Loading...
HomeMy WebLinkAbout2010-12-14; Municipal Water District; Resolution 14091 RESOLUTION NO. 1409 2 A RESOLUTION OF THE BOARD OF DIRECTORS OF 15 16 17 18 19 CARLSBAD MUNICIPAL WATER DISTRICT, CALIFORNIA, TO APPROVE AND AUTHORIZE SUBMITTAL OF APPLICATION FOR PROPOSITION 84 GRANT FOR THE PHASE III 3 4n RECYCLED WATER PROJECT NO. 5022 5" 6 WHEREAS, On July 7, 2009, through adoption of Resolution No. 1363, the Board 7 approved a professional engineering services agreement with Carollo Engineers for preparation of 8 recycled water master plan update, and Phase III Recycled Water Feasibility Study reports, Project No. 5022; and WHEREAS, in June 2010, the District entered into an agreement with ten other water and wastewater agencies to retain the engineering consultant, RMC, to develop a comprehensive report to maximize the use of recycled water referred to as the North San Diego County Recycled 12 Water Project II; and 13 WHEREAS, the District's Phase III Recycled Water Project No. 5022 is proposed to be 14 included in the San Diego North Regional Recycled Water Project (#212) as part of the upcoming California Proposition 84-Round 1 implementation grant package; and WHEREAS, up to a 75 percent total cost share grant is available from the State of California Proposition 84 program for planning, engineering, environmental, and design efforts for the Phase III Recycled Water Project No. 5022; and WHEREAS, the Board has approved funding in the amount of $672,468 for the recycled water master plan and Phase III Feasibility Study reports, Project No. 5022, which includes a $170,500 Local Investigations and Studies Assistance grant, and is available to provide for a matching total cost share for the reports; and 22 NOW, THEREFORE, BE IT RESOLVED by the Board of the Carlsbad Municipal Water 23 District, California, as follows: 24 1. That the above recitations are true and correct. 25 2. That the Director of Utilities is hereby authorized to apply for State of California Proposition 84 grant for planning, engineering, environmental, and design efforts 27 for the Phase III Recycled Water Project, Project No. 5022. 28 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 PASSED, APPROVED AND ADOPTED at a Special Meeting of the Board of Directors of the Carlsbad Municipal Water District of the City of Carlsbad on the 14th day of December, 2010, by the following vote to wit: AYES: Board Members Hall, Kulchin, Blackburn, Douglas and Packard. NOES: None. ABSENT: None. MATT HALL, President ATTEST: LORRAINE M. WOOD, Secretary (SEAL)