering, water supply, sewer collection, parks, general engineering municipal projects, project management, front counter operations, and construction inspection. The Engineering Department provides services to the public and other City departments through preparation and processing of planning, design, and construction of capital projects and performing traffic and transportation studies, water and sewer modeling and preparation of master plans. The department is also responsible for ensuring that private development and public improvements are properly designed, constructed, and inspected while maintaining public safety and the well being of the community. PROGRAM ACTIVITIES: Administration • Coordinate with all divisions to ensure accomplishment of City Council Goals and Objectives, provide administrative and clerical support to all divisions and the Beach Preservation Committee, ensure that the management reporting system is accurately maintained and generates all reports on schedule, and provide accurate records filed in a standardized and efficient manner. Development Services • Provide comprehensive engineering input for all land use development applications, process engineering development plans and maps in a professional manner, maintain high-quality and meet production goals; ensure engineering questions related to land development are answered in a timely manner. Planning and Programs • Coordinate the preparation of the annual update to the City's Buildout Capital Improvement Program, update existing facility impact fee programs, and assist developers with the formation of finance districts to fund major public improvements. Administer and coordinate engineering activities for beach erosion, lagoon dredging, growth management monitoring, special districts program, and facility mapping. H-5 Exhibit 4B PROGRAM: ENGINEERING PAGE TWO FUND: GENERAL/WATER & SEWER ENTERPRISE PROGRAM GROUP: ENGINEERING SERVICES ACCTNO. 001571X/5XX6310 PROGRAM ACTIVITIES (continued): Design • Design citywide capital improvement projects including domestic and recycled water systems, sewer systems, civic and municipal building and park improvements, street improvements, perform markouts, prepare master plans, conduct special studies and investigations, and assist with water resource development. For each project a variety of services are provided including planning, preparation of final plans and specifications, water quality investigations, technical engineering assistance, mapping, facility location and administration, and project management. Transportation • Review, investigate, analyze, and resolve a wide variety of traffic and transportation issues, concerns, complaints, and inquiries. Maintain records of collision reports, speed surveys, and traffic counts. Assist in maintaining optimum traffic signal operations and efficient traffic flow. Provide resource assistance to other City Departments on a wide variety of traffic issues. Construction Management and Inspection • Perform construction management and inspection for capital improvement projects and private developments. Ensure construction of high-quality public improvements. Minimize inconvenience to the public while ensuring safe work sites. KEY ACHIEVEMENTS FOR 2007- 08: Design Completed 2008 Slurry Seal Overlay and Pavement Overlay Cynthia Lane Storm Drain 2008 Concrete Replacement Beech Street Sewer Replacement La Golandrina Sewer Extension La Costa Meadows Sewer Extension Vista/Carlsbad Interceptor Sewer Manhole Replacement North Agua Hedionda Interceptor Sewer - West Segment Carlsbad Village Drive and Avenida De Anita Intersection Improvements El Camino Real Transmission Main from Faraday to Cougar Romeria Channel Improvements El Camino Real Widening at Cougar Drive Hosp Grove Park Storm Channel Improvements Rancho Carrillo Water Pipeline Extension Calle Gavanzo French Drains 2008 Corregated Metal Pipe Replacements 2008 N.W. Quadrant Sewer Rehabilitation El Camino Real Widening at Cougar Drive Upper and Lower Faraday Lift Station Removal Construction Completed 2007 Concrete Replacement 2007 Pavement Overlay 2007 Slurry Seal Poinsettia Lift Station Improvements Mira Monte Drive Access Control Gate 2008 N.W. Quadrant Storm Drain Replacement Pajama Drive Water Facility Removal Ridgecrest Drainage Improvements N.E. Quadrant Manhole Rehabilitation Aviara Park Water Service Relocation Carlsbad Municipal