Loading...
HomeMy WebLinkAbout2009-08-18; Municipal Water District; Resolution 1372EXHIBIT 4 1 RESOLUTION NO. 1372 2 A RESOLUTION OF THE BOARD OF DIRECTORS OF CARLSBAD MUNICIPAL WATER DISTRICT (CMWD), 3 APPROVING THE DELIVERY POINTS AND DELIVERY REGIME FOR THE DESALINATED WATER SUPPLY. 4 WHEREAS, on September 28, 2004, by Resolution No. 1226, the Board approved a 5 Water Purchase Agreement (WPA) between the Carlsbad Municipal Water District (CMWD) and 6 Poseidon for the purchase of up to 25 MGD of desalinated water from the proposed seawater 7 desalination facility; and 8 WHEREAS, Poseidon will design and construct the Appurtenant Facilities which include 9 all conveyance facilities, pipeline, pumps, pumping stations and any other infrastructure 10 necessary to deliver the product water to interconnection points on their 54-inch diameter transmission main; and12 WHEREAS, staff recommends that the Board not elect to own the Appurtenant Facilities \ O whereby, in accordance with Section 9.2 of the WPA, CMWD and Poseidon shall determine14 mutually-acceptable interconnection points for the interconnection of the Appurtenant Facilities I O with the CMWD distribution system; and16 WHEREAS, it is desired to deliver desalinated water to CMWD's four existing connections referred to as CWA No. 1 , CWA No. 2, TAP No. 3, and TAP No. 4 to the San Diego County18 Water Authority's Second Aqueduct; andi y _- WHEREAS, staff developed three options for the Delivery Points and recommends Option 21 1 which delivers desalinated water to TAP No. 3 and No. 4 through a 36" transmission main 22 proceeding north in Melrose Drive from Faraday Avenue, to CWA No. 1 through a 30" 23 transmission main proceeding south in Business Park Drive from Lionshead Avenue, and to CWA 24 No. 2 through a 24" transmission main proceeding south in Melrose Drive from Lionshead 25 Avenue; and 26 WHEREAS, to enable connections to the Delivery Points and to the Second Aqueduct in 27 the City of San Marcos, pipeline alignments and details not considered in certified EIR 03-05 are 28 1 necessary; accordingly, additional pipeline alignments and details, including an increase in the 2 diameter of the Appurtenant Facility desalinated water transmission main from 48" to 54", have 3 been proposed and are under review; and 4 WHEREAS, since pipeline alignments to serve the Delivery Points and Second Aqueduct 5 are still subject to review and environmental analysis, the Board of Director's accepting of Option 6 1 establishes its objective to provide all of the CMWD's service area with desalinated water but 7 does not approve the transmission main diameter increase or the alignments or details of these 8 pipelines; and 9 WHEREAS, Section 9.3 of the WPA stipulates that CMWD and Poseidon shall mutually 10 select a delivery regime for the delivery of Product Water from the seawater desalination facility to 11 CMWD; and 12 WHEREAS, staff recommends obtaining up to 20 percent of the CMWD water supply from 13 the imported water source through SDCWA and up to 80 percent of the CMWD water supply from 14 the desalinated water source through Poseidon; and 15 WHEREAS, the desalinated water supply would meet CMWD's water demand occurring 1^ at the beginning of operation of the desalination facility and Appurtenant Facilities and gradually 1' expand to CMWD's build-out water demand as projected in the 2003 Water Master Plan or 18 subsequent update. 1Q WHEREAS, since the action will not have any physical impact on the environment, the 20 consideration of the action is covered by the general rule that CEQA applies only to projects that 21 have the potential for causing a significant effect on the environment. In this case, it can be seen 22 with certainty that there is no possibility that the action may have a significant effect on the 93 environment and it is not subject to CEQA pursuant to CEQA regulation 15061 (b)(3). 24 NOW, THEREFORE, BE IT RESOLVED by the Carlsbad Municipal Water District Board 25 of the City of Carlsbad, California, as follows: 26 1. That the above recitations are true and correct. 27 2. That the Executive Manager is authorized to submit a letter to Poseidon stipulating 28 the Delivery Points and Delivery Regime as noted above. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 PASSED, APPROVED AND ADOPTED at a Joint Special Meeting of the Carlsbad Municipal Water District and the City Council of the City of Carlsbad on the 18th day of August 2009, by the following vote, to wit: AYES: NOES: ABSENT: Board Members Lewis, Kulchin, Hall, Packard, Blackburn None None . LEWISPRESIDENT ATTEST: Jfxl LORRAINE M. MX3D/, SECRETARY Karen R. Kundtz, AssistaniSecretary (SEAL) :c/J =