Golf Course H-6 Exhibit 4B PROGRAM: ENGINEERING PAGE THREE FUND: GENERAL/WATER & SEWER ENTERPRISE PROGRAM GROUP: ENGINEERING SERVICES ACCT NO. 001571X/5XX6310 KEY ACHIEVEMENTS FOR 2007-08 (continued): Miscellaneous Water Reservoir Fencing Faraday Avenue From Orion to Melrose El Fuerte from Palomar Airport Road to Faraday City Library Learning Center Carlsbad Bridge Retrofit Maerkle Dam Cover Rainwater System Replacement Olivenhain/Rancho Santa Fe Road Improvements Senior Center Remodel El Camino Water Line Projects Point "D" Piping Removal @ PAR & ECR Encina Basin Water Reclamation Program Highland Drive Storm Drain Mahr Reservoir Onsite Wetland Mitigation Restoration Pine Avenue Park RSF Rd Road Fill Failure at Agua Dulce Court Cannon Road and College Boulevard Street Widening Improvements Tamarack Sinkhole Repair Cameo Sinkhole Repair Traffic Signals Constructed at 40 Intersections throughout the City Other Projects Completed Draft Pedestrian Master Plan Updated Traffic Impact Fee Program Implemented the New Regional Transportation Congestion Improvement Program Fee Acquired City Council Certification of the Drainage Master Plan for Agua Hedionda Channel Dredge EIR Secured Memorandum of Understanding with SANDAG for the Beach Sand Project Completed Bicycle Master Plan Amended Cannon College Assessment District to Include an 84 Inch Storm Drain Updated Existing and Established New Storm Water Inspection Fees Updated Stormwater Protection Construction Standards Completed Code Revisions to Accommodate New Storm Water Requirements Developed Bridge Preventative Maintenance Program Completed Review and Issued Permits for Grading on the N.E Quadrant Park Site Completed Review for Robertson Ranch and Issued Permits to Begin Construction Completed the 84 Inch Cannon Road Storm Drain Completed Review and Issued Permits for Bressi Ranch Village Center KEY GOALS FOR 2008-09: Transportation/Circulation • Continue to work toward the environmental processing, design, and/or construction of major road projects including: College Boulevard widening • Update traffic signal coordination timing on El Camino Real and on Palomar Airport Road. Design Complete Operation and Maintenance Manual for Mahr Reservoir Obtain Agreement with Vallecitos Water District to serve recycled water in their service area. Obtain Construction Bids for Alga Norte Community Park. Complete Design of First Responders Training Facility. Complete Preliminary Design of the Public Works Operations Center. Obtain Bids for Buena Vista Lagoon Sewer Force main. Complete Preliminary Design for Tri-Agency Pipeline. H-7 Exhibit 4B PROGRAM: ENGINEERING PAGE FOUR FUND: GENERAL/WATER & SEWER ENTERPRISE PROGRAM GROUP: ENGINEERING SERVICES ACCTNO. ooi57ix/sxx63io KEY GOALS FOR 2008-09 (continued): Planning and Programs Complete Pedestrian Master Plan Prepare a Bid for Agua Hedionda Channel Dredge Project Support Effort to Secure Financing for College Boulevard, Reach A Support Efforts to Secure Financing for Poinsettia Lane, Reach E Create an Enterprise Geo-Database Environmental Management • Update Storm Drain Master Plans per the growth management data and National Pollutant Discharge Elimination System (NPDES) requirements and determine if the current planned facilities and Planned Local Drainage Area fees are adequate for the existing rate of growth and future buildout. Construction Management & Inspection • Update Construction Management & Inspection Division Inspection Manual. • Workload and business processes of the Construction Management & Inspection Division are reviewed and updated as necessary to ensure efficiency, reliability and accountability in the close out process for development projects including development improvement agreements, subdivision improvement agreements and grading agreements and their associated securities, including bonds, letters of credit, and cash deposits. SIGNIFICANT CHANGES: • A Traffic Signal Systems Engineer was hired in January 2008 to develop a comprehensive transportation network optimization of traffic signals to ensure cost-effective and efficient vehicle flow on arterial roadways. • A total of 1.0 position has been reallocated to the Engineering Storm Water Program to assist with the inspection requirements of the new Storm Water Program. • A total of 0.50 hourly positions have been added to meet the increased workload requirements of the program. H-8